Disaster RiskSensitive Shelter Plan (DRSSP) of the Nine (9) Pilot Barangays in Legazpi City Province of Albay in the Bicol Region Philippines

Disaster Risk-‐Sensitive Shelter Plan (DR-‐SSP) of the Nine (9

  • Upload
    voduong

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

   

Disaster  Risk-­‐Sensitive  Shelter  Plan  (DR-­‐SSP)  of  the  Nine  (9)  Pilot  Barangays  in  Legazpi  City    

Province  of  Albay  in  the  Bicol  Region    Philippines  

                                       

 

 The  DR-­‐SSP  of  Barangay  23  -­‐  Imperial  Court  Subdivision    A. Summary  Profile  

 Barangay  23  is  one  of  two  identified  “in-­‐city  relocation”  sites  of  Legazpi  City.  The  barangay  is  situated  on  a  low-­‐lying  area  and  a  wetland.  There  are  areas  of  the  barangay  that  are  under  water  where  instability  of  some  houses  can  be  observed.    The  area  is  characterized  by  hazards,  including  floods,  susceptibility  to  fire,  liquefaction  and  ground  subsidence.    In  spite  of  these,  the  residents  are  decided  to  remain  in  the  barangay  due  to  the  prospects  of  owning  the  land,  which  is  identified  as  a  relocation  site.    Most  of  the  community  members  opt  to  stay  put,  adapt  to  the  problems  and  mitigate  them  with  whatever  solutions  are  made  available  to  them.    Nevertheless,  the  DRSSP  process  has  raised  awareness  among  the  members  of  the  community  that  the  solutions  that  might  be  made  available  to  them  will  only  be  remedial  while  no  engineering  works  to  address  the  structural  integrity  of  their  houses  could  be  made  possibly  affordable  to  them.        B.  Proponents  San  Nazareno  Home  Owners  Association  and  San  Francesca  Home  Owners  Association      C.  Proposed  Projects    To  address  the  flooding  problems  in  the  barangay,  the  following  projects  have  been  submitted  to  Legazpi  City  for  adoption:  

 1.    Construction  of  additional  drainage  canals.    This  is  to  provide  drainage  and  outfall  of  the  stagnant  and  flood  water  in  the  barangay  to  Dapdap/Macabalo  River  (option1),  or  to  Rizal/Gutsan  Creek  (option2-­‐rehabilitation).  The  project  will  benefit  the  267  households  in  Purok    1,  2  and  3,  from  the  risks  of  flooding  and  waterborne  diseases.      2.  Road  improvement  between  Barangay  23  and  Barangay  24  at  the  relocation  site.    The  project  will  entail  road  concreting  and  drainage,  which  will  directly  benefit  60  households  in  the  community.    The  road  improvement  will  provide  access  for  public  utility  and  protective  vehicles  (police  mobile  and  fire  trucks)  which  will  address  the  safety  of  approximately  200  households.    3.    In  addition  to  the  above  projects,  the  barangay  also  request  for  the  survey  and  titling  work  for    the  relocation  site.      Below  is  the  Project  Brief  submitted  to  the  LGU  for  adoption.  

BARANGAY  23  –  IMPERIAL  COURT  

PROPOSED  PROJECTS   23  -­‐  1   23  -­‐  2  

1. Name  of  project      

(A)  Installation  of  drainage  Option  1:  to  Dapdap/Macabalo  River  Option  2:  to  Rizal/Gutsan  Creek    

(B)  Road  improvement  between  Barangays  23  and  24  at  Relocation  Site  (Site  Development)    

2. Project  proponent   Barangay  23  LGU    San  Nazareno  HOA  San  Francesca  HOA    

Barangay  23  LGU    San  Nazareno  HOA  San  Francesca  HOA    

3. Activity  components  and  resource  inputs  

Design  and  implementation  of  engineering  works        

Road  concreting;  drainage  

4. Justification  for  the  project  

Stagnant    water  poses  health  risks  to  residents  

Provide  access  for  emergency  vehicles  and  other  transportation  to  Relocation  Site  

5. Target  beneficiaries  

 

Purok  1,  2  &  3  residents    

60  HHs  –  direct  affected    

6. Target  outputs  or  success  indicators    

267  HHs  enjoy  better  environment  and  less  health  risks  

±  200  HHs  have  better  access  to  public  utility  vehicles  and  protective  

  services  (e.g.  firefighters,  police)  7. Possible  risks  or  

external  factors  that  could  frustrate  the  realization  of  the  project  (natural,  social,  economic,  etc)  

For  Option  1:  Need  to  establish  right-­‐of-­‐way  through  private  property  (Aida  Costa)  and  nine  HHs  encroaching  on  the  creek  For  Option  2:  Need  to  establish  right-­‐of-­‐way  through  private  land  (PB  JP  Lee)  

Possible  resistance  from  residents  who  have  encroached  on  road  right-­‐of-­‐way  

REQUESTED  SERVICES   -­‐ Survey  and  titling  works  for  the  Relocation  Site  

 D.  Summary  of  Identified  Projects  and  Services  based  on  Strategies  The  following  are  the  identified  regulations,  projects  and  services  in  the  program  of  needs  and  plans  for  Barangay  23.        

                                 

 E.  Socioeconomic  Profile  of  Barangay  23    Population    Total    Urban  Poor  Population    :  72  HH  Average    No.  of    Household          :  2  

Density                                                                                :4.7sq.m/occupant  

  Economic  Situation  Average    monthly      income                      :        Php6,  744.00  Average  monthly    expenditure          :        Php7,460.00  

   

                 

     

 The  DRR-­‐SSP  of  Barangay  24  -­‐  Rizal    A.  Summary  Profile    Barangay  24  is  the  other  in-­‐city  relocation  identified  by  the  LGU  of  Legazpi  City  in  addition  to  Barangay  23.    Barangay  24  has  a  similar  situation  to  Barangay  23.  However,  residents  in  Barangay  24  are  of  relatively  higher  income  than  in  Barangay  23.  Purok  1  and  2  of  the  Barangay  is  where  the  informal  settler  families  (ISF)  mostly  reside.  These  Puroks  are  flood-­‐prone  and  are  under  the  risk  of  liquefaction  and  ground  subsidence.    Like  in  Barangay  23,  most  of  the  ISFs  of  Bgy  24    have  decided  to  stay  where  they  are  presently  situated  due  to  the  prospects  of  eventually  owning  the  property.    To  be  able  to  adapt  to  the  risks,  the  community  members  have  identified  several  mitigating  measures  like  new  drainage  canals,  clean-­‐up  of  existing  canals  and  a  barangay  multipurpose  hall  that  can  serve  as  their  evacuation  center  should  the  need  arise.    B.  Proponents  Barangay  Rizal  Homeowners  Association      C.  Proposed  Projects    To  address  the  various  problems  in  the  barangay,  the  following  projects  have  been  submitted  to  Legazpi  City  for  adoption:      1.  Improvement  of  drainage  system:                A1.  in    Purok  1A-­‐  New  construction              A2.  in    Purok  2-­‐  New  construction  (catwalk  w/  lined  canal)              A3.    Purok  3-­‐    De-­‐clogging  of  existing  canals  The  drainage  improvement  projects  will  address  the  health  risks  in  Puroks  1,2  and  3,    due  to  high  incidence  of  flooding.    Benefits  of  these  drainage  projects  will  be  provided  to  more  than165  households  in  Purok  1,  119  in  Purok  2,  and  85  in  Purok  3  of  the  barangay.      2.    Construction  of  barangay  hall  and  evacuation  center  with  public  toilet.    The  project  will  serve  as  a  safe  evacuation  center  for  the    residents  of  Puroks  1,  2  and  3,  who  are  highly  affected  by  the  typhoon  and  flooding  in  the  barangay.  A  combined  number  of    200  households  of  the  3  Puroks,  will  benefit  from  the  project.    3.  Improvement  of  pathwalks  in  Purok  1A  and  Purok  2.  The  project  shall  entail  the  concreting  of  the  said  pathwalks,  which    will  address  the  need  to  improve  circulation  and  access  of  residents  within  the  community.  A  total  of    165  households  in  Purok  1A  ,  and  119  from  Purok  2  will  directly  benefit  from  this  project.      4.    Proposed  Drop-­‐Off  Center  /  Material  Recovery  Facility  (MRF).  The  project  is  a  component  of  improvement  of  barangay  system  for  collecting  and  segregating  solid  waste.  The  solid  waste  management  effort  in  the  barangay  is  also  a  part  of  their  effort    to  unclog  the  waterways.  Benefits  from  the  project  will  extend  to  165  households  in  Purok  1;  199  in  Purok  2;  and,  85  in  Purok  3.      5.  Installation  of  fire  hydrants.    Since  Barangay  24  is  a  densely  built-­‐up  area,  the  residents  recognize  their  need    to  provide  the  community  with    protection  against  fire.    The  project  will  entail  the    purchase  and  installation  of  a  total  of    ten  (10)  fire  hydrants,  including  the  provision  of  connections  to  water  mains.    Beneficiaries  of  this  project  are  the  165households  of  Purok  1;  119  in  Purok  2;  and,  85  in  Purok  3                            

 Below  is  the  Project  Brief  submitted  to  the  LGU  for  adoption.      

BARANGAY  24  –  RIZAL  PROPOSED  PROJECTS   24  –  1       24  –  2     24  –  3     24  –  4   24  –  5    

1. Name  of  project    

(A)  Improvement  of  drainage  system:  (A1)  Purok  1A-­‐  New  construction  (A2)  Purok  2-­‐  New  construction  (catwalk  w/  lined  canal)  (A3)  Purok  3-­‐    De-­‐clogging  of  existing  canals  

(B)  Construction  of  barangay  hall  and  evacuation  center  with  public  toilet  

(C)Improvement  of  pathwalks  in  Purok  1A  and  Purok  2  

(D)  Proposed  Drop-­‐Off  Center  /  Material  Recovery  Facility  (MRF)  

(E)  Installation  of  fire  hydrants  -­‐Purok  1  –  3  units    -­‐Purok  2  –  3  units    -­‐Relocation  Site  No.  2  –  2  units    -­‐Relocation  Site  No.  1  –  2  units    

2. Project  proponent  

Bgy.  24  LGU    Bgy.  Rizal  HOA  

Bgy.  24  LGU    Bgy.  Rizal  HOA  

Bgy.  24  LGU    Bgy.  Rizal  HOA  

Bgy.  24  LGU    Bgy.  Rizal  HOA  

Bgy.  24  LGU    Bgy.  Rizal  HOA  

3. Activity  components  and  resource  inputs  

Engineering  works;  Labor  for  De-­‐clogging;  Dredging/  Excavation  

Evaluation  of  proposed  site  for  suitability  as  evacuation  center;  general  construction  

Concreting   General  construction;  Improvement  of  barangay  system  for  collecting  and  segregating  solid  waste  

Purchase  and  installation  of  fire  hydrants,  including  connection  to  water  mains  

4. Justification  for  the  project  

Health  risks  due  to  high  incidence  of  flooding  

Need  to  serve  the  residents  who  are  highly  affected  by  the  typhoon  and  flooding  ;  Need  for  safe  evacuation  center    

Need  to  improve  circulation  and  access  in  settlements  

Need  to  improve  solid  waste  management  to  help    in  unclogging  waterways  

Need  to  provide  protection  against  fire  in  densely  built-­‐up  area  

5. Target  beneficiaries  

Puroks  1,  2  and  3     Puroks  1,  2  and  3    

Puroks  1A  and  2  

Puroks  1,  2  and  3    

Puroks  1,  2  and  3    

6. Target  outputs  or  success  indicators    

165+  HHs  in  Purok  1,  119  HHs  in  Purok  2,  and  85  HHs  in  Purok  3  enjoy  better  environment  and  less  health  risks  

Purok  1  –  65  Purok  2  –    100  Purok  3  –  30  95%  of  the  pop.  is  affected        

Purok  1A  –  165  Purok  2  –  119      

Purok  1  –  165  Purok  2  –  119    Purok  3  –  85    

Purok  1  –  165  Purok  2  –  119    Purok  3  –  85    

7. Possible  risks  or  external  factors  that  could  frustrate  the  realization  of  the  project  (natural,  social,  economic,  etc)  

Purok  2  –  Rectification/  Amendment  Romano’s  compound  –  it  should  be  a  Public  Land    

Site  with    on-­‐going  negotiation  

None  foreseen   None  foreseen  

None  foreseen  

   

 D.  Summary  of  Identified  Projects  and  Services  based  on  Strategies    The  following  are  the  identified  regulations,  projects  and  services  in  the  program  of  needs  and  plans  for  Barangay  24.      

 E.  Socio-­‐economic  Profile  of  Bgy  24    Population    Total    Urban  Poor  Population    :  450HH  Average    No.  of    member/Household          :  2.5  

Density          :  5.5  sq.m/person  

  Economic  Situation  Average    monthly      income                      :        Php9,571.82    Average  monthly    expenditure      :        Php10,234.02  

 

   

                   

   

     

 The  DRSSP  of  Barangay  27  -­‐  Victory  Village  South      A.  Summary  Profile    Barangay  27  is  a  coastal  community.  It  is  flood-­‐prone  and  sits  on  a  wetland.    The  barangay  is  bounded  by  Macabalo  River  and  creeks  while  its  eastern  side  is  along  the  shoreline  of  the  Albay  Gulf.    The  planned  rehabilitation  of  the  Macabalo  River,  which  will  include  the  3-­‐meter  easement  on  both  sides,  is  one  of  the  present  major  concerns  of  the  barangay’s  affected  communities.    The  organized  urban  poor  in  the  community  occupy  privately  owned  land,  which  is  under  negotiation  for  possible  acquisition.  There  are  at  least  1,000  informal  settler  families  residing  on  this  private  land.    The  families  look  forward  to  the  positive  outcome  of  the  negotiation  over  the  private  land,  and  have  decided  to  stay  and  try  to  adapt  to  the  conditions  of  the  barangay.      B.  Proponents  Victory  Village  27  and  28  Home  Owners  Association  and  Purok  1  West  Side  Home  Owners  Association    C.  Proposed  Projects    To  address  the  flooding  problems  in  the  barangay,  the  following  projects  have  been  submitted  to  the  LGU  of  Legazpi  City  for  adoption:  

 

1. Rehabilitation  of  lined  canal/  drainage  system.    This  will  benefit  Puroks  1,  2  and  3.  The  project  will  entail  de-­‐clogging  and  concrete  and  masonry  works  to  increase  depth  of  approximately  500  meters  of  

canal.    This  will  significantly  reduce  incidence  of  flooding  for  88  HHs  of  Purok  1,  83  HHs  of  Purok  2,  and  81  HHs  of  Purok  3.  It  will  also  address  the  overflowing  of  this  canal  during  high  tide.    We  can  see  the    possible  reblocking  on  existing  alignment  of  the  canal.  See  Project  Brief  for  more  details.  

2.    Construction  of  barangay  multi-­‐purpose  hall/evacuation  center.    The  proposed  project                                is  in  Purok  1  –  Public  Land  Area  (part  Velasco,  part  public  land).  The  project  will  benefit  all                              the  residents  of  the  barangay  as  our  temporary  shelter  during  calamities.  We  will  also                              need  technical  assistance  from  the  LGU  on  the  evaluation  of  proposed  site  for  suitability                              as  evacuation  center  and  for  its  general  construction.  See  Project  Brief  for  details.  

 To  facilitate  the  projects  in  items  1  and  2,    and  to  address  the  concerns  of  displacements  in  the  barangay,  assistance  on  the  following  technical  services  is  also  requested:    

• Preparation  of  reblocking  /  subdivision  plan  to  accommodate  families  that  may  be  displaced  by  compliance  with  easements  

• Survey  works  in  Purok  4  –  Lot  1123  (50  HH)  • Survey  works  for  area  that  will  be  affected  by  road  expansion  in  Velasco  Property  (160  HH)  

 Below  is  the  Project  Brief  submitted  to  the  LGU  for  adoption.  

BARANGAY  27  –  VICTORY  VILLAGE  SOUTH  

PROPOSED  PROJECTS   27  –  1   27  -­‐  2  

1. Name  of  project   (A)  Rehabilitation  of  lined  canal/  drainage  system    

(B)  Construction  of  barangay  multi-­‐purpose  hall/evacuation  center    Proposed  Location:  Purok  1  –  Public  Land  Area  (part  Velasco,  part  public  land)    

2. Project  proponent        

Barangay  27  LGU  Victory  Village  27  and  28  HOA  Purok  1  West  Side  HOA  

Barangay  27  LGU  Victory  Village  27  and  28  HOA  Purok  1  West  Side  HOA  

3. Activity  components  and  resource  inputs  

Concrete  and  masonry  works  to  increase  depth  of  approximately  500  meters  of  canal;  De-­‐clogging  

Evaluation  of  proposed  site  for  suitability  as  evacuation  center;  General  construction  

4. Justification  for  the  project  

Overflow  even  during  high  tide     Need  for  safe  temporary  shelter  during  heavy  rainfall,  typhoons    

5. Target  beneficiaries   Puroks  1,  2  and  3     All  residents  of  the  barangay  6. Target  outputs  or  

success  indicators    Reduced  incidence  of  flooding  for  88  HHs  of  Purok  1,  83  HHs  of  Purok  2,  and  81  HHs  of  Purok  3  

Improved  safety  for  400  HHs  during  times  of  heavy  rainfall  and  typhoons  

7. Possible  risks  or  external  factors  that  could  frustrate  the  realization  of  the  project  (natural,  social,  economic,  etc)  

Need  to  consider  possible  reblocking  on  existing  alignment      

Soil  conditions  in  proposed  site    

REQUESTED  SERVICES  

-­‐ Preparation  of  reblocking  /  subdivision  plan  to  accommodate  families  that  may  be  displaced  by  compliance  with  easements  

-­‐ Survey  works  in  Purok  4  –  Lot  1123  (50  HH)  -­‐ Survey  works  for  area  that  will  be  affected  by  road  expansion  in  Velasco  

Property  (160  HH)  Note:  Adopt  the  Principle  of  Maximum  Retention,  Minimal  Dislocation    

 D.  Summary  of  Identified  Projects  and  Services  based  on  Strategies  The  following  are  the  identified  regulations,  projects  and  services  in  the  program  of  needs  and  plans  for  Barangay  27.              E.  Socio-­‐economic  Profile  of  Bgy  27  Population    Urban  poor  :183  HH    

Average    number  of  HH  member  :2  Density  :    5.1  sq.m/occupant  

  Economic  Situation  Monthly  income  :  Php  8,608.00    

Monthly  expenditure:  Php  6,664.00  

 

 

   

   F.  Socio-­‐economic  Profile  of  Bgy  27  Population    Urban  poor  :183  HH    Average    number  of  HH  member  :2  Density  :    5.1  sq.m/occupant    

  Economic  Situation  Monthly  income  :  Php  8,608.00    Monthly  expenditure:  Php  6,664.00  

           The  DRR-­‐SSP  of  Barangay  28-­‐    

       

The  DRSSP  of  Barangay  28  -­‐  Victory  Village  North    A.  Summary  Profile    Barangay  28  -­‐  Victory  Village  North,  is  one  of  the  five  coastal  barangays  of  the  pilot  areas  that  are  facing  the  Albay  Gulf  along  the  Philippine  eastern  seaboard.  However,  unlike  the  other  four  barangays  (31,  30,  29  and  27)  the  coastal  line  of  Victory  Village  North  is  bounded  with  a  concrete  road  that  separates  the  eastern  side  of  the    barangay  and  the  Albay  Gulf.    This  road  leads  to  the  Embarcadero.    Embarcadero  de  Legazpi  is  being  developed  to  become  the  premier  waterfront  on  Legazpi  City’s  harbor.    A  newly  constructed  road  also  traverses  the  mid-­‐section  of  the  barangay  from  its  western  end,  providing  a  perpendicular  access  to  the  road  leading  to  Embarcadero.            In  the  midst  of  these  big  infrastructure  developments,  the  barangay  remains  affected  by  floods  and  is  regularly  under  water.    It  also  has  the  lowest  income  level  among  the  9  pilot  barangays.    The  3-­‐meter  easement  along  with  the  rehabilitation  of  Macabalo  River  will  potentially  displace  some  of  the  barangay’s  urban  poor  community.  The  areas  occupied  by  the  residents  are  partly  A&D  and  non-­‐A&D.    During  the  consultations,  no  immediate  major  projects  to  mitigate  the  flooding  problems  in  the  area  were  identified  by  the  community.    The  residents  are  expecting  that  the  proposed  Victory  pumping  station  project  by  the  LGU,  through  the  DPWH,  will  address  all  the  flooding  problems  of  Barangay  28  in  the  near  future.      B.  Proponents  Legazpi  City  Slumdwellers  Federation  Inc.    –  Victory  Village  North  Chapter  

   

C.  Proposed  Projects  To  improve  the  economic  well-­‐being  of  the  barangay  residents  ,  the  barangay    requested  for  the  following  services  in    a  project  brief    which  was    submitted  to  LGU,  requesting  for  the:  

 1. Implementation  of  livelihood  skills  training  for  women  and  linking  products  of  livelihood  projects  to  

market.    

2. Conduct  a  consultation  with  barangay  residents  on  details  of  DPWH  Flood  Control  Project    

Below  is  the  Project  Brief  that  was  submitted  to  the  LGU.    

Barangay  28  –  Victory  Village  North  

No  proposed  Project  

REQUESTED  SERVICES  

1. Implementation  of  livelihood  skills  training  for  women  2. Linking  of  products  of  livelihood  projects  to  markets  3. Conduct  of  consultation  with  barangay  residents  on  details  of  

DPWH  Flood  Control  Project      

 

 D.  Summary  of  Identified  Projects  and  Services  based  on  Strategies  

The  following  are  the  identified  regulations,  projects  and  services  in  the  program  of  needs  and  plans  for  Barangay  28.      

                                           

E.  Socio-­‐economic  Profile  of  Bgy  27    Population      Urban    Poor  Population  :  219  HH      Average  no  of  household  member  :    3.25  Density:    5.2  sq.m/occupant  

  Economic  Situation  Average    monthly    income    :  Php  6,962.18  Average    monthly    expenditure  :  Php  6,908.43  

 

   

     

       

The  DR-­‐SSP  of  Barangay  29  -­‐  Sabang    A.  Summary  Profile    Barangay  29  -­‐  Sabang  is  another  coastal  barangay  facing  the  Albay  Gulf,  susceptible  to  storm  surge,  among  other  risks.  Many  houses  in  the  barangay  are  built  on  the  salvage  area.    The  recommended  strategy  for  this  barangay  is  to  find  a  more  suitable  site  for  their  community  within  the  city.  While  waiting  for  a  possible  relocation  site,  the  community  has  identified  projects  to  mitigate  the  problems  of  flooding  and  efficiency  of  the  drainage  system.      However,  due  to  the  long  wait  for  a  relocation  site,  some  residents  also  opt  to  wait  until  the  DENR  (Dept.  of  Environment  and  Natural  Resources,  declares  some  portions  of  the  occupied  land  in  the  community,  as  A&D  to  be  fit  for  eventual  titling  and  distribution.      B.  Proponents  Legazpi  City  Slumdwellers  Federation,  Inc.  -­‐  Sabang  Chapter    C.  Proposed  Projects    To  address  the  various  problems  in  the  barangay,  the  following  projects  have  been  submitted  to  the  Local  Government  of    Legazpi  City  for  adoption:  

 1. Improvement  of  the  drainage  system.    The  project  entails  the  design  and  engineering  works  for  the  

rehabilitation  of  the  drainage  system  in  Purok  1,2  and  3,  which  also  include  the  installation  of  drainage  canals  in  Purok  3.  At  present,  Purok3  does  not  have  any  efficient  drainage  system  to  handle  the  flow  of  waste  and  flood  waters  in  the  community.  The  project  is  expected  to  benefit  all  the  residents  of  the  barangay,  especially  the  30  HHs  in  Purok  3.  

 2. In  addition  to  the  above  mentioned  projects,  the  residents  of    Barangay  29  also  request  for  the  conduct  

of    re-­‐survey  of  the  barangay  to  support  the  petition  of  the  PO  to  the  Department  of  Environment  and  Natural  Resources  (DENR)  to  declare  parts  of  the  barangay  as  alienable  and  disposable.  

 Below  is  the  Project  Brief  submitted  to  the  LGU  for  adoption.  

BARANGAY  29  –  SABANG  

PROPOSED  PROJECT   29  -­‐  1  

1. Name  of  project    

Improvement  of  drainage  system  (A)  Installation  (Purok  3)  (B)  Rehabilitation  (Purok  1,2,3)    

2. Project  proponent   Barangay  29  LGU    LCSFI  Sabang  Chapter  

3. Activity  components  and  resource  inputs  

Design  and  implementation  of  engineering  works    

4. Justification  for  the  project   Part  of  Purok  3  has  no  drainage  at  all.  The  existing  drainage  system  is  not  very  effective.  

5. Target  beneficiaries   All  residents  of  the  barangay.  6. Target  outputs  or  success  

indicators    Reduced  flooding  in  the  barangay,  especially  for  the  30  HHs  in  Purok  3  

7. Possible  risks  or  external  factors  that  could  frustrate  the  realization  of  the  project  (natural,  social,  economic,  etc)  

None  foreseen  

REQUESTED  SERVICES  

-­‐ Re-­‐survey  of  the  barangay  to  support  the  petition  of  the  PO  to  the  Department  of  Environment  and  Natural  Resources  (DENR)  to  declare  parts  of  the  barangay  as  alienable  and  disposable.  

     

 D.  Summary  of  Identified  Projects  and  Services  based  on  Strategies  The  following  are  the  identified  regulations,  projects  and  services  in  the  program  of  needs  and  plans  for  Barangay  29.      

 E.  Socio-­‐economic  Profile  of  Bgy  29-­‐  Sabang    Population    Total    Urban  Poor  Population    :  79  HH  Average    No.  of    member/Household    :  2  

Density          :  4.79    sq.m/occupant  

  Economic  Situation  Average    monthly      income              :        Php8,010.07  Average  monthly    expenditure      :        Php6,675.53  

     

   

                   

 

         

 The  DR-­‐SSP  of  Barangay  30  -­‐  Pigcale    A.  Summary  Profile    Barangay  30-­‐Pigcale  is  one  of  the  5    coastal  barangays  under  the  project.    It  is  situated  between  Barangay  31  (north  side)  and  Barangay  29  (south  side),  sharing  almost  similar  conditions  with  the  other  two  barangays.    The  urban  poor  settlements    are  occpying  non-­‐A&D  land  which  is    prone  to  storm  surge  and  other  risks.  The  identified  strategy  for  Barangay  30    is  to  build  better-­‐-­‐while  waiting  for  the  availability  of  a  relocation  site.  There  are  two  projects  prioritized  by  the  community  for  the  barangay.    First,    is  a  multipurpose  hall  that  would  serve  as  their  evacuation  center.  Second,  is  a  wastewater  treatment  facility  to  address  the  the  untreated  waste  water  coming  from  the  city  which  poses  health  risk  to  the  residents.    B.  Proponents  Legazpi  City  Slumdwellers  Federation,  Inc.  -­‐  Pigcale  Chapter    C.  Proposed  Projects    To  address  the  various  problems  in  the  barangay,  the  following  projects  have  been  submitted  to  the  Local  Governement  of    Legazpi  City  for  adoption:  

 1. Wastewater  treatment  facility.    The  project  entails  engineering  works  that  should  contain  and  treat  

waste  water  from  the  city’s  drainage  system  before  being  discharged  to  the  sea.    Presently,  in  absence  of  the  facility,  the  barangay  residents  are  exposed  to  health  risks  due  to  the  untreated  drainage  water  from  the  city,  which  also  pollute  the  sea.  Households  (HH)  residing  along  the  coast  are  the  most  affected.  Beneficiaries  of  this  project  are  the  35  HHs  of  Barangay  31  and  60  HHs  of  Barangay  30  who  have  been  exposed  to  health  risks,  specially  the  community  members  and  children,  who  usually  swim  in  the  sea.  

 2.    Construction  of  evacuation  center.  The  project  will  involve  the  construction  of  concrete  slab  for  the  

second  floor  of  the  barangay  hall,  stage  and  the  day  care  center.  The  day  care  center,  which  is  intended  to  serve  as  a  safe  evacuation  place  during  calamities,  is  also  requested  to        have  additional  reinforcement  of  foundations  to  carry  the  additional  load.  Two  hundred  (200)  households  of  Purok  3  and  4,  will  benefit  from  the  provision  of  safe  temporary  shelter  for  barangay  residents  during  typhoons,  through  this  project.  

 3. In  addition  to  the  above  mentioned  projects,  the  residents  of  Barangay  30  also  request  for  the  conduct  

of    consultation  with  the  LGU  and  DPWH  to  know  more  about  the  details  of  the  Flood  Control  Project.    Below  is  the  Project  Brief  submitted  to  the  LGU  for  adoption.  

BARANGAY  30  –  PIGCALE  

PROPOSED  PROJECTS   30  -­‐  1   30  -­‐  2  

1. Name  of  project   (A)  Wastewater  treatment  facility     (B)  Construction  of  evacuation  center    2. Project  proponent   Barangay  30  LGU    

LCSFI  Pigcale  Chapter  Barangay  30  LGU    LCSFI  Pigcale  Chapter  

3. Activity  components  and  resource  inputs  

Engineering  works  to  contain  and  treat  water  from  the  city’s  drainage  system  before  discharge  to  the  sea  

Construction  of  concrete  slab  at  combined  second  level  of  barangay  hall,  stage  and  day  care  center  to  serve  as  evacuation  center;  reinforcement  of  foundations  to  carry  load  of  evacuation  center  

4. Justification  for  the  project  

The  barangay  residents  are  exposed  to  health  risks  from  the  untreated  drainage  water  from  the  city.  The  sea  becomes  polluted.  

Need  for  safe  temporary  shelter  for  barangay  residents  during  typhoons  

5. Target  beneficiaries   Households  of  Barangays  30  and  31  located  along  the  coast  

Residents  of  Purok  3  and  4  

Fisherfolk  Other  constituents  of  Legazpi  City  who  swim  in  the  sea    

6. Target  outputs  or  success  indicators    

35  HHs  of  Barangay  31  and  60  HHs  of  Barangay  30  enjoy  a  better  environment  and  are  exposed  to  less  health  risks.  

200  HHs  

7. Possible  risks  or  external  factors  that  could  frustrate  the  realization  of  the  project  (natural,  social,  economic,  etc)  

Need  to  consider  the  affected  families  

Need  to  consider  the  affected  families  

REQUESTED  SERVICES   -­‐ Conduct  of  consultation  with  barangay  residents  on  details  of  DPWH  Flood  Control  Project  

 D.  Summary  of  Identified  Projects  and  Services  based  on  Strategies  The  following  are  the  identified  regulations,  projects  and  services  in  the  program  of  needs  and  plans  for  Barangay  30.      

 E.  Socio-­‐economic  Profile  of  Bgy  30    Population    Total    Urban  Poor  Population    :  60HH  

Average    No.  of    member/Household    :1.16  Density          :  1.7sq.m/occupant  

  Economic  Situation  Average    monthly      income                      :      Php5,147.67  

Average  monthly    expenditure      :        Php4,539.10  

                             

 

       

 The  DR-­‐SSP  of  Barangay  31  -­‐  Centro  Baybay      A.  Summary  Profile    Barangay  31  is  another  coastal  barangay  along  the  shoreline  facing  the  Albay  Gulf.    The  surveyed  urban  poor  area  in  the  community    is  situated  on  a  non-­‐A&D  land.    Hazards  that  pose  threat  to  the  urban  poor  families  in  this  part  of  the  barangay  are  flooding,  liquefaction,  ground  subsidence,  storm  surges  and  others.    Relocation  outside  the  barangay  is  the  outcome  of  the  strategy  for  this  barangay.  While  waiting  for  the  availability  of  a  relocation  site,  they  recommend  projects  such  as,  rehabilitation  of  drainage  system,  installation  of  water  pumps  at  Purok  1  &  2,  and  distribution  of  sanitary  fixtures.    B.  Proponents  Legazpi  City  Slumdwellers  Federation,  Inc.  -­‐  Baybay  Chapter    C.  Proposed  Projects    To  address  the  various  problems  in  the  barangay,  the  following  projects  have  been  submitted  to  the  Local  Governement  of    Legazpi  City  for  adoption:    1.  Rehabilitation  of  catwalk.    The  project  will  include  the  installation  of  drainage  canals  and  concreting  of  road  surface,  covering  approximately  200  meters  which  is  meant  to  improve  circulation  and  access  of  385  households  in  Purok  1,2  and  3,  including  other  pedestrians  form  other  barangays.    2.    Distribution  and  installation  of  sanitary  fixtures  (toilet  bowl  and  septic  tank).  The  project  shall  entail  the  purchase  of  sanitary  fixtures  and  building  of  septic  tanks.    Currently,  around  50  families  in  the  barangay  do  not  have  the  appropriate  sanitation  facilities,  who  will  directly  benefit  from  the  project.  Installation  and  the  proper  use  of  sanitation  facilities  are  expected  to  address  the  bigger  scale  problem  of  the  community  on  environmental  health.    3.  Installation  of  water  pumps  for  Puroks  1  &  2.    The  project  also  requires  the  investigation  of  the  most  suitable  areas  in  the  barangay  to  install  the  pumps.    The  is  no  level  3  water  access  installed  at  the  household  level  in  the  barangay.    At  2  units  each  of  these  pumps  for  Puroks  1  and  2,  will  directly  benefit  a  total  of  60  households  by    improving  their  access  to  water  for  washing,  sanitation,  cooking  and  other  uses.    4.    Improvement  of  barangay  outpost.  The  present  barangay  outpost  needs  construction  work  to  improve  its  present  structure.  This  project  will  ease  the  facilitation  of  peace  and  order  and  Improve  the  access  to  protective  services  for  all  barangay  residents.    5.    In  addition  to  the  above  mentioned  projects,  the  barangay  also  seeks  for  endorsement  of  their  request  for  the  replacement  of  electric  posts  that  are  currently  serving  approximately  150  households  and  with  regards  to  their  inquiry  of  directive  about  the  schools  as  evacuation  centers.    Below  is  the  Project  Brief  submitted  to  the  LGU  for  adoption.  

BARANGAY  31  –  BAYBAY  PROPOSED  PROJECTS   31  -­‐  1   31  -­‐  2   31  -­‐  3   31  -­‐  4  1. Name  of  project   (A)  Rehabilitation  

of  catwalk      (B)  Distribution  of  sanitary  fixtures  (toilet  bowl  and  septic  tank)  

(C  )Installation  of  water  pumps  for  Puroks  1  &  2  

(D)  Improvement  of  barangay  outpost  

2. Project  proponent   Barangay  31  LGU  LCSFI  Baybay  Chapter  

Barangay  31  LGU  LCSFI  Baybay  Chapter  

Barangay  31  LGU  LCSFI  Baybay  Chapter  

Barangay  31  LGU  LCSFI  Baybay  Chapter  

3. Activity  components  and  resource  inputs  

Installation  of  drainage  and  concreting  of  road  surface  

Purchase  of  sanitary  fixtures;  screening  of  families  shown  by  survey  to  need  better  

Purchase  and  installation  of  water  pumps;  Investigation  of  

General  construction  

covering  approximately  200  meters  

sanitation,  plus  others  not  enumerated  in  survey    

proposed  areas  for  most  suitable  locations  

4. Justification  for  the  project  

Need  to  improve  circulation  and  access  

Need  to  improve  sanitation  and  lessen  pollution  of  surroundings  

No  Level  III  water  facilities  installed    

Need  to  improve  peace  and  order  in  the  barangay  

5. Target  beneficiaries    

Portion  of  Purok  1  and  2  –    385  HHs    (all  passers)  

Families  that  currently  do  not  have  sanitary  facilities  (50  families  =  108x46%  IFS)  

Purok  1  –    2  units;  30  HHs  Purok  2  –    2  units;  30  HHs      

All  residents  of  the  barangay  

6. Target  outputs  or  success  indicators    

Improved  access  to  and  from  the  community  for  385  HHs  

Number  of  families  based  on  survey  enjoy  better  environment  and  improved  hygiene  

60  HHs  in  Puroks  1  and  2  have  improved  access  to  water  for  washing  and  other  uses  

Improved  access  to  protective  services  for  all  barangay  residents  

None  foreseen   None  foreseen   None  foreseen   None  foreseen  

7. Possible  risks  or  external  factors  that  could  frustrate  the  realization  of  the  project  (natural,  social,  economic,  etc)  

Actual  Disaster    

REQUESTED  SERVICES  -­‐ Endorsement  of  request  for  replacement  of  electric  posts  currently  serving  

approximately  150  HHs  -­‐  Inquiry  of  directive  about  the  schools  as  evacuation  centers  

 D.  Summary  of  Identified  Projects  and  Services  based  on  Strategies  The  following  are  the  identified  regulations,  projects  and  services  in  the  program  of  needs  and  plans  for  Barangay  31.      

                 

 E.  Socio-­‐economic  Profile  of  Bgy  31    Population    Total    Urban  Poor  Population    :  108  HH  

Average    No.  of    member/Household          :  1.39  Density          :  3.6  sq.m/person  

  Economic  Situation  Average    monthly      income                      :      Php8,777.39  

Average  monthly    expenditure      :        Php8,456.79  

                                                                                               

       

 The  DR-­‐SSP  of  Barangay  37  -­‐  Bitano      A.  Summary  Profile    Barangay  37-­‐Bitano  is  located  in  a  low-­‐lying  area.    Aside  from  the  high  incidence  of  flooding,  the  communities  are  also  at  risk  to  fire,  liquefaction,  ground  subsidence,  etc.      The  eastern  side  of  the  barangay  is  bounded  by  the    PNR  (Philippine  National  Railways)  tracks.    This  railroad  connects  Legaspi  City  to  Manila.    The  estimated  urban  poor  households  in  Bgy,  Bitano  is  1,174.    For  years,  the  residents  of  the  barangay  were  given  the  rights  by  the  PNR  to  occupy  the  unutilized  vacant    portions  of  its  property.      The  PNR  rehabilitation  project  which  started  in  2012,  include  the  reclamation  of  the  3.5m  easement  along  the  railroad  tracks.    This  is  a  major  shelter  concern  confronting  the  affected  communities  of  the  barangay.    B.  Proponents    Homeowners  associations  of  the  urban  poor  communities  in  Barangay  37  –  Bitano  Chapter  Zone  3  PNR  Home  Owners’  Association    C.  Proposed  Projects    To  address  the  flooding  problems  in  the  barangay,  the  following  projects  have  been  submitted  to  LGU  of  Legazpi  City  for  adoption:    1.  Rehabilitation  of  lined  canal/  drainage  system.    The  project  is  expected  to  reduce  flooding  for  834  HHs  in  Zones  5-­‐10,  278  HHs  in  Zones  2-­‐3,  139  HHs  and  a  warehouse  in  Zone  8.    The  works  will  include:  a.    de-­‐clogging  and  portion  to  be  covered  at  Zones  5  –  10  (at  rail  tracks  back  of  terminal);  b.    de-­‐clogging  &  Covering  of  drainage  at  Zones  2  &  3;  and,  c.    de-­‐clogging  at  Zone  8    2.  Installation  of  drainage  and  elevated  pathwalk.    The  project  was  proposed  to  address  the  high  incidence  of  flooding  in  50  HHs  in  Zone  10,  300  HHs  in  Zones  1,  2,  3,  5,  6,  7.    The  project  will  entail  Engineering  works  in  Zones  1,  2,  3,  5,  6,  7  ,  10.    3.  Distribution  of  firefighting  equipment.    The  project  is  expected  to  lessen  the  risk  of  fire  in              densely  built-­‐up  areas,  which  will  benefit  the  whole  barangay  with  1,390  HHs.    Its            implementation  will  entail  the  purchase  and  distribution  of  fire  hose  to  every  zone;              Installation  of  fire  hydrants  in  all  zones  except  Zone  1.  

   4.  Titling  works  for  Zone  1,  Lot  9714.      This  is  targeted  to    provide  100  on-­‐site  households                    with  security  of  land  tenure,  occupying  Lot  9714.                            5.    The  need  for  assistance    to  come  up  with:                        a.  MOA  between  residents  and  landowner;  survey;  legal  fees;  application  and  processing  of                                  reconstitution;                        b.    Research  regarding  the    title  of  the  sequestered  property  of  PCGG,  formerly  owned    by                                  Banahaw    Broadcasting,  comprising  approximately  5,000  sqm,  for  possible  distribution  to  400                                  households.                          

 Below  is  the    Project  Brief  that  was  submitted  to  the  LGU  for  adoption.    

BARANGAY  37  –  BITANO  

PROPOSED  PROJECTS   37  –  1   37  –  2   37  -­‐  3   37  –  4  

1. Name  of  project    

(A)  Rehabilitation  of  existing  lined  canals  

(B)  Installation  of  drainage  and  elevated  pathwalk    

(C)  Distribution  of  fire  fighting  equipment  

(D)  Titling  works  for  Zone  1,  Lot  9714      

2. Project  proponent   Barangay  37  LGU    LCSFI  Bitano  Chapter    Zone  3  PNR  HOA  

Barangay  37  LGU    LCSFI  Bitano  Chapter    Zone  3  PNR  HOA  

Barangay  37  LGU    LCSFI  Bitano  Chapter    Zone  3  PNR  HOA  

Barangay  37  LGU  &  LCSFI  Bitano  Chapter  

3. Activity  components  and  resource  inputs  

 

De-­‐clogging  and  portion  to  be  covered  at  Zones  5  –  10  (at  rail  tracks  back  of  terminal);  De-­‐clogging  &  Covering  of  drainage  at  Zones  2  &  3;  De-­‐clogging  at  Zone  8    

Engineering  works  at  Zones  1,  2,  3,  5,  6,  7  ,  10    

Purchase  and  distribution  of  fire  hose  to  every  zone;  Installation  of  fire  hydrants  in  all  zones  except  Zone  1  

MOA  between  residents  and  landowner;  survey;  legal  fees;  application  and  processing  of  reconstitution    

4. Justification  for  the  project  

High  incidence  of  flooding  

High  incidence  of  flooding  

Risk  of  fire  in  densely  built-­‐up  areas  

Need  to  regularise  tenure  of  residents  

5. Target  beneficiaries    

Zones  5  –  10,  Zones  2  –  3,  Zone  8  

Zones  1,  2,  3,  5,  6,  7,  10    

All  residents  of  the  barangay  

On-­‐site  residents      

6. Target  outputs  or  success  indicators    

Reduced  flooding  for  834  HHs  in  Zones  5-­‐10,  278  HHs  in  Zones  2-­‐3,  139  HHs  and  a  warehouse  in  Zone  8  

Reduced  flooding  for  50  HHs  in  Zone  10,  300  HHs  in  Zones  1,  2,  3,  5,  6,  7  

1,390  HHs  -­‐  Total  HH  Population    have  better  protection  against  fire    

100  HHs  have  security  of  land  tenure  100%  of  the  Total  HHs  occupying  Lot  9714  

7. Possible  risks  or  external  factors  that  could  frustrate  the  realization  of  the  project  (natural,  social,  economic,  etc)  

Affected  families  within  the  existing  lined  canal.    

Zone  10  –  30-­‐40  HH  affected.    Zone  2  –  No  drainage  outlet  

None  foreseen    

Adverse  claim  of  another  individual  with  Tax  Declaration  

REQUESTED  SERVICES  -­‐ Research  title  of  the  sequestered  property  of  PCGG,  formerly  owned  by  Banahaw  Broadcasting,  comprising  approximately  5,000  sqm,  for  possible  distribution  to  400  HHs  

 NOTE:    Identified  updated  mitigating  projects  and  need  for  assistance,  by  Bgy37  Bitano,  as  of  Feb  13,  2013.    

PROPONENTS/BENEFICIARIES                    PROPOSED  PROJECTS  

Zone  10    

                 Extension  of  Drainage  system  (Tahao  Road  )    

Zone  8                      Extension  of  Drainage  system    

Zone  1,3,4                    Need  for  relocation  site  due  to  PNR  rehabilitation      

         

   D.  Summary  of  Identified  Projects  and  Services  based  on  Strategies  The  following  are  the  identified  regulations,  projects  and  services  in  the  program  of  needs  and  plans  for  Barangay  37.                                                                              E.  Socio-­‐economic  Profile  of  Bgy  37      Population    Urban    Poor  Population:  423  HH  Average  no.  of  members  per  HH  :  3  

Density  :  4.56  sq./person  

  Economic  Situation  Average      Monthly    Income:  Php7,337.14  Average    Monthly    Expenditure    Php6,540.71  

                 

                                                                                                               

 

 ANNEX  

   The  Process  of  Developing  the    Barangay  Disaster  Risk-­‐Sensitive  Shelter  Plans            

The  Legazpi  City  Slumdwellers  Federation  Inc.  (LCSFI)  and  COPE  Foundation-­‐Legazpi  prepared  disaster  risk-­‐sensitive  shelter  plans  (DR-­‐SSPs)  in  nine  (9)  barangays  in  partnership  with  the  city  and  barangay  governments.  The  preparation  of  the  shelter  plans  was  supported  by  capacity  building  organized  by  Alternative  Planning  Initiatives  (ALTERPLAN)  and  the  Danish  International  Human  Settlement  Service  (known  as  DIB  in  Denmark).  The  program  for  capacity  building  was  carried  out  in  four  modules  of  training  sessions,  mentoring  and  community  consultations.         The  shelter  plans  cover  nine  contiguous  barangays  in  Legazpi  City  where  the  Federation's  members  reside  and  have  organizational  presence.    These  barangays  are  Brgy.  23  (Imperial  Court),    Brgy.  24  (Rizal),  Brgy.  27  (Victory  Village  South),  Brgy.  28  (Victory  Village  North),  Brgy.  29  (Sabang),  Brgy.  30  (Pigcale),  Brgy.  31  (Baybay),  Brgy.  33  (Peñaranda),  and  Brgy.  37  (Bitano).           To  ensure  a  comprehensive  and  credible  analysis  of  the  situation  of  our  communities  that  could  serve  as  basis  for  the  disaster  risk  sensitive  shelter  plans,  the  project  utilized  several  tools  and  approaches  for  data  gathering  and  analysis.  These  were:    1.    Participatory  Socio-­‐Economic  Survey.  Community  leaders  were  trained  as  local  enumerators  to  gather  identified  data  through  a  one-­‐page  survey  interview.    The  data  includes  income  and  source  of  livelihood,  tenure  and  housing  situation,  educational  background,  available  community  facilities  and  their  access.  The  Bicol  University  Extension  Service  Center  helped  in  designing  the  instrument  and  methods  for  interviewing,  and  in  training  the  community  leaders  for  implementing  it.  

 2.    Physical  Data  Gathering  through    Global  Positioning  System  (GPS).  COPE  staff  were  trained  to  use  GPS  equipment  to  gather  and  locate  on  base  maps  the  geographical  information  of  urban  poor  households,  the  major  landmarks  in  the  communities,  and  hazardous  areas.  The  GPS  survey  also  included  information  on  the  structural  situation  of  the  houses.  

 3.    Hazard  Mapping.  LCSFI  leaders  and  COPE  have  participated  in  developing  shelter  plan  maps,  which  were  overlaid  on  the    hazard  maps  from    the  Mines  and  Geosciences  Bureau  (MGB)  of  the  Department  of  Environment  and  Natural  Resources  (DENR)  and  the  city  government.  

 The  risks  of  each  barangay  were  identified,  and  for  purposes  of  analysis,  the  barangays  were  clustered  according  to  similarity  of  hazards.    In  this  process  we  arrived  at  four  (4)  barangay  clusters.    The  clusters  are:  1)  Low  lying  areas  that  are  flood-­‐prone;  2)  Barangay  along  the  Macabalo  River  and  affected  by  the  3-­‐meter  river  easement;  3)  Communities  along  the  shoreline  and  prone  to  storm  surge;  and  4)  Along  the  Philippine  National  Railways  (PNR)  railroad  tracks,  which  included  some  low  lying  areas.    Table  1  shows  the  clustering  of  barangays.  

 

 Table  1:  Barangay  Clustering  According  to  Identifiable  Hazard                                                    Table  2,  below,  provides  a  tabular  overlay  of  information  gathered  from  the  different  tools  used  in  the  project.    It  presents  the  possible  hazards,  land  status  of  the  members  of  the  Federation  per  barangay,  and  the  socio-­‐economic  data  gathered  in  the  survey.    The  table  provides  quick  information  needed  in  formulating  the  analysis  and  the  housing  strategies.