29
Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Embed Size (px)

Citation preview

Page 1: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Decentralized Wastewater Workshop

Greenville, South Carolina

July 30, 2009

Page 2: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Land Disposal of Treated WastewaterTreatment & Disposal Options Overview

2

Page 3: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Secondary TreatmentTreatment Method Options

3

Page 4: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Tertiary TreatmentTreatment Method Options

4

Page 5: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Secondary Treatment OptionsOrenco AdVantex Recirculating Packed-Bed Media Filter

5

Page 6: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Secondary Treatment OptionsAqueonics Multi-Stage Trickling Filter

6

Page 7: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Secondary Treatment OptionsAquapoint Bioclere Modified Trickling Filter

7

Page 8: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Secondary Treatment OptionsPuraflo Peat Fiber Biofilter

8

Page 9: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Secondary Treatment OptionsRecirculating Sand Filter (RSF)

9

Page 10: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Secondary Treatment OptionsExtended-Air Activated Sludge Plant

10

Page 11: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Secondary Treatment OptionsClearstream ATU

11

Page 12: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Secondary Treatment OptionsSBR

12

Page 13: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Secondary Treatment OptionsPuraflo PuraMax MBBR

13

Page 14: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

How to Select the Right SystemDecision Process Overview

14

Page 15: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Individual Lot Conventional Drain FieldSystem Summary

Std. Septic Tank & Stone Drain Tile FieldDrain field requires cleared land w/ <

10% slope.3,000 sq ft active drain field + 50%

repair areaApprox. Unit Cost = $4,000 - $5,000 per

lot.

15

Page 16: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Individual Lot Drip IrrigationSystem Schematic

16

Page 17: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Individual Lot Drip IrrigationSystem Summary

Std. Septic Tank + Secondary & Tertiary Treatment.

Subsurface drip field requires un-cleared land w/ < 33% slope.

2,000 sq ft drip field + no repair area.Approx. Unit Cost = $25,000 - $28,000 per lot.Requires 110-volt power supply + telephone line.Requires routine maintenance @ approx. $600/yr.

17

Page 18: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Individual Lot Drip IrrigationSystem Cost(City of Austin, TX)

18

Estimated drip irrigation system costs, installed, including controls and alarm, (not including pretreatment unit(s)),

$15,000

Energy costs (using 0.193 KWH/day energy use), $0.47/month

O&M, with a maintenance contract of $540/year (est. 18 hrs. @ $15/hour * 2.0, including taxes, overhead, and profit),

$45/month

Equipment repair/replacement costs, estimated at $50/year,

$4.17/month

20-year NPW (not including design & permitting costs), $20,934.68

Page 19: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Individual Lot Repair SolutionCamden County, NCAdVantex Pre-Treatment & Sand Mound Disposal over Sand Line Trench

19

Page 20: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Communal Drain FieldSystem Overview100-Lot Subdivision, Avg. 3-BR, in UpstatePrimary Treatment0.4 GPD/Sq Ft LTARRequires 6.9 acres of Active Drain Field plus

additional 3.4 acres for 50% Repair AreaHOA Ownership (excluding Collection

System)Permitting by DHEC-Bureau of

Environmental Health (up to 50,000 GPD +/-)Approx. Unit Cost = $5,000 - $6,000 per lot

20

Page 21: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Communal Drain FieldCottageville Elem School

21

Page 22: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Communal Drip IrrigationSystem Overview

100-Lot Subdivision, Avg. 3-BR, in UpstatePrimary & AdVantex Secondary Treatment0.2 GPD/Sq Ft LTARRequires 4.1 acres of Subsurface Drip Field &

No Repair AreaRequires Routine O&MRequires Utility OwnershipPermitting by DHEC-Bureau of WaterApprox. Unit Cost = $18,000 - $20,000 per lot

22

Page 23: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Ralph Chandler Middle SchoolSurface-Drip Irrigation SystemDecision Process

23

Page 24: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

School Surface-Drip IrrigationSystem Overview

New Ralph Chandler Middle School at Fork Shoals

- Orenco Recirculating Media Filter Treatment

- 6-Acre GeoFlow Surface-Drip Irrigation Disposal- 0.1 – 0.2 GPD/Sq Ft LTAR- 250,000 Gal (2 weeks) Treated Effluent Storage- 15,900 GPD Design Flow- 4 Groundwater Monitoring Wells- $1.6 Million Construction Cost- Contract Operator – All Seasons Environmental Laboratories- Orenco Vendor Oversight Operations Contract - AQWA

24

Page 25: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

School Surface-Drip IrrigationEQ Tank, Recirc Pumps, & Treated Effluent Storage

25

Page 26: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

School Surface-Drip IrrigationAdVantex Treatment Pods

26

Page 27: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

School Surface-Drip IrrigationIrrigation Pumps & Disc Filter

27

Page 28: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

School Surface-Drip IrrigationSurface-Drip Irrigation Field

28

Page 29: Decentralized Wastewater Workshop Greenville, South Carolina July 30, 2009

Wrap-Up ….

What Makes a DecentralizedSystem Successful?Suitability of Site & Sustainable Loading Rate.Proper Application of Treatment & Disposal

Methods Selected.Good Design.Good Installation.Good O&M.

Thanks for your attention ….

29