8
Ingrid-Maria Gregor, DESY Infrastructur Ingrid-Maria Gregor, DESY Infrastructu DESY Summary DESY Summary Testbeam Infrastructure and Magnet Testbeam Infrastructure and Magnet Board Population Board Population Ingrid-Maria Gregor Ingrid-Maria Gregor , Julia Fourletova Julia Fourletova, Tobias Haas, Katsumasa Ikematsu, Tobias Haas, Katsumasa Ikematsu, Tatsiana Klimkovich, Tatsiana Klimkovich, Ulrich Koetz, Ulrich Koetz, Lukasz Maczewski, Lukasz Maczewski, Alessandro Montanari, Carsten Muhl, Jolanta Sztuk Alessandro Montanari, Carsten Muhl, Jolanta Sztuk JRA1 Meeting in Geneva JRA1 Meeting in Geneva January 26th 2007 January 26th 2007

DESY Summary

  • Upload
    wallis

  • View
    42

  • Download
    0

Embed Size (px)

DESCRIPTION

DESY Summary. Ingrid-Maria Gregor , Julia Fourletova , Tobias Haas, Katsumasa Ikematsu, Tatsiana Klimkovich, Ulrich Koetz, Lukasz Maczewski, Alessandro Montanari, Carsten Muhl, Jolanta Sztuk. Testbeam Infrastructure and Magnet Board Population. JRA1 Meeting in Geneva January 26th 2007. - PowerPoint PPT Presentation

Citation preview

Page 1: DESY Summary

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

DESY SummaryDESY Summary

Testbeam Infrastructure and MagnetTestbeam Infrastructure and Magnet Board PopulationBoard Population

Ingrid-Maria GregorIngrid-Maria Gregor,, Julia FourletovaJulia Fourletova,Tobias Haas, Katsumasa Ikematsu, Tobias Haas, Katsumasa Ikematsu, Tatsiana Klimkovich,Tatsiana Klimkovich, Ulrich Koetz,Ulrich Koetz, Lukasz Maczewski, Lukasz Maczewski,

Alessandro Montanari, Carsten Muhl, Jolanta SztukAlessandro Montanari, Carsten Muhl, Jolanta Sztuk

JRA1 Meeting in GenevaJRA1 Meeting in GenevaJanuary 26th 2007January 26th 2007

Page 2: DESY Summary

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Magnet Arrival at DESYMagnet Arrival at DESY

PCMAG arrived at DESY on November 30th 2006

Cryo-system and cables were set up by Japanese colleagues with the help from Carsten Muhl and DESY groups (cryo and power supply groups)

First ramping to only 10% of the field followed by a full field test

Page 3: DESY Summary

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Strayfield MeasurementStrayfield Measurement

Page 4: DESY Summary

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

DUT PositionerDUT Positioner

Carsten MuhlCarsten Muhl

x

y

DUT positioner was delivered fully assembled and surveyed

Connection to computer and first tests in the lab without any problems

Ordered patch cables (30m) for the use in the testbeam area

Page 5: DESY Summary

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Senor Boxes are Under DevelopmentSenor Boxes are Under Development

Carsten MuhlCarsten Muhl

Mechanics design almost Mechanics design almost completedcompleted

3 planes on one main structure3 planes on one main structure

Each has different geometry Each has different geometry depending on positiondepending on position

Each plane movable Each plane movable individually with small toolindividually with small tool

Minimal distance between Minimal distance between planes: 7mmplanes: 7mm

Maximum level arm: Maximum level arm:

Material: aluminumMaterial: aluminum

All material non-magneticAll material non-magnetic

Materials were Materials were optimisedoptimised for for minimal thermal stressminimal thermal stress

Page 6: DESY Summary

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Overall ConstructionOverall Construction

Carsten MuhlCarsten Muhl

Box 1Box 1

Box 3Box 3(DUT)(DUT)

Box 2Box 2

xx

yy

zz

Page 7: DESY Summary

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Board ProductionBoard Production

15 board sets were send to DESY by Wojtek 15 board sets were send to DESY by Wojtek

Process of ordering parts was more difficult than anticipatedProcess of ordering parts was more difficult than anticipated

Last part will be delivered to DESY this weekLast part will be delivered to DESY this week

Start of production: February 7Start of production: February 7thth 2007 2007

Will take only a few daysWill take only a few days

Wire bonding will be done at StrasbourgWire bonding will be done at Strasbourg

Testing directly after productionTesting directly after production

Optical inspectionOptical inspection

Electrical test Electrical test

Setting of potentiometersSetting of potentiometers

Testing after wire bonding (DESY)Testing after wire bonding (DESY)

Functionality test with senorFunctionality test with senor

Response to Fe55 Response to Fe55

Testing of a group of boards with DAQ Testing of a group of boards with DAQ

Incorporating trigger logic unit etc.Incorporating trigger logic unit etc.

Page 8: DESY Summary

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

Ing

rid-M

ari

a G

regor,

DES

Y Infr

ast

ruct

ure

SummarySummary

Magnet from Japan delivered and tested up to full field (1.2T) Magnet from Japan delivered and tested up to full field (1.2T)

XYXY table delivered and tested on bench top table delivered and tested on bench top

Mechanical design of sensor boxes well under wayMechanical design of sensor boxes well under way

Board production delayed but under wayBoard production delayed but under way