33
 TRAINING REPOR T ON DAMODAR VALLEY ORPORATION    U    N    I    V    E    R    S    I    T    Y    I    N    S    T    I    T    U    T    E    O    F    T    E    C    H    N    O    L    O    G    Y SUBMITTED B Y :  ABIB MOLLA (2011-6029)  SANC AYITA DAS (2011-6010) SUBMITTED TO:  Mr. KALLOL ROY (H.O.D OF ELECTRICAL ENGG)

DVC Maithon Report

Embed Size (px)

Citation preview

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 1/33

 TRAINING REPORT

ONDAMODAR VALLEY ORPORATION

   U   N   I   V   E

   R   S   I   T   Y

   I   N   S   T   I   T   U   T   E   O

   F

   T   E   C   H   N   O   L   O   G   Y

SUBMITTEDBY:

•  ABIB MOLLA

(2011-6029)

•   SANC AYITA DAS

(2011-6010)

SUBMITTEDTO:

 Mr. KALLOL ROY(H.O.D OF ELECTRICAL ENGG)

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 2/33

WHAT IS DVC ?DVC (Damodar Valley Corporation)a lea!y to t"epeople o# India$ emered a% a !&lmination o# attempt%

made o'er a "ole !ent&ry to !ontrol t"e ild anderrati! Damodar ri'er T"e ri'er %pan% o'er an area o#*+$*,-  /m*  !o'erin t"e %tate% o# 0"ar/"and(D"an1ad$ 2o/aro$ Ha3ari1a"$ 4oderma$ Giridi"$C""atra$ Palama&$ Ra!"i$ 5o"ardaa and Doom/a) 6

We%t 2enal (2&rdan $ Hoo"ly$ Hora"$ 2an/&ra andP&r&lia)

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 3/33

O20ECTIVES7P8RPOSE 9 FLOOD CONTROL.

IRRIGATION.

WATER SUPPLY- INDUSTRIAL AND DOMESTIC.

NAVIGATION & DRAINAGE.

GENERATION, TRANSMISSION AND DISTRIBUTION OF

ELECTRICAL ENERGY.

AFFORESTATION AND CONTROL OF SOIL EROSION.

PROMOTION OF PUBLIC HEALTH, AGRICULTURE,

INDUSTRIAL, ECONOMIC AND GENERAL WELL BEING INTHE VALLEY.

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 4/33

5AND:AR4S ACHIEVED 9 

DVC- FIRST MULTIPURPOSE RIVER VALLEY PROJECT BY THE GOVT. OF INDIA.

DVC- ORGANIZATION GENERATING POWER THROUGH THREE SOURCES- COAL, WATER AND

LIQUID FUEL.

FIRST UNDERGROUND HYDEL STATION- MAITHON.

BTPS- NATION’S BIGGEST THERMAL POWER PLANT IN THE 50’S OF THE LAST CENTURY BTPS BOILERS- FIRST TO BURN UNTAPPED LOW-GRADE COAL IN PULVERIZED FUEL

FURNACES.

CTPS- THE FIRST RE-HEAT UNITS IN INDIA, UTILIZING HIGH STEAM PARAMETER.

MTPS- FIRST OF ITS IND IN EASTERN INDIA WITH TUBE MILLS IN SERVICE FOR ZEROREJECT. DIRECT IGNITION OF PULVERIZED COAL !DIPC" SYSTEM FOR REDUCING OIL

CONSUMPTION IN THE BOILER.

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 5/33

-: DVC Infra!r"#!"r$ A! A G%an#$ :-

DVC COMMAND AREA ',() S*. +MS

POWER MANAGEMENT

TOTAL INSTALLEDCAPACITY 

.) MW

THERMAL POWER

STATIONS

FIVE CAPACITY )/

MW

HYDEL POWER STATIONSTHREE CAPACITY 0''

MW

GAS TURBINE STATIONONE CAPACITY 1.)

MW

SUB-STATIONS AND

RECEIVING STATIONS

AT / +V2 00 NOS.

AT 0( +V2 (( NOS.AT (( +V2 0 NOS.

TRANSMISSION LINES

/ +V2 0)// C+T

+MS

0( +V2 ('0) C+T

+MS

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 6/33

DVC POWER PLANTS AT A GLANCE

NAME LOCATION CAPACITY  

 T ERMAL

BO+ARO 4B4 DIST .- BO+ARO

STATE 2 5HAR+HAND

(/ MW

6( 7 0/ MW8CHANDRAPURA DIST .- BO+ARO

STATE 2 5HAR+HAND

1/ MW6( 7 0(/ MW8

96 7 )/ MW8

DURGAPUR DIST .- BARDDHAMAN

STATE - WEST BENGAL

()/ MW

6070'/ MW896070/ MW8

ME5IA DIST .- BAN+URA

STATE - WEST BENGAL

('/ MW6' 7 0/ MW8

96 7 )/ MW8

96 7 )// MW8

DSTPS DIST .- BARDHAMAN

STATE - WEST BENGAL

0/// MW6 7 )// MW8

+TPS DIST .- +ODERMA

STATE 2 5HAR+HAND

)// MW60 7 )// MW8

TOTAL THERMAL )0/ MW

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 7/33

NAME LOCATION E7ISTING CAPACITY  

HYDEL

TILAIYA RIVER ; 2ARA4AR

DIST ; HA<ARI2AGH

STATE = 0HAR4HAND

+ :W(* > * :W)

MAITHON RIVER ; 2ARA4AR

DIST ; 28RDHA:AN

STATE ; WEST 2ENGA5

,* :W(* > *@ :W)

(B > *,* :W)

PANCHET RIVER ; DA:ODAR

DIST ; DHAN2AD

STATE = 0HAN4HAND

@ :W(* > +@ :W)

TOTAL HYDEL B+* :W

GRAND TOTAL 6THERMAL 9 HYDEL8 5857.2 MW 

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 8/33

DAMS

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 9/33

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 10/33

MAITHON DAM

+EY OB5ECTIVES

FLOODCONTOLGENERATION OFELECTRIC POWER IRRIGATION

NAVIGATIO

N & DRAINAGE

WATERSUPPLY TO

INDUSTRIES AND

DOMESTICS

:ait"on Hydel

• :AITHON HDE5 POWER STATION (:HPS) IS 5OCATED ON THE RIVER2ARA4AR

• FIRST 8NDERGRO8ND POWER STATION• GENERATING CAPACIT OF @ :W• :HPS ;B@@@ FEET 2E5OW THE WATER 5EVE5

 TRAINING AT

:AITHON HDE5 POWERSTATION

**@ 4V 4A5ANESHWARIS82STATION

CENTRA5 5OAD DISPATCH

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 11/33

 OVERVIEW

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 12/33

P;$r G$n$ra!<n  En!r"!$= ;<!> !>$ r$?n<@<%<!<$ f?r<=<n !>$ <!a% <n?"! ?;$r fr <n="!r<a%

r;!> <n !>$ r$"r#$ r<#> Da=ar Va%%$r$<n, DVC >a @$$n ?ra#!<#a%% ?$ra!<n a a?<n$$r, "<n %a!$! aa<%a@%$ !$#>n%<$ !"??% @"% ?;$r a! r$ana@%$ ra!$ !!>$ ar <n="!r<$.

  DVC >a a<n!a<n$= <! %$a= r%$ <n !>$$a!$rn r$<n @ a=?!<n <!$%f ! !>$#>a%%$n$ f !<$ an= !$#>n% ="r<n !>$

#"r$ f %a! ) $ar. DVC >a @$$n $n$ra!<nan= !ran<!!<n ?;$r <n#$ 0)( an= >a"##$$=$= n! n% <n $$!<n !>$ n$$= f#n"$r @"! >a a% >$%?$= ! <n#r$a$ !>$=$an= f ?;$r ;><#> <!$%f < an <n=$ f=$$%?$n!.

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 13/33

MAITHON HYDEL POWER STATION

Maithon Hydal Power Station is

located on the river Barakar 12.9

km above its confluence with the

Damodar near the border of

Dhanbad and Burdwan districts of

the state of harkhand and !estBen"al res#ectively. $he uni%ue

feature of this hydal #ower station

is that it is located under"round in

the left bank of the river and is thefirst of its kind in &ndia. $he Power

station has a total "eneratin"

ca#acity of '( M! with ) units of

2( M! each.

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 14/33

H; H=r?;$r Wr

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 15/33

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 16/33

 PENSTOC+:&t is a closed conduit which connects the fore bay or sur"e tank to the scroll

case of the turbine.

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 17/33

Maithon Hydel Station At A Glance1. Draina"e area 2*)( s% . mile

2. &nflow+ma,imum- 2(( cusec

). /nnual rainfall+ma,- 0( inch

*. /nnual rainfall+av".- )(. inch

. /rea desi"n 2*(( al

'. en"th of back water 1 miles0. Ma3or reservoir level '4((h

. 5ross stron" ca#acity 1(*6(((( /l H

9. 7lood control reservoir **(((( /l H

1(. Monsoon stora"e ca#acity *9'((( /l H

11. 8stimated cost of station *.01 crores

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 18/33

20 Mw Generator Spe!"!at!on

1. Simmens Sehuckert65ermany

2. )PH6"enerator no.D0)**

). $y#e4P7 '0(*04)**. :116((( volt61)1(12am#

. ;PM410'.'

'. <=/42(((29(((

0. P.74(. const.E#!tor Spe!"!at!on

1. => 29))(**

2. /> *'(0((

Main Excitor

1. DC GEN. NO-D39408

2. TYPE-GV 441/36

3. V-310,333,500

4. RPM-176.6

SING5E 5INE DIAGRA: OF HDE5 POWER STATION

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 19/33

SING5E 5INE DIAGRA: OF HDE5 POWER STATION

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 20/33

MEASURING INSTRUMENT USED 2

• ENERGY METER ; To mea%&re t"e enery

tran%mitted enery meter% are tted to t"e panel to

dierent #eeder% t"e enery tran%mitted i% re!orded

a#ter one "o&r re&larly #or it :WHr$ meter i%pro'ided

• WATTMETERS ; It i% atta!"ed to ea!" #eeder to

re!ord t"e poer eported #rom DVC

• FRE*UENCY METER - To mea%&re t"e #reJ&en!y at

ea!" #eeder t"ere i% t"e pro'i%ion o# analo or

diital #reJ&en!y meter

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 21/33

•FRE!EN"Y METER # To me!"#e $%e &#e'"e()* $ e)% &ee+e#

$%e#e ! $%e #o!o( o& (o o# +$ &#e'"e()* me$e#.

•$OLTMETER - $ ! #o+e+ $o me!"#e $%e %!e $o %!eo$e .$ ! !o e ( o$% $%e (o (+ +$ &#e'"e()*

me$e#. 

•AMMETER - $ ! #o+e+ $o me!"#e $%e (e )"##e($. $ ! !o

e ( o$% $%e &o#m! (o ! e ! +$.

•MA7IMUM DEMAND INDICATOR ; T"ere are al%omo&nted t"e !ontrol panel to re!ord t"e a'eraepoer o'er %&!!e%%i'e predetermined period

•MVAR METER ; It i% to mea%&re t"e rea!ti'e poero# t"e !ir!&it

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 22/33

GENERATED POWER

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 23/33

ELECTRIC POWERTRANSMISSION

ELECTRIC-POWER TRANSMISSION IS THE 2854 TRANSFEROF ELECTRICAL ENERGY $ FRO: GENERATING POWER P5ANTS

 TO E5ECTRICA5 S82STATION 5OCATED NEAR DE:ANDCENTERS

AT IS AN ELECTRIC SUBSTATIONA SUBSTATION IS A PART OF AN E5ECTRICA5 GENERATION$ TRANS:ISSIONAND DISTRI28TION SSTE: S82STATIONS TRANSFOR: VO5TAGE FRO:HIGH TO 5OW$ OR THE REVERSE$ 8SING STEP;8P OR STEP;DOWN TRANSFOR:ERS

ELEMENTS OF A SUBSTATION A:PRIMARY POWER LINES4 SIDE B:SECONDARYPOWER LINES4 SIDE 0.PRIMARY POWER LINES .GROUND WIRE (.OVERHEAD LINES'.TRANSFORMER FOR MEASUREMENT OF ELECTRIC VOLTAGE ).DISCONNECT

SWITCH .CIRCUIT BREA+ER .CURRENT TRANSFORMER 1.LIGHTNING ARRESTER.MAIN TRANSFORMER 0/.CONTROL BUILDING 00.SECURITY FENCE 0.SECONDARY

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 24/33

220KV KALYANESWARI SUB-STATION

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 25/33

%%&'$ SYSTEM ()% *AYS+ 

%%&'$ LINES, #

)+ L-%%.('ALYANESWARI#MTPS+

%+ L-%%/('ALYANESWARI#MTPS+

0+ L-%&0('ALYANESWARI#"TPS+

1+ L-%&1('ALYANESWARI#"TPS+

2+ L-%)3('ALYANESWARI#PG"IL4 PITHA'ARI+

5+ L-%).('ALYANESWARI#PG"IL4 PITHA'ARI+

 

COPER - 02 NO.

TE Y-01NO. 

A!TOTRANSFORMERS, #

• ATR-)"GL MA'E )2&M$A4 %%&'$6)0%'$• ATR-% "GL MA'E )2&M$A4 %%&'$6)0%'$• ATR-0 *HEL MA'E )2&M$A4 %%&'$6)0%'$

)0%'$ SYSTEM ()) *AYS+

  )0%'$ LINES, # )+ L- ).('LN#'LP+

 %+ L- )/'LN#'LP+

 0+ L- 5.(MHS#'LN+

 1+ L- 5/(MHS#'LN+

 2+ MAL#IMPE7 FDR ("D 8 5)M$A+

A!TOTRANSFORMERS, # 

)+ ATR-)"GL MA'E )2&M$A4 %%&'$6)0%'$

%+ ATR-% "GL MA'E )2&M$A4 %%&'$6)0%'$

0+ ATR-0 "GL MA'E )2&M$A4 %%&'$6)0%'$

TWO WINDING TRANSFORMERS,#)+ 2& M$A4 )0%600'$4 APE7 MA'E9

%+ 0)92M$A4 )0%600'$4 TEL' MA'E9

COPER - 01 NO.

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 26/33

((+V SYSTEMNAME OF THE CONS$MERS%

)+ IMPE7 STEEL (P$T+ LTD9("D#39&M$A+

%+ HIRA "ON"!ST STEEL P$T LTD ("D#39&M$A+0+ "ITY ALLOYS P$T9 LTD9 ("D#09&M$A+

1+ *MA STAINLESS LIMITED ("D#)%9&M$A+

2+ :AGDAM*A ISPAT P$T LIMITED ("D#09&M$A+

5+ MAA LILORI ISPAT LTD9 ("D# 09&M$A+

3+ "HHA*RA ISPAT P$T9 LTD9("D 8 .M$A+

S82STATIO

N

SWITCHARD

CONTRO528I5DING

SUBSTATION PARTS AND E*UIPMENT

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 27/33

SUBSTATION PARTS AND E*UIPMENT

OUTDOORSWITCHYARD

• INCOMING & OUTGOING LINES• BUSBARS• POWER TRANSFORMERS AND MEASUREMENT TRANSFORMERS• INSULATORS• CIRCUIT-BEAKERS & ISOLATORS• LIGHTNING ARRESTORS• GALVANISED STEEL STRUCTURES FOR TOWERS & EQUIPMENT SUPPORTS.• ROADS, RAILWAY TRACK, CABLE TRENCHES•

 PLCC EQUIPMENT INCLUDING LINE TRAP, TUNING UNIT, COUPLING CAPACITOR, ETC.• STATION EARTHING SYSTEM COMPRISING GROUND MAT, RISERS, AUXILIARY MAT,EARTHING STRIPS, EARTHING SPIKES & EARTH ELECTRODES.

• CONTROL CABLES FOR PROTECTION AND CONTROL

CONTROL BUILDINGIN EVERY SUB-STATION CERTAIN SUPERVISION, CONTROL AND PROTECTION FUNCTIONS

 ARE NECESSARY. SO A CONTROL BUILDING/CONTROL ROOM IS REQUIRED. THE RELAY AND PROTECTION PANELS AND CONTROL PANELS ARE INSTALLED IN THE CONTROLROOM.

CONTROL IN SUB-STATION ARE OF TWO CATEGORIES.

&. NORMAL RO$TINE O'ERATION Y O'ERATORS COMMAND.

2. A$TOMATIC O'ERATION Y ACTION OF 'ROTECTIE RELAYS AND CONTROL SYSTEM

FUNCTIONS OF CONTROL ROOM

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 28/33

FUNCTIONS OF CONTROL ROOM

0. ALARM FUNCTIONS

. CONTROL AND INDICATION

(. DATA COLLECTION, RECORDING,

DISPLAY TRANSFORMERS 'RESENT IN KALYANESH*ARI S$STATION

150 MV 220/132:V TO-TRN;ORMER

Make –BHELYear of manufacture: 2003Type of cooling: ONAN/ONAF/OFAFRating HV & LV (VA)- 75/ 105/ 50

  ( 50%/75%/100%)Rating LV - 10/ 14/20

(50%/70%/100%)Temp rise oil- 40C (Over Ambient of 50)Temp rise winding- 45 (Over Ambient of 50)

 Purchase order Ref- PE-SPEC-719(R)/581257Dated 03.12.02Maker Sl No- 6006080

Elect Spec No- 601098 Phase 3ǾFrequency 50 HzConnection Symbol- YNa0d1Impedance Volt at 150MVA BaseHV Position (1/IV)12.6% to 16.24%HV Position (9b/IV) 14.1% to 15.5%

HV Position (17/IV) 13% to 16.77%

No Load Voltage HV (Kv)-230No Load Voltage IV (Kv)- 138No Load Voltage LV (Kv)-6.9Line Current HV (Amps)-188.5/263.9/377.0

Line Current LV (Amps)- 314.2/439.8/628.3Line Current LV (Amps)- 837.8/1172.9/1675.5

Insulation Level:HV- L1 950AC 395-L1 170 AC 70IV- L1550AC 275LV-L1 75AC 2×6.9Diagram DRG No- 34631900019OGA DRG No- 3463000066Core and winding (Kg)- 59700Weight of oil (Kg)- 38280Total weight (Kg)-140365Oil quantity (L)- 44000Transport Weight (Kg)-79000Undertaking weight (Kg) – 59700

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 29/33

In%tr&ment

tran%#ormer

C&rrenttran%#or

mer

Potentialtran%#or

mer

CURRENT TR NSFORM ER (CT):

 

MAKE – ELECTRIC POWER EQUIPMENT CO.MSR INDUSTRIES ESTATE, BANGALORE – 560054

 TYPE – OHCDB-R

HSV – 36KV

SERIAL NO. – 33193

FREQ – 50 HZ.RATED VOLTAGE – 33KV

SHORT TIME THERMAL CURRENT – 15.15KA FOR 3 SECS

INSULATION – 70/170KV

QTY OF OIL/WT. – 20 LTR./ 24 KG APRX.

DYNAMIC CURRENT – 65.6 KAP

 YEAR – 1999 TOTAL WT. – 150 KGS (APRX)

MAX. TEMP. RISE - WINDING - 45 

C

INSULATION – ‘A’

OVER AMBIENT (45C) OIL - 40C

CONTINUOUS THERMAL CURRENT – 780 A

 

25.24KA FOR 1 SECS

MAKE + MODERN ELECTRONICTY'E + O'T

RATIO + ,,K√

, - &&0√

, -&&0√

,.

HS + ,K/

 'HASE + &/

FRE1 0 H3

INS$LATION CLASS + A

CORE 1 I II

$RDEN 1 &00 &00

CLASS 1 0.2 ,'

.F 1 &.2 CONT. 4 &.5 FOR ,0 S

CONN + 'H + E

IL + 60-&60K

TEM'. RISE OER *DG OIL

C , 

C

OIL TY. + 20 LTR.

TOTAL *T. + 50KG

ISS + ,&/

SL. NO.1 ME-'T-7&&-08

  '.O NO. + CE(T)-' + 7-ST + -2086

POTENTI L TR NSFORMER (PT) :

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 30/33

I l

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 31/33

I%olator%9 

ISOLATORS GIVE PHYSICAL SEPARATION BETWEEN LIVE

PART AND DEAD PART. PHYSICAL SEPARATION CAN BE

SEEN BY NAKED EYE FROM A DISTANCE.

S"r$L<!>n<n Arr$!r 6LA8:SINGLE POLE UNITS CONNECTED BETWEEN BUSBAR AND

GROUND. HIGH VOLTAGE SURGES CAUSED BY LIGHTNING

OR SWITCHING ARE DISCHARGED EFFECTIVELY TO

EARTH.

B" @ar:  

BUSBARS ARE CONDUCTORS OF ADEQUATE

CROSS-SECTION, SUPPORTED ON INSULATORS

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 32/33

PROTECTON < CONTRO

  O;<ecti=e> o? Protection

I+ TO DIS"ONNE"T THE FA!LTY "IR"!IT WITH MINIM!M

DAMAGE D!E TO FA!LT9II+ TO LEA$E THE REST OF THE POWER SYSTEM IN A HEALTHY

STATE9

III+ "OST OF REPAIR OF DAMAGE TO *E 'EPT MINIM!M9

I$+ TO RESTRI"T POSSI*ILITY OF SPREADING AND IN$OL$ING

OTHER E!IPMENT9

$+ TO RED!"E TIME THE E!IPMENT O!T OF SER$I"E9$I+ TO MINIMI@E "OST OF RE$EN!E LOSS9

"haracteri>tic o? Protection,

I+ $ERY FAST

II+ SELE"TI$EIII+ SENSITI$E

III+ STA*LE !NDER E7TERNAL FA!LT

8/16/2019 DVC Maithon Report

http://slidepdf.com/reader/full/dvc-maithon-report 33/33

REFERENCES

• arti!len!om (Generation)

• nirman!are!om (Hydro Poer Plant)

• oldopt!l!oin (Poer Grid)

• /al/ite!"!om (1lo!/ o# C5D)

• Company :an&al (HR Department)• S&1 Station :an&al