Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting – February 2017

Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Eastside Transit Corridor Phase 2 Technical Study Update Community Outreach Meeting – February 2017

Page 2: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

2

Purpose of Tonight’s Meeting

Recap of Board motion (2014) and technical study process

Provide update on SR-60 Alternative technical investigations

Share results of the Washington Blvd. Alternative Routing Concepts

Receive feedback from you

Discuss next steps

Page 3: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Alternatives Studied in 2014 Draft EIS/EIR

3

Aerial configuration eliminated by Metro Board

Draft EIS/EIR Alternatives: SR-60 6.9 Miles, 4 Stations (all aerial)

Washington Bl (Garfield Aerial) 9.3 Miles, 6 Stations (3 aerial, 3 at-grade)

Page 4: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

4

Nov 2014: Board-directed Technical Study to:

Address Agency Comments - US Environmental Protection Agency (USEPA) - US Army Corps of Engineers (USACE) - California Department of Transportation (Caltrans) - California Department of Fish and Wildlife (CDFW) - Southern California Edison (SCE)

Eliminate Aerial on Garfield Av between Via Campo and Whittier Bl. - Draft EIS/EIR eliminated at-grade

Identify a New North/South Connection to Washington Bl.

Explore Feasibility of Operating Both SR-60 and Washington Bl. Alternatives

Board Motion

Page 5: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Phases of Project Development

Final Environmental

Clearance

Construction

Open for Service

Environmental Studies & Conceptual Engineering

Technical Study Metro Board Consideration of

Findings (Spring 2017)

Early Planning

We Are Here

Ongoing Public Participation

Metro Board Directive (Nov. 2014)

Final Design

Page 6: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

6

SR-60 North Side Design Variation (NSDV) Alternative

Paramount

Bridge

0.5 mile

Page 7: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Caltrans: SR-60 NSDV flyover west of Greenwood Ave affects the ability to widen SR-60 to full standard + HOV lanes

Paramount Bl.

Bridge

SCE Mesa Substation

7

SR 60 at Greenwood Bridge Looking West 7

Page 8: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Shifted SR-60 NSDV Flyover Further East and Lowered Grade Profile To Minimize Visual Impact to Marketplace Development

Greenwood Ave / SR-60 looking west

Paramount Bl.

Bridge SCE Mesa Substation

Future Marketplace Development

(under construction) Initial SR-60 NSDV Alignment

New SR-60 NSDV Alignment

8

Page 9: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

SR-60 NSDV Alignment Column Placement Relocation To Avoid Conflict with New SR-60 Ramps

Paramount

Bridge

SCE Mesa Substation

Paramount

Bridge

Caltrans Loop Ramp Improvement (under

construction)

Previous NSDV Alignment/Columns

New NSDV Alignment/Columns

1/8 mile

Page 10: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

10

Raised SCE Transmission Lines at SR-60/Paramount Interchange

Paramount

Bridge

SCE Mesa Substation

3 Poles

3 Towers

500 feet

Page 11: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Raised SCE Transmission Lines at SR-60/Paramount Interchange

Guideway Elevation -

Existing Tower Height

Existing Transmission Lines

New Tower Height

11

Page 12: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

12

Whittier Narrows Dam Flood Control Basin Refined Santa Anita Station Concept

*Station location and park-and-ride structure design concept are subject to change as technical analysis continues

Potential

Park-and-Ride

Structure)

Raise Park-and-

Ride Structure

above flood level

0.25 mile

Page 13: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

13

SR-60 Alternative Transition from At-Grade to Aerial 2014 Draft EIS/EIR Assumptions

Pomona Blvd Existing Atlantic Station

Hil

lvie

w A

v

AltaMed

Beginning of Retaining Wall at

Pomona Bl & Hillview St

0.25 mile

Page 14: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

14

SR-60 Alternative Transition from At-Grade to Aerial Moved Retaining Wall Further East (Proposed Refinement)

Pomona Blvd Existing Atlantic Station

Hil

lvie

w A

v

AltaMed

Beginning of Retaining Wall

Mid-block East of Hillview Ave

0.25 mile

Page 15: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Metro Board Item Checklist

Coordinate with Agencies to Address Comments

US Environmental Protection Agency (USEPA)

US Army Corps of Engineers (USACE)

California Department of Transportation (Caltrans)

California Department of Fish and Wildlife (CDFW)

Southern California Edison (SCE)

SR-60 Alternative

15

No major Resource Agency issues with resuming environmental review of the SR-60 Alternative.

Page 16: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Identify New North-South Connection to

Washington Boulevard

16

Page 17: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

17

Washington Boulevard Alternative

North-South Connection Concepts

Page 18: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Garfield Avenue Underground Concept

18

Potential New Station Location

Aerial

Underground

Transition

Station

At-grade

Aerial

Aerial

Aerial Option

Gold Line Eastside Extension

Metrolink

Existing Transit

Draft EIS/EIR

Garfield Underground Concept

Potential conflicts with

underground utilities

No connection to the

Citadel/major activity

centers

Low-moderate activity

level at Whittier/Garfield

Page 19: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Arizona: 3rd/Mednik Junction Issues

At-grade and Underground Concepts

• Existing Civic Center Station and Gold Line operations

• Sensitive uses

• Residential properties

• Traffic, access and parking

• Pedestrian and bicycle safety

Potential Impacts to:

Third St East LA Civic Center Station

19

Page 20: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

20

Arizona Av. at Whittier Bl. (Looking South)

Arizona Avenue

Page 21: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

South Atlantic Blvd Concept - Opportunities and Challenges

21

Potential Challenges

Commerce

Citadel

Commerce

Casino/Hotel

Citadel Outlets/Hotel Commerce Casino/Hotel

Opportunities

Draft - For Discussion Only

SCE Towers/Wires BNSF Rail spurs I-5 / UPRR “Mix-Master”

Page 22: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

22

Atlantic Bl. at Whittier Bl. (Looking Southbound)

Atlantic Boulevard – Existing Condition

Page 23: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Atlantic Underground Concept – What’s Needed?

23

• Excavation of station boxes

• Two tunnel portals – one north and one south

• Two locations to launch and extract a TBM – exact locations unknown

Page 24: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Atlantic Underground

24

Carry Atlantic Underground forward as the new Washington Alternative

Staff Recommendation:

Page 25: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Metro Board Item Checklist

Eliminate Aerial on Garfield Av between Via Campo and Whittier Bl. Draft EIS/EIR eliminated at-grade

Identify a New North/South Connection to Washington Bl.

Washington Alternative

25

Page 26: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Measure M Funding

Total Funding: $6.0 Billion Funding delivered in two phases:

• Phase 1: $3.0 Billion in 2029

• Phase 2: $3.0 Billion in 2053

Measure M Funding

Page 27: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

27

Combined Alternative

Can You Operate a Combined Alternative with

SR-60 and Washington Alternatives?

Page 28: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Combined Alternative - Overview South El Monte Line A

Whittier Line B B

C South El Monte To Whittier Line C

N

C B A + + = The Combined Alternative

Atlantic

Existing Gold Line Peck Rd

One Maintenance Yard for the Combined Alternative

Location TBD

Lambert

Downtown LA

Draft – For Discussion Only

Page 29: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Metro Board Item Checklist

Explore Feasibility of Operating Both SR-60 and Washington Bl Alternatives

Page 30: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Share Your Thoughts

We would like to ask you some questions about the alternatives. The following Preference Survey is designed to obtain your input on the Eastside Transit Corridor Phase 2 project.

The survey consists of five questions.

Please respond by using the clicker:

Multiple choice answers correspond with the numbers on the voting devices

There are no right or wrong answers

30

Page 31: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Have you ever taken a trip on the Metro Gold Line?

Test Question

1. Yes

2. No

1. Answer 1

2. Answer 2

Page 32: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

What is the most important reason for implementing the Eastside 2 extension?

Question 1

1. Connecting to the regional system

2. Ease traffic congestion

3. Economic revitalization

4. Improving access to major activity centers and jobs

5. Other

1. Connecting to the

regional system

2. East traffic congestion

3. Economic

revitalization

4. Improving access to

major activity centers

and jobs

5. Other

Page 33: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

What is the most important consideration for a Metro Rail station?

Question 2

1. Proximity to activity centers

2. Ease of access (walking, bike, bus, parking, etc.)

3. Safety and security

4. Economic revitalization potential

5. Other

1. Proximity to activity

centers

2. Ease of Access

(walking, bike, bus,

parking, etc.)

3. Safety and Security

4. Economic

revitalization potential

5. Other

Page 34: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Based on what you heard today, what is your biggest concern?

Question 3

1. Traffic/Circulation/Parking

2. Construction activities (displacement/disruption of residents and/or businesses)

3. Safety and security

4. Air quality impacts

5. Other

1. Traffic/Circulation/Parki

ng

2. Construction Activities

(displacement/disruption

of residents and/or

businesses)

3. Safety and Security

4. Economic revitalization

potential

5. Other

Page 35: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Do you agree or disagree with the following statement: “The Atlantic underground concept has enough merit to be

recommended as the new Washington Blvd Alternative.”

Question 4

1. Agree

2. Neutral

3. Disagree

1. Agree

2. Neutral

3. Disagree

Page 36: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Based on what you heard, is there merit in adding a combined Alternative that includes both SR-60 and

Washington Blvd in the next phase of the study?

Question 5

1. Yes

2. No

3. Maybe

1. Yes

2. No

3. Maybe

Page 37: Eastside Transit Corridor Phase 2€¦ · February 2017 - Technical Study Update - Eastside Transit Corridor Phase 2 Keywords: February 2017 - Technical Study Update - Eastside Transit

Next Steps/Schedule

Spring 2017 – Metro Board consideration of Technical Study findings

Summer/Fall 2017 – Reinitiate Environmental Process