Coal Transportation – Railways’ Initiatives 24 September 2010 Coal Production -2025 Company Open cast UG Total CIL 715 124 839 Non-CIL 187 35 222 Total 902 159 1061

Coal Transportation Railway's Initiatives

Embed Size (px)

Citation preview

Page 1: Coal Transportation Railway's Initiatives

Coal Transportation –Railways’ Initiatives

24 September 2010

Coal Production -2025

Company Open cast UG Total

CIL 715 124 839

Non-CIL 187 35 222

Total 902 159 1061

Page 2: Coal Transportation Railway's Initiatives

Coal Production Estimates

2009-10

(Prov.)

2016-17 2025 Addition

ECL 30.1 63 74 43.9

BCCL 27.5 40 49 21.5

CCL 47.1 112 131 83.9

WCL 45.7 36 46 0.3

SECL 108.0 152 159 51.0

NCL 67.7 70 81 13.3

MCL 104.0 174 241 137.0

NEC 1.1 1 1 0.1

Non-CIL areas 0 5 57 57

TOTAL CIL 431.2 653 839 407.9

SCCL 50.4 45 47 0

Others 50.4 80 175 124.6

TOTAL 532.0 778 1061 532.5

Coal Transportation by Railways

Year

Quantity

(Mill. Tonnes) Growth %

2005-06 294.3

2006-07 313.9 6.4%

2007-08 338.3 7.7%

2008-09 369.4 9.1%

2009-10 396.1 7.2%

Includes Coal for TPS, Steel Plants, Washery and Other Users and Imported coal

Page 3: Coal Transportation Railway's Initiatives

Requirement of Railway Transportation

Coal Production +

Imports

(Mill. Tonnes)

Railway's Share

(Mill. Tonnes)

Rail Co-

efficient

2009-10

(Actual)

599

(532 + 67) 396 66

2024-25 1061 700 66

The figures of 2025 do not include imported coal. The demand for coal

transportation by rail will, however, be much more than the conservative estimates

of 700 MT.

Freight RevenueTotal

Freight

Revenue

(Rs. cr.)

Revenue

from

coal

(Rs. cr.)

% of Total

Revenue

Lead

(in Kms.)

2009-10 57594 22366 39% 579

2008-09 53137 20029 38% 578

2007-08 47588 17756 37% 575

Page 4: Coal Transportation Railway's Initiatives

Railway Targets for the XI Five Year Plan (Figures in Km.)

Item X Plan

(Actual)

XI Plan Targets Achievements

(Upto 3rd Year

2009-10)

New Lines 920 2000 763

Gauge

Conversion

4289 6000 3412

Doubling 1300 2500 1489

Railway

Electrification

1809 4500 2416

Total Outlay of XI Plan is Rs. 2,33,289 crore out of which GBS is 63,635 cr.,

Internal Resources Rs. 90,000 cr and EBR Rs. 79,654 cr.

Growth Regions of Coal Traffic

CCL area

MCL Talcher

SECL -Korba area

60% ( 259 mt) CIL’s

production from three

Coal Companies

Page 5: Coal Transportation Railway's Initiatives

Major Capacity Augmentation Projects

• MCL – Doubling of two bridges over rivers of Birupa and Mahanadi – Doubling of Rajatgarh – Barang (20km)– Double/ Third line between Cuttak-Barang-Khurda (47km)– Third line between Vizianagaram – Kottavalsa (35km)– Fourth Line between Simhachalam-Kottavalsa(19km)– Angul – Sukinda new rail link (98km)– Talcher – Bimlagarh new rail link (154km)– Doubling of Jharsuguda-Sambalpur-Titlagarh (229km)– Doubling of Talcher – Sambalpur (174 km)– Doubling of Raipur – Titlagarh (203 kms.)– Third line Jharsuguda – Champa – Future DFC on East Coast Line & East-West

Page 6: Coal Transportation Railway's Initiatives

• SECL

– Third Line Champa – Jharsuguda (165 km.)

– Third line between Bilaspur – Urkura (110km)

– Third Line Bhilai-Durg- Rajnandgaon(13km)

– Doubling of Kalumna – Nagpur (10 km.)

– Doubling of Balance Bilaspur – Anuppur (65km)

– New DFC-East-West Corridor

Major Capacity Augmentation Projects

Page 7: Coal Transportation Railway's Initiatives

• CCL area

– DFC-Eastern Corridor

– Tori-Shivpur-Hazaribagh-Koderma-Tilaiya-Rajgir

New Line (284 km)

– Doubling of B Route of Northern Railway (via

Zafrabad – Lucknow) for serving power houses in

the northern hinterland

– Doubling of Pandebeshar-Sainthia (50km)

– Third Line Aligarh-Ghaziabad(106 km)

Major Capacity Augmentation Projects

Page 8: Coal Transportation Railway's Initiatives

Pakur

mines

Page 9: Coal Transportation Railway's Initiatives

PROPOSED FREIGHT

CORRIDORS

MUMBAI

DELHI

CHENNAI

KOLKATA

LUDHIANA

VIJAYAWADA

Sanctioned projects

VASCO

EasternWestern

North-South

East-West

Southern

East Coast

Dedicated Freight Corridors

• The Eastern DFC (Dankuni – Ludhiana) 1839 km. and the Western DFC

(Dadri – JNPT) 1514 km. are already sanctioned high priority State-of-the-

art projects expected to be commissioned by 2016-17 with an estimated

investment of Rs 50,000 cr.

• It is expected that 60% of the Traffic of eastern DFC will be coal which

will link CCL, NCL , ECL and BCCL as well as new coal mines near Pakur

• Both Eastern and Western DFC will also carry imported coal from the

ports on the eastern and western coasts to the consumption centres

• Besides, surveys are being conducted for four future Dedicated Freight

Corridors (North-South, East-West, East-coast and Southern corridors)

• DFC as well as their feeder routes is being planned for heavy and long -

haul i.e. high axle-load (25 t) wagons and longer trains

• The length of feeder routes to Western and Eastern DFC would be around

5000 km. which are under upgradation

Page 10: Coal Transportation Railway's Initiatives

1 Sonnagar- Garwa Road- Barkakana 311

2 Gomoh-Chandrapura-Bokaro-Muri-Chandil-Sini-Chakradhapur 216

3 Patratu- Gomoh including PD Branch Line 128

4 Sonnagar - Gaya - Gomoh 249

5 Gomoh - Pradhankhunta (39 kms.) including Kusunda–Tetulmari (4.5 Kms.) Katrasgarh–Nichitpur, Pradhankhunta-Pathardih links

(24 kms.)

6 Pradhankhunta - Asansol - Andal including coal Branch lines 75

7 Dhanbad-Katrasgarh-Jamuniatar-Chandrapura 36

8 Andal-Sainthia-Pakur 151

9 Dankuni-Andul-Panskura-Haldia 155

10 Dankuni-DumDum Junction - Ballygunj Junction - Diamond Harbour Ballygunj Junction -Budge Budge 101

11 Chandil-Bhojidih-Mohuda-Gomoh 144

12 Tatanagar-Chandil 20

13 Mughalsarai – Unchahar via Janghai, Phaphamau 205

14 Aligarh – Harduaganj 15

15 Zafrabad – Tanda 99

16 Kanpur – Paricha 198

17 Varanasi-Sultanpur-Utratia –Rosa 558

18 Ludhiana –Beas-Govindwal Sahib 112

19 Rajpura – Dhuri – Bhatinda (Lehra Mohabbat) 173

20 Sirhind – Rupnagar – Nangal Dam 104

21 Hissar-Bhatinda-Suratgarh 298

22 Suratgarh-Biradhwal 18

Total Route Kms. 3366

Western Corridor

1 Pipavav– Surendranagar– Viramgam– Mehsana 395

2 Kandla Port– Gandhidham- Palanpur 312

3 Mundra Port – Gandhidham 66

4 Viramgram – Samakhiali 182

5 Hazira – Surat 40

6 Ludhiana – Hissar – Rewari 348

7 Mumbai Port – Wadala – Kurla – Diva with connectivity with DFC 36

8 Panvel – Pen – Roha 75

9 Bharuch – Dahej 62

Total Route Kms. 1516

Feeder Routes of Eastern and Western DFC

Page 11: Coal Transportation Railway's Initiatives

Port Connectivity Works

NAME OF THE

PORT

PROJECT LENGTH

(KMS.)

PROJECT COST

(RS. CR)

Paradeep Haridaspur – Paradeep New Line 82 791.18

Kandla Port Bhildi – Samdari Gauge Conversion 223 490.00

Mumbai Dedicated Freight Line between Wadala

and Kurla

5.66 104.00

Ennore The new chord line between Puttur –

Attipattu

144 435.00

Haldia Doubling of Panskura – Haldia – Phase-II 37.9 86.91 (for

Rajgoda-

Tamluk)

Cochin Vallarpadam – Idapally New Line. 8.86 246.50

Dahej Bharuch – Samni – Dahej Gauge

Conversion

62.3 200.8

Krishnapatnam Obulavapalle – Krishnapatnam New Line 113.12 732.81

Challenges

• Future growth in coal sector will come from coal blocks which

require urgent rail connectivity

• The linking of coal blocks as well as new ports will be crucial which

can be partnership /PPP projects between Railways and stake

holders

• Last mile connectivity to new blocks will account for more than 200

MT of coal by 2020

• Handling facilities at ports and terminals will have to match the

growth

• Generate capacity, ahead of demand

• Resource Mobilisation for modernisation and network augmentation

Page 12: Coal Transportation Railway's Initiatives

• Capacity Augmentation through Dedicated Freight Corridors

• Enhancement of Axle Load to 25T

• Strengthen Port connectivity

• Enter into long term service agreements

• Enhancing Capacities for production of locomotives through PPP

Strategy for Growth

JNPT

Vadodara

Ahmedabad

Dadri

Son Nagar

Khurja

Ludhiana

Howrah

Western & Eastern DFC Network

Eastern CorridorWestern CorridorWestern CorridorWestern CorridorWestern Corridor

Dankuni

MGS

Page 13: Coal Transportation Railway's Initiatives

Thanks