DESIGN & DRAWING DEPARTMENT

Vision:To provide quality drawings of mechanical components, mechanisms & systems to meet the plant requirements and to provide indigenous solution for failure of any mechanical equipment. 

Page 3: DnD Presentation SEPT2014

PRODUCTION TARGET (2014 - 15)

Hot Metal : 5.38 MT Crude Steel : 5.26 MT Saleable Steel : 4.58 MT

Page 4: DnD Presentation SEPT2014

DESIGN & DRAWING DEPARTMENT

Objectives: • Development of manufacturing drawings of Spare Parts,

Mechanisms & Assemblies to minimize proprietary purchases and thereby reduce cost of procurement.

• Development of Technical specifications of the parts for which drawings cannot be developed.

• Providing consultancy to the maintenance team for repair technologies and other technical issues.

Page 5: DnD Presentation SEPT2014

ORGANISATION CHART

Page 6: DnD Presentation SEPT2014

SOPs

No

Yes

Returned to Shop

Approval by HOD (Shop)

Shop

HOD (D&D)

Feasibility Study by D&D Submitted to GM (Mech.) for approval

Zone Incharge(D&D)

Released drawing available to Shops, Assignment complete

Action has been taken, Drawing attached in DMS

Page 7: DnD Presentation SEPT2014

MANPOWER

DESCRIPTION 2011 2012 2013 2014 2017

EXECUTIVES 12 10 10 9 8

DRAFTSMEN

• POSTED AT D&D DEPTT.

21 20 18 20 14

• POSTED AT SITE/SHOP

23 21 20 20 11

TOTAL 56 51 48 49 33

Page 8: DnD Presentation SEPT2014

HIGHLIGHTS OF 2013-14

Page 9: DnD Presentation SEPT2014

Dept. Description of job

BF1. Gear box carriage of drilling machine BF-42. Reducers of 15 Ton pusher car

SMS1 1. Saddle Beam of Charging Machine 8 & 92. UDB-63 Reducer of Auxiliary Trolley in Teeming Crane

SMS21. Tackle for hot metal ladle tilting into Mixer of SMS-II2. Tender Drawing with Specs for Geared Motor in SC#63. Left and Right Movable frames, MOM of SC#6

HIGHLIGHTS OF 2013-14

Page 10: DnD Presentation SEPT2014

Dept. Description of job

RSM1. Repair of 950 Pinion Stand Housing of Rail & Structural Mill2. Choke assembly and details for 850 stand3. Development of fixture of Pneumatic Rail Drilling Machine

PM1. Tech Specs & drg of HAGC Force Cylinder2. Spares of Cross Cut Shear Machine

EMD 1. Annular Gap Cone worth 1.27 Cr

F&PS 1. 15 T Lip pouring Tilting Ladle Shell

HIGHLIGHTS OF 2013-14

Page 11: DnD Presentation SEPT2014

PHOTOS …. 2013-14……

Page 12: DnD Presentation SEPT2014

PAST HIGHLIGHTS

New scooping device for Rotary Kiln-1 & 2 of RMP1. Assemblies of Dia 800, dia 700 & dia 600 Pedestal

Bearing Bushes of Roughing & Finishing Stand (PM). Design and Detail Engineering of Rail Pusher for new

Roll table in LRP. Repair scheme for main girder of OBC-3. Conversion scheme of Old Russian Balancing Beams to

Newly installed Danieli Balancing Beams for Roughing Stand in PM.

Page 13: DnD Presentation SEPT2014

PAST HIGHLIGHTS

Normalizing furnace No. 2 for Plate Mill. Zero leak door for CO Battery 3&4. Pusher Ram of Coke-Oven battery No. 9 and 10. Chimney stack assembly for converter shop. Four-directional Hydraulic Press for Rail finishing. EMS Mould Assembly for Bloom Caster (CCS). Stripping of BSP Ingots at BSL.

Page 14: DnD Presentation SEPT2014

CHALLENGES

The new machines of 7MT are multi disciplinary in nature.

Availability of spares for reverse engineering is difficult along with inadequate technical data.

The quantum of jobs from 7MT will be huge. To maintain the momentum of department with

lean man power at executive and non-executive level.

Page 15: DnD Presentation SEPT2014

CONSTRAINTS

Separation rate is very high in comparison to intake.

Absence of latest tools Like 3-D Software, Basic Analysis Tools and Precise Measuring Tools.

Basic infra-structure and training in D&D is inadequate with reference to current 7MT capacity of our plant.

Page 16: DnD Presentation SEPT2014

INITIATIVES

Adoption of DMS & online availability of drgs. Developing Tender Drawing/Specification to procure

equipment along with their fast consuming spares. Drawing development at Shop’s end for simple

parts. Procurement of 3D software. Pursuing Management for posting 7 (newly

recruited) Draftsmen in D&D Department.