15
CONNECTIVITY WWW.BALLUFF.COM 1 © 2009 Balluff GmbH – J.Buck Development of Development of CC-Link IO-Blocks CC-Link IO-Blocks • Hardware • Software • Test

Development of CC-Link IO-Blocks

  • Upload
    renata

  • View
    39

  • Download
    1

Embed Size (px)

DESCRIPTION

Development of CC-Link IO-Blocks. Hardware Software Test. What are we talking about?. One piece zinc die cast housing fully potted IP67. IP67 IO-Block Family. Requirements. Productfamily CC-Link IO-Block 16 digital Inputs 8 digital Outputs - PowerPoint PPT Presentation

Citation preview

Page 1: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

1© 2009 Balluff GmbH – J.Buck

Development of Development of CC-Link IO-BlocksCC-Link IO-Blocks

• Hardware

• Software

• Test

Page 2: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

2© 2009 Balluff GmbH – J.Buck

What are we talking about?

• One piece zinc die cast housing• fully potted• IP67

Page 3: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

3© 2009 Balluff GmbH – J.Buck

IP67 IO-Block Family

Page 4: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

4© 2009 Balluff GmbH – J.Buck

Requirements

• Productfamily CC-Link IO-Block

16 digital Inputs

8 digital Outputs

8 digital Inputs + 8 digital Outputs

16 free configurable digital Ports• Display for setting and indicating station number and baud

rate• CC-Link Ver. 1.10 communication interface• CC-Link certification

already a

vaila

ble

Page 5: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

5© 2009 Balluff GmbH – J.Buck

Development of Hardware

Page 6: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

6© 2009 Balluff GmbH – J.Buck

Finding the right Interface Controller

Based on existing IO-Block (e.g. Profibus), the protocol ASIC has to be replaced by a Mitsubishi ASIC

Decision chart from Mitsubishi

MFP3N

Page 7: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

7© 2009 Balluff GmbH – J.Buck

CC-Link Communication hardware

Block Diagram

Digital IOs

MPUASIC

MFP3N

Communication

Interface

Display

new hardware parts

Page 8: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

8© 2009 Balluff GmbH – J.Buck

Schematic for Implementation

Sourcing the specified parts (filter, zener diode) in Europe was not so easy

Help from Mitsubishi/CLPA

Detailed description in the reference manual

e.g. isolated communication system circuit

MFP3N

Page 9: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

9© 2009 Balluff GmbH – J.Buck

Development of Software

Page 10: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

10© 2009 Balluff GmbH – J.Buck

CC-Link Communication Software

MFP3N Reference Manual contains

• Detailed register description• Detailed flowchart

Easy implementation of code, only minor supportfrom Mitsubishi was necesarry

Page 11: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

11© 2009 Balluff GmbH – J.Buck

Testing

Page 12: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

12© 2009 Balluff GmbH – J.Buck

CC-Link Conformance Tests

Pre-Tests have to be done by manufacturer

All tests are simple to apply, exept one:

The noise test•The necessary equipment (noise simulator, isolation transformer) is not known in Europe and difficult to source.CLPA offers that the tests can be done in Japan

First tests were made in Japan•Meanwhile CLPA in Europe ordered the equipment for their lab.

Following tests were made in Ratingen•After the tests are passed these modules are directly sent to CLPA in Japan and they made the CC-Link conformace test.

Page 13: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

13© 2009 Balluff GmbH – J.Buck

Project finished in August 2009

• Development finished• Release available• EMC tests done• Shock/vibration done• CLPA certification for all

4 products done• Production startup done• First products in stock• Product launch in fall 2009

Page 14: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

14© 2009 Balluff GmbH – J.Buck

CC-Link Development

Expeditures

Hardware development 35% project time

Software development 25% project time

Tests (Pretest and conformance test) 40% project time

Conclusion

The reference manual covers nearly all questions. All other questions are answered by Mitsubishi/CLPA

Page 15: Development of  CC-Link IO-Blocks

CONNECTIVITY

WWW.BALLUFF.COM

15© 2009 Balluff GmbH – J.Buck

THANK YOU

Any questions?