Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
U3 and H Bars
DESIGN DATA
12
U4
U3
DETAIL OF LIFTING EYE
PLAN
U2
U1
"d"
C
C C
C
C
C
C
Diaphragm (Typ.)
C
C
C
C
PLAN
C
ELEVATION - 0 SKEW ELEVATION - 30 SKEW
C
END VIEW
WITH REINFORCING
CENTERLINE SECTION
(12 - 13 Dia. Strands)
END VIEW
WITH REINFORCING
CENTERLINE SECTION
(14 - 13 Dia. Strands)
CENTERLINE SECTION
(22 - 13 Dia. Strands)
END VIEW
WITH REINFORCING
END VIEW
WITH REINFORCING
CENTERLINE SECTION
(18 - 13 Dia. Strands)
OPERATING
RATING
DEAD LOAD
DEFLECTION
DEAD LOAD DEFLECTION
DIAGRAM
End of U2 Bars End of U4 Bars
CL Brng.
NOTE:
C
CL Brng.
(See End View and L Section)C(See End View and L Section)C
"d" @ L Span
(See Table)
Draped strands, U1, U3, and H bars shall extend 65mm beyond ends
of beam. Straight strands shall be cut flush with ends of beam.
U2 and U4 bars shall be set 50 clear from ends of beam.
C
at L BeamC
Dimensions along L BeamC
End of
Beam
(placed as shown)
L1 BARS #13 x 1060
75 Dia.
(placed as shown)
(placed as shown)
(placed as shown)
(placed as shown)
(placed as shown)
(placed as shown) (placed as shown)
75
12
S1
S2
S1
S2
12
S3
S4
S4
S3
114
279
216
GENERAL NOTES
50 5
0
50 5
0
50
50
50
50
50
50
50
50
50
50
SPECIFICATIONS FOR STEEL STRANDS: Grade 270, 7-wire, uncoated, low
relaxation steel strand shall conform to the requirements of AASHTO M203
(ASTM A-416) and Supplement I.
STRAND: All strands shall be the size and type as shown on the Plans. Initial
load per strand shall be 75% of the breaking strength of the strand for low
relaxation strand.
Painting to be done by fabricator.
SHOP DRAWINGS: The Contractor shall have his Prestressed Concrete Beam
Fabricator furnish the Bridge Engineer, for his approval, two sets of checked shop
drawings. Shop drawings shall show the casting length center to center of
bearings, and the calculated prestress shortening. One copy shall be returned to
the fabricator with any desired corrections indicated. The fabricator shall then
furnish the Bridge Engineer with as many, generally seven, corrected copies of the
shop drawings as may be required for approval and distribution. The approval
of the shop drawings in no way relieves the Contractor or his fabricator of the
responsibility for mistakes on the shop drawings.
SECTION THRU BEAM
HS 46
HS 40
HS 37
HS 37
Angle to Suit Lifting Beam
U3 BARS #13 x 5050
U4 BARS #13 x 4885
U1 BARS #13 x 5025
U2 BARS #13 x 4875
76
76 76
153
152
152
153
152 152
305
457
381
914
TYPICAL DIAPHRAGM SPACING - 30 SKEW
25 cl.
25 cl.
25 cl.
25 cl.
10
0100
10
0100
56
4
56
4
203203203203
30
5
30
5
50
50
65
50 Dia. open hole for diaph. rod.
65
2 H #13 Bars
4 U2 #13
8 S2 #13
8 S1 #13
2 H #13 Bars
13 Dia. Pretensioned Strands
405
2 H Bars #13
L1 Bars in pairs
8 S1 or S3
8 S2 or S4
UL1 Bars #13
2 U Bars #13
L1 Bars in pairs
Bars
@1
27
c/c
=381
8 S1 or S3
8 S2 or S4
@150 c/c
@150 c/c
50 50
@150 c/c
@150 c/c
Bars
@1
27
c/c
=381
3 spcs. @ 50 c/c=150 (L1 #13
@ 150 c/c
@ 127 c/c
@ 150 c/c
8 S2 #13 @ 150 c/c (Bottom of Beam)
50
2 H #13 Bars
3 spcs. @ 50 c/c=150
8 S3 #13
4 U4 #13
8 S4 #13
8 S4 #13 @ 150 c/c (Bottom of Beam)
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
@ 150 c/c
153153153153
65
60
@ 127 c/c
837
2 H #13 Bars
160 13 Dia. Pretensioned Strands
405
12 5
14 9
SPAN
(M)
254
11
4
11
4
114
50
406
S2 BARS #13 x 1066
215
457
12
S4 BARS #13 x 1117
25 cl.
25 cl.
8 S1 or S3
8 S2 or S4
2 H Bars #13
25 cl.
25 cl.
50
10
01
00
10
0100
103 103 103 103 103 103 103 103
51
4
51
4
Bars @
12
7
c/c=
381
Bars @
76
c/c=
12
3
30
5
305
1401674
8 S1 or S3
8 S2 or S4
25
0
250
2400
22
5
810
100
PRESTRESSED CONCRETE BEAMS:
CHAMFER REQUIREMENT: Chamfer all exposed edges of P.C. Beams 19mm unless
otherwise noted.
FORMS & PALLETS: All beams shall be cast in concrete floored pallets and metal
forms.
FINISH: Top of beams to be rough floated. At approximately the time of initial
set, entire top of beam shall be scrubbed transversely with coarse wire brush to
remove all laitance and to produce a roughened surface for bonding slab.
CEMENT: Type I or III Portland Cement may be used for the Prestressed Concrete
Beams.
HANDLING: In the handling of the beams, they must be maintained in an
upright position at all times and must be picked up from the lifting eye
provided at the beam ends. Disregard of this requirement may lead to collapse
of the member.
140
End of Draped Strands, U1 and H Bars
8 S1 #13 @ 150 c/c (Top of Beam)
End of beam
2 U1 #13 Bars
4 U2 #13 Bars
L Beam
Symm. about L 2 U3 #13 Bars
4 U4 #13 Bars
End of Draped Strands,
End of Beam @ L Beam
60
8 S3 #13 @ 150 c/c (Top of Beam)
Symm. about L
L BeamCONCRETE: (10.0m, 12.0m, and 14.0m Spans)
f’c =41 MPa
f’ci =31 MPa
CONCRETE: (16.0m Span)
f’c =55 MPa
f’ci =41 MPa
L Brng. L Brng.
Span Length
(L1 #13 bars in pairs & UL1 Bars #13)
L1 #13 Bars in Pairs & UL1 Bars #13 @ 300 c/c
2 U3 #13 Bars Roughened Surface Symm. about L
Hold Down Point
End of beam at L Beam
Hold Down Point
Roughened Surface Symm. about L2 K1 #13 Bars
bars in pairs & UL1 Bars #13)
L1 #13 Bars in Pairs & UL1 Bars #13 @ 300 c/c
End of beam
End of beam
2 U Bars #13
UL1 Bars #13
4 U
#1
3
2 H Bars #13
4 U
#13
2 U Bars #13
4 U
#13
L1 Bars in pairs
UL1 Bars #13 UL1 Bars #13
L1 Bars in pairs
2 H Bars #13
2 U Bars #13
4 U
#1
3
12
12
12
S1 BARS #13 x 710
S3 BARS #13 x 735
7
25085
UL1 BARS #13 x 640
L Span
L Bridge
Intermediate
Twisted Cable
1999 SPECIFICATIONS
ALL DIMENSIONS ON THIS SHEET IN MILLIMETERS UNLESS OTHERWISE NOTED.
OKLAHOMA DEPT. OF TRANSPORTATION
DATE
COUNTY BRIDGE STANDARD ( METRIC )
APPROVED BY BRIDGE ENGINEER
CB-33M
4875 (10 m Span), 5875 (12 m Span)
6875 (14 m Span), 7875 (16 m Span)
(14 m & 16 m Spans only)
Beam Length = 9750 (10 m Span), 11 750 (12 m Span)
Beam Length = 13 750 (14 m Span), 15 750 (16 m Span)
1000 (10 m Span)
1200 (12 m Span)
1400 (14 m Span)
16.00 (16 m Span)
4855 (10 m Span), 5855 (12 m Span)
6855 (14 m Span), 7855 (16 m Span)
(14 m & 16 m Spans only)
1000 (10 m Span)
1200 (12 m Span)
1400 (14 m Span)
1600 (16 m Span)
10 2
16 14
10 m SPAN 12 m SPAN 14 m SPAN 16 m SPAN
(14 m AND 16 m SPANS ONLY)
1010
01M
Beam Length = 11 710 (10 m Span), 11 710 (12 m Span)
Beam Length = 13 710 (14 m Span), 15 710 (16 m Span)
L End Diaphragm
L End Diaphragm
P.C. BEAM ELEVATIONS AND SECTIONS
TYPE II - 10.2 m RDY.
TREATMENT OF CUT STRANDS: All cut off strands that will be exposed are to
The Prestressed Concrete Beams may be redesigned to use "Debonded" and or
15 mm strands rather than the "Draped" strands shown. The New Design and
Structural Calculations for "Debonded" and or 15 mm strands must be prepared
by and sealed by a Professional Engineer registered in the State of Oklahoma
and submitted to the Bridge Engineer for approval.
If "Debonded" Strands are used the "U" bars shall extend an additional
1200 mm, toward the middle of the span, just past the point of debonding.
2400
FABRICATOR SHALL PROVIDE
REQUIRED DESIGN STRENGTH
be coated with two coats of an approved zinc rich paint (minimum 80 m). m
50 Dia. open hole as required for diaph.rod.
NOTE: 30 Rt. Fwd. Skew shown.
30 Lt. Fwd. Skew by opposite hand.
LOADING: MS 18+1 kPa Future Wearing Surface
PCB4-1