NVELOP
NVELOP
CCM BUILDING ENVELOPE: TABLE OF CONTENTS
NVELOP
NVELOP
CONTINUOUS AIR & VAPOR BARRIER "DETAIL GUIDE"
NVELOP
NVELOP
NVELOP ROOF ASSEMBLY OPTIONS
NVELOP
NVELOP
VAPOR RETARDER:
CCW 725 TR OVER GYP. BOARD
A
VAPOR RETARDER:
VapAir Seal MD (DIRECT-TO-DECK)
B
ROOF VAPOR RETARDER
NVELOP
ZONESASHRAE 90.1 ASHRAE 189.1 IGCC IBC-IECC
TABLE 1: MINIMUM R-VALUE (NON-RESIDENTIAL, ABOVE ROOF DECK)
NVELOP
MINIMUM INSULATION R-VALUES
ZONESASHRAE 90.1
ASHRAE 189.1(IgCC) IBC-IECC
TABLE 2: MINIMUM R-VALUE (NON-RESIDENTIAL, WALLS, STEEL FRAMED)
Carlisle'sRecommendations
ZONESASHRAE 90.1
ASHRAE 189.1(IgCC) IBC-IECC
TABLE 3: MINIMUM R-VALUE (NON-RESIDENTIAL, WALLS, MASS)
Carlisle'sRecommendations
NVELOP
NVELOP
STUD WALL WITH STUD CAVITY & EXTERIOR INSULATION
1
2, 3& 4
5
IECC 2012 COMPLIANCE &
HYGRO-THERMAL OPTIONS
AS
HR
AE
ZO
NE
S
WALL MATERIALS
6
7&8
CC
W
I
HU
NT
ER
II III IV
NVELOP
CMU OR CONCRETE WALL WITH EXTERIOR INSULATION
NVELOP
WALL MATERIALS
1
2
IECC 2012 COMPLIANCE &
HYGRO-THERMAL OPTIONS
AS
HR
AE
ZO
NE
S3&4
5, 6& 7
8
CC
W
I
HU
NT
ER
II III IV
NVELOP
NVELOP
STUD WALL WITH STUD-CAVITY INSULATION ONLY
1
2 &3WH
4A&4B
AS
HR
AE
ZO
NE
S
WALL MATERIALS
IECC 2012 COMPLIANCE &
HYGRO-THERMAL OPTIONS
3
4C,5 TO
8
NVELOP
NVELOP
1
CMU OR CONCRETE WALL WITHOUT WALL INSULATION
AS
HR
AE
ZO
NE
S
3 TO 8
WALL MATERIALS
IECC 2012 COMPLIANCE &
HYGRO-THERMAL OPTIONS
2
NVELOP
1
2, 3& 4
5
STUD WALL WITH NON-NAILABLE EXTERIOR INSULATING SHEATHING
AS
HR
AE
ZO
NE
S
NVELOP
WALL MATERIALS
IECC 2012 COMPLIANCE &
HYGRO-THERMAL OPTIONS
6
7&8
CC
W
I
HU
NT
ER
II III IV
NVELOP
NVELOP
1
2, 3& 4
5
STUD WALL WITH NAIL-ABLE EXTERIOR INSULATING SHEATHING
AS
HR
AE
ZO
NE
S
WALL MATERIALS
IECC 2012 COMPLIANCE &
HYGRO-THERMAL OPTIONS
6
7 & 8
CC
W
I
HU
NT
ER
II III IV
NVELOP
NVELOP
STUD WALL WITH INSULATED MEMBRANE & WRB ON INSULATION
1A
SH
RA
E Z
ON
ES
WALL MATERIALS
IECC 2012 COMPLIANCE &
HYGRO-THERMAL OPTIONS
2, 3& 4
5
6*
7&8
CC
W
I
HU
NT
ER
II III IV
NVELOP
1
8
CMU OR CONCRETE WALL WITH INSULATED MEMBRANE & WRB ON INSULATION
AS
HR
AE
ZO
NE
S
NVELOP
WALL MATERIALS
IECC 2012 COMPLIANCE &
HYGRO-THERMAL OPTIONS
2
3&4
5, 6*& 7
CC
W
I
HU
NT
ER
II III IV
NVELOP
1
STUD WALL WITH UN-INSULATED MEMBRANE ON EXTERIOR SIDE
AS
HR
AE
ZO
NE
S
NVELOP
WALL MATERIALS
IECC 2012 COMPLIANCE &
HYGRO-THERMAL OPTIONS
2, 3& 4
5
6*
7 & 8
CC
W
I
HU
NT
ER
II III IV
NVELOP
NVELOP
1
2
8
CMU OR CONCRETE WALL WITH UN-INSULATED MEMBRANE ON EXTERIOR SIDE
AS
HR
AE
ZO
NE
SWALL MATERIALS
IECC 2012 COMPLIANCE &
HYGRO-THERMAL OPTIONS
3
4
5, 6*& 7
CC
W
I
HU
NT
ER
II III IV
NVELOP
1
CMU OR CONCRETE WALL WITH INSULATED MEMBRANE ON INTERIOR SIDE
AS
HR
AE
ZO
NE
SWALL MATERIALS
IECC 2012 COMPLIANCE &
HYGRO-THERMAL OPTIONS
CC
W
I
HU
NT
ER
II III IV
2, 3& 4
5
6B
6A, 7& 8
NVELOP
1
2A &3A WH
3
CMU OR CONCRETE WALL WITH UN-INSULATED MEMBRANE ON INTERIOR SIDE
AS
HR
AE
ZO
NE
SWALL MATERIALS
IECC 2012 COMPLIANCE &
HYGRO-THERMAL OPTIONS
CC
W
I
HU
NT
ER
II III IV
& 4
5
6B
6A, 7& 8
2B, 2C,
NVELOP
NVELOP
³³
TIE-IN KEY DETAILS FOR PARAPET OR LOW ROOF EDGES
ROOF WITH VAPOR RETARDER
B
ROOF WITHOUT VAPOR RETARDER
A
NVELOP
NVELOP
WALL BARRIER INSTALLED FIRST
A
ROOF FLASHING INSTALLED FIRST
B
TIE-IN SURE-SEAL EPDM WITH CCW 705 MEMBRANE
WALL KEY SECTION
NVELOP
WALL BARRIER INSTALLED FIRST
A
ROOF FLASHING INSTALLED FIRST
B
TIE-IN SURE-WELD TPO WITH CCW 705 MEMBRANE
NVELOP
WALL KEY SECTION
NVELOP
WALL BARRIER INSTALLED FIRST
A
ROOF FLASHING INSTALLED FIRST
B
TIE-IN SURE-FLEX PVC WITH CCW 705 MEMBRANE
NVELOP
WALL KEY SECTION
NVELOP
WALL BARRIER INSTALLED FIRST
A
ROOF FLASHING INSTALLED FIRST
B
NVELOP
WALL KEY SECTION
NVELOP
WALL BARRIER INSTALLED FIRST
A
ROOF FLASHING INSTALLED FIRST
B
NVELOP
WALL KEY SECTION
NVELOP
NVELOP
WALL BARRIER INSTALLED FIRST
A
ROOF FLASHING INSTALLED FIRST
B
TIE-IN SURE-FLEX PVC WITH BARRISEAL S/R & BARRITECH VP/NP
WALL KEY SECTION
NVELOP
NVELOP
ROOF VAPOR BARRIER
INSTALLED FIRST
A
ASHRAE
ZONES 5-8
ROOF VAPOR
BARRIER
WALL BARRIER INSTALLED FIRST
B
ROOF VAPOR BARRIER TIE-IN WITH WALL MEMBRANE BARRIER
WALL KEY SECTION
³³
NVELOP
NVELOP
³³
ROOF VAPOR BARRIER TIE-IN WITH WALL FLUID-APPLIED BARRIER
ASHRAE
ZONES 5-8
ROOF VAPOR
BARRIER
WALL KEY SECTION
ROOF VAPOR BARRIER
INSTALLED FIRST
A WALL BARRIER INSTALLED FIRST
B
NVELOP
NVELOP
LOW ROOF TO UPPER STORY WALL TIE-IN
NVELOP
SHELF-ANGLE: SELF-ADHERED A&VR FLASHING
NVELOP
NVELOP
SHELF-ANGLE: FLUID-APPLIED A&VR FLASHING
NVELOP
NVELOP
WINDOW HEAD AND SILL FLASHING - OPTION A
NVELOP
NVELOP
WINDOW JAMB FLASHING - OPTION A
NVELOP
NVELOP
WINDOW HEAD AND SILL FLASHING - OPTION B
NVELOP
NVELOP
WINDOW JAMB OPTION B
NVELOP
NVELOP
SELF-ADHERING A&VR - SHEATHING JOINTS & TIES
NVELOP
NVELOP
FLUID-APPLIED A&VR - SHEATHING JOINTS & TIES
NVELOP
NVELOP
STUD WALL JOINT GREATER THAN ONE INCH (25mm) WIDE
NVELOP
NVELOP
CONDUIT PENETRATION FLASHING
NVELOP
FLOOR SLAB: WATERPROOFING & VAPOR-PROOFING
NVELOP
SLAB SECTION
A
MiraDRAIN SEAM
B
POSITIVE SIDE WATERPROOFING - WALL & SLAB TIE-IN USING MiraPLY
NVELOP
A
B
POSITIVE SIDE WATERPROOFING - MiraPLY TIE-IN SPLICE
NVELOP
OPTION A
OPTION B
NEGATIVE SIDE WATERPROOFING - WALL & SLAB MiraPLY TIE-IN
NVELOP
TIE-IN SECTION
A
LAGGING WALL DRAINAGE
B
T-JOINT
NEGATIVE SIDE WATERPROOFING - MiraPLY SPLICE OPTIONS
NVELOP
A B
c
SLAB ON GRADE
NVELOP
GROUND FLOOR: SLAB-ON-GRADE W/FOUNDATION WALL
NVELOP
BASEMENT: FOUNDATION & FLOOR WALL TIE-IN
NVELOP
WALL FLASHING AT TOP OF FOUNDATION
NVELOP
A
B
NEGATIVE SIDE WATERPROOFING - MiraDRAIN SPLICE
NVELOP