Construction Snapshot June 2016 Concept: Gove District Hospital Emergency Department The Department of Infrastructure publishes Construction Snapshot on a quarterly basis. The information provides an overview of the Northern Territory’s construction activity for major works over $500 000. It reflects work that is both currently underway and potential future construction-related work as at 30 June 2016.

Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

Construction Snapshot

June 2016

Concept: Gove District Hospital – Emergency Department

The Department of Infrastructure publishes Construction Snapshot on a quarterly basis. The information provides an overview of the

Northern Territory’s construction activity for major works over $500 000. It reflects work that is both currently underway and potential future

construction-related work as at 30 June 2016.

Page 2: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

Table of Contents

IN PROGRESS ............................................................................... 1

TERRITORY WIDE .................................................................................................... 1

CENTRAL AUSTRALIA ............................................................................................. 2

BARKLY REGION ..................................................................................................... 5

KATHERINE REGION ............................................................................................... 6

EAST ARNHEM REGION .......................................................................................... 8

TOP END RURAL .....................................................................................................10

PALMERSTON AND LITCHFIELD ...........................................................................12

DARWIN ENVIRONS ................................................................................................15

PROPOSED .................................................................................. 19

TERRITORY WIDE ...................................................................................................19

CENTRAL AUSTRALIA ............................................................................................20

BARKLY REGION ....................................................................................................25

KATHERINE REGION ..............................................................................................27

EAST ARNHEM REGION .........................................................................................31

TOP END RURAL .....................................................................................................33

PALMERSTON AND LITCHFIELD ...........................................................................35

DARWIN ENVIRONS ................................................................................................39

DISCLAIMER ................................................................................ 46

CONTACT ..................................................................................... 46

Page 3: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 1

IN PROGRESS

TERRITORY WIDE Est. $M Anticipated Completion

COOPERATIVE PROJECTS

Expand mobile phone services and broadband into communities 30 Q2 2019

DEFENCE PROJECTS

National Aircraft Pavement Maintenance Program - including RAAF Base Darwin, Robertson Barracks and RAAF Base Tindal

50 2020

Phase 3 Defence Terrestrial Communications Network Facilities upgrades TBA TBA

Map: Northern Territory

Page 4: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 2

CENTRAL AUSTRALIA Est. $M Anticipated Completion

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Alice Springs - Wills Terrace - Youth and Community Centre - upgrade existing and construct new Wellbeing Centre

2.7 Q3 2016

Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016

Alice Springs Supreme Court - fit out 3.0 Q3 2016

Arunga Park Speedway - Central Australia Drag Racing Association - infrastructure upgrades for Speedway and Go-Karts

1.1 Q3 2016

Arunga Park Speedway - upgrade water reticulation system 0.6 Q3 2016

Braitling Primary School - new Preschool and multipurpose structure 4.0 Q3 2016

Ilpeye Ilpeye - subdivision - Stormwater, Pavement and Asphalt construction 1.8 Q3 2016

Ilpeye Ilpeye - subdivision - Undoolya Road and Oonchiunpa Road intersection upgrade 0.5 Q3 2016

Larapinta Drive and Lovegrove Drive - intersection improvements (roundabout) 4.4 Q3 2016

Larapinta Primary School - New Child and Family Centre 4.6 Q3 2016

Stuart Highway - asphalt replacement on various sections of highway and Tom Brown roundabout

0.7 Q3 2016

Tanami Road - upgrade and seal chainage 0 - 7.24 km and 37.2 - 45.3 km 4.1 Q3 2016

Todd River - construct steel boardwalk 0.8 Q3 2016

Watarrka National Park - Kings Canyon - construct new visitor shelter 0.6 Q3 2016

Ilpeye Ilpeye - subdivision - new open drains 0.7 Q4 2016

Plenty Highway - chainage 140 - 146 km - upgrade and seal (stage 2) 1.7 Q4 2016

Kata Tjuta - Tjukaruru Road - chainage 0.8 - 8.8 km - upgrade and seal 3.5 Q1 2017

Larapinta Drive - complete sealing to Mereenie Inner Loop 25.0 Q1 2017

Construction Photo: Plenty Highway - chainage 140 - 146 km - upgrade and seal (stage 2)

Page 5: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 3

CENTRAL AUSTRALIA (Cont.) Est. $M Anticipated Completion

Alice Springs Hospital

Alice Springs Hospital - decant ward and corridors rectification 4.9 Q3 2016

Alice Springs Hospital - teaching and training facility 4.8 Q3 2016

Alice Springs Hospital - upgrade emergency power and electrical systems (stage 1) 2.0 Q3 2016

Alice Springs Hospital - fire rectification works 19.7 Q3 2018

Construction Photos: Alice Springs Hospital - teaching and training facility

Government Employee Housing (GEH)

Finke - construct 4 by 3 bedroom Arid Zone dwellings 2.4 Q3 2016

Nyirripi - construct duplex on lot 152 0.8 Q3 2016

Simpson's Gap National Park - Larapinta Drive - construct dwelling 0.6 Q3 2016

Yuendumu - lot 650 - construct 1 by 3 bedroom dwellings 1.1 Q3 2016

Areyonga - upgrade 5 dwellings 0.5 Q4 2016

Page 6: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 4

CENTRAL AUSTRALIA (Cont.) Est. $M Anticipated Completion

Remote Community Housing (RCH)

Kintore - upgrade 57 dwellings 5.4 Q3 2016

Wilora - housing upgrades 1.5 Q3 2016

Atitjere - housing upgrades 1.5 Q4 2016

Laramba - housing upgrades 3.2 Q4 2016

Willowra - housing upgrades 2.4 Q4 2016

TERRITORY GENERATION

Owen Springs Power Station - construction of Dingo Gas Plant 6.0 Q3 2016

Owen Springs Power Station - expand power supply facilities 75.0 Q4 2017

COOPERATIVE PROJECTS

Alice Springs - East Side - 8 Harvey Place - new 4 court indoor netball stadium 6.2 Q3 2016

Alice Springs Golf Club - new bowling green 1.5 Q3 2016

Larrapinta - upgrade Albrecht Drive Carpark, including a "kiss n go" drop off area 1.6 Q3 2016

Ilparpa Road - stage 2 road widening, including a separate bike path 2.0 Q4 2016

Finke, Imanpa, Minjilang, Mount Liebig and Wallace Rockhole - new base stations and upgraded base stations

5 2017

Construction Photos: Alice Springs East Side - 8 Harvey Place - new 4 court indoor netball stadium

MINING AND PETROLEUM SECTOR PROJECTS

Spinifex Bore - garnet sand surface mining and processing operation 20.0 Q3 2016

Newmont Tanami - mine expansion including second decline and increased plant capacity 145.0 Q3 2017

PRIVATE SECTOR PROJECTS

Charles Darwin University / consortium of Catholic Schools – new trades training centre 4.0 Q3 2016

East Side - 6 Winnecke Avenue - complex of 4 units 1.5 Q3 2016

Page 7: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 5

BARKLY REGION Est. $M Anticipated Completion

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Alekarenge - Kinjurra Road (Ali Curung Access Road) shoulder upgrade and reseal 1.6 Q3 2016

Batten Road - reform and re-sheet chainage 9.25 - 16.25 km and 8.15 - 20.15 km 0.7 Q3 2016

Ali Curung - 8 Warlpiri Street - new child care centre - 25 place early childhood education centre

0.9 Q4 2016

Calvert Road - widen gravel pavement 0.5 Q4 2016

Murray Downs Road - gravel pavement 0.5 Q4 2016

Ranken Road - reform and re-sheet chainage 55 -59 / 77 / 01 - 80.02 km and 85.02 - 91.3 km 1.0 Q4 2016

Robinson River - construct new health centre 5.1 Q4 2016

Tablelands Highway - strengthen 3 bridges - North and South Brunette, and Creswell 3.0 Q4 2016

Tablelands Highway - strengthen 3 bridges - Playford, Boree and Whitehole 2.7 Q4 2016

Construction Photo: Alekarenge - Kinjurra Road (Ali Curung Access Road) shoulder upgrade and reseal

Boosting Our Economy (BoE)

Alpurrurulam - new preschool 2.5 Q4 2016

Government Employee Housing (GEH)

Ampilatwatja - 6 housing upgrades 0.5 Q3 2016

Remote Community Housing (RCH)

Alpurrurlum – upgrade 45 dwellings 2.5 Q4 2016

Tennant Creek - upgrade 23 dwellings 2.6 Q2 2017

TERRITORY GENERATION

Tennant Creek Power Station - upgrade of power station 26.0 Q4 2017

COOPERATIVE PROJECTS

Tennant Creek Speedway - new tower and club house and upgrade facilities 0.5 Q3 2016

PRIVATE SECTOR PROJECTS

Tennant Creek - 15 Stuart Street - 10 by 2 bedroom dwellings 1.5 2017

Page 8: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 6

Map: Katherine Region

KATHERINE REGION Est. $M Anticipated Completion

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Amanbidji Road - construct concrete floodway at chainage 0.5 km 0.6 Q3 2016

Bullita Access Road - install 6 concrete invert at various locations 0.7 Q3 2016

Carpentaria Highway – pavement strengthening and widening Borroloola Jump Up chainage 229.0 - chainage 233 km

5.4 Q3 2016

Kalkarindji - Child and Family Centre 1.8 Q3 2016

Katherine Court House - redesign 1.0 Q3 2016

Katherine East - stage 2 - land release - water and sewer headworks 2.7 Q3 2016

Katherine High School - exterior upgrade 1.5 Q3 2016

Katherine Speedway - 31 Bicentennial Road - upgrade the existing facility comprising a new barrier wall and catch fence

1.2 Q3 2016

Construction Photos: Kalkarindji – new child care centre

Page 9: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 7

KATHERINE REGION (Cont.) Est. $M Anticipated Completion

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government (Cont.)

Roper Highway - widen and seal 52.9 - 53.7 km 2.1 Q3 2016

Roper Highway - widen and seal at various locations - 26 - 27.6 km and 28.7 - 30.4 km 2.2 Q3 2016

Stuart Highway - construct 2 new rest areas at chainage 535.50 and 659.02 km 2.0 Q3 2016

Victoria Highway – culvert widening at chainage 448.92 km 0.5 Q3 2016

Victoria Highway – Saddle Creek Crossing upgrade 11.0 Q3 2016

Katherine Ambulance Centre - Bicentennial Road - headworks, flood mitigation and creation of 6 industrial lots

4.5 Q4 2016

Roper Highway - strengthen and widen various chainages between 55.3 km and 99.1 km 6.4 Q4 2016

Roper Highway - upgrade 3 truck bays at chainage 39.8, 56 and 86.1 km 0.7 Q4 2016

Victoria Highway - rest area at chainage 453 km 0.9 Q4 2016

Roper Highway - Roper River / Wilton River - high level bridge crossings and road upgrade 44.0 Q3 2017

Aerial map: Katherine Ambulance Centre - Bicentennial Road - headworks, flood mitigation and creation of 6 industrial lots

Boosting Our Economy (BoE)

Clyde Fenton Primary School - replace fire, potable and irrigation mains and associated works 0.6 Q3 2016

Remote Community Housing (RCH)

Amanbidji - upgrade 10 dwellings 0.5 Q3 2016

Bulla - upgrade 21 dwellings 1.2 Q3 2016

Katherine - 43 Victoria Highway - upgrades to 14 by 2 bedroom units TBA Q3 2016

Peppimenarti - upgrade 30 dwellings 1.9 Q3 2016

Urban Public Housing (UPH)

Katherine - 53 Martin Terrace - construct 6 dwellings 2.3 Q3 2016

Katherine - 90 Acacia Drive - construct 6 dwellings 2.2 Q3 2016

DEFENCE PROJECTS

RAAF Base Tindal - married quarters extension - 50 houses TBA TBA

COUNCIL PROJECTS (Roper Gulf Regional Council)

Katherine - Florina Road - pavement repairs and resealing works 0.7 Q3 2016

Numbulwar - basketball court roof 0.5 Q4 2016

Katherine - office and works depot for Roper Gulf Regional Council 1.8 Q1 2017

Page 10: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 8

Concept: Galiwinku - remote health centre

EAST ARNHEM REGION Est. $M Anticipated Completion

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Central Arnhem Road – re-sheeting and pavement repairs at various locations from chainage 59.8 km to 84.55 km

0.5 Q3 2016

Central Arnhem Road – Rocky Bottom Creek new bridge 15.0 Q3 2016

Galiwinku - demolish and replace 20 dwellings (package 2) 14.6 Q3 2016

Galiwinku - headworks - sewer main and water main extensions 1.7 Q3 2016

Galiwinku - remote health centre 6.3 Q3 2016

Nhulunbuy High School - home economics upgrade 1.3 Q3 2016

Nhulunbuy High School - marine trade training shed 2.3 Q3 2016

Nhulunbuy High School - replace all insulated chilled water pipes 0.5 Q3 2016

Milingimbi School - construct new language and learning centre, new home economics centre and general learning areas

3.5 Q4 2016

Nhulunbuy - cyclone rectification works 15.0 Q4 2016

Nhulunbuy High School - residential boarding facilities - stage 1 - 40 bed residential facility and ancillary infrastructure

17.1 Q4 2016

Numbulwar - new health centre and ancillary housing (2 by 2 bedroom duplex) 7.4 Q4 2016

Construction Photo: Central Arnhem Road – Rocky Bottom Creek new bridge

Page 11: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 9

Plan: Ramingining School - Families as First Teachers - construct new pre-school, canteen and classroom buildings

EAST ARNHEM REGION (Cont.) Est. $M Anticipated Completion

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government (Cont.)

Ramingining School - Families as First Teachers - construct new pre-school, canteen and classroom buildings

5.7 Q4 2016

Umbakumba - health clinic 6.4 Q1 2017

Boosting Our Economy (BoE))

Numbulwar School – painting school and additional repairs 0.5 Q3 2016

Umbakumba School - structural steel painting, vinyl flooring, acoustic wall carpet and basketball court resurfacing

0.5 Q3 2016

Government Employee Housing (GEH)

Alyangula - lot 3045 - construct duplex 1.4 Q3 2016

Gapuwiyak - lot 202 - construct 2 bedroom blockwork duplex 1.0 Q3 2016

Remote Community Housing (RCH)

Umbakumba - demolish and construct 2 dwellings 1.3 Q3 2016

COOPERATIVE PROJECTS

Cobourg Peninsula - Seven Spirit Bay - upgrades 2.0 Q3 2016

Galiwinku - new seal for Burmala Road (Buthan Road), reconstruct Wakirana Street (School Road) and reseal Gakudu Street (Clinic Road),

1.0 Q3 2016

Maningrida area - Arnhem Land Barramundi Nature Lodge – upgrades and 12 new luxury en-suited safari tents

1.2 Q3 2016

Nhulunbuy - Gove Peninsula Surf Life Saving Club kitchen restaurant and function space 0.5 Q4 2016

Nhulunbuy - Gove Yacht Club - upgrades - stages 1 and 2 0.6 2018

Page 12: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 10

Construction Photo: Fog Bay Road - Leviathan Creek Crossing upgrade

TOP END RURAL Est. $M Anticipated Completion

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Adelaide River region - Stuart Highway chainage 107.6 - 109.3 km and Strickland Road rehabilitation

2.3 Q3 2016

Douglas-Daly - Jungawa Road - upgrade and seal chainage 6.5 - 9.3 km 2.6 Q3 2016

Fog Bay Road - Leviathan Creek Crossing upgrade 2.6 Q3 2016

Litchfield Park - Florence Falls site - 2WD campground site upgrades 1.7 Q3 2016

Litchfield Park - Magnetic Termite Mounds site - new boardwalk, upgrades to existing boardwalk and a new toilet block

0.8 Q3 2016

Litchfield Park - Sandy Creek Campground redesign to provide 7 additional campsites and a new toilet block

0.8 Q3 2016

Litchfield Park - Tolmer Falls - new picnic area, toilet facilities and half day walk 2.5 Q3 2016

Litchfield Park Road - seal selected sections 4.9 Q3 2016

Port Keats Road - flood immunity 9.7 Q3 2016

Ringwood Road - upgrade to seal standard at chainage 0 - 45 km 2.7 Q3 2016

Rum Jungle Road - widen shoulders and replace culverts 1.7 Q3 2016

Arnhem Highway upgrades at Scott Creek and Narrow Creek 1.5 Q4 2016

Fog Bay - Dundee Beach - 80-metre concrete self-launch boat ramp built alongside an extended rock groyne

4.8 Q4 2016

Maningrida - upgrade transport access - barge landing 1.2 Q4 2016

Mary River - Shady Camp - 50-metre extension to the boat ramp and sealed parking with 60 marked car and trailer bays

1.2 Q4 2016

Yellow Creek crossing 7.5 Q4 2016

Location: Litchfield Park - Florence Falls site - 2WD campground site upgrades

Page 13: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 11

Map of the Darwin, Palmerston & Litchfield and Top End Rural Regions

TOP END RURAL (Cont.) Est. $M Anticipated Completion

Boosting Our Economy (BoE))

Batchelor Area School - replace fire, potable and irrigation mains and associated works 0.7 Q3 2016

Government Employee Housing (GEH)

Gunbalanya - housing upgrades (package 1) 1.0 Q3 2016

Maningrida - housing upgrades (500-700 series) 2.0 Q3 2016

Minjilang - 6 housing upgrades 0.5 Q3 2016

Warruwi - Goulburn Island - 8 housing upgrades 0.6 Q3 2016

Milikapiti - 10 housing upgrades 0.8 Q4 2016

Milikapiti - lot 360 - construct dwellings 1.0 Q4 2016

Remote Community Housing (RCH)

Belyuen - upgrade 23 dwellings 1.4 Q3 2016

POWER WATER CORPORATION PROJECTS

Darwin River Dam - new pump station 28.0 Q2 2019

COOPERATIVE PROJECTS

Crab Claw Island Resort - caravan / camp ground upgrade and extension 0.7 Q2 2017

COUNCIL PROJECTS (Coomalie Community Government Council)

Batchelor to Adelaide River - seal arterial road - Cheeney Road, Milton Road and Coach Road 2.4 Q4 2016

PRIVATE SECTOR PROJECTS

Finniss River area - Outback Floatplane Adventures new boutique resort TBA Q2 2017

Page 14: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 12

PALMERSTON AND LITCHFIELD Est. $M Anticipated Completion

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Coolalinga - Stuart Highway - outbound pavement rehabilitation at chainage 27.7 - 28.6 km 1.0 Q3 2016

Marine Supply Base - stage 2 115.0 Q3 2016

Palmerston Special School - stage 1 23.5 Q3 2016

Roystonea Avenue duplication - Temple Terrace to Terry Drive 11.0 Q3 2016

Roystonea Avenue upgrade - Temple Terrace to Gurd Street 5.5 Q3 2016

Wishart Road and Berrimah Road - asphalt replacement of wearing courses and unsuitable pavements

1.6 Q3 2016

Palmerston Regional Hospital Headworks 9.6 Q4 2016

Roystonea Avenue - additional third lane at the Gateway development 13.0 Q4 2016

Roystonea Avenue extension - Lambrick Avenue to the Southern Connector Road 5.2 Q4 2016

Palmerston Regional Hospital 170.0 Q2 2018

Construction Photos: Palmerston Regional Hospital (PRH)

PRH – tower crane in operation PRH – Level 2 concrete slab PRH – Level 2, lifts 1 and 2

Palmerston Regional Hospital – aerial view

Photo: Roystonea Avenue / Temple Terrace intersection upgrade

Page 15: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 13

PALMERSTON AND LITCHFIELD (Cont.) Est. $M Anticipated Completion

Boosting Our Economy (BoE)

Bakewell Primary School - expand and refurbish administration building, new multipurpose playground and equipment and drop off area

1.4 Q3 2016

Girraween Primary School - extend administration block to include meeting room and offices 0.6 Q3 2016

Gray Primary School - supply and construct new water mains and upgrade trade waste 0.5 Q3 2016

Moulden Primary School - replace fire, potable and irrigation mains and associated works 0.6 Q3 2016

Palmerston Senior College - replace fire, potable and irrigation mains and associated works 0.7 Q3 2016

Rosebery Middle and Primary School - new library learning centre and basketball court 1.9 Q3 2016

Palmerston East

Palmerston East - Zuccoli southern HV electrical reticulation 3.6 Q3 2016

Palmerston East - Zuccoli west sewer pump station and rising main 6.2 Q3 2016

Palmerston East - Zuccoli subdivision - stage 2 40.0 Q2 2018

Palmerston East - Zuccoli subdivision - stage 3 and 4 - 750 lots, primary school and neighbourhood shopping centre

107.8 Q4 2021

Palmerston East - Zuccoli subdivision - stage 5 - 430 new lots 43.3 Q4 2021

Urban Public Housing (UPH)

Johnston - Angel Road and Redwood Street - construct 8 dwellings 2.6 Q3 2016

TERRITORY GENERATION

Channel Island Power Station - upgrade C1, 2 4 and 5 frame 6 gas generators and gas skids 4.2 Q4 2016

Weddell Power Station - LM600 engine exchange 5.0 Q4 2016

POWER WATER CORPORATION PROJECTS

Hudson Creek - rebuild the CIPS to Hudson Creek 132kV transmission line including Elizabeth River Crossing

15.5 Q3 2016

Johnston - new elevated water tank to service the suburbs of Bellamack, Zuccoli, Rosebery, Johnston and Palmerston South

13.9 Q4 2016

Palmerston - water supply improvements program 26.1 Q4 2018

COOPERATIVE PROJECTS

Palmerston - 36 Elrundie Avenue - upgrade the Satellite City BMX track – install roof over facility and upgrade track

2.0 Q3 2016

Concept: Palmerston - 36 Elrundie Avenue - upgrade the Satellite City BMX track – install roof over facility and upgrade track

DEFENCE PROJECTS

Shoal Bay Receiving Station - replacement of chillers 3.0 Q3 2016

COUNCIL PROJECTS (City of Palmerston and Litchfield Shire Council)

Palmerston CBD - The Boulevard - Stage 2 France Drive to Roystonea Avenue, includes earthworks, pavement, asphalt, footpaths, lighting and associated services

4.6 Q4 2016

Temple Terrace / Emery Avenue - new roundabout 0.8 Q4 2016

Yarrawonga Road - reconstruction 2.5 Q4 2016

Humpty Doo - Fred's Pass Road / Arnhem Highway to Beaumont Road upgrade 1.2 Q4 2017

Middle Point - Anzac Parade - sealed section upgrade from Fog Dam turn off 1.8 Q4 2017

Page 16: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 14

PALMERSTON AND LITCHFIELD (Cont.) Est. $M Anticipated Completion

PRIVATE SECTOR PROJECTS

Johnston - 11 Tarakan Court - 5 by 4 storey apartments TBA Q3 2016

Palmerston Shopping Centre – carpark redevelopment (shade structures) TBA Q3 2016

Tivendale - Wishart Industrial Estate - 15 Fowlestone Road - office / showroom complex of 4 units

2.0 Q3 2016

Yarrawonga - 26 McKenzie Place - complex of 8 showroom sales and warehouses 2.0 Q3 2016

Zuccoli - 81 Crosby Street - 2 by 3 bedroom multiple dwellings in a single storey 0.5 Q3 2016

Zuccoli Shopping Centre - IGA Complex including 15 specialty shops 11.0 Q4 2016

Zuccoli - 15 Seafury Court - single storey duplex 0.5 2017

Coolalinga Shopping Village 80.0 Q2 2017

Palmerston - 5 &11 Yarrawonga Road - Gateway Shopping Centre - stage 1 108.0 Q4 2017

Durack - Charles Darwin University - real estate sub-division 160.0 Q4 2020

Palmerston CBD - 15 The Boulevard - 15 storey multiple use development in 3 towers (in 3 stages)

125.0 Q4 2022

INPEX Ichthys LNG Project at Bladin Point

INPEX - civil site preparation, major foundations and services TBA Q3 2016

INPEX - construct LNG tanks TBA Q3 2016

INPEX - LNG train on-site installation and hook up TBA Q1 2017

Location Map: INPEX - Ichthys LNG Project

Concept: INPEX - Ichthys LNG Project at Bladin Point

Page 17: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 15

DARWIN ENVIRONS Est. $M Anticipated Completion

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Berrimah - Multi User Barge Ramp 15.0 Q3 2016

Berrimah - Peter McAuley Centre - various minor building and civil works 1.3 Q3 2016

Casuarina Coastal Reserve - shared paths and service tracks upgrades 1.3 Q3 2016

Casuarina Coastal Reserve - Dripstone Cliffs and Rapid Creek Site upgrades 4.4 Q3 2016

Casuarina Coastal Reserve - upgrade to Buffalo Creek park area, including new parking 0.9 Q3 2016

Darwin High School - Open Education Centre 14.2 Q3 2016

Darwin Waterfront - additional pontoon to support Cruise operators 2.0 Q3 2016

Henbury Special School - new school 33.0 Q3 2016

Hidden Valley Motor Sports Complex - corporate marquee pad at turn 10 0.8 Q3 2016

Hidden Valley Motor Sports Complex - stage 1 replacement of water mains and systems 0.5 Q3 2016

Leanyer Recreation Park - upgrade work to cascades and lagoon 0.8 Q3 2016

Museum and Art Gallery of the Northern Territory (MAGNT) - construction of a new thermal plant room and cooling tower enclosure

0.6 Q3 2016

Stuart Highway - Supply and Installation of Tactile Edge Lines at Various Sections 1.2 Q3 2016

Tiger Brennan Drive - duplication - Woolner Road to Berrimah Road 88.0 Q3 2016

Darwin CBD - Government House - upgrade air-conditioning and associated works 0.6 Q4 2016

Darwin Waterfront - stage 6 and 7 - fuel facility, decontamination, west Bennett Street, environmental ( 5 year project)

26.0 Q4 2016

Berrimah - Transport Industry Precinct - creating 88 lots - Corner Kirkland and Wishart Roads - Stage 1 – Truck Central - Corner Wishart Road and TBD – 25 Lots

20.0 Q1 2017

Wulagi Primary School - administration building upgrade 1.6 Q1 2017

Darwin Waterfront - stage 2 - redevelopment including Navy fuel lines 0.6 Q2 2017

Aerial Photos: Tiger Brennan Drive - duplication - Woolner Road to Berrimah Road

Re-alignment of Intersections at; Benison Road / Bayview and Charles Darwin National Park / Bowen Street

Page 18: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 16

DARWIN ENVIRONS (Cont.) Est. $M Anticipated Completion

Boosting Our Economy (BoE)

Jingili Primary School - replace fire, potable and irrigation mains and associated works 0.5 Q3 2016

Leanyer Primary School - replace fire, potable and irrigation mains and associated works 0.5 Q3 2016

Sanderson Middle School - replace fire, potable and irrigation mains and associated works 1.2 Q3 2016

Sanderson Middle School - sports field lighting 0.5 Q3 2016

Wagaman Primary School - replace fire, potable and irrigation mains and associated works 0.5 Q3 2016

Karama Primary School - upgrade and refurbish front office 0.8 Q4 2016

Larrakeyah Primary School - 4 new classrooms 2.5 Q4 2016

Nightcliff Primary School - design and construct cover over existing courts 0.5 Q4 2016

Stuart Park Primary School - new classrooms and resurface the basketball court and provide shade sails

1.0 Q4 2016

Royal Darwin Hospital

Royal Darwin Hospital - Emergency Department - reconfigure internal and external waiting area

1.8 Q3 2016

Royal Darwin Hospital - reconfigure external front entrance, including public transport infrastructure and landscaping

5.5 Q3 2016

Royal Darwin Hospital - outpatients and front lobby refurbishment - reconfigure internal front entrance lobby including the construction of a patient transit lounge

14.8 Q4 2016

Royal Darwin Hospital - paediatric facility upgrade / refurbishment 15.0 Q4 2016

Royal Darwin Hospital - upgrade negative pressure isolation rooms 7.4 Q4 2016

Urban Public Housing (UPH)

Stuart Park - Graham Street - construct 2 by 2 bedroom dwellings 0.8 Q3 2016

POWER WATER CORPORATION PROJECTS

Casuarina Zone - substation - outdoor switchyard 22.1 Q2 2017

DEFENCE PROJECTS

RAAF Base Darwin - High Voltage ring main 5.0 Q3 2016

RAAF Darwin - Defence Housing Australia - married quarters redevelopment TBA Q4 2016

COUNCIL PROJECTS (City of Darwin)

Shoal Bay Waste Disposal site - leachate pond treatment system 1.0 TBA

Playground Shade Program – shade structures for 19 suburban playgrounds .8 Q3 2016

Photo: Playground Shade Program – shade structures for 19 suburban playgrounds

Page 19: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 17

Concept: Muirhead – 49 Bridge Street – duplex

DARWIN ENVIRONS (Cont.) Est. $M Anticipated Completion

PRIVATE SECTOR PROJECTS

Berrimah Business Park - 31 Miles Road - warehouse with ancillary showroom / office 1.0 Q3 2016

Casuarina Square - Entertainment and Leisure Precinct development 34.0 Q3 2016

Darwin CBD - 29 Daly Street - Array Apartments on Daly - multi storey building with 65 apartments

20.0 Q3 2016

Darwin CBD - Stokes Hill Wharf - WWII virtual experience - high tech tourism attraction - fit out 3.0 Q3 2016

Darwin International Airport - new international lounge 0.7 Q3 2016

Lee Point - Club Tropical Resort/ Sage Darwin – 92 additional rooms 3.0 Q3 2016

Muirhead - 2 Samuel Street - 2 by 4 bedroom multiple dwellings in a single storey building 0.7 Q3 2016

Muirhead - 49 Bridge Street - 1 by 3 and 1 by 4 bedroom multiple dwellings in a single storey building

0.5 Q3 2016

Muirhead - 60 Asche Street - 2 by 4 bedroom multiple dwellings in a single storey building TBA Q3 2016

Stuart Park - 31 Margaret Street - complex of 10 apartments 2.5 Q3 2016

Berrimah Business Park - 19 Miles Road - complex of 12 warehouses TBA Q4 2016

Casuarina - Charles Darwin University – Purple 3 for ITMS Precinct refurbishment 2.5 Q4 2016

Darwin CBD - 20 Harvey Street - Horizons on Harvey - 16 by 1 and 60 by 2 bedroom multiple dwellings and a shop/office in a 13 storey building plus 2 levels of basement car parking

23.0 Q4 2016

Darwin Corporate Park - stages 1 and 2 - commercial office spaces 85.0 Q4 2016

Darwin International Airport – staff car parking and realignment of Henry Wrigley Drive 2.6 Q4 2016

Darwin International Airport - stage 2 of ground floor office re fit 0.5 Q4 2016

Darwin International Airport Precinct - 1.5 mega watt solar array - stage 2 3.4 Q4 2016

Darwin International Airport Precinct - stage 1 South Osgood Logistics development - showroom / warehouse complex

5.0 Q4 2016

Darwin International Airport Precinct - stage 2 Entertainment Precinct 5.0 Q4 2016

Fannie Bay - AKOYA - 4 Kurringal Court - 36 by 1 bedroom, 104 by 2 bedroom and 22 by 3 bedroom multiple dwellings in 5 by 4 storey buildings including ground and 1 basement level of car parking in 5 stages

TBA Q4 2016

Concept: Fannie Bay - AKOYA - 4 Kurringal Court - 36 by 1 bedroom, 104 by 2 bedroom and 22 by 3 bedroom multiple

dwellings in 5 by 4 storey buildings including ground and 1 basement level of car parking in 5 stages

Page 20: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

IN PROGRESS 18

Concept: Darwin CBD - Woods Street - Magnum apartments

DARWIN ENVIRONS (Cont.) Est. $M Anticipated Completion

PRIVATE SECTOR PROJECTS

Darwin CBD - Woods Street - Magnum apartments 14.0 Q1 2017

Darwin International Airport - western offices and lift 1.6 Q1 2017

Nightcliff - 65 Progress Drive - Serenity Views Apartments - stage 4 24.0 Q1 2017

Parap - 209 Stuart Highway - new mixed use development including service station, drive thru restaurant and shops

2.0 Q1 2017

Parap - 23 Gregory Street - 12 units within 3 storeys 2.8 Q1 2017

Berrimah Business Park - 20 Miles Road - office 1.8 2017

Berrimah Business Park - 24 Miles Road - 2 by warehouses with showrooms/office 1.8 2017

Darwin CBD - Harvey Street, Ryko Court, Barneson Street – lot 7278 (1) - La Vista apartments 63 units within 11 storeys

26.0 2017

East Arm Port - Harbor Support Vessel Facility 7.5 2017

East Arm Port - Refrigerated Container Park - new cold store facility 35.0 2017

East Arm Port - strategic hardstand 7.5 2017

Parap - The Avenue - Hastings over Mindil - Soul and Spirit Towers 270.0 TBA

Concept: Parap - 209 Stuart Highway - new mixed use development including service station, drive thru restaurant and shops

Page 21: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 19

PROPOSED

TERRITORY WIDE Anticipated

Start

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Alekarenge, Alpurrurulam, Alyangula, Borroloola, Elliott, Gunbalanya, Jabiru, Kalkarindji, Kintore, Lajamanu, Ngukurr, Numbulwar, Nyirripi, Papunya, Wadeye and Yuendumu - upgrading morgues in 16 communities

Q3 2016

Boosting Our Economy (BoE)

Christian Schools - additional infrastructure 2016

Independent Schools - additional infrastructure 2016

Lutheran Schools - additional infrastructure 2016

COOPERATIVE PROJECTS

Across the Territory - develop mountain bike trails TBA

Ampilawatja, Belyuen, Utopia, Santa Teresa, Mutitjulu, Beswick, Minyerri, Kalkarindji, Warruwi, Palumpa, Peppimenarti, Wadeye - expand free community Wi-Fi hot spots

TBA

DEFENCE PROJECTS

Robertson Barracks/RAAF Darwin/RAAF Tindal - Land 121 - unit sustainment facilities (weighbridge, loading ramp, fast fuel fill).

Q3 2016

Map: Central Australian Region

Page 22: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 20

CENTRAL AUSTRALIA Anticipated

Start

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Arltunga Road - re-gravel chainage 20 - 32 km Q3 2016

Centralian Middle School - construct new school bus interchange (via Memorial Drive) Q3 2016

Delmore Downs Road - various sections - gravel sheet and drainage repairs Q3 2016

Ernest Giles Road - lift and gravel re-sheet between chainage 28-46 kilometres Q3 2016

Kaltukatjara (Docker River) - new renal clinic Q3 2016

Kata Tjuta - Tjukaruru Road Floodway - upgrade 5 flood ways (stage 3) Q3 2016

Papunya - new renal clinic Q3 2016

Ringwood Road - upgrade to seal standard Q3 2016

Tanami Road - upgrade chainage 0 - 8km and 38 - 44 km Q3 2016

Willowra Road - various sections - gravel re-sheet and drainage repairs Q3 2016

Arlparra (Utopia) - new internal roads Q4 2016

Arlparra (Utopia) - upgrade water, sewer and power infrastructure Q4 2016

Braitling Primary School - redevelopment to complete the early childhood precinct with re purposed areas for a community centre connected to outdoor play and a new cafe to replace existing canteen

Q4 2016

Centralian Middle School - athletics track and field upgrade Q4 2016

Mt John Valley - Flood Immunity - all-weather access Q4 2016

Ross Park Primary School - upgrade school hall Q4 2016

Stuart Highway - Motor Vehicle Registry to Telegraph Road - upgrade Q4 2016

Stuart Highway - upgrades from Motor Vehicle Registry to Herbert Heritage Drive Q4 2016

Finke - extend and seal runway 2016

Photo: Centralian Middle School - location for new school bus interchange

Concept: Centralian Middle School - new school bus interchange

Page 23: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 21

CENTRAL AUSTRALIA (Cont.) Anticipated

Start

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government (Cont.)

Arlparra (Utopia) - 15 new dwellings Q1 2017

Engawala - Alcoota Fossil Bed Field Station Q1 2017

Larapinta - headworks connecting Albrecht Drive and Mparntwe Drive Q1 2017

Larapinta - Mparntwe Drive - subdivision to create 7 lots Q1 2017

Maryvale Road - seal an additional 20 kilometres of priority sections along Maryvale Road to improve connectivity to Alice Springs

Q1 2017

Plenty Highway - chainage 120 - 124 km - upgrade and seal (stage 3) Q1 2017

Sandover Highway - upgrades and seal between Utopia turn off towards Arlparra Q1 2017

Tanami Road - upgrade and seal towards Yuendumu Q1 2017

Areyonga - upgrade and seal runway Q2 2017

Watarrka National Park - 300 metre skywalk Q2 2017

Ti Tree - regional town development Q3 2017

Alice Springs Correctional Centre - upgrades TBA

Arlparra (Utopia) - Police Station TBA

Docker River - subdivision to create 99 lots TBA

Engawala - subdivision to create 62 lots TBA

Imanpa - subdivision to create 77 lots TBA

Mt Liebig - subdivision to create 80 lots TBA

Napperby - extend and seal runway TBA

Nyirripi - subdivision to create 98 lots TBA

Titjikala - subdivision to create 76 lots TBA

Wallace Rockhole - subdivision to create 73 lots TBA

Willowra - subdivision to create 105 lots TBA

Willowra - Police Station TBA

Wutunugurra - subdivision to create 64 lots TBA

Yuendumu - essential services infrastructure TBA

Boosting Our Economy (BoE)

Arlparra School - Apungalindum Learning Centre - replace old classrooms Q3 2016

Sadadeen Primary School - assembly hall modification and other school alterations Q3 2016

Floor Plan and Concept: Arlparra School - Apungalindum Learning Centre - replace old classrooms

Page 24: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 22

CENTRAL AUSTRALIA (Cont.) Anticipated

Start

Alice Springs Hospital

Alice Springs Hospital - new multi-purpose facility Q3 2016

Location and Concept: Alice Springs Hospital - new multi-purpose facility

Page 25: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 23

CENTRAL AUSTRALIA (Cont.) Anticipated

Start

Government Employee Housing (GEH)

Nyirripi - 8 housing upgrades Q3 2016

Kaltukatjara (Docker River) - lot 107 - construct Renal Housing Q4 2016

Papunya - lot 224 - construct Renal Housing Q4 2016

Engawala - construct 1 by 2 bedroom dwelling Q2 2017

Imanpa - 1 by 2 bedroom dwelling Q2 2017

Yuendumu - lot 716 - 1 by 2 bedroom dwelling Q2 2017

Urban Public Housing (UPH)

Larapinta - rejuvenate 4 public housing complexes Q3 2016

Alice Springs - 19 Grant Street, 52 Lyndavale Street and 97 Gap Road - rejuvenate public housing complexes

Q1 2017

Remote Community Housing (RCH)

Imanpa - upgrade 19 dwellings Q3 2016

Nturiya - upgrade 14 dwellings Q3 2016

Santa Teresa - construct 3 new dwellings Q3 2016

Santa Teresa - upgrade 50 dwellings Q3 2016

Titjikala - upgrade 21 dwellings Q3 2016

Areyonga - construct 2 new dwellings Q4 2016

Atitjere - lot 49 - construct 1 new dwelling Q4 2016

Imanpa - construct 4 new dwellings Q4 2016

Kintore - construct 3 new dwellings Q4 2016

Titjikala - construct 2 new dwellings Q4 2016

Willowra - 2 new dwellings Q4 2016

Wilora - construct 6 new dwellings Q4 2016

TERRITORY GENERATION

Owen Springs Power Station - upgrade to potable water system Q3 2016

COOPERATIVE PROJECTS

New Haven Wildlife Sanctuary - construction of feral cat fence - stage 1 (50 kilometres) Q1 2017

New Haven Wildlife Sanctuary - construction of feral cat fence - stage 2 Q2 2020

Alcohol Mandatory Treatment Centre - construction of a purpose built facility TBA

Alice Springs - new multi species export abattoir TBA

MINING AND PETROLEUM SECTOR PROJECTS

Nolan's Mine - open-cut mine, on-site preliminary processing to produce rare earths concentrate for off-site final processing plant

Q3 2016

Ti Tree Airstrip - upgrade and new terminal - supporting Mt Peake Mine 2017

Mt Peake Mine - stage 1 - develop new open pit mining and processing operation, including mine camp, power station and rail siding.

Q2 2017

Chandler Salt Mine - develop underground mine, on-site salt and fertilizer processing plant and underground storage facilities

Q2 2018

Jervois Mine - reopen old mine with 2 open-cut pits, underground mining and on-site processing plant Q2 2018

Mt Peake Mine - stage 2 - mine and production expansion Q3 2022

Page 26: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 24

Concept: Papunya Community Centre - new shaded kitchen and toilet block

CENTRAL AUSTRALIA (Cont.) Anticipated

Start

PRIVATE SECTOR PROJECTS

Alice Springs Airport - high intensity approach lighting Q3 2016

Alice Springs Airport - terminal air-conditioning replacement Q3 2016

Larapinta - 4 Wright Place - 2 by 3 bedroom multiple dwellings in a single storey Q3 2016

Alice Springs – Percy Court – 20 bed extension to an existing 40 bed residential aged care facility. Q4 2016

Papunya Community Centre - new shaded kitchen and toilet block Q4 2016

Ross - Palm Circuit - South Edge Estate – subdivision of 37 residential lots Q1 2017

Ross - 68 Palm Circuit - South Edge Courtyard Apartments - 7 courtyard apartments Q3 2017

Araluen - 4 Taylor Street - 4 new townhouses, including covered carports for existing units TBA

Ciccone - 4 Smith Street - new workshop building TBA

Gillen - 43 Larapinta Drive - triplex TBA

Mt Johns - 29 Werlatye Court - 2 by 3 bedroom dwellings in 2 single storey buildings TBA

Ross - Palm Court - multiple dwellings TBA

Sadadeen - 10 Grevillea Drive - training facility additions to an education facility TBA

Concept: Ross - Palm Circuit - South Edge Estate – subdivision of 37 residential lots

Page 27: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 25

BARKLY REGION Anticipated

Start

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Barkly Stock Route - install flood ways at chainage 117, 180 and 185 kilometres Q3 2016

Kurundi Road - lift, formation, stabilise and seal Q3 2016

Robinson River - Police overnight facilities Q3 2016

Wollogorang Road - Robinson and Calvert Crossings Q3 2016

Tennant Creek region - road upgrades to support open speed limits Q4 2016

Borroloola - land release - 35 residential lots 2017

Ali Curung - essential services infrastructure TBA

Ali Curung - new full gravity reticulation sewer TBA

Alpurrurulam - Police Station TBA

Nturiya - subdivision to create 35 lots TBA

Pmara Jutunta - subdivision to create 58 lots TBA

Tennant Creek - 50 bed low security prisoner work camp TBA

Tennant Creek Primary School - new preschool, early learning and special education facilities TBA

Boosting Our Economy (BoE)

Ampilatwatja - new preschool Q3 2016

Corella Creek - new Alice Springs School of the Air preschool Q3 2016

Concept: Ampilatwatja - new preschool

Government Employee Housing (GEH)

Borroloola - construct duplex on lot 546 Q1 2017

Urban Public Housing (UPH)

Tennant Creek - 12 Bornite Street - 1 by 3 bedroom dwelling Q1 2017

Tennant Creek - 18 Standley Street - upgrades Q1 2017

Tennant Creek - Peko Road - construct 5 new dwellings Q1 2017

Elliott - 2 new dwellings TBA

Elliott - housing renovations TBA

Remote Community Housing (RCH)

Alekarenge - upgrade 29 dwellings Q3 2016

Alpurrurulam - housing upgrades Q3 2016

Ampilatwatja - construct 2 new dwellings Q3 2016

Imangara - upgrade 7 dwellings Q3 2016

Alpurrurulam - construct 7 new dwellings Q1 2017

Wutunugurra - construct 12 new dwellings Q1 2017

Page 28: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 26

Map: Barkly Region

BARKLY REGION (Cont.) Anticipated

Start

MINING AND PETROLEUM SECTOR PROJECTS

Northern Gas Pipeline (previously called North East Gas Interconnector) - 623 kilometre pipeline between Tennant Creek in the Northern Territory and Mount Isa in Queensland, including associated activity includes quarrying material to bed pipeline; construct access; Water Bore development; Service and supply construction spreads.

2017

Ammaroo Phosphate Mine - new mine with open-cut pits, crushing and processing plant (3 options) 2017/18

Tennant Creek to Mount Isa - 600 kilometre rail link project TBA

Wonarah Phosphate Mine - stage 1 - open-cut mine and on-site superphosphate processing TBA

COUNCIL PROJECTS

Tennant Creek - Eldorado Park upgrade TBA

Tennant Creek - 50 Peko Road - new staff supporting accommodation for workers at the Pulkapulkka Kari Aged Care Facility

TBA

PRIVATE SECTOR PROJECTS

Tennant Creek Airport - commercial development TBA

Borroloola - 199 Robinson Road - office and caretakers residence TBA

Concept: Borroloola – 199 Robinson Road - office and caretakers residence

Page 29: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 27

Concept: Katherine- 46 Bicentennial Road - new Ambulance Centre

KATHERINE REGION Anticipated

Start

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Barunga - new child care centre Q3 2016

Carpentaria Highway - chainage 128 - 132.2 km Q3 2016

Edith Farms Road - upgrade creek crossing Q3 2016

Katherine - 46 Bicentennial Road - new Ambulance Centre Q3 2016

Katherine - Central Region - bituminous resurfacing of various roads and highways Q3 2016

Katherine High School - upgrade and beautification of landscaping and main entry Q1 2017

Keep River Plains Road - upgrade Keep River Road to support Project Sea Dragon Q3 2016

Lajamanu Road - Kalkarindji to Lajamanu Q3 2016

Minyerri - new child care centre Q3 2016

Ngukurr - Roper Highway - upgrade and seal from Fizzer Creek Q3 2016

Victoria Highway - pavement strengthening and widening of various sections Q3 2016

Kalkarindji - reseal aerodrome and re-line mark runway Q4 2016

Katherine Region - upgrade Legune Access Road, as part of Project Sea Dragon Q4 2016

Gorrie Road - install concrete inverts at 5.5 km and 10.5 km Q2 2017

Hodgson River Road - seal chainage 25.3 - 30.3 km Q2 2017

Ngukurr - reseal aerodrome and re-line mark Q2 2017

Nitmiluk National Park - 300 metre skywalk Q2 2017

Draft Concept: Nitmiluk National Park - 300 metre skywalk

Page 30: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 28

KATHERINE REGION (Cont.) Anticipated

Start

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government (Cont.)

Victoria Highway - Little Horse and Big Horse Creek upgrade Q2 2017

Mataranka - land release 2017

Pine Creek - land release 2017

Timber Creek - land release 2017

Bulla - subdivision to create 49 lots TBA

Manyallaluk - subdivision to create 46 lots TBA

Minyerri - subdivision to create 108 lots TBA

Ngukurr - essential services infrastructure TBA

Ngukurr - upgrade water production and water storage TBA

Peppimenarti - subdivision to create 81 lots TBA

Rittarangu - subdivision to create 42 lots TBA

Concept: Casuarina Street Primary School - safe and secure drop off areas inside the school grounds and carpark

Boosting Our Economy (BoE)

Casuarina Street Primary School - safe and secure drop off areas inside the school grounds and carpark Q3 2016

Page 31: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 29

KATHERINE REGION (Cont.) Anticipated

Start

Government Employee Housing (GEH)

Kalkarindji - lot 11 - construct 1 by 3 bedroom dwelling Q3 2016

Ngukurr - construct dwelling on lot 252 Q4 2016

Ngukurr - construct dwellings on lot 251 Q4 2016

Kalkarindji - lot 149 - 1 by 3 bedroom dwelling Q1 2017

Nganmarriyanga - 2 by 2 bedroom duplex Q1 2017

Timber Creek - 1 by 3 bedroom dwelling Q2 2017

Ngukurr - housing upgrades TBA

Remote Community Housing (RCH)

Barunga - construct 3 new dwellings Q3 2016

Borroloola - construct 22 new dwellings Q3 2016

Bulla - construct 3 new dwellings Q3 2016

Ngukurr - upgrade 29 dwellings Q3 2016

Amanbidji - construct 11 new dwellings Q4 2016

Minyerri - upgrade 42 dwellings Q4 2016

Nauiyu - upgrade 4 dwellings Q4 2016

Wadeye - upgrade 60 dwellings Q4 2016

Yarralin - construct 5 new dwellings Q4 2016

Yarralin - upgrade 17 dwellings Q4 2016

Minyerri - construct 6 new dwellings Q1 2017

Ngukurr - construct 3 new dwellings Q1 2017

Peppimenarti - construct 1 new dwelling Q1 2017

Pigeon Hole - construct 2 new dwellings Q1 2017

Pigeon Hole - upgrade 15 dwellings Q1 2017

Rittarangu - construct 8 new dwellings Q1 2017

Robinson River - construct 5 new dwellings Q1 2017

Robinson River - upgrade 26 dwellings Q1 2017

Urban Public Housing (UPH)

Kalkarindji - construct 2 dwellings Q1 2017

Katherine - 5 Casuarina Street - 1 by 3 bedroom dwelling Q1 2017

Katherine - 57 Anyula Street - upgrades Q1 2017

Katherine - 6 Neal Place - upgrades Q1 2017

TERRITORY GENERATION

Katherine Power Station - Mars fire protection upgrade Q1 2017

COOPERATIVE PROJECTS

Katherine Country Club - golf course redevelopment Q3 2016

Leigh Creek - Katherine rural roads upgrade Q4 2016

Location: Katherine Power Station - Mars fire protection upgrade

Page 32: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 30

KATHERINE REGION (Cont.) Anticipated

Start DEFENCE PROJECTS

Project Growler - Delamere Range redevelopment - Infrastructure, communications and guidance systems

Q3 2016

RAAF Base Tindal - replacement aviation fire trucks Q3 2016

Project Growler: Tindal. Infrastructure, communications and guidance systems. Q2 2017

RAAF Base Tindal - Air 5431 - Air Traffic Management and Control Systems - replace the existing Australian Defence air traffic system

2017

RAAF Base Tindal - AIR8000 - new air combat capability (JSF35) 2017

RAAF Base Tindal - redevelopment including an F-35A Operational Precinct, upgrades to the on-base warehouse, counter measure storage and preparation facilities

Q4 2017

Delamere Air Weapons Range - new facilities to support the Growler capability TBA

Near RAAF Tindal - development of a Northern Explosive Ordinance Storage Facility, including a rail spur into RAAF Tindal

TBA

Concept: Project Growler - Delamere Range redevelopment - Infrastructure, communications and guidance systems

MINING AND PETROLEUM SECTOR PROJECTS

Mt Todd Mine - reopen open-cut pit with new on-site processing plant and power station 2017/18

Sill 80 project - surface mining and processing of ilmenite sands TBA

COUNCIL PROJECTS (Katherine Town Council and Roper Gulf Regional Council)

Numbulwar - recycling tip site Q3 2016

Numbulwar - transport hub Q3 2016

PRIVATE SECTOR PROJECTS

Katherine - Charles Darwin University – upgrade fire mains and firefighting infrastructure Q3 2016

Project Sea Dragon - prawn farm development - stage 1 - Legune grow-out facility 2017

Katherine - Rundle Street - Parkview on Rundle - 16 townhouses TBA

Lansdowne - 363 Gorge Road - new art gallery TBA

Lansdowne - subdivisions to create 60 Rural and Rural Living lots in 4 stages TBA

Concept: Landsdowne - subdivision to create 60 Rural and Rural Living lots in 4 stages

Page 33: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 31

Concept: Gove District Hospital (GDH) redevelopment

– critical care – triage

EAST ARNHEM REGION Anticipated

Start

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Central Arnhem Road – reform and re-gravel chainage 302 km to 308 km and chainage 359.9 km to 364.9 km

Q3 2016

Gove District Hospital - Emergency Department redevelopment and fire system upgrade Q3 2016

Angurugu - replace infrastructure destroyed by fire Q4 2016

Ramingining - new multipurpose hall / cyclone shelter Q4 2016

Alyangula - upgrade police facilities Q2 2017

Angurugu - upgrade police facilities Q2 2017

Gunyangara - employee accommodation 2018

Beswick - subdivision to create 135 lots TBA

Galiwinku - upgrade transport access - barge landing TBA

Gapuwiyak - upgrade transport access - barge landing TBA

Gove Rehabilitation Centre - alcohol and related services TBA

Gunyangara - subdivision to create 73 lots TBA

Nhulunbuy High School - residential boarding facilities - stage 2 - 40 bed residential facility TBA

Ramingining - upgrade transport access - barge landing TBA

Map: East Arnhem Region

Page 34: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 32

EAST ARNHEM REGION (Cont.) Anticipated

Start Government Employee Housing (GEH)

Milingimbi - housing upgrades TBA

Remote Community Housing (RCH)

Galiwinku - construct 3 by 3 bedroom new dwellings Q3 2016

Galiwinku – construct 2 by 4 bedroom dwellings Q3 2016

Angurugu - construct 8 new dwellings Q2 2017

Angurugu - upgrade 20 dwellings Q2 2017

Umbakumba - upgrade 20 dwellings Q2 2017

Yirrkala - construct 8 new dwellings Q2 2017

Concept: Galiwinku – construct 2 by 4 bedroom dwellings

Urban Public Housing (UPH)

Nhulunbuy - upgrade units 1 and 2, 21 Beagle Circuit Q4 2016

MINING AND PETROLEUM SECTOR PROJECTS

Groote Eylandt - South 32 - GEMCO - establish new quarries on eastern leases to provide additional ore to existing processing plant

2021

COUNCIL PROJECTS (East Arnhem Regional Council)

Galiwinku - lot 331 - administration building TBA

Galiwinku – multi-purpose hall for sport, recreation and cyclone shelter TBA

Gapuwiyak - 13 Bambinarmirri Street - lot 95 - alterations and additions to existing child care centre TBA

Gapuwiyak - lot 90 - alterations and additions to existing aged care facility TBA

Milingimbi - lot 168 - new child care centre TBA

Ramingining - lot 118 - alterations and additions to existing aged care facility TBA

PRIVATE SECTOR PROJECTS

Galiwinku - Butan supermarket and caretakers residence TBA

Gunbalanya - lot 383 - alterations and additions to existing store TBA

Gunbalanya - lot 651 - alterations and additions to existing store TBA

Concept: Gunbalanya - lot 651 - alterations and additions to existing store

Page 35: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 33

TOP END RURAL Anticipated

Start

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Kakadu - new all-weather crossing at Kambolgie Creek on Gimbat Road Q3 2016

Litchfield Park - Florence Falls site - 4WD campground upgrades Q3 2016

Port Keats Road - flood immunity at Saddle Rail crossing Q3 2016

Fog Bay Road - upgrade Rocky Creek crossing 2016

Litchfield Park Road realignment including new bridge at Lower Finniss River Q1 2017

Arnhem Link Road - Regional Roads Productivity Package - one new bridge crossing to improve access Q2 2017

Wadeye (Port Keats) - Barge Landing and goods handling facilities Q2 2017

Acacia Larrakia - subdivision to create 28 lots TBA

Adelaide River - Dorat Road - pavement and seal widening of various sections TBA

Arnhem Link Road - lift and seal selected sections between Ramingining and Central Arnhem Road TBA

Belyuen - subdivision to create 77 lots TBA

Maningrida - transport access - freight facility TBA

Nganmarriyanga - subdivision to create 98 lots TBA

Wadeye - 70 Perdjert Street - redevelopment of remote services centre (Centrelink building) TBA

West Arnhem Aerodrome TBA

Concept: Wadeye - 70 Perdjert Street - redevelopment of remote services centre (Centre Link building)

Government Employee Housing (GEH)

Gunbalanya - lot 422 - 2 by 2 bedroom duplex Q3 2016

Maningrida and Wurrumiyanga - subdivision remedial works Q3 2016

Nguiu - 2 by 2 bedroom duplex Q2 2017

Remote Community Housing (RCH)

Belyuen - construct 6 new dwellings Q3 2016

Gunbalanya - construct 5 new dwellings Q3 2016

Gunbalanya - upgrade 44 dwellings Q3 2016

Maningrida - upgrade 24 dwellings Q3 2016

Pirlangimpi - upgrade 44 dwellings Q3 2016

Nguiu - upgrade 49 dwellings Q4 2016

Pirlangimpi - construct 1 new dwelling Q1 2017

Page 36: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 34

TOP END RURAL (Cont.) Anticipated

Start COOPERATIVE PROJECTS

Darwin Rural - Top Croc NT - Build a new crocodile farm, educational facility and tourist attraction Q3 2016

Pirlangimpi Road / Port Melville Road - upgrade road to support forestry industry TBA

Tiwi Islands - opportunities to develop greenfield sites for tourism/residential, aquaculture, agriculture and industrial purposes

TBA

Top End - vapour treatment plant to support the export of NT mangos TBA

Location Map: Tiwi Islands - opportunities to develop greenfield sites for tourism/residential, aquaculture, agriculture and industrial purposes

MINING AND PETROLEUM SECTOR PROJECTS

Rum Jungle Creek South - rehabilitation of former uranium mine site - repairs and maintenance on cover system and drainage structures on the waste rock dump

Q3 2016

Tom's Gully - reopen underground mine and on-site processing plant Q2 2017

Kilimiraka - develop new mineral sands mine and processing plant - South West corner of Bathurst Island 2018/19

PRIVATE SECTOR PROJECTS

Wurrumiyanga - Nguiu Store - 2 veranda extensions Q3 2016

Batchelor - Community Centre (museum) with ancillary restaurant / café TBA

Jabiru - 43 Elsherana Road - Bus Depot with ancillary office and caretakers residence TBA

Wadeye - Showroom sales in a single storey building TBA

Wurrumiyanga - Bathurst Island - Catholic Education staff housing - quadplex TBA

Concept: Wurrumiyanga - Bathurst Island - Catholic Education staff housing - quadplex

Page 37: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 35

PALMERSTON AND LITCHFIELD Anticipated

Start

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Bees Creek Preschool - extension Q3 2016

Cox Peninsula Road, Finn Road and Hopewell Road intersections - installation of street lighting Q3 2016

Elrundie Avenue and Kirkland Drive - entry statement Q3 2016

Holtze - Yirra House - urgent works to secure care facility Q3 2016

Stuart Highway and Livingstone Road - intersection upgrade Q3 2016

Stuart Highway and Virginia Road - intersection upgrade Q3 2016

Taminmin College - new science lab Q3 2016

Corroboree Billabongs Access Road - grading Q4 2016

Palmerston Regional Hospital Headworks - sewer main construction Q4 2016

Yarrawonga Catchment - flood mitigation Q4 2016

Howard Springs to Coolalinga - extend cycle path along the old North Australian Railway corridor - approximately 4 kilometres

Q1 2017

Stuart Highway / McKinnon Road intersection upgrade - Pinelands Industrial Precinct access Q2 2017

Gunn Point Road - upgrade and seal various sections 2017

Howard Springs - Activity Centre (headworks) 2017

Palmerston Regional Hospital Headworks - HV electrical supply 2017

Wadham Lagoon - flood mitigation 2017

Arnhem Highway - Adelaide River Flood Plain upgrade TBA

Coolalinga - Activity Centre (headworks) TBA

Coolalinga - pavement strengthening of the Stuart Highway at Coolalinga TBA

Roystonea Ave extension – Owston Ave to Channel Island Rd TBA

Location Plan: Palmerston Regional Hospital Headworks - sewer main construction

Boosting Our Economy (BoE)

Various Schools - transportable classrooms (relocatable group of assets) Q3 2016

Concept: Various Schools - transportable classrooms (relocatable group of assets)

Page 38: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 36

PALMERSTON AND LITCHFIELD (Cont.) Anticipated

Start Urban Public Housing (UPH)

Moulden - rejuvenate 8 public housing complexes Q3 2016

Rosebery - 4 by 1 bedroom and 4 by 2 bedroom dwellings Q4 2016

TERRITORY GENERATION

Channel Island Power Station - upgrade C1 - 5 fire protection upgrade Q1 2017

POWER WATER CORPORATION PROJECTS

Palmerston Eastern Trunk Sewer - replace DUPL 750 with 1050 Q3 2016

COOPERATIVE PROJECTS

Fred's Pass Reserve - upgrades including roads, electricity, lighting, irrigation, ablutions and fencing TBA

Johnston - Farrar Villages - 26 Angel Road - 81 by 2 bed and 4 by 3 bed apartments TBA

Concept: Johnston - Farrar Villages - 26 Angel Road - 81 by 2 bed and 4 by 3 bed apartments

DEFENCE PROJECTS

Robertson Barracks - replacement aviation fire trucks Q3 2016

Shoal Bay Receiving Station - facility upgrade Q3 2016

Robertson Barracks - Land 155 enhanced Gap Crossing capability Q4 2016

Robertson Barracks - Land 17 - Land Force mortar replacement Q1 2017

Robertson Barracks - A9052 - 25 metre range Q1 2017

Robertson Barracks - Land 200 Battlefield communication systems TBA

MINING AND PETROLEUM SECTOR PROJECTS

Darwin Refinery - stage 1- development of titanium, vanadium and pig iron refinery Q4 2017

Darwin Refinery - stage 2 - development of titanium, vanadium and pig iron refinery expansion Q4 2021

COUNCIL PROJECTS (City Of Palmerston)

Archer - landfill site rehabilitation Q3 2016

Archer Waste Transfer Station - recycling centre access road and services Q3 2016

Pinelands - Baban Place - stormwater drainage upgrade Q3 2016

Page 39: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 37

PALMERSTON AND LITCHFIELD (Cont.) Anticipated

Start PRIVATE SECTOR PROJECTS

Farrar - 1 Kettle Street - Terrace Garden Aged Care - 32 bed addition to existing supporting accommodation facility - staged construction

Q3 2016

Johnston - 3 Tarakan Court - 30 by 3 bedroom and 1 by 4 bedroom multiple dwellings in 4 by 1 storey and 4 by 2 storey building

Q3 2016

Howard Springs - 85 Whitewood Road - place of worship 2016

Johnston - 12 George Street - 3 by 3 bedroom dwellings 2016

Johnston - 14 George Street - 3 by 3 bedroom dwellings 2016

Howard Springs - new large animal surgery at existing veterinary clinic Q1 2017

Farrar - 1 Kettle Street - Terrace Garden Aged Care - consolidation of dementia accommodation on the existing site

Q3 2017

Johnston - 3 Camm Street - triplex 2017

Zuccoli - Catholic Education - new primary school Q1 2018

Coolalinga - 31-35 Fairweather Crescent - 48 by 2 bedroom multiple dwellings in a 4 storey building and basement car parking

TBA

Driver - 103 Dwyer Circuit - Palmerston Golf and Country Club - new kitchen, outdoor function area, paths and additional car parking

TBA

Durack - 29 Packard Avenue - Childcare Centre - 120 place early learning centre TBA

PRIVATE SECTOR PROJECTS (Cont.)

Durack - 3 Russell Street - 7 by 4 bedroom dwellings TBA

Holtze - Corner Stuart Highway and Mander Road - Shop including a drive through liquor outlet in a single storey building and mezzanine function area

TBA

Johnston - 1 George Street - 3 by 3 bedroom multiple dwellings in 2 by 2 storey buildings TBA

Johnston - 13 Redwood Street - 3 by 3 bedroom multiple dwellings in a single storey building TBA

Middle Point - 1125 Anzac Parade - additions and alterations to existing Barramundi farm (intensive animal husbandry)

TBA

Moulden - Tilston Avenue - Service station and shops TBA

Noonamah Ridge - Redcliff Road - rural residential subdivision including village centres TBA

Palmerston - 5 &11 Yarrawonga Road - Gateway Shopping Centre - retail / shop additions TBA

Rosebery - 10 Browne Place - 4 townhouses TBA

Concept: Durack - 29 Packard Avenue - Childcare Centre - 120 place early learning centre

Page 40: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 38

PALMERSTON AND LITCHFIELD (Cont.) Anticipated

Start PRIVATE SECTOR PROJECTS

Tivendale - 8 Coffey Street - warehouses with ancillary showroom and office in a 2 by 2 storey building TBA

Virginia - 30 Virginia Road - upgrade and extension to existing tavern TBA

Yarrawonga - 11 Georgina Crescent - 7 warehouses TBA

Yarrawonga - 12 Georgina Crescent - showroom, warehouses and service station development TBA

Yarrawonga - 15 Yarrawonga Road - motor repair station TBA

Yarrawonga - 27 McCourt Road - warehouses with ancillary office TBA

Yarrawonga - 28 McCourt Road - 9 warehouse units with ancillary offices in 2 by 2 storey buildings in 3 stages

TBA

Yarrawonga - 37 Toupein Road - warehouses with ancillary offices TBA

Yarrawonga - 41 McCourt Road - showroom sales, office complex TBA

Concept: Tivendale - 8 Coffey Street - warehouses with ancillary showroom and office in a 2 by 2 storey building

PRIVATE SECTOR PROJECTS (Cont.)

Zuccoli - 1 Follington Street - 2 by 3 bedroom multiple dwellings in a single storey building TBA

Zuccoli - 1 Tuckeroo Boulevard - 19 by 3 bedroom multiple dwellings TBA

Zuccoli - 32 Hawker Street - 3 by 3 bedroom multiple dwellings in 2 by 2 storey buildings TBA

Zuccoli - proposed lot 13262 - 3 by 3 bedroom multiple dwelling in a single storey building TBA

Zuccoli - Radford Road - Subdivision to create 90 residential lots and 1 public open space lot and; a building setback and parking plan (Zuccoli Stage 5 A & B)

TBA

Zuccoli Parade - Temporary sales office and display village TBA

Concept: Zuccoli - 1 Tuckeroo Boulevard - 19 by 3 bedroom multiple dwellings

Page 41: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 39

DARWIN ENVIRONS Anticipated

Start

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government

Darwin - Northern Region - bituminous resurfacing of various roads and highways Q3 2016

Darwin - urban asphalt replacement on various roads and highways - Trower Road outbound lanes Q3 2016

Fannie Bay - Waratah Crescent - lot 8898 (Sports House site) - residential redevelopment Q3 2016

Ludmilla Catchment - flood mitigation Q3 2016

Millner - NT Archives Building fit out Q3 2016

Museum and Art Gallery of the Northern Territory (MAGNT) - stage 2 - upgrade and replace heating, ventilation and air conditioning

Q3 2016

Tiwi - Trower Road - asphalt replacement on outbound lanes Q3 2016

Vanderlin Drive - duplication from Mueller Road to the McMillans Road roundabout, including upgrading of 4 intersections

Q3 2016

Wulagi Primary School - upgrade and extend school hall to include new sports surface, indoor fans, staging area and roof top solar array

Q3 2016

Location: Vanderlin Drive - duplication from Mueller Road to the McMillans Road roundabout, including upgrading of 4 intersections

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government (Cont.)

Anula Primary School - upgrade carparks and walkways Q4 2016

Rapid Creek Catchment - stormwater management works Q4 2016

TIO Stadium - upgrade lighting, change rooms and playing surface Q4 2016

Location: Anula Primary School - upgrade carparks and walkways

Page 42: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 40

DARWIN ENVIRONS (Cont.) Anticipated

Start

GOVERNMENT PROJECTS - Australian Government and Northern Territory Government (Cont.)

Berrimah - Peter McAulay Centre - extension to the forensic laboratory Q1 2017

Hidden Valley Motor Sports Complex - stage 2 replacement of water mains and systems Q1 2017

Hidden Valley Motor Sports Complex - upgrade water reticulation Q1 2017

Museum and Art Gallery of the Northern Territory (MAGNT) - stage 3 - upgrade and replace heating, ventilation and air conditioning

Q3 2017

Darwin CBD - Barneson Boulevard Link - duplication of Tiger Brennan Drive from Dinah Beach to McMinn Street

2017

Darwin CBD - Esplanade Boardwalk 2017

Museum and Art Gallery of the Northern Territory (MAGNT) - stage 4 - upgrade and replace heating, ventilation and air conditioning

Q3 2018

Berrimah - Peter McAuley Centre - new multipurpose conference facility TBA

Cullen Bay - dredging TBA

Darwin - land infill headworks TBA

Ludmilla Creek - stage 2 flood mitigation TBA

Middle Arm Industrial Precinct - a range of lot sizes with majority ranging from 5 hectares to 160 hectares TBA

Rapid Creek Catchment - home fortification TBA

Royal Darwin Hospital

Royal Darwin Hospital - main ward block concrete spalling repairs Q3 2016

Royal Darwin Hospital - upgrade fire doors and frames Q3 2016

Royal Darwin Hospital - 24-bed cognitive care facility, with the ability to expand to 36 beds in the future - multi-storey car park, increasing on-site car parking by between 350-400 spaces - residential accommodation

TBA

Concept: Darwin High School - redevelopment ground floor of Block A

DARWIN ENVIRONS (Cont.) Anticipated

Start

Boosting Our Economy (BoE)

Casuarina Senior College - enclose and refurbish under croft to provide a modern recreation space Q3 2016

Darwin High School - redevelopment ground floor of Block A Q3 2016

Nakara Primary School - new science, multipurpose and IT rooms Q3 2016

Nightcliff Primary School - replace fire, potable and irrigation mains and associated works Q3 2016

Wulagi Primary School - replace fire, potable and irrigation mains and associated works Q3 2016

Concept: Nakara Primary School - new science, multipurpose and IT rooms

Page 43: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 41

DARWIN ENVIRONS (Cont.) Anticipated

Start

Urban Public Housing (UPH)

Karama - rejuvenate 10 public housing complexes Q3 2016

Leanyer - 13 Parkside Drive - upgrade Q3 2016

Millner and Ludmilla - upgrade 133 Ryland Road and 95 Bagot Road Q3 2016

POWER WATER CORPORATION PROJECTS

Darwin - Strauss water treatment plant TBA

Draft Concept: Darwin CBD - Barneson Boulevard Link from Tiger Brennan Drive to Cavenagh Street - improve safety and reduce traffic delays at major intersections, including traffic signals and merging lanes

COOPERATIVE PROJECTS

Darwin CBD - Barneson Boulevard Link from Tiger Brennan Drive to Cavenagh Street - improve safety and reduce traffic delays at major intersections, including traffic signals and merging lanes

Q3 2016

Parap - 77 Ross Smith Avenue - Parap Pool Redevelopment - construction of a 50 metre competition standard pool, including children and youth amenities

Q3 2016

Tiwi - 37 Henbury Avenue - Community 360 - Disability services facility in 3 by 1 storey and 1 by 2 storey buildings including ancillary offices in 4 stages

Q3 2016

Berrimah Farm subdivision - 1000+ lots, schools, research precinct, retail centre, offices, bulky goods Q4 2016

Concept: Tiwi – 37 Henbury Avenue - Community 360 – respite building

Concept: Parap - 77 Ross Smith Avenue - Parap Pool Redevelopment - construction of a 50 metre competition standard pool, including children and youth amenities

Page 44: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 42

Concept: Marrara – new tennis centre

DARWIN ENVIRONS (Cont.) Anticipated

Start

COOPERATIVE PROJECTS (Cont.)

Marrara - tennis centre Q4 2016

Marrara - lawn bowls facilities - upgrade 2016

Milner - Darwin Velodrome - upgrades to the fencing, lighting, refurbishing and surfacing of the track, bringing it up to competition standard

2016

Darwin - luxury hotel development 2017

Darwin or Palmerston CBD - New Health Headquarters - 1200 m2 office accommodation for the Department of Health (refurbishment of an existing building or a new building)

2018/19

Berrimah Export Yards upgrade - 2 roof-only sheds, 5 yards, 3 water tanks, excavation and landscaping TBA

Nightcliff - 47 Progress Drive - John Stokes Square -redevelopment of public housing complex TBA

Stuart Park – Frances Bay - redevelopment - exciting waterfront precinct for tourists, locals and boaties TBA

Winnellie - Darwin Showgrounds - upgrade infrastructure TBA

DEFENCE PROJECTS

Darwin Region - establishment of a North Australia Infrastructure Facility 2017

RAAF Base Darwin - Air 5431 - Air Traffic Management and Control Systems - replace the existing Australian Defence Air Traffic system

2017

Larrakeyah Barracks including NORFORCE redevelopment and HMAS Coonawarra – new wharf and in-ground services

Q1 2018

RAAF Base Darwin - AIR7000 - new facilities for P8 aircraft Q3 2018

RAAF Base Darwin - base redevelopment - in ground infrastructure 2018

Darwin Waterfront - removal of redundant fuel pipeline from Stokes Hill to Fort Hill Wharf TBA

HMAS Coonawarra Health Centre - Joint Health Command - permanent garrison health facilities upgrade TBA

Larrakeyah Barracks and HMAS Coonawarra - infrastructure enhancements including a new wharf TBA

Ludmilla - flood mitigation project TBA

RAAF Base Darwin - facilities to support the new P8 Poseidon maritime patrol aircraft TBA

RAAF Base Darwin – J0056 Explosives Ordinance Logistics Reform Program (EOLRP) - new administration office, bulk storage and upgrading roads

TBA

RAAF Base Darwin and Tindal - facilities to support the new Joint Strike Fighter TBA

COUNCIL PROJECTS (City Of Darwin)

Anula - design and construction of play equipment facilities and shade Q3 2016

Darwin Esplanade - community play space at Bicentennial Park Q3 2016

Fannie Bay - Dick Ward Drive - traffic lights at Turf Club entrance Q3 2016

Page 45: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 43

Concept: Darwin CBD - 35 Knuckey Street - refurbishment of 2 storey retail building (Attitude for Men)

DARWIN ENVIRONS (Cont.) Anticipated

Start PRIVATE SECTOR PROJECTS

Darwin CBD - 35 Knuckey Street - refurbishment of 2 storey retail building (Attitude for Men) Q3 2016

Jingili - lot 4522 and 9718 McMillans Road - restaurant, shop, motel and apartments Q3 2016

Lee Point - Club Tropical Resort/ Sage Resort Darwin – new clubhouse Q3 2016

The Narrows - 335 Stuart Highway - Rubix Apartments - 54 by 2 bedroom multiple dwellings in 5 by 3 storey buildings

Q3 2016

East Arm Port - infrastructure upgrades (stage 1) 2016

East Arm Port - sea container handling and storage area 2016

Bayview -The Boulevarde - final stage of Bayview suburban development (in 7 stages) 2017

Darwin CBD - 145 Mitchell Street - 4 by 3 bedroom townhouses 2017

East Arm Port - Marine Maintenance Facility - common user ship lift to support marine maintenance and servicing (stage 1)

2017

East Arm Port - infrastructure upgrades (stage 2) 2018

Alawa - 27, 29, 31 and 33 Young Crescent - 11 multiple dwellings in 3 by 2 storey and 2 by 1 storey TBA

Berrimah - 1 Boulter Road - complex of 178 dwellings (89 duplexes) TBA

Berrimah - 100 Thorak Road - alterations and extension to existing plant nursery including 2 storey office, shed and amenities

TBA

Berrimah - 32-38 Bowerlee Road - 108 by 3 bedroom multiple dwellings in 62 single storey buildings TBA

Berrimah - 41 Boulter Road - Orchid Gardens - 44 by 2 bedroom dwellings TBA

Berrimah - 55 Boulter Road - Tamarind Point - 51 by 2 and 3 bedroom multiple dwellings TBA

Berrimah - 81 Boulter Road - subdivision to create 66 lots including 1 public open space lot TBA

Berrimah - College Road Subdivision - create 72 lots in 3 stages TBA

Berrimah Business Park - 28 Miles Road - showroom/warehouse duplex TBA

Berrimah Business Park - 35 Miles Road - warehouse with ancillary showroom / offices TBA

Berrimah Business Park - 96 Jessop Street (lot B2) - new petrol station TBA

Berrimah Business Park - 96 Jessop Street (lot B3) - warehouse and showroom TBA

Darwin Airport - Shell depot upgrade TBA

Concept: Berrimah Business Park - 96 Jessop Street (lot B3) - warehouse and showroom

Page 46: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 44

Concept: Darwin CBD - 87 Woods Street - refurbishment to create 44 room hostel with shop, restaurant and office

DARWIN ENVIRONS (Cont.) Anticipated

Start PRIVATE SECTOR PROJECTS (Cont.)

Darwin CBD - 103 Smith Street - alterations to service station to include restaurant and drive thru TBA

Darwin CBD - 13 Daly Street - 178 residential dwellings and 72 serviced apartments in a 29 storey building

TBA

Darwin CBD - 166 Smith Street - 18 by 2 bedroom multiple dwellings in an 8 storey building TBA

Darwin CBD - 3 Daly Street - 135 room hotel accommodation TBA

Darwin CBD - 69 Mitchell Street - Six Tanks Brew Co - micro brewery development TBA

Darwin CBD - 85 Mitchell Street (old Hogs Breath site) - 85 by serviced apartments, 2 by 3 bedroom multiple dwellings, restaurant in 16-storey building including 3 parking levels

TBA

Darwin CBD - 87 Woods Street - refurbishment to create 45 room hostel with shop, restaurant and office TBA

Darwin CBD - 9 Daly - 23 storey motel with restaurant and car parking TBA

Darwin CBD - Asti Motel - refurbishment of existing motel plus 24 by 2 and 12 by 1 bedroom serviced apartments

TBA

Darwin CBD - Asti Motel redevelopment - new 7 storey serviced apartment and 13 Storey Multiple Dwelling Buildings

TBA

Darwin CBD - Cavenagh Street - Energy House facade upgrade TBA

Darwin CBD - Daly Street - Gateway Plaza Building - mixed use development TBA

Darwin CBD - DoubleTree by Hilton Hotel Darwin - 100 room expansion TBA

Darwin CBD - Lindsay Street - lot 1462 - 60 by 1 bed apartments TBA

Darwin International Airport Precinct - Neale Street - fast food precinct TBA

East Arm - 14 Casey Street - complex of 4 sheds with office TBA

East Arm - 38 Dawson Street - Warehouse and ancillary office TBA

East Arm - 43 O'Sullivan Circuit - new waste storage and transfer facility TBA

East Arm - 66 O'Sullivan Circuit - 2 storey office extension to an existing warehouse TBA

East Arm - 9 O'Sullivan Circuit - Linfox Multi User Intermodal Facility - warehouse TBA

Concept: East Arm - 9 O'Sullivan Circuit - Linfox Multi User Intermodal Facility - warehouse with ancillary outdoor storage

Page 47: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

PROPOSED 45

DARWIN ENVIRONS (Cont.) Anticipated

Start PRIVATE SECTOR PROJECTS (Cont.)

East Arm Port - Cruise Ship Facility TBA

East Arm Port - Quay Line / Container Park expansion TBA

Fannie Bay - 16 Christie Street - 4 Balinese inspired townhouses TBA

Fannie Bay - 26 Philip Street - 2 by 3 and 2 by 4 bedroom multiple dwellings in 2 by 2 storey buildings TBA

Fort Hill Wharf - additional quay line and passenger facilities TBA

Larrakeyah - 161 Mitchell Street (corner Lambell Terrace) - 19 by 1 bedroom and 1 by 2 bedroom multiple dwellings (serviced apartments) and ground level commercial tenancies in a 4 storey building plus basement carpark

TBA

Milner Village Plaza - stages 2 – 4 Including 54 units and commercial TBA

Muirhead - 18 Morris Street - 2 by 3 bedroom multiple dwellings in a single storey building TBA

Muirhead - 2 Patrick Street - 2 by 3 bedroom multiple dwellings in a single story building TBA

Muirhead - 24 Barratt Street - 2 by 4 bedroom multiple dwellings in a single storey building TBA

Muirhead - 36 Trainer Street - 2 by 3 bedroom multiple dwellings in a 2 storey building TBA

Muirhead - 37 Trainer Street - 2 by 3 bedroom multiple dwellings in a single storey building TBA

Muirhead - 43 Mahoney Street - 2 by 3 bedroom multiple dwellings in 2 single storey buildings TBA

Muirhead - 5 Bridge Street - 2 by 4 bedroom multiple dwellings in a single storey building TBA

Muirhead - 6 Lemke Street - 2 by 4 bedroom multiple dwellings in a 2 storey building TBA

Muirhead stage 7 TBA

Nightcliff - 14 Grevillea Circuit - Elements on Grevillea - 9 by 2 bedroom units TBA

Rapid Creek - 324 Casuarina Drive - 2 by 4 bedroom dwellings in a 2 storey building TBA

Rapid Creek - 67 Ryland Road - 2 by 3 bedroom multiple dwellings in a single storey building TBA

Stuart Park - 16 Eden Street - 2 by 4 bedroom and 1 by 3 bedroom townhouses TBA

Stuart Park - 29 Eden Street - 4 by 3 bedroom townhouses TBA

Stuart Park - 40 Gothenburg Crescent - Boheme Apartments - 12 by 2 bedroom apartments TBA

Concept: Stuart Park - 40 Gothenburg Crescent - Boheme Apartments - 12 by 2 bedroom apartments

PRIVATE SECTOR PROJECTS (Cont.)

The Gardens - 4 Blake Street - 7 storey building of 118 apartments TBA

Winnellie - 21 Swan Crescent - showroom and warehouse TBA

Winnellie - 46 Coonawarra Road - new service station TBA

Winnellie - 85 Coonawarra Road - new offices and showrooms TBA

Winnellie - corner Downes, Bombing, Winnellie Road and Catterthun Street - Warehouse, office and showroom sales in a 2 storey building

TBA

Winnellie - Leprechaun Hotel - new 112 room development TBA

Wishart - 13 Mettam Road - Haulmark Hydro Testing Facility - shaded testing facility for trailers TBA

Page 48: Construction Snapshot June 2016...2.7 Q3 2016 Alice Springs Paths and Tracks Connectivity Project - tourism paths 2.5 Q3 2016 ... barrier wall and catch fence 1.2 Q3 2016 Construction

46

Construction Snapshot June 2016 Edition is published by the Department of Infrastructure. Note: Dates, where shown, are depicted in calendar year quarters.

DISCLAIMER

Construction Snapshot is intended only to provide an overview of construction activity for major works over $500 000 in the Northern Territory up to 30 June 2016. While due care has been taken, this information is compiled from many sources and is subject to change. No reliance should be placed on any statement or information referred to herein without first making your own assessment and enquiry about the completeness, accuracy, reliability and status of the information and relevance to your circumstances. The Northern Territory of Australia gives no warranty or assurance of this information and accepts no direct, indirect or consequential liability arising from reliance on this information.

ISBN: 978-0-9946294-0-1

CONTACT This publication is presently managed by the Major Projects and Procurement Services division of the Northern Territory Government’s Department of Infrastructure. T: +61 8 8999 4743 E: [email protected] Office location: Postal address: 4th Floor, Highway House PALMERSTON NT 0830

PO Box 61 PALMERSTON NT 0830

Web page: https://infrastructure.nt.gov.au/publications/construction-snapshot