Transcript

<ul><li><p>Central Puget Sound </p><p>Regional Transit Authority </p><p> CONTRACT RTA/CN: 0101-11 </p><p>UNIVERSITY LINK PROJECT EMI/VIBRATION MONITORING </p><p>AND WHEEL FLAT DETECTION SYSTEMS </p><p>CONTRACT U835 </p><p>Contract Specifications </p><p>100% SUBMITTAL </p><p>Volume 1 June 2011 </p></li><li><p>This Page is Intentionally Blank </p></li><li><p> CONTRACT SPECIFICATIONS </p><p> PREFACE </p><p> THE LINK CONTRACT SPECIFICATIONS FOR THE UNIVERSITY LINK SYSTEMS CONSTRUCTION </p><p>ARE CONTAINED HEREIN. </p><p>MEASUREMENT AND PAYMENT METHODS FOR EACH ITEM ON THE BID FORM ARE SPECIFIED IN </p><p>CONTRACT SPECIFICATIONS SECTION 01 20 00, PRICE AND PAYMENT PROCEDURES.</p></li><li><p>This Page is Intentionally Blank </p></li><li><p>UNIVERSITY LINK PROJECT SECTION 00 00 10-1 LINK CONTRACT U835 EMI/VIBRATION MONITORING TABLE OF CONTENTS CONTRACT NO. RTA/CN: 0101-11 AND WHEEL FLAT DETECTION SYSTEMS 100% SUBMITTAL JUNE 2011 </p><p>CONTRACT SPECIFICATIONS </p><p> UNIVERSITY LINK PROJECT </p><p> EMI/VIBRATION MONITORING AND WHEEL FLAT DETECTION SYSTEMS </p><p> U835 CONTRACT SPECIFICATIONS </p><p>DIVISION 00 PROCUREMENT AND CONTRACTING RERQUIREMENTS </p><p>00 00 10 Table of Contents </p><p>DIVISION 01 GENERAL REQUIREMENTS </p><p>01 12 16 Work Sequence </p><p>01 20 00 Price and Payment Procedures </p><p>01 25 00 Substitution Procedures </p><p>01 27 00 Dispute Review Board </p><p>01 27 23 Escrow Bid Documentation </p><p>01 31 19 Project Meetings </p><p>01 31 23.10 Internet-Based Document Management System </p><p>01 32 13 Scheduling of Work </p><p>01 33 00 Submittal Procedures </p><p>01 41 26 Permits </p><p>01 45 00 Quality Assurance / Quality Control </p><p>01 60 00 Product Requirements </p><p>01 66 00 Product Storage and Handling Requirements </p><p>01 77 00 Closeout Procedures </p><p>01 78 23 Operation and Maintenance Data </p><p>01 78 39 Project Record Documents </p><p>01 79 10 Training of Operations and Maintenance Personnel </p><p>01 95 00 System Testing Requirements </p><p>TECHNICAL SPECIFICATION </p><p> END OF SECTION 00 00 10 </p></li><li><p>UNIVERSITY LINK PROJECT SECTION 00 00 10-2 LINK CONTRACT U835 EMI/VIBRATION MONITORING TABLE OF CONTENTS CONTRACT NO. RTA/CN: 0101-11 AND WHEEL FLAT DETECTION SYSTEMS 100% SUBMITTAL JUNE 2011 </p><p>This Page is Intentionally Blank </p></li><li><p>UNIVERSITY LINK PROJECT DIVISION 01 LINK CONTRACT U835 EMI/VIBRATION MONITORING GENERAL REQUIREMENTS CONTRACT NO. RTA/CN: 0101-11 AND WHEEL FLAT DETECTION SYSTEMS 100% SUBMITTAL JUNE 2011 </p><p>DIVISION 01 </p><p>GENERAL REQUIREMENTS </p></li><li><p>UNIVERSITY LINK PROJECT DIVISION 01 LINK CONTRACT U835 EMI/VIBRATION MONITORING GENERAL REQUIREMENTS CONTRACT NO. RTA/CN: 0101-11 AND WHEEL FLAT DETECTION SYSTEMS 100% SUBMITTAL JUNE 2011 </p><p>This Page is Intentionally Blank </p></li><li><p>UNIVERSITY LINK PROJECT SECTION 01 12 16-1 LINK CONTRACT U835 EMI/VIBRATION MONITORING WORK SEQUENCE CONTRACT NO. RTA/CN: 0101-11 AND WHEEL FLAT DETECTION SYSTEMS 100% SUBMITTAL JUNE 2011 </p><p>CONTRACT SPECIFICATIONS </p><p>SECTION 01 12 16 </p><p>WORK SEQUENCE </p><p>PART 1 - GENERAL </p><p>1.01 SUMMARY </p><p>A. Section specifies start and completion times, milestones, work sequence, constraints, hours of work, incentive provisions, and liquidated damages. </p><p>B. Schedule and conduct Work in a manner consistent with the Contract, and comply with approved construction schedule, specific work sequence, Contract milestones and constraints of Work as specified. </p><p>C. Plan sequence of construction to accommodate Contract requirements. </p><p>1.02 START DATES </p><p>A. Notice to Proceed (NTP) will be effective no earlier than XXX. This NTP will be the start date for Contract milestones, and Substantial Completion dates established herein. </p><p>1.03 COMPLETION DATES </p><p>A. Complete Work within XXX Days after NTP. Work complete by this time shall include Substantial Completion of Work. </p><p>B. Achieve Final Acceptance within specified time stated in Certificate of Substantial Completion as required by the General Conditions based on acceptance upon completion of maintenance. </p><p>1.04 HOURS OF WORK </p><p>A. Comply with requirements of applicable jurisdictions regarding limitations on work hours outside tunnel and station areas. Work hours are subject to noise level restrictions imposed by City of Seattle. </p><p>1.05 LIQUIDATED DAMAGES </p><p>A. Liquidated damages for failure to achieve Substantial Completion within XXX Days, as provided in General Conditions: $5,000 per Day. </p><p>PART 2 - PRODUCTS (NOT USED) </p><p>PART 3 - EXECUTION (NOT USED) </p><p>END OF SECTION 01 12 16 </p></li><li><p>UNIVERSITY LINK PROJECT SECTION 01 12 16-2 LINK CONTRACT U835 EMI/VIBRATION MONITORING WORK SEQUENCE CONTRACT NO. RTA/CN: 0101-11 AND WHEEL FLAT DETECTION SYSTEMS 100% SUBMITTAL JUNE 2011 </p><p>This Page is Intentionally Blank </p></li><li><p>UNIVERSITY LINK PROJECT SECTION 01 20 00-1 LINK CONTRACT U835 EMI/VIBRATION MONITORING PRICE AND PAYMENT PROCEDURES IFB NO. RTA/CN: 0101-11 AND WHEEL FLAT DETECTION SYSTEMS 100% SUBMITTAL JUNE 2011 </p><p>CONTRACT SPECIFICATIONS </p><p>SECTION 01 20 00 </p><p>PRICE AND PAYMENT PROCEDURES </p><p>PART 1 - GENERAL </p><p>1.01 SUMMARY </p><p>A. Section includes requirements for Measurement and Payment. </p><p>B. Payment for various items on Bid Sheet, as further specified herein, shall include all compensation received by Contractor for furnishing all tools, equipment, supplies, and manufactured articles, and all labor, operations, and incidentals as necessary to complete various items of Work in accordance with the requirements of Contract Documents, including all appurtenances thereto and including all costs of compliance with regulations of public agencies having jurisdiction, including safety and health requirements of Occupational Safety and Health Administration of the U. S. Department of Labor (OSHA), Washington Industrial Safety and Health Act (WISHA), Department of Labor and Industry, Seattle Department of Planning and Development, and Seattle Fire Department. No additional payment will be made for any item not specifically set forth in Bid Sheet, and all costs therefore shall be included in prices provided in Bid Sheet for various items of Work. </p><p>C. Allocate indirect costs, including but not limited to, supervision and overhead, profit, and general conditions specified in Contract to each bid item as applicable for Work defined in bid item. No separate payment will be made to Contractor for these items. </p><p>D. References in Contract Documents to referenced documents including Referenced Standards are for technical and administrative provisions only. Measurement and payment provisions referenced in all such standards are not applicable to this Contract. All payment for Work done under provisions of Contract is provided for in Bid Sheet set forth Special Conditions, and described herein. </p><p>1.02 BID ITEM MEASUREMENT AND PAYMENT </p><p>A. BID ITEM Number One: Lump Sum for all of Work of this Contract excluding item Two. </p><p>1. Measurement: In accordance with a reasonable apportionment of work as established in the Schedule of Values. </p><p>2. Payment: Based upon percentage of completion for each appropriate line item in Schedule of Values. </p><p>3. Additional mobilization information, refer to Article 1.05B, herein. Additional demobilization information, refer to Article 1.05C, herein. </p><p>B. BID ITEM Number Two: Provide a Electromagnetic Interference (EMI), Vibration and Wheel Flat Monitoring and Detection System for the University Link Tunnel expansion. </p><p>1. The bid Sheet includes a Lump Sum Price for the above Monitoring and Detection System for the University Link Tunnel expansion. Measurement: All work necessary for providing and testing the above Monitoring and Detection System for the University Link Tunnel expansion. </p><p>2. Payment: Based on Unit Price provided applied to the measured amount. </p></li><li><p>UNIVERSITY LINK PROJECT SECTION 01 20 00-2 LINK CONTRACT U835 EMI/VIBRATION MONITORING PRICE AND PAYMENT PROCEDURES IFB NO. RTA/CN: 0101-11 AND WHEEL FLAT DETECTION SYSTEMS 100% SUBMITTAL JUNE 2011 </p><p>C. BID ITEM Number Three: Provisional Sum for additional unspecified University of Washington /City of Seattle Requirements. </p><p>1. Work of item includes costs associated with Unspecified University of Washington/City of Seattle Requirements are not indicated in Contract Documents. </p><p>2. Measurement: No separate measurement will be made for item. </p><p>3. Payment: Item will be paid for in accordance with the General Conditions for Payment on Time and Material Basis for Work satisfactorily completed as approved by Resident Engineer. </p><p>D. BID ITEM Number Four: Provisional Sum for Contractor Acquired Permit Fees. </p><p>1. Work of this item includes costs direct permit fees associated with Contractor Acquired Permits. </p><p>2. Measurement: No separate measurement will be made for item. </p><p>3. Payment: Item will be paid for in accordance with the General Conditions. No Contractor markup is allowed for these permit fee costs. </p><p>E. BID ITEM Number Five: Provisional Sum for Contractor System Maintenance. </p><p>1. Work of this item includes costs direct permit fees associated with Contractor System Maintenance. </p><p>2. Measurement: No separate measurement will be made for item. </p><p>3. Payment: Item will be paid for in accordance with the General Conditions. No Contractor markup is allowed for these permit fee costs. </p><p>1.03 SUBMITTALS </p><p>A. Procedures: Section 01 33 00, Submittal Procedures. </p><p>B. Formats for Submittals: </p><p>1. Hard Copy Formats </p><p>a. Schedule of Values: Medium 8-1/2 inches by 11 inches in size. </p><p>2. Electronic Copy Format </p><p>a. Draft Schedule of Values, Final Schedule of Values and Revised Schedule of Values: Electronic file in Microsoft Excel format and in .PDF format. </p><p>C. Schedule of Values. </p><p>1. Draft schedule of values: One paper copy and two electronic copies (.XLS and .PDF). Submit at Limited Notice to Proceed </p><p>2. Final Schedule of Values: One paper copy and two electronic copies (.XLS and .PDF). Submit within 30 Days following Limited Notice to Proceed. </p><p>3. Revised Schedule of Values: One paper copy and two electronic copies (.XLS and .PDF). Submit as required. </p></li><li><p>UNIVERSITY LINK PROJECT SECTION 01 20 00-3 LINK CONTRACT U835 EMI/VIBRATION MONITORING PRICE AND PAYMENT PROCEDURES IFB NO. RTA/CN: 0101-11 AND WHEEL FLAT DETECTION SYSTEMS 100% SUBMITTAL JUNE 2011 </p><p>D. Conform to same requirements as original submittals for all re-submittals. </p><p>1.04 SCHEDULE OF VALUES </p><p>A. Schedule of Values shall be developed and used to provide an allocation of Contract Price for measurement and payment in accordance with General Conditions. </p><p>B. Schedule of Values shall be developed to an appropriate level of detail to ensure accurate payment for Work accomplished. The following is an example of a partial Schedule of Values depicting the minimum level of detail required. </p><p> Division 02 - Existing Condition Qty Unit Price Total </p><p> 024100.001 Demolition Buildings &amp; foundations TBD TBD TBD TBD </p><p> 024100.002 Disconnect, cut &amp; cap utility services TBD TBD TBD TBD </p><p> 024100.003 Remove 225 kVA transformer TBD TBD TBD TBD </p><p> 024100.004 Debris Removal &amp; Disposal TBD TBD TBD TBD </p><p>Division 31 - Clearing And Grubbing TBD TBD TBD TBD </p><p> 311100.001 Clear &amp; Grub TBD TBD TBD TBD </p><p> 312333.001 Trenching TBD TBD TBD TBD </p><p> 312333.002 Backfilling TBD TBD TBD TBD </p><p>C. Schedule of Values shall be agreed between Contractor and Resident Engineer. No payment shall be made prior to an agreed-upon Schedule of Values. </p><p>D. Updated version of Schedule of Values shall be included with each progress payment request. Schedule of Values shall be updated to include: </p><p>1. Dollars earned and percent complete for prior month. </p><p>2. Dollars earned and percent complete this month. </p><p>3. Dollars earned and percent complete-to-date. </p><p>E. Contractor shall ensure that: </p><p>1. Total value of activities are equal to current Contract Price </p><p>2. Overhead and profit are prorated proportional to value of each activity. </p><p>3. Activity values are rounded to nearest hundred dollars. </p><p>4. Value of stored material, as defined in General Conditions, is identified in Schedule of Values with a corresponding cost-loaded activity in current schedule. </p><p>F. Schedule of Values shall be revised and submitted to Sound Transit upon execution of a Change Order. Contractor shall incorporate all executed Change Orders into Revised Schedule of Values and allocate costs appropriately. </p><p>G. If required by Resident Engineer, Contractor shall present documentation substantiating the cost allocations for line items within Schedule of Values. </p></li><li><p>UNIVERSITY LINK PROJECT SECTION 01 20 00-4 LINK CONTRACT U835 EMI/VIBRATION MONITORING PRICE AND PAYMENT PROCEDURES IFB NO. RTA/CN: 0101-11 AND WHEEL FLAT DETECTION SYSTEMS 100% SUBMITTAL JUNE 2011 </p><p>H. Maximum of two progress payments shall be made prior to submittal of acceptable Contract Baseline CPM Schedule. </p><p>PART 2 - MATERIALS (NOT USED) </p><p>PART 3 - EXECUTION (NOT USED) </p><p>END OF SECTION 01 20 00 </p></li><li><p>UNIVERSITY LINK PROJECT SECTION 01 25 00-1 LINK CONTRACT U835 EMI/VIBRATION MONITORING SUBSTITUTION PROCEDURES CONTRACT NO. RTA/CN: 0101-11 AND WHEEL FLAT DETECTION SYSTEMS 100% SUBMITTAL JUNE 2011 </p><p>CONTRACT SPECIFICATIONS </p><p>SECTION 01 25 00 </p><p>SUBSTITUTION PROCEDURES </p><p>PART 1 - GENERAL </p><p>1.01 SUMMARY </p><p>A. Section includes administrative and procedural requirements for substitutions. </p><p>B. Refer to Request for Substitution Form, attached to this Section. </p><p>C. Applies to substitutions after Notice of Award. </p><p>1.02 SUBMITTALS </p><p>A. Procedures: Section 01 33 00, Submittal Procedures. </p><p>B. Substitution Requests: Submit each request for consideration on separate request form. </p><p>C. Submit Request for Substitution Form provided in Attachment A. Supplement form with following documentation in addition to requirements stated on form. </p><p>1. Statement indicating why specified product or fabrication or installation cannot be provided, if applicable. </p><p>2. Coordination information, including a list of changes or modifications needed for other parts of Work, and for construction performed by other Sound Transit contractors, necessary to accommodate proposed substitution. </p><p>3. Detailed comparison of significant qualities of proposed substitution with those of Work specified. Include annotated copy of applicable Contract Specifications Section. Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from Work specified. </p><p>4. Product Data, including drawings and descriptions of products and fabrication and installation procedures. </p><p>5. Samples, where applicable or requested. </p><p>6. Certificates and qualification data, where applicable or requested. </p><p>7. List of similar installations for completed projects with project names and addresses and names and addresses of architects, engineers, and owners. </p><p>8. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated. </p></li><li><p>UNIVERSITY LINK PROJECT SECTION 01 25 00-2 LINK CONTRACT U835 EMI/VIBRATION MONITORING SUBSTITUTION PROCEDURES CONTRACT NO. RTA/CN: 0101-11 AND WHEEL FLAT DETECTION SYSTEMS 100% SUBMITTAL JUNE 2011 </p><p>9. Detailed Contractors construction schedule using original products, methods or materials and a detailed comparison of Contractor's construction schedule using proposed subs...</p></li></ul>