23
Business Planning in SAP BW 3.5 and SAP NetWeaver 2004s – the SEM-BPS transition to BW- BPS Product Management SAP NetWeaver (BI) The information contained herein reflects current planning and may be changed at any time without prior notice

Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

  • Upload
    saanto

  • View
    182

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

Business Planning in SAP BW 3.5 and SAP NetWeaver 2004s –

the SEM-BPS transition to BW-BPS

Product Management SAP NetWeaver (BI)

The information contained herein reflects current planning and may be changed at any time without prior notice

Page 2: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 2

Agenda

Definition of SAP BW-BPS

Product Roadmap

Generic planning in SAP NetWeaver today and tomorrow Overview Future direction of planning in SAP NetWeaver BI

Integration Opportunities with other SAP Planning Applications

Implementation Considerations

Additional Resources

Q&A

Page 3: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 3

Agenda

Definition of SAP BW-BPS

Product Roadmap

Generic planning in SAP NetWeaver today and tomorrow Overview Future direction of planning in SAP NetWeaver BI

Integration Opportunities with other SAP Planning Applications

Implementation Considerations

Additional Resources

Q&A

Page 4: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 4

What Is SAP BW-BPS?

With SAP BW-BPS, SAP delivers tools for generic planning, supporting a planning process that allows for the construction of a planning model. This model integrates global strategic planning and specific operational planning problems in a closed-loop process, with a strong focus on business processes across the enterprise.

This functionality brings planning, budgeting, and forecasting together with monitoring, reporting, and analysis, and bundles it all into one software installation and one support package cycle.

SAP BW-BPS helps you plan, budget, and forecast by providing functions such as:

Top-down planning and bottom-up contribution with a rich set of planning functions

A planning framework that lets you create and maintain planning models A user interface for manual planning and analysis Tools for process control (i.e., status tracking and monitoring)

Page 5: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 5

Agenda

Definition of SAP BW-BPS

Product Roadmap

Generic planning in SAP NetWeaver today and tomorrow Overview Future direction of planning in SAP NetWeaver BI

Integration Opportunities with other SAP Planning Applications

Implementation Considerations

Additional Resources

Q&A

Page 6: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 6

Strategic Enterprise Management as of SEM 3.5/BW 3.1

Business Solution

PerformanceMeasurementPerformanceMeasurement

StakeholderRelationshipManagement

StakeholderRelationshipManagement

BusinessConsolidation

BusinessConsolidation

StrategyManagement

StrategyManagement

BusinessPlanningBusinessPlanning

Contact Management, Stakeholder Service

Legal & Mgmt Cons., GAAP Adjustments,Currency Translation, Inter-unit Eliminations

Profitability Planning,Cost Center Planning,Investment PlanningFinancial Statement Pl.

Strategy Planning

SAP BW OLAP & Analysis

Business Modelling

Data Management

Technology

SEM-SRMSEM-SRM SEM-CPMSEM-CPM SEM-BCSSEM-BCS SEM-BPSSEM-BPS

Page 7: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 7

SAP SEM – SAP BW starting with SAP BW 3.5

Business Solution

StakeholderRelationshipManagement

StakeholderRelationshipManagement

BusinessConsolidation

BusinessConsolidation

StrategyManagement

StrategyManagement

BusinessPlanningBusinessPlanning

Contact Management, Stakeholder Service

Legal & Mgmt Cons., GAAP Adjustments,Currency Translation, Inter-unit Eliminations

Profitability Planning,Cost Center Planning,Investment PlanningFinancial Statement PlExpress Planning.

Strategy Planning

SAP NetWeaver

BW-BPSBW-BPS

Modelling

Generic Planning Framework

Process Coordination

SAP BW OLAP & Analysis

Business Modelling

Data Management

Technology

SEM-SRMSEM-SRM SEM-CPMSEM-CPM SEM-BCSSEM-BCS

PerformanceMeasurementPerformanceMeasurement

Page 8: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 8

Business Planning with SAP NetWeaver – Strategy*

Q1/2004

SAP NetWeaver

2004

SAP NetWeaver2004s

*current as of June 2005

SEM - BPSSEM - BPS

BW-BPS remains functional. Maintenance is ensured by SAP.

BI integrated Planning

BW - BPS

SEM-BPS becomes BW-BPS

Q4/2005

Page 9: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 9

How does SAP secure customer investments in BW-BPS?

Customers will not be forced to migrate. All scenarios created with SAP BW-BPS* will still run, when SAP BI integrated planning was delivered.

SAP BW-BPS will be delivered and maintained with SAP BI releases equal or higher than SAP NetWeaver 2004.

Planning scenarios built with SAP BW-BPS can coexist and integrate with planning scenarios built with SAP BI integrated planning. An InfoCube can be used by BW-BPS and SAP BI integrated planning at the same time.

Apart from this fact, SAP will offer a migration path for the move from SAP BW-BPS to SAP BI integrated planning if needed

No data migration necessary. SAP BI integrated planning can use the same transactional InfoCubes as BW-BPS.

The critical and time consuming part for modeling the planning application (characteristics, key figures, authorizations, locking concept, ...) can be reused in SAP BI integrated planning.

More frontend related objects like planning layouts, web interfaces etc. have to be rebuilt manually

* applies for SAP SEM-BPS, too

Page 10: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 10

Roadmap SAP Business Planning

Integration of master and transactional data

Excel integration Access to plan data

via web Integration to

operational systems via retractors

Process monitoring Reporting and

analysis in SAP BW

SAP SEM-BPS

Q1/04 Q4/2005

Additional features Status and Tracking Monitor

Statistical Forecast Enhancements

for characteristic combinations

Exit Class for customer enhancements in Web Interfaces

Local Functions in Manual Planning

SAP BW-BPS

Web Dynpro based design of planning applications

Application design for integrated planning in BEx Web and Excel

Open service framework

Collaboration features

SAP BW integrated Business Planning

SAP BW-BPS

SAP SEM 3.5/BW3.1 SAP NetWeaver 2004 SAP NetWeaver 2004s > SAP NetWeaver 2004s

Offline Planning Master Data

Planning Planning on ODS

Object ...

SAP BW integrated Business Planning

SAP BW-BPS

Page 11: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 11

Agenda

Definition of SAP BW-BPS

Product Roadmap

Generic planning in SAP NetWeaver today and tomorrow Overview Future direction of planning in SAP NetWeaver BI

SAP‘s strategy in the generic planning area

Integration Opportunities with other SAP Planning Applications

Implementation Considerations

Additional Resources

Q&A

Page 12: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 12

Modeling AutomaticPlanning

Manual Planning/Analysis

Process control

Acceptance of plan data

Plan data entry Excel, Web, ALV

Application Design Planning folders

(GUI) Web Interfaces UI functions Documents Hierarchies in rows

Analysis Analysis in Business

Explorer (Excel + Web)

Flexibility and promptness

Planning functions Simulation/What If Top Down

distribution Bottom up

aggregation Currency translation Formulas Revaluation ... Event-based

execution of planning functions

Coordination of the planning process

Process management Status and

Tracking Monitor Versions

Distribution of data Retractors for write

back of data to SAP R/3

SAP NetWeaver 2004 – SAP BW-BPS

Reliability of plan data

Planning framework InfoCube (transact.):

Integration of master and transaction data

Definition of work packages

Hierarchies Characteristic

combinations Authorizations

Page 13: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 13

SAP NetWeaver 2004 – Extend the reach

More integration

One generic planning tool for all solutions

Simplify system landscape & lower maintenance costs

Component consolidation, one software delivery

SAP NetWeaver 2004s – Combine the best of all worlds

Enhanced user productivity, lower training costs

More flexible and user friendly UI‘s for end users

Web based modelling environment for business expert

Faster implementation & lower maintenance costs

Reduced number of customizing objects (e.g. variables)

Better performance

Reduced data redundancy (e.g. calculated key figures, currency translation)

More flexibility & openness

Alignment with the Enterprise Service Architecture (ESA) strategy

Direction of planning in SAP NetWeaver

Page 14: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 14

Agenda

Definition of SAP BW-BPS

Product Roadmap

Generic planning in SAP NetWeaver today and tomorrow Overview Example from the system Comparison of functionalities

Integration Opportunities with other SAP Planning Applications

Implementation Considerations

Additional Resources

Q&A

Page 15: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 15

Vision: SAP NetWeaver Integrated Business Planning

SAP NetWeaver provides SAP NetWeaver provides integrated planning across integrated planning across heterogeneous business heterogeneous business applications for cross applications for cross functional business functional business planningplanning

mySAP ERP

mySAP ERP

SAP IndustrySolutions

SAP IndustrySolutions

Custom-builtapplicationsCustom-builtapplications

mySAP CRM

mySAP CRM

Legacy

System

Legacy

System SAP ...SAP ...

BusinessBusinessPlanningPlanningin SAP in SAP

NetWeaverNetWeaver BW BW

Page 16: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 16

Planning platform and planning applications

mySAP ...

mySAP CRM

mySAP ERP

SAP delivered business planning applications

SEM & Business Analytics

- Sales and Profitability Planning- Cost Center Planning- Personnel Cost Planning- Investment Planning- Financial Statement Planning- …

Custom-built

planning applications

SAP NetWeaver

Generic Planning Engine

Page 17: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 17

Agenda

Definition of SAP BW-BPS

Product Roadmap

Generic planning in SAP NetWeaver today and tomorrow Overview Example from the system Comparison of functionalities

Integration Opportunities with other SAP Planning Applications

Implementation Considerations

Additional Resources

Q&A

Page 18: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 18

Possible Implementation Scenarios

Implementation 2005Upgrade 2005Implementation 2006

Page 19: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 19

Implementation 2005

Planning only Planning and SEM key capabilities

2005 2005 Install SAP BW 3.5 (incl. BW-BPS)No SEM Add-On necessary

Install SAP BW 3.5 (incl. BW-BPS) Install SEM 4.0

Q1 2006

Upgrade to SAP NetWeaver 2004s (incl. SAP BI integrated planning and BW-BPS)

Upgrade to SAP NetWeaver 2004s (incl. SAP BI integrated planning and BW-BPS)

Upgrade to SEM 6.0

Migration to SAP BI integrated planning with upgrade to SAP NetWeaver 2004s is not a must!

Implemented BW-BPS scenarios still work

Page 20: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 20

Upgrade 2005

Planning only/Planning and other SAP SEM key capabilities

2004

Install SAP SEM 3.5/SAP BW 3.1 (Planning functionality SEM-BPS)

2005

Upgrade to SAP BW 3.5 (Planning functionality BW-BPS)Upgrade to SAP SEM 4.0 Note: Also if you use only the planning capability, you need to upgrade the SEM Add-on.

No migration necessary

2006

Upgrade to SAP Netweaver 2004s (incl. SAP BI integrated planning and BW-BPS)

Upgrade to SEM 6.0Migration to fully SAP BI integrated planning with upgrade to SAP

Netweaver 2004 is not a must! Implemented BW-BPS scenarios still work

Page 21: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 21

Implementation 2006

Planning only Planning and SEM key capabilities

2006 2006

Install SAP Netweaver 2004s (incl. SAP BI integrated planning)

Use SAP BI integrated planning

Install SAP NetWeaver 2004s (incl. SAP BI integrated planning)

Use SAP BI integrated planning Install SEM 6.0 for other SEM key

capabilities

Page 22: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 22

Agenda

Definition of SAP BW-BPS

Product Roadmap

Generic planning in SAP NetWeaver today and tomorrow Overview Example from the system Comparison of functionalities

SAP‘s strategy in the generic planning area

Integration Opportunities with other SAP Planning Applications

Implementation Considerations

Additional Resources

Q&A

Page 23: Business Planning in Sap Bw 3.5 and Sap Netweaver 2004S the Sem Bps Transition to Bw Bps

SAP AG 2005, Transistion SEM-BPS BW-BPS / 23

Resources

Service Marketplace – alias /BW

http://Service.SAP.com/BI

Folder: SAP BW Business Planning and Simulation – presentations, implementation information, how-to guides, product roadmap information, success stories

Licensing: contact [email protected] or your account manager