14
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Embed Size (px)

Citation preview

Page 1: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

ASTeC Research Strategy

Mike PooleDirector

Page 2: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

ASTeC Strategic Objectives• Establish and consolidate UK core accelerator skills base

– leadership and advice to stakeholders

• Ensure international competitiveness – (people + programme)

• Develop future LSF – (advice, design, prototype, construction)

• Promote suitable CCLRC activities (DL + RAL)

• Pursue underpinning technology – (inc. experiments)

• Encourage collaborations – (AIs + HEIs + international)

Page 3: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

Key Elements

• Underpinning design studies

• Beam dynamics simulations

• New technology demonstration

• Advanced beam test facilities

• Major networking with HEIs and overseas laboratories

• Knowledge transfer

• Recruitment

Page 4: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

Programme Outline• Project support

• ERLP FETS MICE 4GLS ILC NF SRS DIAMOND XFEL FAIR

• Underpinning generic studies

• Types• Gun linac ERL synchrotron storage ring FFAG BTS

• Categories• Conceptual (and Technical) Design Studies• Beam dynamics and Radiation Sources• Technologies - magnetics,

RF

diagnostics

vacuum science

collimation and dumps

Page 5: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

Extrapolated SR02 funds = £6M over 3 years

Policy decision:

• 25% on LC programme: £1.5M

• of which £500k available to promote HEI studies

• LC-ABD support to be demonstrated• Priority to synergetic activities (eg Light Sources)

Agreed joint work packages with HEIs:– Collimation

– Longitudinal bunch diagnostics

– BPM R&D

ASTeC Funded LC Programme

Page 6: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

ASTeC Funded Work Packages (3 year)

1. Collimation (ASTeC/Lancaster)• wake field simulations + experiments• £500k (inc RA)

2. Temporal Profile (ASTeC/Abertay)• electro-optic developments (+ small SP support)• ultrafast laser for tests• £600k (inc RA)

3. Advanced BPMs (ASTeC/Cambridge/UCL)• use in high precision spectrometry• £250k (inc RA)

4. Access to Test Beams at SLAC (All groups)

• £100k support costs on ESA

NB CCLRC also funds international advisory panel and travel administration

Page 7: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

EU Programmes

• Previous FP5: EUFELE RF Cavity*

• FP6 I3 contracts: HIPPI ELAN PHIN

• FP6 awards: EuroTeV EUROFEL

* Officially completed

NB Major problem of overhead recovery

FP7 presents major challenges

Page 8: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

Underpinning R&D

• Laser based accelerator systems (with CLF and HEIs)

• Novel magnet systems (with EID and HEIs)

• Vacuum science research collaborations (inc MMU contract)

• Advanced RF technology (with HEIs)

ca £500k pa staff costs (70% ASTeC)

NB This excludes generic R&D elements of funded project programmes

Page 9: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

Planned ASTeC Income 05/06

INCOME SOURCES 05/06

EU5%

OTHER8%

OTHER CCLRC VOTE BUDGET

28%

SR2002 SCIENCE BUDGET

EARMARKED35%

PPARC24%

PPARC

SR2002 SCIENCE BUDGETEARMARKED

OTHER CCLRC VOTE BUDGET

EU

OTHER

TOTAL ~ £8M

Page 10: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

Planned ASTeC Expenditure 05/06EXPENDITURE 05/06

SCIENTIFIC & ENGINEERING STAFF

COSTS29%

CENTRAL SERVICES 17%

CAPITAL EXPENDITURE

17%CONSUMABLES,

TRAVEL37%

SCIENTIFIC & ENGINEERINGSTAFF COSTS

CONSUMABLES, TRAVEL

CAPITAL EXPENDITURE

CENTRAL SERVICES

EXPENDITURE BY PROGRAMME 05/06

EU AND REPAYMENT WORK13%

PPARC/CCLRC LC-ABD PROGRAMME

26%

PPARC/CCLRC UK-NF PROGRAMME

14%

HIGH POWER PROTON ACCELERATORS

15%

HIGH BRIGHTNESS ELECTRON

ACCELERATORS7%

UNDERPINNING RESEARCH

11%

OTHER PROFESSIONAL

ACTIVITIES14%

PPARC/CCLRC LC-ABDPROGRAMME

PPARC/CCLRC UK-NF PROGRAMME

HIGH POWER PROTONACCELERATORS

HIGH BRIGHTNESS ELECTRONACCELERATORS

UNDERPINNING RESEARCH

OTHER PROFESSIONAL ACTIVITIES

EU AND REPAYMENT WORK

Page 11: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

Long Term Investment Priorities

• Sustainable skill base

• Funding of prototypes

• Integrated SRF design/construction/testing facility

• Build and operate e-FFAG Model (on ERLP)

• Construct e and p Accelerator Test Facilities (DL + RAL)

• Ramp up R&D funding prior to Capital Facility

NB All of these involve HEI collaboration and cross-Council interests

Page 12: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

Proposed SRF Technology Initiative

• Maturity and applicability of superconducting RF systems• including 4GLS and ILC - potential major UK role

• Demanding superconducting RF infrastructure

• Integrated design, build and test (HP) - nowhere in Europe !

• Collaboration • ASTeC/HEIs/Industry/Faraday Partnership/NWDA

• Exploit Daresbury infrastructure

• Unsuccessful bids to PPARC (£10M ?)

Page 13: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

Proposed site for EMMA: e-FFAG Model

Build for £4M ?

Page 14: Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director

Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole

Issues

• Training

• Prototype Funding

• Infrastructure

• Collaborations

• Publications