23
COMPANY PROFILE

COMPANY PROFILE - Infra Design Studio

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: COMPANY PROFILE - Infra Design Studio

COMPANY PROFILE

Page 2: COMPANY PROFILE - Infra Design Studio

INTRODUCTION

• Incepted in 2016, Infra Design Studio (IDS) is a specialist Infrastructure

Design Consultancy, offering end-to-end solutions in the public sector space.

• IDS was established as a private limited enterprise in 2017 and is one of the

fastest growing companies in the area of infrastructure.

• At IDS, we provide quality assured consultancy and technical services to our

valued clients covering all aspects of infrastructure viz. Highways, Bridges &

Buildings.

• IDS is recognized as ISO 9001:2015 certified enterprise in the area of

Infrastructure Design and Consultancy.

2

Page 3: COMPANY PROFILE - Infra Design Studio

VISION & VALUES

• IDS is dedicated to transparent work procedures which help us to establish

long term relations with our Clients and our People.

3

Quality Relationship Profitable Growth Transparency

Accessibility Flexibility

Page 4: COMPANY PROFILE - Infra Design Studio

IDS INFRASTRUCTURE

• IDS is well equipped with necessary infrastructure for all types

of testing required for construction of roads. Some of the

facilities include

– ISO certified soil testing laboratory (Proctor Test, CBR,

Atterberg’s Limits etc.)

– Benkelman Beam Deflection (BBD) Test and Falling

Weight Deflectometer (FWD) Test

– Axle Load Measurements

• IDS is also equipped with state of art software technology for

Design and Analysis of Highway & Bridge structures. Some of

the software include

– Autodesk Products for 2D and 3D development

(AutoCAD, Civil 3D, Revit, Infraworks etc.)

– Bentley Products for design and analysis of structures

(Staad Pro)

4

Page 5: COMPANY PROFILE - Infra Design Studio

MANAGEMENT

• IDS is led by vastly experienced people working in the industry for more than

30 years.

• Team at IDS also includes young engineers with intellectual rigor who strive

for best quality output using advanced technology.

5

Mr. Satish Badhe

Managing Director

Mr. Amar Bade

Director

Mr. Harshad Kaulgud

Director

Page 6: COMPANY PROFILE - Infra Design Studio

HUMAN RESOURCE

• IDS has grown manifold in terms of human resource since its inception.

• We have a team of over 65 people working at Head Office and our site

offices.

6

IDS

Wing I – Highways Human Resource - 15

Wing II – Bridges Human Resource - 10

Wing III – Planning & Estimation

Human Resource - 5

Wing IV – Supervision & PMC

Human Resource – 20

Wing V – BD & Others Human Resource – 15

Page 7: COMPANY PROFILE - Infra Design Studio

TECHNICAL SERVICES

7

Inception & Planning

Feasibility Studies

Detailed Project Reports

Supervision Services

Authority’s Engineer

Independent Engineer

PMC for Concessionaires

O&M Audits

Detail Design & Engineering

Pre-Bid Association & Support

Detail Engineering & Optimization

Resource and Financial Planning

Proof Checking

Safety Audits at all stages

Project Implementation on BIM

• IDS provides end to end services for infrastructure projects from inception

till implementation and maintenance audits.

Page 8: COMPANY PROFILE - Infra Design Studio

OVERALL EXPERIENCE • IDS was incepted with smaller sized projects and over the course of last three years,

substantial progress has been achieved and numerous projects of different kinds have

been completed.

8

Page 9: COMPANY PROFILE - Infra Design Studio

Sr. No. Description

1 Detail Design (Highway Part) No. of Projects Total Length

Completed

4 Lane National Highway (EPC) 2 127 Km

2 Lane with Paved Shoulder 8 259 Km

On-going

6 Lane National Highway 1 11.4 Km

2 Lane with Paved Shoulder 4 205 Km

2 Detail Design (Structures)

ROB 2 Railway Span: 47.0m, 36.9m

Flyover 1 1.092 Km (2 x 12.0 m c/way)

Major Bridges 3 Length 102.0m, 90.0m, 100.0m

Minor Bridges 82

VUP/LVUP 17

Grade Separator 2 32m span

Specialized Bridge 1 100m span Butterfly Arch Bridge

3 Detailed Project Reports

National Highways (MoRTH) 1 191 Km

Hybrid Annuity Mode (PWD, Maharashtra)

1 118.3 Km

4 PMC Services

Independent Engineer (Hybrid Annuity Mode)

2 125 Km

Authority Engineer (MoRTH) 1 39 Km

OVERALL EXPERIENCE

9

Page 10: COMPANY PROFILE - Infra Design Studio

OVERALL EXPERIENCE

• We have also completed structural design of various major and minor structures

including Railway Over Bridges, Flyovers, Major Bridges and Minor Bridges etc.

10

Railway Over Bridges –

2 No.s

• Rly. Span – 47.0m

• Rly. Span – 37.0m

Flyover –

1 No.

• Total Length = 1.10km

• Carriageway Width = 2 x 12.0m

Major Bridges –

3 No.s

• Length = 100m

Minor Bridges –

82 No.s

• Box Type

• Solid Slab Type

Vehicular/Light Underpass – 17 No.s

• Box Type

• Girder Type

Specialized Bridge –

1 No.

• 100m span Butterfly Bridge

Page 11: COMPANY PROFILE - Infra Design Studio

Sr. No.

Project Name Length Highway Classification

Project Cost (Cr.)

Contractor Authority

1 Detail design and Supervision for 4 laning of Panvel Indapur section of NH-66 from CH 0.000 to 38.000

84.0km 4-Lane 500.0 J.M.Mhatre Infra Pvt.

Ltd.

NHAI

2 Detail design for Rehabilitation & Upgradation of Khamgaon - Shegaon section of NH 548C to two lane with paved shoulders with dedicated pathway for Shegaon Pilgrims

22.8km 2-Lane + Paved

Shoulders

157.0 Eagle Infra India Ltd.

MoRTH-

PWD NH

3 Detail design for Rehabilitation & upgradation of NH-Mangaon-Dighi CH 0.000 –CH 54.750

54.8km 2-Lane + Paved

Shoulders

281.63 J.M.Mhatre Infra Pvt.

Ltd.

MSRDC

4 Consultancy services for design of major bridge across river Pavana - from Thergaon to Chinchwad Gaon on 18.00 m. wide D P road for PCMC Pune

- - 15.0 M/s. Dhaneshwar

Constructions

PCMC

5 Project management consultancy for Design & construction of elevated road between Thane Belapur Road to NH4

4.2km Flyover - SMC Infra Ltd.

MMRDA

6 Detailed Project Report of selected stretches/ corridors of Road Network in the State of Maharashtra for up-gradation to two lanes with paved shoulder/ Four Lane Configuration: Jalgaon-Bhadgaon-Chalisgaon-Manmad-Chandwad Road.

191.2km 2/4 Lane with Paved

Shoulders

550.0 - MoRTH-

PWD NH

7 Independent Engineer Services for the Package MU-R-07 and MUR-11

125km 2 Lane Highway

257.0 - PWD, Maharashtra

KEY PROJECTS

11

Page 12: COMPANY PROFILE - Infra Design Studio

DETAILS OF COMPLETED PROJECTS

12

Sr. No

. Project Name

Length Km

Highway Classification

Project Cost (Cr)

Contractor Authority

1 Detail design for 4 laning of Panvel Indapur section of NH-66 from CH

0.000 to 84.000 84.0 4 Lane 500.00 JMMIPL NHAI

2 Detail design for 4 laning of NH-12

Sindoor-Bareli section from CH 130.00 to 193.000

63.0 4 Lane 350.00 GVR Infra MORTH-MPRDC

3 Detail Design for 2 laning of NH 353D

Nagbhir-Armori section from CH 97.487 to 137.000

39.5 2L+ PS 160.00 Ajwani Infra

MORTH-PWD NH

4

Detail design for Rehabilitation & Upgradation of Khamgaon - Shegaon section of NH 548C to two lane with

paved shoulders

22.8 2L+ PS 157.00 Eagle Infra India Ltd.

MORTH- PWD NH

5

Detail design for Rehabilitation & Upgradation of Shegaon-Deori fata

section of NH-548C to two lane with paved shoulders

39.4 2L+ PS 300.90 Eagle Infra India Ltd.

MORTH -PWD NH

6 Detail design for upgradation of NH-353E Malewada-Chimur section from

CH-16.000 to 47.700 31.7 2L+ PS 160.00

SMS Limited

MORTH- PWD NH

7 Detail design for Rehabilitation &

upgradation of NH-Indapur-Agardanda CH0.000 – CH 42.345

42.3 2L+ PS 250.00 THAKUR-MHATRE

JV

MORTH-MSRDC

8 Detail design for Rehabilitation &

upgradation of NH-Mangaon-Dighi CH 0.000 –CH 54.750

54.8 2L+ PS 281.63 JMMIPL MORTH-MSRDC

9 Detail design for Rehabilitation & Up-

gradation of stretch Ralegaon to Vadner CH 0.000 to CH 27.912

27.9 2L+ PS 170.00 RPS-

SHANTI JV

MORTH-MSRDC

10

Detail design for Rehabilitation & up-gradation of Mehkar-Chikhali NH-548C

CH 0.000 to KM 39.700 Mehkar-Chikhali NH548C

39.7 2L+ PS 205.00 JMMIPL MORTH-MSRDC

11

Detail Design for Rehabilitation and Augmentation of Karad-Vita section of NH 166E from Km. 134/617 to Km.

182/117 to two lane with paved shoulder

47.5 2L+ PS 275.50

RAJPATH INFRACO

N PVT. LTD.

MORTH- PWD NH

12

Detail Design for Rehabilitation and Augmentation of Vita-Nagaj section of NH 166E from Km. 182/117 to Km.

228/771 to two lane with paved shoulder

46.6 2L+ PS 235.77

RAJPATH INFRACO

N PVT. LTD

MORTH- PWD NH

13

Detail Design for Up-gradation to 2 lane with paved shoulder standards of Highway Starting at NH-66 (17) near

Pen connecting to Ransai and terminating at its Junction with NH-

548(A) near Mahd (Mahad Ashtvinayak), NH 166D approximate

length of 33.328 km in the state of Maharashtra on EPC mode

33.3 2L+PS 192.27 JMMIPL MORTH- PWD NH

Page 13: COMPANY PROFILE - Infra Design Studio

DETAILS OF COMPLETED PROJECTS

13

Sr. No

. Project Name

Length Km

Highway Classification

Project Cost (Cr)

Contractor Authority

1 Detail design for 4 laning of Panvel Indapur section of NH-66 from CH

0.000 to 84.000 84.0 4 Lane 500.00 JMMIPL NHAI

2 Detail design for 4 laning of NH-12

Sindoor-Bareli section from CH 130.00 to 193.000

63.0 4 Lane 350.00 GVR Infra MORTH-MPRDC

3 Detail Design for 2 laning of NH 353D

Nagbhir-Armori section from CH 97.487 to 137.000

39.5 2L+ PS 160.00 Ajwani Infra

MORTH-PWD NH

4

Detail design for Rehabilitation & Upgradation of Khamgaon - Shegaon section of NH 548C to two lane with

paved shoulders

22.8 2L+ PS 157.00 Eagle Infra India Ltd.

MORTH- PWD NH

5

Detail design for Rehabilitation & Upgradation of Shegaon-Deori fata

section of NH-548C to two lane with paved shoulders

39.4 2L+ PS 300.90 Eagle Infra India Ltd.

MORTH -PWD NH

6 Detail design for upgradation of NH-353E Malewada-Chimur section from

CH-16.000 to 47.700 31.7 2L+ PS 160.00

SMS Limited

MORTH- PWD NH

7 Detail design for Rehabilitation &

upgradation of NH-Indapur-Agardanda CH0.000 – CH 42.345

42.3 2L+ PS 250.00 THAKUR-MHATRE

JV

MORTH-MSRDC

8 Detail design for Rehabilitation &

upgradation of NH-Mangaon-Dighi CH 0.000 –CH 54.750

54.8 2L+ PS 281.63 JMMIPL MORTH-MSRDC

9 Detail design for Rehabilitation & Up-

gradation of stretch Ralegaon to Vadner CH 0.000 to CH 27.912

27.9 2L+ PS 170.00 RPS-

SHANTI JV

MORTH-MSRDC

10

Detail design for Rehabilitation & up-gradation of Mehkar-Chikhali NH-548C

CH 0.000 to KM 39.700 Mehkar-Chikhali NH548C

39.7 2L+ PS 205.00 JMMIPL MORTH-MSRDC

11

Detail Design for Rehabilitation and Augmentation of Karad-Vita section of NH 166E from Km. 134/617 to Km.

182/117 to two lane with paved shoulder

47.5 2L+ PS 275.50

RAJPATH INFRACO

N PVT. LTD.

MORTH- PWD NH

12

Detail Design for Rehabilitation and Augmentation of Vita-Nagaj section of NH 166E from Km. 182/117 to Km.

228/771 to two lane with paved shoulder

46.6 2L+ PS 235.77

RAJPATH INFRACO

N PVT. LTD

MORTH- PWD NH

13

Detail Design for Up-gradation to 2 lane with paved shoulder standards of Highway Starting at NH-66 (17) near

Pen connecting to Ransai and terminating at its Junction with NH-

548(A) near Mahd (Mahad Ashtvinayak), NH 166D approximate

length of 33.328 km in the state of Maharashtra on EPC mode

33.3 2L+PS 192.27 JMMIPL MORTH- PWD NH

Sr. No

. Project Name

Length Km

Highway Classification

Project Cost (Cr)

Contractor Authority

1 Detail design for 4 laning of Panvel Indapur section of NH-66 from CH

0.000 to 84.000 84.0 4 Lane 500.00 JMMIPL NHAI

2 Detail design for 4 laning of NH-12

Sindoor-Bareli section from CH 130.00 to 193.000

63.0 4 Lane 350.00 GVR Infra MORTH-MPRDC

3 Detail Design for 2 laning of NH 353D

Nagbhir-Armori section from CH 97.487 to 137.000

39.5 2L+ PS 160.00 Ajwani Infra

MORTH-PWD NH

4

Detail design for Rehabilitation & Upgradation of Khamgaon - Shegaon section of NH 548C to two lane with

paved shoulders

22.8 2L+ PS 157.00 Eagle Infra India Ltd.

MORTH- PWD NH

5

Detail design for Rehabilitation & Upgradation of Shegaon-Deori fata

section of NH-548C to two lane with paved shoulders

39.4 2L+ PS 300.90 Eagle Infra India Ltd.

MORTH -PWD NH

6 Detail design for upgradation of NH-353E Malewada-Chimur section from

CH-16.000 to 47.700 31.7 2L+ PS 160.00

SMS Limited

MORTH- PWD NH

7 Detail design for Rehabilitation &

upgradation of NH-Indapur-Agardanda CH0.000 – CH 42.345

42.3 2L+ PS 250.00 THAKUR-MHATRE

JV

MORTH-MSRDC

8 Detail design for Rehabilitation &

upgradation of NH-Mangaon-Dighi CH 0.000 –CH 54.750

54.8 2L+ PS 281.63 JMMIPL MORTH-MSRDC

9 Detail design for Rehabilitation & Up-

gradation of stretch Ralegaon to Vadner CH 0.000 to CH 27.912

27.9 2L+ PS 170.00 RPS-

SHANTI JV

MORTH-MSRDC

10

Detail design for Rehabilitation & up-gradation of Mehkar-Chikhali NH-548C

CH 0.000 to KM 39.700 Mehkar-Chikhali NH548C

39.7 2L+ PS 205.00 JMMIPL MORTH-MSRDC

11

Detail Design for Rehabilitation and Augmentation of Karad-Vita section of NH 166E from Km. 134/617 to Km.

182/117 to two lane with paved shoulder

47.5 2L+ PS 275.50

RAJPATH INFRACO

N PVT. LTD.

MORTH- PWD NH

12

Detail Design for Rehabilitation and Augmentation of Vita-Nagaj section of NH 166E from Km. 182/117 to Km.

228/771 to two lane with paved shoulder

46.6 2L+ PS 235.77

RAJPATH INFRACO

N PVT. LTD

MORTH- PWD NH

13

Detail Design for Up-gradation to 2 lane with paved shoulder standards of Highway Starting at NH-66 (17) near

Pen connecting to Ransai and terminating at its Junction with NH-

548(A) near Mahd (Mahad Ashtvinayak), NH 166D approximate

length of 33.328 km in the state of Maharashtra on EPC mode

33.3 2L+PS 192.27 JMMIPL MORTH- PWD NH

Page 14: COMPANY PROFILE - Infra Design Studio

COMPLETED PROJECTS

14

Balganga River Bridge

Total Length = 50.0m

Kharpada River Bridge

Total Length = 100.0m

Page 15: COMPANY PROFILE - Infra Design Studio

COMPLETED PROJECTS

15

Pen Vehicular Underpass

Span = 2 x 12.0m

Pen Railway Over Bridge

Span = 47.0m

Page 16: COMPANY PROFILE - Infra Design Studio

COMPLETED PROJECTS

16

Wadkhal Flyover

Total Length = 1.10km

Construction & Improvement of

Ghat Section in Mangaon-Dighi

Section

Page 17: COMPANY PROFILE - Infra Design Studio

DETAILS OF ON-GOING PROJECTS

17

Sr. No.

Project Name Length Km

Highway Classification

Project Cost (Cr)

Contractor Authority

1 Rehabilitation and Up-gradation of 2 lane road with paved shoulders of Package I –Parbhani to Gangakhed Design Ch. 0+000 to 35+885(Existing Chainage from km 46.620 to km 82.505 of NH 752K) in the State of Maharashtra ON EPC Mode.

35.9 2L+ PS 165.0 Sarjan Infracon Pvt. Ltd.

MORTH- PWD NH

2 Detail Design for Rehabilitation and Upgradation to 2 lane with paved shoulder/ 4 laning configuration of Wakan-Pali-Khopoli Road SH 93 (New NH) connecting SH-88 (New NH) from Km.0/000 to Km. 40/600 in the state of Maharashtra on EPC mode.

40.6 2L+ PS Beigh Const. Co. Pvt. Ltd.

MoRTH/ MSRDC

3 Improvement of Balance Length of Inner Ring Road in Nagpur City to 4/6/8 lane divided carriageway SH 340 ( Under CRF Fund ) Km. 4/000 to 6/000 and 32/000 to 41/450 in the state of Maharashtra on EPC Mode

11.4 6L Divided C/way

160.00 Saket-Shah & Parikh

JV

PWD

4 4-Laning of existing 2-laning stretch from Khudus at km 77.800 to Dharmapuri at km 117.000 (Pkg-3) on Mohol – Alandi Section (Design length 39.200 km) of NH-965 in the State of Maharashtra on EPC Mode

39.2 4L Divided C/way

696.02 JMMIPL NHAI

5 Balance work of 4-Laning of Fagne to Mah / Guj Border Section of NH-6 in the State of Maharashtra from Km 510.000 to Km 650.794 (Design Length 140.794 Km) under Bharatmala Pariyojna on EPC Mode

139.0 4L Divided C/way

1198.75 JMMIPL NHAI

Page 18: COMPANY PROFILE - Infra Design Studio

DETAILS OF ON-GOING PROJECTS

18

Sr. No.

Project Name Length Km

Highway Classification

Project Cost (Cr)

Contractor Authority

1 Rehabilitation and Up-gradation of 2 lane road with paved shoulders of Package I –Parbhani to Gangakhed Design Ch. 0+000 to 35+885(Existing Chainage from km 46.620 to km 82.505 of NH 752K) in the State of Maharashtra ON EPC Mode.

35.9 2L+ PS 165.0 Sarjan Infracon Pvt. Ltd.

MORTH- PWD NH

2 Detail Design for Rehabilitation and Upgradation to 2 lane with paved shoulder/ 4 laning configuration of Wakan-Pali-Khopoli Road SH 93 (New NH) connecting SH-88 (New NH) from Km.0/000 to Km. 40/600 in the state of Maharashtra on EPC mode.

40.6 2L+ PS Beigh Const. Co. Pvt. Ltd.

MoRTH/ MSRDC

3 Improvement of Balance Length of Inner Ring Road in Nagpur City to 4/6/8 lane divided carriageway SH 340 ( Under CRF Fund ) Km. 4/000 to 6/000 and 32/000 to 41/450 in the state of Maharashtra on EPC Mode

11.4 6L Divided C/way

160.00 Saket-Shah & Parikh

JV

PWD

4 4-Laning of existing 2-laning stretch from Khudus at km 77.800 to Dharmapuri at km 117.000 (Pkg-3) on Mohol – Alandi Section (Design length 39.200 km) of NH-965 in the State of Maharashtra on EPC Mode

39.2 4L Divided C/way

696.02 JMMIPL NHAI

5 Balance work of 4-Laning of Fagne to Mah / Guj Border Section of NH-6 in the State of Maharashtra from Km 510.000 to Km 650.794 (Design Length 140.794 Km) under Bharatmala Pariyojna on EPC Mode

139.0 4L Divided C/way

1198.75 JMMIPL NHAI

Sr. No.

Project Name Length Km

Highway Classification

Project Cost (Cr)

Contractor Authority

1 Rehabilitation and Up-gradation of 2 lane road with paved shoulders of Package I –Parbhani to Gangakhed Design Ch. 0+000 to 35+885(Existing Chainage from km 46.620 to km 82.505 of NH 752K) in the State of Maharashtra ON EPC Mode.

35.9 2L+ PS 165.0 Sarjan Infracon Pvt. Ltd.

MORTH- PWD NH

2 Detail Design for Rehabilitation and Upgradation to 2 lane with paved shoulder/ 4 laning configuration of Wakan-Pali-Khopoli Road SH 93 (New NH) connecting SH-88 (New NH) from Km.0/000 to Km. 40/600 in the state of Maharashtra on EPC mode.

40.6 2L+ PS Beigh Const. Co. Pvt. Ltd.

MoRTH/ MSRDC

3 Improvement of Balance Length of Inner Ring Road in Nagpur City to 4/6/8 lane divided carriageway SH 340 ( Under CRF Fund ) Km. 4/000 to 6/000 and 32/000 to 41/450 in the state of Maharashtra on EPC Mode

11.4 6L Divided C/way

160.00 Saket-Shah & Parikh

JV

PWD

4 4-Laning of existing 2-laning stretch from Khudus at km 77.800 to Dharmapuri at km 117.000 (Pkg-3) on Mohol – Alandi Section (Design length 39.200 km) of NH-965 in the State of Maharashtra on EPC Mode

39.2 4L Divided C/way

696.02 JMMIPL NHAI

5 Balance work of 4-Laning of Fagne to Mah / Guj Border Section of NH-6 in the State of Maharashtra from Km 510.000 to Km 650.794 (Design Length 140.794 Km) under Bharatmala Pariyojna on EPC Mode

139.0 4L Divided C/way

1198.75 JMMIPL NHAI

Sr. No

Project Name Length Km

Highway Classification

Contractor Authority

1 Improvements to Mahabaleshwar Satara Rahimatpur Pusesawali Vita Road, SH-140, km 0/000 to 131/600, Dist. Satara (Part II- Dhamner to Vita Km 72/360 to Km 130/520 and Pusesawali Diversion 1.0 km) (Project no. PN 37) for 2- lanning with paved shoulder

59.2 2L+PS D.H. Desai & Associates

PWD Maharashtra

2 Improvements to Karad Malkapur Nandapur, Pachwad Phata Yenpe Kokrud Road, SH-144, km 0/000 to 39/400) (Project no. PN 38) for 2- lanning with paved shoulder road

55.1 2L+PS D.H. Desai & Associates

PWD Maharashtra

3 Construction of two-lanning with paved shoulders Road under Package HAM: Hybrid Annuity NAG 149-Dist. Wardha in the State of Maharashtra under MRIP on Hybrid Annuity Mode

75.3 2L +PS Eagle Infra India Limited

PWD Maharashtra

4 Construction of 2-lanning with paved shoulders Road on Savakhedafata- Dharangaon Erandol- Mhasawad- Neri- Jamner (Jamner Diversion) Road District Jalgaon in the State of Maharashtra under MRIP on Hybrid Annuity Mode

79.2 2L+PS Eagle Infra India Limited

PWD Maharashtra

5 Improvement to Hiwara Darur Vitthalwada (MDR-48) Part-I & Wadholi Road (MDR-19) and Improvement to Gondpipari Podsa Road (SH-369) Part-II in the State of Maharashtra under MRIP on Hybrid Annuity Mode (Package No. NAG-140)

47.3 2L+PS Gurubaxani Engg. &

Const. Pvt. Ltd.

PWD Maharashtra

6 Improvement /Widening to two Lane of Nagpur Nagbhid Mul Road. (MSH-9) Total Length 32.900 KM under Hybrid Annuity Package No. NAG. -144 (Old Package - 76C)

32.9 2L+PS Gurubakshani

Infraventures Pvt. Ltd.

PWD Maharashtra

Page 19: COMPANY PROFILE - Infra Design Studio

DETAILS OF ON-GOING PROJECTS

19

Sr. No

Project Name Length Km

Highway Classification

Contractor Authority

1 Improvements to Mahabaleshwar Satara Rahimatpur Pusesawali Vita Road, SH-140, km 0/000 to 131/600, Dist. Satara (Part II- Dhamner to Vita Km 72/360 to Km 130/520 and Pusesawali Diversion 1.0 km) (Project no. PN 37) for 2- lanning with paved shoulder

59.2 2L+PS D.H. Desai & Associates

PWD Maharashtra

2 Improvements to Karad Malkapur Nandapur, Pachwad Phata Yenpe Kokrud Road, SH-144, km 0/000 to 39/400) (Project no. PN 38) for 2- lanning with paved shoulder road

55.1 2L+PS D.H. Desai & Associates

PWD Maharashtra

3 Construction of two-lanning with paved shoulders Road under Package HAM: Hybrid Annuity NAG 149-Dist. Wardha in the State of Maharashtra under MRIP on Hybrid Annuity Mode

75.3 2L +PS Eagle Infra India Limited

PWD Maharashtra

4 Construction of 2-lanning with paved shoulders Road on Savakhedafata- Dharangaon Erandol- Mhasawad- Neri- Jamner (Jamner Diversion) Road District Jalgaon in the State of Maharashtra under MRIP on Hybrid Annuity Mode

79.2 2L+PS Eagle Infra India Limited

PWD Maharashtra

5 Improvement to Hiwara Darur Vitthalwada (MDR-48) Part-I & Wadholi Road (MDR-19) and Improvement to Gondpipari Podsa Road (SH-369) Part-II in the State of Maharashtra under MRIP on Hybrid Annuity Mode (Package No. NAG-140)

47.3 2L+PS Gurubaxani Engg. &

Const. Pvt. Ltd.

PWD Maharashtra

6 Improvement /Widening to two Lane of Nagpur Nagbhid Mul Road. (MSH-9) Total Length 32.900 KM under Hybrid Annuity Package No. NAG. -144 (Old Package - 76C)

32.9 2L+PS Gurubakshani

Infraventures Pvt. Ltd.

PWD Maharashtra

Sr. No

Project Name Length Km

Highway Classification

Contractor Authority

1 Improvements to Mahabaleshwar Satara Rahimatpur Pusesawali Vita Road, SH-140, km 0/000 to 131/600, Dist. Satara (Part II- Dhamner to Vita Km 72/360 to Km 130/520 and Pusesawali Diversion 1.0 km) (Project no. PN 37) for 2- lanning with paved shoulder

59.2 2L+PS D.H. Desai & Associates

PWD Maharashtra

2 Improvements to Karad Malkapur Nandapur, Pachwad Phata Yenpe Kokrud Road, SH-144, km 0/000 to 39/400) (Project no. PN 38) for 2- lanning with paved shoulder road

55.1 2L+PS D.H. Desai & Associates

PWD Maharashtra

3 Construction of two-lanning with paved shoulders Road under Package HAM: Hybrid Annuity NAG 149-Dist. Wardha in the State of Maharashtra under MRIP on Hybrid Annuity Mode

75.3 2L +PS Eagle Infra India Limited

PWD Maharashtra

4 Construction of 2-lanning with paved shoulders Road on Savakhedafata- Dharangaon Erandol- Mhasawad- Neri- Jamner (Jamner Diversion) Road District Jalgaon in the State of Maharashtra under MRIP on Hybrid Annuity Mode

79.2 2L+PS Eagle Infra India Limited

PWD Maharashtra

5 Improvement to Hiwara Darur Vitthalwada (MDR-48) Part-I & Wadholi Road (MDR-19) and Improvement to Gondpipari Podsa Road (SH-369) Part-II in the State of Maharashtra under MRIP on Hybrid Annuity Mode (Package No. NAG-140)

47.3 2L+PS Gurubaxani Engg. &

Const. Pvt. Ltd.

PWD Maharashtra

6 Improvement /Widening to two Lane of Nagpur Nagbhid Mul Road. (MSH-9) Total Length 32.900 KM under Hybrid Annuity Package No. NAG. -144 (Old Package - 76C)

32.9 2L+PS Gurubakshani

Infraventures Pvt. Ltd.

PWD Maharashtra

Page 20: COMPANY PROFILE - Infra Design Studio

CERTIFICATES

20

Design Certificate for

Panvel Indapur Section

Design Certificate for

Malewada Chimur Section

Page 21: COMPANY PROFILE - Infra Design Studio

CERTIFICATES

21

Design Certificate for

Indapur Agardanda Section

Design Certificate for

Ralegaon Wadner Section

Page 22: COMPANY PROFILE - Infra Design Studio

CERTIFICATES

22

Design Certificate for

Mangaon Dighi Section

Proof Checking Certificate for

Airoli Elevated Corridor

Page 23: COMPANY PROFILE - Infra Design Studio

23

THANK YOU…!!

INFRA DESIGN STUDIO PVT LTD.

HEAD OFFICE – PLOT NO. DX 10, TTC INDUSTRIAL AREA, MIDC SHIRAVANE VILLAGE, NERUL POST, NAVI MUMBAI - 400706

CIN NO. - U74999MH2017PTC294431 WEBSITE:

www.infradesignstudio.com