077-05/rs

US DCLL TBM

DCLL TBM Interface Coordinator Activities

TBM

Port cell

Ancillary systems

Hot cell Tritium building

He loops

1

The US is functioning with limited funding as the interface coordinator on the DCLL concept with support

from Korea. Results presented to IO are as consistent as possible and in most cases conservative.

Reported by: Clement Wong

M. Abdou, M. Dagher, A. Ying, N.B. Morley, S. Smolentsev,

S. Sharafat, A. Aoyama, M. Youssef UCLA

M. Schaffer GA

B. Merrill, L. Cadwallader INL

R. Kurtz PNNL

M. Sawan, E. Marriott UW

Y. Katoh, A. Lumsdaine ORNL

S. Willms LANL

M. Ulrickson SNL

Also monitored by:

M. Hechler - ORNL

077-05/rs

US DCLL TBM

DCLL TBM Interface Coordinator Activities

TBM

Port cell

Ancillary systems

Hot cell Tritium building

He loops

1

The US is functioning with limited funding as the interface coordinator on the DCLL concept with support

from Korea. Results presented to IO are as consistent as possible and in most cases conservative.

PMG groups organization and duties

TBM IO management, July 2010

PMG & TBM(FS) meetings

DCLL TBM Interface Coordinator Task Status

ICD & IS + examples

US TBM Design Team supports

TCWS-He loop development

Agenda for PMG-18-4, 9/1-2, Cadarache

US TBM Design Team supports and near term tasks

077-05/rs

US DCLL TBM

General Organisation and Duties for the Port Management Groups

7. The permanent members in each PMG are: the IO/TBM RO, the Port Master, and the

two TBM Leaders (in this document the TBM Interfaces Coordinator (InCo) is

considered equivalent to a TL). The Chair of each PMG is the IO/TBM RO, the Co-

Chair is the PM. The Technical Secretary is made available by IO/FST/TBM.

General Organisation and

Duties for the Port

Management Groups P.2

5. The Port Management Groups are charged of the management

(i.e.,monitoring, reviewing, correcting actions implementation) of all technical aspects

related to the TBSs located in the corresponding Port, including the aspects concerning

for instance the following items:

Test Blanket Systems design and manufacturing;

TBS interfaces with ITER systems and operation;

TBS integration in ITER (in particular in the port cell);

R&D monitoring;

Safety aspects and human access requirements;

RAMI assessment (RAMI = Reliability, Availability, Maintainability, Inspectability);

Quality Assurance Management;

Codes & Standards and acceptance tests

Planning, milestones definition and milestones monitoring;

Testing program and testing objectives;

TBS-related technical documentation.

General Organisation and

Duties for the Port

Management Groups P.1

077-05/rs

US DCLL TBM

General Organisation and Duties for the Port Management Groups

7. The permanent members in each PMG are: the IO/TBM RO, the Port Master, and the

two TBM Leaders (in this document the TBM Interfaces Coordinator (InCo) is

considered equivalent to a TL). The Chair of each PMG is the IO/TBM RO, the Co-

Chair is the PM. The Technical Secretary is made available by IO/FST/TBM.

General Organisation and

Duties for the Port

Management Groups P.2

5. The Port Management Groups are charged of the management

(i.e.,monitoring, reviewing, correcting actions implementation) of all technical aspects

related to the TBSs located in the corresponding Port, including the aspects concerning

for instance the following items:

Test Blanket Systems design and manufacturing;

TBS interfaces with ITER systems and operation;

TBS integration in ITER (in particular in the port cell);

R&D monitoring;

Safety aspects and human access requirements;

RAMI assessment (RAMI = Reliability, Availability, Maintainability, Inspectability);

Quality Assurance Management;

Codes & Standards and acceptance tests

Planning, milestones definition and milestones monitoring;

Testing program and testing objectives;

TBS-related technical documentation.

General Organisation and

Duties for the Port

Management Groups P.1

The US is functioning with limited funding as the interface coordinator on the DCLL concept with

support from Korea. Results presented to IO are as consistent as possible and in most cases

conservative.

077-05/rs

US DCLL TBM

TBM IO management, July 2010

Area of activities IO Dept Main Contact Person Details of the main activities in 2010-2012

Overall coordination and

responsibility

IO/RO for PBS-56 (Test

Blanket Modules

System)

FST/TBM L. Giancarli (LGI)

E-mail:

luciano.giancarli@iter.org

- TBM Programme strategy, specifications and milestones

- Official Interface with Parties, including monitoring of Parties activities

- Integration of TBM Program Test Plan in ITER RP

- Adequacy of the TBSs/ ITER Interfaces

- Interaction with all relevant ITER Committees

Interfaces with all other

ITER Systems and with

the Design Office (CATIA

Models, Diagrams, etc..)

FST/TBM R. Pascal (RPL)

E-mail:

romain.pascal@iter.org

- Interfaces with other PBSs

- Interface with DO (DWOs), CATIA Models and Diagrams

- Verification of TBM Teams assumptions on interfaces and

establishment of specifications

- Acceptance Tests Criteria,

- TBSs components classifications (e.g, ESPN), codes & standards

matter, relation with Notified Bodies and Agreed Notified Bodies

Documents

Management, Planning

and Milestones, PMGs

Secretary and Interfaces

with TBM Teams, TBM

website

FST/TBM D. Plutino (DPO)

E-mail:

Damien.Plutino@iter.org

- PMGs secretary (e.g., agenda, minutes, list of actions, documents

tracking)

- TBM Program schedule and milestones monitoring

- TBM Team activities monitoring and corresponding data

coherence/integration (including TBM PrSR)

- Preparation of QA documents

- Maintenance/upgrading of PBS-56 IDM folder, TBM Program website

- TBM Teams Documents Management

Maintenance operations

and tools/equipment

design in TBM Port Cells

and Hot Cell Facility

FST/TBM J.-C. Nevire (JCN)

E-mail: Jean-

christophe.Neviere@iter.org

- Design integration of AEUs connections, Pipes Forests connections,

bioshield plugs

- Definition of maintenance operations in Port Cell and in Hot Cell Facility

AEU area and their sequence

- Design of required maintenance tools (and proposed R&D if not on the

market)

- Estimation of required time for maintenance

TBM Frames, Dummy

TBMs

TKM C.S. Kim (CSK)

E-mail:

ChangShuk.Kim@iter.org

M. Merola (support)

E-mail:

Mario.Merola@iter.org

- Frame design, analyses, procurement preparation and monitoring

- Dummy design, analyses, procurement preparation and monitoring

- Monitoring of R&D associated with Frame and Dummy TBMs

- Interfaces Sheets concerning Frames and Dummy TBMs, in particular

for RH comapatibility

- Frame and Dummy TBMs Safety Assessment

mailto:luciano.giancarli@iter.orgmailto:romain.pascal@iter.orgmailto:Damien.Plutino@iter.orgmailto:Jean-christophe.Neviere@iter.orgmailto:Jean-christophe.Neviere@iter.orgmailto:Jean-christophe.Neviere@iter.orgmailto:ChangShuk.Kim@iter.orgmailto:Mario.Merola@iter.org

077-05/rs

US DCLL TBM

IO Contact Person for TBM-related activities

Area of expertise IO Dept IO Contact Person for TBM-related

activities

concerned activities in 2010-2012

DI-CC* Tokamak Building CIE I. Kuehn E-mail: Ingo.Kuehn@iter.org Design integration and configuration control for the Tokamak building

DI-CC* - Port system Integration CIE B. Levesy E-mail: Bruno.Levesy@iter.org Design integration and configuration control for Port systems: Port Plug and Port Cell.

DI-CC* Hot Celll Building CEP M. Benchikhoune E-mail: Magali.Benchikhoune@iter.org Design integration and configuration control for the Hot Cell and radwaste building

DI-CC* Tritium Building CEP S. Beloglazov E-mail: Sergey.Beloglazov@iter.org Design integration and configuration control for Tritium building

Cooling Water System (PBS 26) CEP G. DellOrco

E-mail: Giovanni.DellOrco@iter.org

- Cooling Circuits space availability/sharing

- Secondary water coolant systems (CCWS-1, CHWS-1 & -2)

- Primary Coolant System for TBM Frames and TBM shields (FW/BLK PHTS)

Tritium Plant (PBS 32) CEP S. Beloglazov

E-mail: Sergey.Beloglazov@iter.org

- T-related components location and space availability (TBM Tritium Circuits)

- Components specifications and operation

- Components connections

Nuclear buildings (PBS 62) CCS L. Patisson

E-mail: Laurent.Patisson@iter.org

- Specifications for building hosting TBSs components such as acceptable loads,