CAMBI è...
Leader mondiale nella tecnologia di idrolisi termica per la
digestione avanzata di fanghi e frazioni organiche
Più di 60 impianti in 21 Nazioni
Circa 100 Milioni di Abitanti Equivalenti serviti
Sede Operativa mercato Sud Europa: Casteggio (PV)
CAMBI SERVE UNA POPOLAZIONE MAGGIORE DI
100 MILIONI A.E. IN TUTTO IL MONDO
SEOUL – DUBLINO – OSLO – BRUSSELS – ATENE
SANTIAGO DEL CILE – EDINBURGO – CARDIFF – E 20+ ALTRE CITTA’
PECHINO
LONDRA
WASHINGTON DC
SINGAPORE
CambiTHP® IN UK
CambiTHP® tratta
>30% fango
prodotto in UK.
Minworth STW, Birmingham (2016), Cambi 3 x B6-4, Severn Trent Water
Basingstoke (2016), Cambi 1 x B6-4, Thames Water
CAMBI SIGNIFICANTLY REDUCES CARBON FOOTPRINT
”… installation of
anaerobic digestion
… significantly
reduces carbon foot
print, especially if
dewaterability is
improved” (Auty and
Blake, 2008, Barber,
2009)
“… [The] thermal
hydrolysis
pretreatment
system at …
Davyhulme … will
reduce [United
Utilities’] carbon
footprint by 8% - the
equivalent of
removing 270,000 cars
off the road for 30
years.”, March-April
2009, Worldwater
BASIC SLUDGE STRATEGIES - WORLDWIDE
Digested cake is at the road fork of strategic planning of biosolids
Capital and operating costs based on tonne of water evaporation or transport
Drying makes no sense for agriculture at most transport
costs –only if agriculture is not available or too expensive
Digested cake to agriculture based on stackable stable low
volume product – it’s a transport business – is pasteurised
product needed?
Digested cake
Class A
No agriculture
Drying
1MWh/tWE
Drying size based on dewatering/cake
volume
Gasification /
Pyrolisis
Incineration
2MWh/tWE
Autothermic cake is
preferred ~35% DS
Agriculture
Lowest cost option
Cost/t transport
Recycling of nutrients
CAMBI XXL: DAVYHULME, UK, 91,000 t DS/year (1000 MLD)
Cambi THP
B12-4x5 reactors
8 x 7500 m3
digesters
CAMBI Advanced digestion:
Class A Cambi Cake to agriculture and incineration back-up
Increaseas capacity at existing incinerator by 14,000 tonnes dry solids/year (avoided new
incinerator)
60% VS reduction, 2.5 times more sludge through existing digesters
10 MW green electricity generation (gas engines), and steam to Cambi
Raw sludge cake
import
CAMBI THP AT BLUE PLAINS WWTP (390 MGD, 1400 MLD, 4
MILLION P.E.) WASHINGTON DC, 400 DRY TONS PER DAY.
174,000m3 designed originally 4 digesters, = 58,100 m3 (1/3 of traditional)
Saved $200 million CAPEX vs traditional
Saved >$20 mill in OPEX/year
PLANNED TRADITIONAL DESIGN CAMBI SOLUTION
NEW SOLUTION
CANCELLED TRADITIONAL DESIGN CAMBI PROCESS
CAMBI THP AT BLUE PLAINS WWTP (1400 MLD, 4 MILLION P.E.)
WASHINGTON DC, 400 DRY TONS PER DAY.
• 14 weeks from 0 to 330 dry tons per day
• Feeding 4 digesters
• Operating 24/7 fully automatic
• > 60% VSR
• Each train ran 14 days exceeding max
capacity rating
• ½ biosolids leaving site. 30-32% DS
Program Benefits with CambiTHP
advanced digestion at DC Water
Reduce biosolids quantities by more than 50%
Improve product quality (Class A and more)
Generate 13 MW of clean, renewable power
from the CHP
Cut GHG emissions by ~57,000 tonnes/yr
Save millions of dollars annually
Reinventing Biosolids
17