Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Financial Information Act Return for the Year Ended March 31, 2019
Published in accordance with the Financial Information Act,
Revised Statutes of British Columbia 1996, Chapter 140, as amended.
FINANCIAL INFORMATION ACT RETURN FOR THE YEAR ENDED MARCH 31, 2019
TABLE OF CONTENTS
Statement of Financial Information Approval 3
Audited Consolidated Financial Statements Fiscal 2019 4
British Columbia Hydro and Power Authority and its subsidiary Powerex Corp. Schedule of Remuneration and Expenses – Board of Directors 70
British Columbia Hydro and Power Authority Schedule of Debts 72Schedule of Guarantee and Indemnity Agreements 73Schedule of Remuneration and Expenses 74Schedule of Payments to Suppliers for Goods and Services 148Statement of Grants and Contributions 184
Powerex Corp. Schedule of Remuneration and Expenses 185Schedule of Payments to Suppliers for Goods and Services 189
Powertech Labs Inc. Schedule of Remuneration and Expenses 193Schedule of Payments to Suppliers for Goods and Services 197
2
BRITISH COLUMBA HYDRO AND POWER AUTHORITY
STATEMENT OF FINANCIAL INFORMATION APPROVAL
The undersigned represents the Board of Directors of the British Columbia Hydro and Power Authority and approves the information contained in the Statement and Schedules of Financial Information prepared in accordance with the Financial Information Act.
Kenneth G. Peterson
Executive Chair of the Board
3
British Columbia Hydro and Power Authority
MANAGEMENT REPORT
The consolidated financial statements of British Columbia Hydro and Power Authority (BC Hydro) are the responsibility of management and have been prepared in accordance with International Financial Reporting Standards. The preparation of financial statements necessarily involves the use of estimates which have been made using careful judgment. In management’s opinion, the consolidated financial statements have been properly prepared within the framework of the accounting policies summarized in the consolidated financial statements and incorporate, within reasonable limits of materiality, all information available at June 12, 2019. The consolidated financial statements have also been reviewed by the Audit & Finance Committee and approved by the Board of Directors. Financial information presented elsewhere in this Annual Service Plan Report is consistent with that in the consolidated financial statements.
Management maintains systems of internal controls designed to provide reasonable assurance that assets are safeguarded and that reliable financial information is available on a timely basis. These systems include formal written policies and procedures, careful selection and training of qualified personnel and appropriate delegation of authority and segregation of responsibilities within the organization. An internal audit function independently evaluates the effectiveness of these internal controls on an ongoing basis and reports its findings to management and the Audit & Finance Committee.
The consolidated financial statements have been examined by independent external auditors. The external auditors’ responsibility is to express their opinion on whether the consolidated financial statements, in all material respects, fairly present BC Hydro’s financial position, comprehensive income and cash flows in accordance with International Financial Reporting Standards. The Independent Auditors’ Report, which follows, outlines the scope of their examination and their opinion.
The Board of Directors, through the Audit & Finance Committee, is responsible for ensuring that management fulfills its responsibility for financial reporting and internal controls. The Audit & Finance Committee, comprised of directors who are not employees, meets regularly with the external auditors, the internal auditors and management to satisfy itself that each group has properly discharged its responsibility to review the financial statements before recommending approval by the Board of Directors. The Audit & Finance Committee also recommends the appointment of external auditors to the Board of Directors. The internal and external auditors have full and open access to the Audit & Finance Committee, with and without the presence of management.
Chris O’Riley David Wong President and Chief Operating Officer Executive Vice President, Finance, Technology,
Supply Chain and Chief Financial Officer
Vancouver, Canada June 12, 2019
4
British Columbia Hydro and Power Authority
KPMG LLP PO Box 10426 777 Dunsmuir Street Vancouver BC V7Y 1K3 Canada Telephone (604) 691-3000 Fax (604) 691-3031
INDEPENDENT AUDITORS’ REPORT
To the Minister of Energy, Mines and Petroleum Resources, Province of British Columbia and the Board of Directors of British Columbia Hydro and Power Authority:
Opinion
We have audited the consolidated financial statements of British Columbia Hydro and Power Authority (the “Entity”), which comprise:
— the consolidated statements of financial position as at March 31, 2019, March 31, 2018 and April 1, 2017
— the consolidated statements of comprehensive income (loss) for the years ended March 31, 2019 and March 31, 2018
— the consolidated statements of changes in equity for the years ended March 31, 2019 and March 31, 2018
— the consolidated statements of cash flows for the years ended March 31, 2019 and March 31, 2018
— and notes to the consolidated financial statements, including a summary of significant accounting policies
(Hereinafter referred to as the “financial statements”).
In our opinion, the accompanying financial statements present fairly, in all material respects, the consolidated financial position of the Entity as at March 31, 2019, March 31, 2018 and April 1, 2017 and its consolidated financial performance and its consolidated cash flows for the years ended March 31, 2019 and March 31, 2018 in accordance with International Financial Reporting Standards (“IFRS”).
Basis for Opinion
We conducted our audit in accordance with Canadian generally accepted auditing standards. Our responsibilities under those standards are further described in the “Auditors’ Responsibilities for the Audit of the Financial Statements” section of our auditors’ report.
We are independent of the Entity in accordance with the ethical requirements that are relevant to our audit of the financial statements in Canada and we have fulfilled our other ethical responsibilities in accordance with these requirements.
We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion.
5
British Columbia Hydro and Power Authority
Other Information
Management is responsible for the other information. Other information comprises:
— the information, other than the financial statements and the auditors’ report thereon, included in the Entity’s Management Discussion & Analysis.
Our opinion on the financial statements does not cover the other information and we do not and will not express any form of assurance conclusion thereon.
In connection with our audit of the financial statements, our responsibility is to read the other information identified above and, in doing so, consider whether the other information is materially inconsistent with the financial statements or our knowledge obtained in the audit and remain alert for indications that the other information appears to be materially misstated.
We obtained the information, other than the financial statements and the auditors’ report thereon, included in Entity’s Management Discussion & Analysis as at the date of this auditors’ report. If, based on the work we have performed on this other information, we conclude that there is a material misstatement of this other information, we are required to report that fact in the auditors’ report.
We have nothing to report in this regard.
Responsibilities of Management and Those Charged with Governance for the
Financial Statements
Management is responsible for the preparation and fair presentation of the financial statements in accordance with IFRS, and for such internal control as management determines is necessary to enable the preparation of financial statements that are free from material misstatement, whether due to fraud or error.
In preparing the financial statements, management is responsible for assessing the Entity’s ability to continue as a going concern, disclosing as applicable, matters related to going concern and using the going concern basis of accounting unless management either intends to liquidate the Entity or to cease operations, or has no realistic alternative but to do so.
Those charged with governance are responsible for overseeing the Entity’s financial reporting process.
Auditors’ Responsibilities for the Audit of the Financial Statements
Our objectives are to obtain reasonable assurance about whether the financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditors’ report that includes our opinion.
Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with Canadian generally accepted auditing standards will always detect a material misstatement when it exists.
Misstatements can arise from fraud or error and are considered material if, individually or in the aggregate, they could reasonably be expected to influence the economic decisions of users taken on the basis of the financial statements.
As part of an audit in accordance with Canadian generally accepted auditing standards, we exercise professional judgment and maintain professional skepticism throughout the audit.
6
British Columbia Hydro and Power Authority
We also:
— Identify and assess the risks of material misstatement of the financial statements, whether due to fraud or error, design and perform audit procedures responsive to those risks, and obtain audit evidence that is sufficient and appropriate to provide a basis for our opinion.
The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control.
— Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Entity's internal control.
— Evaluate the appropriateness of accounting policies used and the reasonableness of accounting estimates and related disclosures made by management.
— Conclude on the appropriateness of management's use of the going concern basis of accounting and, based on the audit evidence obtained, whether a material uncertainty exists related to events or conditions that may cast significant doubt on the Entity's ability to continue as a going concern. If we conclude that a material uncertainty exists, we are required to draw attention in our auditors’ report to the related disclosures in the financial statements or, if such disclosures are inadequate, to modify our opinion. Our conclusions are based on the audit evidence obtained up to the date of our auditors’ report. However, future events or conditions may cause the Entity to cease to continue as a going concern.
— Evaluate the overall presentation, structure and content of the financial statements, including the disclosures, and whether the financial statements represent the underlying transactions and events in a manner that achieves fair presentation.
— Communicate with those charged with governance regarding, among other matters, the planned scope and timing of the audit and significant audit findings, including any significant deficiencies in internal control that we identify during our audit.
— Obtain sufficient appropriate audit evidence regarding the financial information of the entities or business activities within the group Entity to express an opinion on the financial statements. We are responsible for the direction, supervision and performance of the group audit. We remain solely responsible for our audit opinion.
Chartered Professional Accountants
Vancouver, Canada June 12, 2019
7
British Columbia Hydro and Power Authority
AUDITED FINANCIAL STATEMENTS
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME (LOSS)
See accompanying Notes to the Consolidated Financial Statements.
2019 2018for the years ended March 31 (in millions) (Note 24)Revenues (Note 4)Domestic 5,432$ 5,223$ Trade 1,141 731
6,573 5,954 ExpensesOperating expenses (Note 5) 4,696 4,497 Finance charges (Note 6) 1,186 824 Net Income Before Movement in Regulatory Balances 691 633 Net movement in regulatory balances (Note 14) (1,119) 51 Net Income (Loss) (428) 684
OTHER COMPREHENSIVE INCOME (LOSS)
Items That Will Be Reclassified to Net Income (Loss)Effective portion of changes in fair value of derivatives designated as cash flow hedges (Note 20) (24) 57 Reclassification to income (loss) of derivatives designated as cash flow hedges (Note 20) 8 (30) Foreign currency translation gains (losses) 3 (5) Items That Will Not Be Reclassified to Net Income (Loss)Actuarial gain (loss) (173) 193 Other Comprehensive Income (Loss) before movement in regulatory balances (186) 215 Net movements in regulatory balances (Note 14) 173 (193) Other Comprehensive Income (Loss) (13) 22 Total Comprehensive Income (Loss) (441)$ 706$
8
British Columbia Hydro and Power Authority
CONSOLIDATED STATEMENTS OF FINANCIAL POSITION
Commitments and Contingencies (Notes 11 and 22)
See accompanying Notes to the Consolidated Financial Statements.
Approved on behalf of the Board:
Ken Peterson Len Boggio, FCPA, FCA, ICD.D Executive Chair Chair, Audit & Finance Committee
As at As at As at March 31 March 31 April 1
2019 2018 2017(in millions) (Note 24) (Note 24)ASSETS
Current AssetsCash and cash equivalents (Note 8) 84$ 42$ 49$ Restricted cash (Note 8) 109 77 28 Accounts receivable and accrued revenue (Note 9) 912 728 761 Inventories (Note 10) 168 144 185 Prepaid expenses 179 167 162 Current portion of derivative financial instrument assets (Note 20) 79 174 144
1,531 1,332 1,329
Non-Current Assets Property, plant and equipment (Note 11) 27,952 25,079 22,994 Intangible assets (Note 12) 602 591 601 Derivative financial instrument assets (Note 20) 49 156 215 Other non-current assets (Note 13) 596 632 560
29,199 26,458 24,370 Total Assets 30,730 27,790 25,699 Regulatory Balances (Note 14) 4,942 5,891 6,127 Total Assets and Regulatory Balances 35,672$ 33,681$ 31,826$
LIABILITIES AND EQUITY
Current LiabilitiesAccounts payable and accrued liabilities (Note 15) 1,478$ 1,603$ 1,172$ Current portion of long-term debt (Note 16) 3,121 3,344 2,878 Current portion of unearned revenues and contributions in aid (Note 17) 87 85 82 Current portion of derivative financial instrument liabilities (Note 20) 89 112 60
4,775 5,144 4,192 Non-Current LiabilitiesLong-term debt (Note 16) 19,261 17,020 17,146 Derivative financial instrument liabilities (Note 20) 296 66 41 Unearned revenues and contributions in aid (Note 17) 1,905 1,758 1,620 Post-employment benefits (Note 19) 1,752 1,474 1,566 Other non-current liabilities (Note 21) 1,988 2,021 1,516
25,202 22,339 21,889 Total Liabilities 29,977 27,483 26,081
Regulatory Balances (Note 14) 748 751 845
Shareholder's EquityContributed surplus 60 60 60 Retained earnings 4,934 5,421 4,896 Accumulated other comprehensive loss (47) (34) (56)
4,947 5,447 4,900 Total Liabilities, Shareholder's Equity and Regulatory Balances 35,672$ 33,681$ 31,826$
9
British Columbia Hydro and Power Authority
CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
See accompanying Notes to the Consolidated Financial Statements.
(in millions)Balance as at April 1, 2017 -$ (56)$ (56)$ 60$ 4,896$ 4,900$ Payment to the Province (Note 18) - - - - (159) (159) Comprehensive Income (Loss) (5) 27 22 - 684 706 Balance as at March 31, 2018 (5) (29) (34) 60 5,421 5,447 Payment to the Province (Note 18) - - - - (59) (59) Comprehensive Income (Loss) 3 (16) (13) - (428) (441) Balance as at March 31, 2019 (2)$ (45)$ (47)$ 60$ 4,934$ 4,947$
Contributed Surplus
Retained Earnings Total
CumulativeTranslation
Reserve
Unrealized Income (Loss) on Cash Flow
Hedges
Total Accumulated
Other Comprehensive Income (Loss)
10
British Columbia Hydro and Power Authority
CONSOLIDATED STATEMENTS OF CASH FLOWS
See Note 16 for Cash flow supplement- changes in liabilities arising from financing activities
See accompanying Notes to the Consolidated Financial Statements.
for the years ended March 31 (in millions) 2019 2018Operating ActivitiesNet income (Loss) (428)$ 684$ Regulatory account transfers (Note 14) 504 (295) Adjustments for non-cash items:
Amortization of regulatory accounts (Note 14) 442 437 Amortization and depreciation expense (Note 7) 880 817 Unrealized losses on derivative financial instruments 286 80 Post-employment benefits expense 106 105 Interest accrual 854 795
Other items (22) 108 2,622 2,731
Changes in: Restricted cash (32) (48) Accounts receivable and accrued revenue (131) 94 Prepaid expenses (30) (29) Inventories (23) 40 Accounts payable, accrued liabilities and other non-current liabilities 138 (307) Unearned revenue and contributions in aid 160 142 Other non-current assets 18 (103)
100 (211) Interest paid (850) (795) Cash provided by operating activities 1,872 1,725
Investing ActivitiesProperty, plant and equipment and intangible asset expenditures (3,766) (2,123) Cash used in investing activities (3,766) (2,123)
Financing ActivitiesLong-term debt issued (Note 16) 2,418 1,156 Long-term debt retired (Note 16) (1,287) (40) Receipt of revolving borrowings 8,865 7,749 Repayment of revolving borrowings (7,981) (8,536) Payment to the Province (Note 18) (159) - Other items 80 62 Cash provided by financing activities 1,936 391 Increase (decrease) in cash and cash equivalents 42 (7) Cash and cash equivalents, beginning of year 42 49 Cash and cash equivalents, end of year 84$ 42$
11
British Columbia Hydro and Power Authority
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
NOTE 1: REPORTING ENTITY
British Columbia Hydro and Power Authority (BC Hydro) was established in 1962 as a Crown Corporation of the Province of British Columbia (the Province) by enactment of the Hydro and Power Authority Act. As directed by the Hydro and Power Authority Act, BC Hydro’s mandate is to generate, manufacture, conserve and supply power. BC Hydro owns and operates electric generation, transmission and distribution facilities in the province of British Columbia.
The consolidated financial statements of BC Hydro include the accounts of BC Hydro and its principal wholly owned operating subsidiaries Powerex Corp. (Powerex), Powertech Labs Inc. (Powertech), and Columbia Hydro Constructors Ltd. (Columbia), (collectively with BC Hydro, the Company). All intercompany transactions and balances are eliminated on consolidation. On July 26, 2018, the Company completed the purchase of the remaining two-thirds interest of Waneta Dam and Generating Facility (Waneta) (Note 11). Prior to this transaction, the Company accounted for its one-third interest in Waneta as a joint operation.
NOTE 2: BASIS OF PRESENTATION
(a) Basis of Accounting
These consolidated financial statements have been prepared in accordance with International Financial Reporting Standards (IFRS) as issued by the International Accounting Standards Board (IASB). The significant accounting policies are set out in Note 3. These are the Company’s first consolidated financial statements prepared in accordance with IFRS. In prior years, the Company prepared its consolidated financial statements in accordance with the accounting principles of IFRS, combined with regulatory accounting in accordance with Financial Accounting Standards Board Accounting Standards Codification 980 (ASC 980), Regulated Operations, except as specified in Treasury Board Regulation B.C. Reg 146/2011 section 5(3) (collectively the Prescribed Standards). The comparative figures for the prior year were restated on the adoption of IFRS. An explanation of how the transition to IFRS has affected the reported financial position, financial performance and cash flows of the Company is provided in Note 24.
Certain amounts in the prior year’s comparative figures have been reclassified to conform to the current year’s presentation.
These consolidated financial statements were approved by the Board of Directors on June 12, 2019.
(b) Basis of Measurement
The consolidated financial statements have been prepared on the historical cost basis except for natural gas inventories in Note 3(j), financial instruments that are accounted for at fair value through profit and loss according to the financial instrument categories as defined in Note 3(k) and the post-employment benefits obligation as described in Note 3(o).
12
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
(c) Functional and Presentation Currency
The functional currency of BC Hydro and all of its subsidiaries, except for Powerex, is the Canadian dollar. Powerex’s functional currency is the U.S. dollar. These consolidated financial statements are presented in Canadian dollars and financial information has been rounded to the nearest million.
(d) Key Assumptions and Significant Judgments
The preparation of financial statements in conformity with IFRS requires management to make judgments, estimates and assumptions in respect of the application of accounting policies and the reported amounts of assets, liabilities, income and expenses. Actual results may differ from those judgments, estimates, and assumptions. Estimates and underlying assumptions are reviewed on an ongoing basis. Revisions to estimates are recognized in the period in which the estimates are revised and in any future periods affected. Information about significant areas of judgment, estimates and assumptions in applying accounting policies that have the most significant effect on the amounts recognized in the financial statements is as follows: (i) Retirement Benefit Obligation
BC Hydro operates a defined benefit statutory pension plan for its employees which is accounted for in accordance with IAS 19, Employee Benefits. Actuarial valuations are based on key assumptions which include employee turnover, mortality rates, discount rates, earnings increases and expected rate of return on retirement plan assets. Judgment is exercised in determining these assumptions. The assumptions adopted are based on prior experience, market conditions and advice of plan actuaries. Future results are impacted by these assumptions including the accrued benefit obligation and current service cost. See Note 19 for significant benefit plan assumptions.
(ii) Provisions and Contingencies
Management is required to make judgments to assess if the criteria for recognition of provisions and contingencies are met, in accordance with IAS 37, Provisions, Contingent Liabilities and Contingent Assets. IAS 37 requires that a provision be recognized where there is a present obligation as a result of a past event, it is probable that transfer of economic benefits will be required to settle the obligation and a reliable estimate can be made of the amount of the obligation. Key judgments are whether a present obligation exists and the probability of an outflow being required to settle that obligation. Key assumptions in measuring recorded provisions include the timing and amount of future payments and the discount rate applied in valuing the provision. The Company is currently defending certain lawsuits where management must make judgments, estimates and assumptions about the final outcome, timing of trial activities and future costs as at the period end date. Management has obtained the advice of its external counsel in determining the likely outcome and estimating the expected costs associated with these lawsuits; however, the ultimate outcome or settlement costs may differ from management’s estimates.
(iii) Financial Instruments
The Company enters into financial instrument arrangements which require management to make judgments to determine if such arrangements are derivative instruments in their entirety or contain
13
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
embedded derivatives, including whether those embedded derivatives meet the criteria to be separated from their host contract, in accordance with IFRS 9, Financial Instruments. Key judgments are whether certain non-financial items are readily convertible to cash, whether similar contracts are routinely settled net in cash or delivery of the underlying commodity taken and then resold within a short period, whether the value of a contract changes in response to a change in an underlying rate, price, index or other variable, and for embedded derivatives, whether the economic risks and characteristics are not closely related to the host contract and a separate instrument with the same terms would meet the definition of a derivative on a standalone basis. Valuation techniques are used in measuring the fair value of financial instruments when active market quotes are not available. Valuation of the Company’s financial instruments is based in part on forward prices which are volatile and therefore the actual realized value may differ from management’s estimates.
(iv) Leases
The Company enters into long-term energy purchase agreements that may be considered to be, or contain a lease. In making this determination, judgment is required to determine whether the fulfillment of an arrangement is dependent on the use of a specific asset, and whether the arrangement conveys a right to use the asset. For those arrangements considered to be leases, or which contain an embedded lease, further judgment is required to determine whether to account for the agreement as either a finance or operating lease by assessing whether substantially all of the significant risks and rewards of ownership are transferred to the Company or remain with the counterparty to the agreement. The measurement of finance leases requires estimations of the amounts and timing of future cash flows and the determination of an appropriate discount rate.
(v) Rate Regulation
When a regulatory account has been or will be applied for, and, in management’s estimate, acceptance of deferral treatment by the British Columbia Utilities Commission (BCUC) and recovery in future rates is considered probable, BC Hydro defers such costs in advance of a final decision of the BCUC. In assessing whether deferral approval and collection in future rates is probable management considers factors such as past precedents, magnitude of the costs, impact on rates, legal enquiries, regulatory framework for cost recovery, and political environment. If the BCUC subsequently denies the application for regulatory treatment, the deferred amount is recognized immediately in comprehensive income.
(vi) Revenues
For contributions in aid of construction revenue, management must make judgments when determining the period over which revenue is recognized when the associated contracts do not specify a finite period over which service is provided. For revenue contracts where a significant financing component is present, management must make judgments when determining the appropriate discount rate to use.
14
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
NOTE 3: SIGNIFICANT ACCOUNTING POLICIES (a) Rate Regulation
BC Hydro is regulated by the BCUC and both entities are subject to directives and directions issued by the Province. BC Hydro’s rates are set on a cost of service basis. Calculation of its revenue requirements and rates charged to customers are established through applications filed with and approved by the BCUC.
IFRS 14 Regulatory Deferral Accounts (IFRS 14) is restricted to first-time adopters of IFRS and remains in force until either repealed or replaced by permanent guidance on rate-regulated accounting from the IASB. IFRS 14 provides first-time adopters of IFRS an option to continue recognizing regulatory balances in accordance with the basis of accounting the first-time adopter used immediately before adopting IFRS, which in the case of the Company was the Prescribed Standards. BC Hydro has determined that certain debit and credit balances arising from rate-regulated activities qualify for the continued application of regulatory accounting treatment in accordance with IFRS 14. Under rate-regulated accounting, the timing and recognition of certain expenses and revenues may differ from those otherwise expected under other IFRS in order to appropriately reflect the economic impact of regulatory decisions regarding the Company’s regulated revenues and expenditures. These amounts arising from timing differences are recorded as regulatory debit and credit balances on the Company’s consolidated statements of financial position, and represent existing rights and obligations regarding cash flows expected to be recovered from or refunded to customers, based on decisions and approvals by the BCUC. In the absence of rate-regulation, these amounts would be included in comprehensive income. BC Hydro capitalizes as a regulatory asset all or part of an incurred cost that would otherwise be charged to expense or other comprehensive income if it is probable that future revenue in an amount at least equal to the capitalized cost will result from inclusion of that cost in allowable costs for rate-making purposes and the future rates and revenue approved by the BCUC will permit recovery of that incurred cost. Regulatory liabilities are recognized for certain gains or other reductions of net allowable costs for adjustment of future rates as determined by the BCUC. In the event that the disposition of these balances are assessed to no longer be probable based on management’s judgment, the balances are recorded in the Company’s consolidated statements of comprehensive income (loss) in the period when the assessment is made. Regulatory balances that do not meet the definition of an asset or liability under any other IFRS are segregated on the consolidated statements of financial position, and are separately disclosed on the consolidated statement of comprehensive income (loss) as net movements in regulatory balances related to net income (loss) or net movements in regulatory balances related to other comprehensive income (loss). The netting of regulatory debit and credit balances is not permitted. The measurement of regulatory balances is subject to certain estimates and assumptions, including assumptions made in the interpretation of the BCUC’s regulations and decisions.
(b) Revenue
The Company recognizes revenue when it transfers control over a promised good or service, which constitutes a performance obligation under the contract, to a customer and where the Company is entitled to consideration as a result of completion of the performance obligation. Depending on the
15
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
terms of the contract with the customer, revenue recognition can occur at a point in time or over time. When a performance obligation is satisfied, revenue is measured at the transaction price that is allocated to that performance obligation. Domestic revenues comprise sales to customers within the province of British Columbia, and sales of energy outside the province that are either under long-term contracts or are surplus to domestic load requirements. Other sales outside the province are classified as trade. A significant portion of the Company’s revenue is generated from providing electricity goods and services. Revenue is recognized over time generally using output measure or progress (i.e. kilowatt hours delivered) as the Company’s customers simultaneously receive and consume the electricity goods and services as it is provided. Revenue is determined on the basis of billing cycles and includes accruals for electricity deliveries not yet billed. The Company recognizes a significant financing component where the timing of payment from the customer differs from the Company’s performance under the contract and where that difference is the result of the Company financing the transfer of goods and services. Energy trading contracts that meet the definition of a financial or non-financial derivative are accounted for at fair value whereby any realized gains and losses and unrealized changes in the fair value are recognized in trade revenues in the period of change. Unrealized changes in the fair value of these contracts are accounted for under IFRS 9, Financial Instruments (Note 3(k)). Energy trading and other contracts which do not meet the definition of a derivative are accounted for on an accrual basis whereby the realized gains and losses are recognized as revenue as the contracts are settled. Such contracts are considered to be settled when control of products and services are transferred to the buyer and performance obligation is satisfied.
(c) Finance Costs and Recoveries
Finance costs comprise interest expense on borrowings, accretion expense on provisions and other long-term liabilities, net interest on net defined benefit obligations, interest on finance lease liabilities, foreign exchange losses and realized hedging instrument losses that are recognized in the statement of comprehensive income. All borrowing costs are recognized using the effective interest rate method. Finance costs exclude borrowing costs attributable to the construction of qualifying assets, which are assets that take more than six months to prepare for their intended use. Finance recoveries comprises income earned on sinking fund investments held for the redemption of long-term debt, foreign exchange gains and realized hedging instrument gains that are recognized in the statement of comprehensive income, excluding energy trading contracts.
(d) Foreign Currency
Foreign currency transactions are translated into the respective functional currencies of BC Hydro and its subsidiaries, using the exchange rates prevailing at the dates of the transactions. Monetary assets and liabilities denominated in foreign currencies at the reporting date are re-translated to the functional currency at the exchange rate in effect at that date. The foreign currency gains or losses on monetary items is the difference between the amortized cost in the functional currency at the beginning of the
16
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
period, adjusted for effective interest and payments during the period, and the amortized cost in the foreign currency translated at the exchange rate at the end of the reporting period. Non-monetary items that are measured in terms of historical cost in a foreign currency are translated using the exchange rate at the date of the transaction. For purposes of consolidation, the assets and liabilities of Powerex, whose functional currency is the U.S. dollar, are translated to Canadian dollars using the rate of exchange in effect at the reporting date. Revenue and expenses of Powerex are translated to Canadian dollars at exchange rates at the date of the transactions. Foreign currency differences resulting from translation of the accounts of Powerex are recognized directly in other comprehensive income and are accumulated in the cumulative translation reserve. Foreign exchange gains or losses arising from a monetary item receivable from or payable to Powerex, the settlement of which is neither planned nor likely in the foreseeable future and which in substance is considered to form part of a net investment in Powerex by BC Hydro, are recognized directly in other comprehensive income in the cumulative translation reserve.
(e) Property, Plant and Equipment
(i) Recognition and Measurement
Property, plant and equipment in service are measured at cost less accumulated depreciation and accumulated impairment losses. Cost includes expenditures that are directly attributable to the acquisition of the asset. The cost of self-constructed assets includes the cost of materials, direct labour and any other costs directly attributable to bringing the asset into service. The cost of dismantling and removing an item of property, plant and equipment and restoring the site on which it is located is estimated and capitalized only when, and to the extent that, the Company has a legal or constructive obligation to dismantle and remove such asset. Property, plant and equipment in service include the cost of plant and equipment financed by contributions in aid of construction. Borrowing costs that are directly attributable to the acquisition or construction of a qualifying asset are capitalized as part of the cost of the qualifying asset. Upon retirement or disposal, any gain or loss is recognized in the statement of comprehensive income (loss).
The Company recognizes government grants when there is reasonable assurance that any conditions attached to the grant will be met and the grant will be received. Government grants related to assets are deducted from the carrying amount of the related asset and recognized in profit or loss over the life of the related asset. Unfinished construction consists of the cost of property, plant and equipment that is under construction or not ready for service. Costs are transferred to property, plant and equipment in service when the constructed asset is capable of operation in a manner intended by management.
(ii) Subsequent Costs
The cost of replacing a component of an item of property, plant and equipment is recognized in the carrying amount of the item if it is probable that the future economic benefits embodied within the component will flow to the Company, and its cost can be measured reliably. The carrying amount of the replaced component is derecognized. The costs of property, plant and equipment maintenance are recognized in the statement of comprehensive income (loss) as incurred.
17
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
(iii) Depreciation
Property, plant and equipment in service are depreciated over the expected useful lives of the assets, using the straight-line method. When major components of an item of property, plant and equipment have different useful lives, they are accounted for as separate items of property, plant and equipment. The expected useful lives, in years, of the Company’s main classes of property, plant and equipment are:
Generation 15 – 100 Transmission 20 – 65 Distribution 20 – 60 Buildings 5 – 60 Equipment & Other 3 – 35
The expected useful lives and residual values of items of property, plant and equipment are reviewed annually. Depreciation of an item of property, plant and equipment commences when the asset is available for use and ceases at the earlier of the date the asset is classified as held for sale and the date the asset is derecognized.
(f) Intangible Assets
Intangible assets are recorded at cost less accumulated amortization and accumulated impairment losses. Land rights associated with statutory rights of way acquired from the Province that have indefinite useful lives and are not subject to amortization. Other intangible assets include California carbon allowances which are not amortized because they are used to settle obligations arising from carbon emissions regulations. Intangible assets with finite useful lives are amortized over their expected useful lives on a straight line basis. These assets are tested for impairment annually or more frequently if events or changes in circumstances indicate that the asset value may not be fully recoverable. The expected useful life for software is 2 to 10 years. Amortization of intangible assets commences when the asset is available for use and ceases at the earlier of the date that the asset is classified as held for sale and the date that the asset is derecognized.
(g) Asset Impairment
(i) Financial Assets
Financial assets, other than those measured at fair value, are assessed at each reporting date to determine whether there is impairment. The Company accounts for impairment of financial assets based on a forward-looking expected credit loss model under IFRS 9, Financial Instruments. The expected-loss impairment model requires an entity to recognize the expected credit losses (ECL) when financial instruments are initially recognized and to update the amount of ECL recognized at each reporting date to reflect changes in the credit risk of the financial instruments. ECL are measured as the difference in the present value of the contractual cash flows due to the Company
18
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
under the contract and the cash flows that Company expects to receive. For accounts receivable without a significant financing component, the Company applied the simplified approach for determining expected credit losses, which requires the Company to determine the lifetime expected losses for all accounts receivable and accrued revenue. For a non-current receivable with a significant financing component, the Company measures the expected credit loss at an amount equal to the 12-month expected credit loss at initial recognition. If the credit risk has increased significantly since initial recognition, the Company measures the expected credit loss at an amount equal to the lifetime expected credit loss. The expected lifetime credit loss provision and 12-month expected credit loss is based on historical counterparty default rates, third party default probabilities and credit ratings, and is adjusted for relevant forward looking information specific to the counterparty, when required. Impairment of cash and cash equivalent and restricted cash is evaluated by reference to the credit quality of the underlying financial institution.
(ii) Non-Financial Assets
The carrying amounts of the Company’s non-financial assets are reviewed at each reporting date to determine whether there is any indication of impairment. If any such indication exists, then the asset’s recoverable amount is estimated. For intangible assets that have indefinite useful lives or that are not yet available for use, the recoverable amount is estimated annually.
For the purpose of impairment testing, assets that cannot be tested individually are grouped together into the smallest group of identifiable assets that generates cash inflows from continuing use that are largely independent of the cash inflows of other assets or groups of assets (the cash-generating unit, or CGU). The recoverable amount of an asset or CGU is the greater of its value in use and its fair value less costs to sell. In assessing value in use, the estimated future cash flows are discounted to their present value using a pre-tax discount rate that reflects current market assessments of the time value of money and the risks specific to the asset. All of BC Hydro’s assets form one CGU for the purposes of testing for impairment. An impairment loss is recognized if the carrying amount of an asset or CGU exceeds its estimated recoverable amount. Impairment losses are recognized in net income. Impairment losses recognized in respect of a CGU are allocated to reduce the carrying amounts of the assets in the CGU on a pro-rata basis. Impairment losses recognized in prior periods are assessed at the reporting date for any indications that the loss has decreased or no longer exists. Impairment reversals are recognized immediately in net income when the recoverable amount of an asset increases above the impaired net book value, not to exceed the carrying amount that would have been determined (net of depreciation) had no impairment loss been recognized for the asset in prior years.
(h) Cash and Cash Equivalents
Cash and cash equivalents include unrestricted cash and units of a money market fund (short-term investments) that are redeemable on demand and are carried at amortized cost and fair value, respectively.
19
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
(i) Restricted Cash
Restricted cash includes cash balances which the Company does not have immediate access to as they have been pledged to counterparties as security for investments or trade obligations. These balances are available to the Company only upon settlement of the underlying trade obligations.
(j) Inventories
Inventories are comprised primarily of natural gas, materials and supplies. Natural gas inventory is valued at fair value less costs to sell and included in Level 2 of the fair value hierarchy (refer to Note 10). Materials and supplies inventories are valued at the lower of cost determined on a weighted average basis and net realizable value. The cost of materials and supplies comprises all costs of purchase, costs of conversion and other directly attributable costs incurred in bringing the inventories to their present location and condition. Net realizable value is the estimated selling price in the ordinary course of business, less the estimated selling expenses.
(k) Financial Instruments
(i) Financial Instruments – Recognition and Measurement
All financial instruments are measured at fair value on initial recognition of the instrument, except for certain related party transactions. Measurement in subsequent periods depends on which of the following categories the financial instrument has been classified as: fair value through profit or loss (FVTPL), fair value through other comprehensive income (FVOCI) and those measured at amortized cost. The Company may designate financial instruments as held at FVTPL when such financial instruments have a reliably determinable fair value and where doing so eliminates or significantly reduces a measurement or recognition inconsistency that would otherwise arise from measuring assets and liabilities or recognizing gains and losses on them on a different basis. All derivative instruments are categorized as FVTPL unless they are designated as accounting hedges. Transaction costs are expensed as incurred for financial instruments classified or designated as fair value through profit or loss. For other financial instruments, transaction costs are included in the carrying amount. All regular-way purchases or sales of financial assets are accounted for on a settlement date basis.
Financial assets and financial liabilities classified as FVTPL are subsequently measured at fair value with changes in those fair values recognized in net income in the period of change. Financial assets classified as FVOCI are subsequently measured at fair value, with changes in those fair values recognized in other comprehensive income (loss) until realized or impaired. Financial assets and liabilities are measured at amortized cost if the business model is to hold the instrument for collection or payment of contractual cash flows and those cash flows are solely principal and interest. If the business model is not to hold the instruments, it is classified as FVTPL. After initial recognition they are measured at amortized cost using the effective interest method less any impairment losses in the impairment of financial assets.
(ii) Classification and Measurement of Financial Instruments
The Company adopted IFRS on April 1, 2017 and has assessed the classification and measurement of financial assets and financial liabilities under IFRS 9. The original measurement categories under the Prescribed Standards and IAS 39 and the new measurement categories under IFRS 9 are
20
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
summarized in the following table:
There has been no change in the carrying value or fair value of the Company’s financial instruments or to previously reported figures as a result of changes to the measurement categories in the table noted above.
(ii) Fair Value
The fair value of financial instruments reflects changes in the level of commodity market prices, interest rates, foreign exchange rates and credit risk. Fair value is the amount of consideration that would be agreed upon in an arm’s length transaction between knowledgeable willing parties who are under no compulsion to act. Fair value amounts reflect management’s best estimates considering various factors including closing exchange or over-the-counter quotations, estimates of future prices and foreign exchange rates, time value of money, counterparty and own credit risk, and volatility. The assumptions used in establishing fair value amounts could differ from actual prices and the impact of such variations could be material. In certain circumstances, valuation inputs are used that are not based on observable market data and internally developed valuation models which are based on models and techniques generally recognized as standard within the energy industry.
(iii) Inception Gains and Losses
In some instances, a difference may arise between the fair value of a financial instrument at initial recognition, as defined by its transaction price, and the fair value calculated by a valuation technique or model (inception gain or loss). In addition, the Company’s inception gain or loss on a contract may arise as a result of embedded derivatives which are recorded at fair value, with the
IAS 39 IFRS 9Short-term investments FVTPL FVTPLDerivatives not in a hedging relationship
FVTPL FVTPL
Cash Loans and receivables Amortized costRestricted cash Loans and receivables Amortized costAccounts receivable and other receivables
Loans and receivables Amortized cost
US dollar sinking funds Held to maturity Amortized costAccounts payable and accrued liabilities
Other financial liabilities Amortized cost
Revolving borrowings Other financial liabilities Amortized costLong-term debt (including current portion due in one year)
Other financial liabilities Amortized cost
Finance lease obligations, First Nations liabilities and Other liabilities presented in Other long-term liabilities
Other financial liabilities Amortized cost
21
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
remainder of the contract recorded on an accrual basis. In these circumstances, the unrealized inception gain or loss is deferred and amortized into income over the full term of the underlying financial instrument. Additional information on deferred inception gains and losses is disclosed in Note 20.
(iv) Derivative Financial Instruments
The Company may use derivative financial instruments to manage interest rate and foreign exchange risks related to debt and to manage risks related to electricity and natural gas commodity transactions.
Interest rate and foreign exchange related derivative instruments that are not designated as hedges, are classified as FVTPL whereby instruments are recorded at fair value as either an asset or liability with changes in fair value recognized in net income in the period of change. For liability management activities, the related gains or losses are included in finance charges. For foreign currency exchange risk associated with electricity and natural gas commodity transactions, the related gains or losses are included in domestic revenues. The Company’s policy is to not utilize interest rate and foreign exchange related derivative financial instruments for speculative purposes.
Commodity derivative financial instruments are used to manage economic exposure to market risks relating to commodity prices. Commodity derivatives that are not designated as hedges are classified as FVTPL whereby instruments are recorded at fair value as either an asset or liability with changes in fair value recognized in net income. Gains or losses are included in trade revenues.
(v) Hedges
In a fair value hedging relationship, the carrying value of the hedged item is adjusted for unrealized gains or losses attributable to the hedged risk and recognized in net income. Changes in the fair value of the hedged item attributed to the hedged risk, to the extent that the hedging relationship is effective, are offset by changes in the fair value of the hedging derivative, which is also recorded in net income. When hedge accounting is discontinued, the carrying value of the hedged item is no longer adjusted and the cumulative fair value adjustments to the carrying value of the hedged item are amortized to net income over the remaining term of the original hedging relationship, using the effective interest method of amortization.
In a cash flow hedging relationship, the effective portion of the change in the fair value of the hedging derivative is recognized in other comprehensive income. The ineffective portion is recognized in net income. The amounts recognized in accumulated other comprehensive income are reclassified to net income in the periods in which net income is affected by the variability in the cash flows of the hedged item. When hedge accounting is discontinued the cumulative gain or loss previously recognized in accumulated other comprehensive income remains there until the forecasted transaction occurs. When the hedged item is a non-financial asset or liability, the amount recognized in accumulated other comprehensive income is transferred to the carrying amount of the asset or liability when it is recognized. In other cases the amount recognized in accumulated other comprehensive income is transferred to net income in the same period that the hedged item affects net income.
Hedge accounting is discontinued prospectively when the derivative no longer qualifies as an
22
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
effective hedge, the hedging relationship is discontinued, or the derivative is terminated or sold, or upon the sale or early termination of the hedged item.
(l) Investments Held in Sinking Funds
Investments held in sinking funds are held as individual portfolios and are classified as amortized cost. Securities included in an individual portfolio are recorded at cost, adjusted by amortization of any discounts or premiums arising on purchase, on a yield basis over the estimated term to settlement of the security. Realized gains and losses are included in finance charges.
(m) Unearned Revenue
Unearned revenue consists principally of amounts received under the agreement relating to the Skagit River, Ross Lake and the Seven Mile Reservoir on the Pend d’Oreille River (collectively the Skagit River Agreement) and other amounts received from customers for performance obligations which have not been performed. Under the Skagit River Agreement, the Company has committed to deliver a predetermined amount of electricity each year to the City of Seattle for an 80 year period ending in fiscal 2066 in return for annual payments of approximately US$22 million for a 35 year period ending in 2021 and US$100,000 (adjusted for inflation) for the remaining 45 year period ending in 2066. The amounts received under the agreement are deferred and included in income on an annuity basis over the electricity delivery period ending in fiscal 2066. As a result of the upfront consideration received under the Skagit River Agreement, in determining the transaction price, the promised amount of consideration is adjusted for the effects of the time value of money (i.e. significant financing component). The application of the significant financing component requirement results in the recognition of interest expense over the financing period and a higher amount of revenue.
(n) Contributions in Aid of Construction
Contributions in aid of construction are amounts paid by certain customers toward the cost of property, plant and equipment required for the extension of services to supply electricity. These amounts are recognized into revenue over the term of the agreement with the customer, or over the expected useful life of the related assets when the associated contracts do not have a finite period over which service is provided.
(o) Post-Employment Benefits
The cost of pensions and other post-employment benefits earned by employees is actuarially determined using the projected accrued benefit method prorated on service and management’s best estimate of mortality, salary escalation, retirement ages of employees and expected health care costs. The net interest for the period is determined by applying the same market discount rate used to measure the defined benefit obligation at the beginning of the annual period to the net defined benefit asset or liability at the beginning of the annual period, taking into account any changes in the net defined benefit asset or liability during the period as a result of current service costs, contributions and benefit payments. The market discount rate is determined based on the market interest rate at the end of the year on high-quality corporate debt instruments that match the timing and amount of expected benefit payments.
23
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
Past service costs arising from plan amendments and curtailments are recognized in net income immediately. A plan curtailment will result if the Company has demonstrably committed to a significant reduction in the expected future service of active employees or a significant element of future service by active employees no longer qualifies for benefits. A curtailment is recognized when the event giving rise to the curtailment occurs. The net interest costs on the net defined benefit plan liabilities arising from the passage of time are included in finance charges. The Company recognizes actuarial gains and losses immediately in other comprehensive income.
(p) Provisions
A provision is recognized if the Company has a present legal or constructive obligation as a result of a past event, it is probable that an outflow of economic benefits will be required to settle the obligation and a reliable estimate of the obligation can be determined. For obligations of a long-term nature, provisions are measured at their present value by discounting the expected future cash flows at a pre-tax rate that reflects current market assessments of the time value of money and the risks specific to the liability except in cases where future cash flows have been adjusted for risk. Decommissioning Obligations
Decommissioning obligations are legal and constructive obligations associated with the retirement of long-lived assets. A liability is recorded at the present value of the estimated future costs based on management’s best estimate. When a liability is initially recorded, the Company capitalizes the costs by increasing the carrying value of the asset. The increase in net present value of the provision for the expected cost is included in finance costs as accretion (interest) expense. Adjustments to the provision made for changes in timing, amount of cash flow and discount rates are capitalized and amortized over the useful life of the associated asset. Actual costs incurred upon settlement of a decommissioning obligation are charged against the related liability. Any difference between the actual costs incurred upon settlement of the decommissioning obligation and the recorded liability is recognized in net income at that time. Environmental Expenditures and Liabilities
Environmental expenditures are expensed as part of operating activities, unless they constitute an asset improvement or act to mitigate or prevent possible future contamination, in which case the expenditures are capitalized and amortized to income. Environmental liabilities arising from a past event are accrued when it is probable that a present legal or constructive obligation will require the Company to incur environmental expenditures. Legal
The Company recognizes legal claims as a provision when it is probable that the claim will be settled against the Company and the amount of the settlement can be reasonably measured. Management obtains the advice of its external counsel in determining the likely outcome and estimating the expected costs associated with lawsuits. Further information regarding lawsuits in progress is disclosed in Note 22.
24
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
(q) Leases
Embedded Leases
The Company may enter into an arrangement that does not take the legal form of a lease but conveys a right to use an asset in return for a payment or series of payments. Arrangements in which a party conveys a right to the Company to use an asset may in substance be, or contain, a lease that should be accounted for as either a finance or operating lease. Determining whether an arrangement is, or contains, a lease requires an assessment of whether fulfilment of the arrangement is dependent on the use of a specific asset; and whether the arrangement conveys a right to use the asset. The right to use an asset is conveyed if the right to operate or control physical access to the underlying asset is provided or if the Company consumes substantially all of the output of the asset and the price paid for the output is neither contractually fixed per unit of output nor equal to the current market price. Finance Leases
Leases where substantially all of the benefits and risk of ownership rest with the Company are accounted for as finance leases. Finance leases are recognized as assets and liabilities at the lower of the fair value of the asset and the present value of the minimum lease payments at the date of acquisition. Finance costs represent the difference between the total leasing commitments and the fair value of the assets acquired. Finance costs are charged to net income over the term of the lease at interest rates applicable to the lease on the remaining balance of the obligations. Assets under finance leases are depreciated on the same basis as property, plant and equipment or over the term of the relevant lease, whichever is shorter. Operating Leases
Leases where substantially all of the benefits and risk of ownership remain with the lessor are accounted for as operating leases. Rental payments under operating leases are expensed to net income on a straight-line basis over the term of the relevant lease. Benefits received and receivable as an incentive to enter into an operating lease are recognized as an integral part of the total lease expense and are recorded on a straight-line basis over the term of the lease.
(r) Taxes
The Company pays local government taxes and grants in lieu to municipalities and regional districts. As a Crown Corporation, the Company is exempt from Canadian federal and provincial income taxes.
(s) Jointly Controlled Operations
Prior to the purchase of the remaining 2/3 interest in Waneta Dam and Generating Facility on July 26, 2018, the Company had joint ownership and control over certain assets with third parties. A jointly controlled operation exists when there is a joint ownership and control of one or more assets to obtain benefits for the joint operators. The parties that have joint control of the arrangement have rights to the assets, and obligations for the liabilities, related to the arrangement. Each joint operator takes a share of the output from the assets for its own exclusive use. These consolidated financial statements include the Company’s share of the jointly controlled assets. The Company also records its share of any liabilities and expenses incurred jointly with third parties and any revenue from the sale or use of its share of the output in relation to the assets.
25
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
(t) New Standards and Amendments Not Yet Adopted
A number of new standards, and amendments to standards and interpretations, are not yet effective for the year ended March 31, 2019, and have not been applied in preparing these consolidated financial statements. In particular, the following new and amended standards become effective for the Company’s annual periods beginning on or after the dates noted below: Leases
IFRS 16, Leases replaces the existing standard IAS 17, Leases and IFRIC 4, Determining Whether an Arrangement Contains a Lease and the effective date for BC Hydro is April 1, 2019. IFRS 16 combines the existing dual model of operating and finance leases under IAS 17 into a single lease model for lessees. Under the new single lease model, a lessee will recognize the lease assets and lease liabilities on the statement of financial position initially measured at the present value of the unavoidable lease payments, with the exception of leases with a duration of twelve months or less and leases with low value. IFRS 16 will also cause expenses to be higher at the beginning and lower towards the end of a lease, even when payments are consistent throughout the term. The standard permits two methods of adoption: (i) the full retrospective method; and (ii) the modified retrospective method, under which comparative periods would not be restated and the cumulative impact of applying the standard would be recognized at the date of initial adoption. During fiscal 2019, management has compiled all of the Company’s existing lease and service contracts and reviewed the relevant agreements to identify which of these contracts are in scope of IFRS 16. In addition, management has completed a review of existing service contracts for embedded leases and has identified all operating leases. Furthermore, the Company began developing a valuation approach to measuring the right of use assets and related lease obligations for our leases and reviewed the increased accounting and disclosure requirements arising from the new leasing standard. The Company is in the process of completing the quantification of the impact that adoption of IFRS 16 will have upon adoption. The Company intends to use the full retrospective approach of adoption resulting in restatement of prior year comparatives. The quantitative impact of adopting IFRS 16 will be provided in our first interim condensed consolidated financial statements in fiscal 2020. Investments in Associates and Joint Ventures, Employee Benefits, and Financial Instruments
The Company does not expect to have a material impact on the consolidated financial statements upon adoption of the following amended standards effective April 1, 2019: Amendments to IAS 28, Investments in Associates and Joint Ventures Amendments to IAS 19, Employee Benefits Amendments to IFRS 9, Financial Instruments
26
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
NOTE 4: REVENUES Disaggregate Revenue
The Company disaggregates revenue by revenue types and customer class, which are considered to be the most relevant revenue information for management to consider in allocating resources and evaluating performance.
Contract Balances
The Company does not have any contract assets which constitutes consideration receivable from a customer that is conditional on the Company’s future performance. The current and non-current receivables balances from customers as at March 31, 2019 totalled $867 million (2018 - $741 million, April 1, 2017 - $796 million). Contract liabilities represent payments received for performance obligations which have not been fulfilled. The following table reconciles the items included in the contract liabilities balance:
The following table reconciles the changes in the contract liabilities balances during the years ended March 31, 2019 and 2018:
(in millions) 2019 2018DomesticResidential 2,127$ 2,097$ Light industrial and commercial 1,925 1,860 Large industrial 873 811 Surplus sales 115 139 Other sales 392 316 Total Domestic 5,432 5,223 Total Trade1 1,141 731 Total Revenue 6,573$ 5,954$
1 Includes mark-to-market gains/(losses) from derivatives.
March 31, March 31, April 1,(in millions) 2019 2018 2017Unearned revenues 230$ 210$ 179$ Contributions in aid (Note 17) 1,762 1,633 1,519 Customer deposits 13 15 14
2,005$ 1,858$ 1,712$
27
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
1 Other includes finance charges and foreign exchange adjustments
Remaining Performance Obligations
The following table includes revenue expected to be recognized in the future related to the performance obligations that are unsatisfied (or partially unsatisfied) as at March 31, 2019.
The Company elected to use the performance obligation practical expedients whereby the performance obligation is not disclosed for the following:
(i) Where the Company has a right to consideration from a customer in an amount that corresponds directly with the value to the customer of the Company’s performance to date, revenue is recognized in the amount to which the Company has a right to invoice.
(ii) Where the remaining performance obligations have an original expected duration of one year or less.
Contract Liabilities
Balance at April 1, 2017 1,712$ Revenue recognized that was included in the contract liability balance at the beginning of the period (93) Increases due to cash received, excluding amounts recognized as revenue during the period 218
Other1 21 Balance at March 31, 2018 1,858 Revenue recognized that was included in the contract liability balance at the beginning of the period (107) Increases due to cash received, excluding amounts recognized as revenue during the period 230
Other1 24 Balance at March 31, 2019 2,005$
(in millions)
Energy sales 22$ 29$ 18$ 69$ Contribution in aid 50 197 1,515 1,762 Skagit River Agreement 29 117 1,233 1,379 Other 53 79 45 177
154$ 422$ 2,811$ 3,387$
Less than one year
Between one and five years
More than five years Total
28
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
NOTE 5: OPERATING EXPENSES
NOTE 6: FINANCE CHARGES
The effective capitalization rate used to determine the amount of borrowing costs eligible for capitalization was 4.0 per cent (2018 - 4.1 per cent). NOTE 7: AMORTIZATION AND DEPRECIATION
(in millions) 2019 2018Electricity and gas purchases 1,661$ 1,610$ Water rentals 331 324 Transmission charges 205 203 Personnel expenses 630 591 Materials and external services 707 650 Amortization and depreciation (Note 7) 880 817 Grants and taxes 268 241 Other costs, net of recoveries 84 130 Less: Capitalized costs (70) (69)
4,696$ 4,497$
(in millions) 2019 2018Interest on long-term debt 854$ 795$ Interest on finance lease liabilities 42 18 Interest on defined benefit plan obligations (Note 19) 56 62 Mark-to-market losses on derivative financial instruments (Note 20) 318 27 Other 46 31 Capitalized interest (130) (109)
1,186$ 824$
(in millions) 2019 2018Depreciation of property, plant and equipment (Note 11) 797$ 733$ Amortization of intangible assets (Note 12) 83 84
880$ 817$
29
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
NOTE 8: CASH AND CASH EQUIVALENTS, AND RESTRICTED CASH
Restricted cash represents cash balances which the Company does not have immediate access to as they have been pledged to counterparties as security for investments or trade obligations. These balances are available to the Company only upon liquidation of the investments or settlements of the trade obligations they have been pledged as security for. NOTE 9: ACCOUNTS RECEIVABLE AND ACCRUED REVENUE
Accrued revenue represents revenue for electricity delivered and not yet billed. NOTE 10: INVENTORIES
There were no materials and supplies inventory impairments during the years ended March 31, 2019 and 2018. Natural gas inventory held in storage is measured at fair value less costs to sell and therefore, not subject to impairment testing. Inventories recognized as an expense during the year amounted to $77 million (2018 - $82 million).
March 31, March 31, April 1,(in millions) 2019 2018 2017Cash 34$ 11$ 25$ Short-term investments 50 31 24
84$ 42$ 49$
March 31, March 31, April 1,(in millions) 2019 2018 2017Accounts receivable 640$ 492$ 547$ Accrued revenue 192 170 138 Other 80 66 76
912$ 728$ 761$
March 31, March 31, April 1,(in millions) 2019 2018 2017Materials and supplies 161$ 142$ 145$ Natural gas trading inventories 7 2 40
168$ 144$ 185$
30
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
NOTE 11: PROPERTY, PLANT AND EQUIPMENT
(i) Prior to the purchase of the remaining two-thirds interest in Waneta on July 26, 2018, the Company included its one-third interest in Waneta with a net book value of $668 million (2018 - $674 million, April 1, 2017 - $695 million) in Generation assets. On August 1, 2017, BC Hydro agreed to exercise its option to purchase the remaining two-thirds interest of Waneta from Teck Resources (Teck) for $1.20 billion. Following receipt of BCUC approval in July 2018, BC Hydro completed the transaction on July 26, 2018. The transaction has been accounted for as an asset acquisition, with the purchase price being allocated to the applicable integrated components of the property, plant and equipment acquired. The purchase agreement includes a 20 year agreement, whereby BC Hydro has contracted to sell two-thirds of the generation of Waneta to Teck. Teck has an option to extend such agreement for a further 10 years. Depreciation expense on the Waneta assets for the year ended March 31, 2019 was $46 million (2018 - $21 million).
(ii) Included within Distribution assets are the Company’s portion of utility poles with a net book value of $1.11 billion (2018 - $1.05 billion, April 1, 2017 - $972 million) that are jointly owned with a third party. Depreciation expense on jointly owned utility poles for the year ended March 31, 2019 was $29 million (2018 - $27 million).
(iii)The Company received government grants arising from the Columbia River Treaty related to three dams built by the Company in the mid-1960s to regulate the flow of the Columbia River. The grants were made to assist in financing the construction of the dams. The grants were deducted from the carrying amount of the related dams. In addition, the Company received, in prior years, government grants for the construction of a new transmission line and has deducted the grants
(in millions) Generation Transmission DistributionLand &
BuilidingsEquipment &
OtherUnfinished
Construction TotalCostBalance at April 1, 2017 6,782$ 6,623$ 5,225$ 590$ 652$ 3,364$ 23,236$ Net additions 877 404 447 109 115 933 2,885 Disposals and retirements (167) (10) (24) (3) (8) (23) (235) Balance at March 31, 2018 7,492 7,017 5,648 696 759 4,274 25,886 Net additions 2,397 516 442 30 105 241 3,731 Disposals and retirements (10) (10) (31) (1) (10) (17) (79) Balance at March 31, 2019 9,879$ 7,523$ 6,059$ 725$ 854$ 4,498$ 29,538$
Accumulated DepreciationBalance at April 1, 2017 (187)$ (25)$ (9)$ (8)$ (13)$ -$ (242)$ Depreciation expense (212) (217) (192) (24) (88) - (733) Disposals and retirements 162 1 1 - 4 - 168 Balance at March 31, 2018 (237) (241) (200) (32) (97) - (807) Depreciation expense (255) (225) (201) (26) (90) - (797) Disposals and retirements 6 3 3 - 6 - 18 Balance at March 31, 2019 (486)$ (463)$ (398)$ (58)$ (181)$ -$ (1,586)$
Net carrying amountsAt April 1, 2017 6,595$ 6,598$ 5,216$ 582$ 639$ 3,364$ 22,994$ At March 31, 2018 7,255$ 6,776$ 5,448$ 664$ 662$ 4,274$ 25,079$ At March 31, 2019 9,393$ 7,060$ 5,661$ 667$ 673$ 4,498$ 27,952$
31
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
received from the cost of the asset. No government grants were received in fiscal 2019 or fiscal 2018.
(iv) The Company has contractual commitments to spend $3.35 billion on major property, plant and
equipment projects (on individual projects greater than $50 million) as at March 31, 2019. Leased assets
Property, plant and equipment under finance leases of $695 million (2018 - $695 million, April 1, 2017 - $388 million), net of accumulated amortization of $77 million (2018 - $54 million, April 1, 2017 - $201 million), are included in the total amount of property, plant and equipment above. NOTE 12: INTANGIBLE ASSETS
Land rights consist primarily of statutory rights of way acquired from the Province in perpetuity. These land rights have indefinite useful lives and are not subject to amortization. These land rights are tested for impairment annually or more frequently if events or changes in circumstances indicate that the asset value may not be recoverable.
(in millions)Land Rights
Internally Developed Software
Purchased Software Other
Work in Progress Total
CostBalance at April 1, 2017 243$ 91$ 217$ 13$ 51$ 615$ Net additions (transfers) 4 18 47 26 (12) 83 Disposals and retirements - - (1) (6) (3) (10) Balance at March 31, 2018 247 109 263 33 36 688 Net additions 29 6 35 9 27 106 Disposals and retirements - - - (12) - (12) Balance at March 31, 2019 276$ 115$ 298$ 30$ 63$ 782$
Accumulated AmortizationBalance at April 1, 2017 -$ (8)$ (6)$ -$ -$ (14)$ Amortization expense - (23) (61) - - (84) Disposals and retirements - - 1 - - 1 Balance at March 31, 2018 - (31) (66) - - (97) Amortization expense - (21) (62) - - (83) Disposals and retirements - - - - - - Balance at March 31, 2019 -$ (52)$ (128)$ -$ -$ (180)$
Net carrying amountsAt April 1, 2017 243$ 83$ 211$ 13$ 51$ 601$ At March 31, 2018 247$ 78$ 197$ 33$ 36$ 591$ At March 31, 2019 276$ 63$ 170$ 30$ 63$ 602$
32
British Columbia Hydro and Power Authority
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
NOTE 13: OTHER NON-CURRENT ASSETS
Non-Current Receivables
Included in the non-current receivables balance are $135 million of receivables (2018 - $140 million, April 1, 2017 - $145 million) attributable to contributions. The contributions are to be received in 16 annual payments of approximately $11 million, adjusted for inflation. The fair value of the receivable was initially measured using an estimated inflation rate and a 4.6 per cent discount rate.
Included in the non-current receivables balance is a $5 million (2018 - $28 million, April 1, 2017 - $68 million) receivable from mining customers participating in the Mining Customer Payment Plan. In February 2016, the Province issued a direction to the BCUC to establish the Mining Customer Payment Plan, which allows the operators of applicable mines to defer payment of a portion of electricity purchases for a period of up to five years.
Sinking Funds
Investments held in sinking funds are held by the Trustee (the Minister of Finance for the Province) for the redemption of long-term debt. The sinking fund balances at the statement of financial position date are accounted for at amortized cost, and include the following investments:
Effective December 2005, all sinking fund payment requirements on all new and outstanding debt were removed. The existing sinking funds relate to debt that mature in fiscal 2026 and fiscal 2037.
Other
Included in the other balance is the long-term portion of prepaid expenses from the Site C Project of $235 million (2018 - $229 million, April 1, 2017 - $115 million).
March 31, March 31, April 1,(in millions) 2019 2018 2017Non-current receivables 148$ 194$ 239$ Sinking funds 197 182 179 Other 251 256 142
596$ 632$ 560$
(in millions)
Province of BC bonds 126$ 2.9 % 114$ 3.2 % 114$ 3.5 %Other provincial government and crown corporation bonds 71 2.9 % 68 3.4 % 65 3.5 %
197$ 182$ 179$
1 Rate calculated on market yield to maturity.
Carrying Value
Weighted Average
Effective Rate1Carrying
Value
Weighted Average
Effective Rate1
2018
Carrying Value
Weighted Average
Effective Rate1
March 31, April 1,20172019
March 31,
33
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
NOTE 14: RATE REGULATION
Regulatory Accounts
The Company has established various regulatory accounts through rate regulation and with the approval of the BCUC. In the absence of rate regulation, these amounts would be reflected in total comprehensive income (loss). For the year ended March 31, 2019, the impact of regulatory accounting has resulted in a net decrease to total comprehensive income of $946 million (2018 - $142 million net decrease) which is comprised of a decrease to net income of $1.12 billion (2018 - $51 million increase) and an increase to other comprehensive income of $173 million (2018 - $193 million decrease). For each regulatory account, the amount reflected in the Net Change column in the following regulatory tables represents the impact on comprehensive income for the applicable year. Under rate regulated accounting, a net decrease in a regulatory asset or a net increase in a regulatory liability results in a decrease to comprehensive income.
(in millions)
As at April 1 2018
Addition /(Reduction) Interest A Amortization
Net
Change B
As atMarch 31
2019
Remaining recovery/ reversal
period (years)Regulatory Assets
Non-Heritage Deferral Account 462 (170)$ 13$ (229)$ (386)$ 76$ Note D
Trade Income Deferral Account 127 (109) 1 (19) (127) - Note DDemand-Side Management 903 111 - (99) 12 915 1-15Debt Management - 163 - - 163 163 9-35First Nations Provisions & Costs 518 22 4 (39) (13) 505 5-9 Note GNon-Current Pension Costs 304 240 - (58) 182 486 8-12Site C 472 - 19 - 19 491 Note ECIA Amortization 88 (5) - - (5) 83 21
Environmental Provisions & Costs 261 (1) (2) (31) (34) 227 Note F, GSmart Metering & Infrastructure 239 - 9 (31) (22) 217 10 IFRS Pension 535 - - (38) (38) 497 13 IFRS Property, Plant & Equipment 1,025 67 - (28) 39 1,064 33-42Rate SmoothingC 815 (815) - - (815) - - Storm Restoration Costs 47 19 2 (10) 11 58 Note FTotal Finance Charges - 3 - 17 20 20 Note FForeign Exchange Gains and Losses - (2) - 14 12 12 1-10Other Regulatory Accounts 95 37 4 (8) 33 128 2-5Total Regulatory Assets 5,891 (440) 50 (559) (949) 4,942 Regulatory LiabilitiesHeritage Deferral Account 423 95 19 (52) 62 485 Note DTrade Income Deferral Account - 212 3 44 259 259 Note DForeign Exchange Gains and Losses 31 (6) - (25) (31) - 1-10Debt Management 158 (158) - - (158) - 9-35Total Finance Charges 134 (50) - (84) (134) - Note FOther Regulatory Accounts 5 (1) - - (1) 4 2-5Total Regulatory Liabilities 751 92 22 (117) (3) 748 Net Regulatory Asset 5,140$ (532)$ 28$ (442)$ (946)$ 4,194$
34
British Columbia Hydro and Power Authority
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
AAs permitted, interest charges were accrued to certain regulatory balances at a rate of 4.0% for the year ended March 31, 2019
(2018 – 4.1%).
B Net Change includes a net increase to net loss of $1.12 billion (2018 – a net increase to net income of $51 million) and net
decrease to other comprehensive loss of $173 million (2018 – a net decrease to other comprehensive income of $193 million).
C As at December 31, 2018, the entire balance of the Rate Smoothing Regulatory Account (RSRA) was expensed as BC Hydro
determined that collection of the RSRA was no longer probable based on information received from the Province. This resulted
in an operating expense of $1.04 billion during the year ended March 31, 2019. The operating expense was comprised of the
$815 million balance in the account as at April 1, 2018 and $229 million deferred in the account from April 1, 2018 to December
31, 2018.
D For fiscal 2018 to fiscal 2019, the balances in these regulatory accounts were recovered in rates through the Deferral Account
Rate Rider (DARR), which is an additional charge on customer bills. The DARR was 5 per cent for fiscal 2018 and fiscal 2019.
In the Fiscal 2020 to Fiscal 2021 Revenue Requirements Application, BC Hydro proposed to reduce the DARR from 5 per cent
to 0 per cent effective April 1, 2019 and to refund the forecasted net credit balance in the Revenue Requirements Application in
these accounts over the fiscal 2020 to fiscal 2021 test period.
E The recovery period for this account will be determined by the BCUC as part of a future regulatory proceeding once the Site C
Project is placed into service.
(in millions)
As at April 1 2017
Addition / (Reduction) Interest A Amortization
Net
Change B
As at March 31
2018
Remaining recovery/ reversal
period (years)Regulatory Assets
Non-Heritage Deferral Account 756 (123) 26 (197) (294) 462 Note D
Trade Income Deferral Account 194 (21) 5 (51) (67) 127 Note DDemand-Side Management 916 82 - (95) (13) 903 1-15First Nations Provisions & Costs 532 20 5 (39) (14) 518 6-9 Note GNon-Current Pension Costs 485 (123) - (58) (181) 304 9-13Site C 453 - 19 - 19 472 Note ECIA Amortization 91 (3) - - (3) 88 22Environmental Provisions & Costs 294 - (2) (31) (33) 261 Note F, GSmart Metering & Infrastructure 261 - 10 (32) (22) 239 11 IFRS Pension 574 - - (39) (39) 535 14 IFRS Property, Plant & Equipment 962 90 - (27) 63 1,025 34-43Rate Smoothing 488 327 - - 327 815 - Storm Restoration Costs 39 16 2 (10) 8 47 Note FOther Regulatory Accounts 82 28 1 (16) 13 95 3-6Total Regulatory Assets 6,127 293 66 (595) (236) 5,891 Regulatory LiabilitiesHeritage Deferral Account 371 61 5 (14) 52 423 Note DForeign Exchange Gains and Losses 66 4 - (39) (35) 31 1-11Debt Management 187 (29) - - (29) 158 10-35Total Finance Charges 212 24 - (102) (78) 134 Note FOther Regulatory Accounts 9 (1) - (3) (4) 5 3-6Total Regulatory Liabilities 845 59 5 (158) (94) 751 Net Regulatory Asset 5,282$ 234$ 61$ (437)$ (142)$ 5,140$
35
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
F The forecast balances in these accounts at the end of a test period are recovered over the next test period. A test period refers to
the period covered by a revenue requirements application filing. The forecast balance at the end of fiscal 2019 will be recovered
over fiscal 2020 to fiscal 2021 test period.
G The First Nations Provisions & Costs and Environmental Provisions & Costs regulatory accounts include both expenditures
and provisions (costs to be incurred in future years). Actual expenditures are recovered over the term identified. The provision
balance becomes recoverable at such time as actual expenditures are incurred and transferred to the respective regulatory cost
account.
RATE REGULATION On March 1, 2018, the BCUC issued Order No. G-47-18, which approved final rate increases of 4.0 per cent for fiscal 2017, 3.5 per cent for fiscal 2018, and 3.0 per cent for fiscal 2019. In addition, the BCUC directed the establishment of two new regulatory accounts, the Post Employment Benefit (PEB) Current Pension Costs Regulatory Account and the Dismantling Cost Regulatory Account and the closure of the Future Removal and Site Restoration Regulatory Account. On February 25, 2019, BC Hydro filed the Fiscal 2020 to Fiscal 2021 Revenue Requirements Application requesting rate increases of 6.85 per cent for fiscal 2020 and 0.72 per cent for fiscal 2021 and a reduction in the Deferral Account Rate Rider from 5 per cent to 0 per cent effective April 1, 2019. If approved, these two requests would result in a net bill increase of 1.76 per cent for fiscal 2020 and 0.72 per cent for fiscal 2021. BC Hydro proposed to reduce the Deferral Account Rate Rider to 0 per cent as the accounts it is intended to recover have a combined credit balance at March 31, 2019. Instead of the Deferral Account Rate Rider recovery mechanism, BC Hydro has proposed to refund the forecast fiscal 2019 net closing balance and the forecast fiscal 2020 and fiscal 2021 net additions and interest applied to the Heritage Deferral Account, the Non-Heritage Deferral Account, and the Trade Income Deferral Account over the fiscal 2020 to fiscal 2021 test period. HERITAGE DEFERRAL ACCOUNT This account is intended to mitigate the impact of certain cost and revenue variances between the forecast costs and revenues in a revenue requirements application and actual costs and revenues associated with the Company’s hydroelectric and thermal generating facilities. These deferred variances are recovered in rates through the Deferral Account Rate Rider (DARR). The DARR, which was set at 5 per cent for fiscal 2018 and fiscal 2019, is an additional charge on customer bills and is currently used to recover the balances in the energy deferral accounts for fiscal 2018 and fiscal 2019. NON-HERITAGE DEFERRAL ACCOUNT This account is intended to mitigate the impact of certain cost and revenue variances between the forecast costs and revenues in a revenue requirements application and actual costs and revenues related to items including all non-heritage energy costs (e.g., costs related to power acquisitions from Independent Power Producers) and load (i.e., customer demand). These deferred variances are recovered in rates through the DARR for fiscal 2018 and fiscal 2019. TRADE INCOME DEFERRAL ACCOUNT This account is intended to mitigate the uncertainty associated with forecasting the net income of the Company’s trade activities. The impact is to defer the difference between the Trade Income forecast in a revenue requirements application and actual Trade Income. These deferred variances are recovered in rates through the DARR for fiscal 2018 and fiscal 2019.
36
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
DEMAND-SIDE MANAGEMENT Demand-Side Management expenditures are deferred and amortized on a straight-line basis over the anticipated 15 year period of benefit of the expenditures. Demand-Side Management expenditures include materials, direct labour and applicable portions of support costs, equipment costs, and incentives, which are not eligible for capitalization. Costs relating to identifiable tangible assets that meet the capitalization criteria are recorded as property, plant and equipment. In March 2017, the Government issued Orders in Council No. 100 and No. 101, which enable BC Hydro to pursue cost-effective electrification and allows for costs related to undertakings pursuant to Order in Council No. 101 to be deferred to the Demand-Side Management Regulatory Account. FIRST NATIONS PROVISIONS & COSTS The First Nations Provisions Regulatory Account includes the present value of future payments related to agreements reached with various First Nations groups. These agreements address settlements related to the construction and operation of the Company’s existing facilities and provide compensation for associated impacts. Lump sum and annual settlement costs paid pursuant to these settlements are transferred to the First Nations Costs Regulatory Account. In addition, annual negotiation costs are deferred to the First Nations Costs Regulatory Account. Forecast lump sum settlement payments are amortized over 10 years starting in the year of payment, forecast annual settlement payments are amortized in the year of payment, and actual annual negotiation costs are recovered from the First Nations Costs Regulatory Account in the year incurred. Variances between forecast and actual lump sum and annual settlement payments in the current test period are recovered over the following test period. A test period refers to the period covered by a revenue requirements application filing. NON-CURRENT PENSION COSTS The Non-Current Pension Costs Regulatory Account captures variances between forecast and actual non-current service costs, such as net interest income or expense, related to pension and other post-employment benefit plans. In addition, all re-measurements of the net defined benefit liability (asset) are deferred to this account. Amounts deferred during the current test period are amortized at the start of the following test period over the expected average remaining service life of the employee group (currently 12 years). SITE C Site C Project expenditures incurred in fiscal 2007 through the third quarter of fiscal 2015 were deferred. In December 2014, the Provincial Government approved a final investment decision for the Site C Project, resulting in expenditures being capitalized in property, plant and equipment starting in the fourth quarter of fiscal 2015. BC Hydro plans to seek BCUC approval to begin amortizing the balance of the Site C Regulatory Account once the assets are in service.
CONTRIBUTIONS IN AID (CIA) OF CONSTRUCTION AMORTIZATION This account captures the difference in revenue requirement impacts of the 45 year amortization period the Company uses as per a depreciation study and the 25 year amortization period determined by the BCUC.
37
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
ENVIRONMENTAL PROVISIONS & COSTS A liability provision and offsetting regulatory asset has been established for environmental compliance and remediation arising from the costs that will likely be incurred to comply with the Federal Polychlorinated Biphenyl (PCB) Regulations enacted under the Canadian Environmental Protection Act, the Asbestos requirements of the Occupational Health and Safety Regulations under the jurisdiction of WorkSafe BC and the remediation of environmental contamination at a property occupied by a predecessor company. Actual expenditures related to environmental regulatory provisions are transferred to the environmental cost regulatory asset accounts. Forecast environmental and remediation costs are amortized from the accounts each year. Variances between forecast and actual environmental and remediation expenditures in the current test period are recovered over the following test period. SMART METERING & INFRASTRUCTURE Net operating costs incurred with respect to the Smart Metering & Infrastructure program were deferred through the end of fiscal 2016 when the project was completed. Costs relating to identifiable tangible and intangible assets that meet the capitalization criteria were recorded as property, plant and equipment or intangible assets respectively. The balance in the regulatory account at the end of fiscal 2016 is being amortized over a period of 13 years, reflecting the remaining period of the overall amortization period of 15 years, which is based on the average life of Smart Metering & Infrastructure assets. IFRS PENSION Unamortized experience gains and losses on the pension and other post-employment benefit plans recognized at the time of transition to IFRS as part of the Prescribed Standards (the previous accounting standards applicable to BC Hydro that were effective April 1, 2012) were deferred to this regulatory account to allow for recovery in future rates. The account balance is amortized/recovered over 20 years on a straight-line basis beginning in fiscal 2013. IFRS PROPERTY, PLANT & EQUIPMENT This account includes the fiscal 2012 incremental costs impacts due to the application of the accounting principles of IFRS to Property, Plant & Equipment to the comparative fiscal year for the adoption of IFRS as part of the Prescribed Standards (the previous accounting standards applicable to BC Hydro that were effective April 1, 2012). In addition, the account includes an annual deferral of overhead costs, ineligible for capitalization under the accounting principles of IFRS. The annual deferred amounts are amortized over 40 years beginning the year following the deferral of the expenditures.
RATE SMOOTHING As part of the 10 Year Rates Plan, the Rate Smoothing Regulatory Account was established with the objective of smoothing rate increases over the 10 Year Rates Plan period so that there is less volatility from year to year. As part of the Comprehensive Review, BC Hydro ceased using the Rate Smoothing Regulatory Account at the end of the third quarter of fiscal 2019. The balance of the Rate Smoothing Regulatory Account was written-off in December 2018 in the amount of $1.04 billion, resulting in a net loss for BC Hydro in fiscal 2019. BC Hydro is seeking BCUC approval to close this regulatory account in fiscal 2020.
38
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
STORM RESTORATION COSTS This account captures the difference between certain forecast storm restoration costs in a revenue requirements application and actual storm restoration costs. Variances deferred during the current test period are recovered over the following test period. FOREIGN EXCHANGE GAINS AND LOSSES Foreign exchange gains and losses from the translation of specified foreign currency financial instruments are deferred. Foreign exchange gains and losses are subject to external market forces over which BC Hydro has no control. The account balance is amortized using the straight-line pool method over the weighted average life of the related debt. DEBT MANAGEMENT This account captures mark-to-market gains and losses on financial contracts that economically hedge future long-term debt. The realized gains or losses are amortized over the remaining term of the associated long-term debt issuances, commencing in the test period following the test period in which the long-term debt associated with a particular hedge is issued.
TOTAL FINANCE CHARGES This account is intended to mitigate the impact of certain variances that arise between the forecast finance costs in a revenue requirements application and actual finance charges incurred. Variances deferred during the current test period are recovered over the following test period. OTHER REGULATORY ACCOUNTS Other regulatory asset and liability accounts with individual balances less than $50 million include the following: Real Property Sales, Capital Project Investigation Costs, Arrow Water Systems Provisions, Arrow Water Systems (Costs), Dismantling Cost, PEB Current Pension Costs, Customer Crisis Fund and Amortization of Capital Additions. NOTE 15: ACCOUNTS PAYABLE AND ACCRUED LIABILITIES
March 31, March 31, April 1,(in millions) 2019 2018 2017Accounts payable 359$ 259$ 224$ Accrued liabilities 908 995 792 Current portion of other long-term liabilities (Note 21) 100 136 97 Dividend payable (Note 18) 59 159 - Other 52 54 59
1,478$ 1,603$ 1,172$
39
British Columbia Hydro and Power Authority
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
NOTE 16: LONG-TERM DEBT AND DEBT MANAGEMENT
The Company’s long-term debt comprises bonds and revolving borrowings obtained under an agreement with the Province.
The Company has a commercial paper borrowing program with the Province which is limited to $4.50 billion and is included in revolving borrowings. At March 31, 2019, the outstanding amount under the borrowing program was $2.95 billion (2018 - $2.05 billion, April 1, 2017 - $2.84 billion).
For the year ended March 31, 2019, the Company issued bonds for net proceeds of $2.42 billion (2018 - $1.16 billion) and a par value of $2.45 billion (2018 - $1.20 billion), a weighted average effective interest rate of 3.0 per cent (2018 - 2.9 per cent) and a weighted average term to maturity of 19.8 years (2018 - 20.3 years).
For the year ended March 31, 2019, the Company redeemed bonds with par value of $1.29 billion (2018 – par value of $40 million).
Long-term debt, expressed in Canadian dollars, is summarized in the following table by year of maturity:
(in millions) March 31, 2019 March 31, 2018
Canadian US Euro Total
Weighted Average Interest
Rate1 Canadian US Euro Total
Weighted Average Interest
Rate1 Canadian US Euro Total
Weighted Average Interest
Rate1
Maturing in fiscal:2018 -$ -$ -$ -$ - -$ -$ -$ -$ -$ 40$ -$ -$ 40$ 4.9 2019 - - - - - 1,030 258 - 1,288 4.4 1,030 267 - 1,297 4.4 2020 175 - - 175 5.3 175 - - 175 5.3 175 - - 175 5.3 2021 1,100 - - 1,100 7.5 1,100 - - 1,100 7.5 1,100 - - 1,100 7.5 2022 526 - - 526 7.8 526 - - 526 7.8 526 - - 526 7.8 2023 500 - - 500 6.8 500 - - 500 6.8 - - - - - 2024 200 - - 200 5.9 - - - - - - - - - -
1-5 years 2,501 - - 2,501 7.2 3,331 258 - 3,589 6.2 2,871 267 - 3,138 6.1 6-10 years 3,960 668 395 5,023 3.1 2,860 644 418 3,922 3.2 2,460 666 376 3,502 3.9 11-15 years 1,610 - 207 1,817 4.5 1,610 - 219 1,829 4.5 1,910 - - 1,910 4.6 16-20 years - 400 - 400 7.4 - 387 - 387 7.4 - 400 197 597 5.2 21-25 years 3,273 - - 3,273 4.3 3,273 - - 3,273 4.3 1,250 - - 1,250 4.9 26-30 years 5,985 - - 5,985 3.5 2,565 - - 2,565 3.7 4,588 - - 4,588 3.9 Over 30 years 560 - - 560 3.1 2,830 - - 2,830 3.3 2,230 - - 2,230 3.4 Bonds 17,889 1,068 602 19,559 4.1 16,469 1,289 637 18,395 4.3 15,309 1,333 573 17,215 4.4 Revolving borrowings 2,743 202 - 2,945 1.8 1,817 236 - 2,053 1.3 2,284 554 - 2,838 0.6
20,632 1,270 602 22,504 18,286 1,525 637 20,448 17,593 1,887 573 20,053
Adjustments to carrying value resulting from discontinued hedging activities 13 22 - 35 17 22 - 39 20 24 - 44
Unamortized premium, discount, and issue costs (143) (10) (4) (157) (107) (11) (5) (123) (56) (12) (5) (73)
20,502$ 1,282$ 598$ 22,382$ 18,196$ 1,536$ 632$ 20,364$ 17,557$ 1,899$ 568$ 20,024$ Less: Current portion (2,919) (202) - (3,121) (2,850) (494) - (3,344) (2,324) (554) - (2,878)
Non-current long-term debt 17,583$ 1,080$ 598$ 19,261$ 15,346$ 1,042$ 632$ 17,020$ 15,233$ 1,345$ 568$ 17,146$
1 The weighted average interest rate represents the effective rate of interest on fixed-rate bonds.
April 1, 2017
40
British Columbia Hydro and Power Authority
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
The following foreign currency contracts were in place at March 31, 2019 in a net asset position of $24 million (2018 - $105 million, April 1, 2017 - $41 million). Such contracts are primarily used to hedge foreign currency long-term debt principal and U.S. commercial paper borrowings.
The following bond locks and forward swap contracts were in place at March 31, 2019 with a net liability position of $285 million (2018 – net asset of $83 million, April 1, 2017 – net asset of $194 million). Such contracts are used to lock in interest rates on future Canadian denominated debt issues. The contracts outstanding relate to $6.05 billion of planned 10 and 30 year debt to be issued on dates ranging from June 2019 to June 2024.
For more information about the Company’s exposure to interest rate, foreign currency and liquidity risk, see Note 20.
March 31, March 31, April 1,(in millions) 2019 2018 2017Cross-Currency Swaps
Euro dollar to Canadian dollar - notional amount1 402€ 402€ 402€ Euro dollar to Canadian dollar - weighted average contract rate 1.47 1.47 1.47 Weighted remaining term 9 years 10 years 11 years
Foreign Currency ForwardsUnited States dollar to Canadian dollar - notional amount1 US$ 741 US$ 1,012 US$ 1,241United States dollar to Canadian dollar - weighted average contract rate 1.27 1.22 1.26 Weighted remaining term 8 years 7 years 6 years
1 Notional amount for a derivative instrument is defined as the contractual amount on which payments are calculated.
March 31, March 31, April 1, (in millions) 2019 2018 2017Bond Locks
Canadian dollar - notional amount1 600$ 1,250$ 400$ Weighted forecast borrowing yields 3.06% 3.17% 2.54%Weighted remaining term < 1 year < 1 year < 1 year
Forward SwapsCanadian dollar - notional amount1 5,450$ 3,625$ 3,200$ Weighted forecast borrowing yields 3.11% 2.76% 2.47%Weighted remaining term 2 years 2 years 2 years
1 Notional amount for a derivative instrument is defined as the contractual amount on which payments are calculated.
41
British Columbia Hydro and Power Authority
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
SUPPLEMENTAL DISCLOSURE OF CASH FLOW INFORMATION
Reconciliation for liabilities arising from financing activities:
NOTE 17: UNEARNED REVENUES AND CONTRIBUTIONS IN AID
($millions)
Balance, March 31, 2018 Issued Redemptions
Foreign exchange movement Other1
Payment (Proceeds)
Balance March 31, 2019
Long-term debt and revolving borrowings:Long-term debt 18,311$ 2,418$ (1,287)$ 2$ (7)$ -$ 19,437$ Revolving borrowings 2,053 8,865 (7,981) - 8 - 2,945 Total long-term debt and revolving borrowings 20,364 11,283 (9,268) 2 1 - 22,382 Finance lease obligation (Note 20) 665 - - - - (11) 654 Vendor financing liability 320 - - - 27 (9) 338 Debt-related derivative liability (182) - - - 345 100 263
21,167$ 11,283$ (9,268)$ 2$ 373$ 80$ 23,637$
($millions)
Balance, April 1, 2017 Issued Redemptions
Foreign exchange movement Other1
Payment (Proceeds)
Balance March 31, 2018
Long-term debt and revolving borrowings:Long-term debt 17,186$ 1,156$ (40)$ 20$ (11)$ -$ 18,311$ Revolving borrowings 2,838 7,749 (8,536) - 2 - 2,053 Total long-term debt and revolving borrowings 20,024 8,905 (8,576) 20 (9) - 20,364 Finance lease obligation (Note 20) 219 - - - 466 (20) 665 Vendor financing liability 236 - - - 84 - 320 Debt-related derivative liability (235) - - - (29) 82 (182)
20,244$ 8,905$ (8,576)$ 20$ 512$ 62$ 21,167$
1 Other includes new finance lease obligations, fair value adjustments to the debt-related derivative liability, and other non-cash items.
March 31, March 31, April 1,(in millions) 2019 2018 2017Unearned revenues 230$ 210$ 183$ Contributions in aid 1,762 1,633 1,519
1,992 1,843 1,702 Less: Current portion, unearned revenues (40) (38) (38) Less: Current portion, contributions in aid (47) (47) (44)
1,905$ 1,758$ 1,620$
42
British Columbia Hydro and Power Authority
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
NOTE 18: CAPITAL MANAGEMENT
Orders in Council from the Province establish the basis for determining the Company’s equity for regulatory purposes, as well as the annual Payment to the Province (see below). Capital requirements are consequently managed through the retention of equity subsequent to the Payment to the Province. For this purpose, the applicable Order in Council defines debt as revolving borrowings and interest-bearing borrowings less investments held in sinking funds and cash and cash equivalents. Equity comprises retained earnings, accumulated other comprehensive loss, and contributed surplus. The Company monitors its capital structure on the basis of its debt to equity ratio.
During the year, there were no changes in the approach to capital management.
The debt to equity ratio at March 31, 2019, March 31, 2018 and April 1, 2017 was as follows:
Payment to the Province
In accordance with Order in Council No. 095/2014 from the Province, for fiscal 2018 and subsequent years, the payment to the Province will be reduced by $100 million per year based on the payment in the immediate preceding fiscal year until it reaches zero and will thereafter remain at zero until BC Hydro achieves a 60:40 debt to equity ratio.
The fiscal 2018 Payment to the Province was $159 million and was paid in June 2018. As a result, the Payment for fiscal 2019 will be $59 million and the Company has accrued $59 million as at March 31, 2019.
NOTE 19: EMPLOYEE BENEFITS – POST-EMPLOYMENT BENEFIT PLANS
The Company provides a defined benefit statutory pension plan to substantially all employees, as well as supplemental arrangements which provide pension benefits in excess of statutory limits. Pension benefits are based on years of membership service and highest five-year average pensionable earnings. The plan also provides pensioners a conditional indexing fund. Employees make equal basic and indexing contributions to the plan funds based on a percentage of current pensionable earnings. The Company may contribute additional amounts as prescribed by the independent actuary. The Company is responsible for ensuring that the statutory pension plan has sufficient assets to pay the pension benefits. The supplemental arrangements are unfunded. The most recent actuarial funding valuation for the statutory pension plan was
March 31, March 31, April 1,(in millions) 2019 2018 2017Total debt, net of sinking funds 22,185$ 20,182$ 19,845$ Less: Cash and cash equivalents (84) (42) (49) Net Debt 22,101$ 20,140$ 19,796$
Retained earnings 4,934$ 5,421$ 4,896$ Contributed surplus 60 60 60 Accumulated other comprehensive loss (47) (34) (56) Total Equity 4,947$ 5,447$ 4,900$ Net Debt to Equity Ratio 82 : 18 79 : 21 80 : 20
43
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
performed at December 31, 2015. The next valuation for funding purposes will be prepared as at December 31, 2018, and the results will be available in September 2019. The Company also provides post-employment benefits other than pensions including limited medical, extended health, dental and life insurance coverage for retirees who have at least 10 years of service and qualify to receive pension benefits. Certain benefits, including the short-term continuation of health care and life insurance, are provided to terminated employees or to survivors on the death of an employee. These post-employment benefits other than pensions are not funded. Post-employment benefits include the pay out of benefits that vest or accumulate, such as banked vacation. Information about the pension benefit plans and post-employment benefits other than pensions is as follows: (a) The expense for the Company’s benefit plans for the years ended March 31, 2019 and 2018 is
recognized in the following line items in the statement of comprehensive income (loss) prior to any capitalization of employment costs attributable to property, plant and equipment and intangible asset additions:
Actuarial loss recognized in other comprehensive income (loss) are $173 million (2018 – gain of $193 million).
(in millions) 2019 2018 2019 2018 2019 2018
100$ 86$ 8$ 15$ 108$ 101$
46 45 10 17 56 62
146$ 131$ 18$ 32$ 164$ 163$
Net interest costs charged to finance costs
Total post-employment benefit plan expense
Benefit Plans Benefit Plans
Current service costs charged to personnel operating costs
TotalPension Other
44
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
(b) Information about the Company’s defined benefit plans, in aggregate, is as follows:
The Company determined that there was no minimum funding requirement adjustment required in fiscal 2019 and fiscal 2018 in accordance with IFRIC 14, The Limit on Defined Benefit Asset, Minimum Funding Requirements and Their Interaction.
(c) Movement of defined benefit obligations and defined benefit plan assets during the year:
March 31, March 31, April 1, March 31, March 31, April 1, March 31, March 31, April 1,(in millions) 2019 2018 2017 2019 2018 2017 2019 2018 2017Defined benefit obligation of funded plan (5,035)$ (4,654)$ (4,431)$ -$ -$ -$ (5,035)$ (4,654)$ (4,431)$ Defined benefit obligation of unfunded plans (186) (164) (160) (278) (272) (435) (464) (436) (595) Fair value of plan assets 3,747 3,616 3,460 - - - 3,747 3,616 3,460 Plan deficit (1,474)$ (1,202)$ (1,131)$ (278)$ (272)$ (435)$ (1,752)$ (1,474)$ (1,566)$
Represented by:
Accrued benefit plan liability (1,474)$ (1,202)$ (1,131)$ (278)$ (272)$ (435)$ (1,752)$ (1,474)$ (1,566)$
TotalPension
Benefits PlansOther
Benefits Plans
March 31, March 31, March 31, March 31,(in millions) 2019 2018 2019 2018Defined benefit obligationOpening defined benefit obligation 4,818$ 4,591$ 272$ 435$ Current service cost 100 86 8 15
Interest cost on benefit obligations 191 202 10 17 Benefits paid1 (183) (180) (8) (13) Employee contributions 41 38 - - Actuarial losses (gains)2 254 81 (4) (182)
Defined benefit obligation, end of year 5,221 4,818 278 272
Fair value of plan assetsOpening fair value 3,616 3,460 n/a n/a
Interest income on plan assets3 145 157 n/a n/aEmployer contributions 44 42 n/a n/aEmployee contributions 41 38 n/a n/a
Benefits paid1 (176) (173) n/a n/a
Actuarial gains (losses)2,3 77 92 n/a n/aFair value of plan assets, end of year 3,747 3,616 - - Accrued benefit liability (1,474)$ (1,202)$ (278)$ (272)$ 1
Benefits paid under Pension Benefit Plans include $13 million (2018 - $15 million) of settlement payments.2
3
OtherBenefit Plans
Actuarial gains/losses are included in the Non-Current Pension Costs regulatory account and for fiscal 2019 are comprised of $77 million of experience gains on return of plan assets and $250 million of net actuarial losses on the benefit obligations due to discount rate changes and actuarial assumption changes.
Actual income on defined benefit plan assets for the year ended March 31, 2019 was $222 million (2018 - $249 million).
PensionBenefit Plans
45
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
(d) The significant assumptions adopted in measuring the Company’s accrued benefit obligations as at each March 31 year end and April 1 are as follows:
The valuation cost method for the accrued benefit obligation is the projected unit credit method pro-rated on service.
(e) Asset allocation of the defined benefit statutory pension plan as at the measurement date:
Plan assets are re-balanced within ranges around target applications. The Company’s expected return on plan assets is determined by considering long-term historical returns, future estimates of long-term investment returns, and asset allocations.
(f) Other information about the Company’s benefit plans is as follows:
The Company’s contribution to be paid to its funded defined benefit plan in fiscal 2020 is expected to amount to $45 million. The expected benefit payments to be paid in fiscal 2020 in respect to the unfunded defined benefit plans are $18 million. Assumed healthcare cost trend rates have a significant effect on the amounts recognized in net income. A one percentage point change in assumed healthcare cost trend rates would have the following effects:
March 31, March 31, April 1, March 31, March 31, April 1,2019 2018 2017 2019 2018 2017
Discount rateBenefit cost 3.56% 3.68% 3.81% 3.54% 3.92% 3.72%Accrued benefit obligation 3.33% 3.56% 3.68% 3.24% 3.54% 3.92%
Rate of return on plan assets 3.56% 3.68% 4.00% n/a n/a n/aRate of compensation increase
Benefit cost 3.00% 3.00% 3.35% 3.00% 3.00% 3.35%Accrued benefit obligation 3.50% 3.00% 3.00% 3.50% 3.00% 3.00%
Health care cost trend ratesWeighted average health care cost trend rate n/a n/a n/a 3.58% 4.57% 5.03%Weighted average ultimate health care cost trend rate n/a n/a n/a 2.81% 3.47% 4.29%Year ultimate health care cost trend rate will be achieved n/a n/a n/a 2040 2026 2026
PensionBenefit Plans
OtherBenefit Plans
March 31, March 31, April 1,Target Allocation Min Max 2019 2018 2017
Equities 55% 35% 75% 57% 56% 61%Fixed interest investments 20% 15% 35% 26% 29% 26%Real estate 15% 5% 20% 10% 9% 8%Infrastructure and renewable resources 10% 5% 15% 7% 6% 5%
Target Range
46
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
The impact on the defined benefit obligation for the Pension Benefit Plans of changing certain of the major assumptions is as follows:
NOTE 20: FINANCIAL INSTRUMENTS
Financial Risk Management Overview
The Company is exposed to a number of financial risks in the normal course of its business operations, including market risks resulting from fluctuations in commodity prices, interest rates and foreign currency exchange rates, as well as credit risks and liquidity risks. The nature of the financial risks and the Company’s strategy for managing these risks has not changed significantly from the prior year. Risk management strategies and policies are employed to ensure that any exposures to these risks are in compliance with the Company’s business objectives and risk tolerance levels set out in the Company’s Treasury Risk Management Policy and Liability Risk Management Annual Strategic Plan. Responsibility for the oversight of risk management is held by the Company’s Board of Directors and is implemented and monitored by senior management within the Company. The following discussion is limited to the nature and extent of risks arising from financial instruments, as defined under IFRS 7, Financial Instruments: Disclosures. However, for a complete understanding of the nature and extent of financial risks the Company is exposed to, this note should be read in conjunction with the Company’s discussion of Risk Management found in the Management’s Discussion and Analysis section of the 2019 Annual Service Plan Report. (a) Credit Risk
Credit risk refers to the risk that one party to a financial instrument will cause a financial loss for a counterparty by failing to discharge an obligation. The Company is exposed to credit risk related to cash and cash equivalents, restricted cash, accounts receivable, non-current receivables, sinking fund investments, and derivative instruments. The Company manages financial institution credit risk through a Board-approved treasury risk management policy. Exposures to credit risks are monitored on a regular
One percentage One percentage point increase point decrease
(in millions) 2019 2019Effect on current service costs $ - $ - Effect on defined benefit obligation 4 (5)
2019
($ in millions)
Increase/ decrease in assumption
Effect on accrued benefit
obligation
Effect on current service costs
Discount rate 1% increase -593 -34Discount rate 1% decrease + 766 +48Longevity 1 year +/- 119 +/- 3
47
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
basis. Large customers are assessed for credit quality by taking into account external credit ratings, where available, an analysis of financial position and liquidity, past experience and other factors. The Company assigns credit limits for counterparties based on evaluations of their financial condition, net worth, credit ratings, and other credit criteria. For some customers, security over accounts receivable may be obtained in the form of a security deposit. Maximum credit risk with respect to financial assets is limited to the carrying amount presented on the statement of financial position with the exception of U.S. dollar sinking funds and non-current receivables which are classified as amortized cost and carried on the statement of financial position at $197 million and $148 million respectively. The maximum credit risk exposure for the U.S. dollar sinking funds, and non-current receivables as at March 31, 2019 is their fair value of $220 million and $159 million respectively. (b) Liquidity Risk
Liquidity risk refers to the risk that the Company will encounter difficulty in meeting obligations associated with financial liabilities. The Company manages liquidity risk by forecasting cash flows to identify financing requirements and by maintaining a commercial paper borrowing program under an agreement with the Province (see Note 16). The Company’s long-term debt comprises bonds and revolving borrowings obtained under an agreement with the Province. Cash from operations reduces the Company’s liquidity risk. The Company does not believe that it will encounter difficulty in meeting its obligations associated with financial liabilities. (c) Market Risks
Market risk refers to the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market prices. Market risk comprises three types of risk: currency risk, interest rate risk, and other price risk, such as changes in commodity prices. The Company monitors its exposure to market fluctuations and may use derivative contracts to manage these risks, as it considers appropriate.
(i) Currency Risk
Currency risk refers to the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in foreign exchange rates. The Company’s currency risk is primarily with the U.S. dollar. The majority of the Company’s currency risk arises from long-term debt in the form of U.S. dollar denominated bonds. Energy commodity prices are also subject to currency risk as they are primarily denominated in U.S. dollars. As a result, the Company’s trade revenues and purchases of energy commodities, such as electricity and natural gas, and associated accounts receivable and accounts payable, are affected by the Canadian/U.S. dollar exchange rate. In addition, all commodity derivatives and contracts priced in U.S. dollars are also affected by the Canadian/U.S. dollar exchange rate. The Company actively manages its currency risk through its Treasury Risk Management Policy. The Company uses cross-currency swaps and forward foreign exchange purchase contracts to achieve and maintain foreign currency exposure targets.
48
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
(ii) Interest Rate Risk
Interest rate risk refers to the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market interest rates. The Company is exposed to changes in interest rates primarily through its variable rate debt and the active management of its debt portfolio including its related sinking fund assets and temporary investments. The Company actively manages its interest rate risk through its Treasury Risk Management Policy. The Company uses interest rate swaps and bond locks to lock in interest rates on future debt issues to protect against rising interest rates. (iii) Commodity Price Risk
Commodity price risk refers to the risk that the fair value or future cash flows of a financial instrument will fluctuate because of changes in market prices. The Company has exposure to movements in prices for commodities including electricity, natural gas and other associated products. Prices for electricity and natural gas fluctuate in response to changes in supply and demand, market uncertainty, and other factors beyond the Company’s control. The management of commodity price risk is governed by risk management policies with oversight from either the BC Hydro or subsidiary Board of Directors. Risk management strategies, policies and limits are designed to ensure the Company’s risks and related exposures are aligned with the Company’s business objectives and risk tolerance. Risk management policies and procedures are reviewed regularly to reflect changes in market conditions and the Company’s activities.
Categories of Financial Instruments
The following table provides a comparison of carrying values and fair values for non-derivative financial instruments as at March 31, 2019 and 2018 and April 1, 2017. The non-derivative financial instruments, where carrying value differs from fair value, would be classified as Level 2 of the fair value hierarchy.
The carrying value of cash equivalents, restricted cash, accounts receivable and accrued revenue, accounts payable and accrued liabilities, and revolving borrowings approximates fair value due to the short duration of these financial instruments.
2019 2018
(in millions)Carrying
ValueFair
ValueCarrying
ValueFair
ValueCarrying
ValueFair
Value
Interest Income (Expense) recognized in Finance Charges
Interest Income (Expense) recognized in Finance Charges
Fair Value Through Profit or Loss (FVPTL):Cash equivalents - short-term investments $ 50 $ 50 $ 31 $ 31 $ 24 $ 24 $ 3 $ -
Amortized Cost:Cash 34 34 11 11 25 25 - - Restricted cash 109 109 77 77 28 28 - - Accounts receivable and accrued revenue 912 912 728 728 761 761 - - Non-current receivables 148 159 194 195 239 243 9 11 Sinking funds 197 220 182 201 179 197 9 8 Accounts payable and accrued liabilities (1,478) (1,478) (1,603) (1,603) (1,172) (1,172) - - Revolving borrowings (2,945) (2,945) (2,053) (2,053) (2,838) (2,838) (39) (20)Long-term debt (including current portion due in one year) (19,437) (22,480) (18,311) (20,814) (17,186) (19,601) (815) (775)First Nations liabilities (non-current portion) (391) (640) (399) (652) (394) (549) (17) (17)Finance lease obligations (non-current portion) (642) (642) (653) (653) (197) (197) (42) (18)Other liabilities (419) (434) (409) (416) (336) (342) (18) -
March 31, 2019 March 31, 2018 April 1, 2017
49
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
Hedges
As permitted by the transitional provision for hedge accounting under IFRS 9, the Company has elected to continue with the hedging requirements of IAS 39, Financial Instruments: Recognition and Measurement (IAS 39) and not adopt the hedging requirements of IFRS 9. The following foreign currency contracts under hedge accounting were in place at March 31, 2019 in a net asset position of $22 million (2018 – net asset $99 million, April 1, 2017 – net asset $41 million). Such contracts are used to hedge the principal on $US denominated long-term debt and the principal and coupon payments on Euro denominated long-term debt for which hedge accounting has been applied. The hedging instruments are effective in offsetting changes in the cash flows of the hedged item attributed to the hedged risk. The main source of hedge ineffectiveness in these hedges is credit risk.
($ amounts in millions)March 31,
2019March 31,
2018April 1,
2017Cross- Currency Hedging Swaps
Euro dollar to Canadian dollar - notional amount1 402€ 402€ 402€ Euro dollar to Canadian dollar - weighted average contract rate 1.47 1.47 1.47 Weighted remaining term 9 years 10 years 11 years
Foreign Currency Hedging Forwards
United States dollar to Canadian dollar - notional amount1 US$ 573 US$ 773 US$ 773United States dollar to Canadian dollar - weighted average contract rate 1.25 1.19 1.19 Weighted remaining term 11 years 9 years 10 years
1 Notional amount for a derivative instrument is defined as the contractual amount on which payments are calculated.
50
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
The fair value of derivative instruments designated and not designated as hedges, was as follows:
The carrying value of derivative instruments designated and not designated as hedges was the same as the fair value. The derivatives are represented on the statement of financial position as follows:
For designated cash flow hedges for the year ended March 31, 2019, a loss of $24 million (2018 – gain of $57 million) was recognized in other comprehensive income. For the year ended March 31, 2019, $8 million (2018 - $30 million) was reclassified from other comprehensive income and reported in net income, offsetting net foreign exchange gains on the underlying hedged item (2018 - losses) recorded in the period. For outstanding interest rate contracts not designated as hedges with an aggregate notional principal of $6.05 billion (2018 - $4.90 billion, April 1, 2017 - $3.60 billion), used to economically hedge the interest rates on future debt issuances, there was a $335 million decrease (2018 - $41 million decrease) in the fair value of these contracts for the year ended March 31, 2019. For interest rate contracts associated with debt issued, there was a $14 million increase (2018 - $12 million increase) in the fair value of contracts that
(in millions)Designated Derivative Instruments Used to Hedge Risk Associated with Long-term Debt:Foreign currency contract assets (cash flow hedges for $US denominated long-term debt)
$ 10 $ 59 $ 72
Foreign currency contract liabilities (cash flow hedges for $US denominated long-term debt)
- (8) (4)
Foreign currency contract assets (cash flow hedges for €EURO denominated long-term debt)
12 48 -
Foreign currency contract liabilities (cash flow hedges for €EURO denominated long-term debt)
- - (27)
22 99 41 Non-Designated Derivative Instruments:Interest rate contract assets 25 180 194 Interest rate contract liabilities (310) (97) - Foreign currency contract assets 2 6 - Commodity derivative assets 78 36 90 Commodity derivative liabilities (74) (72) (67)
(279) 53 217 Net (liability) asset (257)$ $ 152 $ 258
April 1,2017
Fair Value
March 31, March 31,2019 2018
Fair Value Fair Value
(in millions)Current portion of derivative financial instrument assets $ 79 $ 174 $ 144 Current portion of derivative financial instrument liabilities (89) (112) (60)
Derivative financial instrument assets, non-current 49 156 215 Derivative financial instrument liabilities, non-current (296) (66) (41)Net (liability) asset $ (257) $ 152 $ 258
April 1, 2017
March 31, March 31, 2019 2018
51
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
settled during the year ended March 31, 2019. The net decrease for the year ended March 31, 2019 of $321 million (2018 - $29 million) in the fair value of these interest rate contracts was transferred to the Debt Management Regulatory Account which had an asset balance of $163 million as at March 31, 2019. For foreign currency contracts not designated as hedges for the year ended March 31, 2019, a gain of $1 million (2018 – loss of $2 million) was recognized in finance charges with respect to foreign currency contracts for cash management purposes. For foreign currency contracts not designated as hedges, which are comprised primarily of foreign currency contracts for U.S. revolving borrowings, for the year ended March 31, 2019, such contracts had a gain of $3 million (2018 - loss of $53 million) recognized in finance charges. These economic hedges offset $1 million of foreign exchange revaluation losses (2018 – gain of $56 million) recorded in finance charges with respect to U.S. revolving borrowings for the year ended March 31, 2019. For commodity derivatives not designated as hedges, a net gain of $266 million (2018 - loss of $67 million) was recorded in trade revenue for the year ended March 31, 2019.
Inception Gains and Losses
Changes in deferred inception gains and losses are as follows:
CREDIT RISK
Domestic Electricity Receivables
A customer application and a credit check are required prior to initiation of services. For customers with no BC Hydro credit history, the Company ensures accounts are secured either by a credit bureau check, a cash security deposit, or a credit reference letter. The value of the current domestic and trade accounts receivable, by age and the related provision for doubtful accounts are presented in the following table:
(in millions) 2019 2018Deferred inception loss, beginning of the year 22$ $ 36 New transactions (43) (12) Amortization 35 (1) Foreign currency translation (gain) loss - (1) Deferred inception loss, end of the year 14$ 22$
52
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
Current Domestic and Trade Accounts Receivable Net of Allowance for Doubtful Accounts
At the end of each period, a review of the provision for doubtful accounts is performed. It is an assessment of the expected lifetime credit losses of domestic and trade accounts receivable at the statement of financial position date. The assessment is made by reference to age, status and risk of each receivable, current economic conditions, and historical information.
Financial Assets Arising from the Company’s Trading Activities
The Company’s counterparties span a variety of industries. There is no significant industry concentration of credit risk. The Company’s management of credit risk generally includes evaluation of counterparties’ credit quality, establishment of credit limits, and measurement, monitoring and mitigation of exposures. The Company assesses the creditworthiness of counterparties before entering into contractual obligations, and then reassesses changes on an ongoing basis. Credit risk is managed through securing, where appropriate, corporate guarantees, cash collateral, letters of credit, or third party credit insurance, and through use of master netting agreements and margining provisions in contracts. Counterparty exposures are monitored on a daily basis against established credit limits. The Company enters into derivative master netting agreements or similar agreements, and presents these transactions on a gross basis under derivative commodity assets/liabilities in the Statement of Financial Position. The following table sets out the carrying amounts of recognized financial instruments presented in the statement of financial position that are subject to the above agreements:
March 31, March 31, April 1,(in millions) 2019 2018 2017Current 592$ 448$ 515$ Past due (30-59 days) 31 32 31 Past due (60-89 days) 7 7 7 Past due (More than 90 days) 16 12 1
646 499 554 Less: Allowance for doubtful accounts (6) (7) (7)
640$ 492$ 547$
(in millions)Gross Derivative
Instruments
Related Instruments Not Offset Net Amount
As at March 31, 2019 Derivative commodity assets $ 78 $ 1 $ 77 Derivative commodity liabilities 74 1 73
As at March 31, 2018 Derivative commodity assets $ 36 $ 2 $ 34 Derivative commodity liabilities 72 2 70
As at April 1, 2017 Derivative commodity assets $ 90 $ 1 $ 89 Derivative commodity liabilities 67 1 66
53
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
LIQUIDITY RISK The following table details the remaining contractual maturities at March 31, 2019 of the Company’s non-derivative financial liabilities and derivative financial liabilities, which are based on contractual undiscounted cash flows. Interest payments have been computed using contractual rates or, if floating, based on rates current at March 31, 2019. In respect of the cash flows in foreign currencies, the exchange rate as at March 31, 2019 has been used.
Carrying Value
Fiscal 2020
Fiscal 2021
Fiscal 2022
Fiscal 2023
Fiscal 2024
Fiscal 2025
(in millions)and
thereafter
Non-Derivative Financial LiabilitiesTotal accounts payable and other payables 1,238$ (1,238)$ -$ -$ -$ -$ -$
(excluding interest accruals and current portion of lease obligations and First Nations liabilities)
Long-term debt 22,591 (3,928) (1,862) (1,218) (1,158) (835) (25,846) (including interest payments)
Lease obligations 654 (54) (54) (54) (54) (55) (1,037) Other long-term liabilities 829 (125) (61) (57) (56) (55) (1,831) Total Non-Derivative Financial Liabilities 25,312 (5,345) (1,977) (1,329) (1,268) (945) (28,714) Derivative Financial Liabilities
used for hedging - Cash outflow - - - - - (169) Cash inflow - - - - - 174
310 (26) (81) (97) (73) (44) (3) Total Derivative Financial Liabilities 310 (26) (81) (97) (73) (44) 2 Total Financial Liabilities 25,622 (5,371) (2,058) (1,426) (1,341) (989) (28,712) Derivative Financial Assets
(12) Cash outflow (14) (14) (14) (14) (14) (651) Cash inflow 5 5 5 5 5 622
used for hedging (10) Cash outflow - - - - - (550) Cash inflow - - - - - 591
(2) Cash outflow (223) - - - - - Cash inflow 225 - - - - -
(25) 9 16 - - - - (4) 1 (12) - 1 1 1
Total Derivative Financial Assets (53) 3 (5) (9) (8) (8) 13 Net Financial Liabilities 25,569$ (5,368)$ (2,063)$ (1,435)$ (1,349)$ (997)$ (28,699)$
Net commodity derivativesInterest rate swaps used for hedging
Cross currency swaps used for hedging
Interest rate swaps and bond locks used for hedging
Forward foreign exchange contracts
Forward foreign exchange contracts
Other forward foreign exchange contracts designated at fair value
54
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
MARKET RISKS
(a) Currency Risk
Sensitivity Analysis A $0.01 strengthening (weakening) of the U.S. dollar against the Canadian dollar at March 31, 2019 would otherwise have a negative (positive) impact of $1 million on net income before movement in regulatory balances but as a result of regulatory accounting would have no impact on net income or other comprehensive income. The Total Finance Charges Regulatory Account that captures all variances from forecasted finance charges (as described in Note 14) eliminates any impact on net income. This analysis assumes that all other variables, in particular interest rates, remain constant.
This sensitivity analysis has been determined assuming that the change in foreign exchange rates had occurred at March 31, 2019 and been applied to each of the Company’s exposures to currency risk for both derivative and non-derivative financial instruments in existence at that date, and that all other variables remain constant. The stated change represents management’s assessment of reasonably possible changes in foreign exchange rates over the period until the next statement of financial position date.
(b) Interest Rate Risk
Sensitivity analysis for variable rate non-derivative instruments An increase (decrease) of 100-basis points in interest rates at March 31, 2019 would otherwise have a negative (positive) impact on net income before movement in regulatory balance of $30 million, but as a result of regulatory accounting, it would have no impact on net income or other comprehensive income. The Total Finance Charges Regulatory Account that captures all variances from forecasted finance charges (as described in Note 14) eliminates any impact on net income. This analysis assumes that all other variables, in particular foreign exchange rates, remain constant.
For the interest rate contracts, an increase of 100-basis points in interest rates at March 31, 2019 would otherwise have a positive impact on net income of $790 million and a decrease of 100 basis points in interest rates at March 31, 2019 would otherwise have a negative impact on net income before movement in regulatory balances of $980 million but as a result of regulatory accounting would have no impact on net income or other comprehensive income as all gains and losses will be captured in the Debt Management Regulatory Account.
This sensitivity analysis has been determined assuming that the change in interest rates had occurred at March 31, 2019 and been applied to each of the Company’s exposure to interest rate risk for non-derivative financial instruments in existence at that date, and that all other variables remain constant. The stated change represents management’s assessment of reasonably possible changes in interest rates over the period until the next statement of financial position date.
(c) Commodity Price Risk
Sensitivity Analysis Commodity price risk refers to the risk that the fair value or future cash flows of a financial instrument will fluctuate due to changes in commodity prices. The Company has exposure to movements in prices for commodities including electricity, natural gas
55
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
and associated derivative products. Prices for electricity and natural gas commodities fluctuate in response to changes in supply and demand, market uncertainty, and other factors beyond the Company’s control. The Company manages these exposures through its risk management policies, which limit components of and overall market risk exposures, pre-defined approved products and mandate regular reporting of exposures. The Company’s risk management policies for trading activities defines various limits and controls, including Value at Risk (“VaR”) limits, Mark-to-Market limits, and various transaction specific limits which are monitored on a daily basis. VaR estimates the pre-tax forward trading loss that could result from changes in commodity prices, with a specific level of confidence, over a specific time period. The Company uses an industry standard Monte Carlo VaR model to determine the potential change in value of the Company’s forward trading portfolio over a 10-day holding period, within a 95% confidence level, resulting from normal market fluctuations. VaR as an estimate of price risk has several limitations. The VaR model uses historical information to determine potential future volatility and correlation, assuming that price movements in the recent past are indicative of near-term future price movements. It cannot forecast unusual events which can lead to extreme price movements. In addition, it is sometimes difficult to appropriately estimate VaR associated with illiquid or non-standard products. As a result, the Company uses additional measures to supplement the use of VaR to estimate price risk. These include the use of a Historic VaR methodology, stress tests and notional limits for illiquid or emerging products. The VaR for commodity derivatives, calculated under this methodology, was approximately $10 million at March 31, 2019 (2018 - $6 million, April 1, 2017 - $8 million).
Fair Value Hierarchy
The following provides an analysis of financial instruments that are measured subsequent to initial recognition at fair value, grouped based on the lowest level of input that is significant to that fair value measurement. The inputs used in determining fair value are characterized by using a hierarchy that prioritizes inputs based on the degree to which they are observable. The three levels of the fair value hierarchy are as follows:
Level 1 - values are quoted prices (unadjusted) in active markets for identical assets and liabilities.
Level 2 - inputs are those other than quoted prices included within Level 1 that are observable for the asset or liability, either directly or indirectly, as of the reporting date. The Company determines Level 2 fair values for debt securities and derivatives using discounted cash flow techniques, which use contractual cash flows and market-related discount rates. Level 2 fair values for commodity derivatives are determined using inputs other than unadjusted quoted prices that are observable for the asset or liability, either directly (i.e. as prices) or indirectly (i.e. derived from prices). Level 2 includes bilateral and over-the-counter contracts valued using
56
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
interpolation from observable forward curves or broker quotes from active markets for similar instruments and other publicly available data, and options valued using industry-standard and accepted models incorporating only observable data inputs.
Level 3 - inputs are those that are not based on observable market data. Level 3 fair values for
commodity derivatives are determined using inputs that are based on unobservable inputs.
Level 3 includes instruments valued using observable prices adjusted for unobservable basis differentials such as delivery location and product quality, instruments which are valued by extrapolation of observable market information into periods for which observable market information is not yet available, and instruments valued using internally developed or non-standard valuation models.
The following tables present the financial instruments measured at fair value for each hierarchy level as at March 31, 2019 and 2018, and April 1, 2017:
As at March 31, 2019 (in millions) Level 1 Level 2 Level 3 TotalTotal financial assets carried at fair value:Short-term investments 50$ -$ -$ 50$ Derivatives designated as hedges - 22 - 22 Derivatives not designated as hedges 64 38 4 106
114$ 60$ 4$ 178$
As at March 31, 2019 (in millions) Level 1 Level 2 Level 3 TotalTotal financial liabilities carried at fair value:Derivatives designated as hedges -$ -$ -$ -$ Derivatives not designated as hedges (47) (325) (13) (385)
(47)$ (325)$ (13)$ (385)$
As at March 31, 2018 (in millions) Level 1 Level 2 Level 3 TotalTotal financial assets carried at fair value:Short-term investments 31$ -$ -$ 31$ Derivatives designated as hedges - 107 - 107 Derivatives not designated as hedges 17 201 5 223
48$ 308$ 5$ 361$
As at March 31, 2018 (in millions) Level 1 Level 2 Level 3 TotalTotal financial liabilities carried at fair value:Derivatives designated as hedges -$ (8)$ -$ (8)$ Derivatives not designated as hedges (62) (106) (2) (170)
(62)$ (114)$ (2)$ (178)$
57
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
The Company’s policy is to recognize level transfers at the end of each period during which the change occurred. During the year, commodity derivatives of $1 million were transferred from Level 2 to Level 1 as the Company now uses observable price quotations (2018 – no transfers). The following table reconciles the changes in the balance of financial instruments carried at fair value on the statement of financial position, classified as Level 3, for the years ended March 31, 2019 and 2018:
During the year ended March 31, 2019, there were no transfers between Level 3 and Level 2 (2018 – $7 million transferred from Level 3 to Level 2). During the year ended March 31, 2019, unrealized losses of $14 million (2018 – losses of $14 million) were recognized on Level 3 derivative commodity financial instruments still on hand. These losses were recognized in trade revenues. Methodologies and procedures regarding commodity trading Level 3 fair value measurements are
As at April 1, 2017 (in millions) Level 1 Level 2 Level 3 TotalTotal financial assets carried at fair value:Short-term investments 24$ -$ -$ 24$ Derivatives designated as hedges - 72 - 72 Derivatives not designated as hedges 39 207 41 287
63$ 279$ 41$ 383$
As at April 1, 2017 (in millions) Level 1 Level 2 Level 3 TotalTotal financial liabilities carried at fair value:Derivatives designated as hedges -$ (31)$ -$ (31)$ Derivatives not designated as hedges (52) (14) (4) (70)
(52)$ (45)$ (4)$ (101)$
(in millions)Balance as at April 1, 2018 $ 3 Net loss recognized (34)New transactions 8 Transfer from Level 3 to Level 2 - Existing transactions settled 14 Balance as at March 31, 2019 $ (9)
(in millions)Balance as at April 1, 2017 $ 37 Net loss recognized (31)New transactions (5) Transfer from Level 3 to Level 2 (7)Existing transactions settled 9 Balance as at March 31, 2018 $ 3
58
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
determined by the Company’s risk management group. Level 3 fair values are calculated within the Company’s risk management policies for trading activities based on underlying contractual data as well as observable and non-observable inputs. To ensure reasonability, Level 3 fair value measurements are reviewed and validated by risk management and finance departments on a regular basis. The key unobservable inputs in the valuation of certain Level 3 financial instruments include components of forward commodity prices and delivery or receipt volumes. A sensitivity analysis was prepared using the Company’s assessment of reasonably possible changes in various components of forward prices and volumes of 10 percent. Forward commodity prices used in determining Level 3 fair value at March 31, 2019 are $7-$123 per MWh and a 10 percent increase/decrease in certain components of these prices would decrease/increase fair value by $1 million. A 10 percent change in estimated volumes used in determining Level 3 fair value would increase/decrease fair value by $15 million. NOTE 21: OTHER NON-CURRENT LIABILITIES
Changes in each class of provision during the financial year are set out below:
March 31, March 31, April 1,(in millions) 2019 2018 2017Provisions Environmental liabilities 284$ 317$ 339$ Decommissioning obligations 53 53 52 Other 30 70 27
367 440 418 First Nations liabilities 410 401 394 Finance lease obligations 654 665 219 Other contributions 238 242 246 Other liabilities 419 409 336
2,088 2,157 1,613 Less: Current portion, included in accounts payable and accrued liabilities (100) (136) (97)
1,988$ 2,021$ 1,516$
Environmental Decommissioning Other TotalBalance at April 1, 2017 339$ 52$ 27$ 418$ Made during the period - - 47 47 Used during the period (25) (1) (4) (30) Changes in estimate (1) 1 - - Accretion 4 1 - 5 Balance at March 31, 2018 317$ 53$ 70$ 440$ Made during the period - - 26 26 Used during the period (32) (1) (67) (100) Reversed during the period (9) - (1) (10) Changes in estimate 2 - 2 4 Accretion 6 1 - 7 Balance at March 31, 2019 284$ 53$ 30$ 367$
59
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
Environmental Liabilities
The Company has recorded a liability for the estimated future environmental expenditures related to present or past activities of the Company. The Company’s recorded liability is based on management’s best estimate of the present value of the future expenditures expected to be required to comply with existing regulations. There are uncertainties in estimating future environmental costs due to potential external events such as changes in legislation or regulations and advances in remediation technologies. All factors used in estimating the Company’s environmental liabilities represent management’s best estimates of the present value of costs required to meet existing legislation or regulations. Estimated environmental liabilities are reviewed annually or more frequently if significant changes in regulation or other relevant factors occur. Estimate changes are accounted for prospectively. At March 31, 2019, the undiscounted cash flow related to the Company’s environmental liabilities, which will be incurred between fiscal 2020 and 2045, is approximately $328 million and was determined based on current cost estimates. A range of discount rates between 1.6 per cent and 1.9 per cent were used to calculate the net present value of the obligations. Decommissioning Obligations
The Company’s decommissioning obligation provision consists of estimated removal and destruction costs associated with certain PCB contaminated assets and certain submarine cables. The Company has determined its best estimate of the undiscounted amount of cash flows required to settle remediation obligations at $77 million (2018 - $80 million, April 1, 2017 - $80 million), which will be settled between fiscal 2020 and 2054. The undiscounted cash flows are then discounted by a range of discount rates between 1.6 per cent and 1.9 per cent were used to calculate the net present value of the obligations. The obligations are re-measured at each period end to reflect changes in estimated cash flows and discount rates. First Nations Liabilities
The First Nations liabilities consist primarily of settlement costs related to agreements reached with various First Nations groups. First Nations liabilities are recorded as financial liabilities and are measured at fair value on initial recognition with future contractual cash flows being discounted at rates ranging from 4.4 per cent to 5.0 per cent. These liabilities are measured at amortized cost and not re-measured for changes in discount rates. The First Nations liabilities are non-interest bearing. Finance Lease Liabilities The finance lease obligations are related to long-term energy purchase agreements. The present value of the lease obligations were discounted at rates ranging from 5.6 per cent to 7.9 per cent with contract terms of 25 to 30 years expiring from 2036 until 2048. Finance lease liabilities are payable as follows:
(in millions)
Future minimum
lease payments Interest
Present value of
minimum lease
payments
Future minimum
lease payments Interest
Present value of
minimum lease
payments
Future minimum
lease payments Interest
Present value of
minimum lease
paymentsLess than one year 54$ 42$ 12$ 54$ 42$ 12$ 40$ 18$ 22$ Between one and five years 217 158 59 216 161 55 84 60 24 More than five years 1,037 454 583 1,091 493 598 291 118 173 Total minimum lease payments 1,308$ 654$ 654$ 1,361$ 696$ 665$ 415$ 196$ 219$
March 31, 2019 March 31, 2018 April 1, 2017
60
British Columbia Hydro and Power Authority
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
Other Contributions
Other contributions consist of contribution from a vendor to aid in the construction of a transmission system. Contributions include payment received and also contributions to be received (refer to Note 13) and are being recognized as an offset to the applicable energy purchase costs over the life of the energy purchase agreement.
Other Liabilities
Other liabilities include a contractual obligation associated with the construction of assets. The contractual obligation has an implied interest rate of 7 per cent and a repayment term of 15 years commencing in fiscal 2019. The liability is measured at amortized cost and not re-measured for changes in discount rates.
NOTE 22: COMMITMENTS AND CONTINGENCIES
Energy Commitments
BC Hydro (excluding Powerex) has long-term energy and capacity purchase contracts to meet a portion of its expected future domestic electricity requirements. The expected obligations to purchase energy under these contracts have a total value of approximately $51.08 billion of which approximately $101 million relates to the purchase of natural gas and natural gas transportation contracts. The remaining commitments are at predetermined prices. Included in the total value of the long-term energy purchase agreements is $1.31 billion accounted for as obligations under capital leases. The total BC Hydro combined payments are estimated to be approximately $1.49 billion for less than one year, $6.17 billion between one and five years, and $43.42 billion for more than five years and up to 57 years.
Powerex has energy purchase commitments with an estimated minimum payment obligation of $1.82 billion extending to 2034. The total Powerex energy purchase commitments are estimated to be approximately $539 million for less than one year, $1.2 billion between one and five years, and $85 million for more than five years. Powerex has energy sales commitments of $559 million extending to 2031 with estimated amounts of $332 million for less than one year, $212 million between one and five years, and $15 million for more than five years.
Lease and Service Agreements
The Company has entered into various agreements to lease facilities or assets classified as operating leases, or service agreements supporting operations. The agreements cover periods of up to 70 years, and the aggregate minimum payments are approximately $873 million. Payments are $74 million for less than one year, $113 million between one and five years, and $686 million for more than five years.
Refer to Note 11 for commitments pertaining to major property, plant and equipment projects.
Contingencies and Guarantees
a) Facilities and Rights of Way: the Company is subject to existing and pending legal claims relatingto alleged infringement and damages in the operation and use of facilities owned by the Company. These claims may be resolved unfavourably with respect to the Company and may have a significant adverse effect on the Company’s financial position. For existing claims in respect of which settlement negotiations have advanced to the extent that potential settlement amounts can reasonably be predicted, management has recorded a liability for the potential costs of those settlements. For pending claims, management believes that there is a risk that any loss exposure that
61
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
may ultimately be incurred may differ materially from management’s current estimates. Management has not disclosed the ranges of expected outcomes due to the potentially adverse effect on the negotiation process for these claims.
b) Due to the size, complexity and nature of the Company’s operations, various other legal matters are
pending. It is not possible at this time to predict with any certainty the outcome of such litigation. Management believes that any settlements related to these matters will not have a material effect on the Company’s consolidated financial position or results of operations.
c) The Company and its subsidiaries have outstanding letters of credit to secure pension plan solvency
deficiency payments related to the registered pension plan totaling $1.27 billion (2018 - $1.17 billion, April 1, 2017 – 1.12 billion), which includes US $25 million (2018 - US $12 million, April 1, 2017 – US $21 million) in foreign denominated letters of credit.
NOTE 23: RELATED PARTY TRANSACTIONS Subsidiaries
The principal subsidiaries of BC Hydro are Powerex, Powertech, and Columbia. All companies are wholly owned and incorporated in Canada and all ownership is in the form of common shares. Operating out of Vancouver, BC, Canada, Powerex is an energy marketer, whose activities include trading wholesale power, environmental products (renewable energy credits or other similar products), carbon products (allowances and other similar products), natural gas, ancillary services, and financial energy products in North America. Powertech offers services to solve technical problems with power equipment and systems in Canada and throughout the world. Columbia provides construction services in support of certain BC Hydro capital programs. All intercompany transactions and balances are eliminated upon consolidation. Related Parties
As a Crown Corporation, the Company and the Province are considered related parties. All transactions between the Company and its related parties are considered to possess commercial substance and are consequently recorded at the exchange amount, which is the amount of consideration established and agreed to by the related parties. The related party transactions are summarized below:
62
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
The Company’s debt is either held or guaranteed by the Province (see Note 16). Under an agreement with the Province, the Company indemnifies the Province for any credit losses incurred by the Province related to interest rate and foreign currency contracts entered into by the Province on the Company’s behalf. As at March 31, 2019, the aggregate exposure under this indemnity totaled $49 million (2018 - $293 million, April 1, 2017 - $266 million). The Company has not experienced any losses to date under this indemnity. Key Management Personnel and Board Compensation
Key management personnel and board compensation includes compensation to the Company’s executive management team and board of directors.
NOTE 24: EXPLANATION OF TRANSITION TO IFRS As stated in Note 2, these are the Company’s first consolidated financial statements prepared in accordance with IFRS. As IFRS require comparative financial information, the Company has applied IFRS 1, First-time Adoption of IFRS on the transition date of April 1, 2017. The accounting policies set out in Note 3 have been applied in preparing the consolidated financial statements for the year ended March 31, 2019, the comparative information presented in these consolidated financial statements for the year ended March 31, 2018 and in preparation of an opening statement of financial position at April 1, 2017. In adopting IFRS, the Company has applied the recognition, measurement, presentation and disclosure principles of IFRS 1 in preparing its transitional adjustments and consolidated financial statements. The principles of IFRS 1 generally require that first-time adopters of a new set of accounting policies retrospectively apply all effective standards and interpretations in effect as at the reporting date. However, IFRS 1 also provides optional and mandatory exemptions to the requirement for full retrospective
March 31, March 31, April 1,(in millions) 2019 2018 2017Consolidated Statement of Financial Position Prepaid expenses 87$ 95$ 93$ Accounts payable and accrued liabilities 139 222 57
2019 2018Amounts incurred/accrued during the year include: Water rental fees 331 324 Cost of energy 202 111 Grants and Taxes 141 138 Interest 854 797 Payment to the Province 59 159
(in millions) 2019 2018Short-term employee benefits 4$ 4$ Post-employment benefits 1 1
63
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
application of IFRS. The Company has applied the following relevant mandatory and optional exemptions in the opening IFRS consolidated statement of financial position: IFRS mandatory exemptions:
a) Estimates
The Company’s estimates under IFRS at the date of transition were consistent with estimates made under the Prescribed Standards. Estimates previously made were not revised for changes under IFRS except to reflect any difference in accounting policies.
IFRS optional exemptions:
a) Fair Value as Deemed Cost
Entities that hold items of property, plant and equipment or intangible assets used in operations subject to rate regulation are permitted under IFRS 1 to elect to use their carrying amounts as deemed cost at the date of transition to IFRS. The Company has elected to apply this exemption except for assets impacted by elections (b) and (d) in this section.
b) Leases IFRS 1 allows entities to apply the transitional provision in IFRIC 4 – Determining whether an Arrangement contains a Lease, which allows the Company to determine whether an arrangement existing at the date of transition to IFRS contains a lease on the basis of facts and circumstances existing at that date. This election has been applied to all leases.
c) Cumulative Translation Differences
IAS 21, The Effects of Changes in Foreign Exchange Rates requires an entity to recognize foreign exchange differences arising on translation of subsidiaries with a different functional currency in other comprehensive income and accumulate these in a separate component of equity. However, IFRS 1 allows entities to not comply with these requirements for cumulative translation differences that existed at the date of transition to IFRS. This election has been applied to the operations of Powerex with all related cumulative translation differences deemed to be zero at the date of transition.
d) Decommissioning liabilities
IFRIC 1, Changes in Existing Decommissioning, Restoration and Similar Liabilities requires specified changes in a decommissioning, restoration or similar liability to be adjusted against the cost of the asset to which it relates with the adjusted amount depreciated prospectively over its remaining useful life. IFRS 1 provides an exemption from complying with these requirements for changes in such liabilities that occurred before the date of transition to IFRS. The Company has applied this exemption to existing asset retirement obligations recognized under the Prescribed Standards and to new obligations recognized on transition to IFRS.
64
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
In preparing its opening statement of financial position, the Company has adjusted amounts reported previously in financial statements prepared in accordance with the Prescribed Standards. An explanation of how the transition from the Prescribed Standards to IFRS has affected the Company’s financial position, and financial performance is set out in the following tables and the notes that accompany the tables. The transition to IFRS did not have a material impact to the Company’s cash flows. Reconciliation of Consolidated Statement of Financial Position
(in millions) Note IFRS IFRSASSETS
Current AssetsCash and cash equivalents 49$ -$ -$ 49$ 42$ -$ -$ 42$ Restricted cash 28 - - 28 77 - - 77 Accounts receivable and accrued revenue c, d 780 (19) - 761 733 (5) - 728 Inventories 185 - - 185 144 - - 144 Prepaid expenses 162 - - 162 167 - - 167 Current portion of derivative financial instrument assets 144 - - 144 174 - - 174
1,348 (19) - 1,329 1,337 (5) - 1,332
Non-Current Assets Property, plant and equipment a, b 22,998 (4) - 22,994 25,083 (4) - 25,079 Intangible assets 601 - - 601 591 - - 591 Regulatory assets c, g 6,127 - (6,127) - 5,892 (1) (5,891) - Derivative financial instrument assets 215 - - 215 156 - - 156 Other non-current assets c 599 (39) - 560 683 (51) - 632
30,540 (43) (6,127) 24,370 32,405 (56) (5,891) 26,458 Total Assets 31,888 (62) (6,127) 25,699 33,742 (61) (5,891) 27,790 Regulatory Balances - - 6,127 6,127 - - 5,891 5,891 Total Assets and Regulatory Balances 31,888$ (62)$ -$ 31,826$ 33,742$ (61)$ -$ 33,681$
LIABILITIES AND EQUITY
Current LiabilitiesAccounts payable and accrued liabilities c 1,190$ (18)$ -$ 1,172$ 1,621$ (18)$ -$ 1,603$ Current portion of long-term debt 2,878 - - 2,878 3,344 - - 3,344 Current portion of unearned revenues and contributions in aid c - 82 - 82 - 85 - 85 Current portion of derivative financial instrument liabilities 60 - - 60 112 - - 112
4,128 64 - 4,192 5,077 67 - 5,144 Non-Current LiabilitiesLong-term debt 17,146 - - 17,146 17,020 - - 17,020 Regulatory liabilities c, g 530 315 (845) - 437 314 (751) - Derivative financial instrument liabilities 41 - - 41 66 - - 66 Unearned revenues and contributions in aid of construction c 1,765 (145) - 1,620 1,874 (116) - 1,758 Post-employment benefits 1,566 - - 1,566 1,474 - - 1,474 Other non-current liabilities c 1,803 (287) - 1,516 2,338 (317) - 2,021
22,851 (117) (845) 21,889 23,209 (119) (751) 22,339 Total Liabilities 26,979 (53) (845) 26,081 28,286 (52) (751) 27,483 Regulatory Balances - - 845 845 - - 751 751 Shareholder's EquityContributed surplus 60 - - 60 60 - - 60 Retained earnings b, d, e, g 4,822 74 - 4,896 5,347 74 - 5,421 Accumulated other comprehensive income (loss) e 27 (83) - (56) 49 (83) - (34)
4,909 (9) - 4,900 5,456 (9) - 5,447 Total Liabilities, Shareholder's Equity and Regulatory Balances 31,888$ (62)$ -$ 31,826$ 33,742$ (61)$ -$ 33,681$
Prescribed Standards
Effect of Transition
March 31, 2018April 1, 2017
Prescribed Standards
Effect of Transition
IFRS 14 Presentation
Reclassf
IFRS 14 Presentation
Reclassf
65
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
Reconciliation of Consolidated Statement of Comprehensive Income
a) Fair Value as Deemed Cost
With the application of the deemed cost exemption, the net book value of property, plant and equipment and intangible assets for BC Hydro entities subject to rate regulation at April 1, 2017 have become the opening cost of property, plant and equipment and intangible under IFRS except for finance leases and asset retirement obligation.
b) Provision Re-Measurement
Under IAS 37, Provisions, Contingent Liabilities and Contingent Assets, provisions are reviewed at the end of each reporting period and adjusted to reflect the current best estimate, including a reassessment in discount rates where present value of a provision has been calculated. The Company elected to use an exemption allowing decommissioning related assets to be re-measured on a simplified approach at the transition date rather than perform a full detailed calculation. As a result, the re-measurement decreased property, plant, and equipment and retained earnings by $4 million as at April 1, 2017.
c) Revenue from Contracts with Customers
Under the Prescribed Standards, BC Hydro applied IAS 18, Revenue which did not provide specific guidance regarding the measurement of the transaction price for a contract that includes financing provided by the customer. Under IFRS 15, Revenue from Contracts with Customers the transaction
for the year ended March 31, 2018 (in millions) Note IFRSRevenuesDomestic c 5,527$ 18$ (322)$ 5,223$ Trade 731 - - 731
6,258 18 (322) 5,954 ExpensesOperating expenses b 4,921 - (424) 4,497 Finance charges c 653 18 153 824 Net Income Before Movement in Regulatory Balances 684 - (51) 633 Net movement in regulatory balances - - 51 51 Net Income 684 - - 684
OTHER COMPREHENSIVE INCOME
Items That Will Be Reclassified to Net IncomeEffective portion of changes in fair value of derivatives designated as cash flow hedges 57 - - 57 Reclassification to income of derivatives designated as cash flow hedges (30) - - (30) Foreign currency translation gains (losses) (5) - - (5) Items That Will Not Be Reclassified to Net IncomeActuarial gain - - 193 193 Other Comprehensive Income (Loss) before movement in 22 - 193 215 regulatory balancesNet movements in regulatory balances - - (193) (193) Other Comprehensive Income 22 - - 22 Total Comprehensive Income 706$ - -$ 706$
Effect of Transition
Prescribed Standard
IFRS 14 Presentation
Reclassf
66
British Columbia Hydro and Power Authority
NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
price for contracts that include a significant financing component is required to be adjusted for the time value of money (e.g. interest) based on the interest rate in effect at the inception of the contract.
As a result of adjusting the measurement of the transaction price due to a significant customer financing component for consideration received in advance of delivery of electricity under the Skagit River Agreement, as at April 1, 2017 there was a decrease of $334 million in the unearned revenue liability account, and increase in current portion of unearned revenues of $16 million respectively. To ensure ratepayers receive the benefit of the accounting change, the corresponding net increase of $318 million was transferred to the Heritage Deferral Account regulatory liability balance instead of adjusting retained earnings with such impact being reflected in the proposed F2020 – F2021 Revenue Requirement Application. In addition to the transition date adjustment, domestic revenue increased by $17 million, finance charge increased by $16 million, and net movement in regulatory balances in net income decreased by $1 million for the year ended March 31, 2018. The unearned revenues also decreased by $1 million, with a corresponding increase in Heritage Deferral Account regulatory liability during the year ended March 31, 2018.
Due to the new prescriptive guidance in IFRS 15 regarding recognition of receivables and related unearned revenue amounts, as at April 1, 2017 and March 31, 2018, there was a decrease of $39 million and $51 million respectively in non-current receivables within other non-current assets, a decrease in accounts receivable and accrued revenue of $14 million and $nil respectively, a decrease in unearned revenues of $50 million and $47 million respectively, and a decrease of $3 million and $5 million respectively to the Total Finance Charges regulatory liability account and a decrease to the Non-Heritage Deferral regulatory asset account of $1 million at March 31, 2018.
The impact to the statement of comprehensive income for these changes for fiscal 2018 was that finance charges increased by $2 million, domestic revenue increased by $1 million, and net movement in regulatory balances in net income increased by $1 million.
Reclassifications:
i) Current portion of contributions in aid of construction have been reclassified to a separateline item on the Statement of Financial Position. This reclassification resulted in a decreasein contributions in aid of construction of $44 million as at April 1, 2017 and $47 million asat March 31, 2018, with a corresponding increase in current portion of unearned revenuesand contributions in aid.
ii) Unearned revenues have been reclassified to a separate line item on the statement offinancial position. This reclassification resulted in a decrease in other non-current liabilitiesof $529 million as at April 1, 2017 and $555 million as at March 31, 2018, with acorresponding increase in unearned revenues and contributions in aid. There was also areclassification for the current portion that resulted in a decrease in accounts payable of $22million respectively as at April 1, 2017 and March 31, 2018, with a corresponding increasein current portion of unearned revenues and contributions in aid of $22 million respectively.
iii) Contributions from a vendor to aid in the construction of a transmission system have beenreclassified from contributions in aid to other non-current liabilities and accounts payable
67
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
for the current portion to differentiate contributions in aid from customers. This reclassification resulted in a decrease in contributions in aid of $246 million as at April 1, 2017 and $242 million as at March 31, 2018, with a corresponding increase in accounts payable and accrued liabilities of $4 million respectively and $242 million and $238 million, respectively, in other non-current liabilities.
d) Accounts Receivable
Under the Prescribed Standards, BC Hydro recognized impairments of financial assets based on the incurred loss model in accordance with IAS 39, Financial Instruments: Recognition and Measurement. IFRS 9, Financial Instruments requires that impairments are based on a forward-looking ‘expected loss’ model. On adoption of IFRS, accounts receivable and accrued revenues have decreased by $5 million and retained earnings decreased by $5 million at both April 1, 2017 and March 31, 2018 as compared to amounts previously presented.
e) Cumulative Translation Adjustment In accordance with IFRS 1, the Company elected to deem all foreign currency translation differences arising on consolidation of Powerex to be nil at the date of transition, April 1, 2017. The impact of this adjustment was to increase retained earnings and decrease accumulated other comprehensive income by $83 million at April 1, 2017.
f) Regulatory Deferral Account Balances
The Company elected to adopt IFRS 14, Regulatory Deferral Accounts. IFRS 14 specifies the financial reporting requirements for regulatory deferral account balances that arise from rate-regulation. This standard requires the consolidated statement of comprehensive income above net movement in regulatory balances to be presented in a manner that does not include the impacts of rate-regulation. As a result, domestic revenues decreased by $322 million, operating expenses decreased by $424 million, finance charges increased by $153 million, net movement in regulatory balances in net income increased by $51 million for the year ended March 31, 2018. In addition, actuarial gain increased and net movement in regulatory balances in other comprehensive income decreased by $193 million respectively for the year ended March 31, 2018. IFRS 14 also requires separate disclosure in the statement of financial position for the total of all regulatory deferral debit balances and the total of all regulatory deferral credit balances. The regulatory balances will distinguished from the assets and liabilities by the use of sub-totals. As a result, $6.13 billion and $5.89 billion of regulatory assets was reclassified to regulatory balances under total assets and $845 million and $751 million of regulatory liabilities was reclassified to regulatory balances under total liabilities as at April 1, 2017 and March 31, 2018 respectively.
68
British Columbia Hydro and Power Authority NOTES TO THE CONSOLIDATED FINANCIAL STATEMENTS FOR THE YEARS ENDED MARCH 31, 2019 AND 2018
g) Deferral of Transitional Impacts The following transitional impacts resulted from the application of the principles of IFRS to retained earnings has been deferred for regulatory purposes. The changes have increased (decreased) regulatory assets and liabilities as follows:
(in millions)
NoteAs at
April 1, 2017For the year ended
March 31, 2018Revenue from Contracts with Customers c (315) - Incremental increase (decrease) for the period (315) - Total cumulative increase (decrease) as at the balance sheet date (315) (315)
Regulatory assets - (1) Regulatory liabilities (315) (314) Net regulatory increase (315) (315)
Incremental Increase (Decrease)
69
BC Hydro Powerex BC Hydro Powerex BC Hydro Powerex
Board of Directors3 1 of 1
Audit & Finance Committee 1 of 1
Capital Projects Committee 1 of 1
Board of Directors 7 of 8Audit & Finance Committee, Chair 7 of 7Pension Management Committee 5 of 5Powerex Audit & Risk Management Committee, Chair 4 of 4Nominating Committee 2 of 3Powerex Board of Directors 3 of 4Site C Project Assurance Board 10 of 13
Board of Directors8 2 of 4Governance & Human Resources Committee 1 of 1Site C Project Assurance Board 1 of 1
Board of Directors 8 of 8Operations & Planning Committee 3 of 4Nominating Committee 3 of 3Site C Project Board 11 of 13
Board of Directors4 1 of 1Operations & Planning Committee 1 of 1Governance & Human Resources Committee 1 of 1
Board of Directors 8 of 8
Operations & Planning Committee, Chair 5 3 of 4
Capital Projects Committee, Chair 6 3 of 4Powerex Audit & Risk Management Committee 4 of 4Powerex Board of Directors 4 of 4
Board of Directors 8 of 8
Audit & Finance Committee 7 of 7
Pension Management Committee 3 of 4
Governance & Human Resources Committee 7 4 of 4
Nominating Committee 3 of 3
Powerex Audit & Risk Management Committee 4 of 4
Powerex Board of Directors 4 of 4
Board of Directors8 2 of 4
Audit & Finance Committee 2 of 2
Governance & Human Resources Committee 1 of 1
Board of Directors9 1 of 1Operations & Planning Committee 1 of 1Governance & Human Resources Committee, Chair 1 of 1Pension Management Committee 0 of 1Site C Project Assurance Board 2 of 3Peace Williston Advisory Committee, Chair 1 of 1
Board of Directors 7 of 8Capital Projects Committee 4 of 4
Site C Project Assurance Board, Chair 10 13 of 13
Board of Directors, Chair11 7 of 8Audit & Finance Committee (ex-officio) 7 of 7Capital Projects Committee (ex-officio) 4 of 4Operations & Planning Committee (ex-officio) 4 of 4Governance & Human Resources Committee (ex-officio) 4 of 4Nominating Committee, Chair 3 of 3Powerex Audit & Risk Management Committee 4 of 4Powerex Board of Directors, Chair 4 of 4
Site C Project Assurance Board12 12 of 13
Board of Directors13 3 of 4Capital Projects Committee, Chair 3 of 3Operations & Planning Committee 3 of 3Site C Project Assurance Board 10 of 10
2,625
2,250
- 1,875 -
9,750
- 21,750 -
3,000
5,250 2,625 - 7,875- 6,264
30,000 15,000
-
81,000 4,500
3,848
6,453
Boggio, Len
Peterson, Ken
North, Janine
Nunn, John
15,000
Hanuse, Debra
17,250
16,688
Ritchie, John 13,500
Gallagher, Bob
Lambert, Valerie
Hatton, James
5,625
Lanzinger, Irene 3,750
1,7604,125
18,000 6,000
1,680
2,476
53,000
36,750
20,000 9,000 19,875
- 13,125 - 28,125
2,956
7,500
2,382Adsit, Bill 5,250-
BRITISH COLUMBIA HYDRO AND POWER AUTHORITYAND ITS SUBSIDIARY POWEREX CORP.SCHEDULE OF REMUNERATION AND EXPENSESBOARD OF DIRECTORSFISCAL YEAR ENDED MARCH 31, 2019
NAME POSITIONRETAINERS ($)
MEETINGS
ATTENDED1 TOTAL REMUNERATION ($)
EXPENSES ($)MEETING FEES ($)2
3,750 - 1,500
Fields, Daryl - - - - - -
12,000 25,500-
6,000 12,000
11,182
990
130,500
38,438
6,375 428
37,500
70
BC Hydro Powerex BC Hydro Powerex BC Hydro Powerex
NAME POSITIONRETAINERS ($)
MEETINGS
ATTENDED1 TOTAL REMUNERATION ($)
EXPENSES ($)MEETING FEES ($)2
Board of Directors8 3 of 4Operations & Planning Committee 1 of 1Site C Project Assurance Board 3 of 4
Board of Directors 8 of 8Audit & Finance Committee 6 of 7
Operations & Planning Committee14 4 of 4
GRAND TOTAL $168,313 $36,000 $196,875 $13,875 $415,063 $45,270
1 Reflects only the total number of meetings held during each Director’s tenure on the Board or Committee.
2 Includes attendance at all Board and Committee meetings.
3 Ceased to be Director on June 30, 2018.
4 Ceased to be Director on August 20, 2018.
5 Ceased to be Chair of the Operations & Planning Committee on January 11, 2019.
6 Appointed Chair of the Capital Projects Committee on January 11, 2019.
7 Appointed Chair of the Governance & Human Resources Committee on June 8, 2019.
8 Appointed Director on December 10, 2018.
9 Ceased to be a Director on June 7, 2018.
10 Appointed Chair of the Site C Project Assurance Board on September 7, 2018.
11 As Executive Chair, attended 49 Board/Committee meetings, and 86 other meetings related to the business of the Board.
12 Ceased to be Chair of the Site C Project Assurance Board on September 7, 2018.
13 Ceased to be Director on December 31, 2018.
14 Appointed Chairof the Operations & Planning Committee on January 11, 2019.
4,56215,750 - 15,000 - 30,750Sanderson, Chris
Roome, Catherine 3,750 3,750 7,500 289
71
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
SCHEDULE OF DEBTS
A listing of debts covered by sinking funds can be found in Note 13 of the annual consolidated financial statements contained within this report.
There were no long-term debts secured by BC Hydro at March 31, 2019.
72
Name of Company/Indemnified PartyAquila Networks Canada (British Columbia) Ltd. and Teck Cominco Metals Ltd.
Bank of Montreal
Columbia Basin Broadband Corporation and Teck Metals Ltd.
Columbia Power Corporation/Columbia Basin Trust
General Motors of Canada Limited
Her Majesty the Queen in Right of Canada
Her Majesty the Queen in Right of the Province of British Columbia and Cominco Ltd.
Her Majesty the Queen in Right of the Province of British Columbia and Teck Metals Ltd.
Pacific Northwest Security Coordinator
Royal Trust Corporation of Canada
Simon Fraser University
T&N PLC and J.W. Roberts Limited
Teck Cominco Metals Ltd. and FortisBC Inc.
Teck Metals Ltd. (7 indemnities)
Teck Metals Ltd. and FortisBC Inc. (2 indemnities)
Teck Metals Ltd., Teck Resources Limited and Teck American Limited
The Toronto-Dominion Bank
Waneta Holdings (US) Inc., Teck Resources Limited and TCAI Inc.
Waneta Expansion General Partner Ltd. (3 indemnities)
^ Indemnity amounts are unlimited, unless specified
Name of Company/Indemnified Party
Bank of Montreal $1,094.72
Bank of Montreal
CQ Energy Canada Resources Partnership
Her Majesty the Queen in Right of Canada
HSBC Bank Canada
National Defence (Public Works and Government Services Canada) $5,126.14
Public Works and Government Services Canada $3,965.11
The Bank of Tokyo-Mitsubishi UFJ Ltd. USD 1,466,795.00
BC Hydro provides each Director on the Board of Directors, and each executive on the Management Executive Team, with a full indemnity under an indemnity agreement.
^ Indemnity amounts are unlimited, unless specified
BC Hydro has issued guarantees on behalf of its subsidiary, Powerex Corp. BC Hydro has not disclosed information related to these guarantees as doing so would cause harm to third-party business interests and BC Hydro's economic interests.
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
SCHEDULE OF GUARANTEE AND INDEMNITY AGREEMENTS AS AT MARCH 31, 2019
List of Indemnities approved by the Risk Management Branch^
List of Indemnity Agreements issued through a process that received prior approval by Government^*
* The Indemnity Agreements described in this section include those agreements that have the dominant purpose of indemnificationand does not include those agreements where the dominant purpose of the agreement is not indemnification.
List of Guarantees issued through a process that received prior approval by Government
73
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
SCHEDULE OF REMUNERATION AND EXPENSES
STATEMENT OF SEVERANCE AGREEMENTS
During the fiscal year ended March 31, 2019, there were 20 severance agreements made between British Columbia Hydro and Power Authority and its non-unionized employees. These
agreements represented from 1 week to 18 months compensation.
GENERAL
The schedule of remuneration paid to employees during the year ended March 31, 2019 lists gross remuneration which can include base salary, overtime, timebank payouts, incentive
payments, benefit payouts and other cash payments (e.g., shift premiums).
74
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
1 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
SH 121,728Abbas 1,838
IA 129,695Abbasi 815
SK 203,036Abbey 3,175
CJ 134,746Abbott 446
JD 126,962Abbott 910
A 142,380Abdalla 1,737
M 125,938Aboughoury 1,809
J 80,252Abraham 286
A 85,634Abusbeaa 510
LS 97,989Abutaleb 5,660
DC 103,258Acebedo 4,384
OP 131,779Acharya 6,495
JD 159,381Acland 7,995
RL 114,170Adair 1,773
RM 100,859Adam 0
BS 175,857Adams 3,683
DW 123,009Adams 4,359
E 91,995Adams 634
J 113,292Adams 4,042
JC 171,338Adams 2,011
TD 189,018Adams 20,755
KO 194,799Addo 18,507
AO 124,146Adeleye 5,146
A 104,979Adeyemi 779
U 99,499Adikaram 1,820
KL 137,742Aeichele 11,135
KC 107,059Agbanlog 1,022
DD 83,980Aguiar 4,036
MS 86,466Aguiar 3,620
JG 93,199Agustin 1,346
KO 150,564Ahlfield 9,213
H 103,944Ahmadi 4,854
I 96,396Ahsan 5,758
LR 140,618Aird 1,248
ZS 79,811Aird 21,257
BW 99,738Aitken 1,217
I 84,651Akbari Soltanieh 1,122
A 105,374Akbulatova 16
GW 118,485Akerman 1,553
TL 93,645Akeroyd 9,387
M 79,020Akhtary 2,090
JP 97,270Akkerman 761
N 85,849Akkur 0
BE 142,959Akou 8,661
D 104,870Aksenchuk 37
MA 81,680Albinto 8,250
RA 154,840Aldeguer 3,379
RM 94,034Aldridge 6,023
V 130,708Aleshchenko 16,346
LG 115,338Alexander 183
MO 148,599Alexander 24,937
DG 77,819Alexandrescu 441
GT 149,761Alexis 2,962
DE 77,982Alger 257
G 125,420Alho 9,988
A 138,358Alimardani 24,331
A 92,405Allanigue 520
JS 119,002Allard 10,033
EH 77,844Alle 656
GM 118,950Allen 5,944
J 101,155Allen 0
MP 124,515Allen 21,445
SE 98,486Allen 0
T 160,797Allen 3,108
LB 105,207Allen-Garbutt 5,467
NM 90,917Allinson 631
J 150,527Almonidovar 2,832
AA 83,919Alsodani 420
75
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
2 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
BP 98,806Alsop 10,584
DT 142,056Alsop 2,955
N 120,756Altmannshofer 11,725
HF 110,500Alvarado 12,833
MA 101,164Alvarez 733
BD 154,208Ambrosi 6,777
B 152,887Amer 2,038
CA 113,548Ames 50
MR 134,788Ames 1,990
F 147,398Amjadi 1,079
CW 121,555Anderlini 1,994
GR 134,722Anderlini 5,990
TD 107,181Anderlini 3,520
AC 164,725Andersen 3,051
MW 91,041Andersen 1,017
AD 90,293Anderson 100
BE 86,913Anderson 2,067
CR 98,688Anderson 1,001
GJ 121,025Anderson 2,520
IR 127,151Anderson 2,507
J 137,736Anderson 2,642
KK 264,606Anderson 6,667
KL 84,075Anderson 998
KL 83,741Anderson 515
LG 103,307Anderson 441
LP 75,166Anderson 6,726
MC 110,968Anderson 8,836
SG 123,838Anderson 8,392
SJ 97,336Anderson 276
WM 93,348Anderson 8,100
B 150,736Andjelkovic 2,608
LM 85,887Andrade 335
P 119,730Andrade Fairey 3,095
A 118,102Andreoiu 3,268
BD 113,001Andrews 5,561
JR 161,491Androsky 4,523
M 98,604Andruff 2,212
RG 171,491Angman 4,019
M 120,918Angrignon 9,137
SC 111,679Angrignon 2,738
R 158,734Angus 3,954
D 102,147Anil 2,351
A 80,036Ansari 830
MT 96,488Ansari 8,116
YA 79,303Ansari 100
I 107,729Antonenko 4,858
VB 187,039Antoniades 420
VA 132,671Antonio 1,227
GA 119,470Anuik 1,162
T 108,104Aoki 17,487
AL 85,239Apellanes 9,313
AR 76,191Apolzer 276
JF 160,957Apolzer 3,061
TR 86,237Appleby 9,077
K 95,480Aquino 854
GD 137,077Arbez 43,031
RN 106,305Arce 3,993
CL 142,082Archibald Carson 2,633
IF 116,079Arinduque 9,363
RT 89,193Arkinstall 2,334
TM 222,718Armatage 7,970
EC 88,169Armellini 200
M 134,955Armstrong 4,594
CJ 109,448Arnason 3,492
N 82,233Arnaut 8,705
T 103,140Arndt 9,537
DJ 167,782Arnold 4,101
GL 126,157Arnold 4,585
KW 94,689Arnold 1,350
DA 136,228Arnott 19,832
76
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
3 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
DN 107,224Arriagada 50
DA 100,566Arsenault 7,004
VJ 113,348Arsenault 36
M 180,821Arshad 5,832
S 85,267Arshad 7,166
MS 147,783Arthur 1,806
H 113,260Asgharpour 1,406
TJ 98,918Ashman 85
CJ 92,825Ashton 288
EJ 79,730Ashton 6,239
D 144,869Ashwell 12,549
M 92,299Asleson 14,568
CA 146,606Aslin 2,835
BP 85,420Aspell 8,633
A 115,046Assadipour 1,791
KS 121,390Assaf 133
JN 90,150Astles 50
D 167,652Atanackovic 4,179
M 88,783Athari-Anaraki 1,759
BJ 94,521Atherton 7,480
H 95,293Atighechi 691
A 90,544Au 8,338
AK 82,099Au 5,929
JS 156,676Aujla 18,667
N 96,630Aujla 2,891
GM 142,500Aung Thin 5,745
C 195,270Aurala 1,498
N 123,978Avdic 4,439
TA 143,541Avender 44,431
RW 162,627Avis 0
L 141,513Awlasiewicz 5,176
HM 124,284Ayach 12,855
A 102,069Ayad 3,508
YC 76,620Aye 50
RL 121,636Ayers 150
T 87,749Azad 1,344
N 82,132Azimikor 3,178
KJ 137,993Babiy 1,880
KL 112,936Babkirk 4,754
SA 86,242Bacchus 0
RW 210,230Back 16,069
RS 106,936Badial 535
SS 107,717Badyal 347
MU 114,742Baga 219
BM 114,479Bahre 8,269
M 82,029Bai 1,606
DR 123,193Bailey 1,419
RE 141,009Bailey 3,735
SE 105,224Bailey 1,972
D 125,893Bains 629
HS 189,281Bains 642
N 84,119Bains 701
PK 150,327Bains 7,648
D 154,992Bairstow 13,265
B 103,257Baker 0
BG 135,091Baker 182
DE 80,223Baker 2,613
JA 176,974Baker 9,798
KL 125,633Baker 9,787
RJ 111,100Baker 473
BS 96,144Bal 0
RS 153,310Bal 7,486
MS 78,590Baldinger 75
D 115,471Balea 1,138
MA 153,615Balea 13,614
GE 113,072Balk 0
AL 92,846Ball 4,209
JT 179,566Ball 5,748
ZA 149,165Balogh 0
NM 100,916Baltar 998
77
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
4 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
C 110,679Balutescu 3,650
DC 111,877Balutescu 332
LA 185,341Bandelin 11,141
IA 81,228Banica 2,707
L 121,409Bao 1,009
Y 127,505Bao 225
SR 174,117Barbour 2,739
TM 153,272Bare 50,990
JR 77,141Barham 0
MC 95,180Bariesheff 6,954
RJ 133,580Barilea 3,249
DA 82,064Barisoff 18,562
W 115,169Barkhouse 3,124
LR 85,775Barkman 1,136
BW 205,001Barnes 22,971
J 125,119Barnes 0
JN 109,245Barnes 6,590
MA 166,693Barnes 7,416
SJ 107,290Barnes 0
KR 171,676Barnett 34,585
MJ 124,961Barnette 9,033
J 108,315Barone 2,703
RP 159,703Barone 7,348
JJ 212,685Barr 60,675
WR 157,801Barrie 10,934
CL 257,253Bartle 1,426
SM 77,814Bartolomeu 1,022
RD 141,067Bartusek 10,293
LO 108,995Bashualdo 1,191
AS 103,669Basra 814
V 104,905Batinovic 3,676
RM 136,624Bauer 11,682
DB 167,828Bauerfind 5,663
JS 140,165Baum 1,350
EA 118,337Bautista 383
S 121,566Bavarian 2,117
J 79,642Bawa 4,557
CJ 102,566Baxter 23,711
JS 95,387Baxter 4,882
K 103,356Baxter 2,611
LJ 137,260Baxter 0
OJ 140,005Baycroft 19,822
SM 125,973Baylis 7,728
L 90,811Beale 15,297
DG 135,958Bear 4,653
LJ 231,904Beardsell 8,271
RJ 82,287Beato 536
GP 176,727Beaton 4,091
CJ 152,511Beauchamp 25,255
JF 160,362Beauchamp 35,499
M 91,799Beauchemin 0
MT 106,638Beaulieu 1,278
GO 92,371Beaumont 0
RJ 107,556Beaumont 6,535
NA 197,038Bebber 10,686
B 168,800Becer 536
K 97,713Beck 1,826
C 83,230Bedard 1,875
SJ 111,162Bednar 691
EL 136,137Beebe 487
CE 104,866Beers 4,117
MA 115,790Beese 8,028
BW 84,720Befus 9,732
GJ 110,339Beggs 7,577
S 169,580Behnam Malekzadeh 472
W 97,999Beisiegel 536
MJ 118,606Belansky 1,278
TG 93,506Beley 27,716
AS 93,052Bell 442
DE 133,640Bell 12,562
78
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
5 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
DL 83,829Bell 15,573
HJ 146,520Bell 11,423
KW 152,844Bell 3,983
MD 78,803Bell 259
WG 179,281Bell 5,979
MC 92,442Bellis 20,586
A 82,329Bello 185
S 117,758Belsey 4,137
LM 116,761Bemister 23,072
B 150,712Benjamin 9,209
SM 128,377Benjamin 512
AP 147,863Bennett 25,982
DR 142,023Bennett 2,809
MT 76,074Bennett 495
CN 75,055Benson 7,661
JP 156,557Benson 14,885
LC 169,846Bentsen 55,272
T 121,429Benzinger 0
DW 167,275Berard 45,281
LR 162,314Berard 2,667
MG 179,574Berard 2,078
DV 91,991Beresnev 8,178
MJ 135,929Berg 492
MJ 90,286Berg 3,315
BB 151,778Bergen 2,444
CD 136,292Bergen 5,895
CE 77,969Bergen 4,407
RG 90,869Bergen 2,275
TD 94,658Berger 3,648
TG 227,570Bergh 10,230
BW 115,378Bergman 4,911
UH 170,276Bergmann 2,349
DR 112,977Bergsma 5,692
DJ 103,664Berisoff 163
BE 202,291Berkelaar 52,996
SS 77,249Berkelaar 197
ML 140,773Berkey 2,840
L 104,080Bernrot 5,970
A 136,468Berrisford 1,751
MT 135,183Berrisford 3,225
MJ 108,964Berry 788
MJ 106,366Berry 1,927
TJ 92,664Berry 9,110
GM 146,799Berthold 0
S 128,588Bertoia 6,478
TJ 115,449Beswick 0
VD 157,623Bevacqua 5,287
JO 108,986Bevan-Pritchard 513
MS 93,347Bezembinder 11,465
JS 96,799Bhanot 586
R 84,175Bharaj 1,405
BS 101,508Bhatti 549
S 75,206Bhaukaurally 1,048
R 90,484Bhayaani 0
AS 77,202Bhoey 939
C 181,400Bianco 10,477
GA 123,020Bianowsky 5,068
AJ 110,213Biely 4,637
ER 158,382Bienias 6,369
CA 130,754Biever 5,338
DJ 95,931Biever 12,099
D 76,186Biferie 108
BJ 159,463Billey 1,764
BK 146,039Billey 44,109
A 107,940Bimbhra 1,184
GJ 138,894Birch 739
SR 91,496Bird 16,294
JF 95,536Birdsell 2,394
J 106,226Birett 17,355
C 196,461Birkland 1,338
79
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
6 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
KJ 133,009Bishop 552
WR 163,342Bissat 1,910
S 212,139Bjorklund 489
DC 119,970Bjorkman 1,812
C 92,947Bjorknas 0
GW 131,697Black 2,040
ME 136,936Black 1,422
OD 178,681Black 6,428
DB 119,467Blackall 7,478
CD 160,311Blackburn 2,083
MA 109,365Blackburn 18
SW 101,550Blackburn 64
MD 141,474Blackstock 44,438
TJ 126,434Blair 4,083
DW 99,005Blake 2,310
JL 112,456Blake 30,419
T 78,170Blanchet 6,913
GS 134,294Bland 3,320
MA 160,814Blaxland 8,049
H 88,403Blecker 17
CW 147,980Blokland 2,618
BW 129,001Bloxham 12,317
F 178,882Boccia 2,007
AJ 108,517Bock 2,070
CJ 143,330Bock 15,647
ND 107,504Boeckner 587
JB 105,193Boersma 551
BW 121,768Boese 4,964
D 111,665Boffy 7,579
RA 114,066Boffy 12,519
ML 82,133Bohn 13,464
D 110,336Bojanic 1,529
PE 108,678Bokis 4,219
R 90,879Boldt 2,305
BA 128,686Bolenback 9,349
C 170,982Boltwood 3,415
DW 103,452Bonkowski 86
JD 174,732Bonser 976
JD 130,886Booth 1,313
NE 106,060Booth 12,732
ST 121,837Booth 1,031
T 125,239Booth 1,983
JM 162,025Boots 712
RM 131,671Bootsma 4,324
M 114,008Boozari 538
DA 102,949Born 4,062
RW 189,143Borowitz 3,735
R 132,931Borsoi 4,385
K 97,615Boskovic 498
MA 143,203Bosma 2,623
TJ 130,264Bosma 8,738
DJ 76,718Bosse 1,819
LE 77,212Bottiglieri 5,606
PC 154,187Boucher 1,683
CG 86,912Bourdon 501
SE 92,979Bourne 8,261
CA 75,296Bouthillier 6,072
RM 103,983Boutilier 1,007
E 78,568Bouzari Moghaddam 38
SJ 122,672Bowden 196
DM 137,014Bowen 9,104
TM 97,367Bowen 9,725
DJ 119,801Box 3,061
J 82,212Boxerman 12,719
IJ 93,660Boyd 8,790
KD 102,615Boyko 4,307
LD 122,109Boyle 14,097
G 94,590Bozic 850
CD 118,490Braaten 7,437
PS 139,488Bracken 1,981
80
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
7 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
BR 95,087Braconnier 436
GD 132,781Bradley 2,212
JE 192,868Bradley 60,003
KL 171,834Bradley 4,163
TD 156,437Bradley 5,257
A 105,463Brah 282
MR 110,701Braman 1,370
JM 105,239Brandner 150
KD 106,882Brandon 886
MJ 75,716Brandsma 3,650
H 137,220Brandt 801
JP 142,289Branham 4,959
TW 196,908Brannlund 844
PJ 146,467Brasleret 737
EM 103,159Brassard 4,245
A 124,654Bratt 696
DB 105,596Braun 1,056
SR 130,174Braun 5,922
CW 114,975Bray 28,695
GG 119,830Bray 917
KE 94,791Bray 6,873
AJ 123,391Breault 21,755
JE 108,059Bremner 3,432
KG 141,490Bremner 2,533
TM 93,386Brenneis 1,303
TS 110,703Brenneis 49,312
T 96,244Brent 2,453
TK 148,698Brenton 6,527
CM 148,157Bretherick 26,147
TD 77,960Breton 10,800
MD 112,723Breuls 3,504
M 102,673Brewis 18,505
CW 136,791Bridal 31,660
CE 122,634Bridges 1,688
S 182,886Bridgman 32,651
EK 150,994Brigden 16,736
NJ 136,262Brigden 1,013
AB 142,537Briggs 3,529
RD 255,367Brittin 43,988
JN 134,531Britton 2,833
R 111,398Brodie 22,060
RT 141,478Brodie 65
DS 126,841Brodoway 4,448
NJ 116,886Broers 5,363
DA 175,490Bromley 1,970
E 107,414Brooke 10,931
JH 146,979Brookes 727
CD 135,005Brooks 16,078
DJ 183,987Brooks 2,941
DM 164,478Brooks 5,228
R 175,334Brooks 7,311
CB 107,318Brough 1,966
TA 106,488Broughton 6,616
AA 121,027Brown 5,080
CJ 132,689Brown 2,798
DG 89,307Brown 1,585
J 97,505Brown 0
JR 156,593Brown 35,066
JT 100,180Brown 14,303
MB 124,096Brown 977
MJ 75,785Brown 138
RJ 85,057Brown 2,699
TJ 118,450Brown 13,949
TS 132,038Brown 6,447
VA 131,860Brown 15,871
WT 82,432Brown 8,876
CG 161,162Browning 24,365
HE 144,928Brownlow 73
SM 113,745Brown-Samis 4,335
JT 137,793Bruce 8,843
81
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
8 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
A 112,762Bruder 10,710
GR 124,602Brule 11,149
D 158,099Brunwald 36,197
BD 103,935Bryan 1,256
GD 77,773Bryan 9,859
LT 145,609Bryan 1,637
RS 78,119Bryan 2,144
CN 156,564Bryant 17,817
J 90,506Brynjolfson 5,515
S 102,163Bryson 724
VL 114,077Bryson 231
L 125,025Bu 3,082
JR 135,453Bublitz 3,612
K 121,817Buccini 0
PN 133,439Buchanan 13,191
B 78,076Bucic 2,214
S 82,069Buckner 11,311
M 150,460Bucy 7,303
PL 76,315Bucy 894
CB 139,957Budalich 716
BE 102,534Bueler 1,671
WF 170,172Bueschkens 2,569
MT 135,412Buffie 5,968
N 75,491Bugarin 1,151
RG 123,440Buller 7,428
L 181,561Bunting 4,933
RS 109,005Bunwait 1,682
SS 97,981Bunwait 14,391
B 126,850Buratto 15,561
TJ 88,383Burch 7,476
MP 147,263Burgess 3,804
TM 88,423Burgess 1,611
DA 160,502Burggraeve 4,751
JJ 92,561Burke 7,476
SP 96,767Burke 16,661
KW 135,170Burkinshaw 1,169
DD 111,945Burkitt 43,844
GE 137,636Burkitt 8,679
SA 165,526Burkitt 27,304
NJ 95,673Burnett 5,522
KW 166,929Burns 8,205
N 166,856Burroughs 3,252
EJ 145,582Burt 12,282
KD 129,720Burton 7,101
NM 157,821Burton 1,199
S 98,103Burton 54,751
WD 78,381Burton 4,391
TC 102,414Busu 1,825
GR 85,236Butler 50
MK 138,881Butt 6,463
PG 149,506Buttle 26,792
BR 156,773Bye 12,346
CR 121,990Byhre 15,661
LD 151,799Byhre 10,925
JD 210,965Byle 2,405
BR 137,867Byrnell 84
DJ 135,831Byrnell 2,842
AR 89,145Byrnes 0
CK 139,700Byron 15,414
J 145,201Byron 8,234
RD 95,825Cabalo 150
M 141,950Cabrilo 2,855
SL 103,215Caceres 3,153
WA 135,765Cachero 301
CT 176,316Cadger 3,990
S 117,016Cai 1,682
RD 112,877Cairns 420
S 88,238Calandra-Checco 220
CG 179,496Caldarella 19,231
DW 179,974Calder 78,084
82
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
9 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
MW 88,580Calder 7,461
RM 117,824Calderon 3,626
CS 124,285Calderwood 698
DW 147,367Calvert 16,455
CL 95,398Calvin 998
JS 118,256Cameron 0
R 96,717Cameron 20,333
JJ 93,371Camp 163
C 123,396Campbell 400
C 77,451Campbell 2,953
CJ 125,704Campbell 57,930
D 115,304Campbell 1,848
DA 151,104Campbell 20,718
DG 81,971Campbell 255
JA 188,428Campbell 51,212
JM 87,389Campbell 0
TB 139,498Campbell 0
J 118,730Campos 416
J 81,544Campos Menchero 2,413
MR 89,715Candy 3,814
S 232,572Canning 10,516
SE 144,667Canning 22,971
SW 75,794Cannon 21,355
SR 98,922Canton 1,409
MA 133,209Canuel 48,994
S 140,537Cao 3,374
PS 92,450Captein 50
LJ 99,513Carabetta 0
JS 152,262Carbonilla 1,239
D 93,265Card 116
LJ 102,013Cardinal 17,495
FD 157,000Cardino 479
DK 149,263Cardno 1,566
CP 87,300Carey 11,983
DE 107,694Carey 889
SM 176,089Carlaw 2,408
LJ 90,909Carleton 4,413
PN 118,747Carlton 25,345
CG 109,439Carmichael 11,566
DA 116,635Carmichael 4,296
JD 130,265Carmichael 4,317
LJ 91,299Carnegie 11,179
D 121,526Carnochan 102
AL 104,780Carr 13,637
WP 112,401Carr 1,745
LA 80,089Carson 23,621
KI 125,942Carston 8,066
BW 77,998Carter 2,435
CA 89,565Carter 11,065
JA 81,507Carter 4,167
M 185,529Carter 7,584
RG 123,617Carter 7,140
K 75,267Cartwright 1,434
CA 103,731Casas 0
VH 128,643Case 2,903
EJ 87,596Cass 5,595
MT 91,578Casselman 6,129
DC 103,925Cassidy 1,045
JA 106,726Cassidy 620
S 92,516Catacoli Mosquera 5,921
R 85,895Catapia 1,891
NA 135,060Catto 9,803
B 134,889Cave 8,737
ET 83,992Cave 436
MR 143,417Cayme 2,177
ZM 153,019Cecic 8,417
JA 78,829Cegnar 3,617
A 85,647Ceh 1,260
JJ 118,429Ceklic 736
J 108,627Cendana 21,882
83
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
10 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
T 137,579Cernezel 1,624
OD 136,597Ceron 398
JO 81,610Cerrato 0
JM 89,255Chabada 3,635
R 133,984Chaisson 8,506
D 143,065Chakrabarti 6,311
S 91,480Chakrabarti 3,533
E 97,152Chalmers 0
WT 156,408Chalmers 32,365
BE 146,124Chambers 2,061
DM 114,035Chambers 4,983
CB 101,437Champoux 34,978
AS 141,909Chan 147
D 77,714Chan 216
D 103,540Chan 1,611
D 80,892Chan 0
DC 104,894Chan 204
DC 85,295Chan 73
DY 124,095Chan 1,911
G 100,903Chan 1,958
GP 155,869Chan 562
H 79,418Chan 753
JN 101,905Chan 454
JY 128,464Chan 1,161
K 105,015Chan 2,447
K 87,599Chan 3,570
L 114,793Chan 1,465
M 98,195Chan 0
PS 141,292Chan 546
SW 100,919Chan 1,610
VW 109,382Chan 53
WW 100,908Chan 144
P 177,493Chand 465
DK 113,095Chang 334
PF 84,955Chang 763
W 112,226Chao 436
SJ 103,912Chapman 6,776
AS 139,544Chappell 31,181
GJ 144,668Charchun 500
AD 81,307Charles 779
CJ 131,139Charlesworth 7,252
NK 129,830Chasse 34,347
M 76,710Chau 0
MW 151,087Cheater 13,230
AS 92,688Cheema 9,802
B 108,361Chen 486
B 129,791Chen 547
B 96,092Chen 0
CI 111,528Chen 0
EY 105,391Chen 3,430
J 86,868Chen 158
K 79,854Chen 0
L 86,824Chen 601
L 75,946Chen 0
Q 118,155Chen 2,693
V 108,929Chen 998
W 114,876Chen 1,263
X 150,287Chen 3,782
X 143,236Chen 12,672
Y 123,903Chen 536
B 86,948Cheng 6,785
D 121,315Cheng 2,128
M 145,135Cheng 1,395
MI 115,225Cheng 474
PA 109,853Cheng 865
W 139,479Cheng 1,522
Z 89,280Cheng 744
KJ 129,964Chenoweth 341
S 99,788Cherian 15,595
LE 97,298Cherkezoff 2,843
84
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
11 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
ID 117,934Cherry 0
KE 112,061Cherry 16,991
S 106,760Cherry 12,247
S 194,799Cherukupalli 9,865
B 166,778Chessa 19,090
AW 122,215Cheung 1,677
DC 96,089Cheung 3,153
PF 104,923Cheung 998
G 100,751Chhokar 0
EW 108,760Chia 4,231
HP 97,894Chia 0
A 113,723Chiang 22,741
G 111,833Chiang 0
IV 143,807Chichkin 10,862
DC 129,869Chicoine 9,193
W 93,365Chim 6,473
RT 116,179Chin 1,928
KK 86,475Ching 7,756
S 114,412Chiniforoosh 480
RL 121,388Chisholm 7,878
AK 77,547Chiu 0
MO 137,586Chiu 463
S 85,273Chizhikov 2,830
AM 83,394Cho 2,611
S 93,354Cho 547
AY 101,758Choi 718
S 100,539Chok 1,053
GR 98,950Chong 998
J 124,789Chong 1,879
RE 93,798Chong 1,048
JA 151,421Chornoluk 23,751
AL 85,944Chou 1,411
S 120,267Chou 4,688
CP 233,695Choudhury 10,640
A 123,926Chow 7,422
BE 158,050Chow 2,936
BW 83,106Chow 1,730
GS 79,697Chow 2,708
JM 145,878Chow 464
KK 83,215Chow 2,142
V 124,223Chow 903
WN 133,082Chow 572
C 76,778Choy 636
SF 77,871Choy 200
JL 135,405Christensen 13
LN 101,758Christensen 11,726
PR 136,679Christensen 294
SA 78,577Christian 0
MR 157,764Christianson 5,312
AA 114,185Christie 12,011
EN 80,408Christopher 754
CC 84,019Chu 671
JB 85,623Chu 13,917
T 156,674Chu 970
J 99,716Chua 43
K 131,287Chun 1,090
AH 142,438Chung 2,165
C 112,096Chung 1,704
E 93,578Chung 11
MP 119,206Chursinoff 2,081
WJ 95,242Chursinoff 2,034
LS 151,842Chutskoff 44
SD 94,855Chutter 782
DT 149,110Chwaklinski 4,429
M 114,402Ciccotelli 4,891
RA 172,124Cielen 2,020
DM 123,099Clancy 1,472
DJ 157,337Clapa 6,172
JH 153,935Clapauch 0
DM 170,638Clark 11,121
85
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
12 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
GT 91,522Clark 1,811
L 124,546Clark 7,753
MC 175,262Clark 27,910
ML 82,758Clark 0
PF 164,061Clark 8,701
R 93,383Clark 8,370
SG 94,811Clark 8,454
TA 117,441Clark 15,092
GS 135,095Clarke 3,296
KJ 162,150Clarke 19,117
LC 134,905Clarke 32,072
PD 88,163Clarke 1,419
S 166,971Clarke 29,827
T 170,486Clarke 44,065
C 98,268Clausen 425
M 159,231Claxton 14,943
BL 108,675Clayton 446
D 133,751Clayton 0
C 162,148Clement 3,361
DP 153,388Clement 3,287
W 190,369Clendinning 7,397
AG 137,930Cleveland 27,384
D 121,624Clinaz 4,998
WG 83,854Cline 2,449
BN 98,087Clish 4,964
CD 101,745Coady 4,941
JA 118,429Coca 1,690
DC 171,225Cochrane 436
GA 185,403Cochrane 1,736
KA 85,551Coddett 5,575
MA 110,182Coffin 2,781
R 101,650Coffin 4,397
GT 119,682Coghill 351
U 96,547Colambot 0
DM 104,177Cole 0
J 122,817Cole 30,257
JM 130,467Cole 14,058
DR 104,813Colegrave 10,348
DA 90,540Coles 4,318
JL 131,998Coles 2,741
W 87,603Coles-Nash 3,438
GA 112,841Collett 23,582
EJ 184,840Collier 6,245
MD 109,469Collingwood 249
C 180,718Collins 10,885
CC 101,107Collins 1,322
DT 126,837Collins 962
TB 169,146Collins 2,143
JR 97,309Colobong 4,426
TJ 88,028Colongard 47,973
A 88,791Colquhoun 180
JD 150,418Colquhoun 10,880
WA 141,204Colquhoun 8,681
D 86,425Colwell 1,041
RD 87,863Combs 12,413
RK 89,614Comer 313
AT 143,958Compton 4,727
JE 95,121Condillac 5,586
Y 100,362Cong 1,308
MH 132,390Congdon 2,052
AM 90,177Conn 71
CP 113,442Conn 2,578
GW 146,951Connell 2,180
JL 130,083Connell 10,706
RM 101,462Conners 1,651
FG 79,711Connor 3,409
GN 97,586Connors 649
MS 114,727Constantino 2,703
D 162,866Conway 25,968
A 90,587Cook 3,372
86
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
13 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
TR 117,147Cook 10,183
VH 93,538Cook 0
TA 76,948Cooke 24
JM 88,025Coote 717
CB 99,374Copithorne 4,199
R 98,847Corbett 0
MM 119,385Corbishley 2,120
F 110,436Corbould 1,167
M 104,140Cordeta 114
W 92,642Cordeta 233
JC 142,495Corkan 3,110
AD 119,967Cornes 2,323
EM 105,211Corrigan 5,410
PM 125,829Corsie 1,340
SA 178,904Corsie 22,017
L 98,274Corso 0
RV 80,197Cortes 3,291
DG 125,443Cory 1,490
A 91,924Costa 2,731
A 125,397Cote 39,551
SA 107,569Cote-Booth 9,393
A 100,107Cotoara 56
JL 166,412Cotter 20,338
EW 101,533Cottingham 4,705
MT 122,948Coueffin 1,481
KH 95,348Coulter 2,083
RK 83,704Coulter 250
N 124,223Cousins 8,662
W 143,241Cousins 5,229
SJ 83,803Coutts 22,158
SM 128,775Covington 1,395
FN 100,387Cox 274
KL 125,465Cox 9,749
SJ 104,304Cox 3,281
PG 88,848Cozza 20,975
P 107,044Craig 8,589
LM 132,735Crampton 35,224
MA 100,544Crampton 3,196
JL 152,033Cratty 839
DC 170,665Crawford 924
LA 78,307Crawford 250
LA 110,429Crawford 2,374
PW 173,221Crawford 0
E 76,527Creak 245
EA 115,202Creelman 42,961
AG 78,294Cresswell 5,152
LJ 115,359Crist 1,119
C 121,073Crocker 47,258
S 78,811Crockett 4,418
SM 92,958Cromarty 7,295
GE 114,465Crompton 10,421
BR 88,832Crompvoets 612
MF 87,387Cronin 536
AS 148,354Cronk 1,299
SA 175,965Crooks 11,225
DR 152,764Cross 5,090
RA 109,232Cross 2,122
TO 156,158Cross 705
CS 92,456Crossin 6,807
JA 119,175Crossman 17,620
SM 157,421Croteau 6,676
AJ 104,523Crowie 2,513
C 81,065Crowson 2,787
DA 127,600Croxall 2,542
MA 152,422Cruz 104
JJ 138,202Cryderman 30,168
TB 118,913Cseh 562
FE 79,104Cuartero 225
D 85,375Cuglietta 0
C 121,202Cui 1,481
87
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
14 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
Y 118,564Cui 517
Y 110,995Cui 18,874
SJ 107,060Cullen 3,232
D 82,686Cumming 35,878
D 87,070Cunnington 0
AM 98,315Cupar 0
MJ 87,892Cupido 36,325
CM 116,766Curll 934
DJ 120,143Curll 2,735
M 127,436Curman 2,994
WL 86,988Currie 7,159
OO 141,813Curtis 10,199
CI 112,025Cuthbert 241
AG 144,953Cutler 39,191
HD 108,877Cyr 16,986
V 142,221Dabic 4,698
ID 76,642Daffurn 40
F 106,824Dagenais Cote 15,934
C 239,382Dahl 5,724
RG 107,439Dahl 0
N 122,073Dai 2,360
JD 184,567Dale 284
MP 104,586Dale 3,165
PR 120,408Dale 8,830
KE 82,130Daley 3,258
KD 112,556Dalgarno 2,619
DF 141,469Dalgleish 3,718
P 94,626Dalgleish 3,584
J 77,887Dalla Gassa 2,126
WJ 166,405Dalling 908
RR 155,694Daly 21,948
M 77,143Dame 7,409
DJ 105,433Damery 13,617
L 106,042Daminato 453
LM 126,393Damy 1,084
H 111,732Danafar 1,485
KR 121,012Danbrook 36,375
AD 122,306D'Andrea 830
RL 101,799D'Andrea 5,043
BS 133,119Daniel 7,508
CR 124,887Daniel 18,345
K 133,664Daniel 31,320
DS 86,885Dar 2,516
A 184,650Darby 1,252
SM 140,905Darwish 22,885
MT 290,314Daschuk 10,145
T 98,243Dashko 419
JD 98,944Dashwood 0
J 108,589Davda 898
JD 81,358David 1,250
SF 167,670David 2,286
JM 138,823Davidoff 31,165
JG 166,566Davie 940
DW 124,713Davies 13,331
GD 107,939Davies 16,631
HJ 103,391Davies 1,494
KL 180,454Davies 35,325
M 102,948Davies 3,960
RA 84,719Davies 24,915
SE 109,016Davies 1,870
AR 171,799Davis 21,985
BE 78,856Davis 9,444
D 142,894Davis 260
EB 95,141Davis 1,133
MG 94,848Davis 0
SA 86,545Davis 10,129
MW 110,663Davison 568
RJ 150,383Dawson 4,995
MF 168,670Dayton 2,862
MA 119,960De Alwis 4,045
88
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
15 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
MS 124,064De Asis 729
RP 105,801De Haan 39,828
C 118,477De Jager 1,066
CA 102,147De Meester 426
EM 89,316De Ramos 5,182
GN 129,675De Zoysa 2,753
DA 111,820Deacon 50
JA 132,499Deacon 6,564
MJ 125,653Deacon 12,861
BM 91,847Debelle 998
AR 161,474Deckert 4,656
SL 83,293Dedelley 6,089
AB 125,942Deeley 4,293
DM 77,452Defazio 0
SG 103,725Degerness 29,555
SM 94,552Deglan 14
PJ 100,985Degroot 847
M 150,988Dehaan 9,257
RB 115,591Deibert 630
DA 142,145Deimling 4,764
TD 106,422Deines 1,918
RT 118,446Del Barrio 1,497
AR 181,493Dela Cruz 307
BH 107,580Dela Cruz 14,055
JA 157,974Delage 22,183
B 90,341Dell 7,948
DF 117,152Della Maestra 9,706
H 151,674Delorey 1,802
AG 97,484Delos Santos 0
BS 84,375Demeo 12,146
JN 114,406Demers 6,122
MF 123,361Demoor 595
BR 93,430Dempsey 102
JA 96,499Dempsey 0
D 107,809Den Biesen 20,236
H 100,448Deng 4,979
Y 113,304Deng 4,761
RG 137,542Denis 1,949
FU 183,626Dennert 10,310
MM 150,105Dennis 7,785
RM 160,679Depuit 2,729
B 79,161Dermody 3,251
ND 198,096Dermody 7,393
LJ 105,300D'Errico 12,185
S 113,184D'Errico 5,494
M 138,655Desbois 4,750
KF 97,341Desharnais 532
MV 101,326Desilets 3,022
DA 146,447Desilva 25,332
EP 121,424Desjardins 2,731
TA 87,088Devaney 16
CR 133,070Devine 846
J 88,125Devito 6,306
DA 162,074Devlin 12,498
TD 138,690Devlin 7,559
ZJ 113,547Devlin 0
DW 100,946Devorkin 7,544
DA 134,898Dewolde 1,566
DC 78,991Dey 450
DG 174,169Deyagher 5,735
TG 127,310Deyagher 964
R 89,614Dezall 33,599
SS 123,769Dhannu 1,755
NS 157,824Dharamshi 5,825
D 108,097Dhari 1,968
G 81,353Dhillon 4,625
N 89,049Dhillon 100
R 131,707Dhillon 1,384
J 122,141Dhindsa 174
H 94,520Dhrolia 2,215
89
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
16 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
B 129,236Diallo 3,992
AS 113,443Dias 1,640
MP 133,442Dickenscheid 29,326
JD 110,063Dickin 545
M 162,119Diesch 4,489
EM 137,054Dillon 23,607
MM 105,033Dimitrijevic 0
T 100,670Dinh 2,698
TL 116,383Dinsdale 3,836
AW 145,925Dionne 3,303
TC 129,683Dithurbide 2,168
AJ 116,230Dixon 0
KH 182,128Dixon 1,931
AB 143,881Dixon-Warren 10,132
M 108,768Djasro 14,301
D 80,671Djonin 0
JN 113,446Dobby 36,461
RG 151,850Dobie 5,828
DR 147,182Dobrenski 14,002
J 128,366Dobrowolski 913
M 89,667Dobrowolski 509
DG 85,625Docherty 75
IB 100,128Dodd 4,947
TP 145,535Dodd 39,267
RJ 181,870Dodman 386
RW 119,142Dojack 12,868
J 79,512Dol 0
LA 118,620Donaghy 3,450
S 161,537Donaghy 1,217
V 114,062Donose 2,721
B 138,807Doostdar 472
JS 158,499Dorsey 5,319
DM 120,574Doskotch 3,570
KA 112,248Dostie 491
HE 111,245Doucet 569
LM 76,945Doucette 315
BC 149,782Douglas 1,737
JL 82,616Douglas 117
KR 117,241Douglas 2,364
PA 114,952Douglas 1,706
RS 122,172Douglass 650
DR 135,699Dowler 2,005
M 80,763Downey 4,223
RJ 137,815Downey 10,291
G 171,908Doyle 8,425
T 88,059Doyle 2,933
BK 97,050Draheim 2,950
JL 160,422Dresler 5,312
MS 151,885Dreslinski 3,920
SW 122,029Drexl 2,947
RD 87,132Drinkwater 5,489
K 117,082Drost 12,825
CT 87,020Drover 5,404
ME 162,760Drown 17,076
JK 89,518Drozdowich 7,087
CD 77,596Druce 2,404
D 127,040Dubljevic 3,322
KG 197,255Duchak 13,792
JR 157,826Ducharme 11,740
GJ 90,339Duff 4,682
AG 95,620Duffy 1,897
JP 168,509Duffy 1,533
TD 114,933Dufloth 2,251
SA 114,254Dufour 11,807
CP 96,933Duhamel 3,287
D 244,679Duhamel 13,503
J 93,978Duke 426
KM 261,178Duke 5,857
RJ 104,178Duke 1,056
DC 146,224Dukeshire 31,909
90
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
17 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
AR 151,077Dulaba 11,313
N 94,610Dumville 0
MK 88,831Dun 1,899
BA 115,132Dunbrack 5,757
RW 126,528Duncan 2,160
SM 171,131Duncan 1,407
ST 94,428Duncan 8,569
IM 81,295Dunlop 588
CH 151,912Dunn 2,585
CL 107,340Dunn 3,737
HL 114,507Dunn 10,140
AT 156,028Dunne 29,360
CW 142,184Dunsford 5,748
JG 154,335Duplessis 23,854
BD 116,690Durand 8,614
Z 142,806Duranovic 715
CM 94,697Durden 1,008
R 194,549Dusil 36,466
B 109,414Dutka 402
MK 79,350Dutta 89
LA 138,801Dwolinsky 7,054
MR 97,281Dwyer 2,400
BT 155,760Dyck 7,962
KB 79,025Dyck 233
KP 86,243Dyck 78
L 168,768Dyck 806
RE 137,792Dyck 4,909
BT 108,643Dyer 4,830
LJ 92,449Dyer 36,712
PA 151,902Dyke 14,924
C 233,973Dyson 5,609
JW 107,672Eadie 16,464
MT 121,267Eang 5,761
WA 231,092Earis 7,370
SD 128,829Earle 568
SJ 97,803Easterbrook 84
AD 96,284Ebrahimzadeh 2,826
MA 81,708Eck 5,616
RM 131,603Edmondson 7,382
JD 115,291Edralin 150
SC 146,982Edwards 753
TA 94,610Edwards 100
CP 143,030Egan 21,494
DR 104,252Eggers 1,444
RJ 103,655Egilson 792
M 97,332Eigenmann 493
P 126,275Eijsberg 473
EW 135,731Ekholm 2,406
R 143,454Elazar 8,488
DA 110,294Elchuk 686
BL 98,142Eldridge 12,975
AS 87,503El-Khatib 1,747
LJ 102,171Elkins 2,882
BE 79,131Ellerman 482
JA 115,642Elliot 0
C 103,052Elliott 13,140
ER 137,881Elliott 9,081
MA 95,060Elliott 3,708
AD 139,692Ellis 5,572
DA 133,263Ellis 104
DJ 106,426Ellis 7,296
GR 145,041Ellis 2,895
TA 135,270Ellison 6,771
EB 113,231Elofir 31,096
D 126,859Elvambuena 4,809
EG 121,668Enegren 10,253
JR 75,372English 3,595
JA 162,010Enns 22,951
RJ 96,586Enns 2,007
NM 123,518Enock 30,993
91
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
18 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
SD 109,238Epa 2,576
D 127,084Epton 2,238
GR 114,869Erho 20,882
CG 141,407Erickson 4,020
GA 104,595Eriksen 67
JS 77,554Ermitanio 4,064
DH 151,117Ernst 33,742
SL 98,162Ernst 685
C 97,275Erskine 0
CJ 99,374Ertel 58
AA 102,452Erven 2,569
L 156,994Erven 1,285
UH 98,013Esegbona 0
R 141,708Espina 730
R 89,414Espiritu 250
EP 178,747Ethier 14,934
BM 114,283Evans 826
CJ 91,252Evans 981
DC 111,332Evans 5,964
JI 123,441Evans 7,335
JL 102,636Evans 1,389
JR 136,394Evans 500
V 102,798Everard 3,207
LA 88,932Everett 18,927
D 151,427Ewaniuk 22,527
D 98,066Ewart 4,968
SD 115,033Ewing 2,031
TD 146,922Ewing 39,692
S 115,578Exter 397
BT 133,078Ezelyk 191
DL 116,124Ezelyk 3,257
AA 108,441Fabian 10,077
AA 157,467Fabros 24,341
MM 87,845Fagan 350
MC 75,725Fahey 753
S 125,510Faisal 3,247
C 119,147Fait 3,158
MG 101,158Fait 15,086
WR 165,885Fajber 6,309
P 131,995Falardeau 19,054
M 77,495Falcone 3,520
VJ 98,919Falcone 3,155
RJ 109,626Falloon 10,501
LA 127,117Fane 2,113
BH 137,773Farahani 4,452
R 116,171Farbridge 553
RJ 129,067Fard 1,214
M 100,821Farjadi 28,796
JM 103,724Farmer 3,375
LM 97,374Farn 50
CJ 92,096Farquharson 8,767
GT 94,786Farrell 0
KM 131,992Fast 7,759
CG 100,617Faulkner 1,803
BL 120,261Fawcett 3,153
R 111,270Fearnley 433
LC 130,421Fedan 3,105
RS 100,217Federico 257
A 125,402Fedorov 1,018
BR 79,852Fee 0
SA 132,763Feener 6,351
IR 100,376Feir 1,960
R 133,940Felton 250
GW 101,569Feng 280
Z 83,809Feng 855
G 232,517Fenwick 7,238
S 101,752Fenwick 6,078
RG 110,978Fequet 0
KJ 114,395Ferber 19,813
YS 124,256Ferdinandez 6,747
92
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
19 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
AL 163,295Ferguson 47,670
JD 80,439Ferguson 84
LR 94,532Ferguson 73
R 107,859Ferguson 529
IR 175,940Fernandes 4,098
TE 124,144Ferolie 1,661
A 141,401Ferraresso 12,238
RG 107,401Ferraro 2,685
A 140,420Ferreira 100
BC 151,902Ferris 1,061
BE 82,787Ferris 715
DD 106,183Festerling 5,928
JS 80,704Fidel 250
SA 77,607Fielding 687
CK 155,748Findlay 4,799
IT 86,745Finlayson 6,069
KS 102,610Finlayson 897
PF 131,749Finnegan 8,902
RM 111,433Finney 724
CF 83,116Fish 556
M 159,606Fish 4,429
TE 97,239Fish 699
EE 172,681Fisher 18,479
EV 144,100Fisher 2,051
RV 138,853Fisher 488
S 107,656Fisher 2,558
JJ 133,555Fitzgibbon 6,080
E 121,165Fitzsimons 17,323
DR 112,921Fladmark 1,845
JB 171,408Flanagan 2,652
BL 164,635Fleming 2,228
DP 138,581Fleming 2,267
MG 132,021Fleming 8,604
BR 96,569Fletcher 5,323
EA 240,849Fletcher 5,189
C 177,051Fleury 2,809
JD 76,203Fleury 19,026
DJ 127,244Flood 1,466
MR 80,370Flood 162
CJ 77,387Flores 643
DJ 153,684Flynn 1,661
DS 111,188Foglia 9,729
J 112,247Foley 20,474
J 89,752Foley 2,096
C 151,902Folkestad 4,059
DH 96,014Fong 478
V 122,645Fong 6,815
YY 88,178Fong 2,107
DP 102,709Fontaine 61
K 116,951Foo 1,317
PC 87,564Forberg 28,436
JM 122,084Forbes 6,130
SA 94,749Forbes 554
JN 78,369Ford 2,562
T 142,933Ford 25,397
WA 116,647Forman 668
R 170,303Fornasier 3,329
RC 135,398Fors 5,423
CA 106,393Forsberg 10,732
MC 173,934Forster 2,336
TL 86,872Fortune 20,707
BC 110,248Foss 2,862
DW 169,828Fossa 1,904
GE 134,575Foster 2,295
LC 148,293Foster 2,967
S 184,610Foster 9,697
JN 94,824Fotheringham 10,092
PE 150,242Found 8,870
J 109,996Fournier 4,197
J 108,527Fowler 953
93
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
20 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
MB 121,921Fowler 29,420
RK 94,195Fowler 12,445
WH 181,420Fowler 3,229
SC 178,621Fowles 23,366
DA 176,994Fox 31,164
J 87,487Fox 983
K 108,987Fox 4,498
WH 128,343Fox 4,703
D 84,830Frame 9,579
CG 134,129France 42,315
C 133,249Francis 1,006
E 141,672Frank 10,734
B 157,191Franklin 9,695
B 133,455Fraser 8,785
CE 146,498Fraser 1,627
JL 336,511Fraser 15,174
JS 92,415Fraser 8,837
LG 151,371Fraser 3,265
MR 104,944Fraser 28
TE 113,528Fraser 13,036
AJ 129,445Fraughton 40,616
MR 80,358Freda 0
PA 76,459Frederick 0
JD 117,376Fredette 6,830
JC 128,025Freele 20,912
AP 183,974French 1,859
DJ 152,101French 7,688
JG 104,540French 690
AG 80,747Fresnido 50
CA 152,407Frick 41,218
GC 136,275Fricker 1,044
BH 115,976Friedman 1,238
GJ 96,355Friend 3,978
BA 115,853Friesen 8,600
MH 150,428Friesen 2,200
OS 87,463Friesen 349
TM 90,036Friske 813
KA 87,524Froats 3,268
FE 114,377Froese 50
PN 108,311Froklage 0
SA 116,423Fromme 8,331
PJ 93,188Fromyhr 0
KL 109,005Fruno 420
J 75,622Fry 18,768
W 94,714Fu 0
J 127,129Fuchser 2,567
DW 103,616Fuhrmann 7,000
DJ 195,863Fulcher 21,246
MJ 162,629Fulcher 4,196
SA 75,560Fulcher 9,783
CP 81,474Fulmer 19,007
CJ 223,456Fulton 13,141
DA 166,148Fulton 4,516
ME 151,027Fulton 8,974
I 125,573Fung 2,495
RH 133,624Funk 275
BP 175,808Fuoco 505
MC 120,652Furberg 180
SM 85,820Fure 5
CT 127,699Furler 0
JA 97,330Furness 3,056
M 75,585Furumori 14,228
RT 116,426Fusick 4,052
SG 185,257Fyfe 21,761
GS 137,012Gabert 4,265
JG 188,481Gabriel 721
SS 139,082Gadhok 1,252
A 89,933Gaensbauer 37,487
PC 139,119Gaffran 17,346
V 134,365Gafitulin 0
94
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
21 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
PL 92,011Gahir 3,820
DR 112,883Gahr 17
PN 109,145Gaillardetz 7,188
M 77,306Gajdosik 674
C 91,257Galam 16,777
WW 126,636Gale 1,823
GG 131,226Gallagher 13,162
R 83,303Galope 2,157
D 168,396Galos 2,028
MJ 138,703Galvez 5,233
JT 129,685Gamache 1,716
AW 178,299Gamage 34,422
GB 101,682Gamboa 0
B 131,997Gammer 11,414
RD 130,373Gammie 10,893
MA 85,893Gansner 250
C 104,950Gao 6,013
Q 113,074Gao 4,911
C 132,339Garand 16,409
AS 142,559Garber 3,105
KE 213,644Garbet 777
AC 76,730Garcia 87
H 78,544Garcia 438
BR 92,676Gardiner 6,354
AM 88,957Gardner 8
BB 137,233Gardner 13,138
RJ 142,908Gardner 14,369
CV 89,007Gargantiel 50
ZC 100,694Garland 1,813
AL 103,380Garrecht 1,459
ME 115,522Garrett 3,894
TR 142,835Garrow 11,441
PJ 122,767Garson 4,628
DH 132,762Gartner 29,709
A 76,374Garvey 1,829
KS 98,444Gaskin 9,201
JF 188,424Gaspard 573
C 156,452Gatzke 33,101
DR 161,214Gaudin 4,235
ZD 152,050Gauthier 2,335
RL 96,706Gauvin 270
PJ 81,826Gavigan 2,644
D 143,849Gavin 3,482
BK 93,140Geall 50,573
D 166,334Gebert 8,019
JM 131,429Geddert 7,997
PE 111,773Geddes 11,194
MA 108,838Gedig 9,608
C 78,844Gehring 2,342
AA 103,105Gelchu 10,088
WC 96,326Gemmell 2,856
TS 164,391Gent 464
D 137,754George 4,932
O 85,437Geraskina 1,484
KM 85,054Gerbrandt 22,161
RG 150,580Gerbrandt 6,311
VO 194,751Gerlib 46,407
SC 95,206Gerwin 7,875
J 178,019Gesic 4,100
H 141,176Gharachamani 3,791
SG 86,160Ghirardello 8,021
S 132,871Ghosal 2,379
SI 153,479Gibb 258
M 110,899Gibbs 4,651
K 201,117Gibson 5,247
NG 89,716Giddens 376
HJ 101,170Giesbrecht 7,878
MK 105,850Giesbrecht 1,821
TA 117,063Giesbrecht 1,048
TD 82,216Giesbrecht 12,558
95
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
22 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
E 119,539Gietz 1,432
JC 199,986Gietz 559
LJ 107,460Gifford 1,764
BM 106,207Gilbert 135
DJ 82,144Gilchrist 312
AG 78,898Gilks 2,070
HK 135,050Gill 1,418
R 163,226Gill 5,126
RA 136,200Gill 8,693
CD 134,391Gillespie 8,739
SA 127,741Gilliss 4,650
A 129,623Gilpin-Jackson 9,335
P 75,264Giminski 380
AC 127,794Gimple 638
M 121,700Gimson 0
GF 117,947Gin 8,611
JF 78,376Gin 100
AR 128,028Girard 3,901
MJ 89,455Girard 684
KK 115,772Girgulis 5,877
P 120,794Girn 1,963
J 94,444Gladish 9,729
J 89,025Glawdel 4,841
C 86,306Gleeson 178
BR 114,697Glover 1,043
TM 94,789Glover 12,219
J 107,278Gobeil 0
AK 112,631Gobena 436
L 94,766Gobin 733
R 92,742Godding 998
RB 117,860Godfrey 1,909
TN 139,285Godreau 2,544
PC 85,284Godsoe 0
BK 170,118Goehring 5,612
GE 120,578Goettemoeller 2,056
R 108,885Goh 1,989
SJ 94,280Goh 0
A 115,067Gohar 1,346
R 144,181Goldberg 2,994
WT 99,770Goldie 9,156
EK 140,971Goldsmith 12,002
BJ 110,043Gollmer 232
DL 87,394Gomes 40
GB 102,433Gonzales 0
CA 110,617Gonzalez 796
FE 88,976Gonzalez 2,280
KT 84,883Goodall 2,039
PM 120,945Goodall-Hart 3,631
N 119,463Goodfellow 9,823
JE 80,298Goodman 1,123
M 95,891Goodman 5,903
RS 103,971Goodman 5,490
RJ 99,541Goodwin 0
W 79,463Goodwin 0
J 104,239Googel 54,748
DD 127,217Gorby 7,132
MA 125,019Gordon 15,471
MD 177,022Gordon 46,092
MT 102,878Gordon 50
ND 96,847Gormley 2,533
VR 116,721Gorospe 0
R 106,327Gorter 0
BM 105,296Goss 1,599
AS 120,469Gosse 36,853
JR 136,815Gosse 1,726
VV 120,765Gossen 2,327
R 106,634Goswami-Powell 7,919
DM 111,355Gothard 7,489
MW 153,650Gotobed 3,005
DH 133,138Gould 4,904
96
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
23 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
TJ 92,058Grabowski 392
KJ 176,797Graeme 3,430
CD 146,263Graff 12,890
AA 79,377Graham 0
DM 100,086Graham 3,709
JM 133,033Graham 16,428
MJ 126,031Graham 50,929
MS 88,084Graham 281
PE 139,167Graham 11,883
SM 174,067Graham 8,651
S 125,187Grahn 1,418
D 153,984Grant 3,181
KB 100,330Grant 17,031
KW 114,687Grant 0
LM 94,512Grant 25
RJ 121,042Grant 3,118
D 138,560Graves 342
A 118,780Gray 16,445
A 94,607Gray 9,850
GL 121,232Gray 8,273
JD 132,638Gray 4,684
MA 112,849Gray 20,562
SD 156,918Gray 15,896
W 173,989Greeley 2,118
BW 78,507Green 0
GW 115,621Green 28,333
IS 129,537Green 453
LA 130,250Green 607
CD 152,106Greenham 9,343
RK 85,466Greenlaw 1,615
AR 149,540Greenlay 18,184
KG 102,979Greenwell 1,703
SD 111,671Greenwell 1,554
DW 135,860Greenwood 41,063
S 152,813Gregg 5,605
KR 102,201Gregory 2,702
MN 91,780Gregory 858
R 99,914Gregory 4,620
A 116,706Grenier 5,117
BS 136,240Grewal 214
GS 76,576Grewal 7,673
TK 129,418Griffith 877
C 128,678Griffiths 363
KJ 83,730Griffiths 5,704
JA 79,882Grijzen 2,711
C 177,283Groenevelt 402
CL 107,276Grohs 6,658
TH 90,580Grohs 9,031
RM 104,730Groombridge 766
AJ 84,439Grose 6,148
SG 122,460Grose 3,681
KJ 115,869Gross 1,362
JA 98,080Grosse 3,729
CL 162,352Groves 1,043
EM 118,735Groves 13,019
KL 159,903Groves 12,554
RC 157,379Groves 41,832
A 137,629Grujic 11,297
B 114,385Gu 2,335
M 95,280Gu 0
ME 114,209Guajardo 1,388
M 113,877Guanlao 466
LH 181,416Gudbjartsson 2,660
DR 203,074Gude 7,677
B 182,511Gueldenstern 13,134
T 101,043Guerra 190
PR 108,434Guglielmin 137
M 80,600Guglielmotti 16,891
D 140,414Guinan 1,925
MA 134,426Guite 4,965
97
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
24 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
B 148,340Gulliver 385
CR 108,471Gunderson 3,079
K 101,922Gunn 16,140
TD 107,851Gunness 6,821
DR 123,738Gunson 2,299
F 170,595Guo 3,102
J 107,651Guo 536
T 120,016Guo 3,699
A 151,408Gupta 3,785
A 115,279Gupta 5,844
ML 92,241Gusola 3,199
SB 102,129Gustafson 4,830
B 165,055Gustaspi 340
TL 178,172Guterres 5,697
EC 76,140Gutierrez 0
TB 153,131Gutwin 6,278
AK 115,664Guy 222
SM 171,518Gwilliam 128
TC 154,698Haaf 13,011
M 167,266Haag 8,270
EF 144,327Haboly 1,345
AG 103,160Habte 964
MP 128,474Hackwell 2,429
K 96,860Hadavi 6,577
GR 185,220Haddow 17,738
KA 87,910Hadgkiss 759
K 105,347Hadzimahovic 1,282
KK 113,455Hagen 7,221
PA 109,253Hahto 7,399
RA 77,180Haines 4,650
CE 175,377Haizimsque 3,848
V 128,383Hajiabdolmajid 1,503
AS 110,603Halcro 4,780
DW 160,854Hale 1,598
JJ 185,170Haley 948
RD 114,949Haley 0
A 101,106Hall 3,443
AP 90,731Hall 1,250
CM 86,205Hall 3,580
JJ 115,631Hall 8,580
R 95,776Hall 17,032
TD 177,538Hall 38,948
TE 143,660Hall 36,680
CB 133,881Hallamore 10,381
GR 129,336Hallaway 11,856
BJ 195,305Hallborg 33,774
ER 130,019Hallson 251
G 121,056Halmaghi 445
JB 169,044Halse 927
DG 114,918Hamagami 9,594
PE 87,177Hamaguchi 0
D 86,602Hamberg 1,150
HG 145,401Hamberger 6,055
KO 138,611Hambleton 8,559
O 174,688Hamed 9,425
R 114,437Hamel 6,667
GR 138,234Hamer 16,362
CG 121,696Hamilton 1,813
CG 142,073Hamilton 0
S 132,942Hamilton 6,741
WJ 178,219Hamilton 13,070
H 138,599Hamilton Harding 3,370
CJ 176,035Hampton 25,534
B 76,532Han 2,414
H 123,862Han 7,027
Q 121,379Han 436
Q 126,763Han 1,323
VK 126,889Hanada 7,383
SM 164,833Handley 6,235
NM 127,087Handra 2,402
98
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
25 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
KA 156,090Hanlon 438
ME 145,571Hanlon 4,653
MW 137,836Hannath 4,487
MJ 91,566Hannon 560
D 95,360Hanratty 1,567
AD 129,099Hansen 19,938
TP 155,761Hanson 7,727
V 178,519Hanson 1,121
WA 156,112Hanson 21,031
LL 123,095Hanssens 564
J 107,030Hao 3,474
BM 106,172Harapnuk 1,597
D 101,282Harapnuk 1,241
BR 145,203Hardcastle 687
DM 171,349Hardie 410
J 130,956Hardman 3,556
DB 106,316Hare 75
H 97,414Hare 12,874
D 172,536Hargreaves 4,110
E 117,696Harmati 1,979
KM 98,635Harmon 436
RC 127,416Harms 1,012
CC 146,296Harper 16,521
D 112,690Harper 2,095
RM 132,463Harper 4,607
T 162,248Harper 112
PG 141,564Harrington 972
C 114,559Harris 1,199
GW 103,132Harris 6,213
NR 76,782Harris 423
PR 85,600Harris 11,861
SC 88,336Harris 3,819
SM 112,049Harris 1,035
ER 85,917Harrison 2,206
S 130,722Harrison 4,363
TP 142,743Harrison 1,537
N 113,302Hart 2,167
DN 187,507Hartford 25,577
C 91,455Hartley 3,314
RK 103,872Hartley 1,112
SA 114,615Hartley 20,971
SL 87,885Hartley 279
WP 86,565Hartley 123
JT 79,088Hartman 0
GF 198,981Hartney 8,614
CC 83,224Hartwell 169
AJ 144,328Harvey 124
BW 127,683Harvey 3,700
DS 88,546Harvey 31,027
LJ 97,055Harwood 129
S 88,611Hashemi 1,517
AM 108,865Hasselaar 1,107
CR 79,524Hastings 13,684
CR 135,026Hastings 2,465
MW 116,006Haston 2,434
BM 84,518Hatch 2,700
C 97,326Hatton 8,193
CK 153,084Hau 1,019
BK 114,305Hawes 725
SA 77,394Hawes 800
KA 113,251Hawkins 5,201
JA 157,383Hawryluk 1,070
RM 196,561Hawryluk 15,291
A 100,310Hay 613
DJ 123,388Hay 163
JA 132,878Hayashi 100
R 87,718Hayat 1,882
RA 78,612Hayek 663
SS 91,928Hayer 16,271
IC 94,840Hayes 10,096
99
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
26 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
PH 142,280Hayes 3,546
M 136,627Hayles 2,332
DS 92,119Hayre 2,045
KD 75,157Hazelwood 8,516
TD 123,517Hazelwood 2,186
CD 160,632Head 24,212
AS 85,265Heath 350
SL 85,402Heaton 5,966
GT 83,957Hebert 14,526
JR 148,957Hebner 7,184
MP 139,031Heenan 13,473
GR 151,581Hefflick 1,530
A 154,620Hefford 3,820
RG 123,791Heide 277
TB 129,678Heiman 6,215
EB 128,924Helander 5,283
G 133,842Helfrich 16,140
RA 123,058Helgason 6,239
JW 108,767Helten 1,280
DF 147,315Hembling 3,015
CD 184,129Heminsley 5,257
AA 95,666Henderson 2,466
DE 85,018Henderson 14,600
G 141,797Henderson 875
J 114,148Henderson 11,731
RL 120,890Henderson 17,704
RM 158,628Henderson 4,402
TC 135,930Henderson 513
S 136,949Henzel 11,119
JS 164,196Heppner 3,366
KB 110,476Heppner 2,516
WJ 170,177Herman 55,563
RW 101,673Hern 592
A 129,393Herrick 438
DM 147,829Herrington 2,578
JM 141,696Herrington 15,059
RE 163,922Herzog 19,751
BD 135,698Heslip 3,685
JM 138,972Heslop 3,099
G 93,917Heward 11,553
JL 87,126Hewat 1,207
RJ 103,646Hewko 3,327
AM 125,093Hibbs 1,190
RW 81,539Hickerson 273
GD 83,164Hicks 1,853
SA 116,322Hiebert 21,808
SM 134,529Hiebert 4,506
TJ 146,747Higa 259
SA 88,445Higginbottom 3,347
CD 203,085Higgins 22,075
G 169,277Higgins 2,283
JL 132,588Higham 1,422
CL 131,634Hill 4,771
DB 164,021Hill 3,584
L 96,344Hill 4,120
MA 163,927Hill 18,467
MP 134,910Hill 6,614
RJ 128,368Hill 2,073
RJ 173,203Hill 27,123
S 145,631Hill 1,883
JL 122,415Hillgartner 28,453
DB 143,332Hills 0
TT 121,853Hills 3,399
D 135,807Hillsdon 8,598
KA 97,684Hilton 17,411
WC 84,737Hilton 10,489
GS 180,226Hiltz 1,958
TG 76,582Hinatsu 8,400
WR 101,572Hine 5,728
KJ 127,451Hines 1,400
100
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
27 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
J 88,748Hinke 5,096
BM 167,887Hirschfield 12,192
DM 144,652Hirschman 45,719
KW 122,775Hirtle 3,976
E 137,806Ho 471
J 82,535Ho 145
KA 138,685Ho 3,644
W 127,894Ho 8,694
NL 121,231Hobbs 31,909
AJ 118,120Hobden 1,285
BJ 145,565Hobkirk 2,025
S 230,674Hobson 4,222
HR 188,701Hodgson 19,336
TB 120,693Hodgson 31,267
MB 98,604Hoekstra 807
ST 156,551Hoekstra 4,434
IT 83,554Hofer 1,517
AN 100,322Hoffman 14,683
BE 98,468Hoffman 10,622
L 116,487Hogan 0
DA 111,725Hoglund 2,818
EL 119,373Hohert 10,531
KB 117,423Hohert 3,070
RK 188,083Hohner 13,674
JL 78,420Hokanson 716
JE 97,522Holdaway 480
DJ 132,345Holden 24,421
RC 134,325Holden 8,330
EO 77,832Holgate 6
GJ 130,636Holisko 5,398
DJ 125,396Holitzki 665
J 122,034Holitzki 20,682
A 75,693Holland 2,011
FM 180,595Holland 102,533
HA 130,453Holland 1,670
M 95,485Holland 5,308
MD 85,709Holland 3,853
MM 249,536Holland 11,328
B 89,268Hollybow 1,369
MS 161,528Hollybow 3,412
AS 146,669Holmgren 5,061
CD 185,413Holmgren 2,002
TJ 92,033Holst 12,535
JR 155,228Holt 18,086
SA 88,009Holt 0
SW 122,191Holt 31,198
B 108,492Holtby 7,450
RC 102,232Holyk 1,848
W 159,363Hon 741
HK 180,077Honda 1,993
DK 97,715Hong 1,012
WW 138,680Hong 11,801
RR 135,414Honrade 12,331
WA 220,828Hood 6,619
LM 106,781Hooper 1,495
P 91,490Horan 1,611
JF 140,288Horkoff 15,659
NR 143,786Horne 22,691
RJ 88,437Horner 20,317
Q 124,053Hornosty 6,670
BG 133,994Horton 1,309
JC 157,605Horton 31,097
MR 120,778Horwood 1,935
JS 259,555Hothi 2,575
JG 75,231Hougan 0
D 161,631Houghton 2,208
JS 135,022Houle 859
TD 76,575Houser 73
PW 210,639Houston 21,707
RB 113,068Houston 8,738
101
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
28 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
EA 130,265Howard 6,167
MA 75,856Howard 6,762
PJ 131,522Howard 4,640
JD 165,015Howes 0
EB 173,273Howker 10,436
CP 77,467Howkins-Burgart 1,170
MJ 172,422Hrad 1,013
H 116,381Hsu 581
GT 133,271Htan 10,525
P 101,800Hu 481
J 137,378Hua 1,621
S 129,523Huan 315
V 112,152Huang 2,671
X 119,180Huang 18,992
Y 87,868Huang 3,462
AF 78,256Hubbard 2,383
TR 82,648Hubbard 10,006
Z 102,899Hudani 4,822
J 112,138Hudgin 130
B 93,843Hudson 2,778
DW 131,930Huey 11,506
CJ 123,615Huff 8,460
B 94,308Hughes 8,091
TE 109,734Hughes 7,691
SJ 77,944Huhn 3,827
C 197,941Hui 549
C 110,583Hui 4,454
PW 131,340Hui 856
WL 126,043Hui 113
DD 90,652Huisman 26,561
TR 126,160Huitika 4,871
RB 127,800Hull 2,775
JP 144,328Hulme 8,722
B 93,225Hulsman 12,799
G 94,005Huml 3,570
B 117,252Humle 1,889
J 88,384Humphrey 1,177
SW 151,579Humphreys 6,798
GS 109,921Hundal 536
IS 112,965Hundal 5,629
CS 83,207Hundial 2,740
MW 78,768Hung 997
DJ 141,563Hunsberger 9,907
CJ 94,723Hunt 5,242
DJ 106,522Hunter 10,466
DP 171,587Hunter 2,008
MS 81,599Hunter 18,350
JR 94,468Hurd 312
DM 126,264Hurl 15,827
E 128,899Hurley 21,490
B 113,627Hurrie 3,945
JG 99,254Hurst 617
SL 107,231Hurst 100
A 222,966Hussain 5,100
MR 156,451Husty 14,955
GF 106,784Hutcheson 38,002
A 106,950Hutchinson 420
K 175,904Hutchinson 2,418
JD 113,136Huxley 1,228
RP 143,800Hynes 0
FD 131,446Hyslop 27,054
LM 94,446Iggulden 3,303
JM 88,831Illerbrun 16,708
BR 113,897Imler 58
R 168,612Infanti 1,264
TO 148,658Inga-Rojas 2,866
DW 118,696Ingleson 132
BD 132,324Ingraham 15,364
CR 81,598Ingraham 199
AJ 116,128Ink 7,221
102
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
29 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
C 120,252Intihar 296
P 93,162Ionica 750
J 149,511Iosfin 1,136
Q 160,770Iqbal 4,408
RW 192,653Ireland 8,577
AD 138,484Irving 38,410
RJ 100,319Irving 22,465
TE 85,233Irving 4,820
T 94,658Isaac 1,234
DR 127,787Isberg 9,599
E 136,330Iseli 633
M 129,835Iseli 3,168
T 105,096Isert 4,888
MS 105,596Islam 3,232
R 120,454Islam 7,609
NT 107,120Israel 25,177
M 78,210Istok 15,277
R 150,123Itcush 4,941
AJ 85,646Ito 20
VI 76,533Ivanov 6,115
I 103,967Ivanovic 0
TD 105,008Iwaskow 31,936
M 89,334Jabbari 0
RS 104,946Jack 2,307
DE 118,486Jacks 8,401
SD 83,847Jacks 11,362
DL 134,663Jackson 13,386
FS 153,606Jackson 15,016
GW 178,200Jackson 37,285
JK 78,314Jackson 2,559
S 173,357Jackson 10,582
A 76,983Jacob 819
AI 123,659Jacob 436
IS 146,237Jacobs 3,419
TL 87,698Jacobs 221
RE 193,429Jacobson 1,527
SD 114,719Jacobson 20,405
NC 76,158Jaik-Robinson 1,971
HB 104,815Jakobsen 0
FS 223,393James 16,914
RG 120,143Jamieson 396
G 139,546Jang 1,043
C 184,312Jansen 3,978
TL 98,751Jansen 130
TS 131,862Jansma 3,199
M 84,929Janusz 0
BR 159,087Janzen 8,360
RA 173,027Janzen 16,192
SH 119,101Janzen 3,169
S 91,012Jarman 26,726
H 97,404Jarollahi 11,010
KW 125,470Jarratt 13,729
C 86,080Jarrett 0
JF 95,613Jarvis 28,782
M 140,708Jasek 15,568
M 123,476Javaid 2,165
G 96,317Jay 0
K 87,211Jay 9,480
MP 104,120Jeffery 40,463
J 77,447Jeffrey 9,335
TM 115,103Jeffrey 25,277
RJ 113,698Jeffries 200
CR 95,724Jelenici 2,663
D 113,901Jensen 7,349
DA 127,223Jensen 5,004
T 171,039Jensen 13,024
TA 83,933Jensen 12,041
RJ 106,037Jess 8,678
SK 133,428Jewell 252
E 144,004Ji 5,483
103
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
30 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
H 126,181Ji 1,130
K 97,876Jiang 1,249
Z 146,611Jiao 2,451
KJ 152,506Jmaiff 14,236
CW 87,534Joe 5,256
DK 127,511Johannesson 7,825
TM 140,687Johansen 26,416
CW 136,489Johnson 11,854
DD 134,995Johnson 23,134
DE 88,319Johnson 9,581
DM 98,068Johnson 751
DN 99,525Johnson 4,413
GC 105,679Johnson 16,673
H 83,190Johnson 1,424
JF 131,693Johnson 2,647
NA 105,719Johnson 1,018
PD 103,172Johnson 638
T 108,220Johnson 710
TL 101,610Johnson 2,193
ZK 119,229Johnson 996
WT 138,582Johnston 32,931
RC 165,132Jolly 13,075
HC 114,206Jonas 11
MB 165,319Jones 624
S 97,109Jones 0
SM 89,666Jones 1,130
SR 168,406Jones 549
TC 82,076Jones 200
TL 98,692Jones 2,006
F 147,263Jongeneel 470
M 107,216Jonsson 2,312
S 82,069Jordan 11,117
G 109,630Jost 6,283
K 77,337Jovanovic 995
SF 93,127Joyal 2,162
P 93,597Joyce 4,491
AK 157,024Jubb 9,692
DH 181,402Juby 5,545
KG 116,440Judge 18,983
P 133,650Jugovic 4,128
D 147,564Jung 933
T 135,331Jurbin 15,999
IC 77,702Jurgea 4,904
R 125,278Justesen 4,037
DL 102,265Kadonoff 947
AT 124,065Kaempffer 8,736
DM 254,800Kahl 22,883
SS 88,064Kaila 290
G 134,325Kainth 1,589
WJ 102,711Kaiser 113
O 108,155Kalaydin 5,466
F 155,488Kalb 2,192
JA 100,963Kallin 1,637
JL 171,488Kallusky 14,022
R 85,193Kalsi 204
VS 75,571Kalsi 26,391
P 130,526Kam 25
AS 133,196Kamal 2,188
SK 75,961Kamiya 0
RM 108,555Kammerer 32,681
MJ 110,457Kammerle 1,237
DC 83,325Kan 1,716
KS 77,842Kanda 712
RM 87,794Kane 4,075
TJ 80,862Kang 7,858
JS 158,604Kanhaiya 28,670
T 97,085Kanin 28,318
JL 180,862Kapalka 3,516
A 123,116Kar 7,427
JD 96,977Karila 52
104
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
31 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
RM 105,185Kariz 12,876
B 117,260Karpinski 3,220
F 145,826Karsan 998
N 75,994Kasenda 4,790
TD 119,853Kask 51
MG 110,750Kassam 0
W 202,015Kassam 1,182
DA 130,922Kastak 1,157
LA 110,945Kasten 0
FP 96,730Katunar 0
KN 77,342Katusa 401
VR 88,978Kaulback 2,135
SM 102,961Kay 762
B 106,228Kazakoff 6,822
A 79,522Keane 4,612
AD 128,358Kearney 14,145
WA 106,404Keats 1,207
MT 170,463Keefe 2,635
WD 109,554Keeley 8,123
JD 106,404Keen 0
P 101,311Keen 1,492
FG 103,615Kehl 5,288
JM 163,489Kehl 44,420
SM 106,230Kehl 34,378
DG 156,059Keir 11,590
R 85,624Kelders 0
BD 156,277Keller 1,880
DT 95,029Kelley 32,396
TJ 177,255Kelley 7,863
DW 120,867Kelly 16,425
KB 91,373Kelly 5,740
LC 83,200Kelly 2,771
N 233,705Kelly 16,643
RM 135,213Kelly 24,171
TJ 113,545Kelly 1,697
M 188,654Kelvin 1,396
SJ 77,270Kemp 1,814
GP 114,969Kempthorne 41,303
AD 107,883Kendrick 3,919
JS 129,607Kennedy 167
KL 160,228Kennedy 175
RB 85,801Kennedy 3,022
DB 136,928Kennelly 1,598
LT 126,551Kenney 2,713
NJ 195,268Kenny 0
TJ 149,984Kenyon 22,176
MD 86,513Keres 248
IP 108,790Kerr 2,523
KD 99,369Kerr 14,155
JL 109,603Kersey 24,428
BJ 187,462Keys 2,828
S 118,056Khade 4,150
A 95,877Khalili 5,976
J 116,503Khan 5,255
M 113,526Khan 4,468
MU 118,079Khan 9,735
S 117,882Khan 1,813
TN 109,985Khan 4,061
A 138,930Khandelwal 0
KS 156,441Khandpur 1,651
DS 135,093Khangura 15,759
K 77,696Khanna 3,251
S 112,404Khatwani 338
MA 144,093Khedr 20,010
GH 162,305Kho 1,426
H 96,639Khodabakhsh 6,074
M 106,280Khoshgoftar 380
H 101,148Khoshsiar 2,005
H 165,222Khosravi 7,725
SC 126,032Khurana 2,272
105
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
32 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
IS 141,910Khurl 805
M 105,835Kia 2,360
KD 182,225Kidd 17,155
WM 89,660Kiedaisch 2,379
L 132,090Kiing 7,798
TR 164,850Kikkert 7,339
L 106,133Kilgour 7,099
RJ 163,048Kilian 2,185
JP 118,653Kilmartin 15,661
NP 119,574Kilmartin 36,226
A 76,340Kilpatrick 6,918
IR 86,017Kilpatrick 2,289
AS 147,498Kim 1,524
S 187,638Kim 2,049
KJ 120,405Kinamore 31,153
CA 138,250King 5,708
G 111,410King 15,038
JM 102,906King 24,421
K 111,428King 1,656
MC 175,086King 7,486
RB 152,565King 769
A 113,673Kingsbury 1,590
R 79,708Kingston 5,673
D 86,252Kinnon 3,724
I 154,616Kirincic 103
TL 91,804Kirk 998
BD 103,816Kirkham 2,647
TA 127,318Kirkham 683
WB 153,873Kirkness 2,310
DT 122,891Kirkwood 2,345
MA 85,397Kirschbaum 1,687
RS 105,976Kirsh 3,512
T 124,114Kisby 9,921
MT 83,944Kiselbach 427
A 121,532Kiss 4,061
CL 100,610Kitching 4,783
M 90,080Kitson 27,073
GM 100,749Kitt 17,136
EC 219,211Kiudorf 1,835
DA 95,747Klassen 400
DB 144,389Klassen 1,230
EJ 111,758Klein 8,660
W 160,223Klein 4,997
TK 105,863Kler 3,296
C 113,659Klym 7,982
DJ 127,305Knackstedt 1,735
L 107,228Knezevic 2,048
LD 107,390Knight 4,246
SJ 160,761Knight 150
MB 106,068Knighton 7,699
BJ 225,769Knoke 24,557
JJ 131,241Knoll 4,209
Z 93,471Knowler 29,156
DL 79,289Knowles 275
JR 154,047Knowles 137
RA 92,531Knowles 1,042
KJ 171,047Knudsen 24,843
KR 102,282Knudson 4,754
JC 117,766Ko 0
CH 157,547Kober 1,315
AG 89,526Kobernick 3,802
PA 175,377Kobzar 1,329
E 113,495Koebel 1,655
TD 189,349Koehn 3,414
V 105,383Koh 3,187
JC 164,924Kohut 27,563
E 130,322Kojic 1,669
SJ 134,503Kokko 12,931
P 87,117Kokol 0
S 140,505Komad 30,787
106
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
33 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
MM 163,536Kondo 16,448
GS 161,715Kong 11,751
NA 84,843Konradson 1,778
GA 125,596Kooiman 1,747
N 121,244Kooner 1,063
C 85,835Koop 75
P 94,066Kooy 344
CF 140,123Kopola 4,076
M 164,272Korsei 1,497
AB 127,952Korteland 25,834
AG 123,286Korteland 3,889
K 98,553Kosh 3,759
V 114,951Kositsky 3,339
M 126,738Koski 0
D 146,331Kotaras 5,102
AV 95,125Kouznetsov 0
N 161,450Kovacevic 649
CG 75,230Kovach 5,402
DG 83,451Kovacs 0
DJ 132,274Kovacs 856
L 149,409Kovacs 3,580
CA 139,427Kowak 4,364
C 77,747Kowal 3,415
PG 132,002Kowal 2,910
GA 128,241Kozak 2,877
M 93,824Kozak 1,638
IR 140,958Kozicky 12,248
B 137,776Krahn 1,133
I 99,797Kramarovskaia 642
F 80,082Kramer 1,656
PA 162,190Kramer 25,994
K 147,715Kreye 4,906
CR 138,976Krienke 438
SL 110,048Kritikos 1,031
MG 171,123Kroeker 1,778
B 156,035Kroetsch 24,253
R 77,819Kronebusch 0
SG 105,304Kryuchkov 2,955
R 153,967Krzman 2,883
J 100,539Kuang 0
X 87,936Kuang 2,414
BR 132,035Kube 1,595
AT 87,153Kujawiak 8,055
PK 140,467Kulshreshtha 3,914
A 244,118Kumar 1,268
P 123,332Kumar 4,344
S 112,109Kurian 420
T 81,177Kuthar 126
I 148,514Kuun 737
VR 127,062Kwallek 11,344
HM 145,361Kwan 750
LM 130,856Kwan 1,419
M 101,038Kwan 3,883
MC 77,020Kwan 0
T 75,347Kwee 562
V 141,364Kwiatkowski 3,854
C 94,248Kwok 1,112
JC 101,718Kwok 902
MW 104,719Kwok 1,215
TW 145,758Kwong 1,484
NB 107,556Labadie 41,597
NL 170,545Labadie 23,721
JR 146,786Labelle 15,889
RS 157,599Lacheur 6,375
GS 99,979Lachmanec 27,389
DK 85,341Lachuk 1,459
RJ 120,241Lacoski 42,334
MM 92,655Lacoste 0
A 117,392Ladak 1,505
AG 79,269Ladanga 50
107
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
34 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
RA 142,864Laekeman 1,266
C 99,964Lafferty 1,316
WD 107,903Laflin 17,095
MG 110,943Laframboise 7,955
A 162,149Lagnado 1,003
C 94,985Lai 2,028
MK 136,202Lai 4,989
KA 136,943Laidlaw 26,414
RP 133,616Laidlaw 2,467
RD 91,273Laing 10,757
JS 104,940Laird 8,281
A 134,650Lalic 393
AS 140,603Lally 16,357
K 116,343Lalonde 7,317
WL 96,894Laluk 12,573
A 178,424Lam 3,922
AF 145,977Lam 3,043
AT 82,579Lam 292
BC 78,152Lam 0
H 83,495Lam 0
JW 127,411Lam 1,115
JW 106,015Lam 1,143
K 86,802Lam 4,043
M 85,982Lam 0
MP 119,597Lam 1,048
SN 110,210Lam 1,098
TN 113,602Lam 1,523
WW 87,183Lam 440
Y 137,748Lam 817
K 128,700Lamarre 4,668
D 145,133Lambe 20,130
GD 78,741Lambe 0
DC 121,578Lambert 8,445
JJ 96,045Lambert 4,656
CA 130,045Lamont 3,121
RW 117,860Lamothe 76
SJ 151,663Lancashire 19,575
MA 88,996Lance 746
M 92,235Land 2,494
A 139,744Landas 10,183
M 126,072Lande 22,922
DW 96,335Lane 5,942
WM 87,432Lane 8,455
J 140,887Lang 1,746
RM 156,030Lang 4,662
SM 178,378Lang 23,647
SM 139,028Lang 44,464
CD 195,484Lange 20,964
ML 142,533Lange 5,556
KV 138,641Langley 14,847
AR 117,255Langston 4,658
JM 127,491Lanouette 6,335
RS 120,814Lansink 39,229
JE 77,969Lardizabal 25
MV 106,482Larga 843
GR 84,430Large 4,965
SD 110,895Laroy 5,221
MI 99,313Larsen 522
T 145,351Larsen 6,681
CR 134,478Larson 39,358
RL 84,801Larson 3,506
SJ 89,440Larson 1,241
TD 94,946Larue 7,682
M 83,645Lassam 8,722
JB 104,184Lastavec 3,831
J 120,479Laturnus 199
JS 93,430Laturnus 26,923
KJ 95,726Laturnus 13,227
A 111,102Lau 436
AY 123,624Lau 1,330
108
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
35 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
EY 113,930Lau 1,006
KP 154,390Lau 6,446
KW 193,734Lau 16,671
S 113,501Lauridsen 530
TA 173,415Laurie 3,439
SN 145,444Laurila 17,566
JE 123,775Laursen 786
D 118,315Lautner 5,052
DL 121,597Lavoie 0
C 89,011Lawrence 1,613
CA 83,688Lawrence 125
M 154,571Lawrence 23,880
S 140,504Lawrence 33,133
RF 113,611Laws 42,151
V 108,095Lay 1,827
TJ 154,327Laycock 9,178
P 84,767Layne 588
RD 239,540Layton 15,402
EA 113,034Lazarte 4,962
AC 156,271Le Couteur 10,303
T 147,514Le Couteur 9,772
BA 129,399Leaf 29,448
AC 131,750Leake 10,436
HM 88,169Leake 0
K 119,769Leakey 857
JD 79,695Leal 6,829
A 82,406Leano 1,490
KS 113,142Lear 664
S 110,004Leason 435
DM 100,265Lebedoff 182
DL 308,771Lebeter 45,744
P 98,331Ledesma 1,612
A 210,929Lee 21,343
AD 178,613Lee 13,177
BL 140,503Lee 436
BT 130,859Lee 18,563
C 142,282Lee 0
CH 124,320Lee 7,729
CJ 105,638Lee 2,331
DT 104,917Lee 1,059
G 113,419Lee 6,057
GI 122,210Lee 1,704
H 146,505Lee 436
HE 94,907Lee 1,030
IY 117,911Lee 3,791
J 145,856Lee 2,324
J 88,147Lee 234
JC 89,162Lee 3,478
JS 77,239Lee 998
KC 116,522Lee 511
KY 159,037Lee 5,476
M 82,800Lee 0
M 78,326Lee 18,590
MH 113,768Lee 5,372
N 110,703Lee 1,048
NJ 85,988Lee 150
RW 146,711Lee 3,586
S 89,418Lee 103
SD 94,859Lee 1,098
SJ 77,374Lee 0
SJ 138,634Lee 3,152
SK 78,558Lee 2,040
SN 106,563Lee 180
TS 158,615Lee 2,149
VY 86,821Lee 75
YS 76,930Lee 0
G 80,824Lees 5,602
EA 134,189Lee-Young 2,533
JL 154,867Legaree 21,107
CG 192,917Legault 1,963
109
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
36 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
CR 132,294Leggett 25,834
GU 114,489Lehoux 6,095
DF 84,209Leidl 2,966
RB 120,262Leier 2,598
G 148,500Leigh 7,979
MG 76,098Leigh 7,949
DE 117,447Leik 27,539
DE 151,256Leiske 2,482
CM 129,279Leitch 1,357
PA 138,561Leite 1,617
L 81,097Lemaire-Smith 6,635
CH 106,907Lemoal 215
M 161,389Leng 1,335
Y 122,609Leng 1,453
A 284,712Leonard 23,568
AR 155,702Leonard 1,197
MK 118,162Leong 18,935
DJ 124,787Leoppky Halirewich 6,737
MP 147,677Lepine 18,556
D 100,507Lerose 786
A 76,700Leroux 180
PB 123,111Lesowski 23,993
J 97,711Lessard 14,237
DD 90,414Lester 122
IC 160,873Letkeman 14,664
TR 113,447Letkeman 1,238
BP 117,052Leung 928
CW 97,742Leung 1,225
MA 118,207Leung 2,002
S 110,898Leung 420
T 86,608Leung 9,148
TN 93,042Leung 1,687
W 126,789Leung 134
E 127,808Levchine 486
RJ 86,859Leveridge 3,496
D 181,250Levesque 2,039
RL 86,647Levetsovitis 614
PB 99,961Lew 2,055
B 75,101Lewarne 1,994
DR 98,483Lewis 3,757
JR 127,291Lewis 11,539
KL 177,269Lewis 8,986
N 116,003Lewis 657
WT 107,630Lewis 67
CS 116,068Li 998
G 132,286Li 1,639
J 132,439Li 436
J 109,974Li 23,587
J 146,674Li 4,134
J 103,713Li 6,397
J 117,513Li 436
JY 120,666Li 436
KY 121,994Li 1,797
M 112,315Li 2,414
M 83,376Li 271
MF 106,447Li 0
S 87,609Li 458
SX 94,248Li 1,040
TC 126,860Li 6,566
VY 80,963Li 1,644
W 95,000Li 1,360
Y 129,681Li 46,976
Y 141,664Li 977
FJ 87,332Liang 0
I 97,899Liang 2,276
V 99,680Liberatore 0
RB 179,393Lidstone 38,101
KA 138,282Liebaert 5,784
AM 90,938Ligaya 0
BE 143,684Light 0
110
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
37 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
IS 102,093Lim 18
T 124,418Lim 4,226
SK 110,291Lima 2,939
S 100,164Limchareon 4,380
KK 129,799Lim-Kong 2,074
C 75,290Lin 33,579
FC 217,325Lin 3,192
HL 116,879Lin 9,591
KQ 121,710Lin 1,941
S 121,104Lin 25,632
XP 94,750Lin 1,534
Y 101,008Lin 1,790
R 100,783Lincoln 1,098
BA 119,690Linden 10,308
MR 106,243Lindsay 4,404
AG 113,987Ling 4,894
CY 85,274Ling 691
T 137,763Ling 350
DM 114,760Lingenfelter 1,198
JD 179,940Lintunen 4,549
DR 115,865Lipischak 6,439
GP 144,771Lippingwell 20,098
PM 98,209Lis 5,021
A 99,194Lishman 5,624
RJ 96,003L'Italien 6,193
B 97,599Liu 19,333
C 121,215Liu 100
F 106,129Liu 859
GJ 82,120Liu 0
HY 122,572Liu 1,145
K 115,159Liu 2,503
RK 126,388Liu 1,659
T 115,682Liu 930
Y 140,042Liu 18,532
Y 85,587Liu 0
GB 80,689Livesey 0
BE 147,887Lloyd 1,754
JY 110,044Lo 358
M 104,989Lo 0
M 96,568Lo 1,069
H 103,923Lober 2,927
S 98,297Locicero 13,178
D 198,930Lockhart 21,247
SD 124,384Loeppky 924
AC 137,474Loewie 1,939
RM 113,856Lofstrom 8,750
R 118,997Logie 27,423
ME 142,196Lohr 9,644
R 129,275Loji Roji 90
V 88,570Lokhandwalla 2,448
JA 194,228Lombardo 16,549
JN 148,126London 5,033
KM 134,463London 17,261
DF 162,330Long 5,812
Y 93,008Long 0
C 89,478Longaza 673
MA 80,437Longland 420
RW 119,333Loo 998
C 85,363Lopes 50
J 143,183Lord 7,288
RK 129,384Lord 4,075
CS 172,037Lorenz 16,479
DE 98,644Lotina 1,034
GB 179,947Lott 1,234
Y 91,004Lou 10,591
AF 130,553Louie 998
H 146,295Louie 686
KG 106,388Louie 313
G 128,607Louis 2,175
A 96,693Loukas 383
111
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
38 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
K 89,856Louman-Gardiner 5,596
KM 89,748Louwers 8,200
V 115,313Lovric 3,569
BC 107,827Low 20,499
KL 130,959Low 2,470
KW 101,762Low 998
MM 120,029Low 384
SL 124,233Low 0
W 81,133Low 324
RT 105,094Lowdon 8,811
JL 191,669Lowe 10,617
RA 130,878Lowe 3,708
WT 131,725Lowe 0
J 136,505Lu 3,959
KM 185,405Lu 2,293
M 141,880Lu 7,482
PJ 205,950Lu 16,982
W 76,280Lu 3,410
X 123,924Lu 4,569
X 81,410Lu 0
LM 114,154Luchinski 12,571
KB 136,375Luciak 420
AS 90,623Lucky 622
GR 114,682Ludlow 241
RP 80,187Luem 0
AM 94,215Luey 1,055
B 94,802Lui 1,163
OA 119,996Lui 2,845
D 97,011Luis 11,767
DP 94,960Lukoni 9,437
MJ 160,855Lukoni 2,945
AK 85,673Lum 3,845
AT 125,282Lumb 27
S 83,923Lunty 0
MM 122,817Luo 4,272
W 137,472Luo 1,746
C 75,874Lupton 1,330
LW 77,825Lupul 8,810
DL 130,469Lussier 2,271
JA 92,485Luu 5,538
EM 109,362Lymer 3,307
MJ 123,499Lynn 2,165
J 79,425Lyon 0
J 190,431Lyons 4,001
E 108,656Ma 6,745
L 98,347Ma 222
M 95,156Ma 1,062
RL 81,189Ma 100
SK 107,921Ma 3,192
W 86,720Ma 2,723
YF 133,721Ma 125
RC 85,394Maano 997
F 127,066Macario 2,527
RI 162,953Macarthur 10,007
JK 129,705Macauley 5,767
RD 125,948Macayan 1,982
S 95,073Macculloch 50
JI 184,001Macdermid 3,218
AA 84,149Macdonald 13,566
AD 128,085Macdonald 5,282
AD 101,327Macdonald 300
B 109,364Macdonald 1,944
GA 151,029Macdonald 7,559
GI 87,156Macdonald 50
JL 139,096Macdonald 2,108
L 132,847Macdonald 399
ML 98,105Macdonald 23,599
MT 83,110Macdonald 3,176
AE 99,373Macdonnell 21,386
BD 78,175Mace 8,482
112
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
39 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
K 161,826Mace 20,075
CJ 98,742Macintosh 9,014
IG 105,013Macintyre 3,970
TD 123,214Macisaac 478
DR 107,758Mack 5,938
RW 112,604Mackay 7,755
AC 85,859Mackenzie 394
CW 124,645Mackenzie 76
K 156,592Mackenzie 2,503
S 79,463Mackenzie 602
DA 95,069Mackinnon 14,696
RL 106,706Mackintosh 100
J 97,388Mackus 18,949
K 141,888Maclean 28,674
LL 85,387Maclean 7,369
SS 120,432Macmillan 19,749
CB 147,109Macmurchy 10,278
CJ 95,836Macneal 4,579
CJ 141,996Macpheat 22,610
K 103,616Macpherson 36,830
AJ 90,349Macrae 3,177
R 125,168Macrae 258
ML 81,360Maddatu 0
J 120,772Madill 10,617
S 90,179Madill 0
S 78,973Magaril 1,706
AP 151,230Magbojos 3,901
PH 191,352Magdanz 3,236
LA 124,578Magre 3,551
AL 104,024Mah 810
DM 94,526Mah 3,021
EJ 140,634Mah 4,512
ET 152,463Mah 8,711
LM 113,806Mah 998
NS 89,640Mah 549
TK 158,148Mah 1,684
D 102,516Maharaj 2,031
SB 87,277Maharaj 2,233
A 115,376Mahay 631
E 121,884Mahecha 1,608
L 84,692Mahinsa 0
MN 109,590Mahmood 0
J 120,323Mahon 3,136
RJ 86,303Mahon Welburn 1,261
D 127,801Mahowich 52
K 94,512Mai 3,383
SA 113,451Maikawa 2,061
A 89,945Mainprize 418
ES 147,367Mainprize 19,339
JC 114,599Mair 5,062
DU 77,234Maizik 2,405
N 152,654Majdanac 3,726
F 120,455Majdzadeh 12,606
AR 93,988Major 245
WJ 79,437Major 92
WR 122,250Major 26
LK 94,782Mak 998
RJ 158,424Malcolm 10,129
JN 108,078Maldonado 561
V 76,761Maletic 100
Z 107,890Maletic 5,699
BG 106,200Malfair 3,263
DD 76,671Mallari 0
JP 152,003Malm 10,720
MP 135,795Malm 860
D 119,191Malone 2,533
JR 155,120Maloney 4,543
ML 113,419Maloney 27,811
DF 84,780Maltby 1,283
JR 99,200Managh 2,771
113
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
40 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
NV 95,117Manchon 5,741
PA 138,516Mancor 1,249
LM 105,783Mancuso 1,835
A 133,694Mandair 4,906
AS 81,587Mander 70
JE 105,394Maniezzo 1,050
SK 146,150Manik 1,402
R 120,751Manj 1,129
PD 115,874Manning 1,274
R 117,915Manning 23,224
LJ 127,868Manson 4,669
EN 146,543Mant 8,198
MJ 199,347Mant 6,864
CB 81,553Manurung 3,488
F 145,767Mao 12,678
S 112,741Marashi 0
DE 100,752March 3,905
GH 80,596March 408
SC 112,434Marcil 4,081
LL 97,973Marco 5,277
TL 97,313Mark 2,148
JB 118,520Markowsky 6,884
TJ 123,460Marlowe 24
DJ 160,495Marner 17,699
HH 100,061Marok 21,214
K 84,199Marquardt 3,836
J 150,582Marques 3,582
LA 124,765Marrello 998
CL 137,617Marsh 3,128
RS 109,342Marsh 5,325
BJ 96,607Marshall 763
CR 118,229Marshall 8,046
DJ 114,827Marshall 996
KP 97,464Marshall 14,767
L 107,051Marshall 17,255
NJ 171,433Marshall 13,180
RW 153,479Marshall 5,549
GW 107,857Marshinew 8,420
G 97,178Martel 5,807
SB 131,006Martell 1,082
WD 197,219Martell 2,429
MJ 78,083Martens 3,604
CM 80,514Martichenko-Grilz 3,180
C 98,115Martin 3,940
DF 159,360Martin 20,734
G 144,597Martin 6,521
JE 91,650Martin 474
SA 148,869Martin 2,320
TJ 138,071Martin 1,048
DT 183,157Martini 52,472
TG 166,688Martinich 436
JL 86,383Martiniuk 150
J 131,740Marusenko 2,088
JB 166,765Marwick 4,041
S 127,421Mas 644
MR 96,327Maser 4,444
BW 177,263Mason 4,495
E 76,829Mason 100
S 141,157Mason 4,978
S 213,130Mason 31,077
BW 182,268Masse 13,835
CT 174,515Masse 4,421
SR 84,654Masse 399
MB 92,962Massolin 4,195
B 95,553Massullo 2,526
R 142,954Mastromonaco 3,524
CM 104,846Matchett 2,966
JJ 109,187Matchett 18,536
AW 99,969Matheson 21,577
DN 140,481Mathiasen 6,579
114
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
41 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
PJ 143,364Mathot 819
JC 148,865Matt 189
DS 141,912Matterson 3,139
HM 191,059Matthews 19,316
MN 100,160Matthews 233
AB 127,417Mattock 4,542
MR 155,968Mattson 2,409
MW 155,734Mattson 9,241
Z 95,946Matvejova 980
PC 118,668Mau 6,950
M 125,526Maurivard 2,217
RM 78,758Mawdsley 120
MW 84,373Maydo 23,034
DW 101,412Maye 12,516
PR 119,785Mayenburg 2,953
BJ 75,381Mayer 5,410
J 108,062Mayes 9,755
DD 121,444Mayrhofer 2,192
DS 112,264Mazur 640
N 83,781Mazzei 548
A 128,265Mcalister 1,428
M 103,253Mcarthur 7,610
BG 165,076Mcastocker 4,886
CJ 161,025Mcastocker 46,260
LG 186,300Mcastocker 9,353
TJ 166,464Mccallan 55,738
A 142,015Mccallion 1,122
NC 94,737Mccallum 1,267
P 131,849Mccann 2,644
CL 80,979Mccarthy 7,296
DC 141,869Mccarthy 32,777
JM 96,539Mccarthy 1,119
KN 100,620Mccharles 5,123
JM 127,856Mcclean 4,077
LA 102,497Mcclelland 262
CS 180,107Mcclinton 2,823
AG 110,726Mcclure 1,456
D 135,212Mccollor 0
DC 117,445Mccomb 458
KV 114,530Mccomber 7,078
MJ 89,941Mcconnell 2,125
SK 154,435Mcconnell 437
K 227,458Mccormick 14,048
SC 130,837Mccormick 0
TL 107,575Mccormick 12,260
AS 191,287Mccorquodale 35,618
B 115,605Mccoy 1,240
SA 148,565Mccredie 3,669
N 93,679Mccririck 100
CJ 129,832Mccullough 2,430
DB 138,575Mcdonald 0
DJ 190,729Mcdonald 15,580
FB 86,953Mcdonald 1,298
GN 137,115Mcdonald 18,593
HF 112,028Mcdonald 931
SP 115,707Mcdonald 1,100
J 98,417Mcdonnell 0
AM 142,888Mcdowall 685
SM 141,252Mcdowell 5,400
DB 175,559Mceachern 23,702
AM 94,643Mcewan 104
EF 92,288Mcewen 3,410
GS 107,953Mcfarlane 1,335
SR 80,141Mcfarlane 5,361
J 83,770Mcfaul 2,144
CA 88,865Mcgeachy 639
B 135,885Mcghee 1,577
DR 130,103Mcgill 3,188
BA 122,306Mcgillivray 0
MK 160,817Mcgough 2,027
115
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
42 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
F 103,729Mcgowan 548
K 92,428Mcgregor 10,020
SM 104,660Mcgregor 8,033
KA 141,988Mcinnes 27,819
KA 104,440Mcintosh 3,769
SC 128,450Mcintyre 3,895
DG 116,637Mcisaac 3,234
JL 79,309Mcisaac 4,861
B 126,572Mciver 2,012
BT 114,638Mckay 128
JC 87,419Mckay 20
MA 93,130Mckay 15,591
RN 171,590Mckay 970
ST 167,093Mckay 19,175
JS 171,875Mckeachie 9,845
JD 97,091Mckendry 23,981
MJ 150,249Mckenna 3,227
KR 351,166Mckenzie 15,332
R 113,527Mckenzie 8,117
RH 177,475Mckenzie 29,137
ME 84,432Mckeown 34,023
DR 101,773Mckillop 2,914
S 80,035Mckillop 0
TS 208,070Mckimm 5,084
SM 94,086Mckinney 2,923
GJ 215,942Mckinnon 2,083
S 114,150Mclarty 406
K 81,739Mclauchlan 5,430
KB 167,233Mclauchlin 4,920
BF 120,144Mclaughlin 2,729
NA 134,951Mclaughlin 262
AR 138,025Mclean 25,501
CB 99,592Mclean 152
J 91,768Mclean 1,820
K 137,308Mclean 3,415
RB 135,945Mclean 2,319
S 161,788Mclean 3,227
IC 146,755Mclellan 5,731
RI 125,224Mclellan 1,881
FF 107,685Mclennan 11,609
MA 196,843Mclennan 23,245
SL 131,102Mcleod 21,763
TK 103,323Mcleod 2,549
D 128,883Mclorie 3,072
RC 93,716Mcmath 1,643
A 113,671Mcmillan 3,783
CH 202,739Mcmillan 984
JD 138,720Mcminn 2,913
M 184,611Mcminn 24,748
MD 175,526Mcminn 9,877
PL 162,282Mcminn 19,574
J 92,223Mcmurray 0
KN 177,799Mcnabb 3,902
PE 111,250Mcnabb 14,635
GJ 108,197Mcnamara 0
JD 117,000Mcnaughton 0
B 125,578Mcnulty 2,903
CD 117,191Mcpherson 7,939
JW 184,202Mcpherson 10,128
R 184,921Mcpherson 50,847
CT 98,861Mcrae 223
NH 94,521Mcrae 3,690
SA 181,356Mcrae 9,387
DP 256,149Mcsherry 2,951
GD 92,906Mctaggart 0
JH 169,308Mctaggart 9,403
EJ 160,034Mcwaters 9,659
C 135,016Mcwhirter 3,487
MP 106,450Megens 4,189
BJ 108,335Meger 4,609
116
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
43 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
BW 173,620Meger 16,410
TM 75,058Megeth 23,759
M 108,989Mehrayin 1,013
KM 146,285Meidal 2,790
DP 83,713Meirelles 170
D 120,300Melanson 9,697
SW 147,347Melcosky 1,123
ML 85,484Melich 27
CF 87,965Mena 50
RS 118,534Mendoza 0
DN 146,382Mengering 14,233
CP 184,220Menu 11,951
MW 162,824Menu 16,128
L 90,954Mercado 176
SR 159,130Mercer 25,194
CR 140,156Mercereau 4,715
AS 148,183Mercredi 37,503
BA 139,115Merkley 3,220
SC 106,936Merriman 8,900
SJ 101,549Merriman 1,774
P 78,776Merryweather 13,978
MA 111,697Mertion 23,860
S 96,535Mesghali 5,170
RJ 78,598Mesina 1,785
CR 111,760Messer 15,288
RJ 116,911Metcalf 8,414
J 130,805Metcalfe 977
B 91,734Mewhort 7,096
A 149,052Michaud 21,649
KD 84,770Michnik 22,482
FL 163,432Micholuk 0
RF 147,164Micholuk 11,067
S 81,228Micovic 0
Z 161,473Micovic 9,248
CD 147,759Micu 26,284
BJ 110,408Middleton 5,124
HM 157,718Middleton 26,590
JJ 101,394Middleton 1,183
K 120,728Middleton 1,566
PE 99,364Middleton 11,103
MA 135,421Midgett 1,813
JC 133,053Miedema 1,759
V 90,754Mihai 332
A 98,522Milenkovic 3,465
JW 185,685Millard 1,958
AJ 92,943Miller 7
BJ 193,222Miller 5,932
EJ 125,901Miller 8,636
JR 167,104Miller 5,193
K 118,762Miller 628
KR 143,154Miller 13,957
MJ 118,092Miller 18,921
MR 158,498Miller 2,259
R 76,986Miller 111
RJ 100,801Miller 1,216
S 78,823Miller 4,471
T 131,771Miller 2,927
BD 129,482Mills 3,930
LJ 148,653Mills 2,286
R 117,616Mills 39,264
RJ 150,772Mills 6,780
GW 125,058Milne 36,893
R 243,921Milone 1,557
K 115,760Miltimore 3,852
CJ 79,358Minard 20,606
RP 219,651Minchin 1,296
ML 150,677Minichiello 21,479
DD 81,313Miskovich 15,746
B 76,946Mitchell 24
DA 125,749Mitchell 1,678
117
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
44 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
DD 140,795Mitchell 1,616
JC 94,516Mitchell 12,984
KE 148,184Mitchell 2,762
T 127,614Mitchell 46
TR 81,866Mitchell 162
CE 228,603Mitha 15,762
AE 150,181Mithani 1,152
DM 133,472Mix 8,733
KR 102,224Moeller 3,080
DW 88,599Moffatt 12,089
S 83,785Mohamed 1,104
B 127,726Mohammady 2,814
A 158,547Mol 2,635
SL 120,388Molenaar 27,765
KN 125,025Moller-Hansen 380
A 142,479Moloney 3,937
BR 98,194Monahan 3,855
JD 87,386Moncada Cardona 50
M 127,754Moniruzzaman 2,322
CR 115,088Moniz De Sa 998
RW 211,904Monk 24,350
VA 86,707Monkman 4,706
ER 101,972Monleon 0
CW 102,104Montague 1,479
BC 167,618Montgomery 1,745
JA 170,902Montgomery 875
SH 141,945Montgomery 2,221
SM 78,281Montgomery 5,826
K 123,031Montrichard 3,474
V 162,174Moo 998
BE 113,410Moore 7,187
CA 160,174Moore 14,556
HR 106,554Moore 110
JC 103,444Moore 60
PC 127,292Moore 2,021
RW 88,862Moore 5,456
RL 143,210Morales 14,962
M 118,702More 420
G 101,023Morello 0
GM 100,789Moren 525
CA 108,041Morgan 5,023
TI 148,006Morgan 8,327
S 137,940Morii 11,231
K 266,588Morison 12,069
K 131,412Moritz 0
BJ 95,626Morran 10,495
AT 180,051Morris 5,396
DL 108,558Morris 0
MA 225,552Morris 14,490
PD 101,677Morris 5,901
R 117,470Morris 9,638
SS 160,021Morris 1,374
CM 103,278Morrison 2,387
KL 109,345Morrison 1,087
PJ 109,771Morrison 1,307
DA 149,782Morrow 10,526
RM 124,960Morton 3,016
SK 102,915Morton 9,255
F 75,192Moscatelli 4,190
EM 79,563Moser 735
KJ 100,800Moses 1,595
SE 136,092Mosiuk 15,171
TA 125,300Mosley 7,574
SB 145,517Mossing 3,548
B 122,752Mossop 4,613
DJ 98,984Mosure 9,250
A 101,735Motamedi-Sedeh 1,408
D 110,084Mott 2,922
LM 117,707Mott 11,000
PJ 147,898Mottishaw 5,447
118
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
45 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
BA 180,073Moul 6,629
DR 81,681Mounsey 11,866
JC 158,154Mounsey 2,882
V 106,550Mountain 2,751
M 99,531Movahed 370
WA 127,336Movold 5,824
DJ 97,675Mowat 20,660
K 133,831Mowat 9,442
CH 108,782Mowbray 447
CJ 139,171Mowbray 33,279
IA 190,775Moxon 8,383
RG 177,171Mroch 6,250
GA 81,329Muckle 125
SS 136,556Mudaliar 23,933
MD 87,459Mueller 11,112
JS 117,030Muir 5,367
M 109,902Mukai 11,264
GB 160,010Mukkavilli 2,118
F 92,066Muljono 6,356
JN 141,716Mullard 8,440
CR 150,296Mullen 3,734
BG 84,553Mulligan 12,514
AF 121,315Mullin 7,115
GJ 158,706Mullin 12,953
RG 130,764Mullin 17,583
GW 95,493Mullins 4,726
S 146,495Mullins 8,598
CA 109,169Munro 8,742
KC 201,918Munro 5,198
RJ 91,806Munro 2,803
TR 102,839Munroe 2,331
RM 144,693Munzer 2,063
T 75,912Muratori 6,318
BT 149,839Murphy 6,927
P 80,976Murphy 1,881
WP 107,160Murphy 0
PJ 110,217Murray 50,643
SD 165,073Murray 2,887
D 182,044Muschette 2,511
HR 102,315Mussell 220
JC 78,549Mutanda 257
RP 169,070Mutukutti-Arachchige 8,671
CJ 128,892Muzyka 12,503
AT 107,106Myers 9,628
MJ 136,452Myers 13,162
ME 120,762Myres 8,841
CB 126,330Mytting 2,750
RA 108,619Nacionales 3,703
MR 107,271Nadeau 7,052
RP 142,782Nadeau 1,125
M 191,143Nagpal 7,467
DC 111,116Nahulak 34,646
AB 112,548Nair 6,451
JJ 89,500Naisby 0
JW 128,391Naisby 3,819
Z 92,340Nan 1,082
JS 94,882Nanra 5,005
SD 84,081Narayan 0
LY 77,587Nasiri 175
FT 108,252Nassachuk 287
ST 139,276Nassachuk 9,711
MM 87,086Nazer 1,945
S 75,939Nazim 144
BP 128,477Neal 12,625
RH 97,922Neal 6,572
GT 148,155Neary 11,643
T 120,567Neary 13,350
R 102,484Neden 1,356
T 102,207Neighbour 4,949
VP 146,093Neil 10,047
119
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
46 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
CE 89,669Nelsen 1,827
EA 158,322Nelson 6,695
EJ 117,425Nelson 569
GM 108,113Nelson 14,330
J 149,043Nelson 6,986
JR 194,702Nelson 976
ML 80,273Nelson 2,037
NR 174,733Nelson 3,276
TL 117,912Nelson 2,718
EJ 128,209Nephin 1,368
B 76,998Nera 1,561
DJ 178,142Nernberg 9,139
V 89,787Nesterov 11,611
GM 92,816Neubauer 4,645
DE 98,030Neubeck 2,102
J 158,064Neufeld 3,838
GL 132,246Neufeldt 4,732
A 172,851Neuman 1,395
K 80,733Nevissan 56
WJ 89,291Newby 4,505
PM 95,129Newhouse 29,929
MR 152,600Newland 5,591
J 88,801Newman 1,348
KF 86,976Newman 4,370
TA 80,155Newman 6,030
B 94,970Newson 0
GD 133,346Newson 1,471
DJ 121,154Newstead 11,542
S 109,257Nezafatkhah 1,628
SD 158,205Nezil 15,138
KK 128,789Ng 4,016
PC 123,825Ng 2,652
S 87,645Ng 8,569
S 116,033Ng 2,353
SH 86,421Ng 0
TT 100,080Ngo 2,351
CM 125,623Ngom 3,582
T 89,924Nguy 1,873
A 96,614Nguyen 0
B 98,731Nguyen 1,933
K 82,574Nguyen 0
KV 86,242Nguyen 100
TD 97,701Nguyen 49
TM 164,323Nguyen 13,512
G 88,983Nichele 0
IS 109,086Nichifor 2,854
W 133,677Nichiporik 15,552
MW 141,081Nichol 1,942
TR 99,980Nicholas 548
SW 123,374Nichols 2,021
T 130,212Nichols 19,754
WR 177,789Nichols 2,242
S 109,024Nicholson 1,105
MP 86,304Nickell 0
BK 81,329Nielsen 0
DT 91,894Nielsen 1,734
F 120,055Nielsen 14,834
G 166,828Nielsen 13,888
KL 134,362Nielsen 150
RC 115,084Nielsen 1,010
MK 122,499Nijjar 2,833
ML 85,563Nikiforuk 0
MJ 166,812Nikkel 9,085
M 90,863Nikmaram 54
I 106,692Nikolic 633
H 104,295Nikolov 6,907
MT 127,914Nikolova 0
BJ 159,414Nipp 1,193
DJ 97,980Nishi 3,053
TJ 85,567Nissen 6,441
120
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
47 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
S 99,053Noble 364
SL 97,050Noble 9,163
CR 110,885Noel 19,753
RP 90,269Noga 11,790
CF 107,889Nole 30,843
Z 103,962Noorani 1,992
BW 111,599Nordal 7,128
RE 115,470Norman 250
AJ 131,605Norris 8,196
AS 91,485Norris 3,966
TJ 187,239Norrish 18,203
SD 109,431Northridge 7,600
G 201,202Nowakowski 2,571
JJ 211,942Nugent 6,486
TW 121,263Nugent 12,890
PT 140,796Nundal 7,047
CA 114,251Nunn 4,807
W 137,419Nustad 23,136
RA 100,677Nyden 2,120
CE 125,924Nyrose 8,795
JT 109,160Nzambu 7,484
BP 145,363Oakley 2,640
ZS 90,934O'Brien 6,885
D 99,917O'Connor 1,050
DR 152,873O'Dette 491
JR 125,234Odo 1,148
BZ 88,368O'Donnell 22,079
V 97,718Odyegov 18,087
D 163,027O'Ferrall 9,763
II 86,376Ogbatue 865
DA 84,050O'Gorman 50
JM 142,211O'Grady 4,274
S 78,843Ogram 3,328
A 133,273O'Hara 4,503
E 96,259O'Hare 4,039
KM 118,145Ohman-Relph 4,714
S 77,842Olafsen 1,783
DJ 131,098Olan 665
TF 87,630Olan 0
JT 187,956O'Laney 11,274
DO 103,674Old 4,631
SE 112,223Oldham 7,455
RE 104,060Oldman 24,947
SA 109,417Oleson 1,013
S 75,713Olia 314
BT 91,938Oliver 12,776
A 104,099Olivier 1,231
MD 78,400Olivier 2,661
NG 77,653Olsen 0
HL 89,248Olson 1,961
JM 104,798Olson 6,615
SR 163,343Olson 17,935
O 122,084Olund 4,586
TD 180,813Olynyk 15,416
KM 108,709O'Neil 5,490
KD 100,366O'Neill 429
DG 140,634Ong 6,355
YO 151,214Onifade 1,559
LA 97,594Opatril 0
K 144,335Orchard 29,826
G 83,378Orchiston 36
BR 199,517Organ 6,927
AM 79,029Oriani 0
CK 459,609O'Riley 28,979
KN 76,400O'Riordain 0
TB 107,616Orme 14,159
A 170,609Ormiston 14,709
BE 184,417Orr 4,946
JL 77,499Ortiz 5
A 128,292Osin 24,225
121
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
48 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
V 121,132Ossipchuk 75
M 77,043Ostadi 6,489
DH 122,337Ostendorf 41,082
JR 144,283Ostrinski 3,323
PF 86,435Osuntokun 7,458
MT 128,982Oswell 8,523
D 131,178Ouellet 1,107
GJ 77,875Oughton 0
DT 131,404Oussoren 17,372
T 77,480Owen 0
NF 130,312Ozog 1,135
RS 78,303Pablico 0
FG 77,959Pabustan 659
RP 107,654Pachchigar 5,315
C 151,720Pacheco 10,680
J 90,371Paetz 794
R 153,615Page 1,331
SC 191,889Pai 436
AT 82,022Paivio 0
S 113,596Pajouhesh 2,279
FM 110,800Pakzat 2,342
R 87,165Pal 9,438
R 92,691Paller 100
DT 90,892Palmer 2,066
EC 91,458Palmer 1,008
GJ 141,823Palmer 13,724
JA 152,284Palmer 446
JL 93,973Palmer 2,218
O 118,498Palmer 3,159
SW 105,265Palmer 4,200
H 93,748Pan 25,116
P 78,473Pan 0
Z 141,793Pan 697
RI 85,571Panattoni 25,093
BS 135,171Pancho 1,243
DS 130,902Pandher 20,596
SM 115,051Pang 3,089
JS 132,331Pannu 285
D 180,571Papadoulis 2,468
A 110,828Papaspyros 564
KL 99,105Pappas 2,613
PA 107,248Paquette 2,529
AJ 156,228Paquin 3,916
GP 84,169Paradela 8,461
JA 110,901Parco 23,798
ME 145,166Pardhan 27,259
JJ 155,385Pardiac 2,421
JA 77,397Park 0
K 126,554Park 3,020
A 112,225Parker 4,720
BT 96,499Parker 13,506
HJ 180,521Parker 2,396
LS 93,392Parker 1,515
NA 176,062Parker 25,670
RK 163,840Parker 3,652
V 77,289Parkhouse 433
BJ 149,318Parkin 1,427
S 80,463Parlee 807
G 257,652Parmar 19,431
JS 118,022Parmar 4,240
S 172,035Parmar 1,468
BG 79,058Parsons 680
JJ 119,248Parsons 28,344
WK 99,542Parsons 1,020
CW 83,901Partington 5,155
N 76,518Parya 511
GT 97,380Pasco 36,127
RD 142,423Pascoe 434
CD 131,184Passey 3,850
D 98,876Pastro 280
122
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
49 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
KM 77,805Patel 522
M 115,705Patel 3,328
NC 118,085Patel 622
RR 105,305Patel 18,096
KM 144,943Patouillet 23,363
SR 139,311Patouillet 1,738
CW 108,200Patterson 0
DA 79,994Patterson 154
JL 121,373Patterson 436
WL 102,969Patterson 2,790
AW 148,458Pattinson 35,395
JS 95,328Patton 8,666
AW 99,894Paul 3,615
BJ 103,724Paul 611
RB 81,544Paul 38,180
GJ 122,705Pauls 0
PE 139,937Paulsen 0
GH 89,033Paulson 39,430
BD 196,282Pavlik 14,617
RC 143,161Pavlik 5,596
S 109,846Pavlov 35,926
S 90,954Pavlovic 3,191
D 150,080Pawlachuk 1,171
AP 94,962Paydar 998
BR 131,204Payne 9,615
DC 161,933Payne 16,196
GA 90,742Payne 0
KR 87,102Payne 200
O 95,555Pazukha 1,012
GR 161,893Peachey 2,186
S 81,755Pearce 5,722
KD 249,347Peck 4,073
BP 176,716Peco 17,170
MA 170,595Pedersen 380
KJ 121,770Pederson 2,165
MS 112,648Pedley 8,589
BR 159,332Peel 7,317
EM 118,638Peetoom 3,371
RJ 231,104Peever 1,628
CP 109,663Pelletier 34,097
MD 133,536Pelletier 2,893
J 100,488Peng 0
JS 125,985Peng 2,668
GL 97,180Pengilley 5,625
JR 99,249Penman 111
J 126,665Penner 0
O 118,129Penner 11,699
W 114,488Penno 682
R 152,321Penrose 8,069
NE 114,386Pepper 17,211
BR 95,388Percival 5,424
E 90,433Perczynska 45
CG 86,392Pereira 2,227
AT 82,343Perera 11,178
D 122,729Perera 14,391
M 155,513Pereszlenyi 13,829
T 96,567Perewernycky 437
L 142,752Perfanick 1,418
TJ 110,784Perigo 4,118
GU 108,486Perkins 11,417
RW 129,660Perkins 2,470
L 108,064Perkull 4,968
JD 119,124Peron 427
JL 102,207Perrault 6,787
CJ 155,089Perro 44,797
D 124,219Perry 2,046
JR 129,462Perry 3,056
MJ 222,976Perry 4,238
RI 122,241Perry 3,111
SB 99,721Perry 12,727
123
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
50 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
AW 105,083Peruzzo 116
C 84,829Pesic 1,775
AA 121,080Peters 1,819
B 89,674Peters 10,923
J 94,145Peters 0
MA 114,320Peters 22,770
SM 177,432Peters 9,679
TL 178,513Peters 3,430
CB 191,979Petersen 17,954
CL 95,580Petersen 768
E 118,116Peterson 17,702
KA 79,750Peterson 166
NP 131,171Petkau 1,679
SG 97,220Petrie 0
M 114,881Petrovic 594
E 130,204Petrucci 46,945
DN 158,999Pettet 436
SA 117,776Phair 15,274
DA 104,614Phalen 14,593
L 129,874Phan 13,537
ST 119,136Phang 19,639
CS 106,136Philip 2,570
CA 137,611Phillips 7,508
J 148,117Phillips 43,570
J 98,925Phillips 15,851
JN 197,188Phillips 5,837
CC 143,895Picassi 5,720
BJ 81,950Pierce 13,406
RD 113,365Pierce 0
FV 105,506Pietila 86
P 127,541Pietramala 998
DL 97,001Pigeau 673
TJ 140,332Pighin 1,709
A 109,223Pigott 24,745
J 199,602Piilo 11,162
RJ 138,587Pilkington 1,177
SD 116,240Pilkington 3,558
AP 87,703Pillay 280
PG 126,629Pillay 3,760
LV 191,999Pillon 6,313
DG 90,198Pilon 409
R 128,403Pimer 3,300
AJ 194,916Pineau 4,910
J 91,151Pinkenburg 337
T 126,227Pinkenburg 3,047
A 150,029Pinksen 1,406
S 126,238Pinkus 2,151
CS 93,664Pitt 3,611
RA 137,138Planinshek 3,557
BP 106,322Plunkett 1,046
JD 138,432Plunkett 1,963
KP 112,405Po 814
DS 172,704Pochailo 13,692
S 116,416Pocuca 61
JJ 112,967Poirier 0
W 123,748Poirier 9,986
DB 99,088Poisson 2,031
CD 114,837Poitras 76
RE 125,565Poland 10,820
HL 91,170Polkinghorne 343
BC 176,860Pollock 13,163
BJ 105,466Pollon 18,483
RD 147,575Pollon 2,196
GA 173,610Polok 155
M 122,010Pomeroy 31,065
HM 151,188Pommier 1,396
I 119,849Poniz 614
LA 164,910Ponto 2,762
K 88,919Poon 436
MS 95,141Pooni 8
124
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
51 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
PS 148,644Pooni 2,624
RS 129,826Pooni 22,005
K 114,819Pooyafar 10,037
G 113,922Pope 5,301
LE 141,417Pope 601
DD 169,030Popek 15,748
KE 202,530Popoff 5,178
M 85,529Popoff 4,577
TW 124,644Popoff 1,935
GN 109,727Porbeni 6,332
T 125,247Porritt 3,069
D 155,146Porter 24,728
KL 102,638Porter 3,311
WJ 83,929Porter 14,922
A 126,056Portillo 5,626
I 97,850Portnova 1,034
J 109,605Portras 1,139
BJ 151,008Posnikoff 5,772
IL 142,624Pothier 17,675
GR 110,999Potter 1,743
MR 122,672Potter 0
CN 112,419Poulin 0
S 168,839Pountney 29,137
M 108,635Pourkeramati 3,127
C 105,028Powell 4,930
DI 138,068Powell 10,958
C 142,734Power 7,761
JF 113,635Power 2,052
JR 129,194Power 5,601
VM 154,736Power 1,173
M 343,727Poweska 17,342
SC 132,097Pozzo 3,487
MD 111,760Prachnau 3,868
AC 152,147Pradhan 4,441
SL 105,662Praught 18,119
R 112,554Presgrave 400
AS 95,555Preston 14,210
MA 160,575Prestwich 36,898
TW 101,840Price 1,724
BA 82,558Priest 4,265
D 78,147Pringle 0
GL 128,425Pringle 0
V 137,414Prinja 1,892
ND 171,274Prior 2,764
SL 75,741Prior 663
R 135,607Proch 0
PR 90,574Procter 3,481
S 90,398Proctor 1,563
JR 90,303Profitt 105
AG 98,607Pronger 40,334
KA 81,458Prosch 2,076
M 170,056Prosperi-Porta 7,715
DM 109,740Proudlove 28,225
KD 103,016Proudlove 1,436
ML 108,552Prouse 14,305
A 104,531Provinciano 62
M 206,892Prpic 1,848
DJ 109,573Pruden 23,039
PD 92,082Pryce 272
AM 111,834Pryse-Phillips 6,443
CP 100,682Puleo 509
AL 134,031Pulford 1,478
S 138,161Pulford 7,154
P 91,927Pun 998
KJ 136,655Punch 686
J 135,187Purych 19,362
N 123,404Pusayanawin 403
J 109,701Qi 1,780
Y 95,997Qin 1,943
XJ 89,341Qu 998
125
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
52 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
XX 86,397Qu 582
RG 137,958Quakenbush 1,678
G 136,018Quan 4,132
JR 107,347Quan 2,611
WJ 142,819Quan 3,748
DJ 175,543Quast 1,290
SB 154,994Quast 2,852
CM 83,474Quebral 0
DJ 134,675Queen 6,376
D 94,685Querengesser 7,691
T 76,376Querengesser 1,892
TJ 125,633Quibell 0
AV 155,246Quiddaoen 1,078
GC 133,577Quinlan 15,727
CA 131,219Quinn 3,513
D 123,916Quinn 3,148
R 95,860Quinn 436
S 132,582Quinn 5,821
SP 136,546Quinn 1,784
TA 94,769Quinn 7,475
C 82,914Quon 2,816
JC 177,292Quon 1,062
SC 137,848Quon 2,010
TB 110,481Raagner 0
R 98,877Rabiei-Talkhoncheh 9,111
DE 106,522Racho 275
CJ 99,014Racz 6,268
FF 92,367Rad 6,785
BJ 125,297Radloff 1,475
GL 96,356Radmacker 1,245
JG 123,916Radmacker 30,542
A 113,092Radman 12,008
DJ 121,644Radom 9,760
DE 111,946Radwanski 3,973
A 130,228Radziwon 2,877
GD 136,909Raga 4,885
V 114,125Raghunathan 3,255
A 110,676Rahemtulla 9,536
DS 92,197Rahier 587
SA 119,006Rahman 4,594
DB 115,836Rahn 11,212
D 115,220Rai 3,105
K 111,146Rai 45
A 121,377Rail 4,268
LD 103,096Raison 4,529
R 166,720Raja 5,452
A 149,848Rajora 1,704
PS 88,193Rakhra 1,161
UC 151,767Ram 17
A 88,106Ramachandra 5,335
HR 87,016Ramgoolam 1,300
AC 82,891Ramirez 50
EV 87,595Ramos 0
RA 160,848Rampton 1,860
MU 119,810Rana 3,290
JM 87,985Rand 7,046
A 88,386Ranjbaran 4,704
DG 137,153Raposo 9,242
G 166,796Rasmussen 1,185
LD 117,666Rasmussen 16,582
RG 76,930Rasmussen 2,519
RD 107,182Rasul 467
DA 118,866Rathlef 2,605
M 78,883Rathnayaka 1,638
DM 158,030Ratnam 633
MR 102,008Rattray 7,510
D 120,118Ratzlaff 4,568
W 115,161Rauch 1,067
JA 77,644Rawluk 5,437
KW 76,677Rawn 6,338
126
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
53 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
AM 82,347Raymond 9,032
RM 113,370Raymond 3,653
MH 120,846Raza 0
S 149,345Razavi Darbar 4,343
D 222,696Razlog 7,700
RD 146,513Read 3,805
WA 127,378Readings 11,389
BF 148,573Receveur 8,895
J 130,111Redada 1,158
KJ 107,148Reddy 5,222
DL 137,907Reed 37,580
DR 100,382Reed 12,158
IT 118,503Rehmanji 2,175
S 129,132Rehmat 253
IJ 145,038Reichmuth 4,092
AC 113,634Reid 2,148
DE 139,529Reid 2,695
DS 145,169Reid 16,420
JD 117,043Reid 21,108
JS 194,246Reid 10,310
A 98,172Reidy 2,769
DE 90,435Reilly 73
MG 81,017Reilly 2,117
MD 127,722Reimann 5,159
RG 185,499Reimann 10,543
JG 94,618Reimer 4,933
HM 107,228Reis 250
MA 83,250Rejano 1,603
TJ 161,238Remfert 22,972
C 131,096Rempel 5,570
VH 124,378Rempel 157
G 119,488Ren 3
A 80,964Rennie 0
JM 127,226Rennie 33
KP 81,788Rennie 1,114
C 118,851Revell 4,080
J 95,329Reynolds 6,914
SA 144,016Reynolds 1,172
JW 98,006Rhode 15,732
CC 181,581Rhodenizer 8,148
DR 106,428Rhodes 2,853
AF 139,625Ribeiro 29,826
M 125,271Rice 33,843
R 152,585Rice 0
JD 189,514Rich 4,594
K 125,628Richard 7,055
M 95,202Richard 1,594
CM 218,292Richards 4,461
D 105,107Richards 16,159
J 92,803Richards 0
KJ 140,648Richards 13,560
VL 94,715Richards 3,783
J 123,437Richardson 23,798
D 136,185Richter 2,673
M 133,284Richter 928
TE 104,560Richter 2,189
LI 129,624Rico 193
KG 142,720Riddell 1,133
SB 156,979Rideout 6,224
RL 118,924Ridsdale 20,447
K 96,184Rieder 2,324
CP 96,645Riley 15,745
TW 101,265Ringer 291
GA 103,137Ringham 3,426
WP 124,414Rink 1,166
DL 76,414Rinvold 7,104
A 85,377Rios 5,512
CB 114,030Ristimaki 12,483
S 137,596Ritchey 731
IH 110,223Ritchie 2,016
127
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
54 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
TD 137,885Ritchie 629
KD 94,630Ritson 0
JV 107,017Rittinger 3,447
AF 103,672Rivera 1,085
LG 75,887Rivers 0
M 75,871Riyanto 0
T 111,407Rizwan 1,599
PA 84,052Robbins 9,890
HJ 129,399Roberge 6,710
JP 171,821Roberge 18,317
C 76,247Roberts 0
CA 170,800Roberts 5,082
CI 155,844Roberts 4,357
ET 114,955Roberts 1,830
J 92,452Roberts 11,299
DG 106,607Robertson 200
MW 145,823Robertson 9,629
PH 119,335Robertson 5,723
RR 119,133Robertson 15,417
DA 111,613Robilliard 13,290
BM 126,302Robins 13,425
M 87,373Robins 675
DD 148,022Robinson 5,429
DR 78,583Robinson 10,500
DV 236,517Robinson 2,385
KE 75,157Robinson 1,618
KJ 92,717Robinson 0
JR 123,341Roblin 1,217
T 140,391Roblin 827
IM 147,273Roby 9,416
KD 137,549Rochon 2,441
EH 88,863Rockl 0
RG 104,409Roddick 4,048
C 82,048Roddis 6,626
GD 131,140Rodgers 4,145
PL 87,951Rodgers 1,565
JA 126,263Rodney 11,510
GP 102,790Rodrigue 91
VM 83,006Rodrigues 234
DP 120,181Rodriguez 0
K 161,552Roesch 22,068
DM 130,022Rogers 5,381
DS 174,678Rogers 2,677
DT 104,899Rogers 206
LD 118,079Rogers 21,491
TJ 133,830Rogers 7,678
J 88,536Rojas 1,988
CM 80,692Roland 7,983
R 99,174Rolland 1,598
SA 130,208Rollier 18,377
RL 93,359Rollins 18,535
A 149,001Roman 1,761
MA 176,902Romanczak 4,630
JG 86,384Romas 0
B 88,837Rombis 8,814
C 88,134Rombough 7,621
L 101,588Romo Garcia 703
JC 79,721Rood 551
S 96,375Rooke 11,844
A 176,595Rooney 1,287
MA 85,342Rooney 516
JE 105,815Roote 704
JD 186,342Rosborough 4,011
NA 96,796Rosenow 3,672
MJ 125,874Roset-Crawford 4,047
N 87,987Roshandel Tavana 3,216
CC 78,064Ross 0
CR 92,020Ross 2,284
T 103,035Ross 418
K 78,920Rossouw 815
128
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
55 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
K 112,196Rossouw 7,500
SG 133,082Rossouw 8,243
Z 97,546Rossouw 30
S 99,886Rostamirad 776
PA 152,836Rother 3,977
R 133,606Routledge 2,098
P 76,397Rovere 2,430
K 88,772Rowe 3,600
QO 123,498Rowe 5,996
RS 128,907Rowe 30,456
IC 114,108Rowlands 2,233
GJ 120,398Roy 6,816
M 113,258Rucker 2,144
CG 156,981Ruckstuhl 16,767
BT 117,216Rud 9,517
B 75,720Ruhl 1,590
DM 115,753Rumball 8,282
JC 103,403Rupp 3,885
PL 184,948Russell 3,992
R 168,579Russell 25,109
AP 117,260Rutherford 392
NJ 177,821Rutherford 24,868
JL 129,844Ruzycki 0
C 178,248Ryan 4,849
C 78,306Ryan 3,365
L 119,284Ryan 0
RC 190,645Ryder 29,217
GB 148,931Ryley 16,488
K 92,617Ryu 0
R 197,737Saari 2,531
DM 188,442Sach Johnston 9,479
MA 118,085Sadeque 7,043
MC 124,218Sadler 4,441
DL 88,018Sadowski 10,132
M 128,110Saha 1,173
SP 78,474Sahai 552
I 77,814Sahota 3,482
KS 153,361Sahota 11,565
L 152,006Sahota 998
R 92,084Sahota 3,105
RB 109,686Sahota 26
RS 94,853Sahota 2,430
D 113,993Sahu 184
GS 75,700Saini 387
DK 129,569Sakamoto 4,463
W 97,767Sakamoto 4,926
JL 77,638Saklofsky 50
JA 85,303Salak 2,630
HF 78,633Salameh 154
CM 129,276Salazar 436
D 88,110Saldanha 758
A 121,721Salehi Parast 556
PA 127,740Saliken 19,784
QD 116,130Salt 4,175
MV 78,571Salvana 16
M 123,505Samadi Bahrami 1,801
MR 130,480Sami 1,572
MR 82,723Sami 9,156
BK 125,962Samis 1,853
D 96,354Samonchik 5,372
GS 125,509Samra 3,388
SA 85,349Samson 2,436
JW 96,177San 2,256
A 108,340Sanatizadeh 470
N 88,420Sanchez 1,530
BJ 117,436Sanders 2,051
DS 217,711Sanders 5,214
JC 96,628Sanders 2,095
CA 162,253Sanderson 15,038
L 132,676Sandferd 8,310
129
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
56 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
M 82,542Sandferd 4,360
S 171,518Sandferd 6,682
JP 102,229Sandford 0
PH 113,204Sandhar 2,380
A 113,682Sandhu 248
A 90,878Sandhu 0
NS 121,873Sandhu 1,667
NS 135,362Sandhu 0
PS 120,781Sandhu 1,110
RS 99,637Sandhu 46
RS 86,374Sandhu 229
KJ 85,718Sandstrom 462
DW 90,181Sandulescu 1,151
C 219,541Sandve 2,698
H 78,596Sanghara 6
AS 104,622Sanghera 469
LE 98,655Sanjenko 7,625
SV 115,774Santa Maria 17
RJ 78,686Santiago 998
A 87,557Santos 127
J 82,050Santos 6,015
N 165,707Santos 15,581
A 126,628Saputra 1,442
N 120,515Sarafraz-Shekari 41,019
K 150,145Sarai 3,413
A 114,523Sarkar 0
A 133,353Sarroca 7,302
L 94,251Sartor 998
BJ 76,120Sarvis 15,098
A 119,983Saseendran 698
DS 112,778Sather 420
JL 101,500Sathianathan 229
GS 132,301Sathu 636
DM 246,872Sauer 16,418
BJ 147,544Saunders 1,196
CJ 98,465Saunders 34,053
S 90,494Saunders 2,633
DJ 109,158Saunderson 35,545
AP 95,051Sauter 4,250
BC 107,690Sauter 2,996
BA 86,789Savage 140
MJ 172,942Savidant 1,250
M 91,177Savill 6,346
A 127,951Sawamoto 5,140
CC 151,189Sawatsky 637
GM 232,371Sawatsky 473
MP 188,308Sawatsky 20,733
MB 138,296Sawatzky 20,684
AT 212,642Sawchuck 19,863
AR 84,549Sawicki 2,247
ME 123,358Sawyer 3,824
P 130,307Saxena 0
M 105,837Sayedyahosseini 1,298
BA 130,937Sbitney 5,069
G 161,776Scarborough 20,612
MH 81,040Schaefer 9,726
ZI 125,652Schaffer 2,538
PC 121,545Scheck 39,671
HP 161,612Schellekens 1,290
AD 148,291Schenk 0
JC 150,842Scherer 14,779
A 189,377Schimpel 6,585
CM 80,230Schmaltz 2,123
RL 111,396Schmid 2,504
CG 105,599Schmidt 9,770
D 183,812Schmidt 1,340
DN 112,977Schmidt 1,212
JA 93,409Schmidt 16,673
J 109,356Schmitz 0
RA 83,184Schneider 1,203
130
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
57 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
HR 106,949Schnell 430
R 103,847Schoemeyer 5,434
HM 114,995Scholefield 2,771
D 188,155Schonewille 1,856
MW 78,541Schootman 1,035
BM 115,531Schorn 17,273
SJ 107,974Schroeder 8,843
RB 209,323Schubak 10,989
MN 108,623Schubert 2,839
GD 108,375Schulte 297
M 151,984Schultz 42,094
PN 114,276Schulz 688
SM 93,737Schummer 0
EJ 122,210Schwab 2,664
RA 84,565Schwartz 547
TJ 171,024Schwartz 2,752
K 79,705Schwarz 11,338
DW 124,725Schweb 1,466
SL 104,017Schweb 2,749
L 119,267Schwenning 0
DR 117,724Scorse 0
C 80,290Scott 3,591
CA 122,352Scott 10,972
DD 178,894Scott 2,402
HW 117,236Scott 6,839
MJ 147,100Scott 1,325
S 124,972Scott 5,616
T 121,231Scott 486
TJ 133,781Scott 26,400
ND 151,554Scott-Moncrieff 5,122
JG 178,625Scouras 12,603
AE 99,138Seabrooke 6,496
DP 98,573Seamer 9,792
N 136,150Sears 39,815
AL 116,800Seaton 15,617
GW 93,759Sebastian 33,085
NR 176,173Sebastian 24,305
M 133,451Seblani 273
CS 115,445Seddon 25,049
MS 138,378Seery 2,032
LN 100,677Segarty 10,049
M 115,742Sehgal 8,898
DP 104,851Seidel 26,650
QL 99,204Seitz 120
JS 76,275Selesnic 5,896
A 207,408Selnes 4,040
D 111,291Semenyna 2,986
CM 123,415Semkew 2,711
SP 126,777Seneviratne 1,391
DA 145,946Senger 1,128
MR 209,399Senk 21,086
AC 91,760Senner 1,602
PM 129,269Seo 109
MM 107,661Seong 2,004
DT 127,374Sereda 436
DJ 91,234Serhan 178
LM 106,872Serko 9,167
B 152,421Setiawan 50
EW 123,454Seto 239
JK 133,655Seto 2,796
M 92,664Seto 550
R 132,528Seto 936
DW 146,686Seto-Kitson 9,802
D 107,206Setsikas 78
S 82,692Sewell 5,296
DL 104,726Sexton 467
I 78,548Seyed 2,035
M 116,135Shadnia 3,713
DA 159,014Shafi 13,889
K 84,822Shah 1,342
131
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
58 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
NP 126,618Shah 3,964
S 94,148Shahbazi 325
OS 119,718Shahi 479
MS 165,183Shahid 0
S 114,809Shahriary 4,586
S 79,281Shahrokhi 3,136
R 121,735Shaikh 2,224
JC 135,698Shak 16,445
CL 129,430Shaley 1,221
TS 94,707Shang 998
GA 100,250Shanks 998
E 134,156Sharifi 9,551
AK 168,843Sharma 5,606
N 83,406Sharma 20
R 138,203Sharma 3,728
YP 101,735Sharma 7,025
DA 129,959Sharman 11,696
DN 82,431Sharpe 50
TF 104,762Shave 2,031
A 114,146Shaw 0
AC 110,989Shaw 4,509
HJ 83,972Shaw 1,062
KA 138,627Shaw 374
B 119,769Shearing 3,113
DN 133,848Sheedy 4,415
R 113,944Sheergar 1,955
MR 114,938Sheffer 1,702
B 108,265Shehyn 627
AH 132,413Sheikh 436
B 125,804Shen 3,822
J 81,484Shen 0
J 93,127Shepherd 5,116
JE 165,563Shepherd 8,176
DM 165,156Sherbot 12,577
AD 115,638Sherrard 11,980
PM 94,220Sherrington 2,167
KV 109,571Sherry 15,009
D 144,312Shetty 0
Y 80,200Shi 5,903
JL 111,348Shirley 8,346
ZM 222,372Shivji 8,154
LW 101,199Shockey 3,248
RS 185,852Shoemaker 15,763
BC 96,251Shook 75
KA 127,205Shrubsall 474
C 122,644Shu 6,582
X 88,496Shuai 3,258
ES 77,628Shudo 216
CC 94,392Shum 1,334
W 199,519Shum 3,973
EM 170,293Shuster 7,588
D 116,119Shyong 150
RD 111,137Sicotte 2,488
SJ 146,931Siddoo 0
A 148,137Sidhu 188
AK 88,264Sidhu 3,509
PP 95,404Sidhu 1,318
DJ 202,180Sidney 12,249
RL 146,277Siebert 4,992
RM 125,590Siebold 1,980
BD 101,975Siefken 2,303
PL 159,277Siega 639
SJ 116,954Siega 3,138
BM 88,535Siemens 50
CK 178,048Siew 3,732
Z 143,163Sigarchy 4,931
KJ 78,028Sikora 5,195
O 125,924Siksik 520
M 138,811Silic 100
CB 151,999Sillje 5,808
132
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
59 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
DP 134,861Sillje 18,061
TR 105,663Sills 6,641
MP 122,057Silva 4,049
SG 99,418Silva 195
BC 97,952Silver 1,930
GJ 137,097Simmons 1,871
JV 139,926Simmons 5,264
VB 142,566Simons 9,113
JA 134,902Simonsen 1,318
AD 146,712Simpson 17,699
C 118,949Simpson 498
CJ 79,293Simpson 1,941
EL 126,202Simpson 3,314
J 97,445Simpson 2,752
JG 128,786Simpson 13,079
LP 101,369Simpson 7,907
LR 126,699Simpson 4,108
WA 77,056Simpson 5,793
WG 148,576Simpson 9,011
R 116,787Sin Tak Lam 3,105
SL 147,932Sinclair 19,004
C 132,617Singh 4,873
G 164,077Singh 347
K 78,064Singh 9,044
P 99,357Singh 1,274
B 136,957Singh Joginder 2,072
KA 145,378Singleton 15,922
C 109,481Sinnott 45,477
DY 79,222Siu 673
G 108,228Siu 2,204
JK 231,550Siu 12,552
SK 104,008Siu 998
JC 125,340Skabeikis 4,426
KM 112,608Skibo 625
MP 92,808Skidmore 2,507
LA 86,692Skillen 689
FT 77,159Skoczylas 2,418
JT 80,820Slaco 930
J 96,387Slader 0
KH 109,129Slamang 9,408
DW 99,219Slamon 36,981
NF 131,582Slaney 14,717
DB 112,563Sloan 4,864
SL 112,208Sloan 3,613
G 86,351Slobodin 2,024
JW 173,507Slotte 12,414
TD 96,164Slotte 13,513
JA 102,286Smajla 1,004
SM 110,712Small 1,453
DG 157,898Smart 2,314
B 108,680Smiley 3,710
JI 151,228Smiley 0
N 134,675Smirnov 3,547
B 105,101Smith 244
BJ 84,640Smith 4,307
BJ 100,728Smith 20,012
CC 79,024Smith 5,600
CD 186,485Smith 426
CG 174,087Smith 15,183
DL 143,142Smith 9,054
DL 112,198Smith 3,465
DL 138,610Smith 748
DM 113,118Smith 11,323
DR 102,952Smith 3,147
DR 206,972Smith 33,685
FN 95,122Smith 165
GB 106,838Smith 1,470
GS 113,041Smith 8,908
J 105,566Smith 18,832
JC 128,295Smith 7,690
133
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
60 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
JM 78,895Smith 571
JS 140,271Smith 1,242
K 91,079Smith 11,415
LF 78,715Smith 6,876
M 77,072Smith 0
MW 112,279Smith 4,716
PJ 92,724Smith 3,034
PS 132,114Smith 2,341
R 110,504Smith 436
RA 103,269Smith 1,213
RC 130,042Smith 11,219
RC 140,059Smith 3,477
RF 99,002Smith 8
RJ 132,222Smith 2,256
RO 81,481Smith 2,802
S 114,015Smith 100
SC 160,171Smith 8,251
SE 137,545Smith 5,969
TC 123,898Smith 25
TD 139,370Smith 11,477
TW 95,557Smith 19,493
A 93,927Smithson 0
M 152,768Smusz 4,120
BM 135,671Smythe 7,435
EA 114,927Snelling 5,654
C 102,260So 447
DR 78,675Sobrepena 525
JC 249,916Sofield 2,588
BH 127,659Sokugawa 998
R 110,318Solanki 3,485
K 156,247Solari 7,569
MM 98,449Soliman 1,048
DR 184,556Solmundson 6,387
NM 107,550Solmundson 420
JO 146,382Somerville 7,060
TO 141,910Somerville 7,691
D 96,944Son 0
JA 169,974Sonnenberg 1,770
A 92,020Soo Kaim 8,620
BM 87,039Sopko 251
CE 151,014Sorace 468
WR 107,411Sorto 420
R 259,832Soulsby 6,791
BA 147,617Spalteholz 8,811
RJ 180,336Sparshu 110
SC 110,237Spence 23,258
CS 139,432Spencer 34,367
DR 120,617Spencer 0
MW 113,407Spencer 11,555
R 111,718Spencer 4,662
RL 92,300Spicer 64
MH 146,163Spinney 18,194
DG 86,779Spooner 4,118
GE 82,301Spray 402
J 132,641Spray 19,224
CD 119,557St Jacques 2,463
DJ 105,420St Onge 4,452
G 81,583Stables 0
A 116,203Stacey 6,231
TG 178,937Stack 1,641
SS 190,393Stadey 5,199
KJ 117,300Stanczyk 24,286
DL 85,042Standen 2,240
JD 116,008Standfield 0
JS 219,740Stangl 4,306
CC 134,068Stanhope 2,359
GD 162,712Stanway 1,195
GI 188,133Stark 1,151
L 101,588Stark 21,588
GR 100,315Starling 23,348
134
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
61 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
JA 107,521Stashyn 1,289
DS 84,714Stasiuk 10,545
AL 145,418Stead 0
JJ 94,735Stead 2,836
AM 181,616Steed 11,643
MN 133,431Steele 18,102
TL 141,878Stefan 5,415
AB 95,391Steidle 558
WA 110,469Stein 502
B 75,492Stelzer 7,236
CK 114,404Stenerson 14,043
JR 106,736Stephens 10,873
CA 137,322Stephenson 235
NG 164,863Stephenson 12,109
RJ 170,478Sterrett 3,853
L 138,993Stevanovic 2,319
DW 201,251Stevens 56,122
LA 135,666Stevens 3,925
NM 177,250Stevens 19,891
AJ 168,039Stevenson 3,883
MV 122,560Stevenson 2,023
DJ 117,765Stewart 4,769
RD 135,415Stewart 8,834
RP 173,900Stewart 661
SA 124,879Stewart 39,250
T 145,081Stewart 3,071
TW 173,257Stewart 14,329
KW 121,130Stich 3,801
TA 130,551Stiemer 2,962
TS 87,812Stiemer 659
MJ 78,067Stiglic 1,686
JC 176,897Stites 3,824
MJ 141,048Stobbe 6,261
C 107,431Stock 28,267
M 127,726Stocker 6,057
L 135,668Stoicescu 1,716
HY 115,339Stoichev 14,564
S 107,455Stone 3,586
JD 98,096Stoski 804
JM 142,408Stott 51
G 157,093Stout 3,792
CR 113,598Stoutenburg 2,921
V 94,991St-Pierre 4,290
LA 116,679Strachan 19,292
WA 82,928Strachan 16,062
LV 102,939Strajescu 13,231
DF 114,837Strajt 5,332
PM 148,625Streich 0
DW 159,182Strong 2,974
D 124,747Strudwick 43
RK 102,871Stuber 2,363
BE 174,555Stumborg 6,869
K 80,075Stunden 0
H 140,122Su 3,975
Y 116,215Su 3,531
E 99,108Sukkel 50
C 78,538Sulentic 668
BJ 145,992Sullivan 1,085
KA 133,188Sullivan 11,938
C 76,719Sun 205
H 106,340Sun 170
LT 94,874Sun 374
S 107,099Sun 998
PS 110,719Sundher 4,687
BC 94,406Sung 683
CD 117,478Surdu 4,487
NM 108,390Sutcliffe 9,061
JK 144,125Sutherland 2,463
RJ 123,175Sutton 7,766
C 149,557Suvagau 7,412
135
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
62 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
DL 90,705Suzuki 330
L 144,522Sveinson 2,659
SV 137,032Svendsen 12,250
MJ 99,985Svenson 5,383
DW 91,826Swan 96
RM 110,420Swann 659
AW 180,791Swanson 1,845
EA 97,810Swanson 8,239
LW 90,845Swanson 0
ME 117,988Swanson 560
NM 126,431Sweeney 4,681
FM 102,028Sweet 4,038
WD 164,937Swoboda 6,683
DJ 152,377Sydor 5,254
MJ 88,074Sydor 663
EM 141,217Syed 3,684
GH 91,771Sykes 26
MT 96,270Sykes 9,238
K 118,473Symington 13,498
JM 95,986Sytsma 3,702
GI 99,445Szabo 1,614
R 104,600Szabo 10,759
SK 102,273Szameit 0
CN 132,897Szeto 10,102
S 134,506Szeto 7
IE 130,935Szpak 7,926
RK 89,665Szutoo 8,359
TV 139,524Ta 3,755
YT 76,767Ta 51
JM 76,699Taaffe 5,869
BM 184,774Tabe 4,722
K 106,549Tabesh 1,197
JG 114,293Tabora 21,838
AJ 105,365Tache 561
L 140,779Tagliafero 0
CE 93,834Tagseth 1,208
HH 95,935Takai 472
P 88,779Talaba 200
ID 116,286Talbot 3,528
KB 232,246Talbot 2,760
SE 114,934Talbot 26
B 83,751Tam 104
DS 94,716Tam 998
GC 97,534Tam 1,085
J 79,379Tam 1,025
M 82,607Tam 6,048
HR 134,871Tamehi 2,765
DM 154,171Tammen 8,277
AC 159,136Tan 1,454
JO 117,606Tan 1,638
LD 140,293Tan 1,418
P 111,533Tan 28,247
X 104,410Tan 420
X 111,088Tan 2,891
G 77,198Tande 3,377
GK 122,939Tang 1,501
K 89,975Tang 1,638
SM 111,635Tang 1,149
W 77,367Tang 150
WW 76,732Tang 1,362
XS 173,796Tang 4,076
C 104,127Tang-Miya 659
S 78,091Tani 515
HA 97,035Tannash 4,247
M 144,501Tannenbaum 1,898
DG 136,750Tarampi 6,657
SA 102,424Tarbit 7,214
HG 112,774Tarzwell 2,184
KL 78,056Tarzwell 219
LH 173,693Tassone 47,575
136
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
63 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
CE 100,157Taylor 4,175
FH 242,837Taylor 23,295
GJ 144,286Taylor 14,952
JE 131,236Taylor 27,241
KD 137,834Taylor 1,019
R 98,099Taylor 1,126
SM 106,459Taylor 17,475
A 82,254Taylor-Lane 0
SJ 77,881Taylor-Lane 1,444
NR 87,175Taylor-Reid 544
CR 112,066Tazelaar 6,228
DL 108,123Teasdale 800
IR 127,639Tegart 50
DJ 110,344Teichmann 10,058
GK 126,838Telford 476
RA 95,637Temmer 11,065
AM 104,593Terebka-Slater 420
MC 139,751Terpstra 3,785
SE 117,429Testini 485
T 77,545Teufel 100
WW 123,461Tham 21,349
B 105,372Thandi 1,995
G 97,480Thandi 204
GC 137,703Then 4,702
GN 97,172Then 4,469
PJ 141,888Therrien 7,368
I 87,704Theuring 370
RA 168,864Thibault 13,549
MS 162,191Thielen 10,609
AM 78,490Thiessen 29,289
CJ 125,288Thiessen 4,901
AF 153,774Thomas 30,245
BL 76,242Thomas 3,425
DP 141,313Thomas 20,121
DW 187,766Thomas 20,989
EM 145,902Thomas 10,979
JT 130,604Thomas 6,401
T 108,600Thomas 851
TM 131,679Thomas 17,964
JI 154,348Thomopoulos 1,647
AM 195,798Thompson 6,752
BT 138,294Thompson 5,620
DR 231,731Thompson 63,648
GF 112,355Thompson 10,675
GI 122,550Thompson 3,616
JE 112,339Thompson 1,592
JF 121,480Thompson 1,970
KR 106,130Thompson 9,174
KS 176,113Thompson 5,800
LM 196,044Thompson 10,970
ML 125,234Thompson 3,571
R 76,630Thompson 978
SG 107,376Thompson 139
T 80,285Thompson 2,718
T 162,585Thompson 13,716
WR 125,949Thompson 287
SL 108,331Thomsen 1,304
BA 97,474Thomson 9,902
K 141,517Thomson 17,567
E 80,337Thorkelsson 0
MK 91,575Thorsteinson 3,847
G 116,973Throop 8,393
B 80,708Tian 3,467
N 87,130Tilson 14,219
C 106,031Timoffee 32,358
GS 87,700Ting 100
MJ 127,817Tinholt 7,816
EA 174,506Titus 11,260
NI 100,712Tjie 508
N 75,519Tjiu 3,847
137
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
64 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
JS 106,526Tng 220
P 138,296To 5,720
JG 98,196Tober 212
J 152,051Todd 8,600
P 112,060Tom 786
RC 84,478Toma 1,576
CS 117,187Tomlinson 2,631
MJ 135,694Tompkins 373
SL 117,263Tone 6,930
KP 147,939Toner 9,655
A 103,369Tong 1,305
BS 96,407Tong 0
ET 77,858Tong 23,113
KK 127,321Tong 3,502
GM 83,633Tonido 550
AR 101,478Tonnellier 24,735
SA 155,903Toop 6,007
BN 97,820Tooze 0
EM 97,359Toppazzini 7
R 123,582Torgrimson 419
RK 103,688Toring 807
PR 108,659Torrens 31,383
CM 120,269Tough 32
M 153,248Toussaint 2,439
G 117,121Touwslager 4,165
ML 86,891Toward 1,440
J 92,316Towe 1,942
KL 124,160Townsend 1,882
JN 100,063Tracey 3,008
CG 210,479Trafton 41,610
SQ 143,149Tran 461
T 81,503Tran 0
DW 174,899Trapp 13,514
LJ 106,893Trapp 11,281
KK 145,228Trarup 3,068
PK 167,844Trarup 3,709
BM 76,329Trathen 1,412
AK 115,573Travers 2,076
MJ 149,066Travers 2,048
TR 78,608Traviss 1,910
JL 77,228Tremblay 5,752
KG 117,332Trent 11,414
RD 129,611Trent 30,425
CM 98,509Trigardi 2,220
SA 174,520Trobacher 0
GR 183,342Trudeau 1,198
J 122,827Trudeau 0
P 85,262Trueman 4,658
T 153,119Truhn 1,930
RT 124,574Truong 2,987
PT 156,709Trustham 17,845
AK 120,599Tsang 3,936
TH 152,212Tsang 856
AK 88,449Tse 100
EK 124,638Tse 625
JH 116,830Tsukishima 13,661
AG 128,849Tu 1,003
AD 131,572Tuck 12,592
AG 109,622Tudor 820
BD 113,476Tulloch 353
D 94,725Tulsie 21,718
C 121,397Tung 166
T 103,810Tung 82
R 170,924Tuohey 436
TM 110,382Turko 3,746
AM 119,251Turnbull 8,687
CK 139,719Turnbull 1,449
AJ 85,528Turner 3,839
D 102,144Turner 12,159
DK 98,530Turner 11,902
138
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
65 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
DL 101,081Turner 0
JB 126,790Turner 3,872
R 220,941Turner 30,489
TJ 179,365Turner 3,579
DL 117,998Turney 459
E 79,187Turra 1,938
JK 105,084Turvey 13,151
BE 104,274Tuson 3,301
PS 164,529Tutt 10,101
JG 83,090Tuttle 560
AR 125,111Tuttosi 14,109
SC 162,929Tutty 12,339
SA 94,362Twa 4,334
MG 115,610Ty 2,957
J 86,774Udell 14,448
E 103,833Udma 4,320
EA 108,655Udovich 7,008
AC 92,911Ugalino 3,825
IE 76,544Uittenhout 50
NA 100,976Uittenhout 436
KT 96,694Um 0
CN 115,852Umenyi 1,048
RG 131,170Underwood 16,345
JP 139,117Unger 3,372
R 101,912Urbanowski 15,356
D 85,771Urosevic 4,285
J 119,021Utsunomiya 1,062
P 103,440Vadgama 4,463
PM 98,875Vadgama 8,794
M 112,626Vahidi 1,618
RA 95,305Vaillancourt 7,989
D 101,244Vaillant 20,847
FM 108,919Valderrama 0
RA 92,930Valdez Noguez 9,099
A 95,236Valente 932
F 92,699Valli 9,543
CM 164,400Van Camp 17,078
T 129,813Van De Ruitenbeek 1,157
EW 149,198Van Den Born 44,487
JW 209,824Van Den Born 3,159
RV 83,303Van Den Broek 17
L 93,830Van Der Velden 4,416
W 130,702Van Gassen 10,287
DM 109,551Van Huizen 4,426
B 93,601Van Lare 0
TA 111,756Van Loon 14,619
H 105,616Van Oort 7,829
MD 112,642Van Slageren 13
RK 117,059Van Vliet 6,053
RS 134,938Van Vliet 2,580
J 90,601Vandenbossche 6,913
JM 136,080Vandenbrand 9,481
RL 119,832Vander Zwan 6,209
DA 105,093Vanderkwaak 1,391
M 132,608Vanderkwaak 15,216
J 79,944Vandermaar 452
LH 107,330Vanderzwaag 278
JJ 133,882Vanjoff 2,568
CK 79,029Varco 11,326
R 93,280Varga 10,832
LW 117,487Vargas 714
LW 78,886Varhanik 50
O 86,071Vasylev 998
JL 99,234Vatcher 22,158
S 158,413Vazinkhoo 6,046
CJ 144,494Veary 5,377
J 120,216Velander 76
E 128,821Veloso 781
CR 117,947Venasquez 104
J 113,095Vennesland 113
139
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
66 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
JR 125,079Verhage 20,454
SV 170,048Verjee 3,892
D 83,020Vermette 5,626
J 115,645Verna 540
JD 138,858Verney 25,934
BL 99,835Vernon 21,744
CJ 103,440Verschoor 0
MW 109,877Verschoor 5,803
BJ 115,171Vey 28
JP 213,116Vicente 403
PC 127,783Vigneault 7,819
PJ 87,445Viitasaari 1,458
L 149,541Villa 1,944
AM 105,993Villanueva 1,847
J 135,630Villanueva 14,533
EJ 126,256Villanueva Magni 436
ES 79,625Villarreal 3,903
JE 80,054Vince 0
KL 140,116Vincent-Lambert 472
R 102,131Vine 44,819
V 136,011Vinnakota 785
NC 159,142Vipond 7,404
JP 81,530Vo 2,763
LR 201,052Voerman 3,067
JS 136,074Volpatti 3,073
BO 175,301Von Bargen 2,824
DT 126,105Von Hollen 6,266
SE 171,831Von Minden 3,585
K 130,016Von Muehldorfer 9,176
JM 100,188Vos 4,901
EA 133,400Vowles 8,378
R 122,009Vranesic 3,072
BT 109,013Vrecko 5,490
V 109,231Vujicic 4,876
M 176,833Waardenburg 5,412
CR 189,745Wade 4,502
BK 144,994Waechter 20,125
A 105,213Wagner 2,247
FT 110,924Wagner 2,120
GS 153,674Wagner 8,112
JM 181,005Wagner 21,708
KS 76,800Wagner 1,233
WM 119,278Wagner 29,381
JA 240,917Wahl 2,949
A 103,699Wai 3,353
CA 185,679Waite 6,745
KL 194,755Waiz 3,234
PE 122,690Walcher 34,769
CL 125,750Waldmann 385
SS 99,628Walia 490
AM 138,546Walker 2,460
BJ 185,448Walker 6,642
GB 155,065Walker 13,739
I 102,619Walker 1,924
JM 106,952Walker 3,368
MB 105,806Walker 16,495
J 108,778Walker-Larsen 7,410
CJ 89,259Walks 2,958
KW 117,266Wall 4,258
KJ 144,927Wallace 6,033
LC 89,233Wallace 9,259
MB 152,965Wallace 683
WR 102,202Wallace 34,530
RK 193,628Waller 3,071
K 100,115Wallin 4,888
CM 170,387Walls 41,173
CJ 156,014Walsh 2,153
DR 161,298Walsh 2,449
J 94,332Walsh 711
JA 250,151Walsh 1,314
140
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
67 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
AR 103,643Walter 17,412
BS 111,915Walter 1,622
KH 107,005Walters 745
KC 93,020Wan 515
Z 173,981Wan 24,963
B 121,441Waneck 31,225
BZ 131,293Wang 6,578
C 94,399Wang 1,765
G 175,839Wang 2,572
H 163,032Wang 23,925
J 119,583Wang 1,673
J 114,795Wang 450
JS 113,919Wang 341
L 91,084Wang 951
M 136,266Wang 2,452
N 93,153Wang 8,023
O 91,772Wang 7,998
P 96,428Wang 998
P 124,890Wang 1,224
Q 134,390Wang 2,884
Q 129,349Wang 3,042
Q 91,190Wang 4,741
Q 114,324Wang 9,285
W 130,204Wang 2,619
W 121,732Wang 586
X 83,252Wang 0
Y 119,641Wang 0
GS 108,124Waraich 50
AL 159,527Ward 3,734
BR 168,616Ward 17,330
CL 98,283Ward 608
GA 116,822Wardrop 16,072
KJ 188,038Wardrop 399
T 148,923Wareham 10,858
RJ 132,639Wark 6,499
A 78,449Warner 0
DB 171,429Warner 420
RN 80,607Warner 4,273
DA 172,253Warren 11,537
WM 103,252Warwick 4,587
SL 75,860Wasylik 0
GR 111,892Wasyliw 1,636
AA 102,556Watanabe 125
PR 194,889Waters 40,071
CL 189,794Watrich 15,569
A 223,635Watson 21,860
BH 77,854Watson 59
CL 109,666Watson 3,517
JS 112,453Watson 20,946
JW 96,477Watson 2,775
RC 161,163Watson 3,550
SL 86,467Watson 3,159
TI 116,071Watson 1,822
C 103,816Watt 5,170
DE 153,602Watt 1,071
SJ 116,423Way 2,702
TS 75,970Weatherson 12,899
MJ 113,042Weaver 0
AR 103,450Webb 3,343
SL 110,031Webb 1,317
J 115,348Webber 26,519
FA 124,484Weber 7,643
J 129,460Webster 5,124
EK 152,259Weclaw 1,956
SM 130,616Weeks 1,725
C 125,864Wei 6,019
CM 145,640Weiler 11,979
DJ 103,030Weir 9,347
D 115,077Weisbom 840
DG 117,332Weiss 14,442
141
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
68 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
SJ 122,853Weiss 614
A 171,298Wells 3,355
DV 195,001Wells 26,732
SG 106,519Wells 0
T 145,457Wells 2,562
G 109,424Wen 3,556
W 132,071Wen 664
X 125,445Wen 12,776
SA 130,192Wenaas 2,869
MJ 115,105Wenzlaff 2,280
HA 89,811Weremi 5,169
ML 79,292Wersta 0
RK 163,386Wertz 3,607
TG 139,433Weslowski 996
TG 98,410Westbrook 3,654
L 116,765Westervelt 0
A 108,544Westmacott 15,025
DM 112,400Westmacott 17,830
CB 91,492Weston 86
LJ 92,905Weston 0
ST 96,858Weston 0
AS 94,756Weststeyn 88
C 167,981Weyell 5,633
DE 140,076Wharf 2,629
S 101,278Wheatley 2,828
CP 121,579Wheeler 6,079
RH 110,714Wheeler 5,760
JR 112,009Whissell 9,012
BA 77,850White 0
GC 170,210White 1,480
IH 85,104White 7,285
RA 146,702White 2,192
S 103,747White 14,294
RA 101,882Whitmore 29,329
LK 87,234Whitney 5,741
GW 85,447Whitson 75
JS 136,041Whitson 7,560
CH 192,214Whittaker 1,972
RL 186,110Whittaker 3,009
A 128,253Whitteker 10,466
TA 95,400Whorley 1,360
E 132,274Wichmann 6,649
MP 104,349Wick 982
BR 85,912Widmer 8,284
J 77,331Wiebe 4,244
RC 97,903Wiebe 27,414
SP 124,370Wiebe 7,001
JB 146,413Wiech 8,797
D 114,414Wiens 1,648
KK 84,078Wiens 6,780
AJ 80,556Wight 10,382
A 126,579Wijaya 0
DS 83,337Wijeratne 5,877
NW 147,542Wild 1,274
CA 85,449Wilhelmsen 199
JR 94,309Willey 15,950
C 124,481Williams 436
D 104,126Williams 8,146
DA 143,864Williams 4,268
DB 103,545Williams 3,187
DM 132,988Williams 42,848
GS 139,738Williams 44,774
H 77,820Williams 0
JD 123,759Williams 11,044
L 164,882Williams 2,393
N 99,379Williams 22,912
OR 185,729Williams 18,219
W 162,297Williams 11,750
SM 128,668Williamson 50
TD 126,603Williamson 32,540
142
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
69 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
BK 108,991Willington 472
KM 113,662Willis 526
MR 148,361Willox 3,576
RM 106,202Wilmsmeier 851
AE 114,313Wilson 888
AL 94,143Wilson 3,790
BS 120,529Wilson 2,820
DC 121,823Wilson 1,157
DE 148,526Wilson 3,618
DR 114,629Wilson 10,084
JP 174,422Wilson 17,737
MA 98,527Wilson 2,387
MR 212,675Wilson 54,114
SJ 121,764Wilson 1,050
TR 162,113Wilson 7,264
JD 142,436Winchester 22,823
DC 97,523Winkel 2,890
KJ 95,829Winkelmann 326
SE 120,668Winkelmann 8,686
TS 120,628Winnicky 4,257
PG 116,069Winter 114
TL 114,695Winter 300
JS 95,670Wishart 15,742
AW 172,902Withers 4,422
CN 87,387Withers 592
DR 128,527Witt 10,523
MA 118,685Wiwchar 2,818
C 125,027Woeste 1,124
S 143,299Wogan 47,301
L 97,498Wohlford 1,634
MJ 148,213Woiken 534
SM 80,238Woiken 1,775
DT 105,797Wolanski 0
BJ 125,125Wolosnick 0
HM 185,590Wolter 3,370
A 100,624Wong 88
A 78,913Wong 0
AC 100,706Wong 50
AW 94,974Wong 279
BS 150,319Wong 1,198
BY 159,653Wong 2,225
C 98,768Wong 2,271
C 130,529Wong 446
C 108,982Wong 8,197
C 204,224Wong 24,067
C 75,594Wong 11,763
DW 181,251Wong 23,575
FC 116,781Wong 1,112
J 117,745Wong 1,533
J 109,360Wong 1,061
JL 88,867Wong 3,572
KF 97,795Wong 3,444
KK 82,572Wong 1,284
MT 128,837Wong 1,042
R 129,487Wong 229
SK 122,308Wong 2,806
T 141,593Wong 1,137
TM 98,514Wong 184
TS 94,267Wong 4
VY 84,088Wong 13,937
P 124,474Woo 3,284
V 81,554Woo 250
BJ 110,963Wood 10,482
LJ 127,007Wood 13,688
MD 85,492Wood 50
GW 164,029Woodbury 3,363
TJ 100,534Woodcock 4,530
S 97,327Woodford 1,571
RR 148,264Woodman 5,253
BJ 134,771Woodruff 29,120
143
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
70 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
BM 156,832Woodward 2,806
R 110,237Woodward 7,809
CE 135,000Woolfries 0
E 144,108Worden 1,439
JT 129,929Worden 1,957
KC 81,679Wotten 6,395
DW 94,415Wou 6,984
J 147,251Wou 4,283
MA 110,215Woudwijk 2,006
MN 89,554Woznesensky 50
AL 140,235Wozny 0
TG 147,000Wray 16,517
CJ 123,008Wreggitt 5,302
A 135,348Wright 7,391
AN 184,583Wright 2,302
DO 129,954Wright 31,386
KK 111,456Wright 176
S 155,090Wright 13,023
WJ 134,349Wright 9,449
C 130,579Wu 820
G 136,261Wu 7,848
J 169,786Wu 2,374
W 77,716Wu 0
X 108,393Wu 4,490
L 114,447Wutschnik 2,231
DJ 106,463Wyant 0
RD 89,381Wyant 1,124
JN 77,874Wyatt 5,419
SD 184,007Wylie 6,965
BM 91,880Wynne 1,493
M 241,335Wynne 6,904
T 145,673Wynsouw 8,648
X 112,536Xi 525
D 121,598Xiang 5,737
L 81,431Xiao 0
MH 116,950Xiao 6,667
Y 112,147Xiao 9,521
Y 96,522Xie 998
X 108,777Xing 10,244
C 110,887Xu 2,944
H 132,460Xu 636
H 145,559Xu 676
J 96,499Xu 1,893
X 140,428Xu 0
PG 100,097Yaco 998
V 76,968Yadav 620
K 98,493Yagelniski 16,368
L 134,197Yahav 7,988
S 89,942Yamabata 50
H 155,051Yan 78
J 77,826Yan 0
L 165,816Yan 3,898
M 101,091Yan 998
N 119,778Yan 133
SY 338,686Yan 250
X 121,962Yan 461
AI 99,297Yang 8,680
L 122,649Yang 486
PS 127,196Yang 1,677
Y 108,515Yang 457
YE 84,713Yang 1,868
Z 155,607Yao 4,382
NC 85,900Yap 706
DE 119,249Yarjau 45,362
JR 190,339Yarjau 4,211
BT 136,556Yasinowski 4,428
A 77,381Yau 50
L 110,355Yau 4,676
SC 82,577Yau 740
SA 102,516Yaworski 732
144
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
71 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
A 159,497Yee 3,173
J 79,797Yeom 1,756
T 99,263Yeong 1,975
K 91,820Yesilcimen 333
A 166,397Yetisen 9,433
DC 104,953Yeung 70
W 105,372Yeung 1,990
J 134,182Yick 2,148
R 101,028Yim 1,169
T 114,203Yim 4,348
EC 96,333Yip 998
K 85,138Yip 50
Y 91,700Yip 24
EW 96,745Yiu 820
B 104,630Yochim 28,491
R 136,059Yonadim 14,800
S 170,632Yoon 15,664
IC 79,413Yorkston 95
RA 105,864Yost 20,693
J 118,425You 8,996
A 104,305Young 35
AM 81,403Young 6
BG 131,668Young 10,092
BS 86,148Young 370
C 143,421Young 9,690
EB 131,187Young 903
KE 189,601Young 4,359
LP 88,253Young 998
ML 95,603Young 6,500
SJ 97,138Young 3,040
TD 116,067Young 38,399
DD 75,061Youngson 1,182
EH 106,973Yu 1,630
L 133,703Yu 955
LM 142,269Yu 2,533
M 114,327Yu 7,394
RA 113,369Yu 1,682
Y 108,814Yu 1,275
BP 92,121Yuan 733
F 153,850Yusuf 4,445
PT 125,200Ywaya 5,390
T 124,067Yzerman 10,182
J 101,364Zabala 6,581
P 129,779Zabeti 5,270
BJ 93,935Zabierek 3,808
JE 100,685Zabkar 2,223
BA 237,854Zacharias 1,877
LS 223,927Zachow 16,057
DP 138,351Zack 1,038
JG 133,493Zadra 452
T 186,188Zagumenna 436
HA 90,297Zaka 11,480
H 124,077Zaki 2,356
JN 185,629Zarin 2,041
S 78,724Zarin 0
ED 195,795Zaruk 4,681
JL 86,811Zathureczky 4,574
N 101,741Zazubek 4,117
W 132,122Zeilstra 1,537
MW 146,595Zeller 3,878
SM 163,179Zemenchik 16,273
RJ 111,779Zemlak 20,391
R 143,350Zeni 780
F 112,293Zhai 13,317
W 127,331Zhan 2,578
Z 107,046Zhan 686
A 126,787Zhang 761
C 81,822Zhang 1,002
D 111,152Zhang 108
H 113,562Zhang 3,133
145
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
72 of 73
REMUNERATION REMUNERATIONEXPENSES EXPENSES
J 83,705Zhang 220
J 81,027Zhang 2,454
L 105,150Zhang 827
L 119,136Zhang 1,818
M 109,974Zhang 979
M 85,515Zhang 491
W 77,961Zhang 0
WW 93,895Zhang 1,401
X 170,795Zhang 804
XX 142,810Zhang 13,982
Y 129,336Zhang 4,983
Y 140,432Zhang 12,811
Y 81,341Zhang 16,156
C 112,063Zhao 725
H 128,863Zhao 1,903
H 168,163Zhao 203
J 75,347Zhao 998
Q 129,743Zhao 0
Q 109,576Zhao 7,523
BS 133,684Zheng 655
YG 99,573Zheng 346
H 102,641Zhong 673
C 81,359Zhou 2,003
J 120,756Zhou 2,777
J 82,528Zhou 5,323
X 76,649Zhou 338
Y 153,503Zhou 18,732
H 161,312Zhu 19,715
P 84,266Zhu 12
Q 147,575Zhu 2,941
V 134,997Zhu 12,891
DP 100,199Zibauer 14,022
KJ 100,226Ziefflie 34,376
MJ 204,882Zieske 9,087
LI 99,066Zilberman 98
V 108,629Zilberman 315
TO 115,629Zilcosky 9,957
E 113,595Zimmerman 0
JA 94,043Ziola 199
DP 124,406Zobel 787
DM 169,517Zoerb 1,781
A 144,836Zolis 5,507
M 166,314Zou 547
M 91,373Zrinyi 5
MJ 95,657Zulak 3,889
C 123,478Zuo 4,301
C 211,173Zurak 1,598
M 108,651Zwygart 18,199
GI 124,163Zylstra 5,909
146
Report ID: FI308
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Run Date:Run Time:
2019/06/18 4:10:15PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
73 of 73
25,395,125Receiver General for Canada (employer portion of EI and CPP)
723,359,337Total
3,882,617Consolidated total of other employees with remuneration of $75,000 or less
36,557,966
113,159,886
REMUNERATION EXPENSES
147
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
1 of 36
102,1650662836 BC Ltd
350,2750697864 B.C. Ltd.
77,1950723024 BC Ltd
38,6080760506 BC Ltd.
53,7230771803 BC Ltd
250,2430798619 BC Ltd.
39,3750805462 BC Ltd
174,6380820744 BC Ltd
36,0320847033 BC Ltd
130,7630887757 BC Ltd
472,3880914716 BC Ltd
33,4760939166 BC Ltd
142,5920946982 BC Ltd
40,6200951303 BC Ltd
42,1151011954 BC Ltd
53,0441025458 BC Ltd
77,1461033394 BC Ltd
45,5861049897 BC Ltd
684,92910647802 Canada Ltd
338,5441081239 BC Ltd
1,305,0581085140 BC Ltd
38,1351106643 BC Ltd
113,7961109594 BC Ltd
115,5321134360 BC Ltd
37,8801164376 BC Ltd
2,134,6981324195 Alberta Ltd
179,6731793278 Alberta Ltd
39,5151894725 Alberta Ltd
29,167211 British Columbia Services
183,75024/7 Customer Canada Inc
27,200285120 BC Ltd
114,2423M Canada Company
24,112,0954 Evergreen Resources LP
33,3204 Season Maintenance Ltd.
156,27844550 SOUTH SUMAS INC
85,2714DGIS Ltd.
48,470505217 BC Ltd
78,896606225 BC Ltd
52,960642385 BC Ltd
27,894670937 B.C. Ltd
167,559676222 BC Ltd
121,270676376 B.C. Ltd.
96,235679692 BC Ltd
57,308734405 BC Ltd
63,0539270-9005 Quebec Inc
315,420A Edward Stedman Consulting Inc
32,000A&B Rail Services Ltd
31,147A.R. Thomson Group
2,407,903A.T. Maintenance Plus Contracting
57,790AAA Field Services Ltd
32,575AB Edie Equities Inc
1,204,671ABB Enterprise Software Inc.
29,278,064ABB Inc.
49,144Abbotsford Concrete Products Ltd
25,997ABC Communications Ltd
26,882Aberdeen Machine (1997) Ltd
435,432Abernethy Contracting
5,197,611Accenture Business Services of BC
1,394,189Acclaro Management Corporation
33,963Accounts Recovery Corp.
55,197Accurate Gauge Ltd
4,511,728Acklands-Grainger Inc.
30,098Acme Janitor Service Ltd
82,725Acme Visible Filing Systems Ltd
1,149,467Acres Enterprises Ltd
881,846Action Environmental Services Inc.
42,155Actuation Test Equipment
183,914Acuren Group Inc.
148
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
2 of 36
217,124Adaptic AS
55,207Addy Power Ltd.
384,239Adecco Employment Services Limited
3,881,269Adept Vegetation Management Inc.
90,487Advance Mobile First Aid & Safety
127,713Advanced Eco-Solutions Inc
457,180Advanced Electrical Services Ltd
1,427,699Advanced Energy Systems 1 LP
681,128Advanced Energy Systems II Limited
934,056Advanced Excavating and Utilities
13,697,432Advanced Powerlines Ltd.
48,930Advanced System For Power Eng. Inc.
1,394,306Advanco Electric Ltd
70,956Advantage Crane Rental Ltd.
8,006,089AE Concrete Products Inc
296,217AECOM Canada Ltd
48,792Aecom Technical Services Inc
236,147,004Aecon-Flatiron-Dragados-EBC
41,801Aerial Contractors Ltd.
194,661Aerodraw Drafting Services
5,521,551Aerotek ULC
73,570AES Engineering Ltd
118,726Aethon Aerial Solutions Inc.
2,512,618Aevitas Inc
71,001AGD Services Ltd.
1,234,088Agrium Canada Partnership
451,709AIG Insurance Company of Canada
55,190Air Canada
160,880Air Liquide Canada Inc.
33,441Airplus Systems Ltd.
1,116,447Airspan Helicopters Ltd
27,027AJH Consulting
104,517Akisqnuk First Nation
162,916Al Bolger Consulting Services Inc.
55,518Alberni-Clayoquot Regional Dist
1,634,889Alberta Electric System Operator
25,820Alberta Governor Service Inc
57,960Alda Development & Leasing Ltd
52,458AldrichPears Associates Ltd
29,701Alex W Coutts
99,221All Power Traffic Control Inc
613,928All Safe Traffic Control Inc
45,993Alliance Concrete Pumps Inc.
1,706,851Alliance Traffic Group Inc
37,734Alliant Consulting Ltd
1,332,029Allnorth Consultants Limited
82,273Allpoints Fire Protection Ltd
29,901,203Allteck Line Contractors Inc.
241,138All-Timate Creations
249,838Allwest Reporting Ltd.
61,130Alouette River Mngt. Society
153,788Alpha Technologies Ltd.
180,931Alpine Country Rentals Ltd
527,828Alpine Pole Maintenance Inc
1,320,604Alstom Grid LLC
393,105Alstom Power Canada Inc.
30,021Altagas Extraction & Transmission
12,130,107Altec Industries Ltd.
388,833Altus Group Limited
79,877Alum-Tek Industries Ltd
41,605Amac Equipment Ltd.
120,436Amazon Canada Fulfillment Services
80,676Amec Cutting & Coring Ltd
182,558American Superconductor Corp
27,022Amirix Systems Inc.
74,319Ampco Manufacturers Inc
589,869Ampjack Industries Ltd
27,626Andre M. Cordonier Trucking
2,939,087Andritz Hydro Canada Inc
45,600Angie Watson
149
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
3 of 36
3,800,726Anixter Canada Inc.
24,440,203Anixter Power Solutions Canada Inc
4,159,653Annex Consulting Group Inc
160,016Anritsu Electronics Ltd.
1,794,009Ansan Industries Ltd.
166,797Antares Construction LLP
512,938Antares Project Services LLP
99,426Anthony Darnell Lewis
62,518Antiquus Archaeological Consultants
72,402APP Engineering Inc.
1,127,858Appia Developments (2001) Ltd
35,046Apple Canada Inc.
1,277,185AppleOne Services Ltd
32,918Applied Industrial Technologies Ltd
263,001Aqua-Bility Projects Ltd.
43,022Aquanta Inc
113,947Aquaterra Corporation Ltd.
27,601Aquaterra Environmental Ltd
103,567Aquatics Environmental Services Inc
31,398Arbiter Systems Inc.
426,692Arbor-Art Tree Service Ltd
860,161ArborCare Tree Service Ltd
314,452Arborwest Consulting Ltd.
34,337Arc Resources General Partnership
10,180,489ARC Resources Ltd
217,641Archer CRM Partnership
53,793ArchiText Consulting
141,741Arcose Consulting Ltd
180,514ArcTech Welding & Machining Ltd.
12,397,749Arctic Arrow Powerline Group Ltd
74,400Arctic North Consulting
31,978Ardill's Ranch Ltd.
39,800Arete Safety & Protection Inc.
46,753,307ARI Financial Services Inc.
1,957,044Ariba Inc
98,746Armature Electric Ltd
78,225Armi Tugade Dedick
151,565Armstrong Crane & Rigging Inc.
72,388,881Arrow Lakes Power Corporation
65,152Artech Painting (2006) Corp
110,965ASA Energy Consulting Ltd
4,428,550Ascent Helicopters Ltd
16,064,953Ashlu Creek Investment LP
95,453ASI Group Ltd
304,490Aspac Holdings Ltd
41,983Aspect Software Inc
38,137Aspen Traffic Control
17,402,071Asplundh Canada ULC
143,536Assa Abloy Entrance Systems Canada
386,305Associated Engineering(B.C.)Ltd
176,277Associated Environmental Consultants Inc
112,036Association of Major Power Customers of BC
107,691AT&T Global Services Canada Co
2,714,781ATB Riva Calzoni Hydro Canada Inc
25,432ATCO Energy Ltd
308,598ATCO Structures & Logistics Ltd
32,426,492ATCO Two Rivers Lodging Group
40,226Atek Hydrographic Surveys Ltd.
404,040Atlantic Industries Ltd
43,461,319Atlantic Power Preferred Equity Ltd
150,466Atlas Copco Compressors Canada
253,662Atlas Tree Services Ltd.
39,739A-Tlegay Fisheries Society
320,218Attridge Contracting Ltd
256,298Aura Health and Safety Corp
34,631Aurora Resource Consulting
1,371,457Ausenco Engineering Canada Inc
162,187Austin Engineering Ltd
45,429Austin Metal Fabricators LP
180,866Autodesk Inc.
150
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
4 of 36
1,033,429Automatisation Grimard Inc
404,972Autopro Automation Consultants Ltd.
2,927,001Avanade Canada Inc
27,073Avcorp Industries Inc
88,750AvePoint Inc
1,078,027Awesense Wireless Inc
178,209Azimuth Consulting Group Inc.
229,089Azmeth Forest Consultants Ltd.
33,057B & B Bearing &Elect. Motor Ltd
64,759B & B Compudraft Ltd.
347,395B & T Line Equip. Testers Ltd.
177,234B&G Machine Inc
577,829B.A. Blacktop Ltd.
95,047B.A. Blackwell & Associates Ltd.
87,171B.C. Fasteners & Tools Ltd.
44,434,521B.C. Hydro Pension Plan
26,250B.C. Pavilion Corporation
404,976B.C. Wildlife Federation
250,124BA Dawson Blacktop Ltd
362,081Bad Ventures Ltd
330,472Badger Daylighting LP
62,688Bagwell Supply Ltd.
46,662Baird Bros Ltd
85,874Baker Creek Estates Ltd
25,074Balpreet Parhar
149,725Bandstra Transportation Systems Ltd
53,147Banngate Holdings Ltd
1,307,675Barr Creek Limited Partnership
40,298Barry's Bulldozing Ltd.
45,219Barton Industries Inc
202,883Baseline Archaeological
347,562Basetwo Media Inc
35,017Basler Electric Company
3,469,645BBA Engineering Ltd
2,495,597BBA Inc
29,859BC Anderson TL Services Inc
26,250BC Common Ground Alliance
148,990BC Conservation Foundation
25,625BC Crime Stoppers Society
89,371BC Foundation Specialties Ltd
217,511BC Housing Management Commission
199,600BC Hydro Power Pioneers
128,326BC Institute of Technology
147,616BC Investment Management Corporation
91,063BC Non-Profit Housing Association
423,646BC One Call Limited
124,131BC Public Interest Advocacy
162,633BC Sustainable Energy Association
37,060BC Transit
95,478BCH Business Cases Inc
44,310BCIMC Realty Corporation
399,662Bear Creek Contracting Ltd
9,716,999Bear Hydro Limited Partnership
14,886,700Bear Mountain Wind Limited Partnership
111,524Beaver Electrical Machinery Ltd
450,000Bechtel Canada Co.
145,517Beckwith Electric Co. Inc.
311,594Bee Clean Building Maintenance
40,491Beldon Sales Ltd.
88,120Bell Conferencing Inc.
489,035Bell First Aid Services Inc
179,975Bellavance Welding Ltd.
27,090Bellwood
64,090Benjamin Lyseng
33,130Bennett Jones LLP
164,626Bennett Land Surveying Ltd
123,064Bentall Kennedy (Canada) LP
32,256Berserker Welding Limited
125,900Best Buy Canada Ltd.
85,565Beverly Joanne Genzel
151
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
5 of 36
762,749BGC Engineering Inc
13,859,956BGIS Global Integrated
173,434BHD Instrumentation (BC) Ltd
274,817BHeX Contracting Ltd.
39,021Big Iron Hydrovac Services Ltd
17,580,822Big Silver Creek Power Limited
44,858Bigfoot Crane Company Inc
69,347Bill Wheeler Consulting Ltd
43,002Birchdale Ecological Ltd.
27,609Bird Studies Canada
50,400Bit Stew Systems Inc
44,007BJH Engineering Ltd
1,650,855Black & Mcdonald Ltd.
28,559Black Press Group Ltd
2,042,909Blackcomb Helicopters LP
68,393Blackridge Solutions Inc
43,535Blackwood Building Centre Ltd.
1,067,416Blake Cassels & Graydon LLP
184,843Bloomberg Finance L.P.
145,168Blue Max Drilling Inc
51,135Blue Sapphire Contracting Ltd.
510,202Blue Universe Communications Ltd
380,578Blueberry River Enterprises Ltd
330,039Blueberry River First Nations
144,872BNBK Contractor Ltd
378,894Boffo Developments Ltd
119,645Bogdonov Pao Associates Ltd.
35,669Bonaparte Indian Band
132,892Boondock Development Ltd.
2,768,730Boralex Ocean Falls LP
3,617,509Borden Ladner Gervais LLP
676,216Borradaille Consulting & Inspection
1,970,744Boston Bar Ltd. Partnership
8,796,352Boulder Creek Power Limited
485,579Bowen Island Municipality
6,257,263Box Canyon Hydro Corporation
141,227BQAS Ventures Ltd
128,796Bracewell LLP
1,380,753Brainhunter Systems Ltd
25,129Brand Xpress
413,654BrandAlliance Inc
35,720Brandt Tractor Ltd.
125,883Brent Collins
239,384BRG Projects Ltd.
33,383Brian McIntosh
70,846BRIDGE Energy Group Inc
134,600Bridge River Indian Band
132,372Bridgeway Consulting Inc
29,937,335Brilliant Expansion Power
27,539,350Brisco Wood Preservers Ltd
553,083Bristol Global Mobility Limited
393,424Britco BOXX Limited Partnership
38,194British Columbia Ferry Services Inc
5,523,550British Columbia Utilities Commission
1,183,654Brock Canada West Ltd.
99,544Brock White Canada Company
40,521Brogan Safety Supplies
209,948Brooklynn Contracting Ltd.
150,265Brown & Oakes Archaeology
7,812,264Brown Miller Power LP
32,616Bruce Miller
104,988Building Officials Association
78,750Building Owners & Managers
87,263Burckhardt Compression (Canada) Inc
46,873Burcon Slipform Inc.
263,411Bureau of Reclamation
37,397Burns & McDonnell Canada Ltd
31,775Business Council Of B.C.
66,807Busy Bee Cleaning
110,207Butler Ridge Energy Services (2011)
152
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
6 of 36
95,668Butler Workplace Solutions
413,993C & D Technologies Inc.
41,224C & R Truck West Ltd
25,384C 4 Distribution Group Inc.
313,234C. Boehringer & Associates
35,121C. KEAY INVESTMENTS LTD.
819,713C. Norman Trenching Ltd.
89,937C.G. Brooks Contracting
38,464C.J. Ledgers
228,732Caddo Consulting
462,987Cadillac Fairview Corporation Ltd.
37,145CALEB.com Consulting Services
48,932Caliper Mach. & Hydraulics Ltd.
31,462,293Cam Tran Co Ltd
959,979Cameron Management Services Inc.
35,303Camlin Power Ltd
306,063Campbell River Common Shopping Centre
34,277Canada Lands Company CLC Limited
145,425Canada Metal (Pacific) Ltd.
25,924Canada NDE Technical Services
177,870Canada Place Corp
6,829,248Canada Post Corp.
190,789Canada Wide Media Limited
27,879Canadian Cache Development
49,623Canadian Construction Materials
38,315Canadian Dewatering LP
207,972Canadian Dry Storage Ltd
348,600Canadian Electricity Association
67,385Canadian Energy Vancouver
479,468Canadian Forest Products Ltd.
2,835,155Canadian Helicopters Ltd.
42,955Canadian Home Builders Association
6,454,187Canadian Hydro Developers Inc.
171,252Canadian Hydropower Association
65,462Canadian Imperial Bank Of Commerce
132,407Canadian Linen & Uniform Service
428,304Canadian National Railway Co.
415,000Canadian Natural Resources Limited
120,492Canadian Pacific Railway Company
54,772Canadian Softwood Inspection
34,667Canadian Springs
460,284Canadian Standards Association
369,382Canadian Time Systems
209,803Canadian Tire Assoc. Store
27,724Canadian Tire Corporation Limited
31,500Canadian Urban Transit Research
52,750Canco Cranes and Equipment
300,462Canem Systems Ltd.
36,082,352Canfor Pulp Limited
59,206CANLAN INV CORP
1,730,602Canoe Creek Hydro Limited
31,853Canoe Forest Products Ltd
60,755Canplas Industries Ltd.
715,287Canruss Paramedic Oil Services Ltd
31,758Cansel Survey Equipment Inc
58,342Cantalk (Canada) Inc.
790,599Cantega Technologies Inc
283,941Capco Construction Services Ltd
44,799,190Cape Scott Wind LP
198,083Capgemini Canada Inc.
171,069Capilano University
88,560Capital Grid Services Corp
117,555Capital Now Inc
89,480,995Capital Power LP
1,038,637Capital Regional District
1,512,663Capital Tree Service Inc
32,416Capreit Apartments Inc
346,216Cariboo Power Flagging Ltd
16,717,190Cariboo Pulp & Paper Company
154,033Carleton Rescue Equipment
153
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
7 of 36
35,605Carlwood Lumber Limited
31,500Carol Hartwig
88,555Caroline + Gislason Lawyers LLP
94,257Caroline Nehme El Srouji
95,211Carrot Insights Inc
116,355Carte International Inc.
48,442Carter Chevorlet and Dodge
296,248Cascade Energy Inc
48,049Cascade Environmental Resource
96,167Cascadia Instrumentation Inc.
2,963,141Castle Mountain Hydro Ltd.
18,718,593Catalyst Paper Corporation
153,220Cayoose Creek Indian Band
2,734,109Cayoose Creek Power LP
169,473Cayuse Flats Transportation
41,329CB Engineering Ltd.
69,654CBV Collection Services Ltd
115,621CD Industrial Group Inc
46,673CD Nova Ltd.
323,820CEATI International Inc
416,419Cedar Road Bioenergy Inc
109,048Cedars at Cobble Hill
27,082Central Cariboo Disposal Services
36,287Central Hardware Ltd
240,265Central Interior Piping
3,297,823Central Island Powerline Ltd.
69,311Central Kootenay Invasive Species
2,879,454Central Park Developments Inc.
207,775Century Plastics Ltd.
31,526Century Plumbing & Heating Ltd
143,325CES Engineering Ltd.
26,920Cesco Electrical Supply Ltd.
88,925CG Industrial Specialties Ltd
169,050CGG Canada Services Ltd
2,759,604CGI Information Systems and Mgmt Consultants Inc
79,698CGL Contracting Ltd.
865,848Change Champions Consulting Inc
54,640ChargePoint Canada Inc
63,000chART Projects Inc.
33,313Chartered Professional Accountants of BC
2,877,149Chartwell Consultants Ltd
54,169Chastity Davis Consulting
112,548Chatter Creek Holdings Ltd
56,598Cheam First Nation
52,290Checkmate Fire Prevention Inc
117,390Chemtrade West Limited Partnership
591,386Chen Engineering Solutions
72,128Chevin Fleet Solutions LLC
1,876,527Chew Excavating Limited
276,476Chinook Scaffold Systems Ltd.
52,799Christensen Associates Energy
370,448Christenson-Bellows Valvair Ltd
35,975Chroma Communications Inc
458,778Chu Cho Environmental LLP
1,136,081Chu Cho Industries LP
34,470Chuck's Janitor Service
176,612Cicame Energie Inc.
37,909Ciena Canada Inc
153,803CIF Composites Inc.
41,884CIMA Canada Inc
194,085Cintas Corporation
687,470Cisco Systems Capital Canada
27,408Citrix Systems Inc.
90,900City Green Solutions Society
3,559,473City Of Abbotsford
99,900City of Armstrong
11,453,381City Of Burnaby
4,100,141City of Campbell River
76,101City Of Castlegar
1,797,502City Of Chilliwack
154
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
8 of 36
171,341City of Colwood
3,588,731City Of Coquitlam
619,261City Of Courtenay
871,373City Of Dawson Creek
3,656,129City Of Delta
67,099City of Duncan
1,807,497City Of Fort St. John
2,234,703City Of Kamloops
340,126City Of Kimberley
747,028City of Langford
326,541City Of Langley
2,072,832City of Maple Ridge
548,240City Of Merritt
2,867,449City Of Nanaimo
2,959,609City of Nelson
329,894City of New Westminster
1,460,697City Of North Vancouver
171,764City Of Parksville
305,862City of Pitt Meadows
878,319City Of Port Alberni
652,113City of Port Coquitlam
1,289,427City Of Port Moody
588,710City of Powell River
2,515,790City Of Prince George
329,452City Of Prince Rupert
875,706City Of Quesnel
3,913,252City Of Revelstoke
5,191,239City Of Richmond
445,451City of Salmon Arm
19,196,311City Of Surrey
731,727City Of Terrace
31,607,282City Of Vancouver
1,788,486City of Vernon
2,636,240City Of Victoria
613,457City of West Kelowna
240,832City of White Rock
354,212City Of Williams Lake
32,092City Transfer Inc.
112,510CJ Design Ltd
165,103Clarivate Analytics (US) LLC
46,524Clarkson University
208,590Clean Energy Association of BC
26,006Clean Harbors Canada Inc.
41,356Clean Sweep Services Ltd
139,493Clean Team Janitorial Inc
488,861Clearesult Canada Inc
33,203Clearesult Consulting Inc
36,894Cleartech Industries Inc.
48,176Cleaveland Price Inc
30,262Clemmer Steelcraft
6,789,071Clowhom Limited Partnership
173,777CMH Underground Utilities Ltd
204,080Coast 2000 Terminals Ltd
76,930Coast Cutting & Coring Ltd.
82,557Coast Environmental Ltd
302,405Coast Mountain Bus Co. Ltd.
107,970,621Coast Mountain Hydro Limited
499,190Coast Powerline 2005 Ltd
79,164Coast Range Concrete Ltd.
420,000Coast Tsimshian Resources
113,305Coben Advisory Inc
709,106Cogent Industrial Technologies Ltd.
69,985Cohesium Research Ltd
255,487Cold Country Towing & Traffic
194,496Colebran Vegetation Ltd
30,000Colin McLean
35,213College Of The Rockies
78,335Colliers Macaulay Nicolls Inc.
2,421,105Colliers Project Leaders Inc
25,825Colligo Networks Inc
155
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
9 of 36
27,652Colteran Developments Corp
2,198,999Columbia Shuswap Regional Dist.
310,094Columbia Valve & Fitting Ltd
41,151Commander Warehouse Equip. Ltd.
260,218Commercial Energy Consumers Association of BC
713,868Commercial Truck Equipment Corp
442,534Community Energy Association
256,033Comox Pacific Express Ltd.
38,489Comox Rentals & Recreation Ltd
341,532Comox Valley Project Watershed Society
47,587Comox Valley Regional District
62,866Compagnie Enablon Canada Inc
106,403Compass Group Canada Ltd.
43,698Compass Resource Management
39,972,434Compugen Inc.
40,003Computer Applications Inc
52,784Computrol Fuel Systems Inc
37,076Compuwork Pacific Inc.
91,269Concept Controls Inc
493,724Concert Real Estate Corporation
52,054Concorde Specialty Gases Inc.
25,542,650Conifex Power Limited Partnership
30,240Conifex Timber Inc
46,500Connors Curtis Joint Venture Ltd
84,273Conquer Contracting Ltd
98,711Consortium for Energy Efficiency
28,142Constable Consulting
39,988Construction Technology
235,733Consummate Building Services Ltd
540,162Consus Management Ltd
53,422ContainerWest Manufacturing Ltd
3,132,201Contemporary Office Interiors Ltd
403,953Content Strategy Incorporated
77,739Context Research Ltd.
52,952Conway Electric Inc
205,618Cooper Beauchesne and Associates
5,033,717Cooper Industries (Electrical) Inc
1,150,780Copcan Civil Ltd
162,838COPE Local 378
287,653Copper Bay Concrete Ltd
79,406Copper Mountain Mine (BC) Ltd
99,089Coral Canada Wide Ltd
216,099Core6 Environmental Ltd
76,722Corelogic Facility Services
123,460Corix Control Solutions LP
281,683Corix Utilities Inc
505,997Corp of the City of Cranbrook
205,475Corp Of The City Of Fernie
122,666Corp Of The Village of Burns Lake
38,358Corp. Of The City Of Enderby
193,049Corp. Of The Dist. Of Oak Bay
42,424Corp. of the Village of Cumberland
70,737Corwest Fabrications Ltd
193,724Costco Wholesale Canada Ltd.
61,512Coupa Software Inc
25,970Courtenay & District Fish & Game
7,274,734Covanta Burnaby Renewable Energy
35,560Cover Star Structures Ltd.
34,098Cox Taylor
47,412Crane Creek Enterprises
3,024,383Craneium Inc
85,974Creative Energy Vancouver Platforms
234,031Credit Bureau of Vernon Ltd.
164,153Crescent Bay Construction Ltd.
441,330Creston Valley Wildlife
2,608,222Crew Energy Inc
44,469Crimson Door Healing Inc
28,467Crimson First Aid Services Ltd
54,190CrossChasm Technologies Inc
106,928Crosstown Metal Industries Ltd.
156
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
10 of 36
845,462Cryopeak LNG Solutions Corporation
219,463CSP Management Ltd
72,270Cullen Diesel Power Ltd.
6,999,524Culliton Creek Power Limited
29,826Cummings Trailer Sales
123,194Cummins Western Canada LP
27,211Curio Research Ltd
175,783Current Stream Solutions Inc.
193,883Curtis Personalized Health
61,578Custom Air Conditioning Ltd.
300,521Custom Dozing Ltd.
41,329Cuthbert Consulting Inc
57,712CWPC Property Consultants Ltd
96,854Cyclone Logistic Solutions
141,697D D I Selection & Development
325,486D. Andres Quality Construction
216,015D.J. Silviculture Ent. Ltd.
42,391Dado Designs Inc
41,959Dam Helicopters Inc.
33,822Damsolve Limited
362,607Damwatch Engineering Limited
45,758Daniel Johnson Consultants Inc
40,482Daniels Electronics Ltd.
90,842Darren Day
635,860DataCore Mail Management Ltd.
61,445Dave's Backhoe Service
33,180Dave's Plumbing Ltd
8,747,021Davey Tree Expert Co. of Canada
207,270David Cunningham
163,448David Robinson
67,986DC Design Ltd
154,630DC Welding & Fabrication Ltd.
31,252Dease River Development Corporation
174,596Debra A Lamash & Associates Ltd
345,481Deloitte LLP
211,028Delphine's Traffic Control
67,932Delta Infrared Services
73,530Deltares USA Inc
50,000Dene Tha' First Nation
318,452Denis Francoeur Backhoeing Ltd.
41,803Denise Duchene Consulting Inc.
252,153Deramore Construction Services Inc
29,403Derrek Beam
625,713Derrek Gerald Dean Beam
97,944Developmental Disabilities Assoc
36,586Deverell Contracting Ltd.
37,721DG Technologies Ltd.
42,156DGW Law Corporation In Trust
58,717DHL Express (Canada) Ltd
911,339Diamond 'D' Contracting Ltd.
107,227Diamond Head Consulting Ltd
75,675Dicks Lumber
1,166,631Dig Right Enterprises Ltd.
110,788Digger Civil Contractors Ltd
93,374Diggers Impact Ltd.
40,923Diligent Corporation
122,264Dillon Consulting Ltd.
209,356Dilo Co. Inc.
67,862Direct Energy Business
135,072Direct Equipment West Ltd.
146,335Discovery Crane Rental Ltd.
25,553Distributed Energy Financial Group
170,328District Of 100 Mile House
60,424District of Barriere
572,779District of Central Saanich
195,216District Of Chetwynd
113,843District of Clearwater
182,635District Of Coldstream
229,771District Of Elkford
84,530District Of Fort St. James
157
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
11 of 36
116,828District Of Highlands
189,156District Of Hope
248,165District Of Houston
3,318,108District Of Hudson's Hope
73,243District Of Invermere
432,368District Of Kent
220,707District Of Kitimat
607,836District of Lake Country
161,933District of Lantzville
735,309District Of Lillooet
524,165District of Logan Lake
2,343,783District Of Mackenzie
113,824District of Metchosin
3,330,606District Of Mission
51,420District Of New Hazelton
1,977,781District of North Cowichan
285,033District Of North Saanich
4,813,770District of North Vancouver
69,659District of Peachland
271,610District Of Port Edward
154,675District Of Port Hardy
3,000,851District of Saanich
208,072District of Sechelt
89,857District of Sicamous
243,254District Of Sooke
497,203District of Sparwood
1,327,405District Of Squamish
76,734District Of Stewart
509,583District Of Taylor
54,419District Of Tofino
266,507District Of Tumbler Ridge
48,042District of Ucluelet
227,445District Of Vanderhoof
892,290District of West Vancouver
127,333Diversified Environmental Serv.
99,342Dixon Networks Corporation
31,640DKC Digi Key Corp
29,061DL Bins Ltd
219,228DL Safety Consulting Ltd
64,284DM Fourchalk Property Consultants
1,323,628DMD & Associates Ltd.
324,401DMD Power Engineering Ltd
301,144DNA Data Networking and Assemblies
90,016DNV GL Energy Insights USA Inc
1,640,217Doble Engineering Co.
123,558Dogwood Transport Ltd.
402,799Doig River First Nations
33,954,872Dokie General Partnership
3,251,883Domcor Health Safety & Security Inc
77,851Domino Highvoltage Supply Inc
18,583,307Domtar Inc.
45,655Domtar Pulp & Paper Products Inc.
75,301Don Charlton Ltd.
33,627Donald Flintoff
199,922Donald's Machine Works Ltd.
439,705Done Right Painting & Sandblasting
133,766Donna's Northern Connection Ltd
1,520,846Doran Taylor Power Partnership
99,875Dormakaba Canada Inc
91,975Double R Rentals Ltd.
46,077Douglas College
35,142Douglas Jamieson
61,858Douglas Lake Cattle
27,710Douglas Lake Equipment LP
175,991Douglas Mauger
188,338Doumont Welding Ltd
88,091Downie Timber Ltd.
42,000DP World (Canada) Inc
155,343DPS Telecom
145,761Dr. Gail Atkinson
158
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
12 of 36
43,857Dr. Wynfrith Riemer
58,878DriverCheck Inc
483,984Driving Force
333,014Ducks Unlimited Canada
125,152Dudley Thompson Mapping Corporation
42,000Dufferin Land Corporation
362,082Duncan Kent & Associates Ltd.
75,825Dunsky Energy Consulting
12,370,159Duz Cho Construction Limited
540,226DWB Consulting Services Ltd
175,989Dynamic Avalanche Consulting Ltd
103,979Dynamic Isolation Systems Inc
1,255,023Dynamic Rescue Systems Inc
62,412Dynamic Rescue Training Ltd
47,029E H Price Sales
61,327E Lees & Associates Consulting Ltd
70,825E Source Companies LLC
542,086E.B. Horsman & Son
54,449Eagle Industries Ltd
876,853Eagle Nest Construction Ltd
104,139Eagle Vision Video
41,123Eagle West Crane & Rigging
506,403Earth Vac Environmental Ltd.
29,652East Kootenay Cleaners
40,050East Kootenay Invasive Species
84,088Easterbrook & Associates Inc
1,219,032Eaton Industries (Canada) Company
66,848EBC Drafting Services
3,205,192Ebco Industries Ltd.
49,584EBSCO Canada Ltd
86,464Ecodyne Limited
2,467,916Ecofish Research Ltd
1,031,117Eco-fitt Corporation
2,845,922Ecofor Consulting Ltd.
116,776Ecolighten Energy Solutions Ltd
176,720Ecometric Research Inc
330,113Ecora Engineering & Resource Group
630,390Ecoscape Environmental Consultants
184,800Ecotagious Inc
281,881ECS Electrical Cable Supply Ltd
55,876Edge Production Supplies
379,524Edgett Excavating Ltd
48,575Edgewood Holdings 2013 Ltd
586,730EDI Environmental Dynamics Inc.
147,113EDS Pumps & Water Treatment Ltd
26,435,333Eecol Electric Corp.
30,512EESiFlo Inc
50,056Efficiency Forward Inc
524,551EJ Canada ULC
50,000EJM Forest Management Ltd
118,820Elaine Hassell
553,626Electrical Energy Training Group
93,239Electro Rent LLC
143,552Electrolab Training Systems
59,463E-Licensing BC
58,171Elisa J Figueroa
17,286,711EM3 Services Inc
2,858,786EMC Corporation Of Canada
178,622EMCO Corporation
385,316Emil Anderson Construction (EAC)
62,049Emilio M Esguerra
1,942,732Empirica Infrastructure Inc
43,430EMRC Emergency Response Management
64,175Energetic Services Inc.
179,172Energetic Traffic Control Ltd
31,500Energy Performance Services
314,179Energy X Systems Ltd.
44,100Enersys Analytics Inc.
113,257Enervac Corporation
237,531Enervac International ULC
159
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
13 of 36
170,536Eneta Energy Engineering Inc
156,230Engen Services Ltd
1,145,793Engine Digital Inc
548,288EnGlobe Corp
2,970,697EnPower Green Energy Generation LP
69,559Enterprise System Solutions Inc
288,880ENTREC Cranes & Heavy Haul
35,202Envirosystems Incorporated
710,459EPRI
129,504Equifax Canada Co
813,320Equinox Software Design Corporation
28,875Equity Valuation & Consulting
39,943Ergokinetics & Safety Services Ltd
215,381ErgoRisk Management Group Inc
28,255Eric Parkinson
43,403Eric Todd Manning
208,987Erickson Incorporated
1,060,682Ericsson Canada Inc
104,023Erik Blaney
4,360,202Ernst & Young LLP
34,069Erron Consulting Ltd.
32,581ESG Filtration Ltd
83,738Esketemc First Nation
34,553Essential Resources Inc
29,766Evergreen Building Maintenance Inc
327,660Evert J Hope
42,808Exclusive Mechanical Systems Ltd.
26,124Exova Canada Inc
68,892exp Services Inc
31,041Expertec Van Systems
63,143Express Business Systems Inc
201,243Exton and Dodge Land Surveying Inc
403,571Extreme Safety & Services Ltd
66,328Extreme Signs Inc.
43,942F & F Concrete Ltd.
45,127,875F & M Installations Ltd
47,161Fab-Rite Services Ltd.
126,691Facility Solutions Group Inc
76,267Factiva Limited
7,313,109Falcon Equipment Ltd.
35,275Farrish Marketing Services
6,006,517Fasken Martineau DuMoulin LLP
270,021FAST First Aid & Survival
31,620Fastenal Canada Ltd
57,625Federal-Mogul Deva GmbH
58,973Filtervac International Inc.
2,475,371Finnair Ltd.
1,662,921Finning International Inc.
449,082Firefin Enterprises
137,225Firma Strata Corporation BCS 4398
61,706First Aid and Survival
38,231First Quartile Consulting LLC
78,297FIS
171,400FIS Avantgard LLC.
246,160FIS Financial Solutions Canada Inc
35,801Fitness Town Commercial
2,525,417Fitzsimmons Creek Hydro Limited
29,483Flameguard Safety Services Ltd.
13,555,788Flatiron Dragados Joint Venture
124,868,818Flatiron-Graham
748,081Fleming Tree Experts Ltd
45,507Flightdeck Media Inc
49,953Flo-Draulic Controls Ltd
61,445Flynn Canada Ltd
2,080,071Fonex Data Systems Inc.
64,288FORME Ergonomics & Workplace
48,000Forrester Research Canada Inc
210,000Fort Capital Partners
379,748Fort Modular Inc
15,144,775Fort St James Green Energy LP
160
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
14 of 36
28,179,075FortisBC Energy Inc
1,579,879Foundex Explorations Ltd.
93,534Four Directions Management Services
1,079,314Fourth Wall Consulting Inc.
30,631FR Rentals Ltd
33,600Frank S Borowicz QC Law Corporation
32,000Fraser Basin Council Society
115,458Fraser Burrard Diving Ltd
129,920Fraser Health Authority
53,267Fraser Valley Equipment Ltd.
27,155Fraser Valley Fire Protection Ltd
142,478Fraser Valley Regional District
140,471Fraser Valley Watersheds Coalition
26,228Fred Ruttan Consulting Services Ltd
18,360,272Fred Thompson Contractors (1991)
31,622Frequency Coordination System
526,694Freshwater Fisheries Society of BC
708,698Freshworks Studio Inc
409,148Frontier Power Products Ltd.
73,832FrontierPC.com Computer Inc
476,290FRP Transmission Innovations Inc
55,165Fugro Canada Corp
24,379,790Fujitsu Consulting (Canada) Inc.
40,924Fulford Harbour Consulting Ltd
1,186,021Funktional Electric & Utility
2,474,334Furry Creek Power Ltd.
26,250G Brunner Consulting Ltd
123,737Gail Force Cleaning Services
32,902Galaxy Satellite
37,540Galiano Inn
85,873Garaventa (Canada) Ltd
94,988Garnett Wilson Realty Advisors Ltd
60,231Garth's Electric Co. Ltd.
61,539Gartner Canada; Co.
32,721Gary L Shumka Law Corporation
41,734Gasfield Plumbing and Heating Ltd
821,562GE Energy Management Services LLC
104,183GE Oil & Gas Canada Inc
2,289,407GE Packaged Power Inc.
35,259Geier Waste Services Ltd.
238,194General Cable Company Ltd
229,523General Credit Services Inc.
1,097,766General Electric Canada
26,371General Electric International Inc.
197,906Generator & Motor Services of Pennsylvania LLC
40,697Genesis Systems Corporation
798,560Genics Inc.
31,612Geonorth Engineering Ltd.
146,411George Derby Care Society
35,718Georges R Darbre
133,762Georgia Tech Research Corporation
2,222,618Geotech Drilling Services Ltd.
148,260GEOVision Inc
31,119Gerald Peters Ventures Ltd.
55,333Gibraltar Mines Ltd
26,922Gibson Bros. Contracting Ltd.
4,703,491GIF Crowsnest Power LP
61,735Gilbert Supply Co.
131,915Giles Shearing
200,000Gill; Singh; Brar; Bhullar
150,248Gilnockie Inspection Ltd.
103,510Gisborne Industrial Construction
45,983Glave Communications
93,661Glenn Power Contractors (1994) Ltd
27,269Gliderline Solutions Inc
36,163Global Industrial Canada
121,030Global Knowledge Network
155,300Global Mountain Solutions Inc
421,938Global Rental Canada Ulc
48,881Globaltranz Enterprises Inc
161
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
15 of 36
92,697Gloo Studios Inc
45,431GM Ballard & Associates Ltd.
8,265,448Golder Associates Ltd
47,325Gordon Bjorkman
914,301Gordon Crane & Hoist Inc.
56,258Gorman Bros Lumber Ltd
48,448Gossamer Threads Inc
2,315,462GOTraffic Management Inc
62,011Gottler Bros. Trucking & Excavating Ltd.
193,004Gowling WLG (Canada) LLP
69,999Graf Excavating Co. Ltd.
390,748Graham Woodworking Inc
848,039Grand & Toy
199,360Gratto Electrical Services Inc
882,469Great Bear Forest Management Inc.
124,640Great Bear Initiative Society
45,545Greater Vancouver Powersports Inc
51,961Greater Vancouver Regional District
44,217Green Leaf Environmental Ltd
48,524Green Line Hose & Fittings Ltd.
158,983Green Motors Practices Group
263,506Greenbank Environmental Inc
377,425Gregg Distributors LP
36,750Greta's Class Act Services
2,322,612Grid Solutions Canada ULC
81,629Ground-It.Com Consulting Ltd.
4,133,104Groundswell Group Inc
29,180GS Hitech Controls Inc.
37,760Guardians of Mid Island Estuaries
120,960Guidewire Environmental Management
700,289Guillevin International Co.
46,574Gulf Islands Cruising School Ltd
112,003Gunn Consultants Inc
44,126G-Van Catering and Consulting Inc
48,609GVIC Communications Corp
362,861Gwil Industries Inc.
31,760G-WP Training and Consulting
641,264H & H Welding Fabrication & Rental
1,453,756H2X Contracting Ltd.
2,073,175Haa-ak-suuk Creek Hydro Limited
68,333Habanero Consulting Group
250,000Habitat Conservation Trust
149,357Halfway River First Nation
3,954,616Halfway River Frost LP
11,608,545Halfway River IDL Ltd Partnership
2,347,782Halfway River International
127,573Hamazaki Wong Marketing Group
60,145Hamideh Abolghasemi Riseh
29,448Haney Marine Sales & Service
59,378Harbour House Hotel
85,524Harbour International Trucks
31,493Harbour Machining; Welding; & Fabricating Ltd.
29,614Harbourgreene Consulting Inc
58,017Harbourview Electric Ltd.
67,650Harris Steel ULC
43,898,183Harrison Hydro Limited Partnership
100,467Hastings Northview Apartments Ltd
4,082,972Hatch Ltd.
591,215Hauer Creek Power Inc.
117,850Hawker Siddeley Switchgear Limited
57,748Haylock Bros. Paving Ltd.
13,216,674Hazelwood Construction Services Inc
188,518Hazmasters Inc
27,342HBH Land Surveying Inc
79,557HD Tree Service Ltd.
49,594Health and Safety Executive
30,800Heartland Steel Doors Ltd.
666,654Heartwood Services Inc
285,681Heather M Cane
264,100Heemskirk Canada Limited
162
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
16 of 36
956,566Heenan Tree Service Ltd.
701,021Hemlock Printers Ltd.
2,031,591Hemmera Envirochem Inc.
1,701,541Henry Foundation Drilling Inc
570,248Hercules SLR Inc
1,532,131Heritage Office Furnishings Ltd
416,066Hewlett Packard Enterprise
249,662HHS Drilling & Blasting Ltd
163,108Hiballer Productions Inc
163,879High Tide Tours & Water Taxi Ltd.
58,433Highlander Marine Services Ltd
321,356Hilti (Canada) Corporation
161,468Hilton Vancouver Metrotown
285,102Him Cheung Luk
181,404Hi-Rigger Tree Service Ltd.
232,916HJT Steel Tower North America Co
3,541,169HMI Construction Inc.
264,376Hodgson King & Marble Ltd.
691,210Home Depot Canada Inc.
32,837Home Hardware Building Centre
49,969Hootsuite Media Inc
12,255,441Horizon Recruitment Inc
76,122Hoskin Scientific Ltd.
2,091,048Houle Electric Limited
1,707,702Houweling Nurseries Property Ltd.
87,883Howe Sound Drill. & Blast. Ltd.
38,537,035Howe Sound Pulp & Paper Corporation
53,600HSBC Bank Canada
3,019,456Hub International Canada West ULC
30,374Hubbell Canada LP
2,069,018Hunter Creek Hydro Limited
25,223Hunter Overhead Doors Ltd
35,118Hutton Communications
282,806Hydrodig Canada Inc.
70,501Hydropower Engineering Ltd
401,038Hyland Excavating Ltd.
50,896Hyper Toys (2007) Ltd
66,585Hyseco Fluid Systems Ltd.
10,746,605Hyundai Elec & Energy Sys Co Ltd
26,939I Glass Janitorial Ltd.
36,798I.G. Gavac & Son Inc.
92,329I/O Design & Engineering Ltd
110,285Ian Christopher Ramsay
432,462IBEX Construction Ltd
627,910IBM Canada Ltd.
120,751ICIS
320,642ICS Great Western LP
77,628Ida Keung
26,126Ideal Welders Ltd
1,374,682IDL Projects Inc.
35,257Ignite Technical Resources Ltd
26,498IHS Markit Canada Limited
298,503Image Uniforms Inc
57,744Image-Pro Marketing Ltd.
16,075,211Imperial Oil Limited
274,439Imperial Parking Canada Corporation
44,553Impulse TV Network Ltd
42,000Indeed Ireland Operations Ltd
31,837Indian Isle Const. (1982) Ltd.
116,885Indji Systems Inc
92,172Industrial Forestry Service Ltd
49,136Industrial Solutions Inc.
1,094,477Industrial Trades Group Ltd.
159,472Inertia Engineering
449,108Infosat Communications LP
47,713Infracon Construction Inc
48,637Iniven LLC
2,836,977Inlailawatash GP Ltd
84,625Inland to Island Social Enterprise
31,106Inlet Diesel Recon. Ltd.
163
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
17 of 36
182,277Inlet Express Services Ltd
28,613Innovative Interfaces Global Ltd
364,069Innovative Steam Technologies Inc
101,832Innvest Hotels LP
57,111inoLECT LLC
60,368,554InPower BC General Partnership
240,256Insight Energy Ventures LLC
105,037Insights Learning & Development
1,385,555InStream Fisheries Research Inc.
94,735Insurance Corporation of B.C.
33,317Integral Group Engineering (BC) LLP
2,993,378Integration Solution Services Inc.
42,282Intellisense Solutions Corp
25,428Interact Inspection Corp
116,989Interface Forestry Ltd
60,906Interfax Systems Inc.
43,163Interfor Corporation
58,182Interior Health Authority
132,768Interior Warehousing Ltd.
60,875Inter-Kraft Contracting Ltd.
62,836International Assoc for Contract
28,702International Paints
387,891International Trade Centre
477,292Interoute Construction Ltd
147,594Intertek Inspection Services Ltd
42,500Intertek Testing Services NA Ltd
36,479Inventa Sales & Promotion Inc
33,815Inventronics Limited
30,741Invermere Sales & Rentals Inc
43,494iOC Tech Inc
507,342Ipex Electrical Inc
45,975Iris Power LP
78,750Iron Age Manufacturing Ltd
461,777Iron Mountain Intellectual Property
145,449Ise Consulting Group
105,000Island Corridor Foundation
149,380Island Timberlands Limited
3,689,778ITB Subsea Ltd
168,821ITM Instruments Inc.
6,117,077Itron Canada Inc.
1,363,353It's On Electric Company Inc
246,421Ivanhoe Cambridge II Inc.
86,681Ivanhoe Loader Service
582,478IVL Contracting Ltd.
123,729J & R Services
44,687J. Weir
2,157,824J. Wilkins Consulting Ltd.
128,861J.L.'s Excavating Ltd.
64,526J.R. Industrial Supplies
27,088Jack W Baker
196,128Jaco Powerlines Ltd.
3,015,169Jacob Bros. Construction Inc
43,936Jadds Maintenance
128,665Jake-Jay Construction Ltd
45,781Jakob Dulisse
101,945James Anthony Bruce
46,386James Plant
6,279,140Jamie Creek LP
149,087Jamie Shane Contracting
69,687Jana Jacobsen and Roger Jacobsen
236,120Janox Fluid Power Ltd
64,703Janzen Enterprises Ltd
25,245Jared Webb
79,591Jean Goettemoeller
61,925Jeff Ankenman/Sue Mcmurtrie
29,925Jennefer Lea Wilson
68,122Jennifer R Watson
82,373Jensen Hughes Consulting Canada Ltd
155,563Jesstec Industries Inc.
51,341Jewel Holdings Ltd
164
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
18 of 36
29,120JHW Construction Ltd
2,219,383Jim Dent Construction Ltd.
29,318Jim Easson Contracting
54,008Jim McAuley LLC
20,158,799Jimmie Creek Limited Partnership
43,589JLB Ventures Ltd
52,471Jocks Blasting & Son Ltd.
47,362Jody Schick
47,438John Brooks Company Ltd.
25,800John Cootes
780,966John Hunter Co. Ltd.
47,711Jordan Armstrong Welding Ltd.
62,189JR Overhead Doors (2006) Ltd.
32,431JRN Compressor Services Inc
518,275JSK Traffic Control Services Inc
200,233JTM Consulting Ltd.
3,769,469JTS Consulting Inc
97,260Juanita Poirier
102,995Justason Market Intelligence Inc
102,545Justice Institute Of B.C.
46,243JW Recycle-IT Inc.
61,149JWF Consulting LLC
83,088K R Loggin Consulting Services
251,972K. Pearson Contracting Ltd.
1,087,156K2 Electric Ltd
53,613Kal Tire
123,596Kalmar Construction Ltd
412,328Kamea Contracting Ltd
33,939Kamloops Home Hardware Building Centre
46,553Kamloops Indian Band
1,287,371Kasian Architecture Interior Design
155,374Kato and Associates Research Ltd
138,782Katzie Development Limited
171,462KDS Installations Ltd
33,242Keefer Ecological Services Ltd
90,754Kelowna Industrial Mechanical
83,372Kema Consulting Canada Ltd
204,786Ken Byron Excavating
318,972Ken Johnson Trucking Ltd.
150,305Kendall Enterprises Corp
257,310Kenstone Hornby LP
41,131Kenstone West Properties Ltd
97,796Kermodei Adventures Inc
735,912Kerr Wood Leidal Assoc. Ltd.
2,404,950Key Largo Electric Ltd
262,905Keystone Environmental Ltd
68,285KGAL Consulting Engineers Ltd
383,560Kick Start Technologies Ltd
97,172Kidnetic Education Inc
35,138King Cool Refrigeration & Air Conditioning Ltd
63,704King Kubota Services Ltd.
38,492Kinsight Community Society
60,386Kisik Aerial Survey Inc
143,388Kisters North America Inc.
49,960KL Solutions Inc
32,823K-Line Insulators Limited
24,085,659Klohn Crippen Berger Ltd.
90,744KMR Industries Llc
123,451KMS Tools & Equipment Ltd
570,225Knappett Industries (2006) Ltd.
73,410Knight Piesold Ltd
29,912Kohler Canada Co
61,891Kojima EHV Cable Engineering Inc
177,803K'omoks First Nation
1,948,304K'omoks FMI Electrical Services JV
673,840Koncar Instrument Transformers Inc.
56,297Kone Inc
322,994Konecranes Canada Inc.
68,313Kootenay Dirty Diggers
33,736Kootenay Industrial
165
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
19 of 36
44,967Korem Geospatial Software and
1,477,151KPMG LLP
29,694K-Rod Steel Ltd.
266,288Kruger Products LP
108,560KTA-Tator Inc
449,044Ktunaxa Nation Council Society
62,346Kwadacha Education Society
189,665Kwadacha Green Energy Limited
92,349Kwadacha Nation
19,278,478Kwagis Power Limited Partnership
32,588Kwantlen First Nation
139,429Kwela Leadership & Talent
28,230Kwikwetlem First Nation
18,339,474Kwoiek Creek Resources
4,481,638L & S Electric Inc.
116,429L & S Electric of Canada ULC
34,376L&M Engineering Limited
99,169L.B. Paving Ltd.
621,002Lafarge Canada Inc.
2,056,203Laich-Kwil-Tach Environmental
37,115Lakeland Mills Ltd
167,501Lakelse Air Ltd.
36,221Lance Mulvahill
413,669Landsure Systems Ltd
26,528Langley Concrete Ltd Partnership
113,814Laprairie Crane Ltd.
37,005Larry Casper
372,867Lava Forestry Ltd
91,115Law Society Of British Columbia
2,482,354Lawson Lundell LLP
100,614Lawson Products Inc. (Ontario)
40,187Layfield Canada Ltd
134,025LearningWorks Enterprises Inc
440,959Leavitt Machinery Inc.
504,837Lehigh Hanson Materials Limited
29,708Leica Geosystems Ltd
59,887LemonTree Statistical Consulting
33,680Lenz Welding
95,374Les Hall Filter Service (2013) Ltd
50,409Levitt Safety Ltd
606,145Lexa Caterers Ltd
42,928LexisNexis Canada Inc.
695,688Lgl Limited
26,745Lheidli T'enneh First Nation
695,053Lhi Tutl'it Services Inc
139,220Liam Cole
120,962Libra Tree Service Ltd.
25,200LifeSpeak Inc
44,742Lillooet Builders World Ltd
39,208Lillooet Disposal & Recycling Ltd
35,355Lillooet Tribal Council
547,766Limestone Learning Inc
29,770Limno Lab Ltd.
48,718Lincoln Electric Cooperative Inc
72,680Linda Arkhanguelski
49,514Lindberg Construction (2010) Inc.
114,781Linde Canada Limited
216,476Lindsey Manufacturing Co
492,004Lineman's Testing Laboratories of Canada Ltd.
5,529,745LineStar Utility Supply Inc.
230,419LinkedIn Ireland Unlimited Company
31,356Lisa Pineault Ent
59,220Lisims Forest Resources Limited
49,473Little Shuswap Lake Indian Band
79,792Living Resources Environmental
77,881Load 'Em Up Contracting (TD) Ltd
313,622Loblaws Inc
27,006Lobo Picker Service Ltd.
89,206Local Rental Solutions Ltd
50,060Locweld Inc
166
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
20 of 36
35,707London Drugs Ltd.
66,265Long Bow Pipe and Tap Ltd
17,926,553Long Lake Hydro Inc
1,324,799Long View Systems Corporation
35,465Loomis Express
57,103Lordco Parts Ltd.
791,192Louisiana Pacific Canada Ltd.
880,058Lower Mainland Pump Supplies Inc
108,925Lower Nicola Indian Band
3,038,002LS Cable America Inc
25,693Lumbershield Corporation
83,643Lumen City Lighting Company Ltd.
26,219Lumley Developments Ltd
642,284Lups Contractors Ltd.
64,629Lux Insights Inc
72,744Lynn Aldridge
132,611Lynx Creek Industrial & Hydrovac
70,259Lytton First Nation
40,180M & R Electrical (B.C) Ltd.
27,670M H King Excavating Ltd
354,501M Pauletto and Associates LLC
2,158,684M&M Resources Inc.
65,288M. Schott Contracting Ltd.
58,230M.N.D. Consulting Inc.
48,865MacDonald Power Services Ltd.
57,666Magnolia Communications Ltd
35,165Mainland Machinery Ltd
110,448Mainstream Biological Consulting
47,552Malt Ventures
274,248Manpower Services Canada Limited
58,781Manson Environmental & Water
29,274Manteo Resort Limited Partnership
3,272,576Maple Leaf Forestry Ltd.
125,981Maple Leaf Power Corporation
859,188Maple Red Financial Management
84,514Marco Marrello
55,662Marcon Metalfab
34,210Margaret Whidden
125,939Maridex Inc
903,795Marion Creek Hydroelectric Project
103,175Marisol Marine Center
50,505Mark Anthony Group
45,267Mark Coates
2,067,885Mark's Work Wearhouse Ltd.
87,426Marlene Machemy
34,047Marpole Transport Ltd
8,763,334Marsh Canada Ltd
57,450Marshall Reece
78,892Martech Motor Winding Ltd.
28,539Marvel Cleaning Services Ltd
434,680Marwest Utility Services Ltd
1,142,808Marwin Industries Inc.
27,017Massachusetts Microwave Corp
38,455Masse Environmental Consultants Ltd
43,611Matakana Scaffolding BC Inc
32,361Matcon Excavation & Shoring Ltd.
109,330Matharu Motors Ltd
961,230Matrix Solutions Inc
2,578,458Matrix Staffing Group Inc
341,185Matthews Equipment Ltd.
34,199Maureen Schwingenschloegl
34,962Mauris Family Investments Ltd
1,126,110Maven Consulting Ltd
62,123Max Helmer Construction Ltd.
47,652Maxxam Analytics Inc.
125,343Mazzi Consulting Services
32,393McCarthy Tetrault LLP
247,198McColl Forestry Ltd.
131,230Mccoy Lake Excavating Ltd.
328,739Mcdonald & Ross Constr. Ltd.
167
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
21 of 36
1,153,378McElhanney Consulting Services Ltd.
470,413McGard LLC
111,158McGregor & Thompson Hardware Ltd
300,024McKenzie Tree Service Ltd.
210,245McLaren Software Inc
385,080McLeod Lake Indian Band
41,496,212McMahon Cogeneration Plant
1,127,799McMillen LLC
1,590,510McNair Creek Hydro Limited
70,941McRae's Environmental Srvc Ltd.
2,237,240MCW Consultants Ltd
152,918MD Signs Ltd.
505,207MDT Technical Services Inc.
7,732,324Medical Services Plan Of B.C.
216,472Mediquest Technologies Inc.
106,479Medisys Health Group Inc
94,843Medix Holdings Ltd
113,775Megan Harris Consulting
543,479MegaSys Enterprises Ltd
242,085Megger Ltd.
49,017,928Meikle Wind Energy Limited
44,403Meltwater News Canada Inc
36,960Mercury Grove Inc
30,398,676Merritt Green Energy Ltd
44,018Mersen Canada DN Ltd
1,391,044Metagnosis Consulting Inc
152,703Metro Concrete Restoration Ltd
26,250Metro Vancouver Crime Stoppers
25,703Metro Vancouver Regional District
324,907Metsa Resource Management Inc.
298,992Mgs Engineering Consultants Inc
105,736Michael Yeomans IClean
41,216Micra Design
25,286Microdotdna Technology
270,032Microsoft Canada Inc.
5,592,865Microsoft Licensing GP
49,460Midland Tools
3,619,356Midway Power Line Services Ltd
28,021Mike's Welding
37,737Mile 0 Electric Ltd
123,836Mill & Timber Products Ltd
343,337Millennia Research Limited
471,057Miller Instruments Ltd.
2,679,399MindCore Technologies
408,075,147Minister Of Finance
119,343Minpraxis Solutions
127,247Mintz Global Screening Inc
1,259,882Mission Contractors Ltd
527,329Mission Engineering Corporation
28,378Mitchell Group Langley Inc
3,347,724Mitchell Installations Ltd
26,250Mitovia Consulting Inc
3,833,131Mitsubishi Electric Power Products
31,500MMK Consulting Inc.
513,448Modis Canada Inc
363,632Moffatt & Nichol
27,867Monaghan Engineering and Consulting Ltd
31,430Monashee Chimney Expert
263,306Monashee Mfg. Corp. Ltd.
371,189Monashee Surveying & Geomatics
942,274Moore Canada Corporation
1,010,712Morneau Shepell Ltd
94,604Morrison Hershfield Ltd.
162,754Motion Industries (Canada) Inc.
39,532Mount Currie Indian Band
79,710Mount Sicker Lumber Company Ltd
97,582Mountain Water Research
6,752,504MPT Hydro LP
72,998MRC Total Build LP
69,299MRO Electronic Supply Ltd.
168
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
22 of 36
68,904MSE Precast Ltd
162,322Mud Bay Drilling (2015) Ltd
236,726Murray Jamieson
76,319Murray Latta Progressive Machine
187,496Musqueam Indian Band
43,573Mussell Crane MFG
66,069Mustel Group
29,353N C Rentals Inc
1,103,458N&S Power Digging Ltd.
20,718,080Nanaimo Forest Products Ltd
35,162Napa Auto Parts
97,242Napp Enterprises Ltd.
153,751National Concrete Accessories
54,642National Instruments Corporation
69,954National Process Equipment Inc.
27,817Natural Capital Consulting Inc
323,501Nature Conservancy of Canada
83,289Navigant Consulting Inc.
158,624Navigant Consulting Ltd
91,270Navius Research Inc
93,696Navus Environmental Consulting
239,232NCURA Consulting Inc
32,225NDB Technologies Inc
42,277NDS Electronic Solutions Inc
100,157Nechako Lumber Co Ltd
60,480Nechako Valley Fab
27,825Nemetz (S/A) & Associates Ltd
80,821Neopost Canada Ltd.
66,535Neptune Bulk Terminals (Canada) Ltd
846,875New Edgewater Development ULC
30,985New Elevation Civil Construction
254,940New Gold Inc
37,632,112Nexans Canada Inc.
115,646Next Wave Innovation Inc
2,905,684Nextgen Technologies Ltd
1,945,412NGK Insulators Of Canada Ltd.
38,213Nicholas Gregor
398,178Nik-Nik Drafting Services
80,340Nilex Inc.
98,921NIS Northern Industrial Sales Ltd
42,561NitrogenX Process Solutions Inc
33,012NL Building Maintenance
196,747Nlaka'pamux Nation Tribal Council
1,976,886Nokia Canada Inc
255,306Nomadic Machine
27,470Nooaitch Indian Band
32,341Norbert R. Morgenstern Consulting
48,732Norman A. Abrahamson; Inc.
84,919Norsat International Inc
84,421Norske Corrosion & Inspection
1,226,207North Arm Transportation Ltd.
49,761North Central Plumbing & Heating Ltd
36,478North Fraser Salmon Assistance
49,803North Okanagan Water Earthworks
1,006,091North Quarter Holdings Ltd
522,504Northern Civil Energy Inc
20,150,000Northern Development Initiative
27,186Northern Geo Testing & Engineering
79,047Northern Health Authority
27,974Northern Mat & Bridge
96,528Northern Metalic Sales Ltd.
684,055Northern Rockies Regional Municipality
30,465Northland First Aid Inc
85,932Northwest Avalanche Solutions Ltd
2,369,661Northwest Hydraulic Consultants
154,418Northwest Power Pool
7,231,763Northwest Stave River Hydro LP
30,133Northwest Wire Rope Ltd.
113,710Northwestel Inc.
33,748Norton Rose Fulbright Canada LLP
169
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
23 of 36
68,486Nor-Val Rentals Ltd
302,393Nova Pole International Inc.
76,782NPR Limited Partnership
39,129NR McCall and Associates
41,475NRG Research Group
63,924NRS Engineering Ltd
132,536Nun wa dee Stewardship Society
1,733,235Nupqu Development Corporation
29,400Nuxalk Nation
103,804Oballa Holdings Ltd
3,399,985O'Brien Brothers Enterprise
62,376Ocean Trailer
150,800OETS Services Ltd
145,039Office Perks Coffee
37,275Okanagan and Similkameen
59,766Okanagan Audio Lab Ltd.
804,365Okanagan Indian Band
2,472,721Okanagan Nation Alliance
162,160Okanagan Test Rite Liveline Tool
32,700Okiok Data Ltd
33,310Old Massett Village Council
211,815Old Victoria Properties Ltd
21,790,610Omicron Construction Ltd
36,534Omicron Electronics Canada Corp
82,867On Side Restoration Services Ltd
86,347Onni Cambie Street Development
98,348Onni Contracting Ltd.
260,607Onsite Engineering Ltd
40,559Ootsa Air Ltd
1,184,022Open Access Technology
255,829OpenRoad Communications Ltd
38,241Optimum Talent Inc
517,754Opus Stewart Weir Ltd
6,785,174Oracle Canada ULC
313,733Orkin Canada
26,478Oscar's Disposal Ltd
1,654,465OSIsoft LLC
3,238,765Ouest Business Solutions Inc
38,028Overhead Door Co Of Grande Prairie (1979) Ltd
99,856Overland West Freight Lines Ltd.
212,777Overwaitea Food Group Limited
34,622Owen G Carney Ltd
159,321P & L Ventures Ltd
500,000P & T Shopping Centre Holdings Ltd.
29,662P. D. McLaren Limited
34,973P2 Energy Solutions Alberta ULC
125,895Pace Creative Group Ltd
169,509Pace Technologies (BC) Inc
55,797Pacheedaht First Nation
30,124Pacific Air Mechanical Ltd
119,082Pacific Blasting & Demolition Ltd.
205,597Pacific Bolt Manufacturing Ltd
210,000Pacific Climate Impacts Consortium
318,360Pacific Customs Brokers Ltd
9,562,200Pacific Electrical Installations
51,342Pacific Fasteners Ltd.
82,017Pacific Flagging
482,463Pacific Industrial & Marine Ltd
143,586Pacific Industrial Movers LP
108,938Pacific National Exhibition
700,318Pacific Northern Gas Ltd.
70,923Pacific Northwest Electric and Controls Ltd
39,766Pacific Powertech Inc
39,758Pacific Reach Hotel OP (Richmond)
26,250Pacific Reach Properties Ltd
42,188Pacific Ropes Contracting Ltd
213,984Pacific U-Power Inc
1,747,694Pacific West Tree Services Inc.
186,588Pacific-Surrey Construction Ltd
14,221,451Paladin Technologies Inc
170
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
24 of 36
206,691Panevo Services Limited
44,250Parastone Developments Ltd
25,475Park Derochie Seaside Coatings Inc
1,947,991Parkland Fuel Corporation
733,232Parks West Enterprise Inc
75,619Parsnip River Forestry Inc.
28,298Partnerships British Columbia Inc.
45,499Partridge Powerhouse Consulting
1,534,296Pathfinder Endeavours Ltd.
626,097Patton & Cooke Co
525,000Paul Paquette & Sons Contracting
43,184Paulette's Cleaning Services Ltd
56,135PBX Engineering Ltd
99,363PCB Freight Management Ltd
24,572,326PCL Constructors Westcoast Inc
459,885,959Peace River Hydro Partners
1,349,512Peace River Regional District
67,337Peace Valley Line Locating Ltd
62,366Peace View Enterprises Ltd.
3,958,408Peak Reliability
5,466,923Pedre Contractors Ltd.
34,073Pegasus Ecological
115,500Penalty Ranch Ltd
210,812Penguin Computing Inc.
31,007Pensionfund Realty Ltd
47,716Penticton Indian Band
91,375Peregrine Aerial Surveys Inc
29,761Performance All Terrain & Rentals
15,260,273Peter Kiewit Sons ULC
25,986Petro-Canada
1,720,603Petro-Canada Lubricants Inc
1,971,257Phasor Engineering Inc
48,762Phillips Brewing Company Ltd
37,389Phoenix Contact Ltd.
285,233Phoenix Enterprises Ltd.
103,452Pictometry Canada Corp
337,917Pidherny Contracting Ltd.
527,450Pinchin Ltd.
41,580Pineland Peat Farms Ltd
8,378,433Pingston Creek Hydro Joint Venture
29,600Pinna Sustainability Inc
29,543Pinton Forrest & Madden Group Inc
55,055Pioneer Forest Consulting Ltd
31,867Pioneer Fuel Delivery Ltd
27,017Pipe-Eye Video Inspections
298,117PJ Engineering Services Corporation
61,562PJB Crane Services Ltd
25,348Planet Ice
739,419Planetworks Consulting Corporation
282,484Plowe Power Systems Ltd.
51,923Plumptre Engineering Inc
28,509Poets Cove Resort & Spa
38,518Points West Audio Visual Ltd.
34,714Poisson Consulting Ltd
26,923Polar Battery Vancouver Ltd.
145,094Polaris Corporate Services Inc.
38,792Polaris Land Surveying Inc
45,208Polycast International
99,854Poly-Chlor Plastics Ind. Ltd.
72,913Polygon Ashbury & Oak Homes Ltd
106,582Polygon Minoru Affordable Seniors
4,240,686Ponte Bros Contracting Ltd.
58,360Posiak ID Consulting Inc
34,125Posi-Plus Technologies Inc
65,371Positive Purchasing Ltd
31,043Pottinger Gaherty Environmental
138,068Powell Canada Inc
191,113Power Battery Sales Ltd.
64,112Power Engineers Inc
80,807Power Glass Inc
171
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
25 of 36
70,322Power Info LLC
61,576Power Line Systems; Inc.
436,538Power Measurement Tech. Inc.
27,584Power Standards Lab
971,467Power Tree Werx
183,225PowerAdvocate Canada Ltd
56,520PowerComm Solutions; LLC
123,286Powerpoint Electrical Contractors
16,064,278Powertech Labs Inc.
146,103Praxair Canada Inc.
70,912Precise Cleaning Services
49,176Precision Communications Services
1,165,896Precision ERP Inc.
44,931Precision Identification
176,189Precision Medical Monitoring Ltd
899,305Precision Pole Inspections Ltd
212,096Precision Tree Services Ltd
151,126Premier Farnell Canada Ltd.
8,563,347Pricewaterhousecoopers LLP
3,964,925Primary Engineering & Construction
102,043Prime Boiler Services Ltd
25,058Prime Engineering Ltd
237,978Prince Rupert Port Authority
690,914Prism Engineering
58,029Pro Care Enterprises Ltd
142,660Pro Hardware and Build
3,453,011Procom Consultants Group Ltd
350,576Procrane Inc
305,372Progressive Fence Installations
899,956Progressive Ventures Construction
49,693Prometek Inc
106,527Proof Experiences Inc
64,173Proto Manufacturing Ltd
35,028Protorch Welding
65,629Protrans BC Operations Ltd
102,738Proven Compliance Solutions Inc
2,497,558Province of BC
189,072Provincial Health Services
41,059PRUFTECHNIK Maintenance Technology
29,470PSD Trauma Tech International Inc
143,573PSI Fluid Power Ltd
38,462PSS Renewables LP
46,246Pulse Electronics Inc
105,691Pure Industrial Real Estate Trust
157,500Pure Sunfarms Corp
37,420Purity Casting Alloys Ltd
2,355,611QM LP
77,425Quadra Utility Locating Ltd
49,636Qualico Chow and Li Yorkson LLP
101,555Qualico Developments (Vancouver)
375,781Qualitrol Company LLC
121,374Quality Training Systems Inc
25,269Quantum First Automation Inc
28,942Quantum Foam Inc
827,784Quartech Systems Ltd
62,291Queensway Auto World Ltd
50,953Quest Structures Inc
129,281Quietly Media Inc
228,428Quoin Consulting Ltd.
342,170R & J Williams Consulting Inc.
90,415R & R Hoist Repair Ltd.
84,217R C Rescue One Services Ltd
29,762R Jones Contracting Ltd
53,417R&B Line Consultants Ltd
45,165R. N. Trucking Ltd.
79,846R.A.L. Bobcat Service
9,203,748R.F. Binnie & Associates Ltd.
57,538R.T. Penney Property Services
68,088R2 Resource Consultants Inc
2,243,362Raging River Power & Mining Inc.
172
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
26 of 36
53,415Raider Hansen
39,683Railway Café
36,750Rainforest Automation Inc
54,722Ralmax Contracting Ltd
41,764Ramdar Resource Management Ltd
45,000Ranbir Singh Sihota
12,507,930Randstad Interim Inc
27,120Randy Moody
175,678Ratio Architecture Interior Design
54,903Raven Center Holdings Ltd
620,185Raydon Rentals Ltd.
55,191Raymer Safety Solutions Inc
82,110Raysa Enterprises Inc
65,464RBC Investor Services Trust
88,590RDH Building Science Inc
154,602Read Jones Christoffersen Ltd.
47,970Rebecca Polvere
71,106Rebel Contracting Ltd
3,742,843Receiver General For Canada
93,606RECO DECORATION
56,123Red Bluff Development
438,475Red Chris Development Company Ltd
50,793Reddhart Workwear
10,275,198Reel Coh Inc.
1,694,815Reg Dist Of Kootenay Boundary
82,393Reg Norman Trucking Ltd.
128,423Regal Tanks Ltd
78,205Regional Dist. Of East Kootenay
1,122,841Regional District of Central Kootenay
1,023,620Regional District Of Fraser - Fort George
166,866Reinhausen Canada Inc
35,220Reliable Equipment Rentals Ltd.
27,249Reliable Mobile Hearing Testing Ltd
31,454Reliance Office Services Ltd.
30,600Remco Insulation Ltd
29,754Rempel Bros. Concrete
57,514Rempel Farms Ltd
113,762Rentco Equipment Ltd
449,797Resolution Reprographics Ltd.
925,022Resort Municipality Of Whistler
89,250Revay and Associates Ltd.
293,391Revelstoke Equipment Rentals Ltd
31,267Revelstoke Excel Tire Centres
318,645Revolution Environmental Solutions
27,510Rex Peak Contracting
173,894Rexel Canada Electrical Inc.
364,893RHM International LLC
38,708Ric Electronics Ltd.
46,332Richard Bartelme
3,005,774Ricoh Canada Inc.
140,877Ridgeback Consulting Ltd
202,380Ridpest Service Ltd.
115,525RightCrowd Software Pty Limited
234,377RIMAC Technologies Ltd
87,544,971Rio Tinto Alcan Inc
30,390Rips Shoe Re-Nu Ltd.
1,026,931Riteway Tree Service Ltd
180,820River's Edge Business Park Limited
49,720Rivers West Enterprises Ltd
119,427Rivertec Inland Spill Response Corp
521,324Roadpost Inc
29,047Roadrunner Excavating Ltd.
39,732Rob Klovance
206,764Robcat Services (1998) Ltd.
39,933Robert C Stone
51,024Robert Furlong Design Company
40,300Robert J Engelbrecht
67,200Robertson Kolbeins Teevan & Gallaher Ltd
36,931Robots and Pencils ULC
795,418Robson Valley Power Corp.
173
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
27 of 36
32,326Rock Creek Environmental
2,110,061Rockford Energy Corporation
2,010,366Rocky Mountain Environmental Ltd
2,885,689Rogers Wireless Inc.
7,328,956Rokstad Power (2018) Ltd
170,308Rona Inc
44,421Ronald Collins
36,120Ronald Ungless
518,394Roper Greyell LLP
26,347Rosenau Transport Ltd.
58,937Ross Peck
54,839Ross Rex Industrial Painters Ltd
79,939Roy Campbell Ltd
50,348ROYAL CENTRE (KREC) INC
1,440,917Royal Group Inc
25,760,801RPC Limited Partnership
14,791,095RS Line Construction Inc
1,071,324RS Technologies Inc
1,207,170RST Instruments Ltd.
613,912R-Tech Technology Inc.
88,296RTR Performance Inc
335,238Ruckle Navigation Ltd.
34,050Russel Metals Inc
28,322Russel's Crane and Cartage
9,676,220Rutherford Creek Power LP
780,786RW Dozing & Heavy Haul Ltd
373,369RWDI Air Inc.
1,165,493Ryerson Canada Inc.
13,474,091S & C Electric Canada Ltd.
58,490S.G. Peardon & Assoc. Inc.
183,980S.O.F. White Paper Company
166,799Sacre-Davey Engineering
97,850SAEN Solutions Inc
526,707Safety Boss Inc
302,589Saint Bernadine Mission
1,985,344Sakwi Creek Hydro LP
38,422Salim Zubair
57,036Salmo Watershed Streamkeepers
202,800Sanford Cameron Consulting
5,018,467SAP Canada Inc.
10,086,332SA-RA Enerji INS. TIC. ve SAN. A.S.
38,698Sarah And Marcs Holdings Inc
60,270Sardis Explosives (2000) Ltd
273,685SAS Institute (Canada) Inc.
56,922Sasco Contractors Ltd
1,522,592Saulteau EBA Environmental Services
283,712Saulteau First Nations
43,161SBA Canada ULC
2,735,650Schneider Electric Canada Inc
108,904Schneider Electric Systems Canada
100,452Schnitzer Steel Canada Ltd
52,500School District - 23 (Central Okanagan)
30,319School District - 33 (Chilliwack)
90,470School District - 35 (Langley)
182,744School District - 36 (Surrey)
43,691School District - 37 (Delta)
76,231School District - 38 (Richmond)
66,655,411School District - 39 (Vancouver)
87,366School District - 41 (Burnaby)
203,620School District - 42 (Maple Ridge & Pitt Meadows)
156,336School District - 43 (Coquitlam)
118,416School District - 44 (N. Van)
30,246School District - 5 (SE Kootenay)
449,625School District - 60 (Peace River North)
34,850School District - 63 (Saanich)
76,541School District - 68 (Nanaimo-Ladysmith)
1,499,119Schweitzer Engineering Lab Inc.
70,544Scott McLean Contracting
37,349SDR Survey Ltd
82,953Seabird Island Indian Band
174
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
28 of 36
27,039Seals Unlimited
85,088Seaway Diving Ltd
65,359Sechelt Indian Band
33,373Sechelt Indian Government District
4,742,876Securiguard Services Limited
3,417,160Secwepemc Camp & Catering
161,784Segema Energy Consulting Ltd
99,827Sekhon JS Consulting Ltd
118,860Selarion Enterprises Inc
103,463Select Fluid Power (2014) Ltd
390,935Select Steel Ltd
93,835Selkirk Mountain Helicopters Ltd
25,988Sentis Market Research Inc
155,056Sequence Instruments Inc
74,954Serveron Corporation
126,166Service Quality Measurement Group
42,575SES Consulting Inc.
440,522Seto Engineering Inc.
137,970Seton 99 Enterprises
46,934Sexton Consulting
427,971Seyem' Qwantlen Resources LP
56,124Seylynn North Shore Development LP
161,525SGS Canada Inc
141,450Shackan Indian Band
79,584Shape Property Management Corp
30,300Shaughnessy Heights United Church
137,844Shaun Gloslee Excavating Ltd
228,438Shaw Cable Systems GP
76,446Shearing Environmental Consultants
25,641Shelley's Shiners Cleaning Service
51,757Shelter Point Ent. Ltd.
598,715Sherine Industries Ltd.
71,284Shift Consulting
114,271Shulman Enterprises Ltd
86,285Shuswap Indian Band
74,754Shuswap Nation Tribal Council
2,677,385Si Systems Ltd
7,383,907Siemens Canada Ltd.
30,943Siemens Janitorial Services
366,408Siemens Transformers Canada Inc
467,097Sigma Safety Corp
394,099Sigmaflow Canada Ltd
91,888Silversmith Power & Light
805,816Simon Fraser University
33,453Simon Hardy
143,046Simpcw First Nation
121,826Simple Path Consulting Ltd
179,632Simson-Maxwell
86,205Sinclar Group Forest Products Ltd
103,037Singleton Urquhart
79,243Singletree Contracting
195,926Sitsa Holdings Ltd.
71,643Skagit Environmental Endowment
27,708Skatin Nation
49,761Skeena Power Systems Ltd.
32,333Skeetchestn Indian Band
63,870Skidegate Band Council
9,008,967Skookum Creek Power Partnership
24,165,395Skookumchuck Pulp Inc
832,047Sky High Tree Services Ltd
62,496Skye Consulting (BC) Ltd
240,424Sky-Hi Scaffolding Ltd.
35,738Slocan Solutions Society
928,770SLR Consulting (Canada) Ltd.
693,361SM Group International Inc
70,092Smak Impact Agency Inc
467,144SmartGrid interConnect Advanced
49,278Smith Cameron Pump Solutions Inc
106,200SMPC Technologies Ltd
101,456Snap-On-Tools Of Canada Ltd.
175
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
29 of 36
42,405,101SNC Lavalin Inc
207,412SNC-Lavalin Constructors
345,387Snowshoe Power Ltd
37,351Softlanding Solutions Inc
194,066Solid Caddgroup Inc
568,691Solid Soil Solutions Ltd
58,592Sonepar Canada Inc.
4,000,245Soo River Hydro
1,181,722South Sutton Creek Hydro Inc.
59,394Southborough Investments Ltd
40,335Southeast Disposal Ltd
33,678Southern Railway Of B.C. Ltd.
40,355Southern States LLC
410,747Southfork Holdings Ltd
32,477Southgate Electric Ltd
229,481Southwest Power Pool
912,416Southwire Canada Company
153,777Sp Allumcheen Indian Band
104,720SpanMaster Structures Limited
599,054Spartan Controls Ltd
460,263Spatial Business Systems Inc
42,028Spatial Technologies (2017) Inc
55,440Spatial Vision Consulting Ltd
42,026Spatial Vision Group Inc.
93,569Spaz Logging
44,098SPC Software Productivity Centre Inc
31,725Special T Cleaning (2012) Ltd.
97,950Specialist Referral Clinic
36,999Spectra Power Sports Ltd
384,204Spectrum Resource Group Inc.
162,788Spectrum Safety Group Inc
593,801Speers Construction Inc
31,477Spencer McDonald & Associates Inc.
65,844SpidaWeb LLC
45,804Spider Staging Canada ULC
62,669Spidex All Terrain Excavating
282,105Splatsin
1,245,700Splatsin Construction Services LLP
470,110Splitrock Environmental
1,217,590SPM Construction Ltd
34,451Spooner Electric Ltd
82,602SPOT Messenger
388,817Spruce City Sanitary Service Ltd
284,565SPX Transformer Solutions
47,983Squamish Indian Band
236,923Squamish Nation
194,113Squamish River Watershed Society
1,324,357Squamish-Lillooet Regional District
69,144SSH Bedding Canada Co
63,995St. John Society (BC & Yukon)
83,140Stacey Dong Mathot Consulting
3,719,490Stantec Consulting Ltd
152,258Staples
28,286Star West Petroleum Ltd.
109,070Star-Tek Industrial Services Ltd
2,544,318St'at'imc Eco-Resources Ltd
329,040St'at'imc Government Services
181,163Stefan Fraser & Associates Inc
39,748Stella-Jones Inc.
6,020,385Stephen Bros Contracting Ltd
71,217Stericycle
197,646Sterling Lumber Company Ltd.
541,631Sterling Mgmt Services Ltd.
120,715Steve Emery Contracting
57,015Steven Kosa
601,843Stevenson Consulting & Contracting
50,376Stikeman Elliott LLP
148,279Stillwater Energy LLC
63,990Stinger Welding Ltd
374,666Stk'emlupsemc Limited Partnership
176
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
30 of 36
42,225Stolz Mechanical Systems Service
411,246Stoneridge Management Consultants
110,817StormGeo Inc
37,321Strata Plan 2313 The Owners
1,000,000Strata Plan LMS 1491
142,069Strategic Natural Resource
130,604Strathcona Regional District
386,612Streamline Fencing Ltd.
297,216Subnet Solutions Inc
221,846SUEZ Water Technologies & Solutions
3,978,376Sumas Environmental Svc's. Inc.
25,609Summit AEC
518,192Summit Blasting Ltd.
41,693Summit Catering Ltd
39,557,067Sun Life Assurance Co. Of Canada
40,646Sun Peaks Mountain Resort Municipality
1,395,566Suncor Energy Products Partnership
246,718Sunfields Consulting Inc.
149,972Sunlynn Consulting Ltd
66,876Sunshine Coast Regional Dist.
73,707Super Save Disposal Inc.
38,917Super Save Fence Rentals Inc.
42,161Super Save Toilet Rentals Inc.
96,433Superior Propane
428,190Supreme Structural Transport Ltd
128,288Surespan Ready-mix Ltd.
2,206,085Surespan Structures Ltd.
43,625Surplus Energy Match Inc
293,785Surrey City Development Corporation
4,002,695Surtek Industries Inc
160,510Survalent Technology Corp
85,050Susan Larsen
37,500Susie Kovecses
200,655Sustainable Strategies
44,074Suzanne Pederson
44,443Swanson's Ready-Mix Ltd.
4,755,129Swift Limited Partnership
185,459Switchwrite Consulting Inc
26,229Synergy Applied Ecology
1,555,244Synex Energy Resources Ltd
281,983Sytec Engineering Inc
37,017T & D High Voltage Consulting Ltd.
80,044T & T Supermarket Inc
624,929T. Montague Contracting Ltd
104,382T. Page Consulting Inc.
736,442TA Management Ltd
140,335Tableau Software Inc
79,061Tag Mechanical Inc
1,831,176Tahltan and Progressive Ventures GP
296,475Takla Lake First Nation
1,307,627Targa Contracting (2013) Ltd
182,543Taschuk Excavating Ltd
32,562Tastefully Yours by Jeff
7,304,921TAXI Canada Ltd
84,494Taylor-Made Business Solutions
30,030Tbadigital Inc
326,510TE Little Consulting Inc
479,359Teal Cedar Products Ltd
29,873Team Power Solutions
181,603Teck Coal Limited
136,702Teck Highland Valley Copper
11,446,089Teck Metals Ltd
1,203,441,900Teck Resources Limited
117,607Teknion Limited
6,850,020Teksystems Canada Inc.
48,261,979Telus Communications Company
518,229Telus Services Inc.
2,375,572Tems Sayamkwu Limited Partnership
32,017Tenaquip Ltd.
57,447Tenold Transportation LP
177
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
31 of 36
620,545Terra Archaeology Limited
668,053Terra Remote Sensing Inc.
32,534Terrace Steel Works Ltd.
29,348Terranova Worldwide Corporation
71,369Terrapin Station Holdings Inc
29,899Terry Timpany
510,764Tervita Corporation
116,158Testworx Inc
5,158,429Tetra Tech Canada Inc.
36,751Texcan
83,661Textworks Consulting Services
963,504TForce Final Mile Canada Inc
214,414The Cadmus Group Inc
81,645The Caldwell Partners International
98,578The Conference Board Of Canada
58,728The Corp of The Village of Masset
53,756The Corp. of the Village of McBride
32,996The Cottages on Salt Spring
197,583The Dam Welders Inc
40,980The Governing Council of the Salvation Army in Canada
191,651The Humphrey Group Inc
37,776The Mathworks; Inc.
39,900The Museum at Campbell
903,559The Nature Trust Of B.C.
225,797The Source Tree Service
32,250The Vancouver Board Of Trade
41,029Thinkup Communications
84,194Thirdwind Consulting Inc
99,434Thomas & Betts Ltd.
48,090Thomas Hart Contracting
30,476Thompson Creek Metals Company Inc
212,010Thompson Rivers University
70,112Thomson Reuters
351,775Thomson Technology Power Sys ULC
32,408Thordon Bearings Inc
2,641,948Thoreson Project Consulting Corp
31,736Three Points Cranes Ltd
131,743Thurber Engineering Ltd.
168,847ThyssenKrupp Elevator (Canada)
41,164Tibco Software (Ireland) Limited
36,579TidalShift Inc.
163,605Timberoot Environmental Inc
333,777Tipi Mountain Eco-Cultural Services Ltd
152,722T'it'q'et Administration
85,145Tk'emlups Te Secwepemc
48,939TKT Contracting Ltd.
5,970,726T-Lane Transportation & Logistics
222,861T-Mar Industries Ltd.
307,482TNT Crane & Rigging Canada Inc
67,880Toad River Lodge Ltd
62,064,886Toba Montrose General Partnership
10,860,147Tolko Industries Ltd.
404,055Tompkins Ranching Ltd
246,256Toncar Contracting
147,954Toolcomm Technology Inc.
411,946Toronto Dominion Bank
422,100Touchdown Enterprises Ltd.
29,974Tourmate Systems Limited
153,317Town of Comox
121,290Town Of Gibsons
206,920Town Of Golden
172,389Town Of Ladysmith
63,397Town of Lake Cowichan
49,139Town of Port McNeil
255,077Town Of Qualicum Beach
142,579Town of Sidney
253,268Town Of Smithers
258,931Town Of View Royal
113,643Townsend Bros Construction
441,324Township of Esquimalt
178
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
32 of 36
2,872,441Township of Langley
286,696Township of Spallumcheen
18,629,398Tracker Contracting Ltd
95,181Tracy Kindrachuk
41,247Tracy Willcock
26,223Tradewinds Refrigeration & Air Conditioning Ltd
42,638Traine Construction Ltd
35,276Trak Assets LLC
28,384Transduction Ltd
87,166Transformer Consulting Services Inc
527,105Translink
206,250Tree Canada Foundation
114,515Tree Island Industries Ltd
777,966Treeko Contracting Ltd.
50,132Trek Aerial Surveys
5,866,811Trench Ltd
8,416,362Tretheway Creek Power
130,326Tri-An Contracting Ltd.
286,411Tribus Services Limited Partnership
462,965Trico Excavating Inc.
608,362Trinoor Consulting Canada Ltd
165,398Tripwire Inc
216,799Triton Environmental Cons. Ltd.
468,104Triumf
43,894Troy Life & Fire Safety Ltd
53,967Troy Purmal Contracting
82,805True Value Service
494,952Trueline Power & Consulting Ltd
37,065Tru-Steel Inc
3,879,823Trydor Industries (Canada) Ltd.
60,235Tsal'alh
1,270,065Tsalalh Development Corporation
42,050Tsawwassen First Nation
3,516,465Tsay Keh Dene
77,467Ts'kw'aylaxw First Nation
114,833Tsleil-Waututh Nation
39,679TSS Total Safety Services Inc
41,868Tsuius Consulting
311,626Turner & Townsend CM2R Inc
32,567TVC Communications Canada
2,003,644TVE Industrial Services Ltd
90,510Twin Island Excavating Ltd.
47,161Twin Rivers Controls Ltd.
34,149Twin Sisters Native Plants Nursery
455,137Twin Valley Contracting Ltd.
112,822Twofortythree Components Ltd
4,104,998Tybo Contracting Ltd
514,072Tyco Integrated Fire & Security
5,518,227Tyson Creek Hydro Corp
63,791TYTline Consulting
40,661Tzeachten First Nation
490,846Ubisense Solutions Inc
94,679UBS Industries
45,551Uchucklesaht Tribe Government
564,659Uline Canada Corporation
2,351,417Underhill Geomatics Ltd.
44,929Underwriters Laboratories of Canada
179,107Unilogik Systems Inc.
26,947Unique Broadband Systems Inc.
48,059Unique Restoration Ltd
114,005United Concrete & Gravel Ltd.
25,743United Flower Growers Assn
2,035,855United Rentals Of Canada Inc.
51,273United States Department of the Interior
57,734Univar Canada Ltd.
117,796Universal Machining & Engineering
2,060,417University of British Columbia
472,159University Of Northern B.C.
170,958University Of Victoria
477,250University Of Waterloo
179
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
33 of 36
69,248Unlimited Medical Services Inc
315,050Upaknee Inc
32,592Upanup Studios Inc
499,860Upland Contracting Ltd
61,562Upland Ready Mix Ltd
1,471,575Upnit Power Limited Partnership
28,730,669Upper Lillooet River Power Limited
378,162Upper Nicola Indian Band
398,792UPS Canada Ltd.
404,481Ursus Heritage Consulting
92,113Utilities Aviation Specialists Inc
49,700UWC Goods Ltd
146,703Vac It Excavation Inc
156,311Valard Construction LP
1,188,592Valemount Hydro Limited Partnership
89,425Vallen
98,214Valley Helicopters Ltd.
6,647,416Valley Power Line Contracting Ltd
3,015,638Valley Traffic Systems Inc
25,747Valley Weddings Inc
25,010Valmont Industries Inc.
103,986Valmont West Coast Engineering
221,950Van Houtte Coffee Services Inc.
475,448Van Kam Freightways Ltd.
168,959Vancouver Airport Authority
60,484Vancouver Airport Property
515,723Vancouver Coastal Health Authority
110,094Vancouver Community College
98,860Vancouver Convention Centre Expansion
447,852Vancouver Fraser Port Authority
1,874,096Vancouver Island Health Authority
1,855,046Vancouver Island Tree Services Ltd
51,922Vancouver Regional Construction
318,389Vast Resource Solutions
33,422Vector Geomatics Land Surveying
99,000Veerum Inc
92,955Venture Elevator Inc
204,948Verint Americas Inc
59,087Verisk Canada ULC
295,474Versatech Products Inc.
463,462Vesta Partners Canada Inc
2,941,006VF Clean Energy Inc
2,234,125Viakonnexions Consulting
53,057Victor Asmunt
72,299VIH Helicopters Ltd
296,980Viking Fire Protection Inc.
400,427Village Of Anmore
37,483Village of Ashcroft
43,888Village Of Cache Creek
26,095Village of Canal Flats
45,025Village Of Chase
41,239Village of Clinton
50,080Village Of Fraser Lake
31,013Village of Gold River
33,223Village of Harrison Hot Springs
71,370Village of Lions Bay
26,628Village Of Lumby
89,832Village Of Nakusp
240,055Village of Pemberton
69,431Village of Queen Charlotte
79,494Village Of Radium Hot Springs
38,390Village Of Tahsis
454,644Village of Valemount
106,495Vinnie Antao Consulting
7,317,581VIP Powerline Ltd
48,500Virender Malik
152,399ViRTUS Interactive Business
114,722Vision Critical Communications Inc
203,201VisionLink Consulting
119,339Viterra Inc
180
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
34 of 36
45,868Vitrum Industries Ltd
59,455,513Voith Hydro Inc
340,756VVI Construction Ltd
75,264Wainwright Marine Services Ltd.
178,904Wall Centre Central Park
108,971Wall Financial Corporation
97,238Wal-Mart Canada Corp
29,837Waneta Enterprises Ltd
49,726,554Waneta Expansion LP
67,394Wardill Marine Ltd.
108,414Wartsila Canada Inc.
177,534Wasp Consulting Ltd
90,235Waste Connections of Canada Inc
182,563Waste Management of Canada Corp
3,780,022Wastech Services Ltd.
35,050Watershed Watch Salmon Society
28,891Wayne's Janitorial Services
31,765Webtrends Inc
44,731Wee Willy's Woodyshop
30,000Wei Wai Kum
44,556Weidmann Electrical Technology Inc
174,044Weir Canada Inc
65,701Weisberg Law Corporation
1,949,768Wesco Distribution Canada LP
38,716Wesco Industries Ltd.
31,627Wes-Har Asbestos Analysis & Consulting Ltd
25,825West Can Auto Parts
226,417West Coast Helicopters
1,814,541West Coast Installations
347,238West Coast Labour Systems Corp
252,195West Coast Title Search Ltd
55,107West Fraser Concrete Ltd.
27,488,684West Fraser Mills Ltd.
332,716West Moberly First Nations
27,783West Rim Fibre Corp.
495,533Westbank First Nation
28,891Westcana Electric Inc.
40,425Westcoast Cutting & Coring Ltd
6,555,192Westcoast Energy Inc.
4,101,531Western Electricity Coordinating Council
56,961Western Energy Institute
108,684Western Equipment Ltd.
47,714Western Forest Products Inc
63,073Western Gasco Cylinders Ltd
340,011Western Health & Safety
82,712Western Industrial Contractors Ltd.
2,753,831Western Pacific Enterprises Ltd
4,941,913Western Sustainable Power Inc
3,172,150Western Technical Installations
101,363Western Traffic Ltd
366,097Western Tree Services Corp.
81,841Western Water Associates Ltd
385,179Western Wood Services Inc
1,518,312Westgreen Contracting Ltd
174,162Westhaul Services Ltd.
30,000Westhills Land Corp
48,776Westmar Advisors Inc
45,462Weston Foods (Canada) Inc
962,998Westower Communications Ltd.
463,972Westshore Terminals LP
3,863,099Westwood Industrial Electric Ltd
240,609Wewaikai Nation
55,500Whistler Blackcomb Resorts Ltd
46,543Whistler Excavations Ltd.
77,785White Pine Environmental Resources
1,885,181Whitecap Resources Inc
124,392Whiteline Contracting Ltd
59,970Whitevalley Community Resource
363,629Whitewater Composites Ltd
33,040Wide Sky Disposal (1989) Ltd.
181
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
35 of 36
307,415Wil Dunlop Trucking
32,700Wild Coast Productions & Event
126,213Wild Creek Contracting Ltd
94,917Wild North Vac & Steam Ltd
75,893Wildlife Conservation Society
595,447Wildlife Infometrics Inc
169,911Williams & White Machine Inc.
39,750Williams Boot & Glove Dryers Inc
646,271Williams Machinery LP
171,865Williams Telecommunications Corp.
517,499Winchie Creek Hydro Limited
60,843Windward Resources Ltd
98,779Wingenback Inc
40,466Wiser Wire Rope Ltd.
778,089Wismer & Rawlings Electric Ltd.
67,700Wolseley Industrial Canada Inc
43,817,167Wood Canada Limited
25,697Wood Environment & Infrastructure
91,630Wood Mackenzie Inc
99,337Wood 'N' Horse Logging
97,868Woodbridge NW (Deer Lake) Homes Ltd
285,407Woodcore Pole Maintenance Limited
1,695,069Woodfibre LNG Limited
58,445Woodsman Equipment
5,009,258Workers' Compensation Board of BC
384,783Wosks Coffee Service
254,822Wref's Consulting Inc
37,151Wright Machine Works Ltd.
27,419WRS Lower Mainland LP
539,367WSP Canada Group Limited
5,433,952WSP Canada Inc
189,061WSP UK Limited
61,059Wurth Canada
86,468WWL Vehicle Services Canada Ltd
38,900Wyllie & Norrish Rock Engineers
64,799Xaxli'p First Nations
1,801,774Xeitl LP
42,800XXX Motorsports Ltd
772,026YCS Holdings Ltd
106,418Yellow Pages Group
639,023Yellowhead Helicopters Ltd.
349,472YUCWMENLUCWU 2007 LLP
132,578YVR Project Management Ltd
7,264,509ZE Power Engineering Inc
3,321,174Zeballos Lake Hydro Limited
1,486,762Zella Holdings Ltd
12,438,516Zellstoff Celgar Limited
123,283Zenith Appraisal & Land Consulting
5,044,335Zero Emissions Pennask Limited
357,500Zero Emissions Septimus Creek LP
4,926,278Zero Emissions Shinish Creek
155,390Zira Properties Ltd
98,910Zonal Ecosystem and Wildlife
182
Report ID: FI307
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
Page No:Run Date:Run Time:
2019/07/22 1:06:42PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
36 of 36
Consolidated total of other suppliers with payments of $25,000 or less 36,814,749
Total 6,353,491,738
183
BRITISH COLUMBIA HYDRO AND POWER AUTHORITY
STATEMENT OF GRANTS AND CONTRIBUTIONS
Total of payments to suppliers for grants and contributions exceeding $25,000
Consolidated total of grants exceeding $25,000 $ -
Consolidated total of contributions exceeding $25,000 $ 261,808
Consolidated total of all grants and contributions exceeding $25,000 $ 261,808
184
POWEREX CORP.
SCHEDULE OF REMUNERATION AND EXPENSES
STATEMENT OF SEVERANCE AGREEMENTS
During the fiscal year ended March 31, 2019, there were two severance agreements
made between Powerex Corp. and its non-unionized employees. These agreements
represented from three months to seven months compensation.
GENERAL
The schedule of remuneration paid to employees during the year ended March 31, 2019 lists gross remuneration which can include base salary, overtime, timebank payouts, incentive
payments, benefit payouts and other cash payments (e.g., shift premiums).
185
Report ID: FI308
POWEREX CORP.
Run Date:Run Time:
2019/06/17 4:29:17PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
1 of 3
REMUNERATION REMUNERATIONEXPENSES EXPENSES
S 99,561Ahmadi 0
MR 366,611Aitken 20,127
EC 132,357Alcala 2,600
S 122,064Bal 0
TM 884,324Bechard 17,990
M 121,850Benn 18,415
J 234,406Bennett 2,894
R 411,677Beyer 647
P 77,688Boden 1,461
MF 254,420Buchko 436
A 262,433Budhwar 3,914
T 88,110Bui 33
HA 142,137Burgi 4,700
RM 876,822Campbell 11,488
T 161,248Capek 0
DW 114,094Chiu 478
P 104,186Chow 32
JW 114,289Choy 0
JA 126,626Congdon 2,201
TM 203,641Conway 0
EY 139,208Coors 1,171
MR 332,617Corrigan 13,551
KM 145,604Craven 11,122
C 93,607Curson 6,152
M 448,002Dalziel 5,503
K 274,833Desante 12,802
A 366,349Deslauriers 10,810
RR 107,079Dhopade 0
J 298,235Dion 2,911
GP 185,651Dobson-Mack 5,439
GJ 415,257Emslie 2,846
MA 391,676Federspiel 1,366
KD 256,932Ferguson 436
K 153,088Forbes 25
D 426,457Fotiou 6,707
EF 123,115Fowler 9,097
JS 134,181Fu 192
R 303,766Geisthardt 998
JI 149,595Gilhen 5,674
TR 131,323Gillis 0
MJ 489,889Goodenough 24,714
RE 373,050Gosney 943
R 365,691Gosselin 3,243
RT 91,888Hare 336
J 140,299Harms 2,069
DR 262,027Harney 0
DI 163,608Hirsch 1,777
H 125,039Ho 31
M 209,813Ho 17
SK 90,574Ho 0
M 877,304Holman 41,859
L 152,133Hopkins 67
KP 152,983Huckell 0
RS 191,223Hundal 28,768
D 265,935Kaiman 485
P 279,010Kern 916
S 95,563Kim 5,544
AY 116,719Ku 0
F 182,597Lacombe 1,652
J 232,767Lam 4,784
A 97,215Lavrik 3,184
H 97,168Law 0
G 143,904Lee 73
NK 125,724Lee 55
C 135,681Lind 24,088
O 123,947Lo 3,907
AR 127,409Lopez 168
MB 109,364Low 13
186
Report ID: FI308
POWEREX CORP.
Run Date:Run Time:
2019/06/17 4:29:17PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
2 of 3
REMUNERATION REMUNERATIONEXPENSES EXPENSES
R 117,215Low 317
RE 133,726Luke 0
GA 188,352Macdonald 0
MW 254,669Macdougall 20,309
C 113,460Macrae 0
JA 188,477Mantle 3,144
ID 131,413Mathieson 3,540
ML 418,444Mcwilliams 15,847
AN 113,331Meyer 2,161
J 339,250Mikawoz 271
BL 115,593Mo 725
B 177,100Moghadam 27,468
MR 308,821Morgan 267
MT 76,536Mori 0
DA 99,867Mostowa 0
MH 120,055Motani 139
M 115,930Moti 0
JA 252,846Neill 1,807
AG 176,691Newell 1,518
JJ 189,476Norman 1,303
DW 362,328O'Hearn 19,457
DL 129,133Owen 0
CB 304,895Pamplin 3,022
RA 205,424Pavan 456
FJ 90,266Pepper Ii 33
HA 111,392Qazi 0
J 210,826Ratzlaff 8,578
H 94,087Rhee 453
RJ 181,855Richings 7,462
R 214,390Robertson 2,414
E 93,726Rosin 213
DM 322,206Russell 953
MH 128,112Sahagian 78
G 162,754Schwarz 0
K 102,480Shi 0
W 92,885Song 2,099
J 495,437Spires 21,017
L 160,198Stauber 4,034
GM 297,536Tang 466
KM 83,831Thielmann 998
JM 187,971Timmers 1,481
O 198,260Towfigh 1,484
DC 132,184Tse 0
PD 225,678Vaillancourt 2,626
KA 95,521Van Heerden 284
J 93,049Vroom 20
KC 387,878Wagner 606
N 105,703Wein 0
K 78,364Wild 454
KA 98,096Williams 0
J 106,109Yam 0
D 147,931Yeadon 7,715
D 255,612Zavoral 218
RC 91,568Zittlau 9,905
187
Report ID: FI308
POWEREX CORP.
Run Date:Run Time:
2019/06/17 4:29:17PM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
3 of 3
600,513Receiver General for Canada (employer portion of EI and CPP)
27,655,515Total
56,349Consolidated total of other employees with remuneration of $75,000 or less
564,596
2,382,938
REMUNERATION EXPENSES
188
Report ID: FI307
POWEREX CORP.
Page No:Run Date:Run Time:
2019/06/26 9:16:32AM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
1 of 4
2,410,3101672 Holdings Ltd
155,915ABB Enterprise Software Inc
5,461,035Air Resources Board
3,708,899Aitken Creek Gas Storage ULC
7,484,984Alberta Electric System Operator
36,092Alliance Pipeline Limited Partnership
3,505,768AltaGas Ltd
29,230Amerex Brokers LLC
92,964Annesley Financial
56,125Annex Consulting Group Inc.
62,783Ansergy WECC Inc.
37,762Arc'Teryx Equipment
25,666Argus Media, Inc.
240,670Arizona Electric Power Cooperative
1,414,056Arizona Public Service Company
569,615ATCO Energy Solutions Ltd.
5,213,517Avangrid Renewables, LLC
4,174,919Avista Corporation
65,329Basin Electric Power Cooperative
35,496Bay Street Est 1861 Inc
132,463BGC Enviornmental Brokerage
46,962BGC Financial L.P.
150,454Black Hills Power Inc.
211,598Bloomberg Finance LP
117,076,141Bonneville Power Administration
68,829Borden Ladner Gervais LLP
6,680,818BP Canada Energy Group ULC
4,623,673BP Canada Energy Marketing Corp.
925,784BP Energy Company
3,437,085Bracewell LLP
90,000Brady Credit Trading Limited
144,766Brainhunter Systems Ltd.
143,907Brookfield Energy Marketing LP
40,250Burnkit Creative Inc.
35,793,658California Independent System Operator Corporation
2,239,822Calpine Energy Services L.P.
28,539Canadian Electricity Association
344,574Canadian Natural Resources
19,517,147Canbriam Energy Inc.
3,350,789Chevron Canada Resources
64,859Chevron Natural Gas
48,643Chroma Communications Inc.
3,032,466CIMA Energy, LP
572,589Citigroup Energy Inc.
48,303City of Glendale Water & Power
443,374Clatskanie People's Utility District
152,631Cologix Canada, Inc.
2,258,616Compugen Inc
8,268,622ConocoPhillips Canada Marketing & Trading ULC
487,641ConocoPhillips Company
37,763Covington & Burling LLP
555,220Crew Energy Inc.
48,455Customized Energy Solutions Ltd.
293,658Davis Wright Tremaine LLP
112,644Deloitte LLP
30,070Diligent Corporation
120,199Direct Energy Business Marketing, LLC
3,624,055DTE Energy Trading Inc.
4,610,170DTE Gas Company
60,621Eaton Industries (Canada) Company
44,148EDC Associates Ltd
47,292Edelstein Gilbert Robson & Smith LLC
1,130,764EDF Trading North America LLC
381,059El Paso Electric Company
446,373EnCana Marketing (USA) Inc.
130,208Energy and Environmental Economics, Inc.
5,214,419Energy Keepers, Inc.
133,650EOX Holdings LLC
189
Report ID: FI307
POWEREX CORP.
Page No:Run Date:Run Time:
2019/06/26 9:16:32AM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
2 of 4
55,098Equus Energy Group LLC
53,873Etrali North America LLC
2,030,420Eugene Water and Electric Board
470,198Export Development Corp.
491,232FIS Energy Systems Inc.
2,102,133Foothills Pipe Lines Ltd.
71,650Forrester Research Ltd.
13,298,383FortisBC Energy Inc.
1,672,997FortisBC Inc.
1,053,758FTI Consulting Inc.
9,437,711Gas Transmission Northwest LLC
26,621Genscape Inc.
97,913GFI Securities LLC
133,971Goodin MacBride Squeri & Day LLP
32,947Gordon Latham Limited
27,155HelpSystems, LLC
533,023Hodgson King & Marble Ltd
40,236ICE Data Services, Inc.
512,634ICE US OTC Commodity Markets LLC
782,661Idaho Power Company
69,197IGI Resources Inc.
103,670Imperial Parking Canada Corp.
25,088Industrial Information Resources Inc.
32,693Information Systems Architects Inc.
859,246ITIQ Tech Recruiters
57,779J. Aron & Company
46,718John R MacCormack
77,453Kasian Architecture Interior Design
580,257Koch Energy Services, LLC
266,700KPMG LLP
84,357KTHoffman Consulting
490,859Lawson Lundell LLP
530,795Livingston International Inc.
39,826,499Los Angeles Department of Water & Power
1,436,403Macquarie Energy Canada Ltd.
3,925,695Macquarie Energy LLC
261,943Mercuria Commodities Canada Corporation
36,613Microserve, V8205
82,842Microsoft Canada Inc.
523,713Moody's Analytics Inc.
30,345N.R. McCall Environmental & Assn.
97,776,883Natural Gas Exchange Inc.
2,143,797Nevada Power Company
252,871NextEra Energy Marketing, LLC
32,741NJR Energy Services Company
839,396Northwest Pipeline LLC
63,073Northwest Power Pool Corporation
4,402,436NorthWestern Corporation
5,837,415NOVA Gas Transmission Ltd.
87,396Opatrny Consulting Inc.
138,622Open Access Technology Int'l Inc.
4,105,578Pacific Gas and Electric Company
30,883,619PacifiCorp
2,004,330PetroChina International (Canada) Trading Ltd
274,760Pillsbury Winthrop Shaw Pittman LLP
10,283,237Portland General Electric Company
29,146PowerWorld Corporation
524,252Pricewaterhousecoopers LLP
4,012,680Progress Energy Canada Ltd.
197,585,936Province of British Columbia
114,093Public Service Company of Colorado
1,743,906Public Service Company of New Mexico
65,200,807Public Utility District No. 1 of Chelan County
2,057,989Public Utility District No. 1 of Douglas County
2,468,931Public Utility District No. 1 of Klickitat County
4,508,628Public Utility District No. 1 of Snohomish County
1,439,604Public Utility District No. 2 of Grant County
21,905,910Puget Sound Energy Inc.
84,697Ranch Energy Corporation
41,991Ricoh Canada Inc
190
Report ID: FI307
POWEREX CORP.
Page No:Run Date:Run Time:
2019/06/26 9:16:32AM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
3 of 4
42,064Robert Half Finance & Accounting
80,318Rogers Wireless
25,089Ruby Canyon Engineering Inc.
251,453S&P Global Market Intelligence LLC
415,086S&P Global Platts
706,794Sacramento Municipal Utility District
2,561,076Salt River Project
7,990,586Seattle City Light
150,964Sempra Gas & Power Marketing, LLC
857,399Sequent Energy Management LP
44,353Shaw Business
724,157Shell Energy North America (US) L.P.
25,432Sheppard Mullin Richter & Hampton LLP
68,011Si Systems Partnership
92,400Slalom Consulting ULC
4,185,792Southwest Power Pool
65,149Stoel Rives LLP
2,786,107Suncor Energy Marketing Inc.
99,918Tableau Software Inc
1,877,212Tacoma Power
7,462,768Talen Energy Marketing, LLC
102,096TAQA North Ltd.
48,022Teck Metals Ltd.
645,341Teksystems Canada Inc.
292,250Telus Communications Company
536,900TEMS Sayamkwu Limited Partnership
5,764,572Tenaska Marketing Ventures
556,263Tenaska Power Services Co.
69,194TFS Energy Futures, LLC
3,243,060The Energy Authority Inc.
68,562The Toronto-Dominion Bank
1,262,355Tidal Energy Marketing (U.S.) L.L.C.
30,286,304TransAlta Energy Marketing (US) Inc
873,164TransCanada Gas Storage Partnership
7,823,254Transmission Agency of Northern California
2,490,178Tri-State Generation and Transmission Association
1,311,735Tucson Electric Power Company
252,922Tullett Prebon Americas Corp.
167,062Turlock Irrigation District
8,263,136Union Gas Limited
51,753United Energy Trading, LLC
101,954Unity Connected Solutions Inc.
151,375UNS Electric Inc.
44,957Van Houtte Coffee Services Inc.
290,072Vitol Inc.
22,576,972Westcoast Energy Inc
170,755WestConnect Regional Transmission Service
3,364,880Western Area Power Administration
55,500Western Power Trading Forum
39,150WSI Corporation
225,891Yes Energy
44,800ZE Powergroup Inc.
191
Report ID: FI307
POWEREX CORP.
Page No:Run Date:Run Time:
2019/06/26 9:16:32AM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
4 of 4
Consolidated total of other suppliers with payments of $25,000 or less 1,232,954
Total 928,264,622
192
POWERTECH LABS INC.
SCHEDULE OF REMUNERATION AND EXPENSES
STATEMENT OF SEVERANCE AGREEMENTS
During the fiscal year ended March 31, 2019, there were four severance
agreements made between Powertech Labs Inc. and its non-unionized
employees. These agreements represented from 3 months to 6 months of compensation.
GENERAL
The schedule of remuneration paid to employees during the year ended March 31, 2019 lists
gross remuneration which can include base salary, overtime, timebank payouts, incentive payments, benefit payouts and other cash payments (e.g., shift premiums).
193
Report ID: FI308
POWERTECH LABS INC.
Run Date:Run Time:
2019/05/2911:22:57AM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
1 of 3
REMUNERATION REMUNERATIONEXPENSES EXPENSES
E 81,616Abasta 32,222
S 81,143Agraviador 908
P 97,360Allan 100
S 87,274Allen 1,300
Y 99,761An 5,696
W 102,926Anthoine 16,504
S 184,502Arabi 224
G 118,173Balfour 22,471
R 113,095Bazarjani 6,177
K 158,330Bognar 12,239
C 90,837Brandt 4,020
D 157,694Bromley 7,549
L 96,347Cao 11,234
S 115,409Chambers 16,170
B 85,948Chan 8,118
J 153,002Chee 0
G 109,991Chen 23,432
K 118,865Cheong 4,476
S 82,159Cherukupalli 3,741
C 97,254Cindrich 4,114
J 78,053Clark 2,592
L 147,181Connaughton 10,147
M 94,557Crapper 5,270
D 89,309Crockett 75
E 140,118Crozier 14,574
A 157,142Das 14,273
A 97,893Demaeseneer 7,760
G 93,141Dennis 2,795
S 76,969Deonarine 409
B 155,134Derksen 22,137
R 91,434Devita 21,033
G 82,347Ding 21,236
M 103,234Dixon 13,324
M 89,988Du 1,959
J 95,175English 5,935
D 165,150Facey 5,227
Z 194,267Feng 19,798
S 101,117Franzke 567
K 104,244Garandza 154
T 96,096Gordon 0
B 82,268Gourley 1,647
Y 93,008Guo 29
A 112,913Hall 22,783
D 86,734Hansen 3,804
P 99,031Ho 10,225
P 148,354Horacek 10,955
F 188,919Howell 9,189
J 83,874Howell 113
R 102,719Howell 4,765
S 87,826Hunjan 8,474
M 104,883Ibrahim 9,024
M 104,006Jain 7,757
H 83,054Janani 2,126
A 114,063Kahrobaeian 8,542
K 82,387Kainth 21
W 96,611Kang 494
E 82,946Klett 4,079
D 80,836Kung 21
K 79,839Lacy 878
A 81,234Laguador 18,741
J 81,628Lang 1,230
G 76,294Langman 1,951
K 243,773Lee 3,813
H 160,185Li 824
Q 110,737Li 4,168
X 160,135Lin 24,933
R 282,614Lings 27,559
M 81,765Loos 5,535
194
Report ID: FI308
POWERTECH LABS INC.
Run Date:Run Time:
2019/05/2911:22:57AM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
2 of 3
REMUNERATION REMUNERATIONEXPENSES EXPENSES
I 84,976Manzoor 3,989
H 97,856Mayuga 1,480
A 96,066Mcclean 20,330
H 76,153Meng 888
H 81,103Miller 6,953
S 84,761Mills 2,153
A 123,850Moharana 8,011
C 142,487Morton 7,800
M 131,727Nurminen 10,259
P 86,021Obrovac 0
T 95,834Oliver 371
M 78,195Payot 222
C 82,344Pitis 2,519
K 75,706Porter 759
Q 79,673Qu 373
L 79,132Quinlan 1,026
T 138,348Ramnial 6,902
F 92,213Rashidi 55
W 78,453Rigter 0
S 79,459Sandhu 9,858
S 164,437Sasitharan 955
L 96,385Sharpe 2,529
E 83,743Siavashi 5,152
J 84,726Sketchley 1,165
B 107,743Skillings 4,966
T 85,022Smutny 8,243
R 135,263Soltani 14,411
G 124,655Stanciulescu 15,297
G 103,291Stark 2,513
M 121,732Stephens 1,681
H 95,473Sun 16,467
B 150,670Sunga 7,096
T 124,584Szakacs 30,602
S 89,412Tahermaram 4,273
L 129,905Taylor 343
Y 82,696Tian 1,003
M 102,637Treacy 4,391
R 119,860Trip 3,826
R 94,243Urrutia 3,239
J 87,971Vandermaar 4,375
V 172,362Vankayala 24,505
S 106,384Varisco 5,867
X 144,401Wang 8,941
Y 76,648Wang 795
B 109,818Xia 50,587
H 80,464Xu 1,029
F 108,342Yahyaie 16,744
F 81,686Yang 24,719
L 76,841Yang 0
R 163,656Yuen 9,080
P 111,420Zadkhast 24,483
G 116,226Zheng 13,697
X 119,763Zong 49,360
195
Report ID: FI308
POWERTECH LABS INC.
Run Date:Run Time:
2019/05/2911:22:57AM
Page No:Schedule of Remuneration Paid to Employees and Expenses Paid to or on Behalf of Employees During the Year Ended March 31, 2019
3 of 3
813,072Receiver General for Canada (employer portion of EI and CPP)
19,027,219Total
113,477Consolidated total of other employees with remuneration of $75,000 or less
1,103,397
5,813,533
REMUNERATION EXPENSES
196
Report ID: FI307
POWERTECH LABS INC.
Page No:Run Date:Run Time:
2019/06/19 4:10:28PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
1 of 3
368,586A.R. Thomson Group
138,798ABB INC.
205,858ABC Customs Brokers Ltd.
40,819Acklands-Grainger Inc.
121,132Advanced Flow Systems Inc.
198,698Agilent Technologies
61,103Anixter Canada Inc.
35,945Avaral Rao
523,955B.C. Hydro
45,497BigSteelBox Structures
307,415Broadband TelCom Power, Inc.
29,171Canadian Life Science Inc.
59,083Canto Systems, LLC
91,861CARO Analytical Services Ltd.
119,277CDW Canada Inc.
51,730City Of Surrey
211,544Code Electric Products Ltd.
172,634Columbia Valve & Fitting
26,305Daehwa Power Engineering Co., Ltd.
70,604Deloitte Management Services LP
30,057Delta Electronics (Americas) Ltd.
27,548Digi-Key Electronics 349845
36,227Dynalene Inc.
34,627Eagle West Crane & Rigging
110,392Eddyfi NDT Inc.
52,500ELEN-MECH. Consulting Inc.
291,977ESPEC North America Inc.
129,216FedEx Freight
53,351Fluid Mechanics Valve Co
49,574FortisBC-Natural Gas
161,847Foxfab Power Solutions
225,065Fraser Valley Refrigeration Ltd.
36,892Grand & Toy
88,671Ground-It.Com Consulting Ltd.
39,053Hemlock Printers Ltd.
734,431Hexagon Lincoln, LLC
27,589High Pressure Equip. Co
46,914Hoskin Scientific Limited
317,586Hydro-Pac Inc.
27,115Intertek Testing Services
63,138Iris Power LP
133,243IT For Less
311,888John C. Owen
27,763Jorilou Consulting Inc.
32,816Justin Stitches Inc.
159,569Karisma Consulting Inc.
85,460Keysight Technologies Canada Inc.
32,980Lineman's Testing Laboratories of Canada Limited
32,223LineStar Utility Supply Inc.
65,810Luxfer Canada Limited
153,889Luxfer-GTM Technologies, LLC
34,447Manitoba Hydro International Ltd.
37,914Mark's Work Wearhouse
349,104Marsh Canada Limited
336,026McDonald & Ross Const. Ltd.
33,583McMaster-Carr
112,547Miller Instruments Ltd.
168,784Minister of Finance
52,500Mitacs Inc.
207,823Mitsubishi Electric Power
60,115National Instruments Corporation
53,165Noshok Inc.
26,349Novex Couriers
318,176Nunn Electrical Ltd.
76,001P.J. Electronics, Inc.
44,540PCB Freight Management Ltd.
1,245,105Power Pros Electrical Ltd
123,420Praxair Distribution
197
Report ID: FI307
POWERTECH LABS INC.
Page No:Run Date:Run Time:
2019/06/19 4:10:28PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
2 of 3
27,471Proax Technologies Ltd.
28,040QualityLogic, Inc.
88,670Quickbase, Inc.
184,926Raysa Enterprises Inc.
49,140RDH Building Science Inc.
158,073Ridgeline Power Engineering
54,185Rogers
409,438Sentient Energy Inc.
537,162Services Flo
60,094Skystone International LP
58,230South Fork Instruments, Inc.
26,807SRP Control Systems Ltd.
27,398Standards Council Of Canada
56,547Tana Industries Ltd.
53,409Telus
46,971Telus Mobility
174,090Test Equipment Distributors LLC
34,811Thermal Care
187,402Thomco Supply Limited
40,000Transpower New Zealand Ltd.
35,993Travis Pattern and Foundry, Inc.
95,309Trillium PC Network Sol.
50,109Uline Canada Corporation
43,426Underwriters Laboratories
106,454Uptime Industrial Inc.
68,557VWR International Co.
76,321WEH Technologies Inc.
30,779Wescan Calibration
303,613Weslly Renovations
27,682Westburne West
27,750Williams Machinery LP
43,144Wimax Forum
115,447WorkSafeBC
33,087Wosks Coffee Service
49,901ZaGO Manufacturing Inc.
72,870Zimco Instrumentation
198
Report ID: FI307
POWERTECH LABS INC.
Page No:Run Date:Run Time:
2019/06/19 4:10:28PM
Schedule of Payments to Suppliers for Goods and Services During the Year Ended March 31, 2019
3 of 3
Consolidated total of other suppliers with payments of $25,000 or less 3,453,705
Total 16,716,033
199
NOTE
A reconciliation of amounts reported in the Financial Information Act Return and the audited consolidated financial statements has not been prepared. BC Hydro prepares its Financial Statements on an accrual basis while the amounts reported in the Financial Information Act Return are based on cash payments in the year. This will result in timing differences between amounts recorded as expenses in the Financial Statements and amounts paid in the year.
200
British Columbia Hydro and Power Authority
Contact Information
333 Dunsmuir Street
Vancouver, BC
V6B 5R3
Lower Mainland
604 BCHYDRO
(604 224 9376)
Outside Lower Mainland
1 800 BCHYDRO
(1 800 224 9376)
bchydro.com
201