20 DONGYANG STRUCTURAL ENGINEERS GROUP
DongYang BIM Process
03
21 DONGYANG STRUCTURAL ENGINEERS GROUP
Analysis
Bills of Quantities
Building Management
Fabrication Details
Project Management
3D Visualization
2D Drawings
03 DongYang BIM Process
• B I M 을 통 한 업 무 기 대 효 과
22 DONGYANG STRUCTURAL ENGINEERS GROUP
SD
BIM
DD+CD
BIM
As Built
Model
2D
CAD
Revit Tekla
Micro
staion
Catia
Inventor
Advance
Steel
3D
MAX
Rhino
Sketch
up
03
관련 프로그램
DongYang BIM Process
Archi
CAD
23 DONGYANG STRUCTURAL ENGINEERS GROUP
SD
BIM
DD+CD
BIM
As Built
Model
Document
Model
Detail
Model
Structural
Analysis
Studies Structural
Model
Architecture
Design
Studies
Structural
4D
Simulation Structural
5D
Cost
Structural 4D
Simulation
Structural
5D
Cost
Building
Model
2D
Document
Curtain
wall
Panel
Systems
03
활용 프로세스
DongYang BIM Process
24 DONGYANG STRUCTURAL ENGINEERS GROUP
03 DongYang BIM Process
• C r a s h D e t e c t i o n
This is not only to find design errors by checking
interferences, but also to collaborate with each
sector and to provide possible problems by using
BIM data. It brings significant advantages in
financially and in time.
25 DONGYANG STRUCTURAL ENGINEERS GROUP
03 DongYang BIM Process
• D i g i t a l F a b r i c a t i o n
Digital Modeling and Fabrication is a process that
joins Design with the Construction / Production
through the use of 3D modeling software and
additive and subtractive manufacturing processes.
These tools allow designers to produce digital
materiality, which is something greater than an
image on screen, and actually tests the accuracy
of the software and computer lines.
26 DONGYANG STRUCTURAL ENGINEERS GROUP
03 DongYang BIM Process
• P r e - C o n s t r u c t i o n
OVERALL PROJECT EVALUATION
- Our goal is to generate sufficient thought,
insight and communication that the big picture of
the project is well understood by all project
participants. This is where we ensure a good
foundation for the project
SITE ANALYSIS
– We find the way to confirm that the site will
conform to the requirements of the project without
excessive cost or future surprises.
27 DONGYANG STRUCTURAL ENGINEERS GROUP
03 DongYang BIM Process
• S k i n S t r u c t u r e & P a n e l i n g
More complicating and enlarging façade and exterior
shape requires intricate structural system and higher costs.
However, BIM provides simpler and modularized paneling
work which suggests efficient structural system and better
constructability.
28 DONGYANG STRUCTURAL ENGINEERS GROUP
국내 BIM 프로젝트
04
29 DONGYANG STRUCTURAL ENGINEERS GROUP
Size : 4F
Gross Area : 90,000㎡
Architect : Space Group
Young In Citizen Stadium Park
First BIM Turn-Key Project in Korea 04
2 0 1 4 Dong Yang Structural Engineers Group
Revit Structure
Navis works MEP
Construction Stie
Young In Citizen Stadium Park
DONGYANG STRUCTURAL ENGINEERS GROUP
흙막이 가시설 검토 장비 반입 검토
가설 벤트 검토 크레인 검토
시공단계 BIM의 활용
DONGYANG STRUCTURAL ENGINEERS GROUP
공종간 간섭 체크(골조와 설비간의 간섭)
DONGYANG STRUCTURAL ENGINEERS GROUP
안전시설물 설치계획 및 검토
DONGYANG STRUCTURAL ENGINEERS GROUP
레미콘 타설 관리
DONGYANG STRUCTURAL ENGINEERS GROUP
파일 항타 작업 관리
2 0 1 4 Dong Yang Structural Engineers Group
4D Simulation
37 DONGYANG STRUCTURAL ENGINEERS GROUP
Seoul National University Hospital
Revit Structural
Temporary Beam
Sunken View Construction Sequence
04 BIM Project in Korea