Mission Overview - Objective

Our team’s mission is to send a balloon satellite to an altitude of 100,000 feet and have the satellite:

1) Take pictures and a digital recording of the flight

2) Measure the radiation levels in the upper atmosphere

Mission Overview - Goals

Our aim with these experiments is to:

1) Obtain a visual record of near space and balloon burst

2) Discover how the radiation levels vary at higher altitudes.

Design - Parts

Still Camera

Digital video cameraRadiation sensors

Temperature probe

Wires

Film

Foam core

Aluminum tape

Hot glue

Small tube

Washers (2)

9V batteries (6)

23A batteries (6)

Design – Block Diagram

RadiationSensors

Video Camera

Power (23A)

Timing Circuit

Still Camera

Heater

Power (9V)

HOBO #1 Int. HumidityInt. Temperature

ExternalTemperature

Management – Org Chart

Team LeaderNick Hoffmann

Programming/Drafting

Geoff Morgan

PlanningLauren Wenner

FinanceMiranda Rohlfing

Design/ConstructionMiles BuckmanRahul Devnani

Management - Schedule

Task to Be CompletedComplete design . . . . . . . . . Acquire all hardware . . . . . . . .Prototyping design . . . . . . . .Testing Final Design

Drop Test . . . . . . . . . .Subsystem Tests . . . . . . .Functional Tests . . . . . . . Mission SIM Tests . . . . . . .Whip Tests . . . . . . . . . .Cooler Test . . . . . . . . . .

Design ReviewsDesign Rev A . . . . . . . . .Design Rev B . . . . . . . . .Design Rev C . . . . . . . . .Design Rev D . . . . . . . . .

Finalization . . . . . . . . . . . .LAUNCH . . . . . . . . . . . . . .

Target Completion DatesSept. 20Sept. 28 – Oct. 5Oct. 17

Oct. 18Oct. 18 ; Oct. 25 ; Nov. 1Oct. 25 ; Nov. 1Nov.1Oct. 18Oct. 25

Oct. 4Oct. 16Nov. 8Nov. 29Nov. 9Nov. 11

Budget – Mass Budget

Experiments $43.00

Second Camera $100.00

Small Parts $47.00

Error Cushion $50.00

Extra $30.00

TOTAL $275.00

Budget - Money

Digital video $100.00camera

Radiation sensors$43.00

Wires $10.00

Film $15.00

Small tube $5.00

Washers (2) $2.00

9V batteries (3) $15.00

23A batteries (3) $10.00