Creating a Storm Water Pollution Prevention Plan

A requirement of the industrial storm water permit is to develop a storm water pollution prevention plan (SWPPP) within 60 days of submitting the Notice of Intent (NOI). The following slide show will step through each item that is to be addressed in the SWPPP. By following this guide, you will be able to develop a SWPPP that fulfills the requirements of the Arkansas Department of Environmental Quality.

Page 3: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

SWPPP Organization Guideline

Planning and Organization

Name the facility / operation

Give a description of the facility / operation

Form Pollution Prevention Team

Review other plans

Page 4: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

SWPPP Organization Guideline

Assessment Phase

Develop a site map

Inventory and describe exposed materials

List significant spills and leaks

Test for non-storm water discharges

Evaluate monitoring data

Summarize pollutant sources and risks

Page 5: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

SWPPP Organization Guideline

BMP Identification

Baseline BMPs

Select activity- and site-specific BMPs

Page 6: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

SWPPP Organization Guideline

Implementation Phase

Implement BMPs

Train employees

Page 7: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

SWPPP Organization Guideline

Evaluation / Monitoring

Conduct annual site inspection / BMP evaluation

Conduct recordkeeping and reporting

Review and revise plan

Page 8: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

SWPPP Organization Guideline

General Requirements

Deadlines

Signature requirements

Plan location and public access

Required plan modification

Page 9: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

SWPPP Organization Guideline

Special Requirements

Discharges through MS4s

Salt storage piles

EPCRA, Section 313 Facilities

Page 10: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

SWPPP

The following is a step-by-step description of each item in the organizational list that was previously supplied. By addressing each item in the list, an acceptable SWPPP can be developed that meets ADEQs basic criteria.

Page 11: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Planning and Organization

Name the facility / operation

Supply the name of the facility

Supply the mailing and physical address of the facility

Include an emergency contact’s name and phone number

Page 12: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Give a detailed description of the facility / operation and industrial activity

Include the type of industry

Include the quantity of final product that is produced at the facility

Describe the facility’s location and be sure to include:

• County

• Section

• Range

• Latitude

• Longitude

Planning and Organization

Page 13: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Planning and Organization

Form the Pollution Prevention Team. Be sure to include the following:

Title

Responsibilities

Emergency phone numbers

Page 14: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Planning and Organization

Review other plans

SWPPPs may reflect requirements for Spill Prevention Control and Countermeasure (SPCC) plans developed for the facility under Section 311 of the Clean Water Act or BMP programs otherwise required by an NPDES permit for the facility as long as such requirements are incorporated into the SWPPP

Page 15: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Assessment Phase

Draw a map of your site including a blueprint of all buildings, structures, paved areas, and parking lots. You need to include the following features on your site map:

All outfalls and storm water discharges

Drainage areas of each storm water outfall

Structural storm water pollution control measures, such as:

• Flow diversion structures

• Retention / detention ponds

• Vegetative swales

• Sediment traps

Page 16: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Assessment Phase

Site map continued:

Name of receiving waters (or if through a Municipal Separate Storm Sewer System)

Locations of exposed significant materials

Locations of past spills and leaks

Page 17: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Assessment Phase

Site map continued:

Locations of high-risk, waste-generating areas and activities common on industrial sites such as:

• Fueling stations

• Vehicle / equipment washing and maintenance areas

• Area for unloading / loading materials

• Above-ground tanks for liquid storage

• Industrial waste management areas (landfills, waste piles, treatment plants, disposal areas)

• Outside storage areas for raw materials, by-products, and finished products

• Outside manufacturing areas

• Other areas of concern

Page 18: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Assessment Phase

Inventory and describe exposed materials

Material

Purpose / Location

Quantity used, produced, and stored

Quantity exposed to storm water in last 3 years

Likelihood of contact with storm water

Any past significant spills

Page 19: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Assessment Phase

Identify past spills and leaks

Include a list of significant spills & significant leaks of toxic or hazardous pollutants that occurred at areas that are exposed to precipitation or that otherwise drain to a storm water conveyance at the facility after the date of 3 years prior to the effective date of the permit

Page 20: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Assessment Phase

Identify non-storm water discharges

Identify potential non-storm water discharges

List the results of any test and/or evaluation for the presence of non-storm water discharges

List the evaluation criteria or test method used

List the date of testing and/or evaluation

List the onsite drainage points that were directly observed during the test and/or evaluation

Page 21: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Assessment Phase

Identify non-storm water discharges continued:

Allowable non-storm water discharges:

• Discharges from fire fighting activities

• Fire hydrant flushings

• Potable water sources including waterline flushings

• Irrigation drainage

• Lawn watering

Page 22: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Assessment Phase

Identify non-storm water discharges continued:

Allowable non-storm water discharges, continued:

• Uncontaminated ground water

• Foundation or footing drains where flows are not contaminated with process materials

• Discharges from springs

• Routine exterior building wash down which does not use detergents or other compounds

• Air conditioning condensate

• Pavement wash waters where spills or leaks or hazardous materials have not occurred and where detergents are not used.

Page 23: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Assessment Phase

Evaluate monitoring data * if your facility is required to perform

storm water sampling

Include a summary of any existing discharge sampling data describing pollutants in storm water discharges from the facility and a summary of sampling data collected during the term of this permit

Page 24: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Assessment Phase

Summarize pollutant sources and risks

Include in your plan a narrative description of the potential pollutant sources and identify any pollutant of concern that may be generated by the following activities at your facility

• Loading and unloading operations

• Outdoor storage activities

• Outdoor manufacturing or processing activities

• Significant dust or particulate generating activities

• Onsite waste disposal practices

Page 25: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

BMP Identification

Baseline BMPs

Select the proper measures or BMPs that will eliminate or reduce pollutant loadings in storm water discharges from your facility site. Your plan design should include the following:

• Good housekeeping

• Preventative maintenance

• Visual inspections

• Spill prevention and response

• Sediment and erosion control

• Management of runoff

• Employee training

• Recordkeeping and reporting

Page 26: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

BMP Identification

Select activity-specific BMPs

Fueling• Consider installing spill and overflow protection

• Discourage “topping off” of fuel tanks

• Reduce exposure of the fuel area to storm water

• Use dry cleanup methods for the fuel area

• Use proper petroleum spill control

• Encourage employee participation

Maintaining Vehicles and Equipment• Check for leaking oil and fluids

• Use nontoxic or low-toxicity materials

• Drain oil filters before disposal or recycling

• Don’t pour liquid waste down drains

• Recycle engine fluids and batteries

Page 27: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

BMP Identification

Select activity-specific BMPs continued:

Painting vehicles and equipment• Inspect parts prior to painting

• Contain sanding wastes

• Prevent paint waste from contacting storm water

• Proper interim storage of waste paint, solvents, etc.

• Evaluate efficiency of equipment

• Recycle paint, paint thinner, and solvents

Washing vehicles and equipment• Consider use of phosphate-free detergents

• Use designated cleaning areas

• Consider recycling wash water

Page 28: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

BMP Identification

Select activity-specific BMPs continued:

Loading and unloading materials• Contain leaks during transfer

• Check equipment regularly for leaks

• Limit exposure of material to rainfall

• Prevent storm water run on

Liquid storage in above-ground tanks• Comply with applicable State and Federal laws

• Properly train employees

• Install safeguards against accidental releases

• Routinely inspect tanks and equipment

• Consider installing secondary containment

Page 29: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

BMP Identification

Select activity-specific BMPs continued:

Industrial waste management and outside manufacturing

• Conduct a waste reduction assessment

• Institute industrial waste source reduction and recycling BMPs

• Prevent runoff and run on from contacting the waste management area

• Minimize runoff from land application sites

Outside storage of raw materials, by-products, or finished products

• Cover or enclose materials

Page 30: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

BMP Identification

Select activity-specific BMPs continued:

Salt Storage• Put it under a roof

• Use temporary covers

• Enclose or berm transfer areas

Page 31: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

BMP Identification

Select site-specific BMPs

Flow diversion practices• Storm water conveyances

• Diversion dikes

• Graded areas and pavement

Exposure minimization practices• Containment diking

• Curbing

• Drip Pans

• Collection Basins

• Sumps

• Vehicle positioning

• Loading and unloading by air pressure or vacuum

Page 32: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

BMP Identification

Select site-specific BMPs continued:

Mitigating Practices• Sweeping

• Shoveling

• Excavation practices

• Vacuum and pump systems

• Sorbents

• Gelling Agents

Other Preventive Practices• Preventive monitoring practices

• Dust control

• Signs and labels

• Security

• Area control procedures

• Vehicle washing

Page 33: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

BMP Identification

Select site-specific BMPs continued:

Sediment and erosion prevention practices• Vegetative practices

• Structural erosion prevention and sediment control practices

Infiltration practices• Vegetated filter strips

• Grassed swales

• Level spreaders

• Infiltration trenches

• Porous pavements / concrete grids and modular pavement

Page 34: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Implementation Phase

Implement BMPs

Develop a schedule for implementation

Assign specific individuals with responsibility for implementing aspects of the plan and / or monitoring implementation

Ensure that management approves of your implementation schedule and strategy and schedule regular times for reporting progress to management

Page 35: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Implementation Phase

Train employees

Employee training programs must inform personnel at all levels of responsibility of the components and goals of the SWPPP. Topics to include:

• Spill prevention and response

• Good housekeeping

• Material management practices

* The SWPPP must specify how often training is conducted

Page 36: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Evaluation / Monitoring

Conduct annual site inspection / BMP evaluation

Inspect storm water drainage areas for evidence of pollutants entering the drainage system

Evaluate the effectiveness of measures to reduce pollutant loadings and whether additional measures are needed

Observe structural measures, sediment controls, and other storm water BMPs to ensure proper operation

Inspect any equipment needed to implement the plan, such as spill response equipment

Revise the plan as needed within 2 weeks of inspection

Page 37: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Evaluation / Monitoring

Conduct annual site inspection / BMP evaluation continued:

Implement any necessary changes in a timely manner, but at least within 12 weeks of the inspection

Prepare a report summarizing inspection results and follow up actions, the date of the inspection and personnel who conducted the inspection; identify any incidents of noncompliance or certify that the facility is in compliance with the plan

All incidents of noncompliance must be documented in the inspection report

Sign the report

Page 38: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Evaluation / Monitoring

Conduct recordkeeping and reporting

Incidents such as spills or other discharges, along with other information describing the quality and quantity of storm water discharges must be included in the records.

The records should include:• The date and time of the incident

• Formal written records

• A list of procedures for notifying the appropriate plant personnel and the names and telephone numbers of responsible employees

Page 39: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Evaluation / Monitoring

Review and revise plan

You must amend your plan whenever there is a change in design, construction, operation, or maintenance, which may impact the potential for pollutants to be discharged or if the SWPPP proves to be ineffective in controlling the discharge of pollutants; Otherwise, the plan shall be updated and amended every three years

Page 40: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

General Requirements

Deadlines

New facilities must submit a Notice of Intent at least 48 hours prior to commencement of the storm water discharge

New facilities have 60 days after commencement of a storm water discharge to complete and implement a SWPPP

Page 41: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

General Requirements

Signature requirements

For a corporation, the plan must be signed by a “responsible corporate officer.” A responsible corporate officer may be any of the following:

• President, secretary, treasurer, vice-president, or manager

For a partnership or sole proprietorship, the plan must be signed by a general partner or the proprietor, respectively

Page 42: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

General Requirements

Signature requirements continued:

For a municipality, State, Federal, or other public agency, the plan must be signed by either:

• The principal executive officer or ranking official, which includes the chief executive officer of the agency, or

• The senior officer having responsibility for the overall operations of a principal geographic unit of the agency

Page 43: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

General Requirements

Plan location and public access

Plans are required to be maintained onsite of the facility unless the Director, or authorized representative, or the operator of a large or medium municipal separate storm sewer system, requests that the plan be submitted. Plans and all required records must be kept until at least one year after coverage under the permit expires

Page 44: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

General Requirements

Required plan modification

Any changes required by the permitting authority shall be made within 30 days, unless otherwise provided by the notification, and the facility must submit a certification signed by a responsible corporate officer, to the Director that the requested changes have been made

Page 45: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Special Requirements

Discharges through MS4s

Permittees must comply with conditions in municipal storm water management programs developed under the NPDES permit issued for that system to which the industrial facility discharges, provided that the facility was directly notified of the applicable requirements by the municipal operator.

Page 46: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Special Requirements

Salt storage piles

Where storm water from a salt storage pile is discharged to waters of the United States, the pile must be covered or enclosed to prevent exposure to precipitation, except when salt is being added to or taken from the pile

Page 47: Creating a Storm Water Pollution Prevention Plan For Industrial Facilities

Special Requirements

EPCRA, section 313 facilities

The following specific control requirements must be practiced in areas where Section 313 water priority chemicals are stored, handled, processed, or transferred

• Provide containment, drainage control, and/or diversionary structures

• Prevent discharges from all areas

• Prevent discharges from liquid storage areas

• Prevent discharges from loading / unloading areas

• Prevent discharges from handling / processing / transferring areas

• Introduce facility security programs to prevent spills