Click here to load reader
Upload
ngomien
View
216
Download
2
Embed Size (px)
Citation preview
IV I II III
J A S O N D J F M A M J J
Plan
Baseline
0
1,500
3,000
4,500
6,000
7,500
9,000
10,500
12,000
13,500
15,000
16,500
18,000
19,500
21,000
22,500
24,000
25,500
27,000
28,500
30,000
BudgetActualEarned ValuePV
Earned Value Dashboard
PV(BCWS)
EV(BCWP)
ActualCost
BaselineCost
Name PercentComplete
SV CV CPI
$6,296$6,703$13,924$19,873 PROJECT SUMMARY $407.05 ($7,221) 0.48
$1,489$1,480$3,000$3,523TEST MOTOR DESIGN AND SUPPORT ($9.01) ($1,520) 0.49
$1,803$1,907$3,050$4,333ANALYSIS PLAN $103.47 ($1,143) 0.63
$1,900$1,984$2,050$4,222TEST & VERIFICATION PLAN $84.44 ($66) 0.97
$429$508$3,600$1,452DESIGN PLAN $78.78 ($3,092) 0.14
$675$825$2,224$6,343SYSTEM DESIGN ANALYSIS $149.37 ($1,399) 0.37
$0$0$0$2,555SYSTEMS ENGINEERING AND INTEGRATION $0.00 $0 0.00
Plan
Baseline