23
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 1/23 Symposium on Public Transportation in Indian Cities with Special focus on Bus Rapid Transit (BRT) System New Delhi 20-21 Jan 2010    Bus Rapid Transit Solution Bus Rapid Transit Success Factors - A Reminder - Richard Mejía Daimler Buses Mercedes-Benz 

Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

Embed Size (px)

Citation preview

Page 1: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 1/23

Symposium onPublic

Transportation inIndian Cities withSpecial focus on

Bus Rapid Transit

(BRT) System

New Delhi

20-21 Jan 2010

  

Bus Rapid Transit SolutionBus Rapid Transit Success Factors

- A Reminder - Richard MejíaDaimler Buses

Mercedes-Benz 

Page 2: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 2/23

Content

• Global Trends in Urban Development• Bus Rapid Transit Common System Elements

• Advantages of Bus Rapid Transit Systems• BRT Elements in Praxis• An Urban Catalyst‘s Framework• Visioning: BRT & Land use - Planning for Today andTomorrow• Practical Examples

Page 3: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 3/23

Global trends in urban development

Urban dynamics

Demographic Change: growingand/or ageing urban populations

Urbanization & land use patterns:more megacities and shifting of citycentres

Page 4: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 4/23

Global trends in urban development

Transport needs more and more space

Existing systems becomeobsolete and reach theirlimits in terms of performance

Faster means of transportation

Individualization of Mobility Demands

People want to reachtheir destinationsquicker, safer andmore comfortable

Page 5: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 5/23

What determines urban development?

Ecological, economical and social and safetyissues

Noise pollution

Air pollution

Traffic congestion slowsdown urbandevelopment.Long, expensive

transport routes arecost-prohibitive forpoorer population

Public transport oftenneeds public subsidies

Financing new projectsis often an open issue

Mobility means access to citylife, quality of life, moresocial equality and fairness

The needs of pedestrians andcyclists

Page 6: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 6/23

The starting point

Analysis of the current infrastructure andrequirements

• Where are the traffic sources and destinations?• What is the traffic flow profile?•

What requirements do traffic flows indicate?• Where are the bottlenecks and weaknesses of 

the present system?• Which solutions are available? How is it

accepted and used? Is it cost-efficient?• What kind of demand-analysis studies have

been conducted? Which are still missing?

What should a newsystem offer?

(task definition,objectives)

Page 7: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 7/23

The starting point

Investigating possibilities

Page 8: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 8/23

Bus Rapid Transit

Common System Elements

Page 9: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 9/23

Advantages of BRT

Investment costs

Typical range of BRT system investment:1 to 5.3 million USD per km

Typical range of Underground Metro system investment:45 to 320 million USD per km

Johannesburg example:Cost of Gautrain project (80 kmmetro) would allow construction of 

approx. 1,400 km BRT infrastructure!

Bogotá Example:Two Systems at the same cost

Page 10: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 10/23

Advantages of BRT

External costs

Passenger Car Bus Rail-based PT

10

20

30

40

50

60

70

0

15,6

61,6

21,2

Average external costs caused by passenger traffic[€/1,000 PKM]

BRT: Loweraggregateenvironmentalcosts

BRT: Lowernoise pollutionlevels

Lowercarbondioxideemissionsperperson-kilometre

Page 11: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 11/23

Advantages of BRT

Speed of implementation

BRT

Light Rail

Metro

2-3 years

2-3 years

3-4 years

approx. 1 year

1 2 3 4 5 6 7 8 9 10 11 12

Planning Implementation

4-8 years

at least 3 years

Page 12: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 12/23

Advantages of BRT

Sustainability

High flexibility of BRT Systems:

• Bus routes are more flexible compared to light-rail systems, allowingeasier system expansion or adjustments.

• Once installed, any changes to the rails, tracks and overhead wires of light-rail systems can be extremely costly and time-consuming.

• The lower average lifetime of buses allows timely fleet modernizationand upgrading to more environmental-friendly technologies.

Average vehicle lifetime of mode of transport

Bus 10 – 15 years

Metro 35 – 40 years

Page 13: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 13/23

Bus Rapid Transit

Elements in Praxis

Additional revenuegeneration and costreduction potential

Common elements relevantfor BRT operation

Page 14: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 14/23

Bus Rapid Transit

An Urban Catalyst’s Framework

Page 15: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 15/23

BRT & Land use: Planning for Today and Tomorrow

Innovative Financing & Value Capture 

Page 16: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 16/23

Visioning: How should my city evolve?• Which mayor projects are to be expected in the near

future?• How can I best support projects e.g. with BRT systems?• Model for different scenarios: “How does land use have to

change in order to make corridor X economically feasible?” 

• What are the mayor urban development problems?• Which environmental factors can be expected to change

e.g. in the next 20-50 years?• How will change affect my transport system and land use

patterns?• Which are potential interrelated effects?• How can I adjust or optimize my land use patterns and

public transport system?

Visioning

Integrating Land Use Changes IntoTransport Models

Page 17: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 17/23

Cancun Planning Obstacle:

Modelling was undertaken for status quoand general population increase only.

• Land use changes were not considered.

• Politics focused on most visual corridoronly.

• No cost-benefit analysis was conducted

• Time pressure.

• Conflicting interests: operators andplanning agency vs. decision makers

• Result: lack of trust in BRT plans due tolack of proof of financial feasibility.

Brasilia Planning Obstacle:

•Primary BRT corridor chosen based on

political preferences.

•Corridor runs parallel to under-utilizedmetro.

•No cost-benefit analysis was conducted

•Conflicting interests: planning agency vs.decision makers

•Result: lack of trust in BRT plans due tolack of proof of financial feasibility.

Practical Examples

A single component does grant a BRTsystem’s success. Neglecting one factor in

planning may cause the entire system to fail

Page 18: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 18/23

Practical Examples

Planning Process Cancun, Mexico

Page 19: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 19/23

BRT & Land use: Planning for Today and Tomorrow

Modeling land use changes and impacts ontraffic demand and road network capacities

Page 20: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 20/23

BRT & Land use: Planning for Today and Tomorrow

Modeling station caption areas for reachingas many voters as possible!

Page 21: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 21/23

BRT & Land use: Planning for Today and Tomorrow

Modeling land use changes and impacts ontraffic demand and road network capacities

Passenger car demandchanges in the roadnetwork induced by a

new housing project

Public transport demandchanges in the roadnetwork induced by a

new housing project

Resulting impact on road networkcapacities

Page 22: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 22/23

Traffic and transport planningcompetence from Mercedes-Benz

FIVE STEPS TO BRT

Consultancy regarding:

- Actual traffic situation

- Integrated planning

- Bus corridor and net planning

- Bus stop concepts, transfer stations, bus depots

- Integration of other means of transportation

- ITS, including ticketing solutions

Page 23: Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder

http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 23/23

We support you developing your system!

Thank you!