    INTRODUCTION

    Durgapur Steel Plant was built in 1950s and commissioned in 1959

    It is in Durgapur, West Bengal

    DSP is one of the six plant under the holding of SAIL

    One of the two loss making plant under SAIL

    It is under the balance sheet SAIL

    DSP had 29224 employees, 26724 workers and 2500 executives

    The blue collar employees of DSP are from local areas of West Bengal while the

    supervisors and managers were from different parts of the country

  • 8/7/2019 durga steel

    3/26

    Page 3

    PROBLEM IDENTIFICATION

    Poor product quality

    High production cost

    Inadequate development of infrastructure

    Under utilization of capacity and consequent low production

    High energy consumption

    High level of pollution

    High manning ratios relative to its output

    Militancy of the unions

    Inter union rivalry supported by the state government

  • 8/7/2019 durga steel

    4/26

    Page 4

    SPECIAL ATTENTION

    Change in work attitude

    Intervention needed to develop positive relation

    Excess manpower would have to be released

    Work methods need to be rationalized

    No drift in administration

    Growth and development of the organization as well as the employee

  • 8/7/2019 durga steel

    5/26

    Page 5

    PROBLEM GRAPH

    Managementapproaches

    Workmensparticipation

  • 8/7/2019 durga steel

    6/26

    Page 6

    WHAT WAS THE SOLUTION ????

    Managementapproaches

    Workmensparticipation

    A logical and rationalattitude from the

    employees and workers

    Formation joint counciland shop councils

    Collaborativeapproaches by thethree trade unions

    Suggestion from alldirections and strict

    guidelines to follow it

    Investment inmachineries to increase

    the yield

    Decentralizing theorganizational structure

  • 8/7/2019 durga steel

    7/26

    Page 7

    MANAGEMENT APPROACHES

    Towards technological changes:-

    Preparation of the degradation report by MECON

    Invitation to the expertise from outside INDIA to advice on the current scenario and

    technological up gradation

    An investment of Rs. 40000 million for technological changes

    Replacement of some machinery plants and equipments like LD convertor replaced with

    open hearth(OHF) process, concast casting with ignot casting and TNT & Slit rolling

    technology in the merchant mill

    Greater automation and application of electronic instruments in the computer

    controlled processes

    Recovery of the by products

  • 8/7/2019 durga steel

    8/26

    Page 8

    Identification ofproblems

    Investment forpurchase andmaintenance around

    Rs 40000 million

    Adding capacity

    Replacing somemachinery, plantsand equipments

    Introducing newtechnology

    aintenance amountand structure for the

    newer machines

  • 8/7/2019 durga steel

    9/26

    Page 9

    Evaluation:-

    A supporting hand from the mother plant SAIL as well as the state government

    Well planned process of the operation

    Good mingling between foreign purchase and local purchase of the machinery

    Proper and exact manpower planning and subsequent planning for their growth and

    training

    Good utilization of inflows in purchasing the new and second hand machineries

    Excellent co-ordination between the management and the plant engineers

    No intervention of any third parties

    Good adaptation of computer and electronics adopted systems

  • 8/7/2019 durga steel

    10/26

    Page 10

    The long awaited outcomes:-

    Technological aspects

    Improvement in the cost and the quality of production in the preparatory stages

    Improvement of yields from liquid steel to finished steel by 8%-10%

    Reduction in energy requirements

    Improvements in hot metal productivity as well as labour productivity

    Attainment of higher level of production

    Reduction of environmental pollution by possible conversion of waste materials into

    meaningful byproducts , lesser emission and reduced level of effluents

  • 8/7/2019 durga steel

    11/26

    Page 11

    0

    200

    400

    600

    800

    1000

    1200

    1960-1969 1970-1979 1980-1989 1990-1993

    Crude Steel

    Saleable Steel

    Pig Steel

    Hot steel

    BEFORE TECHNOLOGY

    ADAPTATION

  • 8/7/2019 durga steel

    12/26

    Page 12

    BENEFITS FROM TECHNOLOGICAL

    CHANGES IN DSP

    0

    100

    200

    300

    400

    500

    600

    700

    800

    900

    1993 1994 1995

    Crude steel

    Saleable steel

    Pig steel

    Hot steel

  • 8/7/2019 durga steel

    13/26

    Page 13

    The average saleable steel price had increased from Rs. 6843 to Rs. 6551

    Labour productivity had increased from 46 TCS/man/year to 96 TCS/man

    /Year

    Energy consumption had also increased

    The by products recovery process were made more faster and efficient

    The product mix became more beautiful

  • 8/7/2019 durga steel

    14/26

    Page 14

    Other aspects : -

    A vibrant changes in relation with the trade unions

    Gained confidence in handling critical problems

    Improvement in work culture

    Urge of success in future

    Training programme had boosted the confidence of the existence employees and the

    workers

    Trade unions had subdivided themselves into co-operatives

  • 8/7/2019 durga steel

    15/26

    Page 15

    Contributing Factors:-

    Support from mother plant SAIL

    Co-ordination between higher, middle and lower managements

    Even the supervisors and the executives played a helping hands

    The three unions felt the need of the plant and contributed equally in economic

    development of the plant and co-operated with the management by logical reasoning

    rather than collective bargaining

    An unparalleled contribution from the employees and workers in understanding the

    basic needs of up gradation and current economic, political and social scenario

    Arrangement of regular workshops, seminars and training programmes

    regularly, attained by all classes

    Regular meeting sessions between managements and operation team

  • 8/7/2019 durga steel

    16/26

    Page 16

    ROLE OF TRADE UNIONS

    Played a typical role

    Sort out the problems analytically rather than thinking politically

    Hold meetings with management regarding the transfer, Voluntary retirement schemes

    and payment of wages on behalf of the workers

    Sort out the critical issues in manpower placing

    All the three unions acted and participated equally and collaboratively

    Managed to gather confidence from the employees and workers individually by their

    good works

  • 8/7/2019 durga steel

    17/26

    Page 17

    Communication Consultation

    Joint decision making Participation

    Role of the three

    Trade unions toevolve out from thecrisis situation of DSP

  • 8/7/2019 durga steel

    18/26

    Page 18

    All workingcollaborativelyfor the success

    HIGHER

    MANAGEMENT

    MID- LEVELMANAGEMENT

    ANDSUPERVISORS

    EMPLOYEESAND

    WORKERS

    TRADEUNIONS

    THE

    SUCCESS

    STORY

  • 8/7/2019 durga steel

    19/26

    Page 19

    Replenishment ofinfrastructure, equ

    ipments, inflowsand investment innew machineries

    that boost up sales

    ncoura ed theunions and theemplo ees tothin for the

    futuredevelopment ofthe or anization

    Increasedjob

    satisfaction

  • 8/7/2019 durga steel

    20/26

    Page 20

    Improved work

    culture

    Managersmaintainedsympathetic

    but firmrelationships

    Three tierconsultativesystem andemployee

    workshops

    Strengtheningbonds amongunions and

    management

  • 8/7/2019 durga steel

    21/26

    Page 21

    THE BEST PART

    The were handled with no third party interference i.e. no involvement

    of arbitrator, adjudicator and conciliator

    The mother plant SAIL had extended their helping hand

    MECON had played the advisory role

  • 8/7/2019 durga steel

    22/26

    Page 22

    OTHER ISSUES

    Stabilization of the emerging social system

    Matching the requirements, production along with the modernization procedures

    Hiring fresh manpower to possibly eliminate the hurdle of overtime and shift sessions

    To capitulate upon the future changes in the political scenario of West Bengal

    Matching economic situations in deciding the wage and salary structures

    Time constraint to overcome the huge loss and run in profit

    Future requirement in higher quality and quantity production level to match the

    capacities of the plants

  • 8/7/2019 durga steel

    23/26

    Page 23

    RECOMMENDATION

    Reduction of intended and unintended consequences

    May have a profit sharing approach along with shorter working days / week to enhance

    employee satisfaction

    Role of trade union in implementation as well as installation

    Career progression of the employees as well as the workers to be highlighted by proper

    training facilities and job transfer

    A proper and scheduled categorization must be there between temporary and

    permanent department for the workers

  • 8/7/2019 durga steel

    24/26

    Page 24

    Informationsharing

    Consultation

    Managementcommitment

    Works skillstraining andup gradation

    Measuringworkers

    health andsafety

    Sharinggains withemployees

    Trade unionparticipation

  • 8/7/2019 durga steel

    25/26

    Page 25

    To continue with the current performance standards the bonding between the

    unions and the management need to be much more stronger.

    It is better to maintain the equipments rather than purchasing new one as per

    requirements will only solve the production problems . Lastly employees and

    workers to be kept satisfied by greater compensation packages and benefits to

    keep healthy work culture and increase the production simultaneously.