Data Centre Masterclasses The King of Green Data Centres is the one that does not need to be built. Chris Butler, on365 Product Manger for Enterprise Management

Data Centre Masterclasses

  • Upload
    oberon

  • View
    45

  • Download
    3

Embed Size (px)

DESCRIPTION

Data Centre Masterclasses. The King of Green Data Centres is the one that does not need to be built. Chris Butler , on365 Product Manger for Enterprise Management. Agenda. Identify Data Centre Personnel and their issues -What they worry about - What questions are asked. Resolutions. - PowerPoint PPT Presentation

Citation preview

Page 1: Data Centre Masterclasses

Data Centre Masterclasses

The King of Green Data Centres is the one that

does not need to be built.

Chris Butler, on365 Product Manger for Enterprise Management

Page 2: Data Centre Masterclasses

Agenda

• Identify Data Centre Personnel and their issues- What they worry about- What questions are asked

• Resolutions

• IT Professionals- What questions are asked

• Resolutions

Page 3: Data Centre Masterclasses

What do they worry about?

• Planning to modify or add to the installed physical layer of the Data Centre

• Checking the Health of the Data Centre

The Data Centre Manager

Page 4: Data Centre Masterclasses

What questions need to be answered?

• If I add or move a piece of equipment, what will happen?

• How much power & cooling am I using in the data centre?

• When am I going to run out of capacity

The Data Centre Manager

Page 5: Data Centre Masterclasses

The IT & Operations Manager

What do they worry about?

• Availability of physical infrastructure to support servers and other IT hardware to meet the business needs

• Space, power & cooling

Page 6: Data Centre Masterclasses

The IT & Operations Manager

What questions need to be answered?

• Will this new server impact my SLA or capacity plan?

• What is the power & cooling requirement for this piece of equipment?

• What is the available kW power at therack level?

Page 7: Data Centre Masterclasses

• Power Management, Monitoring and Data Logging

– Sub Mains Incomer– Data Centre PDU Branch Circuit– Rack Level PDU Strips & Outlets– Data Centre Third Party Systems and Hardwar

• Cooling Solution and Systems Management. Monitoring and Data Logging

– Data Centre Cooling and Air Conditioning Solutions (Point to Point)– Chillers– Condensers– Pumps Sets– Air Handlers– Hot and Cold Aisle Environmental Characteristics– Rack Level Environmental Characteristics

What is needed to answer these questions?

Page 8: Data Centre Masterclasses

• BMS?

• IT Systems?

• Manually?

How to gather & store the data

Page 9: Data Centre Masterclasses

ISX Central & Capacity Manager

• Real time• Capacity Planning

Page 10: Data Centre Masterclasses

Questions presented to IT professionals?

• Physical placement?

• Hardware Assets?

• Maintenance?

Page 11: Data Centre Masterclasses

ISX Central and Change Management

• Clear Instruction

• Visibility

• Change Management

Page 12: Data Centre Masterclasses

Q&A