METERING, BILLING/CRM MIDDLE EAST AND NAPIC 2006 THINK TANK SESSION NICO SINGH JOHANNESBURG WATER (PTY) LTD SOUTH AFRICA COMMON DISTRIBUTION SYSTEM

COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

METERING, BILLING/CRM MIDDLE EAST AND NAPIC 2006

THINK TANK SESSION

NICO SINGHJOHANNESBURG WATER (PTY) LTDSOUTH AFRICA

COMMON DISTRIBUTION SYSTEM

Page 2: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

PREPAYMENT CHALLENGES• Total of 171 000 properties to be equipped with free-payment• Ideological debate around the concept of prepayment and user-pay

principle.• Project scheduling allowing for multiple contracting and

procurement for Super-Blocks ( ± 120 000 meters)• Free-Payment technology

– SANS 1529-9 (Nov 2003) - Strict Compliance…Dec 05 rev– STS enhancement or an urgent aligned alternative (CDS)– Meter Technology for JW Customer

• Affordability for the consumer• Vandalism, Tampering and Illegal Connections • Vending technology reliability, infrastructure, convenience and

accessibility • Customer Service and Complaints Handling• Preventative maintenance programmes and associated costs• Court challenge around constitutionality of prepayment• (inadequate free basic water, procedural fairness, reliability of

technology)

Page 3: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

TECHNOLOGY MANAGEMENT

• SANS 1529-9 promulgate in Nov 2003• Within 2 years, 3 meter suppliers complied with

standard & obtain FULL TYPE APPROVAL• In terms of experience, capacity and resources

accelerated growth of suppliers to comply with standard

• Meter suppliers absorbed costs associated with enhancements, research and development and testing

• Stimulate an open market • Creation of BEE opportunities

Page 4: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

ENHANCED eBUSINESS

• PREPAYMENT MMS link to HANSEN and Venus (Flat file)

• ISD / TECHNICAL PROJECT DATABASE (Pilot completed)–Use of PDA’s

• SAP ISU INTERFACE (Still in initial development phase)

• COMMON DISTRIBUTION SYSTEM (CDS)…tender phase

• PREPAYMENT TRACKING SYSTEM–Use of PDA’s

(Promotion of the use of Internet, GPS, GPRS, PDA’s)

Page 5: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

VENDING ADMINISTRATION

• Limited to existing small and micro businesses • Currently using the CoJ Cash Office – familiarity• Individual vendor locations will be restricted to the

service-provided area of JW and within an approximate 2,5 kilometre radius around his/her business location to ensure: - Consumer convenience, and- Reasonable income per vendor.

• Commission percentage payable is 10% reviewed on a contractual basis.

• Current Vending Systems are proprietary• Currently initiated the development of a CDS

Page 6: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

TYPICAL INSTALLATION TYPES USED

Not Recommended-Ground Level

Preferred - Above Ground level

Page 7: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

DISPLAY

Page 8: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

METER TYPE 1 TPS

Prepaid Meter Information Transfer Unit

Meter Management System Portable Vending Unit

Page 9: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

SPLIT SYSTEM with SMART CARD

METER TYPE 2 TPS

Page 10: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

METER TYPE 3 TPS

Page 11: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

JW MAIN METER FEATURES• Displays/Indicates “FREE” when in FBW• VOLUME (Liters) of FBW remaining• FBW supply options ~ 200l/day or 6kl/month• The VOLUME (Liters) based on the ACCUMULATED

CREDIT and CURRENT TARIFF• LOW CREDIT Warning CURRENT TARIFF Price (R/Kl) The

PREVIOUS MONTH end reading (Proprietary)• POSSIBLE LEAK detection • TAMPER status • Option to LOCK meter

Page 12: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

DESIRED METER FEATURES

• Audio warnings• Luminous displays during poor visibility• Variable credit limitation settings • Storage of the last day of month credit reading• Automatic meter reading

• (Assess NEED and then impact on cost of meter, system performance, user friendliness and battery source)

Page 13: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

PREPAYMENT COSTS

Excludes removal and re-installation

R 200/unitMeter replacement Battery/Recalibration

In absence of Open Standard renting is preferable

R 10 000/unitR 500/month

Maintenance Equipment

In absence of Open Standard renting is preferable

R 10 000/unitR 500/month

Vending Equipment

R 20 000/monthInstallation

Imperative during the project phase life-cycle

R 50 000/monthSite Support

Dependant on typeR 20 – R 60Information transfer unit

Dependant on volume and meter type

R 850 – R 950New meter & box

REMARKCOSTITEM

Page 14: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

COMMON DISTRIBUTION SYSTEM

• Currently financial, operational and maintenance function of theproprietary systems.

• Reputable supplier to either lease or purchase an electronic management system with associated ancillary services and hardware allowing for the integrated financial and technical management of its prepayment metered customer-base from a Common System.

• Through the introduction of common system JW intends integratingit’s:– various proprietary Total Prepayment Systems (TPS), currently

procured and systems that may procured in future; and – current and future conventional customer-base, within all

prepayment operational areas. – creating an enhanced TPS to improve:

• management, operation and maintenance of its prepayment and non-prepayment activities; and

• customer service and convenience.• CDS shall consist of a Common Management System and Common

Vending Units

Page 15: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

CDS SCHEMATIC LAYOUT

P rim a ry (D e fa u lt)C o m m o n D a ta b a se

S e c o n d a ryT ra n s m iss io n

N e tw o rk

P rim a ryT ra n s m iss io n

N e tw o rk

B illin g &R e v e n u e

S e c o n d a ry (B a ck -u p )C o m m o n D a ta b a se

P ro p rie ta ry T P S s

1

2

3

....

n

C M S

S e e D e ta il 2

O p e ra tio n &M a in te n a n ce

C V U

S e e D e ta il 1

H a n se n o r S A P IS -U

Page 16: COMMON DISTRIBUTION SYSTEM...• SAP ISU INTERFACE (Still in initial development phase) • COMMON DISTRIBUTION SYSTEM (CDS)…tender phase • PREPAYMENT TRACKING SYSTEM – Use of

THANK YOU

Nico Singh Johannesburg WaterProject Manager - PrepaymentCell Number: 082 339 8544Work Number: 011 – 946 0600Fax Number: 011 947 1353E-mail: [email protected]