    CA-310 / EC-310 Operating problem

    The stabilization column CA-310 and its reboiler EC-310 failed to achieve the export oil specification (R!and "#$ content% at &0'000 )!* +hereas the, have been desined to process .0'000 )!*/

    se attached setch for better understandin of the installation of CA-310 and EC-310 elevations and findins(elevations are as per site measurement%/

    A. CA-310/EC-310 Operating Findings

    "ere belo+ are the main operatin problems findins2

    hen the flo+ increase to &0'000 )!* throuh the stabilization column' it is not possible to achieve

    the ood temperature profile inside the column b, lac of strippin as/

    hen the reboiler is in operation' ie steam is ettin condensed in the tubes' it is not possible to et

    the proper level in the shell of EC-3102 maximum level obtained is &04 of the shell/ ut +hen thereboiler is off (steam inlet closed% and the oil is in circulation in the column' the level is obtained up tothe +eir in the shell of EC-310/

    To confirm the reboiler +eir heiht and condition the valve on the oil outlet from the +eir chamber (#'

    see setch% has been closed durin fe+ hours/ The oil level in the shell has not increased and nomalfunction of the export pumps +as noticed durin this test/

    *urin normal operation the sin temperature of the #05 pipe from CA-310 to EC-310 is not

    homoeneous2 at 1#h 60C' at 3h 78C and at 6h ..C/ This indicates lo+ flo+ throuh the pipe/

    All above seems to indicate lo+ oil flo+ from CA-310 to EC-310/ 9nspection of CA-310' EC-310 and #05 pipeinternal +as decided to investiate the reason of this lo+ flo+ throuh normal desin oil route/ )il from tra, #8is b,passin EC-310 b, flo+in throuh chimne, to bottom part of column and then export pump/ elo+pictures sho+ oil traces in chimne, and vortex trace on column shell2

    ortex trace on column shell near chimne, )il traces inside chimne,/

  • 8/11/2019 CA-310 & EC-310 Operating problem + Inspection

    2/3

    B. CA-310/EC-310 Inspection, mid-Janar! "00#.

    )n the 10 :anuar, #007 CA-310 and EC-310 +ere shutdo+ns as part of the $*3 of the ;e+ !lant of *orood3 !ro8 mm' +hereas bottom is &88 mm (see setch for details%/This is blocinthe bottom =uarter of the vortex breaer/

    roen clamp bar of seal pan Too lon vortex breaer at ;3

    ". EC-310$The reboiler shell and bundle +ere found clean/There is no defect to report on this vessel' bundle lea test at 18/6 bar +as passed/The tubes of the bundle are ver, close to the oil inlets' as sho+n in belo+ picture b, the steel +ire

    representin the shape of the bundle/ The bundle rail in EC-310 is oil seal on the +hole lenth of the shell/

    $teal +ire at bundle shape undle rail in EC-310

    3. "0-%&-310-00'-B'"3&The #05 pipe bet+een CA-310 and EC-310 has been inspected b, boroscope2 it +as free of an, debris/

  • 8/11/2019 CA-310 & EC-310 Operating problem + Inspection

    3/3

    C. (eslts

    ;o ma