CALCULATION OF IMPERVIOUS COVERAGE PROJECT INFORMATION Date: Address: Applicant’s Printed Name: Applicant’s Signature: ______________________________ Existing Sq. Ft. Addition Sq. Ft. Final Sq. Ft. 1. Building(s) (e.g., house, garage, storage) + = + 2. Parking Lot + = 3. Driveway/Sidewalk/Patios/Carports + = + 4. Swimming Pool/Detention Ponds + = 5. Others + = sq. ft. B Total Area of Lot: sq. ft. C Percentage Impervious area Calculation ( ÷ ) x 100 = % B C NOTE: Refer to Section 5.7 of The City of El Campo Design Manual for the Approval and Acceptance of Infrastructure for Stormwater Requirements. A + + + Total area of impervious cover (A):

CALCULATION OF IMPERVIOUS COVERAGEPROJECT …

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CALCULATION OF IMPERVIOUS COVERAGEPROJECT …

CALCULATION OF IMPERVIOUS COVERAGE

PROJECT INFORMATION Date:

Address:

Applicant’s Printed Name:

Applicant’s Signature: ______________________________ 

Existing Sq. Ft. Addition Sq. Ft. Final Sq. Ft.

1. Building(s) (e.g., house, garage, storage) + = +

2.

Parking Lot

+ =

3.

Driveway/Sidewalk/Patios/Carports

+ = +

4. Swimming Pool/Detention Ponds + =

5. Others + =

sq. ft.

B Total Area of Lot: sq. ft.

C Percentage Impervious area Calculation

( ÷ )x 100 = %B C

NOTE: Refer to Section 5.7 of The City of El Campo Design Manual for the Approval and Acceptance of Infrastructure for Stormwater Requirements.

A

+

+

+

Total area of impervious cover (A):