PENGAWASAN PENGAWASAN TAPAK PROJEK & KERJA TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR PIAWAI KERJA BANGUNAN JKR – 2005 2005 Ir. Muhammad Ir. Muhammad Azman Azman bin bin Jamrus Jamrus, CKSAJ, , CKSAJ, Ibu Ibu Pejabat Pejabat JKR Malaysia JKR Malaysia DO’S & DON’TS DO’S & DON’TS

Do & Dont In Construction Works

  • Upload
    jazpg

  • View
    653

  • Download
    42

Embed Size (px)

Citation preview

Page 1: Do & Dont In Construction Works

PENGAWASAN PENGAWASAN TAPAK PROJEK & KERJA TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR PIAWAI KERJA BANGUNAN JKR –– 20052005

Ir. Muhammad Ir. Muhammad AzmanAzman bin bin JamrusJamrus, CKSAJ, , CKSAJ, IbuIbu PejabatPejabat JKR MalaysiaJKR Malaysia

DO’S & DON’TSDO’S & DON’TS

Page 2: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do’s & Don’tsDo’s & Don’ts

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 3: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do’s & Don’tsDo’s & Don’ts

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 4: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Kompleks Pelancongan, Pulau Banding, Gerik Kompleks Pelancongan, Pulau Banding, Gerik

Project collapse upon completion

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 5: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Persimpangan Bertingkat Ke Projek Perumahan SP Setia, NKVE Persimpangan Bertingkat Ke Projek Perumahan SP Setia, NKVE

Bridge collapse during construction

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 6: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Kompleks Equestrian, Terengganu Kompleks Equestrian, Terengganu

Structures collapse during construction

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 7: Do & Dont In Construction Works

KURSUS PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

SMK Raja Muda, SelangorSMK Raja Muda, Selangor

Building failed earlier than design life

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 8: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do have a proper detailing for cantilever concrete gutter ...

SMK Raja Muda, SelangorSMK Raja Muda, Selangor

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 9: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

IKBN Kinarut, Sabah

Do consider differential settlement of earth filling & piled structures

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 10: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

MRR2MRR2

Do have a proper design for all D&B project

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 11: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Hospital Cheras

Don’t cut excessively trees

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 12: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Pembangunan Kampus II INSPEN, SepangPembangunan Kampus II INSPEN, Sepang

Don’t let our project cause floods

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 13: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Don’t have services blocking our road side drains

Don’t let drain be left un-maintained

Pembangunan Kampus II INSPEN, SepangPembangunan Kampus II INSPEN, Sepang

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 14: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Pembangunan Kampus II INSPEN, SepangPembangunan Kampus II INSPEN, Sepang

Don’t let silt traps be left un-maintained

Don’t have large areas without silt traps

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 15: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Hospital CherasHospital Cheras

Don’t have silt trap poorly done

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 16: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Hospital CherasHospital Cheras

Don’t have temporary earth drain w ith deep & steep slope

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 17: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Hospital CherasHospital Cheras

Don’t let the site muddy with no temporary drainage provided

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 18: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Status Kualiti Kerja TanahStatus Kualiti Kerja Tanah

• Kaedah “Sand Replacement Method”telah dijalankan bagi ujian“compaction test”dikawasantambakyang memerlukan “compaction”.

• (90 % of relative maximum density test)

Ujian Pemadatan (compaction test)

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 19: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

KerjaKerja--kerja Cerunkerja Cerun

Cerun yang sempurna

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 20: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Pemasangan “Capping Beam ” tidak sempurna dan“unreinforced ” untuk menahan tekanan dari “strutting”

Sekiranya‘horizontal reinforcement ’ tidak mencukupi tekanan mendatar (lateral force) yang dikenakan kepada sisi “capping beam” akan menyebabkan “concrete crushed”

Kerja-Kerja Pemasangan U-Drain

Status Kualiti KerjaStatus Kualiti Kerja --kerja Perparitankerja Perparitan

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 21: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Lukisan bagi ‘Capping Beam ’

Status Kualiti KerjaStatus Kualiti Kerja --kerja Perparitankerja Perparitan

Kerja-Kerja Pemasangan U-Drain

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 22: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Tiada ‘berm’ dan ‘toe drain ’ walaupun ketinggian melebihi 5 meter.

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 23: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do’s & Don’tsDo’s & Don’ts

Unsuitable material yang telah dikorek dan dikumpulkan sebelum dikeluarkan dari tapak...

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 24: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek KK2 Taiping, PerakProjek KK2 Taiping, Perak

Rekabentuk Sistem Saliran Permukaan Berpandukan MASMA : Bio-ecological Drainage System(BIOECODS)

Do have project like this ~ Retention pond designed as a recreational area

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 25: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek KK2 Taiping, PerakProjek KK2 Taiping, Perak

Perimeter Grass Swale

Rekabentuk Sistem Saliran Permukaan Berpandukan MASMA : Bio-ecological Drainage System(BIOECODS)

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 26: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

JPJ Langkawi, Kedah.JPJ Langkawi, Kedah.

Don’t let piles be driven w ithout looking at BQ (pre boring specified)

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 27: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

ASWARA, Kuala LumpurASWARA, Kuala Lumpur

Don’t simply cut slopes w ithout geotechnical advice

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 28: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Pembinaan Jambatan Di Atas Sungai Pahang Chenor , Maran, PahangProjek Pembinaan Jambatan Di Atas Sungai Pahang Chenor , Maran, Pahang

Do have concrete for bored piles poured at least 1000mm above cut-off level.

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 29: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do look at Construction Draw ing

Istana Negara, Jalan Duta, Kuala Lumpur .Istana Negara, Jalan Duta, Kuala Lumpur .

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 30: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Don’t let contractor do w hatever he likes

Istana Negara, Jalan Duta, Kuala Lumpur .Istana Negara, Jalan Duta, Kuala Lumpur .

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 31: Do & Dont In Construction Works

KURSUS PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do look at Construction notes...

Istana Negara, Jalan Duta, Kuala Lumpur .Istana Negara, Jalan Duta, Kuala Lumpur .

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 32: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

At Construction Site

Istana Negara, Jalan Duta, Kuala Lumpur .Istana Negara, Jalan Duta, Kuala Lumpur .

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 33: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Don’t let be pad foundation jeopardised

Istana Negara, Jalan Duta, Kuala Lumpur .Istana Negara, Jalan Duta, Kuala Lumpur .

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 34: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Jabatan Kecemasan Hospital Tengku Ampuan Rahimah, Klang SelangorJabatan Kecemasan Hospital Tengku Ampuan Rahimah, Klang Selangor

Pemasangan Papak Pra-tuang

Don’t cut holes/voids in Precast Slabs at site. It should be specified and done at the factory with QC by manufacture.

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 35: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

UiTM SelayangUiTM Selayang

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 36: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Klinik Kesihatan Jenis 2 (KK2) Senaw ang, Negeri SembilanProjek Klinik Kesihatan Jenis 2 (KK2) Senaw ang, Negeri Sembilan

Pemasangan Dinding Bata

Don’t have masonry walls laid for stiffener without tie rods and exmat at every 4 layers...

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 37: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

SMK Teluk Cempedak, PahangSMK Teluk Cempedak, Pahang

Don’t have poorly done formwork with less of grout...

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 38: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Pembinaan Pusat Latihan POLIS (PULAPOL), P. Langkaw i, KedahPembinaan Pusat Latihan POLIS (PULAPOL), P. Langkaw i, Kedah

Hostel Block ~ Don ’t have brick w alls with no stiffeners

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 39: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek UIA(Bangunan Farmasi), Kuantan Don’t let huge trusses be mishandled

Projek Institut Latihan Diplomasi dan Hubungan Luar Nagara, Wisma Putra KL Not handled properly

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 40: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Sekolah Kebangsaan Bintong, Pulau PinangSekolah Kebangsaan Bintong, Pulau Pinang

Don’t have design fault (Local Buckling)

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 41: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Pejabat Agama, Dungun, Terengganu.

Don’t install of roof tiles w ithout proper wall plate (wooden peg left in place)

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 42: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

ADTECH, Taiping, Perak.ADTECH, Taiping, Perak.

Don’t let beam designed without reference to truss design

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 43: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Stiffener were not built

ADTECH, Taiping, Perak.ADTECH, Taiping, Perak.

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 44: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Dewan Makan Universiti Islam Antarabangsa (2004)Projek Dewan Makan Universiti Islam Antarabangsa (2004)

• Agihan genting konkrit secara sekata• Pembinaan ‘wall plate’ yang sempurna

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 45: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Sekolah Menengah Simpang Ampat, Seberang Perai SelatanSekolah Menengah Simpang Ampat, Seberang Perai Selatan

Don’t let truss sit directly on slab subjected to overflowing water

• Improper maintenance• Anti-rust specification• Signs corrosion

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 46: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Mahkamah Kuala LumpurProjek Mahkamah Kuala Lumpur

Don’t sit heavy light fitting directly on ceiling

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 47: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Don’t let ceiling hang by wires

Projek Mahkamah Kuala LumpurProjek Mahkamah Kuala Lumpur

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 48: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Jalan Masuk Sisa Toksid Bukit Nenas Negeri Sembilan Projek Jalan Masuk Sisa Toksid Bukit Nenas Negeri Sembilan

Don’t backfill earthwork from one side only

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 49: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Membina Jalandan Jambatan Kedua Permas Jaya, Johor Bahru Projek Membina Jalandan Jambatan Kedua Permas Jaya, Johor Bahru

Do read draw ing & specification Joint in adjacent sheaths shall be staggered by at least 300mm

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 50: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do have comman sense. Prestressing tendon not protected/covered from weather with water proofing material to avoid corrosion.

Projek Membina Jalandan Jambatan Kedua Permas Jaya, Johor Bahru Projek Membina Jalandan Jambatan Kedua Permas Jaya, Johor Bahru

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 51: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Pembinaan Jambatan No. FT005/252/80, Laluan Persekutuan 5, Alor Gajah, MelakaPembinaan Jambatan No. FT005/252/80, Laluan Persekutuan 5, Alor Gajah, Melaka

Don’t certify a project completed. Starter bars there, but intermediate diaphragm not constructed.

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 52: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Cadangan Penggunaan Semula ‘Tie Frame’ MRRII sebagai jejantas pejalan kaki di Cadangan Penggunaan Semula ‘Tie Frame’ MRRII sebagai jejantas pejalan kaki di Laluan Persekutuan 5, Seksyen 446, Di Hadapan Sek. Keb. Sementa, KlangLaluan Persekutuan 5, Seksyen 446, Di Hadapan Sek. Keb. Sementa, Klang

Water pipe was laid by punching through the w all of roads side drain.

Deviation of anchor bolts deviated from the centreline of pile cap.

Don’t have poorly constructed works

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 53: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Jambatan Sungai Kemaman TeregganuJambatan Sungai Kemaman Teregganu

Do be careful w hen you have high embankment on soft soil

Embankment fill has been removed

Abutment ‘B’ was shifted 150mm towards river due slope failure of approach embankment.

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 54: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Membina Jambatan Baru Bersebelahan Jambatan Merdeka : Pakej C1Membina Jambatan Baru Bersebelahan Jambatan Merdeka : Pakej C1

Sagging of walk way slab

Tranverse beam not constructed below walk way slab (Not following construction drawing)

Do read construction drawing

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 55: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Arrangement of reinforcement for tranverse beam not follow ing construction drawing.

Insufficient reinforcement anchorage length provided at arch beam.

Membina Jambatan Baru Bersebelahan Jambatan Merdeka : Pakej C1Membina Jambatan Baru Bersebelahan Jambatan Merdeka : Pakej C1

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 56: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do use steel formw orks to produce high quality of concrete finishing.

Projek Pembinaan Jambatan Di Atas Sungai Pahang Chenor , Maran, PahangProjek Pembinaan Jambatan Di Atas Sungai Pahang Chenor , Maran, Pahang

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 57: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Piers: Good concrete finishing

Projek Pembinaan Jambatan Di Atas Sungai Pahang Chenor , Maran, PahangProjek Pembinaan Jambatan Di Atas Sungai Pahang Chenor , Maran, Pahang

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 58: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do have a design for scaffolding certified by PE.

Projek Pembinaan Jambatan Di Atas Sungai Pahang Chenor , Maran, PahangProjek Pembinaan Jambatan Di Atas Sungai Pahang Chenor , Maran, Pahang

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 59: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Jln Lingkaran Luar Butterw orth : Pakej1B Projek Jln Lingkaran Luar Butterw orth : Pakej1B –– Jambatan Sungai Perai (BORR)Jambatan Sungai Perai (BORR)

QUALITY CONTROL DURING CONSTRUCTION

The segments were water cured for fourteen (14) days, followed by the application of a curing compound for a further seven (7) days. In this period of curing, the segments were protected from direct w ind and sun in the curing chamber .

Curing of segment with automatic sprinkling system

Curing of segment with mist (fogging)

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 60: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Jln Lingkaran Luar Butterw orth : Pakej1B Projek Jln Lingkaran Luar Butterw orth : Pakej1B –– Jambatan Sungai Perai (BORR)Jambatan Sungai Perai (BORR)

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 61: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Jln Lingkaran Luar Butterw orth : Pakej1B Projek Jln Lingkaran Luar Butterw orth : Pakej1B –– Jambatan Sungai Perai (BORR)Jambatan Sungai Perai (BORR)

View of Twin Leaf Pier Ribbed Finishes

General View of The Ramp

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 62: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Projek Jln Lingkaran Luar Butterw orth : Pakej1B Projek Jln Lingkaran Luar Butterw orth : Pakej1B –– Jambatan Sungai Perai (BORR)Jambatan Sungai Perai (BORR)

Final Connection of Main Segments And Site Frames...

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 63: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do’s & Don’tsDo’s & Don’ts

Do understand our CONTRACTDo understand our CONTRACT

• Obligation of the Government

• Obligation of the Contractors

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 64: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do & Don’tsDo & Don’ts

Do look at DRAWINGSDo look at DRAWINGS

• Construction Drawings

• Details

• Notes

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 65: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do’s & Don’tsDo’s & Don’ts

Do look at Do look at BQ, MOM & SPECIFICATIONSBQ, MOM & SPECIFICATIONS

• Method of Construction

• Quality of finish product

JabatanJabatan KerjaKerja Raya MalaysiaRaya Malaysia

Page 66: Do & Dont In Construction Works

PENGAWASAN TAPAK PROJEK & KERJA KONKRIT BERDASARKAN SPESIFIKASI PIAWAI KERJA BANGUNAN JKR – 2005

Do’s & Don’tsDo’s & Don’ts

THANK YOUTHANK YOU