No Project Name 1 Essar Power Jharkhand Ltd

CCEA Projects

  • Upload
    qasy19

  • View
    208

  • Download
    7

Embed Size (px)

DESCRIPTION

Details regarding CCEA Projects for power & infra

Citation preview

Sheet1NoProject NameMinistry-DepartmentDescription Of ProjectEstimated Investment(in Crores)1Essar Power Jharkhand LtdPower Essar Power Jharkhand Limited (EPJL) is implementing an 1800 MW coal based power project in Latehar, Jharkhand. Phase I (1200 MW) of the project is expected to be commissioned in 2014-15 based on coal sourced from the Chakla mine whereas Phase II of 600 MW is based on Ashok Karkata coal mine. The company has signed PPAs to the tune of 750 MW net for phase I with BSEB, 12% of power generated under variable cost regulated tariff with Govt of Jharkhand and 240 MW with Noida Power Company Ltd from Phase II. The company is also obligated to supply RoFR power worth 13% of installed capacity from Phase I and II to Govt of Jharkhand under regulated tariff.97002Gupta Energy P Ltd Thermal Power project 660 MWPower Gupta Energy Pvt is implementing Thermal Power project 660 MW in Two Phases. The First phase 120(2x60)MW is in operation since may 2012. However the coal linkage for Ist phase yet not been allotted even as we had applied in May 2006. Therfore the plant has resorted shut down for want of linkage fuel. The second Pahse 540MW (2x270) is under implementation for which all clearances are obtained however, MoEF has imposed Temporary moratorium in District Chandrapur of Maharashtra State, therefore MoEF has not yet granted Environment Celarance.39553Angul Sambalpur Toll Road projectRoad Transport and Highways Abhijeet Roads Limited Abhijeet Angul Sambalpur Toll Road Ltd.1220.324Cuttack Angul Tollway ProjectRoad Transport and Highways Ashoka Buildcon Ashoka Cuttack Angul Tollway Ltd. MOEF Clearance already obtained.1123.695Koderma-Ranchi new line projectRailways Construction of 189Km long Koderma-hazaribagh-Barkakana-Ranchi new line on cost sharing basis with Govt. of Jharkhand. Project is important for coal evacuation also.2957.216Tori-Shivpur-Kathutia new line projectRailways Construction of Shivpur-Tori-Kathutia new line which is critical for evacuation of coal during XII plan.234570.4 MTPA DRI Plant + 30 MW Power Plant of Corporate Ispat Alloys LimitedSteel This is the Phase-I of integrated steel Project.In Phase-I 0.4 MTPA DRI Plant and 30 MW Power Plant with an investment of Rs.595 Cr is already commissioned. The associated coal mining project with an investment of Rs.885 Cr & the 0.4 MTPA Expansion (Phase-II) with an investment of Rs.700 Cr are under implementation.The total cost of the Phase-I+Phase-II+ Mines is Rs.2179.39 Cr. The 0.4 MTPA DRI Plant is currently under shut down due to delay in Working Capital disbursement.The financial closure of DRI & Power Project was achieved on 31-03-2010.2179.398Butibori Power ProjectPower 2 X 300 MW Butibori coal based power project under implementation by Vidarbha Industries Power Limited VIPL a wholly owned subsidiary of Reliance Power Limited is located at Butibori MIDC Industrial Area in Nagpur district of Maharashtra. Long term PPA for 600 MW capacity from both the units of the Power Station has been approved by Maharashtra State Electricity Regulatory Commission for supply of power to Reliance Infrastructure Limited - Mumbai Distribution commencing from 1st April 2014. Ministry of Coal has already approved coal linkage from WCL for both the units with LOA quantity of 1.234 MTPA and 1.1108 MTPA for Unit 1 and Unit 2 respectively. Signing of FSAs is being followed up with CIL / WCL.420092000MW coal based Expansion Project at SUMPP site-Sasan Power LimitedPower The 2000 MW coal based thermal power project is being developed by a Group Company of Reliance Power Limited. The project is located adjacent to Sasan UMPP site in the State of Madhya Pradesh and is being implemented by a wholly owned subsidiary of Reliance Power Limited i.e. Sasan Power Limited. The project would employ super critical technology.1300010Tilaiya Ultra Mega Power ProjectPower Jharkhand Integrated Power limited, a Special Purpose Vehicle (SPV) and a wholly owned subsidiary of Reliance Power is implementing 4000 MW Tilaiya Ultra Mega Power Project (TUMPP) based on Super Critical Technology at Tilaiya Village, Hazaribagh District, Jharkhand. Tilaiya UMPP is fourth in the series of nine UMPPs of 4000 MW capacity each at coal mine pit-head and coastal locations across the country. These projects are being developed under the UMPP policy of Govt. of India. The project was awarded through the International Competitive Bidding (ICB) Process based on lowest levelised tariff for 25 Years. The entire Capacity from the Project has been contracted to 18 distribution companies across 10 States for a term of 25 years. Ministry of Coal, Govt of India, has allocated Kerendari BC coal mines for TUMPP. The project is in development phase land and acquisition is in progress.4000011Jhabua Power Limited Phase-1 1x600 MWPower 1x600 MW Coal based Thermal Power Plant being implemented in Villages Barela, Gorakhpur, Tehsil Ghansore, District Seoni, Madhya Pradesh State355012Korba West Power Company Limited Phase-1 1x600MWPower 1x600 MW Coal Based Thermal Power Project being implemented in Villages Bade Bhandar, Chhote Bhandar, Sarvani, Amli Bhouna, Tehsil Pussor, District Raigarh, Chhattisgarh State3850131x800MW Extn Uni-8 Wanakbori TPSPower 800MW SUPERCRITICAL COAL BASED THERMAL POWER PLANT TO BE IMPLEMENTED BY GUJARAT STATE ELECTRICITY CORPORATION LTD. AT Wanakbori near Sevalia Dist Kheda400014Sasan Ultra Mega Power Project (SUMPP)Power 3,960 MW Sasan UMPP is the largest integrated power plant with captive coal mines. It is also the countrys first domestic coal based Ultra Mega Power Project (UMPP) and will benefit around 35 crore people in seven states procuring power from the Project. The project is based on supercritical technology which is more efficient and environment friendly. The project will supply power at lowest levelized tariff of Rs 1.196/kwh for PPA tenure of 25 years, thereby contributing significantly to economic development in the country Construction of the project is in very advance stage. Power generation from the first unit (660 MW) of the Project commenced in March 2013. Construction of remaining five Units is also progressing fast. Sasan UMPP has achieved financial closure and tied up long term loan facilities with Indian as well as foreign banks / financial institutions to finance the project on limited recourse basis. The project is largest recipient of foreign currency loan f2500015Samalkot Power LimitedPower Samalkot Power Limited (SPL) is implementing a 2,400 MW, combined cycle gas-based thermal power plant at Industrial Development Area of Peddapuram, Samalkot Mandal, East Godavari District, Andhra Pradesh, India. Reliance Infrastructure is the EPC Contractor for the Project. It has tied up with reputed Original Equipment Manufacturers (OEM) such as General Electric, USA (for Gas Turbines, Steam Turbines & Generators), CMI-EPTI, USA (for Heat Recovery Steam Generator), Hamon, Belgium (for Cooling Towers), Hyundai Heavy Industries (for transformers) and Xian Electric (for Gas Insulated Switchyard). The Samalkot Project requires about 9.6 million standard cubic meters per day (mmscmd) of Natural gas. The Project was conceived based on supply of gas from the KGD6 block in Krishna Godavari basin. SPL entered into Bulk Power Transmission Agreement (BPTA) with Power Grid Corporation of India Ltd. (PGCIL). As per the BPTA, the EPC contractor (Reliance Infrastructure) would construct10000S.NoProject NameMinistry-DepartmentDescription Of ProjectEstimated Investment(in Crores)16GreenField Cement Manufacturing Plant-Dalmia Cement Bharat Ltd,Commerce and Industry-DIPPGreenField Cement Manufacturing Plant-Dalmia Cement Bharat Ltd, Project Cost Rs 1500, for establishing Green Field Cement Manufacturing plant of 4MTPA Capacity in Dist. Gulbarga, Karnataka with captive limestone mine.150017GreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for establishing Green Field Cement Manufacturing Plant of 4 MTPA Capacity in Satna, District of Madhya PradeshCommerce and Industry-DIPPGreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for establishing Green Field Cement Manufacturing Plant of 4 MTPA Capacity in Satna, District of Madhya Pradesh with captive mines.150018GreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for establishing Green Field Cement Manufacturing plant of 4 MTPA Capacity in Chittorgarh, District of RajasthanCommerce and Industry-DIPPGreenField Cement Manufacturing Plant- Dalmia Cement Bharat Ltd for establishing Green Field Cement Manufacturing plant of 4 MTPA Capacity in Chittorgarh, District of Rajasthan with Captive Mine.150019VISA Steel LtdSteel VISA Steel Ltd. is a MoU signed project with Govt.of Odisha for an approved capacity of 1 MTPA ISP. VSL is a completely integrated Steel plant with Blast Furnace, DRI Plant, Ferro Chrome Plant,Coke Oven, SMS,Rolling Mill & CPP. VSL has commenced commercial production since 2005.3200200.4 MTPA DRI Project with 60 MW Power Plant of Abhijeet Infrastructure LimitedSteel AIL is installing0.4 MTPA DRI Plant and 60 MW Power plant in Dist. Saraikela - Kharsawan,Jharkhand. The project has achieved financial closure in April 2011. Initial Project cost was Rs 846.33 Cr which was funded by a consortium of nine banks. Due to cost over run and delay in project execution the revised project cost is estimated to be Rs. 1050 Cr. The main reason of delay has been due to slow disbursement by lenders.105021Dell International Services Business Process ServicesCommerce and Industry - CommerceDell International Services India Private Limited has been granted approval as a Co-Developer for providing infrastructure facilities in the IT/ITES Special Economic Zone of M/s. Coimbatore Hitech Infrastructures Private Limited at Keeranatham Village, Coimbatore North Taluk, Coimbatore, vide your letter No.F.2/110/2005-EPZ dated 12th October, 2007. The construction of Phase I has been completed and most of the permissions have been received. We have also issued appointment letters to many students, however, the joining dates have been moved as we have not received the Consent To Operate (CTO) from the Tamil Nadu Pollution Control Board (TNPCB). All inspections have been completed and the file is ready to be approved. As a result, this has caused considerable delay in our business activities and has consequently affected Dells planned business expansion in India and impacted our Global plans. Therefore, we kindly request your urgent intervention to sort this issue with the Sta100022Farakka Raiganj Highways LtdRoad Transport and Highways Four-laning of Farakka - Raiganj section of NH34 from Km 295.000 to Km 398.000 in the State of West Bengal under NHDP Phase-III on Design, Build, Finance, Operate and Transfer (DBFOT) Toll Basis. Package No - NHDP-III/BOT/WB/041078.5423Meenakshi Energy Private LimitedPower Development, implementation and operation of a 1000 MW coal based power project in Nellore district in two phases- Phase-I-Already Operational capacity of 300 MW, Lead Lender-State Bank of India,and Phase-II-Under construction capacity of 700 MW. Financial Closure Achieved. Lead Lender-Rural Electrification Corporation540024Essar Steel India Ltd - Vizag ComplexSteel Exisiting facilities - 8 Million tonnes per annum Pellet Plant at Vizag - Andhra Pradesh, 8 Million tones per annum Beneficiation plant at Kirandul - Chhattisgarh, 267 Kms slurry pipeline connecting Pellet Plant to Beneficiation plant. (Rs. 3600 Crores)- To be implemented - Second pipeline connecting Beneficiation plant to Pellet Plant - 463 Kms. (Rs. 1550 Crores)515025Essar Steel India Ltd - Hazira, GujaratSteel Integrated Steel plant in Gujarat comprising of Iron &steel mills, associated downstream facilities, including a cold rolling mill, a galvanising facility, an extra-wide plate mill and a pipe mill. Employment Direct & Indirect 30,000.37500261.2 MTPA Beneficiation & Pelletisation Plant of Abhijeet Integrated Steel Limited (AISL).Steel The company is setting up 1.2 MTPA Beneficiation and Pelletisation plant at Saraikela-kharsawan, Jharkhand. The project is in progress and financial closure has already been achieved and construction of the Plant has been started. The project cost is Rs 987 cr and has been funded by a consortium of 7 banks.100027Tori-Shivpur -Kathautia New BG Rail LineCoal Tori-Shivpur -Kathautia New BG Rail Line (93 Kms) This is a critical evacuation line for enhancing production from the various projects of North Karanpura Coalfields of CCL, Jharkhand.234528Bhupdevpur-Korichapar-DharamjaigarhCoal Bhupdevpur-Korichapar-Dharamjaigarh (180 Kms) This is a critical evacuation line for enhancing production from the various projects of Mand-Raigarh Coalfields of SECL, Chhatisgarh.250029JSPL Patratu Steel ProjectSteel 6 Million Tons per annum integrated steel Plant with 1320 MW CPP 1 Million ton per year capacity Bar Mill and 0.6 Million ton per year capacity wire rod mill are already under production.3736730Jharsuguda- Barpalli-Sardega Railway LineCoal Jharsuguda- Barpalli-Sardega Railway Line (53 Kms) This is a critical evacuation line for enhancing production from the various projects of Ib valley coalfields of MCL, Odisha.700

31JSPL Angul Steel ProjectSteel 6 Milion Ton per annnum Steel Plant with 1142 MW CPP in two Phases2928532LNG Terminal at MundraPetroleum and Natural Gas LNG Terminal of 5 MMTPA capacity, with provision of expansion to 10 MMTPA, at Mundra in Gujarat. The LNG terminal shall meet the growing demand of natural gas in the country. The Phase 1 capacity of 5 MMTPA shall supply approx 18 MMSCMD of natural gas520033OPGS POWER GUJARAT PRIVATE LIMITEDPower 2X150 MW COAL FIRED POWER STATION AT BHADRESHWAR VILLAGE, KUTCH DISTRICT, GUJARAT. 100 per cent FDI PROJECT, PROMOTED BY OPG POWER VENTURES PLC., UK, A PUBLIC COMPANY LISTED ON LONDON STOCK EXCHANGE. PROJECT BEING SET UP UNDER GROUP CAPTIVE SCHEME OF MINISTRY OF POWER, GOVT. OF INDIA, THUS CONTRIBUTING TO INDIAs INDUSTRIAL AND ECONOMIC GROWTH. HIGHLY ENVIRONMENT FRIENDLY PROJECT, BASED ON AIR COOLED TECHNOLOGY, THUS USING 98 per cent LESSER WATER THAN CONVETIONAL WATER COOLED PROJECT. ENVIRONMENTAL CLEARANCE RECEIVED. BOILER, TURBINE SUPPLY AND ERECTION BY BHEL - BHARAT HEAVY ELECTRICALS LTD CONSTRUCTION IN FULL-SWING - 85 per cent OF CIVIL WORKS AND FOUNDATIONS COMPLETED, 60 per cent OF CHIMNEY AND BOILER RELATED CONSTRUCTION COMPLETED.163834Indiabulls Multi Product SEZCommerce and Industry - CommerceIndiabulls SEZ is a Multi-Product SEZ which is being developed over a notified Industrial Area of 1011.264 Ha at Sinnar in Nashik, Maharashtra. The Land has been leased from Maharashtra Industrial Development Corporation for a period of 95 years. The SEZ is proposed to have Manufacturing Industries from the sectors like Auto and Auto Ancillary, Aviation and Ancillary, Pharmaceuticals(Formulations), Light Engineering and Electronics and Electrical.14650351320 MW IPP of Jas Infrastructure & Power Limited, BankaPower The Company is implementing its 2 x 660 MW coal based Super Critical Power Project near Banka in Bihar. The BTG Order has been placed on DECL, China. The Project has achieved Financial Closure in March 2012 . Overall progress of 28 percent has already been achieved. The project is stalled due to non disbursement. Land has been acquired. All necessary clearances and approvals are in place. Financial Closure achieved. EPC Contract awarded.740036300 MW Kaizen Power LimitedPower The company is setting up 1X 300 MW power project, primarily to meet the power requirement of its Ferro Alloy plant. The power plant is being set up in SEZ developed by APIIC at Achutapuram in Vizag district. The project has achieved financial closure in Dec 2012164437540 MW Phase 1 IPP of Corporate Power LimitedPower The company is in advance stage of commissioning the 2 X 270 MW (phase 1) coal based power project near Chandwa, Jharkhand. About 95% of the work has been completed. Hydro Testing of Boiler has been completed.466038Haridaspur - Paradip Rail Link-Rail Connectivity Project for Paradip PortShipping Haridaspur - Paradip Rail Link-Rail Connectivity Project for Paradip Port118639Providing rail connectivity to the existing Tuna Creek -Rail Connectivity Project for Kandla PortShipping Providing rail connectivity to the existing Tuna Creek-Rail Connectivity Project for Kandla Port9440Dedicated freight link from Wadala to Kurla-Rail Connectivity Project for Mumbai PortShipping Dedicated freight link from Wadala to Kurla-Rail Connectivity Project for Mumbai Port17741Four lane road connectivity to NH17-Road Connectivity Project for Mormugoa PortShipping Four lane road connectivity to NH17-Road Connectivity Project for Mormugoa Port145424 lane NH Connectivity to ICTT, Vallarpadam Road Connectivity Project for Cochin Port.Shipping 4 lane NH Connectivity to ICTT, Vallarpadam- Road Connectivity Project for Cochin Port.91443Ennore Manali Expressway (EMRIP)-Road Connectivity Project for Chennai and Ennore PortsShipping Ennore Manali Expressway (EMRIP- Road Connectivity Project for Chennai and Ennore Ports.60044Elevated four lane link road from Chennai Port and NH4 at MaduravoyalShipping Elevated four lane link road from Chennai Port and NH4 at Maduravoyal165545Essar Steel India Ltd - Odisha ComplexSteel Integrated Steel Plant of 6.0 MTPA at Paradeep,Beneficiation Plant at Dabuna (10.7 MTPA),Slurry Pipeline from Dabuna to Paradeep (253 km , on ROW), Pellet Plant at Paradeep (12 MTPA)2258746Essar Steel India Ltd - Odisha ComplexSteel Integrated Steel Plant of 6.0 MTPA at Paradeep, Beneficiation Plant at Dabuna (10.7 MTPA), Slurry Pipeline from Dabuna to Paradeep (253 km , on ROW), Pellet Plant at Paradeep (12 MTPA)2258747Lenzing Modi Fibers India Private LimitedTextiles Lenzing Modi Fibers India Private Ltd. LMI is introducing in India, State of the Art Technology, to manufacture Viscose Fibres. Viscose Fibers is presently being imported by Textile Industries. Viscose Fiber is more absorbent than Cotton. The demand for Viscose is projected at 1 million TPA by 2020, where as production is only 3, 30,000 TPA. Renowned Modi group has signed collaboration, technical, financial and management agreements with Lenzing AG Austria in September 2008. Lenzing is world largest producer of viscose fibers, having plants in Austria, UK,USA, Indonesia and China. The LMI project is on the anvil since 2008. LMI acquired MIDC 90 acres land at Adl. Patalganga, Taluka Panvel, District Raigad, Declared as Industrial and Chemical Zone to manufacture 80,000 TPA viscose fiber plant. Government of Maharashtra has declared the Project as Mega. Maharashtra Pollution Control Board has granted Consent to Establish on October 1, 2005 & revised approval dated July 24,2012128548Kanika SidingCoal Kanika Siding Single Spur2049Rly. Line Jharsuguda to BansudharaCoal Mahanadi coalfields Limited Rly. Line Jharsuguda to Bansudhara (52.4 Km double line)107250Nataraj(U/G) MineCoal Nataraj(U/G) Mine (0.64 Mty)92.1151Hingula OCPCoal Hingula OCP (15 MTY) of Mahanadi Coalfields Limited.653.5552MJSJ Coal GopalprasadCoal MJSJ Coal Gopalprasad (15 Mty)395.8753MNH Shakti Talabira OCPCoal MNH Shakti Talabira OCP (20 Mty)447.7254Kaniha OCPCoal Kaniha OCP (10 Mty)457.7755Ananta Extn. OCPCoal Ananta Extn. OCP (15 Mty)446.6456Bharatpur OCPCoal Bharatpur OCP (20 Mty)434.2557Garjanbahal OCPCoal Garjanbahal OCP (10.00 Mty) MAHANADI COALFIELDS LIMITED466.3158Orient(U/G) 4Coal Orient(U/G) 4 THE COMBINED COST OF ORIENT (U/G) 1&2, 3, HRC AND ORIENT (U/G) 4 MAHANADI COALFIELDS LIMITED20359Orient(U/G) 1&2,3 &HRCCoal Orient(U/G) 1&2,3 &HRC The cost includes the cost of Orient (U/G 4) MAHANADI COALFIELDS LIMITED20360Lajkura OCPCoal Lajkura OCP (2.50 Mty)82.25

61Samaleswari OCPCoal Samaleswari OCP (12 Mty)284.6962Belpahar OCPCoal Belpahar OCP (8 Mty)181.18632X600 MW Stage II - Tamnar Power PlantPower 2X600 MW Stage II pit-head Coal-Based Thermal Power Plant at Tamnar, Dist Raigarh, Chhattisgarh630064Ideal Energy Projects LimitedPower 1.Installed capacity - 1 x 270 MW. 2.Coal Requirement - 1.3 MMT per year per Unit. 3.Water Requirement - 7.8 MM3 per Year per Unit. 4.Energy available for sale with 85 percent Plant Load Factor- 1829 MU per Year for Phase-I. 5.Date of Commissioning - Phase-1- 18.07.2013-COD. 6.Land Requirement - 141 Hectors 7.Project Implementation-Phase-1-1x270 MW. 8.PROJECT EXECUTION - PHASE-1 - commissioned 9. PROJECT LOCATION - 51 kms from Nagpur on Nagpur - Chandrapur state Highway NH-7. 10. Nearest village-Bela, Tahsil-Umred, District-Nagpur, Maharashtra State. 11. Nearest Railway station- Borkhedi on Nagpur - Mumbai Central Railway at a distance of 11 kms from Project site. 12. Nearest Airport Nagpur. 13). Nearest Seaport Mumbai and Vizag. 14. MAIN PLANT i.e boiler turbine generator and esp is supplied, erected and commissioned by bhel. 15. Balance of plant comprising of CHP, AHP, treatme1768651080 (8 x 135) MW, PITHEAD THERMAL POWER PROJECTPower 1080 -8 x 13) MW, PITHEAD THERMAL POWER PROJECT (Commisssioned) -Enhancement of Kapurdi Lignite Mines capacity from 3 MTPA to 7 MTPA till the Jalipa mines becomes operational720066ONGC Project - Construction of 3 ETPs-MehsanaPetroleum and Natural Gas To construct 3 ETPs To deal with future water cut and injection water quality requirement. Site survey for the Sobhasan is under progress. For balance two sites Land Acquisition is pending.14467ONGC Project - Sonamura GGS & Pipeline Project (Tripura Asset)Petroleum and Natural Gas 1. Construction of Sonamura GGS having 0.8 MMSCMD gas processing capacity & Gas metering station at Monarchak. 2.Laying of 10" diaX 10.5 Km gas trunk pipeline from Sonamura to Moarchak 3. Laying of 20" dia X 29.4 Km gas trunk pipeline from Agartala. Project Progress-38.6 %. ROU is required to complete the project.128.368ONGC Project - Upgradation of Konaban GGS & Pipeline Grid Project (Tripura Asset)Petroleum and Natural Gas 1.Upgradation of Konaban GGS from 0.50 to 1.50 MMSCMD capacity. 2. Laying of approx. 86 kms of Trunk Pipeline from Agartala Dome to OTPC via Nimbutali with metering facilities at OTPC,pipeline from Sonamura GGS to OTPC and pipeline from Konaban GGS to Nimbutali and laying of 64 Km of Feeder line from Kunjaban to ADB GGS and Sundalbari to Sonamura GGS. Project Progress-86.1 %. ROU is required including in forest land to complete the laying of pipeline.253.6669ONGC Project - Assam renewal Project ( Group-A)Petroleum and Natural Gas Revamping and optimazation of 21 Surface Installation to 9 integrated Complex and replacement of existing pipelines and laying of new 467.80 Km of pipelines. Project Progress - 79.24%. ROU is required in forest land to complete the laying of piepline.2378.86702*300 MW Thermal Power Plant BHARAT ALUMINUM COMPANY LIMITEDPower Set up of 2* 300 MW Thermal Power Plant2500714 x 61.50 MW IPP of Abhijeet MADC Nagpur Energy Private LimitedPower The AMNEPL Power Plant with four units of 61.50 MW each has been developed under PPP Model with Maharashtra Airport Development Company Limited (a Government of Maharashtra Undertaking) as 26% Partner. The Plant has been commissioned in August 2011. Presently the Power Plant is incurring losses as is operating on costly market coal.138272Development of Rampia Coal Block and Dip Side of RampiaCoal Rampia and Dipside of Rampia Coal Block was allotted jointly to six Companies vide Ministry of Coal letter no 38011/1/2007-CA-I dated 17th January,2008 for providing onshore fuel to their Power Plants. 1) M/s Sterlite Energy Ltd 2) M/s GMR Energy Ltd 3) M/s Arcellor Mittal India Ltd 4) M/s Lanco Group Ltd 5) M/s Nabbharat Power Pvt Ltd 6) M/s Reliance Energy Ltd In terms of compliance of the said letter of MOC, a Joint Venture Company Ms Rampia Coal Mine and Energy Pvt. Limited (RCMEPL) was incorporated on 19th Feb 2008. RCMEPL submitted application for grant of Prospecting License (PL) to Govt of Odisha within the stipulated time of 3 months. Ministry of Coal, Government of India conveyed its prior approval for grant of Prospecting License (PL) in favour of the allottees to Govt. of Odisha vide letter No 13116/29/2009-CA-1 dated 13th Aug 2009. However the production of coal from the Block could not commence due to delay in grant of Prospective License from State.150773Loktak Downstream HEPPower Loktak Downstream HEP (66MW)is a JV project between NHPC (CPSU) and Govt. of Manipur. The estimated cost of the project is Rs. 1350 crores (Dec 12 PL). The project has been accorded environment clearance and Stage-I Forest Clearance.135074SKS POWER GENERATION CHHATTISGARH LIMITEDPower 1200 MW - 4 UNITS 300MW EACH COAL BASED IPP BEING IMPLEMENTED AT BINJKOTE and DARAMURRA VILLAGE, RAIGARH DISTRICT IN CHHATTISGARH. PROMOTED BY SKS ISPAT AND POWER LIMITED - SKS. SITHE GLOBAL BLACKSTONE OF USA IS AN INVESTOR IN THE POWER PROJECT. PROJECT IS UNDER ADVANCE STAGE OF CONSTRUCTION AND SCHEDULED FOR COMMISSIONING OF UNIT -1 BY SEPT 27, 2014, UNIT -2 BY DEC 27, 2014 AND UNIT 3 AND 4 BY DEC 27, 2015. BOILER DRUM FOR UNIT 1 AND 2 ALREADY EREECTED AND PLACED IN POSITION IN MAY 2013. CONSTRUCTION OF ALL THE FACILITIES SUCH AS RAW WATER PIPE LINE and INTAKE SYSTEM, 400 KV TRANSMISSION LINE, RAILWAY SIDING, COAL HANDLING PLANT, ASH HANDLING SYSTEM, WATER SYSTEMS, ETC ARE IN ADVANCE STAGE. RS.2311.17CRORES INCURRED TILL 30.6.2013 MINISTRY OF POWER HAS GRANTED PROVISIONAL MEGA POWER STATUS ON 29.2.2012. SIGNED BPTA AND TSA WITH PGCIL684875Talaipalli Coal BlockPower Ministry of coal allocated the Talaipalli coal block to NTPC on 25.01.2006, it has Geological reserves of 1267 MT, Production Target - Mar.2015 Annual rated capacity - 18 MTPA, Project Status as on 25.07.13 Block was regionally explored at the time of allocation. Detailed exploration undertaken by NTPC. Total 39855 mt. drilling done. Geological Report prepared. Mining Plan approved by MOC. Environment clearance accorded by MOEF. Stage-I forest clearance accorded. Payment towards NPV and CA charges made. Compliance of stage-I conditions to be submitted after receipt of NOC under FRA (New format) from Raigarh Dist. Admin. The JV Company between NTPC & SCCL has been appointed as MDO on nomination basis pricing & other modalities under finalization. All notifications for mining area land acquisition completed. RAP approved by NTPC Board. Payment for 1278 acres of land compensation disbursed to project affected families, till date. Total expenditure of approx Rs 3002542

Sheet2

Sheet3