18
PERENCANAAN ULANG STRUKTUR UTAMA BANGUNAN ATAS PENAHAN GEMPA DENGAN KOMBINASI PORTAL DAN DINDING GESER BERDASARKAN SNI 1726 : 2012 PADA GEDUNG KANTOR PEMERINTAH KABUPATEN LAMONGAN Tugas Akhir Diajukan Kepada Universitas Muhammadiyah Malang Untuk Memenuhi Salah Satu Persyaratan Akademik Dalam Menyelesaikan Program Sarjana Teknik Disusun Oleh : CHANDRA YUDHA 201310340311119 JURUSAN TEKNIK SIPIL FAKULTAS TEKNIK UNIVERSITAS MUHAMMDIYAH MALANG 2020

CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

PERENCANAAN ULANG STRUKTUR UTAMA BANGUNAN ATAS PENAHAN GEMPA DENGAN KOMBINASI PORTAL DAN DINDING

GESER BERDASARKAN SNI 1726 : 2012

PADA GEDUNG KANTOR PEMERINTAH KABUPATEN LAMONGAN

Tugas Akhir

Diajukan Kepada Universitas Muhammadiyah Malang

Untuk Memenuhi Salah Satu Persyaratan Akademik

Dalam Menyelesaikan Program Sarjana Teknik

Disusun Oleh :

CHANDRA YUDHA

201310340311119

JURUSAN TEKNIK SIPIL

FAKULTAS TEKNIK

UNIVERSITAS MUHAMMDIYAH MALANG

2020

Page 2: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

ii

Page 3: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

iii

SURAT PERNYATAAN

Yang bertanda tangan di bawah ini:

Nama : Chandra Yudha

NIM : 201310340311119

Jurusan : Teknik Sipil

Fakultas : Teknik

UNIVERSITAS MUHAMMADIYAH MALANG

Dengan ini saya menyatakan sebenar-benarnya bahwa: Tugas Akhir dengan judul: “PERENCANAAN

ULANG STRUKTUR UTAMA BANGUNAN ATAS PENAHAN GEMPA DENGAN

KOMBINASI PORTAL DAN DINDING GESER BERDASARKAN SNI GEMPA 1726:2012 PADA

GEDUNG KANTOR PEMERINTAH KABUPATEN LAMONGAN” adalah hasil karya saya dan

bukan karya tulis orang lain, dan dalam naskah tugas akhir ini tidak terdapat karya ilmiah yang pernah

diajukan orang lain untuk memperoleh gelar akademik di suatu Perguruan Tinggi dan tidak terdapat karya

atau pendapat orang yang pernah ditulis atau diterbitkan oleh orang lain, baik sebagian maupun

seluruhnya, kecuali yang secara tertulis dikutip dalam naskah ini dan disebutkan dalam sumber kutipan

atau daftar pustaka. Demikian pernyataan ini saya buat dengan sebenarnya dan apabila pernyatan ini tidak

benar saya bersedia mendapat sanksi akademis.

Malang, 22 Juli 2020 Yang Menyatakan

Chandra Yudha

Page 4: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

iv

LEMBAR PERSEMBAHAN

Segala puji bagi Allah SWT atas karunia dan rahmat-Nya yang tidak pernah kurang

sedikitpun kepada hamba-Nya yang selalu meminta kepada-Nya. Shalawat serta salam kita

haturkan kepada junjungan kita Nabi Muhammad SAW sebagai suri tauladan bagi umat-Nya.

Tugas akhir ini saya persembahkan kepada:

a. Bapak Warsito dan Alm. Ibu Sri Setitik selaku kedua orang tua saya yang selalu

memberikan semangat, motivasi, serta bantuan materi yang rela kerja banting tulang

demi anaknya bisa mendapatkan gelar sarjana. Terimakasih atas doa-doa yang telah

kalian panjatkan, karena dengan doa kalian tugas akhir ini dapat terselesaikan. Semoga

gelar sarjana yang saya dapatkan ini dapat membuat Bapak dan Alm. Ibu bangga. Amin.

b. Saudara adik ke-2 Danar Priyambodo dan adik ke-3 Abdul Manaf Adhi Pramana, kalian

selaku saudara muda saya yang selalu memberikan semangat serta mendoakan saya

sebagai kakak, agar dapat meraih gelar S1.

c. Teman-teman seperjuangan dari awal masuk kuliah sampai detik saat ini yaitu Gerin

Hardena, Faris Khoirul Hadi, Yoga Arga Pratama, Yoga Bimantara, Didik Prasetya,

Radika Meidi, Ega Alif Maulana, yang saling memberikan semangat serta motivasi

dalam menyelesaikan tugas akhir ini. Tak lupa untuk kawan Amril Zainuddin, Sri

Wahyuni dan Sirajul Munir, serta teman yang pada saat – saat terakhir ini yang kerap

memberikan support dan bantuannya : Irwandi, dan Allen Winmal Purwadi.

d. Seluruh Anggota Keluarga Besar Sipil C serta teman-teman angkatan 2013 terimakasih

atas dukungan dan doanya.

e. Semua pihak yang telah membantu saya dalam menyelesaikan tugas akhir ini yang tidak

dapat disebutkan satu-persatu.

Semoga semua pihak yang telah membantu saya dalam menyelesaikan tugas akhir ini

mendapatkan pahala dari Allah SWT.

Page 5: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

v

KATA PENGANTAR

Puji syukur kehadirat Allah SWT yang telah memberikan berkah, rahmat, hidayah,

serta inayah-Nya sehingga sang penulis dapat menyelesaikan Tugas Akhir ini dengan judul

PERENCANAAN ULANG STRUKTUR UTAMA BANGUNAN ATAS PENAHAN

GEMPA DENGAN KOMBINASI PORTAL DAN DINDING GESER BERDASARKAN SNI

1726 : 2012 PADA GEDUNG KANTOR PEMERINTAH KABUPATEN LAMONGAN.

Meskipun dalam penyelesaian Tugas Akhir ini melalui perjalanan waktu yang panjang

serta melibatkan banyak bantuan dari berbagai pihak, penulis berharap Tugas Akhir ini dapat

bermanfaat bagi pembaca.

Pada kesempatan kali ini penulis menyampaikan terima kasih yang sebesar-besarnya

kepada seluruh pihak yang telah membantu dalam menyelesaikan Tugas Akhir ini. Oleh karena

itu penulis menyampaikan terima kasih kepada:

1. Ibu Ir. Rofikatul Karimah, MT selaku Ketua Jurusan Teknik Sipil Universitas Muhammadiyah

Malang. 2. Ibu Ir. Rofikatul Karimah, MT selaku Pembimbing I dan Bapak Ir. Erwin Rommel, MT selaku

pembimbing II yang telah mengarahkan serta membimbing penulis untuk menyelesaikan

Tugas Akhir ini. 3. Seluruh Dosen Teknik Sipil Universitas Muhammadiyah Malang, terima kasih telah

memberikan ilmu pengetahuan yang bermanfaat untuk saat ini maupun seterusnya. 4. Bapak Warsito dan Alm. Ibu Sri Setitik selaku orang tua kandung, yang senantiasa mendukung

dan mendoakan si penulis demi kelancaran penulisan tugas akhir ini. 5. Ibu Faradilla dan seluruh staff Tata Usaha, terima kasih atas kemudahan segala urusan

akademik selama saya kuliah. 6. Semua teman Teknik Sipil terutama angkatan 2013 kelas C, terimakasih atas dukungan serta

doa yang kalian berkan selama ini. 7. Dan semua pihak yang telah membantu penulis dalam penyusunan Tugas Akhir ini.

Akhir kata penulis berharap Tugas Akhir ini dapat bermanfaat bagi semua pihak yang

membutuhkan.

Malang, 17 Juli 2020

Page 6: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

viii

DAFTAR ISI

HALAMAN JUDUL ............................................................................................... i

LEMBAR PENGESAHAN ................................................................................... ii

LEMBAR PERNYATAAN ................................................................................. iii

LEMBAR PERSEMBAHAN ............................................................................... iv

KATA PENGANTAR ............................................................................................ v

ABSTRAK ............................................................................................................. vi

ABSTRACT .......................................................................................................... vii

DAFTAR ISI....................................................................................................... viii

DAFTAR TABEL ................................................................................................ xv

DAFTAR GAMBAR .......................................................................................... xvii

BAB I PENDAHULUAN

1.1. Latar Belakang ...................................................................................... 1

1.2. Rumusan Masalah ................................................................................. 2

1.3. Tujuan ................................................................................................... 3

1.4. Manfaat ................................................................................................. 3

1.5. Batasan Masalah ................................................................................... 4

BAB II TINJAUAN PUSAKA

2.1. Umum.................................................................................................... 5

2.2 Sistem Struktur Gedung ........................................................................ 7

2.2.1 Sistem Rangka Pemikul Momen (SRPM) ............................................ 7

2.2.1.1 Sistem Rangka Pemikul Momen Khusus (SRPMK)............................. 7

Page 7: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

ix

2.2.2 Dinding Geser (shear wall) ................................................................... 8

2.2.3 Sistem Rangka Gedung ....................................................................... 12

2.2.4 Perilaku Struktur Rangka Kaku, Dinding Geser, dan Struktur Rangka – Dinding

Geser (Dual System)............................................................................ 12

2.2.4.1 Perilaku Struktur Rangka Kaku (Rigid Frame) .................................. 12

2.2.4.2 Perilaku Shear Wall ............................................................................ 14

2.2.4.3 Perilaku Struktur Rangka – Dinding Geser (Dual System) ................. 17

2.2.5 Perencanaan Dinding Geser ................................................................ 19

2.3 Pembebanan Struktur .......................................................................... 23

2.3.1 Beban Hidup ....................................................................................... 23

2.3.2 Beban Mati .......................................................................................... 23

2.3.3 Kombinasi Beban Untuk Metode Ultimit ........................................... 24

2.4 Beban Gempa ...................................................................................... 25

2.4.1 Kategori Resiko Gempa dan Faktor Keutamaan Gempa .................... 25

2.4,2 Klasifikasi Situs .................................................................................. 27

2.4.2.1 Definisi Kelas Situs ............................................................................. 28

2.4.3 Koefisien situs dan parameter spectral percepatan Gempa ................. 29

2.4.3.1 Kecepatan Rata – Rata Gelombang Geser .......................................... 30

2.4.3.2 Peta Gempa yang Dipertimbangkan Resiko-Tertarget ....................... 30

2.4.4 Kategori Desain Seismik ..................................................................... 31

2.4.5 Spektrum Respons Desain .................................................................. 32

2.4.6 Gaya Geser Dasar Akibat Gempa ....................................................... 33

2.4.7 Koefisien Respon Gempa .................................................................... 34

Page 8: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

x

2.4.8 Distribusi Vertikal Gaya Gempa ......................................................... 34

2.4.9 Distribusi Horisontal Gaya Gempa ..................................................... 34

2.4.10 Penentuan Simpangan Antar Lantai .................................................... 35

2.4.11 Pengaruh Torsi .................................................................................... 36

2.4.11.1 Torsi Bawaan ...................................................................................... 36

2.4.11.2 Torsi Tak Terduga ............................................................................... 37

2.4.11.3 Pembesaran Momen Torsi Tak Terduga ............................................. 37

2.4.12 Geser dasar Minimum untuk menghitung Simpangan Antar lantai .... 38

2.5 Perencanaan Tulangan Dinding Geser ................................................ 39

2.5.1 Persyaratan Tulangan .......................................................................... 39

2.5.2 Kuat Geser........................................................................................... 39

2.5.3 Desain Untuk Torsi ............................................................................. 40

2.6 Beton Bertulang .................................................................................. 41

2.6.1 Balok ................................................................................................... 41

2.6.1.1 Faktor Reduksi Kekuatan .................................................................... 42

2.6.1.2 Distribusi Tegangan Ekuivalen ........................................................... 44

2.6.1.3 Penampang Persegi Bertulangan Tunggal .......................................... 45

2.6.1.4 Penampang Persegi Bertulangan Rangkap ......................................... 48

2.6.1.5 Tulangan Tekan sudah Luluh .............................................................. 48

2.6.1.6 Tulangan Tekan belum Luluh ............................................................. 50

2.6.2 Pelat ..................................................................................................... 51

2.6.2.1 Pelat Satu Arah.................................................................................... 51

2.6.2.2 Pelat Dua Arah .................................................................................... 52

Page 9: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

xi

2.6.3 Metode Desain Sistem Pelat Datar ...................................................... 53

2.6.3.1 Metode Desain Sistem Langsung (Direct Design Method) ................ 53

2.6.3.1.1 Momen Statis Terfaktor Total untuk suatu Bentang ........................... 54

2.6.3.1.2 Momen Terfaktor Negatif dan Positif ................................................. 54

2.6.3.2 Metode Portal Ekuivalen (Equivalent Frame Method) ....................... 55

2.7 Sistem Rangka Pemikul Momen (SRPM) .......................................... 57

2.7.1 Sistem Rangka Pemikul Momen Khusus (SRPMK)........................... 58

2.7.1.1 Komponen Struktur Lentur Rangka Pemikul Momen Khusus ........... 58

2.7.1.1.1 Tulangan Longitudinal ........................................................................ 58

2.7.1.1.2 Tulangan Transversal .......................................................................... 59

2.7.1.1.3 Persyaratan Kekuatan Geser ............................................................... 61

2.7.1.2 Komponen SRPMK yang dikenai Beban Lentur dan Aksial .............. 61

2.7.1.2.1 Ruang Lingkup .................................................................................... 61

2.7.1.2.2 Kekuatan Lentur Minimal Kolom pada SRPMK ................................ 62

2.7.1.2.3 Tulangan Memanjang ......................................................................... 63

2.7.1.2.4 Tulangan Transversal .......................................................................... 63

BAB III METODOLOGI

3.1 Umum.................................................................................................. 65

3.2 Pengumpulan Data .............................................................................. 66

3.2.1 Data Umum ......................................................................................... 66

3.3 Tahap Perencanaan Ulang ................................................................... 68

3.3.1 Menentukan Pra Dimensi (Preliminiary Design) ............................... 68

Page 10: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

xii

3.3.1.1 Perencanaan Dimensi Kolom .............................................................. 68

3.3.1.2 Perencanaan Dimensi Balok Induk ..................................................... 68

3.3.1.3 Perencanaan Balok Anak .................................................................... 69

3.3.1.4 Perencanaan Dinding Geser (shear wall)............................................ 69

3.3.1.5 Perencanaan Struktur Sekunder .......................................................... 69

3.3.1.5.1 Penentuan Dimensi Pelat .................................................................... 69

3.3.1.6 Perhitungan Tulangan Lentur Pelat ..................................................... 71

3.3.1.6.1 Perencanaan Penulangan Kolom ......................................................... 71

3.3.1.6.2 Perencanaan Penulangan Dinding Geser ............................................ 71

3.3.1.6.3 Perhitungan Tulangan Susut ............................................................... 73

3.3.1.6.4 Kontrol Retak ...................................................................................... 73

3.4 Diagram Alir Perencanaan .................................................................. 74

BAB IV HASIL PERENCANAAN DAN PEMBAHASAN

4.1 Data Perencanaan ................................................................................ 75

4.2 Perencanaan Dimensi Struktur ............................................................ 75

4.2.1 Balok ................................................................................................... 75

4.2.2 Kolom.................................................................................................. 77

4.2.3 Dimensi Dinding Geser (Shear Wall) ................................................. 77

4.2.4 Pelat ..................................................................................................... 78

4.3 Perencanaan Pembebanan ................................................................... 79

4.3.1 Pembebanan Pelat Melintang .............................................................. 79

4.3.2 Beban Horizontal pada struktur .......................................................... 80

4.4 Parameter Gempa Sesuai SNI 1726 : 2012 ......................................... 83

Page 11: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

xiii

4.4.1 Kategori Resiko Bangunan ................................................................. 83

4.4.2 Faktor Keutamaan Gempa .................................................................. 83

4.4.3 Klasifikasi Kelas Situs ........................................................................ 84

4.4.4 Parameter Kecepatan Tanah ................................................................ 84

4.4.5 Faktor Kelas Situs ............................................................................... 85

4.4.6 Parameter Percepatan Desain .............................................................. 85

4.4.7 Kategori Desain Seismic ..................................................................... 85

4.4.8 Sistem Parameter Struktur .................................................................. 86

4.4.9 Koefisien Respon Seismic dan Gaya Seismic ..................................... 86

4.4.10 Distribusi Gaya Gempa pada Struktur Bangunan ............................... 86

4.5 Perencanaan Pelat ............................................................................... 88

4.5.1 Perencanaan Penulangan Pelat ............................................................ 90

4.5.2 Kontrol Simpangan (drift) ................................................................... 94

4.6 Perencanaan Balok Anak .................................................................... 95

4.6.1 Pendistribusian Pembebanan Pelat ke Balok anak .............................. 95

4.6.2 Balok anak arah melintang ................................................................ 103

4.7 Perencanaan Balok Induk .................................................................. 111

4.7.1 Pendistribusian Pembebanan dari Pelat ke Balok Induk ................... 111

4.7.1.1 Pembebanan pada Balok Induk arah memanjang ............................. 111

4.7.1.2 Pembebanan pada Balok Induk arah melintang ................................ 113

4.7.2 Gaya Ultimit Balok Induk ................................................................. 115

4.7.3 Penulangan Balok Induk ................................................................... 118

4.8 Perencanaan Kolom .......................................................................... 135

Page 12: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

xiv

4.8.1 Perencanaan Kolom Lantai 1 s/d 3 ................................................... 135

4.8.2 Perencanaan Penulangan Kolom ....................................................... 137

4.8.3 Perencanaan Tulangan Sengkang Kolom ......................................... 145

4.8.3.1 Perencanaan Pengekang pada Kolom ............................................... 146

4.8.3.2 Panjangnya Penyaluran Tulangan ..................................................... 147

4.8.3.3 Penulangan Hubungan Balok Kolom ................................................ 148

4.9 Perencanaan Dinding Geser (Shear Wall) ........................................ 149

4.9.1 Perhitungan Gaya Momen dan Gaya Lintang ................................... 149

4.9.2 Penulangan Dinding Geser................................................................ 150

BAB V PENUTUP

5.1. Kesimpulan ....................................................................................... 155

5.2. Saran.................................................................................................. 158

DAFTAR PUSTAKA ...............................................................................................

LAMPIRAN..............................................................................................................

Page 13: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

xv

DAFTAR TABEL

Tabel 2.1 Kategori Resiko Gempa ...................................................................... 25

Tabel 2.2 Faktor Keutamaan Gempa .................................................................. 26

Tabel 2.3 Definisi Kelas Situs ............................................................................. 28

Tabel 2.4 Koefisien Situs, Fa .............................................................................. 29

Tabel 2.5 Koefisien Situs, Fv .............................................................................. 29

Tabel 2.6 Kategori desain Seismic Percepatan periode pendek (SDS) ................ 31

Tabel 2.7 Kategori desain Seismic Percepatan pada periode 1 detik (SD1)......... 31

Tabel 2.8 Simpangan Antar Lantai Ijin, Δa ......................................................... 36

Tabel 2.9 Tebal Minimum Pelat tanpa Balok Interior ........................................ 52

Tabel 2.10 Distribusi Momen Total Terfaktor ...................................................... 54

Tabel 3.1 Data Tinggi dan Elevasi Lantai ........................................................... 67

Tabel 3.2 Deskripsi Gedung ................................................................................ 67

Tabel 4.1 Rekapitulasi Dimensi Balok Induk dan Balok Anak .......................... 76

Tabel 4.2 Beban Total Pertingkat........................................................................ 83

Tabel 4.3 Kategori Resiko Bangunan Gedung .................................................... 83

Tabel 4.4 Faktor Keutamaan Gempa .................................................................. 83

Tabel 4.5 Parameter Respons Spectral Perencanaan Gempa (MCER) ................. 85

Tabel 4.6 Kategori Desain Seismic ..................................................................... 85

Tabel 4.7 Sistem Penahan Gaya Seismic ............................................................. 86

Tabel 4.8 Gaya Gempa lateral tiap tingkat.......................................................... 87

Tabel 4.9 Distribusi Gaya Gempa pada Portal dan Shear Wall .......................... 87

Tabel 4.10 Distribusi Gaya Gempa per-Portal dan per-Shear Wall ...................... 87

Tabel 4.11 Momen Pelat Penulangan dua arah Metode amplop ........................... 88

Page 14: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

xvi

Tabel 4.12 Distribusi Momen pada Pelat lantai .................................................... 89

Tabel 4.13 Distribusi Momen pada Pelat atap ...................................................... 89

Tabel 4.14 Perhitungan Penulangan Pelat Lantai ................................................. 92

Tabel 4.15 Perhitungan Penulangan Pelat Atap .................................................... 92

Tabel 4.16 Rekapitulasi Tulangan Pelat ................................................................ 93

Tabel 4.19 Ijin drift berdasarkan jenis kategori dan Struktur Bangunan .............. 94

Tabel 4.20 Perhitungan simpangan pada tiap tingkat ........................................... 94

Tabel 4.21 Rekapitulasi Dimensi Balok Anak .................................................... 110

Tabel 4.22 Gaya Ultimit Balok Induk melintang ................................................ 116

Tabel 4.23 Gaya Ultimit Balok Induk memanjang ............................................. 117

Tabel 4.24 Momen Balok Induk ......................................................................... 118

Tabel 4.25 Penulangan tumpuan Balok Induk melintang ................................... 128

Tabel 4.26 Penulangan lapangan Balok Induk Melintang .................................. 130

Tabel 4.27 Penulangan tumpuan Balok Induk memanjang ................................ 131

Tabel 4.28 Penulangan lapangan Balok Induk memanjang ................................ 132

Tabel 4.29 Rekapitulasi Penulangan Balok Induk .............................................. 134

Tabel 4.30 Momen Gaya Aksial dan Gaya geser Maksimum ............................ 135

Tabel 4.31 Perhitungan Penulangan Kolom........................................................ 148

Tabel 4.32 Momen dan Gaya lintang pada Dinding geser .................................. 150

Tabel 5.1 Penulangan Pelat ............................................................................... 155

Tabel 5.2 Penulangan Balok Anak .................................................................... 155

Page 15: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

xvii

DAFTAR GAMBAR

Gambar 2.1 Ilustrasi Struktur Shear Wall System.............................................. 9

Gambar 2.2 Respons lenturan Balok dan Kolom ............................................ 12

Gambar 2.3 Simpangan pada Struktur Rangka kaku ....................................... 13

Gambar 2.4 Mekanisme keruntuhan pada Struktur dengan Sendi plastis ....... 14

Gambar 2.5 Deformasi Portal terbuka dan Dinding geser ............................... 15

Gambar 2.6 Letak Dinding geser ..................................................................... 16

Gambar 2.7 Superimpos mode individu dari Deformasi ................................. 18

Gambar 2.8 Deformasi Dinding geser menurut Kiyoshi Muto ....................... 19

Gambar 2.9 Gempa maksimal yang dipertimbangkan resiko tertarget S1 ....... 30

Gambar 2.10 Gempa maksimal yang dipertimbangkan resiko tertarget SS ....... 31

Gambar 2.11 Spektrum Respons Desain ........................................................... 33

Gambar 2.12 Penentuan simpangan antar Lantai .............................................. 35

Gambar 2.13 Torsi tak terduga .......................................................................... 37

Gambar 2.14 Pembesaran Torsi tak terduga ...................................................... 38

Gambar 2.15 Balok menerus ............................................................................. 42

Gambar 2.16 Diagram tegangan regangan Balok Beton Bertulang................... 42

Gambar 2.17 Variasi nilai 𝜑𝜑 terhadap εt untuk Fy = 400 MPa ........................... 43

Gambar 2.18 Penampang Persegi pada kondisi seimbing ................................. 45

Gambar 2.19 Penampang Persegi dengan Tulangan Rangkap dan Diagram Regangan 49

Gambar 2.20 Pelat satu arah dan Pelat dua arah ................................................ 52

Gambar 2.21 Pelat Ekuivalen ............................................................................ 56

Gambar 2.22 Denah lajur Kolom dan lajur tengah Portal Ekuivalen ................ 56

Gambar 2.23 Sistem Rangka Pemikul Momen .................................................. 57

Page 16: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

xviii

Gambar 2.24 Contoh-contoh sengkang tertutup saling tumpuk dan ilustrasi batasan pada

spasi horizontal maximum batang tulangan longitudinal yang ditumpu 60

Gambar 2.25 Geser desain untuk Balok dan Kolom ......................................... 62

Gambar 2.26 Tulangan Transversal pada Kolom .............................................. 64

Gambar 3.1 Lokasi Eksisting Gedung Pemerintah Kabupaten Lamongan ..... 66

Gambar 3.2 Diagramn Alir Perhitungsn Penulangan Komponen Lentur ........ 71

Gambar 4.1 Portal melintang ........................................................................... 80

Gambar 4.2 Respon Spectrum Design ............................................................. 84

Gambar 4.3 Gempa maksimal dipertimbangkan resiko-target (MCER) .......... 84

Gambar 4.4 Distribusi Beban Pelat pada Balok Anak ..................................... 95

Gambar 4.5 Momen pada Balok Anak memanjang ......................................... 96

Gambar 4.6 Momen Balok Anak Melintang ................................................. 104

Gambar 4.7 Penulangan Balok Anak ............................................................. 110

Gambar 4.8 Denah Balok Induk .................................................................... 111

Gambar 4.9 Pembagian Zona Bangunan ....................................................... 115

Gambar 4.10 Momen Beban Balok Induk Lantai 2 dan 3 ............................... 118

Gambar 4.11 Penulangan Daerah Tumpuan Balok Induk ............................... 122

Gambar 4.12 Penulangan Daerah Lapangan Balok Induk ............................... 124

Gambar 4.13 Penulangan Sengkang Balok Induk melintang .......................... 128

Gambar 4.14 Penulangan Sengkang Balok Induk memanjang........................ 128

Gambar 4.15 Momen, Gaya Aksial dan Gaya geser maksimum ..................... 135

Gambar 4.16 Tulangan Kolom ........................................................................ 138

Gambar 4.17 Diagram tegangan regangan Kolom seimbang .......................... 139

Page 17: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

xix

Gambar 4.18 Diagram regangan Kolom Kondisi Eksentris x ......................... 140

Gambar 4.19 Diagram tegangan Kolom Kondisi Eksentris y ......................... 142

Gambar 4.20 Penulangan Kolom ..................................................................... 147

Gambar 4.21 Gaya yang bekerja pada Shear Wall .......................................... 149

Gambar 4.22 Dinding geser ............................................................................. 150

Gambar 5.1 Penulangan Balok Anak ............................................................. 155

Gambar 5.2 Penulangan Balok Induk ............................................................ 156

Gambar 5.3 Penulangan Jarak Sengkang Balok Induk Melintang ................ 156

Gambar 5.4 Penulangan Jarak Sengkang Balok Induk Memanjang .............. 156

Gambar 5.5 Penulangan Kolom ..................................................................... 156

Gambar 5.6 Penulangan Dinding Geser ........................................................ 157

Page 18: CHANDRA YUDHAeprints.umm.ac.id/64302/55/PENDAHULUAN.pdf · 2020. 8. 11. · 6.1.4 Penampang Persegi Bertulangan Rangkap .....48 2. 6.1.5 Tulangan Tekan sudah Luluh ... 6.3.1 Metode

DAFTAR PUSTAKA

Badan Standarisasi Nasional. (2012). Tata Cara Perencanaan Ketahanan Gempa untuk

Struktur Bangunan Gedung dan Non Gedung (SNI 1726:2012). Jakarta: Standar Nasional

Indonesia

Badan Standarisasi Nasional. (2013). Persyaratan Beton Struktural untuk Bangunan Gedung

(SNI 2847:2013). Jakarta: Standar Nasional Indonesia

Badan Standarisasi Nasional. (2013). Beban Minimum untuk Perancangan Bangunan Gedung

dan Struktur (SNI 1727:2013). Jakarta: Standar Nasional Indonesia

Diphohusodo, Istimawan. (1993). Struktur Beton Bertulang. Jakarta: Gramedia Pustaka Utama

Kusuma, Gideon, dan Takim Andriono. (1993). Pedoman Pengerjaan Beton Jilid 2. Jakarta:

Erlangga

British Standard. 1997. BS 8110-1:1997 Structural use of Concrete-part 1: Code of Practice

for Design and Construction.

Purwono, Rahmat. (2005). Perencanaan Struktur Beton Bertulang Tahan Gempa. Surabaya:

ITS Press

Mc.Cormac, Jack. (2005). Design of Reinforced Concrete. New York : John Willey & Sons.Inc

Setiawan, Agus. (2016). Perancangan Struktur Beton Bertulang Berdasarkan SNI 2847:2013.

Jakarta: Penerbit Erlangga

Faizah Syahidah. (2017). Studi Perbandingan Desain Struktur Menggunakan Sistem Rangka

Gedung Dengan Sistem Genda Sesuai SNI 1726:2012 dan SNI 2847:2013. Surabaya: Institut

Teknologi Sepuluh November