bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

  • Upload
    others

  • View
    16

  • Download
    2

Embed Size (px)

Citation preview

Page 1: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold
Page 2: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

SafeCleanSmartFairAnywhere

Page 3: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

What do we mean.

Some History

1 - BUNDLE PRODUCT

Page 4: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

A pipeline bundle is a “package of subsea well or step out field development

facilities. Typically pipelines control umbilicals and manifolds.

Page 5: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold
Page 6: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

The Manifold facility is integrated into the tow head

Page 7: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

The Bundle is towed to location using CDTM

Page 8: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

The Long Trek West

1978

1980

Page 9: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Aerial View - Wester Fabrication Facility

Page 10: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

2 - Why CDTM - Fatigue Life

Controlled Depth Towing Method

By controlling the depth at which the bundle is towed, the pipeline system is not subjected to wave and surface current effects. This allows acceptable level of fatigue within the bundle system.

Tow durations of 6 days have been successfully achieved.

Page 11: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Towed Production Systems - CDTM in Practice

A data highway runs the length of the bundle and allows acoustic commands made at one end of the bundle to be implemented at the other, for example for valve actuation or acoustic spool metrology.

Towmaster’s real-time display of bundle shape and water depth.

Page 12: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold
Page 13: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

3 – BASIC ENGINEERING PRINCIPLES

Page 14: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Controlled Depth Tow Method

1000 mmChain attachment strap

76 mm chain

5000 mm

Weight of chain on seabed

• Chains attached at regular intervals along the bundle.

• Ensures accurate weight control to approximately 0.5%.

• Weight of chain links on seabed is submerged weight of bundle.

• Chains can be easily cut by ROV to trim bundle for tow if required.

Page 15: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Anchor Chains

With typically 3” chain, a tow speed of 4 knots produces an uplift force of 50N/m

Page 16: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

4 – EVOLUTION OF THE BUNDLE PRODUCT

Page 17: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

BUNDLE LENGTH

The length of Bundles towed and installed by Subsea 7 is a function of the fabrication site length.

Beach tie in has been performed but not recommended in North Sea.

The site at Wick has been developed from 2km to 8 km. However, the Subsea tie back length is not restricted.

Viz Mobil Skene.

2 off 7.5km bundles with a mid point tie in structure.

Page 18: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

A Bundle may be as simple as a pipe in a pipe, or may contain many lines

Gullfaks 01MCP-01 Bypass bundle - 2.4km pipe-in-pipe

Why consider a Bundle?

Page 19: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

High Levels of Thermal InsulationShell Gannet U=0.75W/m2K

Page 20: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Typical Cross Section

5 - BUNDLE DESIGN

Page 21: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

BASIC PRINCIPLES

Constructability & Economics

Engineering

Service Requirements

Page 22: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Bundle Cross Section

Heat Transfer Low Cof G

Page 23: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold
Page 24: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

6 - BUNDLE C0NSTRUCTION AT WICK

Page 25: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Site Layout

HOLDBACKWINCHCH7800

Seaward

WESTEROFFICE/CANTEEN

FABRICATIONSHOP 2

A99 to WICK

A99 to JOHN O’GROATSPIPE STORAGEAREA 3

TRACK 1

TRACK 2

TRACK 3

TRACK 4

HOLDBACKWINCHCH2600

STORES

FABRICATIONSHOP 1

TRACKCHICANE

A99 BRIDGE

PIPE STORAGEAREA 2

PIPE STORAGEAREA 1

FABRICATIONSHOP 3

LAUNCHWAY

HASTIGROWOFFICE/CANTEEN

TRACKS 1 AND 2

Landward

Page 26: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

• All materials subject to initial inspection

• Identification numbers checked and recorded

• Materials quarantined if required

• Weekly checks on long term storage carried out

• Permanent works are carefully weighed and dimensionally checked

• Information input into PRABOS for resultant buoyancy calculations

Material Handling & Weight Control

Page 27: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Shop Welding

Page 28: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

10 inches Double Jointing at Fabrication Shop

Page 29: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Production Welding

Pipelines are normally 100% Tig welded.

Automatic welding now is Economic & Reliable.

Shop conditions allow welding of exotic material.

13Cr, 22Cr, Inconel lined pipe have been used extensively in Bundles.

Page 30: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Creation of Bundle Cross Section

Page 31: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Pipeline Packaging

Page 32: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

• Fabricated in lengths of 700m to 7.5km

• Configuration to allow attachment of spacers

• Polypropylene and polyurethane field joints

• Low density polyurethane half shells inside sleeve pipe

Configuration & Insulation

Page 33: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Tube & Cable Installation

• Installation of:- Hydraulic Tubes- Chemical Injection Tubes- Power and Signal Cables

• Utilises on site deployment system

• Coated or uncoated

• Various material types

• Final pre-tensioning if required

Page 34: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold
Page 35: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold
Page 36: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Semi automatic and Automatic processes are normally used for carrier pipe welding

Page 37: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold
Page 38: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Inner Bundle assembled showing spacer pitch

Carrier pipe sleeved, ready for closing welds

Page 39: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

7 - T0WHEADS &TRANSPORTATION

Page 40: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Tow HeadsBouyancy Force in shallow water

Page 41: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Tow HeadsIntegrated buoyancy 8 Slot Manifold

Page 42: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Tow HeadsOffloading Tow Head in Wick Harbour

Page 43: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Tow HeadsThere are however designs to avoid

Page 44: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Tow HeadsMud Mats & Detachable Buoyancy

Page 45: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Tow Heads

Integrated buoyancy can be flooded or grouted to create gravity based stability. Obviating piling means control modules can be pre-installed and commissioned on site

Page 46: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Tow Heads

Oil & Gas Development presents challenges!

Page 47: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Tow HeadsPlanning and preparation have allowed this to be performed more than 40 times.

Page 48: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Towhead Delivery/Tie-In

• Large structures by sea to Wick Harbour

• Smaller towheads by road

• Final towhead alignment and bundle tie-in

Page 49: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

8 - BUNDLES LAUNCH

Page 50: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Launch way transition from site to sea

Page 51: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Launch

Page 52: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold
Page 53: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold
Page 54: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold
Page 55: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold
Page 56: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

9 – TYPICAL TOW FLEET

Page 57: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Tow Fleet

Page 58: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

• Currently specialised pipelay vessels have full schedules

• Bundle installation is not tied to a specific vessel

Lead Tug Trail Tug

Guard VesselFlooding\Ballast Vessel

Not Vessel Specific

Page 59: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

10 – SPECIFIC ADVANTAGE of the BUNDLE PIPELINE SYSTEM

Page 60: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Removes need for separate CP of each pipe

Carrier pipe anodes protect the whole pipeline system.

Inside bundle there is a biocide protected oxygen free environment. No coatings, no corrosion.

Within pipe-in-pipe systems, the pipeline material and insulation is in

a dry air environment.

CP design for materials susceptible to damage by CP system e.g. 13% Cr is much simpler with less design risk.

Anode procurement and installation time minimised.

Page 61: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Subsea 7 has experience of a wide range of materials optimised for a wide range of fluids

Subsea 7 has installed bundles with the following pipeline materialsCarbon steel ( HFI and Seamless)22% Cr Duplex stainless steel25%Cr Super duplex Stainless Steels13% Cr Steel316L lined pipes904L Lined pipesAlloy 825 Lined pipesPlastic linersLined pipes offer the cheapest solution to corrosive field conditions, and can be installed by CDTM without risk of internal buckling

Page 62: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

System Fully Commissioned Onshore

Prior to launch, all electrical and hydraulic interfaces can be testedFull Site Integration testing with Christmas tree can be undertakenAll Manifold valves can be installed and tested prior to launchMultiphase Flow Meters can be installed prior to launch if towhead/manifold is not piledHydrotesting is completed onshore with only leak testing required offshoreStructures up to 380 Tonnes have been installed, including SCM’s, Chokes and MFM’s.

Page 63: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

11 – BUNDLE APPLICATIONS

Page 64: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

RISER CAISSON

Page 65: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Chevron Alba Caisson. Obviates the need for heavy lift vessel

Page 66: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold
Page 67: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Kerr Mcgee Leadon Field

No trenching. On botton stability achieved

by flooding the carrier pipe

Infield construction. Schedule very short.

Very narrow pipeline. Corridor suits turret moored FPSO.

Mid point riser structure for both well sites

Page 68: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

12 – S7 BUNDLE INSTALLATIONS

Page 69: bundle presentation sut 2005 · 2006-01-17 · 316L lined pipes 904L Lined pipes Alloy 825 Lined pipes ... Multiphase Flow Meters can be installed prior to launch if towhead/manifold

Åsgard

Heidrun

NorwayNorwayOsprey

Cormorant

Claymore

Frigg East

Murchison

PiperSaltire Thelma

CyrusScapa

Alba

Gannet

Embla

DanDenmarkDenmark

WickWick

GulfaksBruce

ScotlandScotland

BucklandKeith

LeadonSkene

Sycamore

Bundle Locations