12
Presenting: Phyllis Grover, Director of Planning and Community Development City of Aberdeen Briefing for the CSSC Consortium

City of Aberdeen Briefing for the CSSC Consortium

  • Upload
    bikita

  • View
    52

  • Download
    0

Embed Size (px)

DESCRIPTION

City of Aberdeen Briefing for the CSSC Consortium. Presenting: Phyllis Grover, Director of Planning and Community Development. Aberdeen Station Area . The Aberdeen Train Station is a designated Transit Oriented Development (TOD) area. Station Square Area . - PowerPoint PPT Presentation

Citation preview

Page 1: City of Aberdeen  Briefing for the CSSC Consortium

Presenting: Phyllis Grover,Director of Planning and Community

Development

City of Aberdeen Briefing for the CSSC

Consortium

Page 2: City of Aberdeen  Briefing for the CSSC Consortium

Aberdeen Station Area

The Aberdeen Train Station is a designated Transit Oriented Development (TOD) area.

Page 3: City of Aberdeen  Briefing for the CSSC Consortium

Station Square Area Utilizing the CSSC-OEA

Grant funding, the Aberdeen Station Square Feasibility Study is completed and pre-preliminary engineering civil site plans and cost estimates were provided for the pedestrian underpass and planned improvements.

Cost approx. $36.0 million for the east and west plazas, underpass, parking, and roadway improvements.

Page 4: City of Aberdeen  Briefing for the CSSC Consortium

Visi

onSTATION SQUARE CONCEPT

Pedestrian

Underpass

Station Square –

East and West

Railroad Tracks/

Platforms

US 40 “GreenBoulevard” at Station Square

Page 5: City of Aberdeen  Briefing for the CSSC Consortium

Stat

ion

Squa

re –

Init

ial P

hase

Page 6: City of Aberdeen  Briefing for the CSSC Consortium

Sta

tion

Squ

are

– U

ltim

ate

Phas

e

Page 7: City of Aberdeen  Briefing for the CSSC Consortium

Aberdeen TOD Area Additional planning

grant funds have been awarded by the BMC and the MDOT to develop a form-based code for the designated TOD area.

Public Workshops are planned for May-July, 2013.

Page 8: City of Aberdeen  Briefing for the CSSC Consortium

Commercial Development North Gate Business Park

– MITRE Corp., Northrop Grumman, DSA, Telcordia Technologies, Roundtable Defense, and Symbolic Systems.

Hickory Ridge Technology Campus – MSA Company, STG, Inc., and Shafer Corp.

Aberdeen Corporate Park Fieldside Commons

Page 9: City of Aberdeen  Briefing for the CSSC Consortium

New Commercial Development

Royal Farms Store Aldi’s Grocery Store Home 2 Suites by

Hilton (107 rooms) Gino’s Burgers and

Chicken restaurant Aaron’s Great Clips

Page 10: City of Aberdeen  Briefing for the CSSC Consortium

New Commercial Development

Clarion Hotel converting to Comfort Suites

Briquettes Charcoal Chicken restaurant

Firestone Complete Auto Care

Chick-fil-A restaurant

Page 11: City of Aberdeen  Briefing for the CSSC Consortium

Residential Development Eagle’s Rest – 133 single

family homes (under construction)

The Fields at Rock Glenn – 101 single family homes (under construction)

The Villages of Highland Commons - 22 townhouses The Residences at Fieldside

Village – 200 apartment units

The Colony at Beards Hill – 192 apartment units

Page 12: City of Aberdeen  Briefing for the CSSC Consortium

Other Activities Aberdeen Heritage

Trust – Historic Walking Tours

Earth Day planned for April 20, 2013

Dog Park planned for Rogers Street

Water enhancements planned for Festival Park