Author
shashank-mehta
View
217
Download
0
Embed Size (px)
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 1/23
Symposium onPublic
Transportation inIndian Cities withSpecial focus on
Bus Rapid Transit
(BRT) System
New Delhi
20-21 Jan 2010
Bus Rapid Transit SolutionBus Rapid Transit Success Factors
- A Reminder - Richard MejíaDaimler Buses
Mercedes-Benz
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 2/23
Content
• Global Trends in Urban Development• Bus Rapid Transit Common System Elements
• Advantages of Bus Rapid Transit Systems• BRT Elements in Praxis• An Urban Catalyst‘s Framework• Visioning: BRT & Land use - Planning for Today andTomorrow• Practical Examples
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 3/23
Global trends in urban development
Urban dynamics
Demographic Change: growingand/or ageing urban populations
Urbanization & land use patterns:more megacities and shifting of citycentres
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 4/23
Global trends in urban development
Transport needs more and more space
Existing systems becomeobsolete and reach theirlimits in terms of performance
Faster means of transportation
Individualization of Mobility Demands
People want to reachtheir destinationsquicker, safer andmore comfortable
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 5/23
What determines urban development?
Ecological, economical and social and safetyissues
Noise pollution
Air pollution
Traffic congestion slowsdown urbandevelopment.Long, expensive
transport routes arecost-prohibitive forpoorer population
Public transport oftenneeds public subsidies
Financing new projectsis often an open issue
Mobility means access to citylife, quality of life, moresocial equality and fairness
The needs of pedestrians andcyclists
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 6/23
The starting point
Analysis of the current infrastructure andrequirements
• Where are the traffic sources and destinations?• What is the traffic flow profile?•
What requirements do traffic flows indicate?• Where are the bottlenecks and weaknesses of
the present system?• Which solutions are available? How is it
accepted and used? Is it cost-efficient?• What kind of demand-analysis studies have
been conducted? Which are still missing?
What should a newsystem offer?
(task definition,objectives)
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 7/23
The starting point
Investigating possibilities
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 8/23
Bus Rapid Transit
Common System Elements
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 9/23
Advantages of BRT
Investment costs
Typical range of BRT system investment:1 to 5.3 million USD per km
Typical range of Underground Metro system investment:45 to 320 million USD per km
Johannesburg example:Cost of Gautrain project (80 kmmetro) would allow construction of
approx. 1,400 km BRT infrastructure!
Bogotá Example:Two Systems at the same cost
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 10/23
Advantages of BRT
External costs
Passenger Car Bus Rail-based PT
10
20
30
40
50
60
70
0
15,6
61,6
21,2
Average external costs caused by passenger traffic[€/1,000 PKM]
BRT: Loweraggregateenvironmentalcosts
BRT: Lowernoise pollutionlevels
Lowercarbondioxideemissionsperperson-kilometre
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 11/23
Advantages of BRT
Speed of implementation
BRT
Light Rail
Metro
2-3 years
2-3 years
3-4 years
approx. 1 year
1 2 3 4 5 6 7 8 9 10 11 12
Planning Implementation
4-8 years
at least 3 years
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 12/23
Advantages of BRT
Sustainability
High flexibility of BRT Systems:
• Bus routes are more flexible compared to light-rail systems, allowingeasier system expansion or adjustments.
• Once installed, any changes to the rails, tracks and overhead wires of light-rail systems can be extremely costly and time-consuming.
• The lower average lifetime of buses allows timely fleet modernizationand upgrading to more environmental-friendly technologies.
Average vehicle lifetime of mode of transport
Bus 10 – 15 years
Metro 35 – 40 years
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 13/23
Bus Rapid Transit
Elements in Praxis
Additional revenuegeneration and costreduction potential
Common elements relevantfor BRT operation
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 14/23
Bus Rapid Transit
An Urban Catalyst’s Framework
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 15/23
BRT & Land use: Planning for Today and Tomorrow
Innovative Financing & Value Capture
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 16/23
•
Visioning: How should my city evolve?• Which mayor projects are to be expected in the near
future?• How can I best support projects e.g. with BRT systems?• Model for different scenarios: “How does land use have to
change in order to make corridor X economically feasible?”
• What are the mayor urban development problems?• Which environmental factors can be expected to change
e.g. in the next 20-50 years?• How will change affect my transport system and land use
patterns?• Which are potential interrelated effects?• How can I adjust or optimize my land use patterns and
public transport system?
Visioning
Integrating Land Use Changes IntoTransport Models
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 17/23
Cancun Planning Obstacle:
•
Modelling was undertaken for status quoand general population increase only.
• Land use changes were not considered.
• Politics focused on most visual corridoronly.
• No cost-benefit analysis was conducted
• Time pressure.
• Conflicting interests: operators andplanning agency vs. decision makers
• Result: lack of trust in BRT plans due tolack of proof of financial feasibility.
Brasilia Planning Obstacle:
•Primary BRT corridor chosen based on
political preferences.
•Corridor runs parallel to under-utilizedmetro.
•No cost-benefit analysis was conducted
•Conflicting interests: planning agency vs.decision makers
•Result: lack of trust in BRT plans due tolack of proof of financial feasibility.
Practical Examples
A single component does grant a BRTsystem’s success. Neglecting one factor in
planning may cause the entire system to fail
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 18/23
Practical Examples
Planning Process Cancun, Mexico
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 19/23
BRT & Land use: Planning for Today and Tomorrow
Modeling land use changes and impacts ontraffic demand and road network capacities
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 20/23
BRT & Land use: Planning for Today and Tomorrow
Modeling station caption areas for reachingas many voters as possible!
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 21/23
BRT & Land use: Planning for Today and Tomorrow
Modeling land use changes and impacts ontraffic demand and road network capacities
Passenger car demandchanges in the roadnetwork induced by a
new housing project
Public transport demandchanges in the roadnetwork induced by a
new housing project
Resulting impact on road networkcapacities
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 22/23
Traffic and transport planningcompetence from Mercedes-Benz
FIVE STEPS TO BRT
Consultancy regarding:
- Actual traffic situation
- Integrated planning
- Bus corridor and net planning
- Bus stop concepts, transfer stations, bus depots
- Integration of other means of transportation
- ITS, including ticketing solutions
8/3/2019 Bus Rapid Transit Solution-Bus Rapid Transit Success Factors-A Reminder
http://slidepdf.com/reader/full/bus-rapid-transit-solution-bus-rapid-transit-success-factors-a-reminder 23/23
We support you developing your system!
Thank you!