Upload
raj-bangalore
View
257
Download
3
Embed Size (px)
Citation preview
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 1/26
1. Title of the Project.
College Administrative Active Website
Introduction
This project “ ” is online website to manage all the activities of
the college. It provide very good interface between college administration
with students. On implementing this project students can get all the
information they want easily.
This project can make the tedious & mistake-prone job easier and faster. Itcan be used both in top-level and bottom-level management for daily
operation.
All the facilities for retrieving like student information, teacher’s information,
library management, courses and fees management will be added, deleted,
updated and saved in the project i.e. when a new student want admission all
the information regarding the admission will be provided online. So he will
get all the information related course, fees, ,teacher’s or non teaching staff
information ,library etc.
The application will be scalable and easily maintained. It could be easily
changeable to the changing needs of users.
The site is also implanted with the face recognition to logon to the site. With
this student can login easily. The same also can be implemented for
attendance, so there is no need of taking the attendance by thelecturer.
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 2/26
2. Introduction and Objectives of the Project.
DRAWBACKS OF EXISTING SYSTEM STUDY
Existing System study reveals that all the booking was done manually on
registers, which was very tedious and error prone job. Searching and report
generation was also not possible in the existing system. Also the work of
Institute was manually maintained. There was register or file system in the
Institute.
Present mode of working is based on manual system in which the all the
information is first received and than entered in the register. It is very
difficult job and time consuming also. Moreover, the existing system is also
dependent on employees, if the employees are absent; it leads to problem
and affects the business performance.
Due to large volume of data, a lot of complexities are involved in
maintaining, updating and retrieving selected information. Since old systemis totally maintained manually, some of the complexities involved in existing
system are as follows:-
1. Redundancy of data: - Due to improper maintenance of data,
inconsistency is there which leads to problem like duplication of data.
2. Difficulty in updating the data:-Problem of updating data in the
existing system since everything is stored in registers and files. It is very
difficult and time consuming to update data.
3. Non-centralized data:-In the existing system, data records are kept
under file maintenance system, due to this system the placement of the data
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 3/26
is not at one particular place. This results in more confusion and more
consumption of time for the proper maintenance of records.
4. Delay in retrieving information: -Retrieving information is quite time-
consuming process because of large volume of data, if it is required to locate
a particular record a large number of registers have to be scanned.
5. Problem for keeping the data: -As the data is voluminous, more space
is required to store it. Also everything is stored on papers. This type of
storage is more prone to damage with time and due to other accidental
factors.
6. No integration or relation between the data: - Present system does
not support any type of data integrity.
7. Not proper retrieval of information: - It is very difficult to get data
information in the existing system if any information is required for any
specific purpose.
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 4/26
PROPOSED SYSTEM STUDY
The new system will automate the whole working of institute. In this project
we will retrieve the information of student or update the information easily
by the use of computer. If any new student come into the institute for
admission all the information regarding the student and in which course he /
she wants to take admission or what the roll no given to the student all the
information is stored into the database .we can easily retrieved , changed ,
updated or saved the information whenever we want. Information regarding
the teachers or non teaching staff are also in this project .Here we will
manage the library also that is how many books are in the library and
information of all the issued books from the library. Fine of the student isalso calculated by the use of computer from the attendance chart. Managing
the funds of students by monthly basis or semester basis.
Proposed System is built with technique i.e. ASP.net with SQL Server.
Proposed system is very fast, easily and efficient system.
The proposed system is also less dependent on employees. It works without
any help of employees. The whole software is automatic. The entire software
is full of photographs of all topics categorized under different groups.
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 5/26
OBJECTIVE OF NEW SYSTEM
The objective is to design a system that can integrate all the above features
in a single system, so that it can be easy to use .The new system should
have all the records and files of the old system in a comprehensively linked
manner so that whenever we want to retrieve some information, it can be
done in an efficient manner.
The system should be a one-step shop solution where all the different jobs
regarding the various operations and functions in the centers can be done on
a single window with least hassle. That is, the new system should be able to
do work in the least amount of time and with much more efficiency and
effectiveness than the existing system.
The designing aspects of new system should be aimed towards basing all the
data fields and data records in a single database, from where any operation
on the data or data retrieval can be done easily. It should be designed in
such a way that only the required information is displayed when asked for.
Not like the manual system where one has to search in hard copy files to
look for a particular record.
It should remove, if not all majority of the problems that exists in the old
system. Also it should be compatible, easy to understand and easy to modify.
The aim would be to remove as many problems as possible from the existing
system and design the new system in such a manner that it looks a very
comprehensive approach to the stated objectives. The organization structureof the old system should be clearly understood so that the objectives it aims
to achieve can be designed.
There should be complete interaction between the various sub-systems of
the main system so that there can be efficient functioning of the system.
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 6/26
Every component of the system should be able to interact with other
components through a common interface. There should be such an
interaction interface, that if one component wants the output from other sub-
system then it can do so freely and without hindrance.
Also all sub-systems should be interdependent on each other and also
independent, it means that whenever some sub-system wants some
information from other sub-system, it can do so without any problem, also
when a system functions independently then it does not have to wait for data
to be processed. All the sub-systems should be performing the designed
operations on the given data in a comprehensive manner so that all of them
are aimed towards achieving a common goal.
The main objectives of the new system are mentioned below:-
1. Fast and Efficient: - As compared to existing system, in new system the
user can get the information fast, easily and efficiently from the software.
2. Reliable and accurate: -As in new system, the information is stored and
processed in computers so that data will be more reliable and accurate.
3. Centralized Data:-In the existing system, data records are kept under
file maintenance system due to this system the placement of the data is not
at one particular place. But in new system, each and every record is
maintained on computer, which leads to the centralization of data.
4. Non Redundant Information: - As in proposed system data is
maintained on the computers so inconsistency does not occur which will
never lead to problem like duplication of data.
5. Easy to Access: -As compared to existing system, in new system the
users can easily and efficiently accesses the information from the computer.
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 7/26
6. No Documentation: -As everything is stored on the computer, so there
is no need of documentation or maintaining the files.
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 8/26
3. Project Category : Web Application
This is online site, works globally. So student and lecturers can access the
web wherever they are.
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 9/26
4. Tools / Platform, Hardware and Software Requirementspecifications.
Hardware and Software requirement
Hardware Requirement
Processor : Intel Core Duo 2.0 GHz or more
RAM : 1 GB or More
Harddisk : 80GB or more
Monitor : 15” CRT, or LCD monitor
Keyboard : Normal or Multimedia
Mouse : Compatible mouse
Software Requirement
Front End : Visual Web Developer 2008
With Sql Server Compact Edition
Language : Visual Basic or C#
Back End : MS Sql Server
Operation System : Windows XP with server pack 3
Or Windows 7
Browser : Internet Explorer or Google Crome
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 10/26
6. A complete structure which includes
Functional Description
The problem under study is being divided into several modules/functions
discussed below to understand the approach to the solution in the broader
way:
This Project have major three modules
1. Admin Module
2. Staff Module
3. Student Module
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 11/26
System architecture description
Document Outline
Here is the outline of the proposed template for software design pacifications.
Please note that many parts of the document may be extracted automatically
from other sources and/or may be contained in other, smaller documents.
What follows is just one suggested outline format to use when attempting to
present the architecture and design of the entire system as one single
document. This by no means implies that it literally is a single document
(that would not be my personal preference):
Major Screens
1. Admin Module
i. Main Page
ii. Login Page
iii. Main page with links
iv. Course Details Form
v. Fee Structure Form
vi. Student List
vii. Fee List
viii. Staff List
ix. FAQ
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 12/26
2. Staff Module
i. Registration Page
ii. Login Pageiii. Main page with links
iv. View Student List
v. Attendance Entry
vi. Test Marks Entry
vii. FAQ
3. Student Module
i. Registration Page
ii. Login Page
iii. Main page with links
iv. View Classes Form
v. Fee Payment
vi. View Test Marks
vii. FAQ
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 13/26
SYSTEM ANALYSIS
System Analysis is an activity that feeds information to thespecification activity. It is essential that during analysis a complete
and consistent set of specifications emerge for the system. For
achieving this, the first major problem is to obtain the necessary
information. The second problem of analysis is to organize the
information obtained so the information can be effectively evaluated
for completeness and consistent. The third problem is resolving the
contradictions that may exist in the information from different parties.Lastly the fourth problem is avoiding internal design.
The proposed system is developed keeping in mind all these steps and
is designed in such a manner that it satisfies all the requirements to be
called a good system design. The database designed follows 3 rd level
normalization and the input output forms show a better match with the
backend. Thus solves the problem of collecting information and storingit. The collected information is logically related and stored in the
database following the database rules that form the data dictionary for
the various database operations. Which is removes all the possible
contradictions that may arrive and results in proper functioning of the
data repository. Thus having proper functioning of the modules which
integrate together to work to their best.
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 14/26
Analysis
Introduction : In this section we covering context diagram, data flow diagram
explanation, and functional decomposition diagram.
Context Diagram
A System Context Diagram (SCD) in software engineering and systems
engineering is a diagram that represents the actors outside a system that
could interact with that system. This diagram is the highest level view of a
system. It is similar to a Block diagram. SCDs show a system, often
software-based, as a whole and its inputs and outputs from/to external
factors.
System Context Diagrams are diagrams used in systems design to represent
the more important external factors that interact with the system at hand.
This type of diagram according to Kossiakoff (2003) usually "pictures the
system at the center, with no details of its interior structure, surrounded by
all its interacting systems, environment and activities. The objective of a
system context diagram is to focus attention on external factors and events
that should be considered in developing a complete set of system
requirements and constraints".
System context diagrams are related to UML, and show the interactions
between a system and other actors with which the system is designed to
interface. System context diagrams can be helpful in understanding the
context which the system will be part of.
Context diagrams are used early in a project to get agreement on the scope
under investigation. Context diagrams are typically included in a
requirements document. These diagrams must be read by all project
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 15/26
stakeholders and thus should be written in plain language, so the
stakeholders can understand items within the document.
College Mng Context Diagram
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 16/26
Data Flow Diagram
A Dataflow Diagram also known as “Bubble Chart” is used to clarify System
requirements and identifying major transformations that all become
programs in System Design
SYMBOLS
Data Source/Destination
Process
Data Storage
Flow of data
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 17/26
Level 0 Data flow Diagram
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 18/26
Level 1 Data flow Diagram
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 19/26
Level 1 Data flow Diagram
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 20/26
Entity Relationship Diagram
In software engineering, an entity-relationship model (ERM) is an abstract
and conceptual representation of data. Entity-relationship modeling is a
database modeling method, used to produce a type of conceptual schema or
semantic data model of a system, often a relational database, and its
requirements in a top-down fashion. Diagrams created by this process are
called entity-relationship diagrams, ER diagrams, or ERDs.
Data flow diagrams can be used to provide a clear representation of any
business function. The technique starts with an overall picture of the
business and continues by analyzing each of the functional areas of interest.
This analysis can be carried out to precisely the level of detail required. The
technique exploits a method called top-down expansion to conduct the
analysis in a targeted way.
The result is a series of diagrams that represent the business activities in a
way that is clear and easy to communicate. A business model comprises one
or more data flow diagrams (also known as business process diagrams).
Initially a context diagram is drawn, which is a simple representation of the
entire system under investigation. This is followed by a level 1 diagram;
which provides an overview of the major functional areas of the business.
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 21/26
ER Diagram Symbols
ENTITY
RELATIONSHIP
KET ATTRIBUTE
ATTRIBUTE
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 22/26
College Mng ER Diagram
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 23/26
Future Development
At this stage of time when the whole world is running after advancedtechnology in every aspect of life and to comfort man’s life these small
electronic machines like computers have become as indispensable part of our
lives. The project broadband services covers various information required by
user.
In future we hope that this demonstration model can be further improved so
that it will define more things about broadband services so the users are
further benefited.
We can also implement forum to discuss, discussion between technical staff
of the college and the students.
We can also implement online payment system, through which people can
make their payments.
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 24/26
CONCLUSION
Computer is the magic word of today’s world. The object of “College
Administrative Active Website” is to harness the power of the computer for
our practical and potential need. This report expected to extensively cover
this concept and plant a seed of inquisitiveness in the minds of the users.
We are thankful to all the people who have given us their hearty support in
this endeavor, we again thank out college for providing us all the facilitiesand thanks to our beloved Coordinator Mr. G. Somashekar and to our guide
7/27/2019 College Management Project Proposal
http://slidepdf.com/reader/full/college-management-project-proposal 25/26
Flowcharting symbols and conventions
On a system flowchart, each component is represented by a symbol
that visually suggests its function. The symbols are linked by flowlines.
A given flow line might represent a data flow, a control flow, and/or a
hardware interface. By convention, the direction of flow is from the top
left to the bottom right, and arrowheads must be used when that
convention is not followed. Arrowheads are recommended even when
the convention is followed because they help to clarify the
documentation.