DOCUMENT RESUME ED 428 529 EF 005 311 TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May 19, 1998. INSTITUTION Alaska State Dept. of Education, Juneau. PUB DATE 1998-00-00 NOTE 69p. PUB TYPE Guides Non-Classroom (055) EDRS PRICE MF01/PC03 Plus Postage. DESCRIPTORS Administrative Policy; Elementary Secondary Education; *Grants; *Program Proposals; Public Schools; School Districts; State Aid; *Workshops IDENTIFIERS *Alaska; *Capital Investment Needs ABSTRACT This workshop addresses the application process for capital improvement funding from the state, e.g., who should apply, applicant eligibility and evaluation criteria, the types of funding available, and project specifics to be included in application submissions. The evaluation and scoring process of applications is explained followed by the lessons that have been learned from past application reviews that will help make the process more complete and fair. Attachments include the application form for funding (Capital Grant or State Aid for Debt Retirement) and instructions for its completion. Appendices provide a breakdown of the phases of capital improvement projects and give explanations behind the application process that include the categories of the grants available, project cost estimates, definitions of maintenance, the current law regarding waiver of participating share/in-kind contributions, and descriptive categories of the types of spaces to be added or improved. (GR) ******************************************************************************** * Reproductions supplied by EDRS are the best that can be made * * from the original document. * ********************************************************************************

DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

DOCUMENT RESUME

ED 428 529 EF 005 311

TITLE Capital Improvement Project Workshops: Anchorage--May 15,1998; Juneau--May 19, 1998.

INSTITUTION Alaska State Dept. of Education, Juneau.PUB DATE 1998-00-00NOTE 69p.

PUB TYPE Guides Non-Classroom (055)EDRS PRICE MF01/PC03 Plus Postage.DESCRIPTORS Administrative Policy; Elementary Secondary Education;

*Grants; *Program Proposals; Public Schools; SchoolDistricts; State Aid; *Workshops

IDENTIFIERS *Alaska; *Capital Investment Needs

ABSTRACTThis workshop addresses the application process for capital

improvement funding from the state, e.g., who should apply, applicanteligibility and evaluation criteria, the types of funding available, andproject specifics to be included in application submissions. The evaluationand scoring process of applications is explained followed by the lessons thathave been learned from past application reviews that will help make theprocess more complete and fair. Attachments include the application form forfunding (Capital Grant or State Aid for Debt Retirement) and instructions forits completion. Appendices provide a breakdown of the phases of capitalimprovement projects and give explanations behind the application processthat include the categories of the grants available, project cost estimates,definitions of maintenance, the current law regarding waiver of participatingshare/in-kind contributions, and descriptive categories of the types ofspaces to be added or improved. (GR)

********************************************************************************* Reproductions supplied by EDRS are the best that can be made *

* from the original document. *

********************************************************************************

Page 2: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

U.S. DEPARTMENT OF EDUCATION

lill Office of Educational Research and ImprovementEDUCATIONAL RESOURCES INFORMATION

CENTER (ERIC)

la This document has been reproduced asreceived from the person or organizationoriginating it.

O Minor changes have been made toimprove reproduction quality.

PERMISSION TO REPRODUCE ANDDISSEMINATE THIS MATERIAL HAS

BEEN GRANTED BY

K. R. Crane

Points of view or opinions stated in thisdocument do not necessarily representofficial OERI position or policy.

TO THE EDUCATIONAL RESOURCES.

INFORMATION CENTER (ERIC)1

Page 3: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

ALAS A STATE LIBRARY

11111111 113 3500 00271 5597

FY00 CIP ApplicationWorkshop

ClPOverview

Eligibility

Scoring

FY00 Application

ApplicationInstructions

Summary

Question &Answer

ApplicationAppendices

resen

Michael Morgan, PMP Tim Mearig, AlAFacilities Manager Architect

Alaska Department of Education

Page 4: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

FY00 CIP ApplicationWorkshop Schedule

CIP Overview 9:30 9:50CIP Changes & New Publications 9:50 10:00The FY00 Application 10:00 10:50Break 10:50 11:00The FY00 Application (continued) 11:00 12:00Lunch 12:00 1:00

Application Question & Answer 1:00 1:30

FY00 CIP Scoring 1:30 3:00Break 3:00-3:10Lessons Learned 3:10 3:40Scoring Question & Answer 3:40 4:00

Facilities Staff

Michael Morgan, PMPFacilities [email protected]

Jack KinnunenProject [email protected]

Tim Mearig, [email protected]

Nathan CoffeeArchitect [email protected]

Division Support Staff

Julie WatkinsDivision [email protected]

Sydney StredickeAdministrative [email protected]

Alaska Department of Education - Education Support Services/Facilities - 801 W. 10th Street, Suite 200 - Juneau, AK 99801-1894

1-

Page 5: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

CIP Application Workshop

CIP Overview

FY00 Application

ApplicationInstructions

Eligibility

Scoring

Summary.

Question &Answer

ApplicationAppendices

Michael Morgan, PMP Tim Mearlg, AlAFacilities Manager Architect

CIP Application WorkshopTopics

Overview of the ProcessWhat the Current Process Is

Changes From last year to this yearCIP Facts

The Application

Scoring and Ranking

Summary, Questions & Answers

5Alaska Department of Education

Presentation:CIP Overview

FY00 CIP Application Workshop

Page 6: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

CIP Overview

Why have a CIP process?o Establishes the spectrum of need,

statewide

Prioritizes the needs of the state

o Provides a vehicle to seek funding

o Currently required by statute2

CIP Overview (continued)

Who should apply?

0 School districts desiring to participatein the state grant program

» Districts having projects which fit thestatutorily allowed categories

3

Alaska Department of Education FY00 CIP Application Workshop

Page 7: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

The Current Process

Major criteria set in statute

Scoring criteria set by statutorycommittee» Used committee recommendations

» Looked at process used by other states» Fine-tuned using district comments

FY00 application updated for clarity4

Alaska Department of Education FY00 CIP Application Workshop

Page 8: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Presentation:FV00 Changes/New Publications

Regulation Revision Impacton the CIP Process

Allows use of priority for a 2nd yearClarifies criteria for approval ofadditional space for schools

Formalizes the "mixed scope" conceptRevises time frame for recovery ofdistrict capital expenditures

5

Regulation RevisionUpdated Publications

Site Selection Criteria and EvaluationGuideline

Guidelines for School EquipmentPurchases

Swimming Pool Guidelines

6

Alaska Department of Education FY00 CIP Application Workshop

Page 9: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

FY00 Application RevisionHighlights

Renumbered questions to group likeinformation together

Changed question 11 to request theyear a facility was built vs. its ageRevised tables to coordinate more fullywith the DOE Cost Model

7

FY00 Application RevisionsHighlights (continued)

Established new standards for schoolequipment based on per-studentamounts

Changed terminology to clarify thatpopulation and unhoused projectionsare based on ADM

Introduced new tools for CIPpreparation publications & guidelines

8

Alaska Department of Education FY00 CIP Application Workshop

Page 10: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

FY 99 CIP Facts

210 ApplicationsSubmitted

Number of RankedProjects» School Construction 92» Major Maintenance -100» Ineligible 16

» Duplicates 2

0 Ineligible

0 SchoolConstruction

:II MajorMaintenance

0 Total Proposals

0 100 200

9

Alaska Department of Education10

FY00 CIP Application Workshop

Page 11: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Presentation:The FY00 Application

FY00 CIP Application

To Start:» Read the instructions and appendices» Answer the questions completely

To Finish:» Review the application as if you know

nothing about the project» Make sure it "makes sense", is

"reasonable" and is complete!

» Sign it and send it to the department10

Type of Project and FundingRequest

Declare Type of Funding Requested.Grant Funding or Aid for Debt Retirement

Indicate which category represents theprimary purpose of the project.

This selects the list the project is on: SchoolConstruction or Major Maintenance [Does NOTeffect scoring]

Specify which phases of the project are to becovered by this funding request.

Planning, Design and/or Construction11

Alaska Department of Education FY00 CIP Application Workshop

Page 12: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Basic Eligibility Requirements(Required by Statute)

Six-year capital improvement plan

Description of fixed asset inventory

Proof of replacement cost propertyinsurance

12

More Basic EligibilityRequirements

Preventive Maintenance ProgramDescription

» Points awarded based on the functionalityand effectiveness of the program.evidence that the program is more than routine

or custodial maintenance

show by example how the "preventive" portionof the program works and how it is effectiveInclude all aspects of building maintenance

» Basic evaluation is district-wide13

Alaska Department of Education 12 FY00 CIP Application Workshop

Page 13: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Basic Eligibility Continued

Proof of capital project» Refer to AS 14.11.013 (b)(3) to establish

that the project is a verified capital projectand not preventive maintenance, routinemaintenance, or custodial care

14

District Facility Information(Actuals)

Average five-year replacement value ofall school facilities district-wide

Average annual district-widemaintenance expenditure for the lastfive years.

15

Alaska Department of Education t 1 3FY00 ClP Application Workshop

Page 14: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

District Facility Information(Excluded Items)

Exclude value of school contents

Exclude value of teacher housing

Exclude expenditures forcommunications, insurance, utilities andteacher housing

16

Existing Facility Information

o Specify the plan for existing facility» If the facility will be abandoned, address

the issues

» Proposed demolition should be consideredas part of the project cost

o Year-built and size of the existing facility+ Include year of occupancy and gross

square footage of each addition to theoriginal facility

17

Alaska Department of Education FY00 CIP Application Workshop

Page 15: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Related Funding

Other AS 14.11 grants already issued insupport of this project» DOE grant #, phase, percent complete

This gives value to projects which havereceived prior funding

Waiver of participating share» In accordance with AS 14.11.008(d) and 4

AAC 31.023 (d), See appendix E.» Possible 'in-kind' contributions should be

considered 18

Project Information

Project's ranking on district's six-yearCIP plan

» The unique number given to eachdiscreet project in a priority sequenceapproved by the district school board.

19

Alaska Department of Education FY00 CIP Application Workshop

Page 16: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Impact on Multi .le FacilitiesIf the project will result in additionaleducational space and will servestudents of the same grade levels ascurrently housed or projected to behoused in other schools...INCLUDE» funding community impacted by this project» student population in each affected grade

» square footage allocated for each grade inexisting schools 20

Necessary Details DefiningEmergency of Project

nature of emergency

facility condition related to the emergencythreat to students and staff

consequence of continued utilization of thefacility

individuals or groups affected by the conditiontemporary mitigation the district has effectedextent of eligibility for insurancereimbursement or emergency funding fromany state or federal agency 21

Alaska Department of Education FY00 CIP Application Workshop

Page 17: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Site Issues New Site

Acquisition of additional land» expansion of an existing school site using

property adjacent to, or in close proximityto, existing school site

Utilization of a new school site» use of a site project previously acquired by

the district, or a new site acquired as aresult of this application and not previouslyutilized as a public school

22

Site Issues Existing Site

Relationship to existing structure

Varying topographic factors or soilsconditions across the site

Impact on bordering development,future expansion and infrastructurerequirements

23

Alaska Department of Education FY00 CIP Application Workshop

Page 18: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Background FacilityInformation

School facility appraisal-Optional for FY00

» districts may find an appraisal useful inestablishing a facility's general deficiencies

Facility condition survey-Optional for FY00» a technical survey of facilities and buildings

to determine compliance with standardsand codes for safety, maintenance, repairand operation

24

Project Scope EvaluationRequirements

Basic starting point for projectevaluation

The description of the project impactsthe evaluation of:» Whether the project meets the definition of

one of the acceptable categories ofprojects

» If the project is an "approvable project"

» Cost and its reasonableness25

Alaska Department of Education 18 FY00 CIP Application Workshop

Page 19: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Project Scope Description

Detailed description of project» Increasingly detailed as project

phases advance

» Include responses to and referencesto previous questions that apply

» Description of the scope of the projectand what the project will accomplish

» Deal with demolition in detail if it is aproject issue 26

Project ScopeDocumentation

If documentation is attached,descriptions of project need, justificationand scope can be referenced

Include documentation of the conditionsjustifying the project

Be complete: provide a copy ofdocuments which are discussed orreferenced

27

Alaska Department of Education FY00 CIP Application Workshop

Page 20: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Project Scope Relationships

Review the parts of the application forconsistency

Compare project scope elements withthe educational specification, facilitycondition survey, and facility appraisal

Review the cost estimate with the scopeto assure that they match

28

Project Scope Cost

Cost Estimatesinformation should support meaningfulevaluation of :project cost

relationship between project cost andoperational cost savings

reasonableness of the cost estimatelife cycle cost analysis

cost/benefit analysis

29

Alaska Department of Education FY00 CIP Application Workshop

Page 21: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

j

Project Scope Cost Analysis

Include detailed cost/benefit analysis_ and a life cycle cost analysis

» Required for new-in-lieu of renovation

» Strongly suggested for all projects

Other Tools» Value analysis

» Value engineering

30

Project Cost EvaluationRequirements

The Department is charged with lookingat the "reasonableness andcompleteness" of the cost estimate

Evaluation of the relationship (if any)between the cost of the project andoperational savings is also made.

31

Alaska Department of Education 21 FY00 CIP Application Workshop

Page 22: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Project Cost "ReasonablenessEvaluation"

Reasonable is judged by standards(Cost model, national estimating,Alaskan experience)

The more information provided, theeasier it is to evaluate "reasonableness"

Identifying sources is beneficial

32

Project Cost Estimates

Table 1. Total Project Cost Estimate» Percentages based on construction cost.

Refer to Appendix C

Table 2. Construction Cost Estimate» Enter cost and gross square feet for new

construction and renovation

33

Alaska Department of Education 22FY00 CIP Application Workshop

Page 23: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Project Cost Estimate(Continued)

Part 1: Total Project Cost Estimate» Construction estimate

» "Factored" elements based on constructioncosts = 100%

» Technology: As part of equipment orseparate detailed estimate required

» Project Contingency: Applies to totalproject for design unknownsShould decrease as design progresses

34

Project Cost Estimate(Continued)

Part 2: The Construction Estimate» Split out new construction from renovation

» Document conditions which causeunusually high costs

» Contains its own contingency do not addto project contingency

35

Alaska Department of Education 23 FY00 CIP Application Workshop

Page 24: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Project Cost Estimate(Continued)

Part 3: The DOE Cost Model» New 7th Edition November, 1997

» Renovation format revised to fit buildingsystems

» Costs updated to incorporate 1997 buildingseason

36

Project Cost Estimate(Continued)

Part 4: Use of the Cost Model» Designed for conceptual estimating

» Should not be used when better 'quality'estimates are available

» Needs to be checked for reasonableness

» Common errors double entryA contractor estimate will already be adjustedfor a particular regionContractor estimates have contingency, profit,etc. 37

Alaska Department of Education 24 FY00 CIP Application Workshop

Page 25: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Funding Community &Average Daily Membership

Include if your application requests newspace

Unhoused must be on a fundingcommunity basis» Key issue is, "What grades are affected?"

(Question 14)

» Square footage for this section is uniquebased on 4 AAC 31.020

38

Funding Community Workin Progress

Within a funding community, describeany additional square footage funded orapproved by local voters» student capacity

» additional DOE net square feet

» grade levels to be served

39

Alaska Department of Education.25

FY00 CIP Application Workshop

Page 26: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Funding CommunityExisting

Describe funding community impactedby project» DOE net square footage of affected

school(s)

» equivalent grade level ADMs (K-6,7-12, and total)

40

ADM & Current Unhoused

Document unhoused students currentlyin the funding community by providing» DOE net square footage

» ADM population: by grade and by school» capacity calculation for each school in the

funding community serving grade levelsimpacted by the proposed projectcapacity = DOE sq ft divided by allowable sq ft

per student (based on DOE Space Guidelines)41

Alaska Department of Education 26 FY00 CIP Application Workshop

Page 27: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Student PopulationProjections

Two-year enrollment projection coverstwo fiscal years beyond most recentstudent count for funding community(should be FY98 count)

Five-year post-occupancy ADMprojection for funding community» beginning with first year facility will be

occupied by students

» typically this would be seven years afterthe CIP application date 42

Student Population ProjectionMethod

Specify by which method studentpopulation projections were calculated» If calculations produce significant

difference from past five-year trends in theenrollment projections JUSTIFY THEVARIANCE

» If a simple, straight line projection is beingmade, years that show large increases ordeclines should be explained or discardedfrom the data 43

Alaska Department of Education 27 FY00 CIP Application Workshop

Page 28: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Project Space Equation

Tell us what space you have» How its use is allocated

» Should match to questions #11 and #21 fortotals

What space is being renovatedWhat new space is being built, andWhat space is being demolished orsurplused

44

Project Space Equation (cont.)

Table 3. Applies to all projects that addspace or change utilization of existingspace» The amount of space to remain "as-is"

column, plus the amount of space to berenovated, plus the new or additionalspace, minus existing space to beabandoned or demolished, equals totalspace when project is completed.

45

Alaska Department of Education FY00 CIP Application Workshop

Page 29: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Alternative Facilities andOptions

List any alternative regional, communityand school facilities in the_area that arecapable of housing students» Refer to AS 14.11.013 (b)(4)

Describe two or more viable options tothis project that have been considered» if project proposes to add new or additional

space, districts must consider attendancearea boundary changes

46

Attachments and Certification

Indicate that all necessary items areattached to the application» Attachments designated as required must

be included for the application to beconsidered eligible.

» Required items are necessary for BASICeligibility

MUST be signed & certified by thesuperintendent

47

Alaska Department of Education FY00 CIP Application Workshop

Page 30: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Instructions and Appendices

Important for a complete understanding

Provides both instructions and direction

Definitions are provided as guidelines

48

Final Review

The application should be viewed as awhole unit:» When finished, ask "does each part of this

make sense?"

» And, "is this reasonable as a whole?"

Finally:» Are all of the items required for eligibility

included?

» Is the application signed?49

Alaska Department of Education 30 FY00 CIP Application Workshop

Page 31: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

_Presentation:

Eligibility and Scoring

Eligibility, Evaluation andScoring

The current system implementsstatutory requirements

Developed by the Bond Reimbursementand Grant Review Committee(Established in statute AS 14.11.014)Scoring covers the full range of projectsfrom conceptual to construction ready

51

Project Eligibility

Based on statutory requirements

Eligibility criteria was updated for thisyear

Not meeting one or more of the criteriais the reason a project would not beeligible for funding

52

Alaska Department of Education FY00 ClP Application Workshop

Page 32: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Types of Scoring: Objective

Objective» 9 scoring elements, 245 possible points

» Based on information submitted in the CIPApplication

» Information verified with DOE filesUses audits and historical files for sources

53

Types of Scoring: Subjective

Subjective» 8 scoring elements, 280 possible points

» Based on information submitted in the CIPApplication

» Independently scored by at least threerators

54

Alaska Department of Education FY00 CIP Application Workshop

Page 33: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Objective Scoring Issues

The following objective scoringelements cause the most difficulty:» Adequacy of fixed asset inventory: 3

award levels0 points: if the district says nothing,5 points: district includes a statement aboutsystem,

10 points: districts includes an audit pageshowing no exceptions

55

Objective Scoring Issues(continued)

» Previous funding: Only state funds count» Planning & Design points: Revised last

yearThree award levels

Planning

Design: Schematic Level CompleteDesign: Design Development Level Complete

» Unhoused Students: applications usuallyneed more detail

56

Alaska Department of Education FY00 CIP Application Workshop

Page 34: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Subjective Scoring Issues

Scoring is subjective by rators

Evaluation is weighted for 'mixed-scope'projects

Judges the full range of possibleprojects

57

Subjective Scoring Overview

Scores the full range of projectsubmittals, from:» conceptual to,

» construction ready

Evaluation uses» material in application,

» attachments,

» material submitted by September 1

58

Alaska Department of Education FY00 CIP Application Workshop

Page 35: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Subjective Scoring: Effectivenessof the preventive maintenance program

Evaluation of effectiveness of theprogram» Focuses on results

» Considers how comprehensive theprogram is

Based on a total district evaluationMay be modified (up or down) for anindividual school

59

Subjective Scoring: Emergency

Scored only if a district declares anemergency

Evaluates information requested in theinstructions

Scoring weighted if project includesnon-emergency scope

60

Alaska Department of Education 35 FY00 CIP Application Workshop

Page 36: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Subjective Scoring: Seriousness oflife/safety and code conditions

Evaluates reported code conditionsbased on national code requirements

Considers seriousness of the listedcode conditions

Weighted in mixed scope projects

61

Subjective Scoring: Evaluation ofexisting space

Considers two factors: physical andfunctional

Considers how the space meetsprogram needs

Balances the type of programWeighted in mixed scope projects

62

Alaska Department of Education 36 FY00 CIP Application Workshop

Page 37: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Subjective Scoring: Cost estimate

Scoring covers the full range of possibleprojects

Looks at reasonableness andcompleteness

Considers the the cost benefit analysisConsiders the life cycle cost analysisConsiders sources of information usedand the level of detail provided

63

Subjective Scoring: Project costversus annual operational cost savings

Evaluates district provided informationConsiders project in a cost/benefitviewpoint

Emphasis is on data and analysis ratherthan opinion

Applies to all projects

Considers how the project showseffects on operational costs

64

Alaska Department of Education 37 FY00 CIP Application Workshop

Page 38: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Subjective Scoring: Alternativefacilities & options

Answers are often too brief

Sample Project: "Repair/Replace Roof"» Common responses to question

Fix the roofLet it totally fail

» Better/viable alternatives might be:Continue to patch the roof

Replace with a 15 year composite roofReplace with a 30 year EPDM roof

65

Subjective Scoring: Adequacy ofdocumentation

Comprehensive evaluation of the totalpackage

Considers how well the providedinformation:» Answered application questions

» Facilitated understanding the project

Scoring applies to the full range ofeligible projects: conceptual toconstruction ready 66

Alaska Department of Education FY00 CIP Application Workshop

Page 39: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Other Issues

Phasing» Projects will be phased if:

Not ready for construction funding

Over $4 million dollarsScope not well defined especially re-models

» If the cost estimate is reasonable, phasedfunding will usually include:

40% of design40% of indirects

site costs 67

Alaska Department of Education39,

FY00 CIP Application Workshop

Page 40: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Presentation:Lessons Learned

CIP Application Workshop"Lessons Learned"

CIP Overview

FY00 Application

ApplicationInstructions

Eligibility

Scoring

..PresentersMichael Morgan, PMP

FaciiitieS Manager

Summary

Question &Answer

ApplicationAppendices

.

Tim Mearig, AIAArchitett

CIP Application Lessons LearnedApplication Issues

Areas For ImprovementProject Scope Tell us what you know about

your projects, explain fully

Be consistent - Make sure all of the pieces ofthe application address the same project

Fill out the application completely

Applications are not judged on the amount ofpaper submitted

72

40 1

Page 41: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

CIP Application Lessons LearnedOther Issues

Preventive Maintenance Plan Afterdescribing your plan, show how it is beingimplemented and examples of how it iseffective

How do the problems and offered solutionseffect the educational program? What doesit do for the kids? Tell us!

73

CIP Application Lessons LearnedScoring Issues

Objective ScoringMost often experienced negative impacts areblank responses to questions

Some problems occur when application dataisn't supported by other submittals to thedepartment. An example would be the annualaudits

74

411 2

Page 42: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

CIP Application Lessons LearnedScoring Issues

Subjective ScoringFacts and figures score better than unsupportedopinions

Reading the instructions are VERY important -"Options" an example of a question oftenpoorly answered

75

Summary/Questions andAnswers "Lessons Learned"

CIP Overview

FY00 Application

ApplicationInstructions

Eligibility

Summary

Scoring

ApplicationAppendices

Question &Answer

.

Presenteri. .

Michael Morgan, PMPFacilities Manager .

Tins A1AArchitect

, 42 3

Page 43: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Application for FundingCapital Grant or State Aid for Debt Retirement

For each funding request submit four complete copies of this applicationand two copies of each attachment.

Reference:FY00 CIP Application

School District Community

School Name

Project Name

**:.,7-'-' , -., -,..- - :1,1:::z, :,-,,::":;..,,-,:s7',:f n.....7,r .., --,m77.,,7 -- ;',"' ''''",:c:'1',' : ,

1 -TYPE.OPPROjEcT 'AND FUNDlisiG,REaUEST7, . ,,..1:.'i... : : .. . Z.Lt......itSir..=........"":f ...."....,...7.2. :.... '..'... t' ',......a.L....,.....L,.,_:::.,.......)..*, 1...::".,=-'..t.I..... -,!...

1. Type of funding requested (Choose only one funding source.)

0 Grant Funding 0 Aid for Debt Retirement (Bonding)

2a. Primary purpose of project (Choose only one category, per AS 14.11.013)

School Construction:

O Health and life-safety (Category A)

Unhoused students (Category B)

O Achieve operating cost savings(Category E)

D Improve instructional program(Category F)

Major Maintenance:

O Protection of structure (Category C)

O Building code deficiencies (Category D)

b. Phases of project to be covered by this funding request (Indicate all applicable phases)

Planning (Phase I) 0 Design (Phase II) 0 Construction (Phase III).

'BASIt-ELIGIBILITTREQUIREMENTS'

3. Has a six-year Capital Improvement Plan (CIP) been approved by the districtschool board?

(Refer to AS 14.11.011(b), attach a copy of the 6-year Plan.)

4. Does the school district have a functional fixed asset inventory system?(Refer to AS 14.11.011(b)(1), attach a description of the fixed assetinventory system and audit page(s) from the district's latest annualaudited financial statement.)

BEST COPY AVAILABLE

Form #05-95-017, Rev. 3198.

0 yes 0 no

D yes 0 no

Page 44: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

5. Is evidence of required insurance attached to this application or hasevidence been submitted as required to the department?

(Refer to AS 14.11.011(b)(2) .)

6. Does the district have a functioning and effective preventive maintenanceprogram?

(Refer to AS14.14.090(10) and AS14.11.011(b)(1), and attach a description ofthe preventive maintenance program that shows the program is bothfunctioning and effective.)

yes Ono

yes Dno

7. Is the project a capital improvement project and not part of a preventivemaintenance program or custodial care? D yes 0 no

(Refer to AS 14.11.011(b)(3), and if the answer is yes, attach astatement of why this is a capital project.)

DISTRICT 114FORMA11ON

8. What is the average replacement value of all school facilities district-wide for the last 5 years?

(Do not.include values for teacher housing.)

9. What is the average, annual district-wide maintenance expenditure forthe last 5 years?

(Do not include costs for teacher housing.)

EXIt11NG FACILMES

10. Will the existing facility be:

O renovated 0 added to 0 demolished 0 surplused 0 none of above(If the project will result in demolition or surplusing of state-owned or state-leasedfacilities, attach a detailed plan for transition and protection of state-owned or state-leased properties.)

11. What is the size of the original existingfacility and when was it constructed? yr. built GSF

What is the size of each addition to theoriginal facility and when were they eachconstructed?

BEST COPY AVAILABLE

Form #05-95-017, Rev. 3198.

yr. built GSF

yr. built GSF

yr. buift GSF

yr. built GSF

Total size GSF

Page 45: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

DT.UNDIN

12. What AS 14.11 administered grants have already been issued in support of this project?

DOE grant # Phase % completed

DOE grant # Phase % completed

0 No AS 14:11 grants have been issued in support of this project.

13. Is the district applying for a waiver of participating share? 0 yes 0 no(If the district is applying for a waiver, attach"ustification.)

PROJECTINFORMATIoN

14. What is the ranking of this project under thedistrict's six-year Capital Improvement Plan?

15. Does this project impact multiple facilities?(If the answer is yes, describe in the project descriptionand provide applicable data as identified in theinstructions.)

16. Is this project an emergency?(Refer to AS 14.011.013(b)(1) and the Instructions. Ifthe answer is yes,the project description shoulddescribe the nature of the emergency and actions thedistrict has taken to mitigate the emergency conditions.)

Ranking:

O yes 0 no

O yes 0 no

17. Will this project require acquisition of additional land orutilization of a new school site? 0 yes 0 no

(If the answer is yes, attach site description or siterequirements.)

18. Has a school facility appraisal been completed? 0 yes 0 no(If the answer is yes, attach 2 copies.)

19. Has a facility condition survey been completed?(If the answer is yes, attach 2 copies.)

BEST COPY AVAILABLE

5Form #05-95-017, Rev. 3/98.

O yes 0 no

Page 46: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

20. Project Description/Scope of Work:(Refer to AS 14:11.011(b)(1) and to the instructions accompanying this form.Appendices A and C accompanying the instructions may be particularly helpful.)

46Form #05-95-017, Rev. 3/98.

Page 47: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

21. Use the Department of Education's 7th edition Cost Model or an equivalent.(Percentages are based on construction cost. See Appendix C. If your project exceeds therecommended percentages, add a detailed justification for each item exceeding the percentage.rnmnIptinn nf thk fnr

'Table 1. TOTAL PROJECTCOST ESTIMATE

1 -it -, m Iv:Maidmum

:percent w/out -,.,..'jtistification

...All prior:.-AS 14:11:.. .

j..funding i

.; ,Current:.;Project',request .

:Percentageof

-conStruction .

.:total

Project total(ind l. all prior

AS.14.11funding)

ConstructionManagement'by Consultantby District/Borough

2-4%2-5%

Land ''Site Investigation 43 -

Design Services 6-8%Construction4 100%Equipment gb 0-7%Technology 4°Indirect/Administrationb 2-5%Percent for Art' 0.5 - 1%Project Contingency 3-5%

=,TotalViojeot Reqiiit ''',',.

1. Percentage is established by AS 14.11.020(c) for consultant contracts; show "in-house"management as a separate cost.

2. Include only if necessary for completion of this project.3. Exclude from percent calculation.4. Attach detailed construction cost estimate and life cycle cost if new-in-lieu-of-renovation.5. Includes Department of Education overhead and districtimunicipaYborough administrative costs.6. See the department's publication, Guidelines for School Equipment Purchases for per student and

percentage limitations without justification.

7. Required for all renovation and construction projects.

Table.Z.:;ZONSTRUCTION:COST.ESTIMATE- -,

(Enter costand sq: ft for eactitypepfconstruction:).NEWZONSTRUCTION: ',- :'RENOVATION

- , cost sq.;ft:'.. .:DgEuie; ,fco§t sq ., ft DOEuse,Instructional/Resource & Support

Teaching spacesGeneral Support areasSpecial requirements 7

Site work and utilitiesGeneral requirementsGeographic cost factorSize factorConstruction contingencyEscalationTOtateOstestimate

Explain in detail and justify special requirements.

Form #05-95-017, Rev. 3198.47 BEST COPY AVAILABLE

Page 48: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

If you have classified this project as Major Maintenance (Category C or D)and you are not including any new space,

please skip to question 29. If you are in doubt about the proper categoryof the proposed project, please fill in all the following questions.

Please note: All appliCaikinS requetting new Odditianal) space Must pr6 vide' the informationrequested in this section. For the purposes of this section, DOE SF is calculated in accordancewith 4 MC 31.020(e).

22. Within the funding community, is there any. work (other than thisproject) that is in progress, or that has been funded or approved bylocal voters?

(If the answer is yes, please provide information below aboutsize, student capacity, and grades to be served.)

Project Student capacityDOE SF Grades to be served

yes EJno

Project Student capacityDOE SF Grades to be served

23. Describe the funding community covered by this project, showing GSF of schools andequivalent grade level ADMs as necessary(K-6, 7-12, and total):

K-6 DOE SF ADM7-12 DOE SF ADM

Total DOE SF ADM

24. Are there unhoused students in the funding community?(If the answer is yes, please describe unhoused students bygrade level and total ADM, and attach calculations of unhousedstudents for each school in the funding community.

K-6 DOE SF Unhoused7-12 DOE SF Unhoused

orK-12 DOE SF Unhoused

yes Dno

Total DOE SF Unhoused

In lieu of data in the format above:for questions 23 and 24,-we are providingdetailed.attachments...:;;

Form #05-95-017, Rev. 3198.

ri yes El no

Page 49: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

25. What is the two-year ADM projection for the funding community?(Please attach copies of calculations.)

1 26. Please make a five-year post-occupancy ADM projection for the funding community:

K-6 7-12 K-6 7-12for FY : for FY :

for FY : for FY :

for FY :

1 27. Please indicate grade levels of students to be housed by or served in the facility proposed inthis project:

28. By which method were ADM projections calculated?

(Please attach copies of calculations, and justification for variance, if applicable.)

29. Completion of this table is mandatory for all projects that add space or change existingspace utilization. It is required for all construction (Phase III) projects, Category B (unhousedstudents) projects, or renovation projects. Once all applicable square footage has beenentered in columns A, I, II, III, and IV, project totals (column V) and equations can be calculatedas follows:

Column I + II + Ill = V also Columns I + II + IV = A

'Table 8. ,,pRoJ CT SPAC

1.-:::..': '''.',:::,:.'"'',.-:'.:.1 .,::,..''...i,.%'.. 7.-,,11F-,. ,, ,-,

.

'' :r.'.1..;.-111.:::''..', :: :".:'.

. - . --, - .,.

'..., :::f.':. Aft:

'f.t.'1.i.,'\,-..-:,,,,,,,,,,,Allr.,,eiltti.n9.:-..

.,:sp'adicE,,t

:;:::.:./".,......--, ,,,,,,:.,.:

.. 'tiiice- ..

.','..5.iitiIiiatloiv..-:irethain;--

,., ,

.

- $

:-.::.4enovatice:

PW:l..-4., _ .

a' 00064,',riatel,---;

To be..,

:i.a.0.0F10.00... ..., . .. ,

...itlemolished.'1:mis,Ti..,,,yi...,.,:i.'

17otal 'Spade'''..'e

:r project Is-,comPlete

ElementarylnstructionaVResource

.

SecondaryInstructional/ResourceSupportteachingspacesGeneralSupportBase sq. ft.totalSupplemen-tary space,. ...,,-, . ,,..

Total sq. ft. . ',.,..i.,:...,:i-t!..;*,j. .3,\'T-'...":: :::',.::-..-`,:. :-.,,,

.. .. .,..

BEST COPY AVAILABLE

Form #05-95-017, Rev. 3/98.

Page 50: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

ALTERNATIVE FACILITIES AND OPTIONS

30. List below any alternative regional, community, and school facilities in the area that arecapable of housing students.

(Refer to AS 14.11.013(b)(4) and attach additionalpages if necessary.)

31. Describe two or more viable options to this project that have been considered.(Refer to AS 14.11.013(b)(6) and attach additional pages if necessary)

Form #05-95-017, Rev. 3/98.

,501

Page 51: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

ATTACHMENTS

32. Please check to indicate all items that are attached to this application and note that two copiesof each attachment should be included. Attachments designated as Required must be includedfor the application to be considered complete. Some items may not be applicable to specificprojects.

O Six-year Capital Improvement Plan (CIP) (question 3); Required for eligibilityO Description of fixed asset inventory system (question 4); Required for eligibilityO Audit of fixed asset inventory system (question 4)O Description of preventive maintenance program (question 6)Di Transition plan for state-owned or state-leased properties (question 7)O Justification for waiver of participating share (question 12)O Evidence that project is a capital project and not preventive maintenance (question 15);

Required for eligibilityO Site description or site requirements (question 17)O School facility appraisal (question 18)O Facility condition survey (question 19)O Project description/scope of work(question 20); Required for eligibilityO Cost/benefit analysis (questions 20, 21)O Life cycle cost analysis (questions 20, 21)O Budget variance justification (question 21)O Cost estimate worksheets (question 21)O Unhoused student calculations by school (question 24)O Two-year and five-year enrollment projections, with calculations (questions 25, 28)O Request for change in grade levels offered (question 27)O Justification for variance in enrollment calculations (question 28)O Description of alternative facilities (question 30)O Description of other options (question 31)O Appropriate compliance reports (i.e., Fire Marshal, AHERA, ADA, etc.)O Superintendent's signature certifying the application (question 33); Required for

eligibilityEl (other)

00

CERTIFICATION

33. I hereby certify that this information is true and correct to the best of my knowledge, and thatthe application has been prepared under the direction of the district school board and issubmitted in accordance with law.

Superintendent

BEST COPY AVAILABLE

Form #05-95-017, Rev. 3/98.

Date

Page 52: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Reference:i Application Instructions

Instructions for completing theApplication for Funding

Capital Grant or State Aid for Debt Retirement

Use these instructions with Alaska Department of Education Form #05-95-017 -Application for Funding, Capital Grant or State Aid for Debt Retirement.

Numbered paragraphs below correspond to numbered questions on the application.

Unless otherwise indicated, each question on the application form must be answered in orderfor the application to be considered complete. Only complete applications will be accepted.Incomplete applications will be returned, un-ranked. The project name on the first pageof the application should be consistent with project titles approved by the district schoolboard and submitted with the six-year Capital Improvement Plan (CIP). Please submit fourcomplete copies of each application and two copies of each attachment.

VI

TYPEOPPROjECT AND FUNDING REQUEST

1. Check one box to indicate which type of state aid is being requested.

2a. Check one box to indicate the primary purpose of the project. Each application shouldbe for a single project for a particular facility, and should be independently justified.The district may include work in other categories in a proposed project. These projectswill be reviewed and evaluated as mixed-scope projects. Refer to Appendix B of theseinstructions for descriptions of categories and the limitation associated with category Cand category D projects. Application of scoring criteria will be on a weighted basis.

b. Check the applicable phase(s) covered by this funding request. Refer to Appendix A fordescriptions of phases.

BASIC ELIGtBiLlii REQUIREMENTS:

3. Attach six-year Capital Improvement Plan (CIP).

4. AS 14.11.011(b)(1) and 4 AAC 31.011(b)(1) require each school district to send theDepartment of Education a description of its fixed asset inventory annually as part of itsaudited financial statement. The district should respond with two items;

a) A description of a functional fixed asset inventory system. (i.e. one that can beaudited and is in compliance with state statutes and regulation), and;

b) A copy of the audit page(s) from the district audited financial statement that refersto the fixed asset inventory system. The department will review these pages toverify the existence of a functional fixed asset system and the current condition ofthat system.

Instructions to accompany Form #05-95-017. Rev. 3/98

521

BEST COPY AVAILABLE

Page 53: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

5. The department may not award a school construction grant to a district that does not havereplacement cost property insurance. AS 14.03.150, AS 14.11.011(b)(2) and 4 AAC31.200 set forth property insurance requirements. Note that revisions to 4 AAC 31.200regarding flood insurance, took effect July 1, 1997.

6. AS 14.11.011(b)(1) and 4 AAC 31.011(b)(2) require each school district to include withthis application a description of its preventive maintenance program, as defined by AS14.14.090(10). Preventive maintenance means scheduled maintenance actions thatprevent the premature failure or extend the useful life of a facility or a facility's systemsand components. A functioning and effective preventive maintenance program is cost-effective on a life cycle basis.

Refer to Appendix D for detail, and attach a statement that describes the preventivemaintenance program and provides evidence that the program addresses the fullspectrum of building systems (i.e.: more than routine or custodial maintenance).Include examples of how the program is effective and achieving results.

7. AS 14.11.011(b)(3) requires a district to provide evidence that the funding request isfor a capital project and not part of a preventive maintenance or regular custodial careprogram. Refer to Appendix D for an explanation of maintenance activities and pleaseinclude complete information in your statement.

DISTRICT INIORMATION'

8. To calculate the five-year average replacement value of all school facilitiesdistrictwide, add together the auditable insurance valuation of all facilities for each ofthe past five years and divide the sum by five. Value of school contents andreplacement costs related to teacher housing should be excluded from this figure.

9. To calculate the average annual districtwide maintenance expenditure for the last fiveyears, total all expenses for district maintenance and operations over the last five years;subtract expenditures for communications, insurance, utilities, and teacher housing (ifapplicable) during the last 5 years; and divide the remaining sum by 5.

EXISTING FACILITIE

10. The response to this question should be consistent with the space utilization table inquestion 29. Projects that will result in demolition or surplusing of existing state-ownedor state-leased facilities should include a detailed plan for transition from existingfacilities to replacement facilities. The transition plan should describe how surplusedstate-owned or state-leased facilities will be secured and maintained during transition.

11. The question is revised for FY2000 to collect the year the facility was constructed.Year built refers to the year the original facility and any additions were completed or

BEST COPY AVAILABLE

Instructions to accompany Form 1/05-95-017. Rev. 3/98

53i

Page 54: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

were first occupied for educational purposes. If a date of construction is not available,use an estimate indicated by an (*). Gross square footage (GSF) of each additionshould be the amount of space added to the original facility. Total size should equal thesquare footage of the existing facility.

RELATED FUNDING

12. Prior state funding refers to funds appropriated to the Department andadministered under AS 14.11 only. No other fund sources apply.

13. Waivers of participating share should be in accordance with AS 14.11.008(d).Justification should be documenied. See Appendix E in the attachments to theseinstructions for detailed information.

PROJECT'INFORMATION..1.1.1

14. The district ranking of each project application must be a unique number approved bythe district school board and placing each discrete project in priority sequence. Theproject having the highest priority should receive a ranking of one, and each additionalproject application of lower priority should be assigned a unique number in priorityorder. The department will accept only one project with a district ranking of priorityone. The ranking of each application should be consistent with the board-approved six-year Capital Improvement Plan (CIP). Please refer to AS 14.11.013(b)(2).

15. If this project (1) will result in renovated or additional educational space, and (2) willserve students of the same grade levels currently housed or projected to be housed inother schools, the project description should indicate:

the funding communities that will be impacted (i.e. will contributestudents) by this project,the current and projected student populations in each facility (school)affected by the project, andthe square footage for each affected facility (school) in the fundingcommunity.

Note: for schools housing a combination of elementary and secondary grades, thespace allocated to elementary (K-6) and secondary (7-12) may be necessary.

16. Refer to AS 14.11.013(b)(1). If this project is an emergency, the project descriptionmust describe:

the nature of the emergency,the facility condition related to the emergency,the threat to students and staff,the consequence of continued utilization of the facility,the individuals or groups affected by the condition,

Instnictions to accompany Form #05-95-017. Rev. 3/983

54BEST COPY AVAILABLE

Page 55: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

what action the district has taken to mitigate the emergencyconditions, andthe extent to which any portion of the project is eligible for insurancereimbursement or emergency funding from any state or federalagency.

Evaluation of the emergency will consider all of the information submittedand the responses to each of the emergency elements noted in theseinstructions.

17. Acquisition of additional land refers to expansion of an existing school site using"property immediately adjacent to, or in close proximity to, the existing school site.Land acquisition may result from long term lease, purchase, or donation of land.Utilization of a new school site refers to use of a site previously acquired by the district,or a new site acquired as a result of this application and not previously utilized as apublic school. If the project site is not yet known, the site description should be thedistrict's best estimate of specific site requirements for the project, and it should beincluded in the project description. The department's 1997 publication, Site SelectionCriteria and Evaluation Handbook, may be useful in responding to this question. A siteselection study is required for those projects involving new sites in order to qualify forplanning points (reference Appendix A).

18. A facility appraisal is an educational adequacy appraisal using the Guide for SchoolFacility Appraisal - Alaska Edition, or a similar format. An appraisal is optional forFY2000; however, an appraisal document is useful to the department in evaluating theoverall merits of the project request. A current appraisal is of more value than onewhich is four or more years old.

19. A facility condition survey is a technical survey of facilities and buildings, using thedepartment's Guide for School Facility Condition Survey or a similar format, for thepurpose of determining compliance with established building codes and standards forsafety, maintenance, repair, and operation. Portions of the condition survey, such asthat information pertaining to building codes and analysis of structural and engineeredsystems, should be completed by someone with training equivalent to that of anarchitect or an engineer. Other portions that document conditions of building elementsmay be completed by someone reasonably familiar with the building and it's variouscomponents. A facility condition survey is optional for FY2000, however, a facilitycondition survey document is useful to the department in evaluating the overall meritsof the project request. Currency of the survey should be addressed. It is doubtful that asurvey four or more years old adequately describes current facility conditions.

PROJECT DESCRIPTION/SCOPE OF WORK

20. The project description/scope of work should include (1) a detailed description of theproject, (2) documentation of the conditions justifying the project, (3) a description ofthe scope of the project and what the project will accomplish and (4) information -ordetail related to the project's cost. The scope should also contain sufficient quantifiable

Instructions to accompany Form #05-95-017. Rev. 3/984

55

Page 56: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

analysis to show the project is in the best interest of both the district and the state. Theproject description/scope of work is a good place to include responses to questions 7,10, 15, 16, and 17, where applicable

Question #7: Statute requires the district to provide sufficient evidence that the projectis not preventive maintenance, routine maintenance, or custodial care. Refer toAppendix D of these instructions for information regarding the definitions ofmaintenance terms related to this question.

Question #10: When a new, renovation, new-in-lieu-of-renewal, or Category E projectis proposed, the project description should include a detailed cost/benefit analysis and alife cycle cost analysis. These documents should provided data documenting conditionsthat justify the project [AS 14.11.011(b)(1)]. If these documents are attached, they canbe referenced rather than reproduced in the project description. The detailed plan fordemolishing or surplusing state-owned or leased properties, should incorporate a draftof the department's Form 05-96-007, Excess Building listing building data and generalinformation; signatures and board resolutions would not be necessary for the CIPprocess.

Question #16: If the project is an emergency, the description should address all theitems specified in the instructions for question 16.

Question #17: Site description should include location, size, availability, cost and otherpertinent information as appropriate. If a site selection and evaluation report isattached, the information can be referenced with a brief summary rather than beingreproduced in this section.

Questions #18 & #19: If a school facility appraisal (question 18) and/or a facilitycondition survey (question 19) are attached, they can be referenced rather thanreproduced in the descriptions of project need, justification, and scope.

Cost Estimate Support: The project description should include sufficient informationto support meaningful evaluation of the project cost and the reasonableness of the costestimate. Though basic cost information is to be incorporated into Tables 1 and 2 ofquestion 21, many cost elements reported in standard estimates will require furtherexplanation or support. This is especially true for lump-sum elements used in thedepartment's cost model in sitework and utilities. The project description and costestimate should be increasingly detailed as project phases advance.

The description of project scope should include information that will allow thedepartment to evaluate the criteria specified in AS 14.11.013. Please refer to AppendixC for guidelines covering project cost estimate percentages for factored cost items.

Operational Cost vs. Project Cost: information (and evaluation points) related tooperational costs is not limited to Category E projects. The project cost and its impacton operational costs is an important consideration for any project. The projectdescription should include a discussion of ways in which the completion of the project

Instructions to accompany Form #05-95-017. Rev. 3/985

56

Page 57: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

ii

would reduce current operational costs. Considerations could cover energy costs, costsrelated to wear-and-tear and maintenance of existing facilities and costs incurred bycurrent functional inadequacies at the facility and funding community level.

Although the addition of square footage is certain to increase overall operational costs,project descriptions for this category of project should include information on methodsand strategies used to minimize operational costs over the life of the building. This caninclude cost benefit analysis which were accomplished on building systems andmaterials, etc.

COST ESTIMATES'

21. For all applications, including those for planning and/or design, cost estimates shouldbe based on the district's most recent information and should address the project beingrequested. Refer to Appendix C for descriptions of elements of the total project cost.The cost estimate should be of sufficient detail that its reasonableness can be evaluated.If a project is projected to cost significantly more than would be predicted by theDepartment's Program Demand Cost Model (7th Edition), provide attachmentsjustifying the higher cost. If there are special requirements, a detailed explanation andjustification should be provided in the project description/scope of work.

In Table 1, all prior AS 14.11 funding for this project should be listed by category andtotaled in Column I. Column II should list the amount of funding being requested inthis application, by category and in total. Column M should show a percentagebreakdown for the project's allocated costs. Column IV should list the total project costestimate from inception to completion, all phases. Calculate each cost categorypercentage based on construction cost equal to 100%, excluding the cost of land andsite investigation. Other categories should be within the ranges listed. ConstructionManagement continues to be broken down into to sub-categories: consultant and "in-house". CM costs associated with each should be reported. DOE overhead is in theIndirect/Administration category. The percent for art, required for all renovation andconstruction projects, is given a separate line. The project total cost should still notexceed 130% of construction cost, excluding land and site investigation. If your projectexceeds the recommended overall guideline, please add a detailed justification for eachcategory that exceeds the specific sub-category guidelines.

Table 2, which summarizes construction costs, is structured to be consistent with theDOE cost model. Other estimating formats may not provide an exact correlation,however, the following categories must be reported to allow adequate comparisonsbetween projects: basic building, site work and utilities, general requirements,contingency and escalation.

Include as an attachment any additional information regarding project cost that may aidin evaluating the reasonableness of the cost estimate (including life cycle cost analysisand cost benefit analysis).

Instructions to accompany Form #05-95-017. Rev. 3/986

Page 58: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

611SIG. C6MINIUNITY Nib. ADM"-:

NOTE: DOE square footage entries in this section should reflect the measurementsspecified by 4 AAC 31.020, excluding exterior wall thickness and applying the 25%factor for outdoor covered spaces and mechanical penthouses. The department realizesthat this is not the conventional definition of gxoss square footage.

22. Any additional square footage that is funded for construction or approved by localvoters for construction, should be described, showing student capacity, additional grosssquare feet, and grade levels to be served. Include these, projects in anycapacity/unhoused calculations provided in the year of anticipated occupancy.

23. Gross square footage and ADM should reflect all schools in the funding communitythat serve elementary or secondary students of equivalent grade level to the studentswho will be served by the proposed project. If the project includes any grades K-6,equivalent grade level means all schools within the funding community servingelementary students, regardless of the specific grades served by each of the elementaryschools. Similarly, if the project includes any grades 7-12, equivalent grade level meansall schools within the funding community serving secondary students. Do not includethe enrollment or gross square footage of students in grade levels (i.e. K-6 or 7-12groupings) other than those served by this discrete project. (ADM) should be based onthe most recent Foundation count date used for funding by each district. For mostdistricts this will be the October Foundation count from the prior year. If a project isproposed to serve multiple funding communities, the schools affected in eachindividual community should be provided. Please attach pages if necessary.

It is best to provide ADM projections by school. Projections by grade for each fundingcommunity are usable, however, they are slightly less favorable to the district for spacecomputations.

24. The total number of unhoused students currently within the funding community shouldbe based on the (ADM) and gross square footage (GSF) responses to question 23 andthe Department of Education Space Guidelines. Unhoused students are students whoexceed the capacity of the facility. Capacity equals the gross square footage divided bythe allowable square footage per student, based on the Department of Education SpaceGuidelines. In your attachment, provide the gross square footage, population, andcapacity calculation for each school in the funding community serving grades affectedby the proposed project.

25. The two-year ADM projection should cover two fiscal years beyond the total ADMfigure for the present funding community, which was provided in question 23. Themethod used to project enrollment throughout this application should be consistent andshould be explained in detail in the response to question 28.

26. The five-year post-occupancy ADM projection should begin with the first year that thefacility will be occupied by students (usually two years after the requested fundingyear), and should cover each of the four succeeding fiscal years, by grade, for the pudelevels to be served by this project request.

Instructions to accompany Form #05-95-017. Rev. 3/987

58

Page 59: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

27. The response to this question should reflect the grade levels that will be served by thefacility at the completion of the project. If project completion will result in changes inthe grade levels offered in existing facilities, those changes in grade levels served mustbe approved by the Commissioner of Education, as described in 4 AAC 09.005(d).Requests for changes in grade levels offered must be submitted under separate cover tothe Commissioner, and a copy should be attached to this application.

28. If the demographic model utilized by the district produces a significant difference fromthat represented by the average percent change in reported ADM over the past five-years, please justify the variance in the attached calculations. If a simple, straight-lineprojection is being utilized, years that show large increases or declines should beexplained, or should not be used in calculating the projected population:

.PROJECT SPACE EQUATION

29. This table summarizes space utilization in the proposed project. Space figuresrepresented should tabulate to match the gross building square footages reported inquestion 11 as well as those shown in Table 2 of the cost estimate section. Theworksheet at Appendix F lists types of school space that fit in each category.

ALTERNATIVE FACILITIES AND OPTIONS

30. The statutes require an evaluation of other facilities in the area which may serve as analternative to accomplishing the project as submitted. Information regarding theavailability of such facilities and the effort (i.e. cost, time, etc.) required to make thefacility usable for the school needs represented bY the project. The area is not restrictedto the attendance area or funding community served by the project.

31. In an effort to support the project, as submitted, as the best possible solution to schoolfacility needs, districts should consider a full range of options during planning andproject development. Options should respond to the specific scope of the project. (i.e. ifa project proposes a new school, what options were considered in lieu of building thenew space; renovation, alternate facilities?) If the project proposes a roof replacement,what options were considered; patching, new roofing, types of roofing, insulation, newroof pitch?) as well as project delivery (i.e. could the project be phased, etc.). If theproposed project would add new or additional space, districts must consider attendancearea boundary changes and any space available in adjacent funding communities thatare connected by road and to which students may be transported within the 120-minutedaily limitation, per 4 AAC 27.045(b). At least one of the options considered andrejected must be an evaluation of potential boundary changes. Scoring in this area willbe related to factors such as: the range of options, the rigor of comparison, the viabilityof options considered, and the quality of data supporting the analysis of the option.

ATTACHMENTS

32. The attachments checklist is provided for your convenience. Please check to see thatyour application is complete.

Instructions to accompany Form 05-95-017. Rev. 3/98

59

Page 60: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

CERTIFICATION2

33. Please be sure the application is signed by the appropriate official. Unsignedapplications cannot be accepted for ranking.

Application packages should be submitted to:Alaska Department of Education

Education Support Services, Facilities801 W. 10th Street, Suite 200

Juneau, AK 99801

For further information contact:Michael Morgan, Facilities Manager

(907) 465-1858

60Instructions to accompany Form #05-95-017. Rev. 3/98

Page 61: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

APPENDIX A: CAPITAL IMPROVEMENT PROJECT PHASESAdopted by the Bond Reimbursement & Grant Review Committee

April 18, 1997

The FY99 application form requires designation of the phase(s) for which the district requests funding.Below is a basic scope of effort for each phase. Items marked Required are mandatory (whereproject type dictates) in order for projects to receive planning, schematic design and/or designdevelopment points. Required documents must be or must have been submitted and received by thedepartment by September lg.

PHASE I-PLANNING1. Select consultants (if needed)(4 AAC 31.065) - (Required)2. Prepare a school facility appraisal (as required)3. Prepare a facility condition survey (as required)4. Identify need category of project - (Required)5. Verify student populations and trends - (Required)6. Complete education specifications (design the educational program - 4AAC 31.010) ) - (Required)7. Identify site requirements and potential sites - (Required)8. Complete concept design studies and planning cost estimate - (Required)

PHASE HA - SCHEMATIC DESIGN1. Perform site evaluation to determine suitability (4AAC 31.025) (Required)2. Prepare plan for transition from old site to new site, if applicable - (Required)3. Accomplish site survey and perform preliminary site investigation (topography, geotechnical)4. Obtain option on site - (Required)5. Complete schematic design documents including dimensioned site plans, floor plans, elevations and

engineering narratives for all necessary disciplines - (Required)6. Complete preliminary cost estimate appropriate to the phase - (Required).

PHASE IIB-DESIGN DEVELOPMENT1. Complete suggested elements of planning/design not finished in the previous phases - (Required)2. Review and confirm planning (4AAC 31.030)3. Accomplish a condition survey relevant to scope - (Required if project includes renovation)4. Obtain purchase or lease agreement for site - (Required)5. Complete design development documents - (Required)6. Prepare proposed schedule and method of construction7. Prepare revised cost estimate appropriate to the phase - (Required)

PHASE III-CONSTRUCTION1. Complete suggested elements of planning and design not previously completed - (Required)2. Prepare final cost estimate3. Complete final contract documents and legal review of construction documents (4AAC 31.040)4. Advertising, bidding and contract award (4AAC 31.080)5. Submit signed construction contract6. Construct project7. Procure furniture, fixtures and equipment, if applicable8. Substantial completion9. Final completion and move-in10. Post occupancy survey11. Obtain project audit/close out

61Instnictions to accompany Form #05-95-017. Rev. 4/97

Appendix A

Page 62: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

APPENDIX B: CATEGORIES OF GRANTSUpdated by the Bond Reimbursement & Grant Review Committee

April 18, 1997

AS 14.11.013(a)(1)-The department shall verify that each proposed project meets the criteria established under AS14.11.014(b) and qualifies as a project required to accomplish one of the following. Projects can combine workin the different categories with the majority of work establishing the project's type. For the purpose of reviewand evaluation, projects which include significant work elements from categories other than the project's primarycategory will be evaluated as mixed scope projects.

A. "Avert imminent danger or correct life threatening situations." This category is generally referred to as, "Health andLife Safety." A project classified under "A" must be documented as having unsafe conditions that threaten thephysical welfare of the occupants. Examples might be that seismic design of structure is inadequate; thatrequired fire alarm and/or suppressant systems are non-existent or inoperative; or that the structure and materialsare deteriorated or damaged seriously to the extent that they pose a health/life-safety risk. The district mustdocument what actions it has taken to temporarily mitigate a life-threatening situation.

B. "House students who would otherwise be unhoused." This category is referred to as "Unhoused Students." A projectto be classified under "B" must have inadequate space to carry out the educational program required for thepresent and projected student population or the existing facility must qualify for replacement-in-lieu-of-renewal.Projects will be considered for replacement-in-lieu-of-renewal when project costs exceed 70% of the currentreplacement cost of the existing facility, based on a twenty year life cycle cost analysis, which includesdisposition costs of the existing facility. Documentation should be based on the current Department of EducationSpace Guidelines. (Refer to AAC 31.020)

C. "Protection of the structure of existing school facilities." This category is intended to include projects that willprotect the structure, enclosure, foundations and systems of a facility from deterioration and ensure continued useas an educational facility. Work on individual facility systems may be combined into one project. However, thework on each system must be able to be independently justified and exceed $25,000. The category is for majorprojects, which are not a result of inadequate preventive, routine and/or custodial maintenance.' An examplecould be a twenty year old roof that has been routinely patched and flood coated, but is presently cracking andleaking in numerous locations. A seven year old roof that has numerous leaks would normally only requirepreventive maintenance and would not qualify. In addition, no new space for unhoused students is permitted inthis category, limiting its ability to be combined with other project types.

D. "Correct building code deficiencies that require major repair or rehabilitation in order for the facility to continue tobe used for the educational program." This category, Building Code Deficiencies, was previously referred to as"Code Upgrade." The key words are "major repair." A "D" project corrects major building, fire, mechanical,electrical, environmental, disability (ADA) and other conditions required by codes. Work on individual facilitysystems may be cOmbined into one project. However, the work on each system must be able to be independentlyjustified and exceed $25,000. An example could be making all corridors one hour rated. Making one or twotoilet stalls accessible would not fit this category. In addition, no new space for unhoused students is permitted inthis category, limiting its ability to be combined with other project types.

E. "Achieve an operating cost saving." This category is intended to improve the efficiency of a facility and therefore,save money. Examples that might qualify arc increasing insulation, improving doors and windows, modifyingboilers and heat exchange units for more energy efficiency. The district must document a cost benefit ratio lessthan 1, considering both capital and operating dollars.

F. "Modify or rehabilitate facilities for purpose of improving the instructional unit."Category "F", Improve Instructional Program, was previously referred to as "Functional Upgrade." This category islimited to changes or improvements within an existing facility such as, modifications for science programs,

computer installation, conversion of space for special cducation classes, or increase of resource areas.

G. "Meet an educational need not specified in Aj-(F) of this paragraph identified by the department." Any situationnot covered by (A)-(F), and mandated by thc Department of Education. (Currently, there are no such mandates.)

Instructions to accompany Form #05-95-017. Rev, 4/07 62 Appendix B

Page 63: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

APPENDIX C: PROJECT COST ESTIMATEUpdated by the Bond Reimbursement & Grant Review Committee

February 20, 1998

Construction Management (CM) includes two categories: CM accomplished by a private contractor and CM accomplished bydistrict/borough staff. Costs may be incurred for one or the other and in some cases both. Estimates for "in-house"construction management should include actual staff time allocated to the project, staff travel and per diem and direct costs oftelephone, etc. It should include construction management costs done by staff and all on site representation. For privatecontractors it should include costs as anticipated to include oversight of any phase of the project and any deliverables such aseducational specifications, legal and bonding assistance, facility appraisals and condition surveys. Construction managementincludes management of the projects scope, schedule, quality, and budget during any phase of the planning, design andconstruction of the facility.Statutory Limit by Private Contractor: 24%Recommended In-house: 2-5%

Land is a variable unrelated to construction cost and should include actual purchase price plus title insurance, fees and closingcosts. Land costs are excluded from project percent calculations.

Site Investigation is also a variable unrelated to construction cost and should include land survey, preliminary soil testing,environmental and cultural survey costs, but not site preparation. Site investigation costs are excluded from project percentcalculations.

Design Services should include full standard architectural and engineering services and extra services such as educationalspecifications, condition surveys, construction administration and post occupancy evaluation. Architectural and engineeringfees can be budgeted based upon a percentage of construction costs. Because construction costs vary by region and size, somay the percentage fee to accomplish the same effort.Recommended: 6-8% (Renovation might run 2% higher)

Construction includes all contract work as well as force account for facility construction, site preparation and utilities. This isthe base cost upon which others are estimated and equals 100%.

Equipment/Technology includes all moveable furnishing, instructional devices or aids, electronic and mechanical equipmentwith associated software and peripherals (consultant services necessary to make equipment operational may also be included).It does not include installed equipment, nor consumable supplies, with the exception of the initial purchase of library books.Items purchased should meet the district definition of a fixed asset and be accounted for in an inventory control system.Equipment/Technology budgets have two benchmarks for standard funding: percentage of construction costs and per-studentcosts as discussed in DOE's Guideline for School Equipment Purchases. If special technology plans call for higher levels offunding, itemized costs should be presented in the project budget separate from standard equipment.Recommended: 0-7% of construction cost or between $1700 - $3050 per student depending on school size and type.

Indirect/Administration includes an allocable share of district overhead costs, such as payroll, accounts payable, procurementservices, and preparation of the six year capital improveMent plan and specific project applications. It also includes theDepartment of Education overhead charges.Recommended: 2-5%

Percent for Art includes the statutory allowance for art in public places. This may fund selection, design/fabrication andinstallation of works of art. One percent of the construction budget is required except for REAA projects which require onlyone-half of one percent. The department recommends budgeting for art.

Contingency is a safety factor to allow for unforeseen changes. Standard cost estimating by A/E or professional estimatorsuse a built in contingency in the construction cost of + 10%. Because that figure is included in the construction cost, thisitem is a project contingency for project changes and unanticipated costs in other budget areasRecommended: 3-5%

Total Proiect Request is the total project cost, as a percent of the construction cost, except in extreme cases, should averageout close to the same for all projects, and when the variables of land cost and site investigation are omitted. This item is thebest overall gauge of the efficiency of the project.Recommended: Not to exceed 130%

Note: These recommended, or guideline percentages differ from some of the averages and from some others previouslysuggested. They are based upon the above descriptions and are therefore more fixed and accountable.

Instructions to accompany Form #05-95-017. Rev. 3/98Appendix C

63

Page 64: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

APPENDIX D: DEFINITIONS OF MAINTENANCEAdopted by the Bond Reimbursement & Grant Review Committee

April 18, 1997

ComponentA part of a system in the school facility.

Component Repair or ReplacementThe unscheduled repair or replacement of faulty components, materials,or products caused by factors beyond the control of maintenance personnel.

Custodial CareThe day to day and periodic cleaning, painting, and replacement of disposable supplies to maintainthe facility in safe, clean and orderly condition.

Deferred MaintenanceCustodial care, routine maintenance, or preventive maintenance that is postponed for lack of funds,resources, or other reasons.

Major MaintenanceFacility renewal that requires major repair or rehabilitation to protect the structure and correctbuilding code deficiencies, and shall exceed $25,000 per project, per site. It must bedemonstrated, using evidence acceptable to the department that (1) the district has adhered to itsregular preventive, routine and/or custodial maintenance schedule for the identified projectrequest, and (2) preventive maintenance is no longer cost effective.

Preventive MaintenanceThe regularly scheduled activities that carry out the diagnostic and corrective actions necessary toprevent premature failure or maximize or extend the useful life of a facility and/or its components.It involves a planned and implemented program of inspection, servicing, testing and replacementof systems and components that is cost effective on a life-cycle basis.

Renewal or ReplacementA scheduled and anticipated systematic upgrading of a facility system or component to rehabilitateit to a renewed functioning standard.

System(s)An assembly of components created to perform specific functions in a school facility, such as aroof system, mechanical system or electrical system.

Instructions to accompany Form #05-95-017. Rev. 4/97 64 Appendix D

Page 65: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

APPENDIX E: WAIVER OF PARTICIPATING SHARE/IN-KIND CONTRIBUTIONSDepartment of Education Guidelines

Updated April 25, 1997

Current law - AS 14.11.008(d) - requires that a district provide a participating share for all schoolconstruction and major maintenance projects funded under AS 14.11. The department administeredall funds for capital projects appropriated to it under the guidelines of AS 14.11 and 4 AAC 31. Thefollowing points should be considered by those districts requesting a waiver of the local participatingshare

1. A distriCt has three years before and after the appropriation to fulfill the participating sharerequirement.

A review of the annual financial audits and school ,district _budgets indicate that no district is in afinancial condition which warrants a full waiver. Local dollars are available to fund all or a portion ofthe match during the six years. Districts continue to generate and budget for, local interest earnings,facility rental fees and other forms of discretionary revenue adequate to fund some or all of therequired local match. If properly documented and not already funded by AS 14.11, prior expendituresfor planning, design, and other eligible costs may be sufficient to meet the match requirement.

2. Both the administration and the Legislature have strong feelings that local communities should atleast be partially engaged in the funding of projects.

In recognition of the inability of some communities to levy a tax or raise large amounts of cash fromother sources, the legislation provides an opportunity for in-kind contributions, in-lieu of cash. Alldistricts need to make a directed effort to provide the local match, utilize fund balances and otherdiscretionary revenue, consider sources of in-kind contributions, document that effort and thenrequest a full or partial waiver-as necessary.

3. All waiver requests require sufficient documentation.

Requests should be accompanied by strong, compelling evidence as to overall financial condition ofthe school district and in the case of a city/borough school district, the financial condition of thecity/borough as well. The attachments should include, at a minimum, cash account reconciliation's,balance sheets, cash investment maturity schedules, revenue projection, cash flow analysis andprojected use of all fund balances and documentation in support of attempts to meet the local match.Historical expenditures do not provide sufficient evidence of future resource allocations.Consideration should be given to new and replacement equipment purchases, travel and otherexpenditures that support classroom activity, but may be delayed until the local match is funded.Each district has an opportunity to help itself and provide a safe, efficient school facility throughshared responsibility.

4. Districts may request consideration of in-kind contributions of labor, materials or equipment.

Under regulation 4 AAC 31.023 (d) in-kind contributions are allowed. This also affords anopportunity for community participation through contributions to the art requirements for newbuildings or other means. This option should be fully explored, as well as the documentationmentioned above, prior to requesting a waiver of all or part of the participating share.

Instructions to accompany Form #05-95-017. Rev. 4/97 65 Appendix E

Page 66: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

APPENDIX F: Type of Space Added or ImprovedAdopted by the Bond Reimbursement & Grant Review Committee

April 18, 1997

Category A - Instructional or Resource

KindergartenElementaryGeneral Use ClassroomsSecondaryLibrary/Media CenterSpecial EducationBi-Cultural/BilingualArtScienceMusic/DramaJournalismComputer Lab/Technology ResourceBusiness EducationHome EconomicsGifted/TalentedWood ShopGeneral ShopSmall Machine Repair ShopDarkroomGym

Category B - Support Teaching

Counseling/TestingTeacher WorkroomTeacher OfficesEducational Resource StorageTime-out RoomParent Resource Room

66Instructions to accompany Form #05-95-017. Rev. 4/97

Category C - General Support

Student Commons/Lunch RoomAuditoriumPoolWeight RoomMultipurpose RoomBoys Locker RoomGirls Locker RoomAdministrationNurseConference RoomsCommunity Schools/PTA AdministrationKitchen/Food ServiceStudent Store

Category D - Supplementary

Corridors/Vestibules/EntrywaysStairs/ElevatorsMechanical/ElectricalPassageways/ChasewaysSupply Storage & Receiving AreasRestrooms/ToiletsCustodialOther Special Remote Location FactorsOther Building Support

Appendix F

Page 67: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

F.

Alaska Department of Education Capital Improvement Project ApplicationSubjective Rating Form

Reference:FY-00Eligibility and Scoring

District::School:

Fund:Project Title:

Category:Phase: Maximum Points:Rator Date:

Note: The number in parenthesis refers to the question with primary applicability on the CIPapplication form. Also, points for elements two through eight will be weighted to apply the eachspecific category of a mixed-scope project.

MaxPoints

.

School

.Construction

A, B, E, F

MajorMaintenance

C, D

20 1. Effectiveness of preventive maintenance program (6)

.

50 2. Emergency (16)

50 3. Seriousness of life/safety and code conditions (16/19120)

40 4. Existing space fails to meet or inadequately servesexisting or proposed elementary or secondary programs(20)

A. Mandated Program = 40 pointsB. Facility inadequately serves local

existing program = 20 pointsC. Fails to provide space for new approved

local program = 15 points

30 5. Reasonableness & completeness of cost estimate (21)

30 6. Relationship of the project cost to the annualoperational cost savings (20)&(21)

30 7. Thoroughness in considering alternative facilities &options (30)&(31)

30 8. Adequacy of documentation (A11)

280 Total Points

Revised: 2/20/98 67

Page 68: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Alaska Department of Education Capital improvement Project ApplicationObjective Rating Form

FY-00

DistrictSchool

Project TitleCategoryMaximum PointsDate

FundPhaseRator

MaxPoints School

ConstructionA, B, E.*F.

MajorMaintenance

C, D10 Adequacy of fixed asset inventory system

30 District rankingProject #1 request = 30 points, #2 = 27 points, #3 = 24 pointsEach additional project 3 points less

20 Weighted average age of facilityA. 0-10 years = 0 pointsB. > 10 < 21 years = .75 / year in excess of 10 yearsC. > 21 < 30 years = 7.5+ 1.25 per year in excess of 20 yearsD. > 30 = 20 points

30 Previous AS 14.11 funding for this project based on % funded of the total projectA. 50% = 30 pointsB. < 50 % funding, the percentage of points earned = 2 times the prior funding %

30 Planning & design phase has been completedA. All required elements of planning= 10 pointsB. All elements planning + required elementsof schematic design = 20 pointsC. All elements of planning and schematics + required elements of DDev. = 30 points

50 Unhoused students todayN/AA 100 % of capacity = 0 points

B. > 100% of capacity = % of excess capacity times 50C. 200 % of capacity = 50 points

30 Unhoused students in seven years (5 year Post-occupancy)N/AA 100 % of capacity = 0 points .

B. > 100% of capacity = % ofexcess capacity times 30C. 200 % of capacity = 30 points

15 Avg expenditure for maintenance for each of last five yearsIf %<2,then%/2 x7If2< % <3,then%/3 x10If3 < % < 4,then%/ 4 x15If % > 4,then 15

30 Type of space added or improvedN/AA. Instructional or resource 30 points

B. Support teaching 25 pointsC. Food service, recreational andgeneral support 15 pointsD. Supplemental 10 points

..245Total Points

Revised: 2/20/98

Page 69: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

Date

District

Is The Project Eligible?

Project Elieibilitv Checklist

Project

Yes: No:

The following items are requirements for projects to be eligible for grants or bondreimbursement as required by statute or regulations. Please check YES or NO if projectapplication is in com liance or not.

Primary Yes NoApplicationQuestion(s)

A All The application is complete and all questions are fully answered -AS 14.11.013 (c)(3)(A)

B #3 The district CIP-6 year plan has been submitted - AS14.11.011(b)(1)

C #4 A description of the district's fixed asset inventory system isprovided - AS 14.11.011(b)(1)

D #5 Evidence of replacement cost property insurance - AS14.11.011(b)(2)

E #13 If the district has requested a waiver of participating share, is therequest attached? (If not applicable, leave blank) - AS 14.11.008(d)

F #6 A description of the district's preventive maintenance program -AS 14.11.011 (b)(1)

G #7 Evidence that project should be a capital improvement project andnot preventive maintenance or custodial care - AS 14.11.011 (b)(3)

H #20 Evidence that project meets the criteria of one of the A-F categories- AS 14.11.013 (a)(1)

I #20 A detailed scope of work, project budget and documentation ofneed - AS 14.11.011 (b)(1)

J #20 & 21 The scope of work should include all information requested in theapplication instructions and should include life cycle cost analysis,cost benefit analysis or any other quantifiable analysis whichdemonstrates that the project is in the best interest of the districtAND the state - AS 14.11.013 (c)(3)(C).

K #23,24,25,26,27, & 28

For projects requesting additional space, evidence of spaceeligibility based on supported 2-year and 5-year-post-occupancystudent population projection data - 4 AAC 31.021(c)(1)&(c)(3)

L #20,30 & 31 Evidence that the existing facility can not adequately serve or thatalternative projects are in the best interest of the state AS14.11.013 (c)(3)(B)

M #30 & 31 Evidence that situation can not be relieved by adjusting service areaboundaries and transportation - 4 AAC 31.021(c)(2)

N #30 & 31 Evidence that situation can not be relieved by adjusting serviceareas or boundaries AS 14.11.013 (b)(6).

As of: 2/20/98 69

Page 70: DOCUMENT RESUME ED 428 529 TITLE Capital Improvement ... · DOCUMENT RESUME. ED 428 529 EF 005 311. TITLE Capital Improvement Project Workshops: Anchorage--May 15, 1998; Juneau--May

41

D

1

U.S. Department of EducationOffice of Educationa/ Research and Improvement (OERI)

National Library of Education (NLE)Educational Resources Information Center (ERIC)

NOTICE

REPRODUCTION BASIS

ERIC

This document is covered by a signed "Reproduction Release(Blanket) form (on file within the ERIC system), encompassing allor classes of documents from its source organization and, therefore,does not require a "Specific Document" Release form.

This document is Federally-funded, or carries its own permission toreproduce, or is otherwise in the public domain and, therefore, maybe reproduced by ERIC without a signed Reproduction Release form(either "Specific Document" or "Blanket").

EFF-089 (9/97)