Develop Prototype Natural- Gas-Fired, Fan-Type Central Furnace(s) with Reduced NOx Emissions Capable of Meeting the Future Requirements of Rule 1111 Bidders Conference February 26, 2010 RFP #P2010-17

Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

  • Upload
    mike97

  • View
    235

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace(s) with

Reduced NOx Emissions Capable of Meeting the Future Requirements of

Rule 1111

Bidders ConferenceFebruary 26, 2010

RFP #P2010-17

Page 2: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Background

Rule 1111 amended November 6, 2009 NOx limit reduced from 40 to 14 ng/J with

phase-in starting 10/1/14 Subject to technology assessment

Board dedicated $1 million to help manufacturers develop furnaces meeting 14 ng/J

2

Page 3: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Purpose of this RFP

Within two years, develop and test prototype natural gas, fan-type central furnace(s) meeting 14 ng/J based on certification procedure in Rule 1111 and applicable safety standards.

The RFP encourages development of high-efficiency products and sharing of intellectual property that results from the project.

3

Page 4: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Statement of Work

Task 1 – develop prototype furnace(s) Task 2 – Rule 1111 NOx certification tests Task 3 – safety tests Task 4 – final report

4

Page 5: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

AQMD Concern with Higher Wobbe Index of Future Gas Supplies

Normal range of Wobbe Index 1330-1340 Future LNG imports may increase WI to as

high as 1385 For some combustion devices, NOx

increases with WI Testing of NOx-vs.-WI would be viewed as

a plus.

5

Page 6: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Deliverables

Monthly Status Reports Quarterly Progress reports Task Reports Final Report – draft, final Two-Page Project Summary

6

Page 7: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Schedule

Work must be completed by June 30, 2012 including submittal of the final report.

7

Page 8: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Expected Bidders

• Furnace manufacturers

• Teams that include furnace manufacturers together with burner manufacturers or research lab’s, etc.

• Bidder must be or include a furnace manufacturer.

8

Page 9: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Bid Evaluation Process

Bids will be evaluated by a panel of experts consisting of AQMD staff and outside expert(s).

Each panel member will score the proposals based on a point system.

Proposals will be ranked by average score.

Other factors may be considered.9

Page 10: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Bid Evaluation Criteria Points

Technical Qualifications

- Equipment Design & Manufacture 20 - Testing Capability 10  Technical Approach 20  Efficiency 10  Management Plan 10

70Cost Cost-effectiveness 20 Return of Funds 10

30Additional Points SB, DVBE, Local 15 Intellectual Property Sharing 10

10

Page 11: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Technical Points for Efficiency

Maximum of 10 additional points based on average AFUE of products to be developed Proposal(s) with highest: 10 points Proposal(s) with lowest: 0 points Other proposals: intermediate

number of points based on where AFUE stands among all proposals

11

Page 12: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Additional Points for Intellectual Property Sharing

Maximum of 10 additional points based on “quality and extent” of IP sharing Proposal(s) with no IP sharing

commitment will receive 0 points. Proposal(s) with best IP sharing will

receive 10 points. Proposal(s) with more restricted IP

sharing will receive an intermediate number of points.

12

Page 13: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Possible Types of IP Sharing

Make IP available to public Patent and make IP available at

reasonable license fee Patent, make available at reasonable

license fee, and share royalties with AQMD

Other Proposal must be specific and detailed.

13

Page 14: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Cost-Effectiveness Points

Cost Effectiveness will be based on proposed cost divided by the number of significantly different products to be developed. Proposal(s) with best: 10 points Proposal(s) with least: 0 points Other proposals: intermediate number of

points based on where cost effectiveness stands among all proposals

14

Page 15: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

What Constitutes “Significantly Different” Products

Furnace categories in Rule 1111 Condensing Non-condensing Weatherized Mobile Home

Efficiency: Standard or High Rated heat input – existing models Combination heating/cooling

15

Page 16: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Points for Return of Funds

Up to 10 cost points will be based on the percentage of funds to be returned to AQMD based on a successful project outcome.

Percentage can exceed 100% and can be based on sales and/or license royalty fees.

Proposal must be specific and detailed.

16

Page 17: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Project Funding

Total funds available = $1,000,000. Funds are expected to be awarded

to the four most highly evaluated bidders, or possibly fewer than four.

17

Page 18: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Proposal Organization

Cover Letter signed by authorized representative of proposing firm.

Volume I – Technical (RFP Section VIII) Volume II – Cost (RFP Section VIII) Volume III – Certifications and

Representations (RFP Attachment A) Clearly mark any confidential

information.

18

Page 19: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Schedule of Events (2010)

Deadline for questions March 4

Questions and answers posted (http://www.aqmd.gov/rfp/index.html)

March 5

RFP closes (2:00 p.m. PDT) March 23

Winning bids selected for presentation to Board

May 21

Board decision - contract awards June 4

Anticipated contract signing (on or before)

July 1 19

Page 20: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Submitting Your Proposal

Must be received by 2:00 p.m. March 23, 2010 Must be signed by authorized representative Eight (8) copies in sealed envelope Mark upper left-hand corner with Bidder’s name

and address, “RFP #P2010-17” Submit to:

Procurement Unit

South Coast AQMD

21865 Copley Dr.

Diamond Bar, CA 91765-417820

Page 21: Develop Prototype Natural-Gas-Fired, Fan-Type Central Furnace

Contact

Howard Lange, Air Quality Engineer II

Science and Technology Advancement

South Coast AQMD

21865 Copley Drive

Diamond Bar, CA 91765-4178

(909) 396-3658, FAX (909) 396-3252

[email protected]