DESY Summary. Ingrid-Maria Gregor , Julia Fourletova , Tobias Haas, Katsumasa Ikematsu, Tatsiana Klimkovich, Ulrich Koetz, Lukasz Maczewski, Alessandro Montanari, Carsten Muhl, Jolanta Sztuk. Testbeam Infrastructure and Magnet Board Population. JRA1 Meeting in Geneva January 26th 2007. - PowerPoint PPT Presentation
Citation preview
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
DESY SummaryDESY Summary
Testbeam Infrastructure and MagnetTestbeam Infrastructure and Magnet Board PopulationBoard Population
Ingrid-Maria GregorIngrid-Maria Gregor,, Julia FourletovaJulia Fourletova,Tobias Haas, Katsumasa Ikematsu, Tobias Haas, Katsumasa Ikematsu, Tatsiana Klimkovich,Tatsiana Klimkovich, Ulrich Koetz,Ulrich Koetz, Lukasz Maczewski, Lukasz Maczewski,
Alessandro Montanari, Carsten Muhl, Jolanta SztukAlessandro Montanari, Carsten Muhl, Jolanta Sztuk
JRA1 Meeting in GenevaJRA1 Meeting in GenevaJanuary 26th 2007January 26th 2007
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Magnet Arrival at DESYMagnet Arrival at DESY
PCMAG arrived at DESY on November 30th 2006
Cryo-system and cables were set up by Japanese colleagues with the help from Carsten Muhl and DESY groups (cryo and power supply groups)
First ramping to only 10% of the field followed by a full field test
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Strayfield MeasurementStrayfield Measurement
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
DUT PositionerDUT Positioner
Carsten MuhlCarsten Muhl
x
y
DUT positioner was delivered fully assembled and surveyed
Connection to computer and first tests in the lab without any problems
Ordered patch cables (30m) for the use in the testbeam area
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Senor Boxes are Under DevelopmentSenor Boxes are Under Development
Carsten MuhlCarsten Muhl
Mechanics design almost Mechanics design almost completedcompleted
3 planes on one main structure3 planes on one main structure
Each has different geometry Each has different geometry depending on positiondepending on position
Each plane movable Each plane movable individually with small toolindividually with small tool
Minimal distance between Minimal distance between planes: 7mmplanes: 7mm
Maximum level arm: Maximum level arm:
Material: aluminumMaterial: aluminum
All material non-magneticAll material non-magnetic
Materials were Materials were optimisedoptimised for for minimal thermal stressminimal thermal stress
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Overall ConstructionOverall Construction
Carsten MuhlCarsten Muhl
Box 1Box 1
Box 3Box 3(DUT)(DUT)
Box 2Box 2
xx
yy
zz
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Board ProductionBoard Production
15 board sets were send to DESY by Wojtek 15 board sets were send to DESY by Wojtek
Process of ordering parts was more difficult than anticipatedProcess of ordering parts was more difficult than anticipated
Last part will be delivered to DESY this weekLast part will be delivered to DESY this week
Start of production: February 7Start of production: February 7thth 2007 2007
Will take only a few daysWill take only a few days
Wire bonding will be done at StrasbourgWire bonding will be done at Strasbourg
Testing directly after productionTesting directly after production
Optical inspectionOptical inspection
Electrical test Electrical test
Setting of potentiometersSetting of potentiometers
Testing after wire bonding (DESY)Testing after wire bonding (DESY)
Functionality test with senorFunctionality test with senor
Response to Fe55 Response to Fe55
Testing of a group of boards with DAQ Testing of a group of boards with DAQ
Incorporating trigger logic unit etc.Incorporating trigger logic unit etc.
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
Ing
rid-M
ari
a G
regor,
DES
Y Infr
ast
ruct
ure
SummarySummary
Magnet from Japan delivered and tested up to full field (1.2T) Magnet from Japan delivered and tested up to full field (1.2T)
XYXY table delivered and tested on bench top table delivered and tested on bench top
Mechanical design of sensor boxes well under wayMechanical design of sensor boxes well under way
Board production delayed but under wayBoard production delayed but under way