4
1:200 @ A2 Short Section Drawn at A1 Key: 1 - CO-OPERATIVE MEMBER 2 - Tram line using existing infrastructure 3 - Landscaped area and public gardens 4 - Warehouses 5 - Housing 6 - Train Tracks 7 - Germination tower 1 8 - Germination tower 2 9 - Entrance 1 10 - Water tank 11 - Germination trays 12 - Continuous ramp 13 - Louvres 14 - Primary steel structure 15 - Secondary timber structure 6 2 3 4 5 7 8 9 10 11 12 13 14 15 1 See detail on pages 48 + 49 See detail on pages 51 to 54 See detail on pages 55 to 57

Design Realisation Drawings

Embed Size (px)

DESCRIPTION

Plans and sections for DR

Citation preview

Page 1: Design Realisation Drawings

1:200 @ A2

Short Section

Drawn at A1Key:

1 - CO-OPERATIVE MEMBER2 - Tram line using existing infrastructure3 - Landscaped area and public gardens4 - Warehouses5 - Housing6 - Train Tracks7 - Germination tower 18 - Germination tower 29 - Entrance 110 - Water tank11 - Germination trays12 - Continuous ramp13 - Louvres14 - Primary steel structure15 - Secondary timber structure

6

2

3

4

5

78

9

10

11

12

13

14

151

See detail on pages 48 + 49 See detail on pages 51 to 54 See detail on pages 55 to 57

Page 2: Design Realisation Drawings

Key:

1 - Tram line using existing infrastructure2 - Landscaped area and public gardens3 - Train Tracks4 - Germination tower 15 - Germination tower 26 - Entrance 17 - Water tank8 - Germination trays9 - Continuous ramp10 - Louvres11 - Primary steel structure12 - Secondary timber structure13 - Market Space14 - Tram exchange15 -Bioluminescent light16 - Louvred roof17 - Water harvester

1:400 @ A2

Long Section

Drawn at A0

1

2

3 4

5

6

7

8

9

10

11

12

13

14

15

16

17

See detail on pages 48 + 49

See detail on pages 51 to 54

See detail on pages 55 to 57

Page 3: Design Realisation Drawings

Key:

1 - Market space2 - Market stalls3 - Train Tracks4 - Germination tower 15 - Germination tower 26 - Entrance 17 - Water tank8 - Germination trays9 - Continuous ramp10 - Entrances11 - Primary steel structure12 - Secondary timber structure13 - Community landscaping14 - Bioluminescent lights 1:400 @ A2

Pan section 1

Drawn at A0

12

3

4

5

6

7

8

9

10

11

12

13

14

See page 31

See detail on pages 54

Page 4: Design Realisation Drawings

1:400 @ A2

Pan section 2

Drawn at A0

1

3

4

5

6

7

8

9

10

11

12

13

14

Key:

1 - Fan canopy2 - Market level3 - Train Tracks4 - Germination tower 15 - Germination tower 26 - Entrance 17 - Water tank8 - Germination trays9 - Continuous ramp10 - Entrances11 - Primary steel structure12 - Secondary timber structure13 - Community landscaping14 - Water harvesters

2