© 2016 Electric Power Research Institute, Inc. All rights reserved. 4 th International Conference on Nuclear Power Plant Life Management Tina Taylor, Deputy Chief Nuclear Officer 25 October 2017 Condition Based Maintenance and On-line Monitoring

Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

  • Upload
    vokhue

  • View
    221

  • Download
    3

Embed Size (px)

Citation preview

Page 1: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

© 2016 Electric Power Research Institute, Inc. All rights reserved.

4th International Conference on Nuclear Power Plant Life Management

Tina Taylor,

Deputy Chief Nuclear Officer

25 October 2017

Condition Based

Maintenance and On-line

Monitoring

Page 2: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

2© 2017 Electric Power Research Institute, Inc. All rights reserved.

Topics

Condition Based Maintenance

Monitoring to Support a Maintenance Strategy

Value Based Maintenance

On-line Monitoring

Page 3: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

3© 2017 Electric Power Research Institute, Inc. All rights reserved.

Conditioned Based Maintenance:

Stages of Maintenance

Page 4: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

4© 2017 Electric Power Research Institute, Inc. All rights reserved.

Page 5: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

5© 2017 Electric Power Research Institute, Inc. All rights reserved.

Tools that Support Maintenance Strategy Development

PMBD

Maintenance Guides

Process Guides

WO Data Visualization Tool

Cost Analysis Tool

Maintenance

Strategy

Development

Page 6: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

6© 2017 Electric Power Research Institute, Inc. All rights reserved.

Preventive Maintenance Basis Database

Maintenance

Strategy

Development

PMBD

Maintenance Guides

Process Guides

WO Data Visualization Tool

Cost Analysis Tool

PMBD Favors a Condition Based Maintenance

Strategy over a Time Based Strategy

Page 7: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

7© 2017 Electric Power Research Institute, Inc. All rights reserved.

Maintenance Guides

Maintenance

Strategy

Development

PMBD

Maintenance Guides

Process Guides

WO Data Visualization Tool

Cost Analysis Tool

Page 8: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

8© 2017 Electric Power Research Institute, Inc. All rights reserved.

Process Guides – Maintenance Strategy Assessment Tool

Maintenance

Strategy

Development

PMBD

Maintenance Guides

Process Guides

WO Data Visualization Tool

Cost Analysis Tool

Page 9: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

9© 2017 Electric Power Research Institute, Inc. All rights reserved.

“THE RIGHT RELIABILITY FOR THE RIGHT COST”

Value-Based Maintenance

Page 10: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

10© 2017 Electric Power Research Institute, Inc. All rights reserved.

Data Visualization

Maintenance

Strategy

Development

PMBD

Maintenance Guides

Process Guides

WO Data Visualization Tool

Cost Analysis Tool

Page 11: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

11© 2017 Electric Power Research Institute, Inc. All rights reserved.

VBM Step 1: Know Your Costs - Work Order Data Visualization Tool

Allows users to easily view,

trend, and compare historical

WO data in order to understand

where and what costs are being

spent related to a given unit, site,

or fleet’s maintenance strategy.

Page 12: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

12© 2017 Electric Power Research Institute, Inc. All rights reserved.

WO Data Visualization Tool – DashboardMultiple Dashboard Views (Standardized)

WO Data Back 10 Years

Additional Filters

Further Drill-down Options

Page 13: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

13© 2017 Electric Power Research Institute, Inc. All rights reserved.

Cost Analysis Tool

Maintenance

Strategy

Development

PMBD

Maintenance Guides

Process Guides

WO Data Visualization Tool

Cost Analysis Tool

Page 14: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

14© 2017 Electric Power Research Institute, Inc. All rights reserved.

VBM Step 2: Develop a Strategy - Cost Analysis Tool (CAT)

• A web-based tool to weigh

reliability and cost

considerations

• Identify and reduce preventive

maintenance that has no

return value in equipment

reliability.

“Right Reliability for the

Right Cost”

Page 15: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

15© 2017 Electric Power Research Institute, Inc. All rights reserved.

Plant Monitoring Initiative: Next Level of Strategy

Mission:

Reduce operations and

maintenance costs through

monitoring to replace (or

extend the intervals of)

preventive maintenance

and surveillance tasks

Implementation

Obtain Data

Transport Data

Secure the Data

Utilize the Data

Page 16: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

16© 2017 Electric Power Research Institute, Inc. All rights reserved.

Plant Monitoring – Foundational Elements

Implementation• Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce

Time-Based Preventive and Predictive Maintenance

• Online Monitoring Guide for Equipment Diagnostics and Reliability

Obtain Data• Wireless Sensor Survey and Generic specification – 1st Qtr 2018

Transport Data• Use of LTE Cellular Network and Distributed Antenna Systems to Improve Connectivity and

Increase Data Transfer

Secure the Data • Cyber Security: Isolation for Maintenance, Monitoring, and Diagnostic Applications in Nuclear

Power Facilities

Sensor Survey and Development Acceleration• Evaluation of best suited sensors

• Electro Magnetic Compatibility Testing

• Sensor Specifications

Page 17: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

17© 2017 Electric Power Research Institute, Inc. All rights reserved.

New Focus for Plant Monitoring

Previous Plant Monitoring Approach

� Focus on safety related equipment

� Permanently mounted, wired sensors

� Data parameters feed onto operation domain

� Advanced Pattern Recognition (APR) models

built for establishing trending/alert levels

� Centralized monitoring centers

New Plant Monitoring Approach

� Focus on components important to production

– Forced loss rate minimized

– Megawatt losses minimized

� Buildout of wireless infrastructure

� Continuous to near continuous monitoring

– Wired and wireless solutions

� Automation of manual PM tasks

� Maximize maintenance frequencies

� Minimize part inventory

THEN

NOW

Page 18: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

18© 2017 Electric Power Research Institute, Inc. All rights reserved.

Combined Approach

PMBD

Maintenance Guides

Process Guides

WO Data Visualization

Tool

Cost Analysis Tool

Maintenance

Strategy

Development

Implementation

Obtain Data

Transport Data

Secure the Data

Utilize the Data

PLANT

MONITORING

Page 19: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

19© 2017 Electric Power Research Institute, Inc. All rights reserved.

Potential Value of Automated Condition Monitoring

OR

Horizontal Pump(from EPRI Preventive Maintenance Basis

Database)

Annualized Task

Hours Without

Monitoring

Annualized Task

Hours With

Monitoring

169 19

Significant O&M

savings with

monitoring

Page 20: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

20© 2017 Electric Power Research Institute, Inc. All rights reserved.

Looking to the future

• Plant monitoring adds to a value based

maintenance strategy, resulting in less

manual data collection and analysis.

• Performing less intrusive time based

maintenance can yield better reliability

by relying on intrusive maintenance

only when necessary.

• Future analytical approaches can

leverage the monitoring infrastructure

to even greater savings.

Page 21: Condition Based Maintenance and On-line Monitoring Developing a Technical Basis for Using On-Line Equipment Condition Monitoring to Reduce Time-Based Preventive and Predictive Maintenance

21© 2017 Electric Power Research Institute, Inc. All rights reserved.

Together=Shaping the Future of Electricity