28
Train for RP survey and visual inspection in LHC Workshop on "Remote manipulations / diagnostics in radioactive areas and handling of radioactive material" - 6th May 2013 Bruno FERAL

Bruno FERAL

Embed Size (px)

DESCRIPTION

Train for RP survey and visual inspection in LHC Workshop on "Remote manipulations / diagnostics in radioactive areas and handling of radioactive material" - 6th May 2013. Bruno FERAL. The TIM* 30 x 30: a remote controlled inspection vehicle for LHC tunnel :. Radiation + oxygen measurements - PowerPoint PPT Presentation

Citation preview

Train for RP survey and visual inspection in LHCWorkshop on "Remote manipulations / diagnostics in radioactive

areas and handling of radioactive material" - 6th May 2013

Bruno FERAL

The TIM* 30 x 30: a remote controlled inspection vehicle for LHC tunnel :

• Radiation + oxygen measurements• Visual Inspection with cameras (HD, infrared, etc) • Autonomous: Battery powered• Additional payload on demand

2

30cm

30cm

*TIM: Train Inspection Monorail

5/6/2013B. Feral

Outline

History of the TIM

TIM main characteristics

TIM tests in LHC early 2013

Development of TIM pre-series and series

3 5/6/2013B. Feral

2007 : TIM 1 - First proposal to develop a multipurpose service provider vehicle for LHC.

2008: TIM 2 - survey

2009: TIM 30x30Automatic opening in LHC ventilation door.Control from CCCWagon RP

2010 & 2011: TIM 30x30Tests & development

2012: TIM 30x30 Consolidation project: preparing for pre-series development

History:

Energy wagon

Control / traction wagon

4 5/6/2013B. Feral

Outline

History of the TIM

TIM main characteristics

TIM tests in LHC early 2013

Development of TIM pre-series and series

5 5/6/2013B. Feral

6

TIM 30-30: main characteristics

• Visual Inspection • Radiation + oxygen measurements• Parks in P5 by-pass• Pass from P5 - P2 and from P5 - P8• Max speed 8km/h• Control from CERN Control Centre

5/6/2013B. Feral

7

General view looking upstream (low resolution)

TIM 30-30 visual inspection of DFBM

5/6/2013B. Feral

8

TIM 30-30: main characteristics

• Visual Inspection • Radiation + oxygen measurements• Parks in P5 by-pass• Pass from P5 - P2 and from P5 - P8• Max speed 8km/h• Control from CERN Control Centre

5/6/2013B. Feral

10 5/6/2013B. Feral

RA47 – UJ47 UJ62

LSS5L & Collimator

11

TIM 30-30: main characteristics

• Visual Inspection • Radiation + oxygen measurements• Parks in P5 by-pass• Pass from P5 - P2 and from P5 - P8• Max speed 8km/h• Control from CERN Control Centre

5/6/2013B. Feral

Current situation: 1 train & 1 garage

Point 5 by pass is a natural garage for TIM.

12

TIM

5/6/2013B. Feral

Train1

Train2 Train3

Train4

Proposal: 4 trains & 4 garages:

2 new garages shall be built on each side of point 1. It shall be possible to dismantle them during technical stop or shutdown.

13 5/6/2013B. Feral

14

TIM 30-30: main characteristics

• Visual Inspection • Radiation + oxygen measurements• Parks in P5 by-pass• Pass from P5 - P2 and from P5 - P8• Max speed 8km/h• Control from CERN Control Centre

5/6/2013B. Feral

15

TIM 30-30 CCC operation

5/6/2013B. Feral

16

Communication network

5/6/2013B. Feral

Surface

Tunnel LHC

TIM 30 x 30

Leaky feeder cable installed in the LHC tunnel – Sunrise network

Modem Sunrise network

Modem

(CCC/CCR)

Outline

History of the TIM

TIM main characteristics

TIM tests in LHC early 2013

Development of TIM pre-series and series

17 5/6/2013B. Feral

TIM tests in LHC early 2013

18

Objective : Operate and test TIM in LHC while the machine is in an operational state.

How can we use the time between two fills in LHC ?

Source : Alick McPherson, LMC 138

5/6/2013B. Feral

TIM tests in pictures:

19 5/6/2013B. Feral

Control panel

RP data acquisition

RAMSES

LHC operationfollow up

TIMOperator

20

TIM “mini CCC” in building 927

5/6/2013B. Feral

Results of tests in LHC:

• Basic functionalities for the vehicle confirmed and tested.

• Basic RP survey functionality available and tested.

• TIM was operational for 20 days in LHC.• 12 successful surveys from point 5.• Number of hours of operation: 22 hours and 22

minutes.• Total distance covered during the tests: 48 km.• Time needed to survey a sector : 2 hours and 15

minutes• Almost 100% availability !

Start/End

21 5/6/2013B. Feral

LHC tunnel tests achievements:

Doors NetworkConnectivity

DCUM readings Diagnostics

22 5/6/2013B. Feral

23 5/6/2013B. Feral

5/6/2013B. Feral24

DS R5

ARC

DS L6

Video tunnel

25 5/6/2013B. Feral

Outline

History of the TIM

TIM main characteristics

TIM tests in LHC early 2013

Development of TIM pre-series and series

26 5/6/2013B. Feral

Development of TIM pre-series and series

To provide remote inspections, radiological surveys in the entire LHC tunnel when the machine is not in access mode.

Establish a reliable service that is fully automated and fully integrated in the LHC operational procedures and controls software and contributes to the full exploitation of the physics potential of the LHC.

27

Mission:

5/6/2013B. Feral

Acknowledgments:

RP colleaguesFB colleaguesDoris Forkel-Wirth - DGS/RPCristina Adorisio - DGS/RPLaurette Ponce - BE/OPCathelijne Hazelaar-Bal - EN/HEThijs Wijnands – ENDenis Paulic – EN/HEGuillaume Michet - DGS/RPNadine Conan - DGS/RPKeith Kershaw - EN/HEDaniel Perrin - DGS/RPChristophe Tromel - DGS/RPJean-Louis Grenard – EN/HEThierry Feniet – EN/HEThomas Fabry - EN/HERamviyas Nattanmai Parasuraman – EN/HE

Sven De Man EN/HEEnzo Genuardi – BE/COPaolo GELATO – Online AutomationFrederic Chapron - IT/CSAurelie Pascal - IT/CSStefano Agosta - IT/CSRodrigo Sierra Moral – IT/CSEnrique Blanco Vinuela – EN/ICEDavid Willeman – EN/ICECedric Charrondiere – EN/ICElhc-operators Markus Albert – BE/OPGhislain Roy- BE/OPIngo Ruhel – EN/HENordine Azizi – FP/PISandrine Magnan – FP/PIChristina Lara – FP/PI

28 5/6/2013B. Feral