CONSTRUCTION PHASING

Virtual Public Information MeetingFebruary 2 – February 16, 2021

Page 2: CONSTRUCTION PHASING

2

CONSTRUCTION PHASING

Page 3: CONSTRUCTION PHASING

3

CONSTRUCTION PHASING

Page 4: CONSTRUCTION PHASING

NOTES:1. During Phase 8A the Casino Center Blvd NB on ramp will be open, but to SB I-15

only.2. Traffic control phases will not be implemented in sequential order; the order of

construction will be determined by the contractor.3. The durations shown for the traffic control phases are estimates, and do not

reflect incentivized schedule acceleration. The actual durations of the TC phases and schedule acceleration, if any, will be determined by the contractor.

4

TRAFFIC CONTROL SUMMARY

4. Replacement of the I-515 bridge over Eastern Avenue will be combined with Traffic Control Phases 2 and 5.

5. A maximum incentive of $1.38 M will be earned if the contractor completes the work in 285 working days (85 working day reduction).

Page 5: CONSTRUCTION PHASING

5

TRAFFIC CONTROL

Page 6: CONSTRUCTION PHASING

6

TRAFFIC CONTROL

Page 7: CONSTRUCTION PHASING

7

TRAFFIC CONTROL

Page 8: CONSTRUCTION PHASING

8

TRAFFIC CONTROL

Page 9: CONSTRUCTION PHASING

9

TRAFFIC CONTROL

Page 10: CONSTRUCTION PHASING

10

TRAFFIC CONTROL

Page 11: CONSTRUCTION PHASING

11

TRAFFIC CONTROL

Page 12: CONSTRUCTION PHASING

12

TRAFFIC CONTROL

Page 13: CONSTRUCTION PHASING

13

TRAFFIC CONTROL

Page 14: CONSTRUCTION PHASING

14

TRAFFIC CONTROL

Page 15: CONSTRUCTION PHASING

15

TRAFFIC CONTROL

Page 16: CONSTRUCTION PHASING

16

TRAFFIC CONTROL