Environmental Monitoring Report Annual Report September 2013

PRC: Taiyuan-Zhongwei Railway Project Prepared by Beijing AOSIS Environmental Protection Technology Co., Ltd for the Ministry of Railways and the Asian Development Bank.

Page 2: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

Project Developed with Loan from Asian Development Bank

Newly-built Taiyuan-Zhongwei (Yinchuan) Railway

General Report on Environment Monitoring

Beijing OASIS Environmental Protection Technology Co., Ltd.September 2013

1

Page 4: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

TABLE OF CONTENTS

1. Brief of Project................................................................................................................................11.1 Project progress...............................................................................................................................11.2 Overview of environment along the Line.......................................................................................42. Management and Monitoring of Environmental and Water Protection..........................................52.1 Management and monitoring..........................................................................................................52.2 Monitoring and control objective....................................................................................................62.3 Monitoring of environmental and water protection........................................................................72.4 Monitoring system and approach....................................................................................................83. Implementation of Environmental Control.....................................................................................93.1 Pre-post training for environmental protection...............................................................................93.2 Monitoring implementation in 2007.............................................................................................103.3 Monitoring implementation in 2008.............................................................................................183.4 Monitoring implementation in 2009.............................................................................................283.5 Monitoring implementation in 2010.............................................................................................303.6 Monitoring implementation during operation in 2011..................................................................354. Monitoring over Completion Acceptance of Environmental Protection......................................394.1 Investigation over tunnelling works..............................................................................................394.2 Investigation over bridge works....................................................................................................474.3 Investigation over slope protection for stations and subgrades....................................................535. Implementation of the Ecological Environment Measures...........................................................565.1 Occupation of land........................................................................................................................565.2 Investigation over borrow pits.......................................................................................................565.3 Investigation over spoil grounds...................................................................................................605.4 Situation of the ecological sensitive area......................................................................................735.5 Investigation over the temporary works........................................................................................795.6 People-benefiting project..............................................................................................................806. Situation of Environmental Pollution Prevention.........................................................................856.1 Implementation situation of water environment prevention measures.........................................856.2 Implementation situation of atmospheric environment prevention measures..............................866.3 Implementation situation of acoustic environment prevention measures.....................................876.4 Impact of construction vibration on environment.........................................................................887. Implementation Situation of Vegetation Measures for Soil and Water Conservation of

Taiyuan-Zhongwei (Yinchuan) Railway........................................................................888. Passenger & Cargo Transportation and Income of Taiyuan-Zhongwei (Yinchuan) Railway......889. Situation of Investment in Environmental Protection...................................................................8910. Conclusion and Suggestion...........................................................................................................89Appendix 1. Details of the borrow pits of Taiyuan-Zhongwei (Yinchuan) Railway.................................90Appendix 2. Details of the spoil grounds of Taiyuan-Zhongwei (Yinchuan) Railway..............................97Appendix 3. Details of the acoustic barrier projects of Taiyuan-Zhongwei (Yinchuan) Railway...........119

Page 5: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

List of Photos1. Photo 3-1: Training class for environmental and water protection2. Photo 3-2: Environmental protection bulletin board at entrance of Baijiashan Tunnel by China Railway 16th

Bureau Group Co., Ltd.3. Photo 3-3: Appraisal report by China Railway 12th Bureau Group Co., Ltd.4. Photo 3-4: Notification of Safety, Quality and Environment by China Railway 19th Bureau Group Co., Ltd.5. Photo 3-5: 1# inclined shaft of Lvliangshan Tunnel by China Railway 12th Bureau Group Co., Ltd.6. Photo 3-6: 2# inclined shaft of Suide Tunnel by China Railway 19th Bureau Group Co., Ltd.7. Photo 3-7: Sewage sedimentation tank at entrance of Lvliangshan Tunnel8. Photo 3-8: Sewage sedimentation tank at entrance of Lvliangshan Tunnel after rectification9. Photo 3-9: Environmental protection billboard of Yongning Yellow River Super-major bridge by China Tiesiju

Civil Engineering Group Co., Ltd.10. Photo 3-10: Construction site of Zhongning Yellow River Super-major bridge11. Photo 3-11: Construction road of Zhongning Yellow River Super-major bridge12. Photo 3-12: Construction site of Fenghaoliang Dadongchuanhe Super-major bridge by China Communications

Construction Co., Ltd.13. Photo 3-13: Spoils around cofferdam of 5# pier of Wubao Yellow River Super-major Bridge by China

Communications Construction Co., Ltd. has been cleared14. Photo 3-14: Construction camp of entrance of Lvliangshan tunnel15. Photo 3-15: Construction camp of 2# inclined shaft of Suide tunnel by China Railway 19th Bureau Group Co.,

Ltd.16. Photo 3-16: Retaining wall built in spoil ground of 1# inclined shaft of Wubao tunnel17. Photo 3-17: Slag retaining dam built in spoil ground at the entrance of Liulin tunnel18. Photo 3-18: Construction road of Yongning Yellow River Super-major bridge for reduction of cross section of

flood discharge19. Photo 3-19: Newly-set major environmental element caution list by China Railway Tunnel Bureau at the

entrance of Xingwangmao tunnel20. Photo 3-20: Bulletin board for environmental protection at 2# inclined shaft set in Lvliangshan tunnel by

China Railway 12th Bureau Group Co., Ltd.21. Photo 3-21: Monitoring and supervising notifications of China Railway Bureau 17th Group Ltd. (left) and

China Railway Bureau 19th Group Ltd.22. Photo 3-22: Staff medical examination report of Second Project Department of China Railway Tunnel Bureau23. Photo 3-23: Waste oil of air compressor has been collected and cycled by the local at No.2 inclined shaft of

Suide Tunnel by China Railway 19th Bureau Group Co., Ltd.24. Photo 3-24: Clean site of air storage tank of air compressor at No. 2 inclined shaft of Liulin Tunnel25. Photo 3-25: Tidy air compressor room at 2# inclined shaft of Lvliangshan Tunnel by China Railway 12th

Bureau Group Co., Ltd.26. Photo 3-26: Waste oil discharged from air storage tank of air compressor has been collected at 1# inclined

shaft of Wubao Tunnel by China Railway 16th Bureau Group Co., Ltd.27. Photo 3-27: Land formation has been conducted with vegetation exposed in the construction site of Si’er’tan

Super-major Bridge in Habahu Nature reserve by China Railway 12th Bureau Group Co., Ltd.28. Photo 3-28: Tidy construction site of Super-major bridge cross Shizhong Highway by China Railway 21st

Bureau Group co., Ltd.29. Photo 3-29: Temporary retaining for contact channel and canal as gridding vegetation at super-major bridge

cross Hekou Temple reservoir by China Railway Erju Co. Ltd.

Page 6: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

30. Photo 3-30: There is vegetation now at completed pier at Maijiatai Super-major Bridge by China State Construction

31. Photo 3-31: Completed protection of riverbank at Er’shilipu Super-major Bridge by China Railway 16th Bureau Group Co., Ltd.

32. Photo 3-32: The canal is restored for Wangwu Xiaohe Super-major Bridge by China Communications Construction Company Ltd.

33. Photo 3-33: Retaining wall of spoil ground along the riverway at Xuejiasi Tunnel Exit by China Communications Construction Company Ltd.

34. Photo 3-34: Retaining wall of spoil ground along with Dali River at Duijiushan Tunnel Exit Spoil Ground by China Railway 17 Bureau Group Co., Ltd.

35. Photo 3-35: Segregation, leveling and retaining have been conducted for No.1 Spoil Ground of Wubao Station creating land about 30 Mu for the local

36. Photo 3-36: Borrow pit has become farmland at DK421+400 by Project Department by China State Construction First Building Corporation Limited

37. Photo 3-37: Borrow pit has partially become farmland at DK391+100 by China Railway Erju Co. Ltd.38. Photo 3-38: The borrow pit has been leveled at GDK420+200 by Project Department by China State

Construction First Building Corporation Limited39. Photo 3-39: The protection of Youfangping Spoil Ground by China Communication Construction Company

Ltd. has been conducted and the planting on both sides of construction roads is under way 40. Photo 3-40: Artemisia ordosica and Gaodan grass planted by China Railway 12th Bureau Group Co., Ltd. on

side slope of spoil ground41. Photo 3-41: Zhongning Girder Fabrication Yard by China Railway Tenth Group Co., Ltd.42. Photo 3-42: Sewage Sedimentation Basin for Er’shilipu Super-major Bridge by China Railway 16th Bureau

Group Co., Ltd. (Left photo: before rectification) (Right photo: after rectification)43. Photo 3-43: Farmland submerged by water gushed from 2# inclined shaft of Xingwangmao Tunnel of China

Railway Tunnel Stock Co., Ltd. is recovered44. Photo 3-44: China State Construction DK646+402 borrow pits had been covered with vegetation45. Photo 3-45: China Railway 12th Bureau Group DK548+400 borrow pits had been greened46. Photo 3-46: Spoil ground of 63mu at the exit of Bajing Bumu Village 1# Tunnel by China Communications

Construction Company Ltd had been reclaimed47. Photo 3-47: Spoil ground of 60mu at the exit of Baijiashan Tunnel by China Railway 16th Bureau Group Co.,

Ltd had been leveled48. Photo 3-48: DK365+150 Spoil ground of 120mu by China Railway Erju Co., Ltd. had been reclaimed49. Photo 3-49: Lvlangshan Tunnel 5# spoil ground by No.3 Engineering Group Co., Ltd had been covered with

earth and could been reclaimed50. Photo 3-50: Spoil ground at the entrance of Hengshan Tunnel by China Railway First Group Co., Ltd.51. Photo 3-51: Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co., Ltd.52. Photo 3-52: Liulin Girder Fabrication Yard by China Communications Construction Company Ltd was to be

handed over to local coal washery53. Photo 3-53: Wubao Girder Fabrication Yard by China Communications Construction Company Ltd had been

removed and become Wubao Station54. Photo 3-54: Mixing station at the exit of Huangzhang 3# Tunnel by China Communications Construction

Company Ltd had been reclaimed55. Photo 3-55: DK413+571 Mixing station by China Railway Erju Co., Ltd. had been reclaimed56. Photo 3-56: Sewage treatment station at Taiyangshan Station by China State Construction

II

Page 7: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

57. Photo 3-57: Boiler rooms at Gaoshawo Station by China Railway 12th Bureau Group Co., Ltd.58. Photo 3-58: Sewage treatment station at Hongsibao Station59. Photo 3-59: Boiler rooms at East Dingbian Station was under installation60. Photo 3-60: Trains pass through the entrance of Lvliangshan Tunnel61. Photo 3-61: Trains run through Shaanbei Plateau62. Photo 3-62: Land Reclamation Agreement concluded between China Railway 17 Bureau Group Co., Ltd. and

Land and Resource Bureau of Zizhou County63. Photo 3-63: Power of Attorney of Land Restoration concluded between China Railway 19th Bureau Group

Co., Ltd. and the people’s government of Mantang town64. Photo 3-64: Acoustic barrier at Beichuanhe Super-major Bridge next to Shuangwudu Village65. Photo 3-65: Acoustic barrier at Beichuanhe Super-major Bridge in Shang’an Village66. Photo 3-66: Acoustic barrier at Liulin Super-major Bridge by China Communications Construction Company

Ltd is under construction67. Photo 3-67: Acoustic barriers at Shijiawan Middle School, Shijiawan Primary School and the exit of Shijiawan

Tunnel68. Photo 3-68: 5# spoil ground at Wubao Station by China Communications Construction Company Ltd.69. Photo 3-69: Water drained from Wubao Station by China Communications Construction Company Ltd. and

subgrade culverts brushing station yard sideslope70. Photo 4-1: Entrance of Lvliang Mountain Tunnel constructed by China Railway 12th Bureau Group Co., Ltd.71. Photo 4-2: Exit of Lvliang Mountain Tunnel constructed by China Railway 3rd Bureau Group Co., Ltd.72. Photo 4-3: Exit of Xingwangmao Tunnel by China Railway Tunnel Bureau73. Photo 4-4: Suide Tunnel by China Railway 19th and 21st Bureaus Group Co., Ltd.74. Photo 4-5: The construction camp at the exit of Lvliang Mountain Tunnel by China Railway 3rd Bureau Group

Co., Ltd has been restored75. Photo 4-6: The construction site outside the exit of Niumaojing Tunnel by China Railway 12th Bureau Group

Co., Ltd. has been restored76. Photo 4-7: The second ploughing has been realized for the construction camp at the entrance of Suide Tunnel

by China Railway 19th Bureau Group Co., Ltd.77. Photo 4-8: The clear water tank to provide water to the villagers at the entrance of Lvliang Mountain Tunnel

by China Railway 12th Bureau Group Co., Ltd.78. Photo 4-9: The master outlet at the entrance Lvliang Mountain Tunnel by China Railway 12th Bureau Group

Co., Ltd.79. Photo 4-10: Award presented by the Public Security Bureau of Fenyang City to the Construction Headquarters

of China Railway 12th Bureau Group Co., Ltd. for Lvliang Mountain Tunnel80. Photo 4-11: The well and water storage tank newly constructed in the Old Xiangyangquan Courtyard81. Photo 4-12: Anjiazhuang reservoir dam82. Photo 4-13: The 0# inclined shaft opening of Lvliang Mountain Tunnel had become the water source for the

water supply project of Yanjiazhuang83. Photo 4-14: The farmland flooded on May 28, 200884. Photo 4-15: The second ploughing had been realized for part of the farmland till April 22, 200985. Photo 4-16: The air compressor’s waste oil of Suide Tunnel 2# inclined shaft by China Railway 19th Bureau

Group Co., Ltd had been collected and utilized by the local86. Photo 4-17: The site for clean air compressor’s air storage tank of Liulin Tunnel 2# inclined shaft by China

Communications Construction Co., Ltd.87. Photo 4-18: The tidy air compressor room for the 2# inclined shaft of Lvliang Mountain Tunnel by China

III

Page 8: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

Railway 12th Bureau Group Co., Ltd.88. Photo 4-19: The waste oil of the air compressor’s air storage tank for 1# inclined shaft of Wubu Tunel by China Railway 16th Bureau Group Co., Ltd. had been centrally collected89. Photo 4-20: Construction site for approach bridge and main bridge of Zhongning Yellow River Super-major

Bridge by China Railway 17th Bureau Group Co., Ltd.90. Photo 4-21: The completed Zhongning Yellow River Super-major Bridge by China Railway 17th Bureau

Group Co., Ltd.91. Photo 4-22: Construction site for east approach bridge and main bridge of Yongning Yellow River Super-major

Bridge by China Railway 4th Bureau Group Co., Ltd.92. Photo 4-23: The completed Yongning Yellow River Super-major Bridge by China Railway 4th Bureau Group

Co., Ltd.93. Photo 4-24: Construction site for main bridge of Wubu Yellow River Super-major Bridge by China

Communications Construction Co., Ltd.94. Photo 4-25: The completed Wubu Yellow River Super-major Bridge by China Communications Construction

Co., Ltd.95. Photo 4-26: The construction site for Yiwang Super-major Bridge by China Communications Construction

Co., Ltd. has been fully restored96. Photo 4-27: The completed Beichuan River Super-major Bridge by China Communications Construction Co.,

Ltd.97. Photo 4-28: The completed Liulin Sanchuan River Super-major Bridge by China Communications

Construction Co., Ltd.98. Photo 4-29: Super-major bridge across Qingdao-Yinchuan Expressway by China Railway 16th Bureau Group

Co., Ltd.99. Photo 4-30: Yihe Super-major Bridge by China Communications Construction Co., Ltd.100. Photo 4-31: The construction site for super-major bridge across Hekoumiao Reservoir by China Railway Erju

Co., Ltd.101. Photo 4-32: The construction site for Zizhou County Dali River Super-major Bridge by China Railway 17th

Bureau Group Co., Ltd.102. Photo 4-33: The construction site for freight-dedicated Zuolian Super-major Bridge by China Railway 25th

Bureau Group Co., Ltd.103. Photo 4-34: The construction site for Beichuan River Super-major Bridge constructed by China

Communications Construction Co., Ltd.104. Photo 4-35: The mud pit of Beichuan River Super-major Bridge by China Communications Construction

Co., Ltd.105. Photo 4-36: Watercourse and slope protection for Super-major Bridge across Hekoumiao Reservoir by China

Railway Erju Co., Ltd.106. Photo 4-37: Watercourse protection for Er’shilipu Super-major Bridge by China Railway 16th Bureau Group

Co., Ltd.107. Photo 4-38: Simple bank protection for Luhe River bank protection by China Railway Erju Co., Ltd.108. Photo 4-39: Water spray for dust setting over Super-major Bridge across Shizhong by China Railway 21st

Bureau Group Co., Ltd.109. Photo 4-40: The canal at the construction site for Wangwu Xiaohe River Super-major Bridge constructed by

China Communications Construction Co., Ltd.110. Photo 4-41: Lvliang Station111. Photo 4-42: Yanchi Station

IV

Page 9: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

112. Photo 4-43: Wenshui Station113. Photo 4-44: Wubu Station114. Photo 4-45: Subgrade slope protection for entrance of Longfangli Tunnel by China Communications

Construction Co., Ltd.115. Photo 4-46: Amorpha fruticosa in front of the subgrade of Xizhigou Tunnel by China Communications

Construction Co., Ltd.116. Photo 4-47: Subgrade and slope vegetation near DK385+600 by China Railway Erju Co., Ltd.117. Photo 4-48: Subgrade slope protection for DK508+800 by China Construction118. Photo 4-49: Subgrade slope protection by China Railway Erju Co., Ltd.119. Photo 4-50: Subgrade slope and culvert protection by China State Construction Engineering Corporation120. Photo 4-51: Subgrade slope vegetation protection by China Railway 16th Bureau Group Co., Ltd.121. Photo 4-52: Subgrade slope vegetation near Qingxu Station122. Photo 4-53: Subgrade slope vegetation of Wubu Station123. Photo 4-54: The station slope was eroded by the drainage pipe of Wubu Station by China Communications

Construction Co., Ltd.124. Photo 4-55: The slope drainage ditch of Wubu Station by China Communications Construction Co., Ltd had

been fractured125. Photo 4-56: The slope trimming for Wubu Station had been completed126. Photo 5-1: Huangyangtan 2# Borrow Pit by China Railway 12th Bureau Group Co., Ltd.127. Photo 5-2: Xiyan Village Borrow Pit by China Railway 15th Bureau Group Co., Ltd.128. Photo 5-3: DK146+650 Borrow Pit by China Communications Construction Co., Ltd. has been planted with

Chinese pine129. Photo 5-4: Xizhigou Borrow Pit by China Communications Construction Co., Ltd. has been planted with

corn130. Photo 5-5: Zhangjiajian Borrow Pit by China Railway 17th Bureau Group Co., Ltd. has been restored131. Photo 5-6: DK391+000 Borrow Pit by China Railway Erju Co., Ltd. has been planted with trees132. Photo 5-7: The second ploughing has been realized for DK422+200 Yidangwan Borrow Pit by China

Construction133. Photo 5-8: DK634+058 Tongtiangou Borrow Pit by China Construction has been restored134. Photo 5-9: Yuding Township Lucaowan Borrow Pit by China Railway 21st Bureau Group Co., Ltd. has been

restored135. Photo 5-10: The vegetation of DK646+402 Borrow Pit by China Construction has been restored136. Photo 5-11: DK548+400 Borrow Pit by China Railway 12th Bureau Group Co., Ltd. has been afforested137. Photo 5-12: DK505+400 Borrow Pit by China Construction has become a pool138. Photo 5-13: DK421+400 Borrow Pit by China Construction has become farmland139. Photo 5-14: DK391+100 Borrow Pit by China Railway Erju Co., Ltd. has become farmland140. Photo 5-15: DK420+200 Borrow Pit by China Construction has been flattened141. Photo 5-16: The Land Reclamation Agreement of China Railway 17th Bureau Group Co., Ltd.142. Photo 5-17: The power of attorney for land restoration of China Railway 19th Bureau Group Co., Ltd.143. Photo 5-18: The 1# Spoil Ground of Chujiagou Station by China Communications Construction Co., Ltd. has

been restored144. Photo 5-19: The second ploughing for the 5# Inclined Shaft Spoil Ground of Lvliang Mountain Tunnel by

China Railway 3rd Bureau Group Co., Ltd. has been realized145. Photo 5-20: The Spoil Ground at the exit of Lishi Tunnel by China Coal has been restored146. Photo 5-21: The Spoil Ground of Wucheng 1# Tunnel by China Communications Construction Co., Ltd. has

V

Page 10: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

been restored147. Photo 5-22: The 1# Spoil Ground of Shanglouqiao Tunnel by China Communications Construction Co., Ltd.

has been restored148. Photo 5-23: The gully of Spoil Ground for Qiaojiata Tunnel by China Communications Construction Co.,

Ltd. has been filled and flattened149. Photo 5-24: The Spoil Ground at the entrance of Shangbaishuang 2# Tunnel by China Communications

Construction Co., Ltd has been utilized as the coal storage yard150. Photo 5-25: The Yihe Spoil Ground by China Communications Construction Co., Ltd. has been restored151. Photo 5-26: The 5# Spoil Ground located beside the road of Huotangzhai Tunnel by China Communications

Construction Co., Ltd. has been restored152. Photo 5-27: The gully of 1# Inclined Shaft Spoil Ground for Baijia Mountain Tunnel by China Railway 16th

Bureau Group Co., Ltd. has been filled for land reclamation and second ploughing153. Photo 5-28: The Spoil Ground at the entrance of Wubu Tunel by China Railway 16th Bureau Group Co., Ltd.

has been restored154. Photo 5-29: Lijiabian Spoil Ground by China Railway 17th Bureau Group Co., Ltd. has been restored155. Photo 5-30: The earthing for Dujiagou Spoil Ground by China Railway 17th Bureau Group Co., Ltd. has

been completed156. Photo 5-31: Suqu Spoil Ground by China Railway 17th Bureau Group Co., Ltd. has been restored157. Photo 5-32: The Spoil Grounds respectively at the entrance and exit of Weijialou 3# and 2# Tunnels by China

Railway 1st Bureau Group Co., Ltd. have been restored158. Photo 5-33: The Spoil Ground at the entrance of Hengshan Tunnel by China Railway 1st Bureau Group Co.,

Ltd. has been restored159. Photo 5-34: The 2# Inclined Shaft Spoil Ground of Hengshan Tunnel by China Railway 1st Bureau Group

Co., Ltd. has been restored160. Photo 5-35: The Spoil Grounds respectively at the entrance of Xingwangmao Tunnel and the exit of

Gangcheng Tunnel both by China Railway Tunnel Bureau have been restored with the slopes planted with willows

161. Photo 5-36: The 1# Inclined Shaft Spoil Ground of Xingwangmao Tunnel by China Railway Tunnel Bureau has been restored

162. Photo 5-37: The DK579+000 Subgrade Spoil Ground by China Construction has been restored163. Photo 5-38: The DK591+600 Gaoshawo Spoil Ground by China Railway 12th Bureau Group Co., Ltd. has

been restored164. Photo 5-39: The Spoil Ground at the entrance of Niumaojing Tunnel constructed by China Railway 12th

Bureau Group Co., Ltd. has been restored165. Photo 5-40: Zhangjiajian Spoil Ground by China Railway 17th Bureau Group Co., Ltd. has been restored166. Photo 5-41: The Spoil Ground at the entrance of Lvliang Mountain Tunnel by China Railway 12th Bureau

Group Co., Ltd. has been restored167. Photo 5-42: The 5# Spoil Ground of Wubu Station by China Communications Construction Co., Ltd. has

been avaliable for second ploughing168. Photo 5-43: The earthing for 5# Spoil Ground of Lvliang Mountain Tunnel by China Railway 3rd Bureau

Group Co., Ltd. has been completed so that it has been avaliable for second ploughing169. Photo 5-44: The DK584+750 Spoil Ground by China Railway 12th Bureau Group Co., Ltd. has been planted

with vegetation170. Photo 5-45: The Spoil Ground at the entrance of Hengshan Tunnel by China Railway 1st Bureau Group Co.,

Ltd. has been restoredVI

Page 11: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

171. Photo 5-46: The Spoil Ground of Xizhigou Tunnel by China Communications Construction Co., Ltd. has been restored

172. Photo 5-47: Huangzhang 3# Spoil Ground by China Communications Construction Co., Ltd. has been restored

173. Photo 5-48: The graded slope cutting, as well as the construction of retaining wall and ditch have been conducted for the Spoil Ground of Huangzhang 1# Tunnel by China Communications Construction Co., Ltd.

174. Photo 5-49: The 2# Inclined Shaft Spoil Ground at the entrance of Xingwangmao Tunnel by China Railway Tunnel Bureau has been flattened to reclaim land for the local

175. Photo 5-50: The artemisia desertorum and sorghum hybrid sudangrass experimentally planted by China Railway 12th Bureau Group Co., Ltd. in the slope of the spoil ground

176. Photo 5-51: The spoil ground on the hillside behind Jundu Village177. Photo 5-52: Jundu Village Spoil Ground of Lulin 2# Inclined Shaft by China Communications Construction

Co., Ltd.178. Photo 5-53: The retaining wall for Jundu Village Spoil Ground by China Communications Construction Co.,

Ltd. had been completed179. Photo 5-54: Jundu Village Spoil Ground was still under treatment180. Photo 5-55: The spoil ground set up beside Sanchuan River for Huotangzhai 2# Tunnel by China

Communications Construction Co., Ltd. had been completely transferred181. Photo 5-56: The slag in the spillway of the Wucheng Reservoir had been completely removed (year of 2010)182. Photo 5-57: Sanchuan River Spoil Ground and instructions of the Township Government183. Photo 5-58: Serious soil and water loss of 5# Spoil Ground of Wubu Station by China Communications

Construction Co., Ltd. (year of 2011)184. Photo 5-59: The drainage culvert of the 5# Spoil Ground of Wubu Station had been broken185. Photo 5-60: The retaining wall constructed beside the gully for Spoil Ground of Wubu Tunel 1# Inclined

Shaft by China Railway 16th Bureau Group Co., Ltd.186. Photo 5-61: The Spoil Ground of Suide Tunnel 4# Inclined Shaft had been utilized by the local brick factory187. Photo 5-62: The Spoil Ground of Lvliang Mountain Tunnel 0# Inclined Shaft had been used as a local walnut

seedling base188. Photo 5-63: The completion site of Siertan Super-major Bridge by China Railway 12th Bureau Group Co.,

Ltd.189. Photo 5-64: Yanchi Station constructed by China Railway 12th Bureau Group Co., Ltd.190. Photo 5-65: The subgrade and surrounding vegetation of LDK549+600 by China Railway 12th Bureau

Group Co., Ltd.191. Photo 5-66: Ningxia Baijitan Nature Reserve192. Photo 5-67: Lingwu Station Building and square in front of the Station (year of 2011)193. Photo 5-68: Billboards of Environmental Protection at Construction Site at Er’shilipu Super-major Bridge by

China Railway 16th Bureau Group Co., Ltd.194. Photo 5-69: Dingjiagou Super-major Bridge by China Railway 16th Bureau Group Co., Ltd.195. Photo 5-70: The road-to-bridge of Ming Great Wall for the mileage DK381+878 by China Railway Erju Co.,

Ltd.196. Photo 5-71: The line mileage DK510+600 by China Construction and the runis of Ming Great Wall197. Photo 5-72: The construction camp mixing station of China Railway 19th Bureau Group Co., Ltd. has been

restored so that it has been availabe for second ploughing198. Photo 5-73: The mixing station site of China Railway 16th Bureau Group Co., Ltd. has been processed199. Photo 5-74: Hardening and protection for the service road of China Railway 17th Bureau Group Co., Ltd.

VII

Page 12: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

200. Photo 5-75: The spoil ground of Qizegou Tunnel by China Communications Construction Co., Ltd. has reclaimed 53 mu’s land

201. Photo 5-76: The second ploughing for the 2# spoil ground of Chujiagou Station by China Communications Construction Co., Ltd. has been realized

202. Photo 5-77: The second ploughing for the spoil ground of Dujiawan Tunnel by China Communications Construction Co., Ltd. has been realized

203. Photo 5-78: The spoil ground at the exit of Mucun 1# Tunnel by China Communications Construction Co., Ltd. has reclaimed 63 mu’s land

204. Photo 5-79: The spoil ground at the entrance of Wubu Tunel by China Railway 16th Bureau Group Co., Ltd. has been utilized

205. Photo 5-80: Dingjiagou spoil ground of China Railway 16th Bureau Group Co., Ltd. has flattened and reclaimed 102 mu’s land

206. Photo 5-81: Gaojiagou spoil ground of China Railway Erju Co., Ltd. has reclaimed 90 mu’s land207. Photo 5-82: The second ploughing for Yidangwan Village Spoil Ground DK422+200 by China Construction

has been finished208. Photo 5-83: About 65 mu’s land of Paomaquan Village 2# Spoil Ground by China Railway 12th Bureau

Group Co., Ltd. has been developed into an automobile market209. Photo 5-84: The second ploughing has been realized for 27 mu’s land of LDK684+000 spoil ground by

China Railway 12th Bureau Group Co., Ltd.210. Photo 5-85: The spoil ground of Zhongningdong Station by China Railway 21st Bureau Group Co., Ltd. has

been developed into an automobile market211. Photo 5-86: The primary school built by the local government upon the spoil ground of China Railway 17th

Bureau Group Co., Ltd.212. Photo 5-87: The DK383+400 spoil ground of China Railway 2nd Bureau Group Co., Ltd. has been built into a

road by the development zone213. Photo 5-88: The Monument of Merits and Virtues presented by the villagers of Zhangjiazhai to China

Railway 17th Bureau Group Co., Ltd.214. Photo 5-89: The retaining wall by China Railway 17th Bureau Group Co., Ltd. for the local village road215. Photo 5-90: The hardened road in front of Yuci Beam Fabrication Plant of China Railway 22nd Bureau

Group Co., Ltd.216. Photo 5-91: The Letter of Thanks presented by Baishuqu Village Committee, Shuangcheng Township,

Hengshan County to China Railway 1st Bureau Group Co., Ltd.217. Photo 5-92: The silk banner presented by Dujiagou Village Committee, Miaoping Town, Zizhou County to China Railway 16th Bureau Group Co., Ltd.218. Photo 5-93: The 6th Economic Department of China Communications Construction Co., Ltd. donated 280000 Yuan to construct a 250 meters’ floodwall for Sanchuan River219. Photo 5-94: The DK611+500 spoil ground of China Construction has become a pond220. Photo 5-95: The couplet on the well reads: “the well has been constructed in a flourishing age and do not

forget the well-digger, China Railway 16th Bureau Group Co., Ltd., when to drink water from this well”The top scroll: “Flow of Clear Spring”

221. Photo 6-1: The sewage treatment facilities at Lvliang Station222. Photo 6-2: The water storage pond in the sewage treatment plant of Fenyang Station223. Photo 6-3: The sewage treatment plant at Jingbian Station224. Photo 6-4: The 1t atmospheric pressure coal-fired hot water boiler at Fenyang Station

VIII

Page 13: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

225. Photo 6-5: The acoustic barrier above Beichuan River Super-major Bridge beside Shuangwudu Village has been built

226. Photo 6-6: The acoustic barrier at the exit of Shijiawan Tunnel adjacent to Shijiawan primary and secondary schools

IX

Page 14: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

1. Brief of Project

1.1 Project progress(1) Route direction and main technical standards

Located at Southwestern Shanxi Province, northern Shaanxi Province and North Central Ningxia Hui Autonomous Region, Taiyuan-Zhongwei (Yinchuan) Railway basically extends along G307 from Taiyuan City, the provincial capital of Shanxi Province in the east to Zhongwei City and Yinchuan City, the capital of Ningxia Hui Autonomous Region in the west.

Taiyuan-Zhongwei (Yinchuan) Railway starts from Central Station K219+561.1 of Taiyuan South Station, the railway terminal of Taiyuan, through Jinzhong City of Shanxi Province and Xiaodian District and Qingxu County of Taiyuan City to Jiaocheng County and Wenshui County in Lvliang City and Fenyang City of Shanxi Province. After going over the Lvliang Mountain, it enters to Lvliang City along the west of Dongchuan River, passes through Liulin County and goes over the Yellow River to Wubao County in Yulin City of Shaanxi Province. After crossing over mountain into Suide County, it goes over Wuding River and Shenmu-Yan’an Railway adjacent to the county, and extends along Dali River to Mayi River and to the joint part of Loess Plateau and Inner Mongolian Plateau after going over the mountain. It enters into Jingbian County through the South Rim of Maowusu Desert, into Yanchi County in Wuzhong City of Ningxia Hui Autonomous Region through Dingbian County in Yulin City and into Zhongning County in Zhongwei City through Taiyanngshan Planning Park of Wuzhoang City and Ningxia Hongsibao Development Park. After passing through the Yellow River and Baotou-Lanzhou Railway, the railway will be paved to Huangyangwan Station of Baotou-Lanzhou Railway; by virtue of Baotou-Lanzhou Railway Yingshuiqiao Marshalling Station, it is ending at Central Station K696+800 of Yingshuiqiao Marshalling Station of Baotou-Lanzhou Railway. The Taiyuan-Zhongwei (Yinchuan) Railway is 747.717km in total.

Yinchuan Rail Link starts from the west end of Dingbian Station (Central Station is K512+400) to Yanchi County in Wuzhong City of Ningxia Hui Autonomous Region, through the peak of the whole line adjacent to Niumaojing, passing through Ningdong Energy and Chemical Industry Base and Lingwu City, to Yongning County of Yinchuan City after passing through the Yellow River. It will be connected to Pingjibao Station at Baotou-Lanzhou Railway; by virtue of Baotou-Lanzhou Railway to Yinchuan Station, the line is ending at Yinchuan Station (BLK524+514). The rail link is 193.029km in total.

The design year of the line is Year 2015 for initial stage, Year 2020 for short term and Year 2030 for long term. The railway level is China Railway Level I, with double line for the line between Yuci and Dingbian Segment and single line and reserved double line for the line between Dingbian and Zhongwei Segment, Dingbian and Yinchuan Segment. The line between the South of Taiyuan and Dingbian is 200km/h, while the line between Dingbian and Zhongwei, Dingbian and Yinchuan is 160 km/h, with 200km/h reserved for the plane. The category of traction is electric power.

(2) Main content of the project

Permanent actual land occupation of Taiyuan-Zhongwei (Yinchuan) Railway is 4160.5hm2 in total and temporary land occupation 2839.66hm2.

There are 79 super-major bridges newly built throughout the line with 120094 linear meters, 261 major and middle bridges, 109 tunnels newly excavated with 180126 linear meters, and 50 stations with 43 stations in the Taiyuan-Zhongwei (Yinchuan) Main Track and 7 stations at Taiyuan-Zhongwei (Yinchuan) Rail Link.

There are 170 borrow pits actually utilized by Taiyuan-Zhongwei (Yinchuan) Railway for earth borrowing of 5208.93×104m3 and 289 spoil grounds for total waste slag of 5146.43×104m3.

Beijing OASIS Environmental Protection Technology Co., Ltd. 1

Page 15: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

The engineering shall be formally commenced in May 2006 and trail operation shall be started on January 11, 2011, with total engineering investment amount of 44 billion Yuan.

(3) Characteristics of this project

Taiyuan-Zhongwei (Yinchuan) Railway basically runs from east to west through Shanxi Province, Shaanxi Province and Ningxia Hui Autonomous Region. It successively passes through three landform units of Jinzhong Basin, Middle and South Segment of Lvliang Mountain and Shan-Gan-Ning Basin and such cities as Taiyuan, Jinzhong, Lvliang, Yulin, Wuzhong, Zhongwei and Yinchuan from Taiyuan to Zhongwei. There are 109 tunnels built by the engineering with 6 long and major tunnels over 10 kilometers, 79 super-major bridges newly built passing through the Yellow River for three times, and three segment of lines passing through natural reserves (Ningxia Lingwu Baijitan State-level Natural Reserve, Ningxia Habahu State-level Natural Reserve and Shanxi Xuegongling Province-level Natural Reserve), together with Shanxi Liulin Quanyu Protection Zone, Dingjiagou of Suide County- Shilipu Drinking Water Source Protection Zone, as well as Site of the Great Wall of the Ming Dynasty for twice. Since the railway passes through large quantity of environmental and water protection sensitive segments, there are plentiful protection contents, and drought, less rainfall, water loss and soil erosion, poor growing environment of vegetation and other ecological characteristics bring new challenges to the railway construction.

(4) Unit undertaking Taiyuan-Zhongwei (Yinchuan) Railway and construction and supervision units

Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. is the unit undertaking Taiyuan-Zhongwei (Yinchuan) Railway. There are 6 construction units of key monitoring bid, 11 construction units of comprehensive bid, 7 units of girder fabrication bid, 5 units for rechannel of telecommunication line, radio and television line and electric power circuit, 2 units for temporary and permanent electric power, 4 joint ventures of post-station construction unit and 10 supervision units. The engineering shall be commenced at the end of 2005 as planned and completed at the end of June, 2010, with total construction schedule of 4.5 years and total investment amount of 30.32 billion Yuan for the engineering. Taiyuan-Zhongwei (Yinchuan) Railway was formally constructed at May 2006 in fact, completed at December 2010 and opened for trail operation throughout the line in January 11, 2011. Principal construction units and supervision units of pre-station engineering of Taiyuan-Zhongwei (Yinchuan) Railway are set out in Table 1-1.

Table 1-1 Construction units and supervision units of Taiyuan-Zhongwei (Yinchuan) Railway

Bid Section

No.

Scope of construction

Bid section mileage Length of bid section

(Km)

Contractor Supervisor

ZK-Ⅰ Zhongning Yellow River Super-major

Bridge

DK706+943 4.459 China Railway 17th Bureau Group Co., Ltd.

Jinan Shunda Supervision Company

ZK-Ⅱ Yongning Yellow River Super-major Bridge

LDK672+963 3.956 China Railway 4th Bureau

Shanghai Tianyou Project Management & Consulting Co,. Ltd.

ZK-Ⅲ Lvliangshan Tunnel Entrance

DK119+157~DK129+255 20.222 No. 12 Bureau Group Co., Ltd. of CREC

Engineering Construction and Supervision Company of China Railway Frist Survey & Design Institute Group Co.,

ZK-Ⅳ Lvliangshan Tunnel Exit

DK129+255~DK139+895 21.335 The Third Engineering Group Co., Ltd. of China Railway

Beijing OASIS Environmental Protection Technology Co., Ltd. 2

Page 16: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Ltd. ZK-Ⅴ Lishi Tunnel DK163+325~DK173+400 9.948 China Coal No.3 Construction (group) Corporation Ltd.

ZK-Ⅵ Wubao Tunnel DK226+600~DK239+500 12.305 China Railway 16th Bureau Group Co., Ltd.

Beijing Tieyan Construction Supervision Co., Ltd.

ZQ-Ⅰ-1

South Taiyuan ~DK20+300

South Taiyuan~DK20+300

17.678 China Railway 25th Bureau Group Co., Ltd.

Shenyang Railway Bureau Construction and Supervision Company

ZQ-Ⅰ-2

DK20+300~DK37+000

DK20+300~DK37+000 16.7 China Railway 15th Construction Bureau Co., Ltd.

Shenyang Railway Bureau Construction and Supervision Company

ZQ-Ⅱ DK37+000~DK247+817

DK37+000~DK247+817 169.316 China Communication Construction Co., Ltd.

Shenyang Railway Bureau Construction and Supervision Company, Engineering Construction and Supervision Company of China Railway Frist Survey & Design Institute Group Co., Ltd. and Heilongjiang China Railway Construction Group Supervision Co., Ltd.

ZQ-Ⅴ Jingbian ~ East Zhongning

DK405+800~DK692+650 287.85 China State Construction

Beijing Tieyan Construction Supervision Co., Ltd. and Jinan Shunda Supervision Company

ZQ-Ⅵ Dingbian ~ Pingjibao

LDK513+300~ Baotou K538+650

179.05 No. 12 Bureau Group Co., Ltd. of CREC

China Academy of Railway Sciences Supervision Company

ZQ-Ⅶ DK247+817~Suide

DK247+817~DK261+550 12.79 China Railway 21st Bureau Group Co., Ltd.China Railway 19th Bureau Group Co., Ltd.

Jinan Shunda Supervision CompanyEast Zhongning

~ YingshuiqiaoDK692+650~ Baotou

K696+80071.55

Pingjibao~ Yinchuan

Baotou K538+650~ Baotou K524+514

SJSⅠ Suide (including)~DK284+310

DK261+550~DK284+310 20.610 China Railway 16th Bureau Group Co., Ltd.

Beijing Ruite Supervision Company

SJSⅡ DK284+310~Weijialou

(including)

DK284+310~DK329+650 45.340 China Railway 17th Bureau Group Co., Ltd.

Urumqi Railway Construction Supervision Consulting Co., Ltd.

SJSⅢ DK361+150~Jingbian Station

(excluded)

DK361+150~DK405+800 41.640 China Railway Erju Co., Ltd.

Tianjin Xinyatai Supervision Company

SJSⅣ Hengshan Tunnel DK329+650~DK345+419 15.769 China Railway First Group Co., Ltd.

Urumqi Railway Construction Supervision Consulting Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 3

Page 17: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

SJSⅤ Xingwangmao Tunnel

DK345+419~DK361+150 15.731 China Railway Tunnel Group

Tianjin Xinyatai Supervision Company

1.2 Overview of environment along the line1.2.1 Natural environment

1. Landform

The line passes through Shanxi Province, Shaanxi Province and Ningxia Hui Autonomous Region and successively goes through three landform units of Jinzhong Basin, Middle and South Segment of Lvliang Mountain and Shan-Gan-Ning Basin:

Taiyuan ~ Wenshui belongs to Jinzhong Basin, most of which is flat and broad, including alluvial plain, piedmont sloping plain and river valley. West rid of the basin is loess hill, with developed gully.

Wenshui ~ Wangjiahui belongs to Middle and South Segment of Lvliang Mountain, which mainly is denudation middle mountain, low mountain and hill, with fluctuating terrain, high mountain and abrupt slope, developed gully and lush vegetation.

Wangjiahui ~ Yingshuiiqiao ~ Yinchuan belongs to Shan-Gan-Ning Basin, mainly including: Shanbei Loess Plateau and Hill with fluctuating terrain and developed gully, middle mountain, low mountain and hill, South Rim of Maowusu Desert, with fluctuating terrain and distributed lakes and marsh, and Yellow River Alluvial Plain and Valley Terrace with gentle terrain and salt ponds and lakes distributed locally.

2.River system

(1) Surface water

The region where the line passes through belongs to the Yellow River Basin, together with rivers mainly including Xiaohe River, Fenhe River, Wenyu River, Dongchuan River, Beichuan River and Sanchuan River in Shanxi Province, Yellow River at the juncture of Shanxi and Shaanxi, Wuding River, Dali River, Luhe River and Hongliu River in Shaanxi Province, Kushui River, Hongliugou, Qingshui River and Yellow River in Ningxia.

Except that the Yellow River, Fenhe River, Sanchuan River, Wuding River, Luhe River and Dali River are running water throughout the year, other rivers are seasonal rivers which possess less water yield and rise suddenly and sharply in the rainy season. Rivers are characterized by typical rainfall flood, with flow and water level in direct proportion to precipitation and extremely unstable general trend for rare and concentrated rainfall and great evaporativity, and large elevation difference between the region except Jinzhong Basin and Yinchuan Plain.

(2) Underground water

Underground water mainly is quaternary pore water, bedrock fissure water and carbonatite karstic water.

3.Climate

The region where the line passes through from Taiyuan to Zhongwei, Yinchuan successively belongs to warm temperate zone subhumid, mid temperate zone and warm temperate zone dry continental climate region, where winter and summer is obvious that summer is short and winter is long under the influence of monsoon circulation. The aim moisture content is between humid and dry that summer is hot and humid while winter is cold and dry.

4.Geologic characteristic of the engineering

Beijing OASIS Environmental Protection Technology Co., Ltd. 4

Page 18: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Stratum along the line is relatively completely exposed, from cenozoic group to archaean group. Bedrock in most part of the mountainous area is exposed and most bedrock in other regions is covered by the quaternary accumulation horizon which is only exposed in local gully. Stratum along the line is bounded by Niushou Mountain- East Foothill of Daluo Mountain, Northern Stratum in the east and Qilian Stratum in the west.

Geotectonics of the region where the line passes through belongs to Jinzhong xi-type structure and east wing of Lvliang Mountain, Yike Zhaomeng- Shaanxi Betwixtland, and edge of backbone Helan Mountain at Qilvshan Lvliangshan Helanshan epsilon structural system. Influenced by polytectonic condition, wrinkle and fracture at basin rim and Lvliang Mountain is highly developed.

1.2.2 Ecological environment

1. Scenic spots

There are abundant tourism resources and scenic spots within attraction area of the engineering along the line, while no scenic spots distributed in or adjacent to the scope of engineering evaluation.

2. Natural reserves

The line passes through Ningxia Lingwu Baijitan State-level Natural Reserve, Ningxia Habahu State-level Natural Reserve and Shanxi Xuegongling Province-level Natural Reserve.

3. Water source

Dingjiagou of Suide County- Shilipu Drinking Water Source Protection Zone.

4. Cultural relics and historic sites

Site of the Great Wall of the Ming Dynasty in the Dingbian County and Jingbian County of Shaanxi Province is national key cultural heritage protection units approved and issued by No. 25 Guo Fa [2001] of the State Council.

2. Management and Monitoring of Environmental and Water Protection

2.1 Management and monitoring Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. is undertaking unit and operation unit of Taiyuan-Zhongwei (Yinchuan) Railway, in charge of environmental protection in the process of construction and operation of Taiyuan-Zhongwei (Yinchuan) Railway. The Engineering Department of Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd., which has one full-time senior engineer on environmental and water protection, is responsible for specific management of environmental and water protection during construction period throughout the line. The Engineering Department of Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. is in charge of three headquarters of Taiyuan Headquarters, Suide Headquarters and Yinchuan Headquarters, each of which has part-time environmental and water protection management personnel. The unit undertaking the project, construction and supervision unit shall incorporate provisions of environmental and water protection in the tendering document as required.

Water and soil conservation monitoring in the process of construction of Taiyuan-Zhongwei (Yinchuan) Railway shall be in the charge of Yellow River Water and Soil Conversation Ecological Environmental Monitoring Center. In September 2007, Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. entered into the Contract of Water and Soil Conversation Monitoring at Newly-built Taiyuan-Zhongwei (Yinchuan) Railway with Yellow River Water and Soil Conversation Ecological Environmental Monitoring Center.

In addition to routine environmental protection and supervision in the charge of on-site construction and supervision unit, Xi’an Yellow River Engineering Supervision Co., Ltd., entrusted by Taiyuan-

Beijing OASIS Environmental Protection Technology Co., Ltd. 5

Page 19: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Zhongwei (Yinchuan) Railway Co., Ltd., undertook water and soil conservation engineering supervision for “Newly-built Taiyuan-Zhongwei (Yinchuan) Railway Engineering”.

Environmental monitoring and control for Taiyuan-Zhongwei (Yinchuan) Railway shall be in the charge of Beijing OASIS Environmental Protection Technology Co., Ltd. and the contract term shall be from October 2006 to December 2012. Two copies of monitoring report shall be submitted during construction phase per year and one copy of monitoring report during operation phase.

Acceptance work for water and soil conservation of Taiyuan-Zhongwei (Yinchuan) Railway shall be in the charge of Xi’an Planning and Design Research Institute of Upper and Middle Yellow River Bureau of Yellow River Conservancy Commission. In March 2010, Taiyuan-Zhongwei (Yinchuan) Railway Company and Xi’an Planning and Design Research Institute of Upper and Middle Yellow River Bureau of Yellow River Conservancy Commission entered into Power of Attorney of Acceptance and Evaluation for water and soil conservation of Taiyuan-Zhongwei (Yinchuan) Railway.

Completion acceptance and environmental protection investigation for Taiyuan-Zhongwei (Yinchuan) Railway engineering shall be in the charge of China Railway Fifth Survey and Design Institution Group Co., Ltd. In June 2011, Taiyuan-Zhongwei (Yinchuan) Railway Company entered into a contract with China Railway Fifth Survey and Design Institution Group Co., Ltd.

2.2 Monitoring and control objectiveIn accordance with bidding result of environmental management plan project of Newly-built Taiyuan-Zhongwei (Yinchuan) Railway Project of Asian Development Bank, environmental monitoring for Taiyuan-Zhongwei (Yinchuan) Railway shall be in the charge of Beijing OASIS Environmental Protection Technology Co., Ltd.

Following objectives shall be fulfilled by environmental protection and monitoring in primary sensitive sites and sensitive regions of the engineering in line with anticipated environmental influence during construction and operation phases of the engineering.

1. Construction activities shall be consistent with relevant national laws and regulations for natural reserves, water source, cultural relics and historic sites, for the purpose of construction and promotion of local ecological protection and economic development throughout the line.

2. Practically implement all types of environmental protection measures, ecological protection engineering and recovery measures proposed in Environmental Influence Report and Water and Soil Conservation Proposal during the construction.

3. Confirm whether a variety environmental protection measures and management system are effective and rational, practicable condition and existing problems as early as possible during the implementation for prompt rectification and reduction of influence on surrounding environment arising out of engineering construction.

4. Conduct environmental protection laws and regulations, responsibilities and commission training for full-time and par-time environmental protection personnel of construction and supervision units for the whole line for promotion of their environmental awareness and proper environmental protection management and propaganda.

2.3 Monitoring of environmental and water protection2.3.1 Pre-post training on environmental protection during construction period

Pre-post training shall be held by Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. during construction period. Training participants include leaders and full-time (and part-time) engineers responsible for environmental protection in our company, and leaders and full-time (and part-time) personnel responsible for environmental protection in construction units and supervision units of each section. The training teachers shall be assigned by Beijing OASIS Environmental Protection Technology Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 6

Page 20: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

“Training Materials for Environmental Protection of Newly-built Taiyuan-Zhongwei (Yinchuan) Railway Project during Construction Period” shall be prepared by Beijing OASIS Environmental Protection Technology Co., Ltd., mainly including following contents:

National related laws, regulations and standards, and some mandatory regional rules relating to environmental protection and water and soil conservation of the construction project;

Environmental management and management procedures of construction project during construction period; environmental and water protection guideline relating to main works such as bridges, tunnels and subgrades, construction roads, rail assembling yard, borrow pits, spoil grounds and other temporary works, and cases concerning implementation of protection, reclamation and reforestation measures; relevant laws, regulations and specific requirements on ecological sensitive areas; sanitary requirements on construction camps, and health and safety requirements on construction workers.

2.3.2 Main concerns for environment monitoring

Impacts of railway construction on Ningxia Lingwu Baijitan State-level Natural Reserve, Ningxia Habahu State-level Natural Reserve and Shanxi Xuegongling Province-level Natural Reserve, Dingjiagou of Suide County- Shilipu Drinking Water Source Protection Zone and Site of the Great Wall of the Ming Dynasty and relevant treatment measures.

Setup, protection, reclamation, greening measures and impacts of borrow pits and spoil grounds on water and soil conservation facilities, disturbance of construction to aboveground vegetation and restoration and treatment measures.

Impacts of water inrush and vibration generated in tunnel excavation on surrounding land vegetation and on resident production, living water and buildings on tunnel top, as well as treatment measures.

Impacts of bridge and culvert construction on surface water.

Impacts of noises, sewage, dust and solid wastes generated in construction camps, roads and other temporary works on environment and relevant prevention.

Implementation of each kind of environmental protection facilities adopted by the project (including noise protection, sewage treatment and smoke-gas treatment measures).

Environment problems brought by local economic development and resulted from the construction of Taiyuan-Zhongwei (Yinchuan) Railway.

2.4 Monitoring system and approach1. Monitoring system

The framework of the environment monitoring system for the project is shown in Figure 4-1.

Beijing OASIS Environmental Protection Technology Co., Ltd. 7

Implementation and supervision

Training

Environmental monitoring unit

supervision unit

Contract

Construction unit

Contract award

Assistance

Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd.

Consultation service

Authorization

Page 21: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Figure 4-1 Block Diagram of Environment Monitoring System

According to project features and common environment problems arisen in construction, following aspects shall be considered in preparation and execution of environmental protection and management system.

The Environmental Protection Commission, headed by the vice-general manager in charge of environmental protection and participated by leaders of each department, is established by Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. Full-time environmental protection engineers are assigned to Engineering Department, responsible for environment management and coordination works in railway construction. Environmental protection requirements specified in Environmental Impact Report and design documents shall be listed in tendering documents in constructor and supervisor tender. Each construction unit and supervision unit shall make commitments to the compliance with environmental protection requirements in construction.

The Environmental Protection Commission, headed by leaders in charge of environmental protection, is established by each construction and supervision unit. Full-time (and part-time) environmental protection personnel having received professional trainings on environmental protection knowledge are assigned to Engineering Department, mainly responsible for supervision and management on environmental problems arisen in construction and assistance with environmental management department in environmental management.

Each construction unit shall be responsible for fulfillment of its commitment to environmental and ecological protection made in construction contract, and development of relevant environmental protection measures in accordance with environmental protection requirements specified in design documents, and protection of construction site environment to reduce and prevent against pollution and damages to the environment and ecology along the railway caused by improper management and construction. In the event of any environmental pollution matter, positive countermeasures shall be taken. However, in case of failure to solve such matters, report them to the railway company or invite relevant experts and units to find solutions in an immediate manner.

Each supervision unit shall be responsible for daily environmental supervision based on environmental protection requirements specified in construction contract. In the event of occurrence of any environmental problems, each supervision unit shall urge construction unit to find solutions in an immediate manner and bring environmental protection into engineering quality monitoring system.

2. Main monitoring methods and measures

Prepare training materials for environmental protection of newly-built Taiyuan-Zhongwei (Yinchuan) Railway project in construction. Assist the railway company in carrying out pre-post training at places specified by Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. Appoint training teachers for field trainings.

Members of environmental monitoring group shall execute field supervision and investigation on each railway section every six months in accordance with monitoring requirements, and collect relevant documents.

In case of any construction activity and field guidance on problem settlement inconformity to

Beijing OASIS Environmental Protection Technology Co., Ltd. 8

Monitoring of engineering implementation

Construction of Taiyuan-Zhongwei (Yinchuan) Railway project

Page 22: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

requirements on environmental and water protection and ecological sensitive areas, the monitoring group shall put forward improvement suggestions and report it to Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd.

Summarize field investigation findings and collected documents. Draw Environmental Monitoring Report of Newly-built Taiyuan-Zhongwei (Yinchuan) Railway by Utilization of Asian Development Bank Loans, which shall then be reviewed and translated into English and be submitted to Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd., Foreign Capital Utilization Center and Development and Planning Division of the Ministry of Railway, and Asian Development Bank (in English).

3. Implementation of Environmental Control

3.1 Pre-post training for environmental protectionBeijing OASIS Environmental Protection Technology Co., Ltd. has prepared training materials for environmental protection in construction period according to the Asian Development Bank’s requirements and provisions listed in the bidding documents for environmental management and planning on monitoring of implementation project. From March 20 to 25, 2007, Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. held “Pre-post Training for Environmental Protection of Taiyuan-Zhongwei (Yinchuan) Railway during Construction Period” in Taiyuan. Environmental protection training classes are tought by Researcher Jia Guoquan, Executive Director of Beijing OASIS Environmental Protection Technology Co., Ltd. and Researcher Cai Weijin, national certified consultant of environmental management system. They made specialized analysis on requirements on environmental monitoring and management in construction period, common environmental problems arisen in construction period and required measures in accordance with engineering to be conducted in Taiyuan-Zhongwei (Yinchuan) Railway construction and environmental characteristics.

Kong Xiangzhong, Vice-general Manager of Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd., participated in the training class and put forward specific requirements to each construction and supervision unit on implementation of environmental measures to be taken along the line. The training was presided by Wang Fuliang, Minister of Engineering Department and Li Yingchun, professional senior engineer engaging in environment and water protection. Participants of environment (and water) protection training class include Vice Commander in charge of environmental protection, Director of Safety and Quality & Environmental Protection Department and full-time (and part-time) engineer in charge of environmental protection assigned by construction unit at each section, together with Chief Supervisor or Deputy Supervisor assigned by supervision unit, 63 persons in total.

Beijing OASIS Environmental Protection Technology Co., Ltd. 9

Page 23: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 3-1: Training class for environmental and water protection

On March 31, 2008, the Engineering Department of Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. held Water and Soil Conservation Training and Symposium, and experts from Xi’an Yellow River Engineering Supervision Co., Ltd. conducted lectures. Besides, Li Guixiang, Vice-general Manager of Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd., gave a special report, the subject of which was Earnest Study and Implementation of “Water and Soil Conservation Approach” and Practical Performance of Water and Soil Conservation of Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. Vice Commander or Chief Engineer, Directors or full-time engineers in charge of environmental protection and water and soil conservation of each construction unit, and Chief Supervisor or Deputy Supervisor of each supervision unit participated.

On October 23, 2008, the Engineering Department of Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. spent one day conducting training on water and soil conservation supervision, and technical disclosures and discussions on water and soil conservation. Vice Commander in charge of environmental protection, engineers in charge of environment and water protection and that in each Project Department assigned by each construction unit, together with Chief Supervisor or Deputy Supervisor assigned by supervision unit have participated, 59 persons in total.

3.2 Monitoring implementation in 20073.2.1 Important contents of monitoring

From July 3 to 12, 2007 and from January 4 to 16, 2008, Beijing OASIS Environmental Protection Technology Co., Ltd. carried out field monitoring investigations on Taiyuan-Zhongwei (Yinchuan) project for two times.

Environmental control over Taiyuan-Zhongwei (Yinchuan) Railway of Year 2007 contains establishment and implementation effect of environment and water protection and management system of construction unit, as well as implementation condition of environment and water protection measures at each construction work site.

Investigation focuses on environment management including the soundness and effectiveness of measures for environment and water protection implementation; the completeness of daily inspection records and other materials; the establishment of environment and water protection billboards at major construction sites, and the pertinence of billboard details; investigation focuses at construction work sites including construction of tunnel longer than 3000m; major and super-major bridge, especially bridges across rivers and waters; use of borrow pit and spoil ground, especially retaining condition of spoil ground; and use and management of temporary lands.

In addition, investigations on implementation of environment and water protection measures to be taken in relevant construction areas located in natural conservation areas and water conservation areas shall be carried out.

Beijing OASIS Environmental Protection Technology Co., Ltd. shall notify Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. of above details by letter about15 days in advance.

3.2.2 Situation & analysis

1. Management on environment and water protection:

Environment and water protection organizations have been set, relevant management approaches have been formulated, and full-time (and part-time) management personnel in charge of environment and water protection have been arranged for each construction section in accordance with the requirements given by Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd.; relatively complete management solutions for environment and water protection and other system documents have been prepared in compliance with ISO14001 environmental management system. The investigations found rules, regulations and standards of construction unit were complete,

Beijing OASIS Environmental Protection Technology Co., Ltd. 10

Page 24: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

construction sites were tidy and orderly, daily inspection record and evaluation materials were complete and integrate, and environmental management system was effectively operated.

Photo 3-2: Environmental protection bulletin board at entrance of Baijiashan Tunnel by China Railway 16th Bureau Group Co., Ltd.

Photo 3-3: Appraisal report by China Railway 12th Bureau Group Co., Ltd.

Photo 3-4: Notification of Safety, Quality and Environment by China Railway 19th Bureau Group

Co., Ltd.

2. Tunnel situation

Tunnels (12 work sites) being investigated in mid-2007 include: exit of Hongjinzi Tunnel by China State Construction; entrance of Xingwangmao Tunnel by China Railway Tunnel Group; entrance of Hengshan Tunnel by China Railway First Bureau Group Co., Ltd.; entrance of Miaojiaping 1# Tunnel by China Railway 16th Bureau Group Co., Ltd.; 2# inclined shaft of Suide Tunnel by China Railway 19th Bureau Group Co., Ltd.; entrance of 2# inclined shaft of Wubao Tunnel by China Railway 16th Bureau Group Co., Ltd.; entrance of Liulin Tunnel by China Communication Construction Company Ltd.; exit of Liangshan Tunnel by China Railway No.3 Engineering Group Co., Ltd.; entrance of Lishi Tunnel by China Coal No.3 Construction (Group) Corporation Ltd.; entrance, 2# inclined shaft and exit of Lvliangshan Tunnel by China Railway 12th Bureau Group Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 11

Page 25: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Tunnels (19 work sites) being investigated in mid-2007 include: exit of Lvliangshan Tunnel; Huangzhang 1# Tunnel by China Communication Construction Company Ltd.; 3# inclined shaft at entrance of Suide Tunnel and Longfangli 1# and 2# Tunnel by China Railway 21st Bureau Group Co., Ltd.; 1# inclined shaft of Suide Tunnel by China Railway 19th Bureau Group Co., Ltd.; 3# inclined shaft of Suide Tunnel by China Railway 21st Bureau Group Co., Ltd.; entrance, 1# inclined shaft opening of Wubao Tunnel , 2# inclined shaft, 4# inclined shaft, 3# inclined shaft, entrance of Baijiashan Tunnel, and exit of Baijiashan Tunnel by China Railway 16th Bureau Group Co., Ltd.; Duanjia 1# and 2# Tunnel by China Railway 17 Bureau Group Co., Ltd.; Entrance of Weijialou 3# Tunnel by China Railway 1st Group Co., Ltd., 1# inclined shaft of Hengshan Tunnel; entrance of Xingwangmao Tunnel by China Railway Tunnel Group; 1# inclined shaft of Xingwangmao Tunnel; and entrance of Niumaojing Tunnel of China Railway 12th Bureau Group Co., Ltd.

In 2007, tunnel was under normal construction. Construction sites were clean and tidy, while most construction sites and roads had been hardened, with sewage sedimentation tanks and environmental protection bulletin boards being arranged.

The investigation showed that much effluent from entrance of Lvliangshan Tunnel, with hundreds of tons per hour. The sewage sedimentation tank set at entrance of Lvliangshan Tunnel was very standardized and was of good sedimentation efficiency. Dozens of tons of effluent were generated from the entrance of Lvliangshan Tunnel per hour. After simple sedimentation, effluent was discharged to Dongchuan River. However, due to poor sedimentation, water quality of Dongchuan River was impacted to certain extent. China Railway No.3 Engineering Group Co., Ltd. made immediate rectification as required and reestablished Grade IV sewage sedimentation tank and drying tank, so that sedimentation effects of tunnel effluent could be guaranteed. Common problems occurred at tunnel construction sites were direct discharge of waste oil to ground from air storage tanks of some air compressors, which resulted in pollution to soil or surrounding water body to different extents.

Photo 3-5: 1# inclined shaft of Lvliangshan Tunnel by China Railway 12th Bureau Group Co., Ltd.

Photo 3-6: 2# inclined shaft of Suide Tunnel by China Railway 19th Bureau Group Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 12

Page 26: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 3-7: Sewage sedimentation tank at entrance of Lvliangshan Tunnel

Photo 3-8: Sewage sedimentation tank at entrance of Lvliangshan Tunnel after rectification

3. Bridge

Bridges (10 ) under mi-term investigation include: super-major bridge across Shizhong Highway by China Railway 21st Bureau Group Co., Ltd.; Zhongning Yellow River Super-major Bridge by China Railway 17th Bureau Group Co., Ltd.; Yongning Yellow River Super-major Bridge by China Tiesiju Civil Engineering Group Co., Ltd.; super-major bridge across Hekoumiao by China Railway No.2 Engineering Group Co., Ltd.; super-major bridge at Baotou-Xi’an Rail Line, Wudinghe River, Wulidian by China Railway 16th Bureau Group Co., Ltd.; Wudinghe Super-major Bridge in Wulidian by China Railway 21st Bureau Group Co., Ltd.; Wubao Yellow River Super-major Bridge by China Communications Construction Company Ltd., China, Fenghaoliang Dadongchuanhe Super-major Bridge by CCCC Second Harbour Engineering Company Ltd., Beichuanhe Super-major Bridge by China Communications Construction Company Ltd., and Yiwang Super-major Bridge.

There are (12) bridges for annual investigation: Fenghaoliang Super-major Bridge, Xiao Dong Chuan River Super-major Bridge, Liulin Super-major Bridge and Wubao Yellow River Super-major Bridge by China Communications Construction Co., Ltd., super-major bridge of Wulidian Wuding River, Dingjiagou Super-major Bridge and Er’shilipu Super-major Bridge by China Railway 21st Bureau Group Co., Ltd., Dalihe Super-major Bridge By Supervision Department of China Railway 17th Bureau Group Co., Ltd., Luhe Super-major Bridge by China Railway Erju Co., Ltd., Si’er’tan Super-major Bridge by China Railway 12th Bureau Group Co., Ltd. and Yongning Yellow River Super-major Bridge by China Tiesiju Civil Engineering Group Co., Ltd.

Around the construction site of Yellow River Zhongning Super-major Bridge by China Railway 17th Bureau Group Co., Ltd., there is farmland and “Thousands of Wolfberry Demonstration Garden” of Zhongwei City which are quite sensitive to the dust from construction site. Therefore, China Railway 17th Bureau Group Co., Ltd. takes enormous effective measures, such as “improving the seal of upper mouth in cement tank”, “watering in time”, asking supplier to cover and protect bulk cargo to keep constructing dust under control. In addition, the site of concrete mixing plant is clear and all the bulk cargo is stored in material shed, backfill the dried mud on bored pile, hygiene condition in camp is good and the construction site of Zhongning Yellow River Super-major Bridge is in order. In the water affairs inspection by Upper and Middle Yellow River Bureau united with other departments on the date of July 8, 2007, environment and water protection of China Railway 17th Bureau Group Co., Ltd. was well received. There is no obvious boundary signs in construction sites of Yongning Yellow River Super-major Bridge by China Tiesiju Civil Engineering Group Co., Ltd., Fenghaoliang Dadongchuanhe Super-major Bridge, Beichuanhe Super-major Bridge and Yiwang Super-major Bridge by China Communications Construction Co., Ltd. All the sites are clear and equipped with environmental protection measures billboards. There are rails and warning boards around mud settling pond.

Investigate the cofferdam spoil over water pier of Wubao Yellow River Super-major Bridge by China Communications Construction Co., Ltd. Give corrective recommendations for problems such as sewage sedimentation efficiency of Wulidian Wudinghe Super-major Bridge by China Railway 21st Bureau Group Co., Ltd. is so low that water quality is affected and so on to solve them in time.

Beijing OASIS Environmental Protection Technology Co., Ltd. 13

Page 27: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 3-9: Environmental protection billboard of Yongning Yellow River Super-major Bridge by China Tiesiju Civil Engineering Group Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 14

Page 28: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 3-10: Construction site of Zhongning Yellow River Super-major Bridge

Photo 3-11: Construction road of Zhongning Yellow River Super-major Bridge

Photo 3-12: Construction site of Fenghaoliang Dadongchuanhe Super-major Bridge by China Communications Construction Co., Ltd.

   

Photo 3-13: Spoils around cofferdam of 5# pier of Wubao Yellow River Super-major Bridge by China Communications Construction Co., Ltd. has been cleared

4. Condition of construction camps

Mid-term investigation: Entrance of Xingwangmao tunnel by China Railway Tunnel Bureau Co., Ltd.

There are (10) construction camps for annual investigation: entrance of Lvliangshan tunnel by China Railway 12th Bureau Group Co., Ltd., entrance of Lishi tunnel by China Coal No.3 Construction (group) Corporation Ltd., No.1 inclined shaft at the entrance of Suide tunnel by China

Beijing OASIS Environmental Protection Technology Co., Ltd. 15

Page 29: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Railway 19th Bureau Group Co., Ltd., No.1 inclined shaft of Wubao tunnel, entrance of Wubao tunnel and 6th branch camp and camp of project department II by China Railway 16th Bureau Group Co., Ltd., bridge team II of China Railway 17th Bureau Group Co., Ltd., entrance of Xingwangmao tunnel by China Railway Tunnel Bureau Co., Ltd. and entrance of Niumaojing tunnel by China Railway 12th Bureau Group Co., Ltd.

Construction camps of entrance of 2# inclined shaft of Lvliangshan tunnel by China Railway 12th Bureau Group Co., Ltd., 2# inclined shaft of Suide tunnel by China Railway 19th Bureau Group Co., Ltd., etc. are clean and specified. All the camps are equipped with environmental protection billboards, domestic wastes ponds and sewage settling ponds with clear boundary.

Photo 3-14: Construction camp of entrance of Lvliangshan tunnel

Photo 3-15: Construction camp of 2# inclined shaft of Suide tunnel by China Railway 19th Bureau Group Co.,

Ltd.

5. Borrow pits and spoil grounds

There are (10) borrow pits and spoil grounds for mid-term investigation: DK389+000 borrow pit by China Railway Erju Co., Ltd., spoil ground at the entrance of Xingwangmao tunnel by China Railway Tunnel Bureau Co., Ltd., spoil ground at the entrance of Hengshan tunnel by China Railway First Group Co., Ltd., spoil ground at the entrance of Miaojiaping 1# tunnel by China Railway 16th Bureau Group Co., Ltd., spoil ground of 2# inclined shaft of Suide tunnel by China Railway 19th Bureau Group Co., Ltd., spoil ground at the entrance of 2# inclined shaft of Wubao tunnel by China Railway 16th Bureau Co., Ltd., spoil ground at the entrance of Liulin tunnel by China Communication Construction Co., Ltd., spoil ground at the entrance of Lishi tunnel by China Coal No.3 Construction (group) Corporation Ltd. and spoil grounds at the entrance and exit of Lvliangshan tunnel by China Railway 12th Bureau Group Co., Ltd.

There are (25) borrow pits and spoil grounds for annual investigation: Spoil ground DK139+915 at the entrance of Lvliangshan tunnel by China Railway 3rd Bureau Co., Ltd., spoil ground of No.2 inclined shaft at the entrance of Lvliangshan and spoil ground of No.1 inclined shaft by China Railway 12th Bureau Group Co., Ltd., spoil ground of Huangzhang No.1 tunnel, spoil ground of Xialiujiashan tunnel, spoil ground of No.1 inclined shaft of Liulin tunnel and No.1 and No.2 spoil ground of Wubao Station by China Communication Constuction Co., Ltd., spoil ground at the entrance of Lishi tunnel, spoil ground of No.1 inclined shaft by China Coal No.3 Construction (group) Corporation Ltd., spoil grounds of No.1 and No.2 inclined shaft at the entrance of Suide tunnel by China Railway 19th Bureau Group Co., Ltd., spoil grounds of No.3 and No.4 inclined shaft of Suide tunnel by China Railway 21st Bureau Group Co., Ltd., spoil grounds of No.1, No.2 and No.4 inclined shaft of Wubao tunnel, No.3 inclined shaft, spoil ground at the entrance of tunnel and spoil ground at the entrance of Baijiashan tunnel by China Railway 16th Bureau Group Co., Ltd., spoil grounds of Duanjia No.1 and No.2 tunnel by China Railway 17th Bureau Group Co., Ltd., spoil ground at the entrance of Weijialou No.3 tunnel and spoil ground of No.1 inclined shaft

Beijing OASIS Environmental Protection Technology Co., Ltd. 16

Page 30: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

of Hengshan tunnel by China Railway First Bureau Group Co., Ltd., spoil ground at the entrance of Xingwangmao tunnel by China Railway Tunnel Bureau Co., Ltd. and borrow pit DK391+440 by China Railway Erju Co., Ltd.

It is found in monitoring investigation that because of the lack of stone material along the line, most of the spoil from tunnel is used for gravel procession, which takes effective use of Waste slag to reduce the amount of waste slag.

Most spoil grounds of tunnel such as spoil ground at the entrance of Lvliangshan tunnel, spoil ground of 4# inclined shaft of Wubao tunnel, etc. are located in barren mountain ditch, which is quite reasonable. With the principle of blocking first & abandoning second, slag retaining dams have been built for spoil ground at the exit of Liulin tunnel and other spoil grounds. However, retaining engineering in spoil ground of 1# inclined shaft of Lvliangshan tunnel and so on are delayed.

Photo 3-16: Retaining wall built in spoil ground of 1# inclined shaft of Wubao tunnel

Photo 3-17: Slag retaining dam built in spoil ground at the entrance of Liulin tunnel

6. Condition of nature reserves

Part of construction work site of ZQ-6 section by China Railway 12th Bureau Group Co., Ltd. is located within the two sites of nature reserve. It is found in site monitoring that formworks spotted in Si’er’tan Super-major Bridge situated in Habahu Nature Reserve outside the construction site have been cleared, and the boundary on the two sides of construction road is quite clear. Piers of Jiaonigou Super-major Bridge situated in Baijitan Nature Reserve has been almostly completed and the site has been almostly cleared.

7. Condition of water source

Dingjiagou Super-major Bridge and Er’shilipu Super-major Bridge by China Railway 16th Bureau Group Co., Ltd. are located in Class II nature reserve.

Subgrade range: DK262+600—DK264+440, not in construction.

8. Condition of cultural relics preservation

On May 2, No.3 Project Department of China Communications Construction Co., Ltd. found bricks and other objects during exavation in borrow pit situated in Maquanliang Village of Zhuanjing Town, Dingbian County without awareness of antique. Members of archaeology exploration working crew of Yulin City found the exposed bricks on the bluff for borrowing. After examination, they definited it as a ancient tomb, so they gave notice in oral to stop borrowing. Headquaters received written notification for stopping construction on May 7. From May 10 to May 20, archeaological team of Yulin City and Dingbian County office of cultural relics implemented salvage clear and excavation on 6 tombs, and these 6 tombs are verified as the ones of Han Dynasty according to archeaological exploration data. Construction has been stopped since May 2, and

Beijing OASIS Environmental Protection Technology Co., Ltd. 17

Page 31: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

construction unit is helping administration of cultural relics to guard the site. The way for construction progress needs to be arranged according to notification of administration of cultural relics.

DK510+670 in historical site of Great Wall of the Ming Dynasty by China Communications Construction Co., Ltd. has not been into construction.

3.2.3 Problems and suggestions

1. In Yongning Yellow River Super-major Bridge constructed by China Tiesiju Civil Engineering Group Co., Ltd., a relatively long construction road is built with debris on the two sides of Yellow River inward to reduce the cross section of riverway flood discharge, which has effects on flood preservation and control. Therefore, Upper and Middle Yellow River Bureau issued a rectification notice to China Tiesiju Civil Engineering Group Co., Ltd. on April 5, 2007.

Monitoring units asked Tiesiju Civil Engineering Group Co., Ltd. and water affair management department of all levels to solve the problem through consultation and protect Yellow River water channel to reduce unnecessary negative effects, and at the same time make emergency preparation for flood preservation practically to ensure construction safety.

Photo 3-18: Construction road of Yongning Yellow River Super-major Bridge for reduction of cross section of flood discharge

2. Ask all the construction units to take control of oil in air compressor plant as key environment element and make management requirements clear in rules and regulations.

3. It is suggested to positively apply capital according to official reply from State Environmental Protection Administration to start monitoring of hydrogeology during construction of Lvliangshan tunnel as soon as possible.

4. After thaw in early spring of 2008, all the relative construction sections shall implement retaining engineering of spoil ground and equip with interception and drainage equipments in spoil ground to eliminate hidden danger of water and soil loss.

3.3 Monitoring implementation in 20083.3.1 Important contents of monitoring

Environmental monitoring investigation in 2008 focuses on pratical situation for environmental and water protection measures in super-major bridges across the river, tunnels more than 3000 meters, borrow pits and spoil grounds, embankment(cutting), station yards, construction roads, construction camps and other parts during construction period and pays great attention to pratical situation for environmental and water protection measures for national (provincial) nature reserves, water

Beijing OASIS Environmental Protection Technology Co., Ltd. 18

Page 32: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

conservation districts and sections across Yellow River and important water areas as well as involving ancient Great Wall, preservation of cultural relics, etc.

Track rectification effects on existing problems of year 2007.

Check relative records about quality, environment, occupational health and safety management system to verify the effectiveness of system operation.

3.3.2 Situation & analysis

From May 19 to June 3, 2008 and from October 24 to November 3, 2008, Beijing Oasis Environmental Protection Technology Co., Ltd. investigated the environmental control of site of Taiyuan-Zhongwei (Yinchuan) Railway engineering.

1. Condition for environmental management

Because of the attention and strict management by Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd., multiple times of supervision and inspection by Upper and Middle Yellow River Bureau, Shanxi Provincial Water Conservancy Department and local management department of all levels and inspection and guidance of monitoring and supervising units for water preservation, awareness of environment and water protection of construction units in most sections has been apparently improved. Environment and water protection measures in construction site have been put into practice and existing environment and water protection problems have been positively improved.

On September 11th, 2008, China Water Resouce issued photos and words in essay named as Obvious rectification effects of measures for keeping water and soil in Shaanxi section of Taiyuan-Zhongwei (Yinchuan) Railway to report that in Taiyuan-Zhongwei (Yinchuan) Railway “water and soil conservation has been apparently improved”. On October 6, 2008, Yellow River Zoology praised a batch of “water and soil reservation engineering with high quality, fast process and good protection effects” in the essay named as Further acceleration of water and soil reservation engineering in Taiyuan-Zhongwei (Yinchuan) Railway to explain that “with gradual complementation of foundation engineering of Taiyuan-Zhongwei (Yinchuan) Railway, the matched water and soil reservation engineering is also further accelerating”.

It is found in investigation that records for every item in inspection of China 17th Bureau Group Co., Ltd. and China 19th Bureau Group Co., Ltd. are complete. Inspection and rectification procedure of these two units all meet with requirements of environmental management system and the record of monitoring and supervising notification is complete, which reflects that environmental management system operation of two sections is continuously effective.

Beijing OASIS Environmental Protection Technology Co., Ltd. 19

Page 33: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 3-19: Newly-set major environmental element caution list by China Railway Tunnel Bureau at the

entrance of Xingwangmao tunnel

Photo 3-20: Bulletin board for environmental protection at 2# inclined shaft set in Lvliangshan tunnel

by China Railway 12th Bureau Group Co., Ltd.

Photo 3-21: Monitoring and supervising notifications of China Railway Bureau 17th Group Ltd. (left) and China Railway Bureau 19th Group Ltd. (right)

All the construction units pay great attention to physical health of staff. They organize one time of physical examination every two years in general and every year for special types of work (refer to tunnellers, electric welders, cooks, etc.).

Photo 3-22: Staff medical examination report of Second Project Department of China Railway Tunnel Bureau

2. Tunnel situation

Work sites for mid-term investigation are: entrance of Lvliangshan tunnel, 2# inclined shaft and exit Beijing OASIS Environmental Protection Technology Co., Ltd. 20

Page 34: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

of Niumaojing Tunnel by China Railway 12th Bureau Group Co., Ltd., exit of Lvliangshan Tunnel, 3# inclined shaft and 4# inclined shaft by China Railway 3rd Bureau Group Co., Ltd., exit of Lishi tunnel and 1# inclined shaft, entrance of Duijiushan Tunnel by China Railway 17th Bureau Group Co., Ltd., entrance of Wubao Tunnel and 1# inclined shaft by China Railway 16th Bureau Group Co., Ltd., entrance of Liulin Tunnel, exit of Xuejiasi Tunnel and Huangzhang No.1 Tunnel by China Communications Construction Co., Ltd., entrance of Suide Tunnel and 1# inclined shaft by China Railway 19th Bureau Group Co., Ltd., entrance of Suide Tunnel by China Railway 21st Bureau Group Co., Ltd., exit of Duijiushan Tunnel by China Railway 17th Bureau Group Co., Ltd., entrance of Hengshan Tunnel and 2# inclined shaft by China Railway First Bureau Group Co., Ltd., entrance of Xingwangmao Tunnel and 1# inclined shaft by China Railway Tunnel Bureau Co., Ltd. and entrance and exit of Hongjingzi Tunnel by China Communications Construction Co., Ltd.

Work sites for annual investigation are: Exit and entrance of Niumaojing Tunnle by China Railway 12th Bureau Group Co., Ltd., exit of Hongjingzi Tunnel by China Communications Construction Co., Ltd., No.2 inclined shaft of Xingwangmao Tunnel by China Railway Tunnel Bureau Co., Ltd., entrance of Hengshan Tunnel by China Railway First Bureau Group Co., Ltd., exit of Duijiushan Tunnel by China Railway 17th Bureau Group Co., Ltd., No.3 and No.4 inclined shaft of Baijiashan Tunnel by China Railway 21st Bureau Group Co., Ltd., 2# inclined shaft of Suide tunnel by China Railway 19th Bureau Group Co., Ltd., exit of Wubao Tunnel by China Railway 16th Bureau Group Co., Ltd. and 5# inclined shaft of Lvliangshan Tunnel by China Railway 3rd Bureau Group Co., Ltd.

In 2008, tunnel constuction project in Taiyuan-Zhongwei (Yinchuan) Railway developed well and the completed hole completion meter had reached 86%.

Management of waste oil of air compressor in tunnel constuction was well, which could basically achieve the goal of concentrated collection and recycle.

Photo 3-23: Waste oil of air compressor has been collected and cycled by the local at No.2 inclined shaft of Suide Tunnel by China Railway 19th Bureau Group

Co., Ltd.

Photo 3-24: Clean site of air storage tank of air compressor at No. 2 inclined shaft of Liulin Tunnel

Beijing OASIS Environmental Protection Technology Co., Ltd. 21

Page 35: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 3-25: Tidy air compressor room at 2# inclined shaft of Lvliangshan Tunnel by China Railway 12th

Bureau Group Co., Ltd.

Photo 3-26: Waste oil discharged from air storage tank of air compressor has been collected at 1# inclined

shaft of Wubao Tunnel by China Railway 16th Bureau Group Co., Ltd.

3. Bridge

Work sites for mid-term investigation are: Zhongning Yellow River Super-major Bridge by China Railway 17th Bureau Group Co., Ltd., Yongning Yellow River Super-major Bridge by China Tiesiju Engineering Bureau Group Co., Ltd., G208 Super-major Bridge by China Railway 15th Bureau Group Co., Ltd., Beichuanhe Super-major Bridge, Wangwu Xiaohe Super-major Bridge, Yiwang Super-major Bridge, Ciyaohe Super-major Bridge and Wenyuhe Super-major Bridge by China Communications Construction Co., Ltd., Suide Wulidian Wudinghe Super-major Bridge and Highway Super-major Bridge passing through Shizhong by China Railway 21st Bureau Group Co., Ltd., Wudinghe Er’shilipu Super-major Bridge and Dingjiagou Super-major Bridge by China Railway 16th Bureau Group Co., Ltd., Juzizhou Dalihe Super-major Bridge by China Railway 17th Bureau Group Co., Ltd., Mayihe Super-major Bridge by China Railway First Bureau Group Co., Ltd., super-major bridge passing through Hekoumiao by China Railway Erju Co., Ltd., Huojiapan Hongliuhe Super-major Bridge and Maijiatai Super-major Bridge by China Communications Construction Co., Ltd. and Si’er’tan Super-major Bridge by China Railway 12th Bureau Group Co., Ltd.

These work sites in annual investigation include: Yongning Yellow River Super-major Bridge by China Tiesiju Civil Engineering Group Co., Ltd., Zhongning Yellow River Super-major Bridge by China Railway 17th Bureau Group Co., Ltd.; Yangjiagou Super-major Bridge by China State Construction; Super-major Bridge Crossing Hekoumiao Reservoir by China Railway Erju Co. Ltd.; Mayihe Super-major Bridge by China Railway first Group Co., Ltd.; Lijiagua Dalihe Super-major Bridge and Zhaoyang Village Super-major Bridge at Macha Town, MZizhou by China Railway 17th Bureau Group Co., Ltd.; Er’shilipu Super-major Bridge by China Railway 16th Bureau Group Cc., Ltd.; Wudinghe Super-major Bridge at Wulidian, Duide by China Railway 21st Bureau Group co., Ltd.; Qingshuigou Super-major Bridge, Wubao Yellow River Super-major Bridge, Beichuanghe Super-major Bridge, Xiangyanghe Super-major Bridge, Wangwu Xiaohe Super-major Bridge by China Communications Construction Company Ltd.; Hezuolian Super-major Bridge by China Railway 25th Bureau Group Co., Ltd.

In 2008, the bridge engineering progressed smoothly, of which the 79.12% of super-major bridge was completed. Pile foundation construction inclined to impact the environment in super-major bridge was basically completed. Full attention was paid to the protection on riverway and mountain in each section and the riverway shall be dredged and ditches shall be recovered in the construction site completed.

Beijing OASIS Environmental Protection Technology Co., Ltd. 22

Page 36: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 3-27: Land formation has been conducted with vegetation exposed in the construction site of Si’er’tan Super-major Bridge in Habahu Nature reserve by China Railway 12th Bureau Group Co., Ltd.

Photo 3-28: Tidy construction site of super-major bridge cross Shizhong Highway by China Railway 21st Bureau Group co., Ltd.

Photo 3-29: Temporary retaining for contact channel and canal as gridding vegetation at super-major bridge cross Hekou Temple reservoir by China Railway Erju

Co. Ltd.

Photo 3-30: There is vegetation now at completed pier at Maijiatai Super-major Bridge by China State

Construction

Beijing OASIS Environmental Protection Technology Co., Ltd. 23

Page 37: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 3-31: Completed protection of riverbank at Er’shilipu Super-major Bridge by China Railway 16th

Bureau Group Co., Ltd.

Photo 3-32: The canal is restored for Wangwu Xiaohe Super-major Bridge by China Communications

Construction Company Ltd.

4. Borrow pit and spoil ground

Work sites in mid-term investigation include: Lvliangshan Tunnel Entrance by China Railway 12th Bureau Group Co., Ltd., Spoil Ground of Tunnel Exist for No.2 Inclined Shaft and Niumaojing, LDK626+400 Spoil Ground, Spoil Ground of Ningdong Central Area; Lvliangshan Tunnel Exit by China Railway No.3 Engineering Group Co., Ltd., Spoil Ground for No.3 and No.4 Inclined Shaft; Lishi Tunnel Exit by China Coal No.3 Construction (group) Corporation Ltd., Spoil Ground for No.1 Inclined Shaft; Wubao Tunnel Entrance by China Railway 16th Bureau Group Co., Ltd., Spoil Ground for No.1 Inclined Shaft; No.1 Spoil Ground of Liangjiahui Tunnel, Spoil Ground of Wangjiahui Tunnel, Spoil Ground of Xialiujiashan No.1 and No.2 Tunnel, Wangjiazhuang Tunnel Spoil Ground, Xuejiasi Tunnel Spoil Ground, Liulin Tunnel Entrance Spoil Ground, Liulin Tunnel Exit Spoil Ground, No.1 Huangzhang Tunnel Spoil Ground by China Communications Construction Company Ltd.; Suide Tunnel Entrance by China Railway 19th Bureau Group Co., Ltd., No.1 Inclined Shaft Spoil Ground; Duijiushan Tunnel Exit Spoil Ground by China Railway 17th Bureau Group Co., Ltd.; Hengshan Tunnel Entrance Spoil Ground by China Railway First Group Co., Ltd.; Spoil Ground on the right side of DK391+100 and DK391+400 by China Railway Erju Co. Ltd.; Xingwangmao Tunnel Entrance by China Railway Tunnel Stock Co,. Ltd., No.1 Inclined Shaft Spoil Ground; Spoil Ground of super-major bridge cross Hekoumiao by China Railway Erju Co. Ltd.; eight spoil grounds for Hongjingzi Tunnel Entrance, Inclined Shaft and Exits by China State Construction.

Annual investigation includes: Huangyangtan No.1 and No.2 Spoil Ground by China Railway 12th Bureau Group Co., Ltd., Huiminxiang Spoil Ground, Spoil Grounds for Niumaojing Tunnel Exit and Entrance; Huangyangwan Tunnel Spoil Ground by China Railway 21st Bureau Group co., Ltd.; Shuangjingzizhan Spoil Ground, Ganquanzi Spoil Ground, Taiyangshan Laoyanchi Spoil Ground, Hongjingzi Tunnel Entrance Spoil Ground and Exit Spoil Ground, Spoil Ground of DK436+160 and DK420+200 by China State Construction; No.2 Xingwangmao Tunnel Inclined Shaft by China Railway Tunnel Stock Co., Ltd.; Hengshan Tunnel Entrance Spoil Ground by China Railway First Group Co., Ltd.; Zhangjiazhai Tunnel Spoil Ground and Duijiushan Tunnel Exit Spoil Ground by China Railway 17th Bureau Group Co., Ltd.; Spoil Ground of Miaojiaping Tunnel No.2 Entrance and Baijiashan Tunnel Exit Spoil Ground by China Railway 16th Bureau Group Co., Ltd.; No.3 and No.4 Inclined Shaft Spoil Ground of Baijiashan Tunnel by China Railway 21st Bureau Group co., Ltd.; No.2 Inclined Shaft Spoil Ground of Suide Tunnel by China Railway 19th Bureau Group Cc., Ltd.; Wubao Tunnel Exit No.4 Inclined Shaft Spoil Ground by China Railway 16th Bureau Group Co., Ltd.; No.1 and No.2 Spoil Ground of Lishi Tunnel Exit by China Coal No.3 Construction Corporation Ltd.; Spoil Ground of Wubao Station, Liulin Tunnel No.2 Spoil Ground, Youfangping Tunnel Spoil Ground of Liulin Tunnel, No.1 Longfangli Tunnel Spoil Ground, No.1 Huangzhang Tunnel Spoil Ground by China Communications Construction Company Ltd.; Spoil Ground of Lvliangshan Tunnel No.2 Inclined Shaft and Exit by China Railway No.3 Engineering Group Co., Ltd.

In 2008, there was significant progress in borrow pit and spoil ground and problem spotted in mid-term investigation in the same year was solved.

Beijing OASIS Environmental Protection Technology Co., Ltd. 24

Page 38: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Considering fragile environment in northwest sandy areas and collapsible loess area as well as long life of vegetation, the investigation indicates that multiple units like China Railway 12th Bureau Group Co., Ltd., China State Construction and Hekou Temple by China Railway Erju Co. Ltd. etc have use grass seed adapting to the local climate.

Due to the fact that formally approved drawing for design of borrow pit and spoil ground in each section is not obtained, the retaining of most borrow pit and spoil ground is preliminary and can be improved after obtaining the drawing. Retaining of some spoil ground with much difficulty is not set.

Photo 3-33: Retaining wall of spoil ground along the riverway at Xuejiasi Tunnel Exit by China

Communications Construction Company Ltd.

Photo 3-34: Retaining wall of spoil ground along with Dali River at Duijiushan Tunnel Exit Spoil Ground by

China Railway 17th Bureau Group Co., Ltd.

Photo 3-35: Segregation, leveling and retaining have been conducted for No.1 Spoil Ground of Wubao Station creating land about 30 Mu for the local

Photo 3-36: Borrow pit has become farmland at DK421+400 by Project Department by China State

Photo3-37: Borrow pit has partially become farmland at DK391+100 by China Railway Erju Co. Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 25

Page 39: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Construction First Building Corporation Limited

Photo 3-38: The borrow pit has been leveled at GDK420+200 by Project Department by China State Construction First Building Corporation

Limited

Photo 3-39: The protection of Youfangping Spoil Ground by China Communication Construction

Company Ltd. has been conducted and the planting on both sides of construction roads is under way

Photo 3-40: Artemisia ordosica and Gaodan grass planted by China Railway 12th Bureau Group Co., Ltd. on side slope of spoil ground

5. Beam fabricating plant

Mid-term investigation includes: Yuci Girder Fabrication Yard by China Railway 22nd Construction Bureau Co., Ltd.; Qingxu Girder Fabrication Yard by China Communication Construction Company Ltd.; Suide Girder Fabrication Yard by China Railway 23th Construction Bureau, Ltd.; Zhongning Girder Fabrication Yard by China Railway Tenth Group Co., Ltd.

Annual investigation includes: Pingjibao Girder Fabrication Yard by China Railway 8th Construction Bureau Ltd.; Zhongning Girder Fabrication Yard by China Railway Tenth Group Co., Ltd.; Yuci Girder Fabrication Yard by China Railway 22nd Construction Bureau Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 26

Page 40: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 3-41: Zhongning Girder Fabrication Yard by China Railway Tenth Group Co., Ltd.

6. Water source overview

Dingjiagou Super-major Bridge (Level II protection zone of water source): Foundation excavation and pier shaft grouting are under way with eye-catching environmental protection billboards; boundary revision of Wuding River at its bank is conducted; there is simply equipped sedimentation tank at the river bank; the boundary of construction road is very clear.

Eye-catching environmental protection billboard is set at the construction site of Er’shilipu Super-major Bridge and temporary retaining to prevent water and soil loss is available at the river bank of Wuding River. Construction sewage shall be discharged into the Grade III sedimentation tank. The site construction is relatively normative.

Mid 2008 Investigation indicates that there was a lot of household garbage piled next to the Grade III sedimentation tank discarded by many people. Much garbage discharged into the river may pollute the water. The investigation team suggested cleaning the sedimentation tank and removing the garbage quickly, building free household garbage tank for local inhabitant to protect water from pollution. At the same year, rectification was completed by China Railway 16th Bureau Group Co., Ltd.

Photo 3-42: Sewage Sedimentation Basin for Er’shilipu Super-major Bridge by China Railway 16th Bureau Group Co., Ltd. (Left photo: before rectification) (Right photo: after rectification)

3.3.3 Problems and suggestions

1. Expert Opinion at Meeting on Proposal and Measure for Hydrological Protection of Lvliangshan Tunnel has suggested arranging specific and subsequent hydrogeological monitoring during Lvliangshan Tunnel construction to provide evidence for further research of local water environment. At the same time, water gushing of tunnel, impact of vibration on surrounding hydrogeology and house shall be monitored or observed constantly to accumulate data and material for formulating compensatory proposal.

2. Due to weak protective measure of some spoil ground, headquarters shall boost design unit to Beijing OASIS Environmental Protection Technology Co., Ltd. 27

Page 41: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

implement the retaining design of spoil ground and construction unit shall communicate with local competent department for liaison and speed up the construction of retaining for spoil ground with particular attention to minimize the impact on the river and avoid creating new soil erosion.

3. Management of oils and garbage at the construction site shall be strengthened and effective measures shall be taken to put an end to the direct discharge of waste oil in the gas tank of air compressor into the ground, avoiding pollution on surrounding environment.

3.4 Monitoring implementation in 20093.4.1 Important contents of monitoring

Starting from April 13 to 27 and from November 7 to 26 in 2009, Beijing OASIS Environmental Protection Technology Co., Ltd. conducted two environment control investigation on the construction site of Taiyuan-Zhongwei (Yinchuan) Railway.

Environmental monitoring in Mid 2008 investigation includes following key parts:

Environment monitoring mainly focus on environment and water protection of parts like super-major bridge across river, tunnel longer than 3000 m, borrow pit and spoil ground, embankment, station yard, construction roads and construction camp etc during construction. Great attention to practical situation for environmental and water protection measures for national (provincial) nature reserves, water conservation districts and sections across Yellow River and important water areas as well as involving ancient Great Wall, preservation of cultural relics, etc shall be paid.

Material verification and summary of borrow pit and spoil ground as well as check of final rectification effect of such borrow pit and spoil ground shall be conducted.

The effect of Lvliangshan Tunnel and Xingwangmao Tunnel water gushing shall be traced; problem spotted in 2008 shall be traced.

According to the arrangement of Project Department by Taizhongyin Company, annual environment control in 2009 organized jointly by Engineering Department, water and soil conservation monitoring unit as well as water and soil conservation supervision unit is special inspection of borrow pit and spoil ground. The joint inspection has contributed to further understanding on restoration status of entire borrow pit and spoil ground.

3.4.2 Situation & analysis

1. Borrow pit situation

58 borrow pits in 17 sections were investigated in Mid 2009 Investigation.

52 borrow pits in 17 sections were investigated in Annual 2009 Investigation.

By the end of 2009, borrowing work of entire borrow pit had been completed. Based on 58 borrow pits in investigation, side slope of some borrow pits shall be repaired. There is a little restoration work and there is little difficulty in restoration.

Borrow pit by China Railway Erju Co. Ltd. finished the handing over procedure with local land and resources department, signing Agreement on Land Rehabilitation, Woodland Rehabilitation and Vegetation Recovery for Temporary Ground of Taiyuan-Zhongwei (Yinchuan) Railway (Borrow Pits and Spoil Ground) and Handing-over Document. 90% of borrow pit by China Railway 12th Bureau Group Co., Ltd. is recovered and to be handed over after borrowing soil area verification by local land and resources department. Vast majority of borrow pit by China State Construction is recovered and can be handed over.

2. Spoil ground situation

137 spoil grounds in 17 sections were investigated in mid 2009 investigation.

Beijing OASIS Environmental Protection Technology Co., Ltd. 28

Page 42: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

153 spoil grounds in 17 sections were investigated in 2009 joint investigation.

Spoil grounds along the whole Taiyuan-Zhongwei (Yinchuan) Railway mainly located around China Communications Construction Company Ltd., China State Construction, China Railway 12th Bureau Group Co., Ltd. and each major tunnel. The investigation indicates that spoil ground in desert region west to the Suide, Shannxi whose height is no higher than fiver meter and after segregation, slope setting and top leveling can be recovered basically. Party of spoil ground east to Suide is recovered, or can be filled and leveled up to reclaim land or can be used for second cultivation; some part of spoil ground with weak retaining and drainage design cannot be recovered entirely with difficulty in “Blocking first& abandon second”.

3. Impact of water gushing of tunnel

Investigation indicated that water inflow at Lvliangshan Tunnel Entrance contracted by China Railway 12th Bureau Group Co., Ltd. reduced from 180T/h to 100T/h by the end of year. There is little water inflow at No.2 Inclined Shaft and much water inflow at entrance. Currently there are three teams blocking the water on construction, which reduced water inflow. 150T/h water is supplied for over 1000 persons and animals of surrounding Xiangyang Village and Potou Village flowing through clean-water reservoir and pump station.

For Lvliangshan Tunnel Exit Section contracted by China Railway No.3 Engineering Group Co., Ltd., total water yield of tunnel is 100T/h; blocking water work is undergoing and water can be obtained from self-aid well. Water can be distributed to villagers through car.

For Xingwangmao Tunnel contracted by China Railway Tunnel Stock Co., Ltd., Water gushing mainly concentrated on entrance and No.3 inclined shaft, there is no increase on drainage capacity. In May, 2008, water from No.2 inclined shaft submerged some farm land and the water gushing didn’t stop until 2009. The surrounding submerged farmland of No.2 inclined shaft was dry and cultivation was recovered. The trees grew well.

Photo 3-43: Farmland submerged by water gushed from 2# inclined shaft of Xingwangmao Tunnel of China Railway Tunnel Stock Co., Ltd. is recovered

4. Protection of cultural relics

The relics of Great Wall of the Ming Dynasty beside Hequan Town route in Dingbian County by China State Construction were well protected and subgrade engineering was completed.

Design drawings for changing road into bridge at the relics of Great Wall of the Ming Dynasty in Yang’er Village of Jingbian County by China Railway Erju Co., Ltd. had arrived in September 2009 and construction of the bridge had been completed.

3.4.3 Problems and suggestions

1. Recovery Agreement on Si’er’tan Mixing Station located at Habahu Nature Reserve by China

Beijing OASIS Environmental Protection Technology Co., Ltd. 29

Page 43: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Railway 12th Bureau Group Co., Ltd. shall be approved by competent department of nature reserve and shall be deemed to be void if only there is agreement signed with villagers.

2. Demolition work of bridge of construction roads for Yongning Yellow River Super-major Bridge by China Tiesiju Civil Engineering Group Co., Ltd. shall be arranged timely and construction material in riverway like steel tube shall be removed to ensure smooth passing of ice flood of Yellow River in spring of next year.

3. If building stones processing cannot stop by local villagers on spoil ground after construction, the construction unit cannot conduct spoil ground recovery timely; or local government required to recovery the spoil ground by themselves (such as Shaanxi Province), the construction unit shall negotiate with competent department superior to local township government to determine recovery responsibility, recovery standard and recovery date of spoil ground and sign effective agreement for timely handing over.

3.5 Monitoring implementation in 20103.5.1 Important contents of monitoring

From May 7 to May 16, 2010 and from October 24 to November 2, OASIS participated in the second joint inspection on environment and water protection organized by Engineering Department of Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd.

Implementation in 2010 focused on the following content:

Cross-river super-major bridges and tunnels of 3000m or above long depended on rectification effects of final spoil grounds; restoration of land ocupation for girder fabrication yards, construction roads, construction camps, mixing stations and construction processing areas was investigated and comprehended, together with conditions of boiler room, sewage treatment station and aoustic barrier construction of post-station engineering; and final remedies for water burst in Lvliangshan Tunnel and rectification results of problems raised in the last report were traced.

Mid-2010 investigation covered 16 borrow pits and 93 spoil grounds in 15 sections in total. Investigation in 2010 covered 3 borrow pits and 53 spoil grounds, 11 mixing stations and rebar processing areas, 3 girder fabrication yards, 8 construction camps, 10 sewage treatment places and 14 boiler rooms in 15 sections in total.

3.5.2 Situation & analysis

1. Borrow pit and spoil ground situation

Restoration and handover of borrow pits were early implemented, as a result, borrow pits along the whole railway were well restored.

All borrow pits and spoil grounds by China Railway Erju Co., Ltd. and China State Construction had been handed over; protection and restoration of most spoil grounds by other units had been completed and was under handover successively; protection of a small number of spoil grounds needed to be completed as soon as possible.

A common problem for borrow pits lied in that, revegetation at the surface of borrow pits, other than reclaimed ones, slowly progressed, due to lack of collection of topsoil before earth borrowing by construction unit and difficulty in collection arising from thin topsoil in borrow pits in desert areas. Another reason was less annual rainfall in northwest districts.

Beijing OASIS Environmental Protection Technology Co., Ltd. 30

Page 44: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 3-44: China State Construction DK646+402 borrow pits had been covered with vegetation

Photo 3-45: China Railway 12th Bureau Group DK548+400 borrow pits had been greened

Photo 3-46: Spoil ground of 63mu at the exit of Bajing Bumu Village 1# Tunnel by China Communications

Construction Company Ltd. had been reclaimed

Photo 3-47: Spoil ground of 60mu at the exit of Baijiashan Tunnel by China Railway 16th Bureau

Group Co., Ltd. had been leveled

Photo 3-48: DK365+150 Spoil ground of 120mu by China Railway Erju Co., Ltd. had been reclaimed

Photo 3-49: Lvlangshan Tunnel 5# spoil ground by No.3 Engineering Group Co., Ltd. had been covered

with earth and could been reclaimed

Beijing OASIS Environmental Protection Technology Co., Ltd. 31

Page 45: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

 

Photo 3-50: Spoil ground at the entrance of Hengshan Tunnel by China Railway First Group Co., Ltd.

Photo 3-51: Spoil ground of Lijiabian Tunnel by China Railway 17th Bureau Group Co., Ltd.

2. Restoration of temporary land

Among 3 girder fabrication yards in this investigation, Wubao Girder Fabrication Yard had become Wubao Station; devices at Liulin Girder Fabrication Yard had been removed and to be returned to local coal washery; some harden ground and waste houses in Suide Girder Fabrication Yard had not been removed yet.

About 40% of restoration of mixing stations, construction camps and processing areas had been completed, the rest under successive restoration.

Photo 3-52: Liulin Girder Fabrication Yard by China Communications Construction Company Ltd. was to be

handed over to local coal washery

Photo 3-53: Wubao Girder Fabrication Yard by China Communications Construction Company Ltd. had been

removed and become Wubao Station

Photo 3-54: Mixing station at the exit of Huangzhang 3# Tunnel by China Communications Construction

Company Ltd. had been reclaimed

Photo 3-55: DK413+571 Mixing station by China Railway Erju Co., Ltd. had been reclaimed

Beijing OASIS Environmental Protection Technology Co., Ltd. 32

Page 46: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

3. Pollution prevention measures

All of the 11 sewage treatment stations in this investigation had been completed and under equipment debugging.

41 boilers in 32 stations adopted 0.21-1.4MW double-layer fire grate hot-water boiler in accordance with environmental protection requirements respectively. Boiler rooms had been completed, installation of boilers would be completed and stoking would be performed next to test smoke.

33 acoustic barriers were set up along Taiyuan-Zhongwei (Yinchuan) Railway based on requirements from Environmental Impact Report. It was known that design of acoustic barriers along the railway had been completed but not been constructed yet.

 

Photo 3-56: Sewage treatment station at Taiyangshan Station by China State Construction

Photo 3-57: Boiler rooms at Gaoshawo Station by China Railway 12th Bureau Group Co., Ltd.

Photo 3-58: Sewage treatment station at Hongsibao Station

Photo 3-59: Boiler rooms at East Dingbian Station was under installation

4. About water burst in Lvliangshan Tunnel

It was known that effluent at the entrance of Lvliangshan Tunnel remained around 800T/h and villages such as Xiangyang Village and Potou Village in surrounding areas were supplied with water by clean-water reservoir and pump station daily. It was also known that there was no complaint from local residents on water use so far.

3.5.3 Problems and suggestions

1. Construction of acoustic barriers along the railway had not been started. As trial operation was to be performed along the railway, difficulties would be brought to construction, as a result, construction should be accelerated, or inspection and acceptance of environmental protection would be directly impacted.

Beijing OASIS Environmental Protection Technology Co., Ltd. 33

Page 47: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

2. Restoration of temporary land for construction should be performed in strict accordance with Land Acquisition Agreement while that of girder fabrication yards, construction camps, mixing stations and material processing areas should be sufficiently emphasized on and completed before complete withdrawal of construction unit so as to prevent losses from second approaching to the site.

3. Due to changes in management personnel for environment and water protection in final engineering phase by construction unit, continuity of environment and water protection should be paid attention to and collection, accumulation and preservation of relevant data on environment and water protection engineering well performed to make preparations for inspection, acceptance and handover of environmental protection projects.

3.6 Monitoring implementation during operation in 20113.6.1 Important contents of monitoring

According to arrangement by Taiyuan-Zhongwei (Yinchuan) Railway Company, from July 1, 2011 to July 15, 2011, OASIS participated in joint inspection on environment and water protection during operation of Taiyuan-Zhongyuan (Yinchuan) Railway organized by Engineering Department of Taiyuan-Zhongwei (Yinchuan) Railway Company.

Joint inspection by four units organized by Taiyuan-Zhongwei (Yinchuan) Railway Company covered 19 in total stations and back-turning sections, 25 borrow pits, 96 spoil grounds, 6 tunnels, 7 construction camps and mixing stations, 20 bridges, 9 subgrades, 5 acoustic barriers and 4 girder fabrication yards, 191 in total construction work sites.

Monitoring during operation mainly included closing and restoration of environment and water protection during construction; construction, use and monitoring of post-station engineering; trial operation of the railway.

3.6.2 Situation & analysis

1. Trial operation of Taiyuan-Zhongwei (Yinchuan) Railway

Taiyuan-Zhongwei (Yinchuan) Railway was completed in December 2010 and came into operation on January 11, 2011. In 2011, 15 pairs of passenger trains and around 20 pairs of freight trains, with prominent changes in through put, passed through Taiyuan-Zhongwei (Yinchuan) Railway.

As of July 2011, closing engineering of railway included: Liulin Station of Altered Design I had not been constructed due to lack of drawings; engineering at the newly added Ningdong Station and Yingshuiqiao Mashalling Station had not been completed and would be extended to early next year; Ningdong Girder Fabrication Yard supporting Ningdong Station were still under girder fabrication; acoustic barrier engineering would be completed at the end of October 2011 as contracted.

Photo 3-60: Trains pass through the entrance of Lvliangshan Tunnel

Photo 3-61: Trains run through Shijiawan Super-major Bridge on Shaanbei Plateau

Beijing OASIS Environmental Protection Technology Co., Ltd. 34

Page 48: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

2. Borrow areas and spoil grounds situation

To facilitate connection with locality, Taiyuan-Zhongwei (Yinchuan) Railway Company divided borrow pits into 170 ones based on local administrative division, with a total earth borrowing capacity of 5208.93×104m3; spoil grounds into 289 ones with a total waste slag volume of 5146.34×104m3.

Most borrow pits and spoil grounds had been restored, under handover or handed over. A few spoil grounds, due to a lack of conditions for inspection and acceptance, needed further restoration and rectification.

Photo 3-62: Land Reclamation Agreement concluded between China Railway 17th Bureau Group Co., Ltd.

and Land and Resource Bureau of Zizhou County

Photo 3-63: Power of Attorney of Land Restoration concluded between China Railway 19th Bureau Group

Co., Ltd. and the people’s government of Mantang town

3. Bridge situation

Bridge engineering along the whole Taiyuan-Zhongwei (Yinchuan) Railway had been completed with good restoration of construction sites. Temporary lands of individual construction sites had not yet completely restored.

4. Tunnel situation

Taiyuan-Zhongwei (Yinchuan) Railway tunnel engineering had been completed and put into use. Most construction sites had been restored. At present, the main problem lied in incompleteness of restoration of some construction sites.

5. Environment and water protection controlling facilities and subgrade sideslope greening at the station

After opening of Taiyuan-Zhongwei (Yinchuan) Railway, boilers attached to the station had been put into use, but not monitored as of 2011. Sewage treatment facilities had been completed, but some under investigation had basically not or not yet put into formal use due to insufficent treating water volume. Protection and greening for most of subgrade sideslope along the whole railway were well performed, but vegetation at sections from Dingbian to Yinchuan slowly or hardly grew due to poor soil and less rainfall.

6. Restoration of temporary land

Beijing OASIS Environmental Protection Technology Co., Ltd. 35

Page 49: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

In terms of restoration of temporary land such as construction camps, mixing station, girder fabrication yards and construction roads, restoration of temporary land by a few units was not completely performed, which could not meet acceptance requirements.

7. Acoustic barrier situation

It was known from Taiyuan-Zhongwei (Yinchuan) Railway Company that among 78 acoustic barrier engineering along Taiyuan-Zhongwei (Yinchuan) Railway raised by Environmental Impact Assessment Report, the Third Railway Survey and Design Institute Group Corporation, the design unit, determined 31 acoustic barrier engineering at last in December 2010 due to rechanneling of Taiyuan-Zhongwei (Yinchuan) Railway, road converted into bridge and increase in demolishing amount.

As of July 2011, acoustic barrier engineering had been constructed (or under construction) in 9 places such as Shuangwudu Village, Shang’an Village, Zhaojiazhuang Village, Qianzhaojiazhaung Village, Houzhaojiazhuang Village, Shangshuixi Village, Xiashuixi Village, Liulin County, Sibaishu Village of Jingbian County and Shijiawan Middle School in Suide County.

As of August 2013, 9 barriers had not been completed, 2 embarkments had been completed and bridges had not completed. Limited by operation of railways, all was estimated to be completed as of the end of 2013, among which, 400m acoustic barrier engineering in Xiaobeige Village had been subcontracted to Southwest Ring Channel Engineering, construction of which was postponed at that time.

Photo 3-64: Acoustic barrier at Beichuanhe Super-major Bridge next to Shuangwudu Village

Photo 3-65: Acoustic barrier at Beichuanhe Super-major Bridge in Shang’an Village

Photo 3-66: Acoustic barrier at Liulin Super-major Bridge by China Communications Construction

Company Ltd. is under construction

Photo 3-67: Acoustic barriers at Shijiawan Middle School, Shijiawan Primary School and the exit of

Shijiawan Tunnel

Beijing OASIS Environmental Protection Technology Co., Ltd. 36

Page 50: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

3.6.3 Problems and suggestions

1. Risk reassessment for Jundu Spoil Ground

Jundu Spoil Ground at No.2 Inclined Shaft of Liulin Tunnel by China Communications Construction Company Ltd. was located at less than 200m above Jundu Village and Wubao Yellow River Road Bridge, thus it had a sensative location. This investigation found the spoil ground, as a permanent one, had been equipped with a retaining wall, but drainage project had not been built. Furthermore, due to waste slag from other engineering on the surface of spoil ground, total load of this spoil ground increased. To ensure life safety of villagers dwelled under the spoil ground, we recommended Taiyuan-Zhongwei (Yinchuan) Railway Company entrust relevant units to perform risk reassessment on Jundu Spoil Ground so as to ensure long-term stability of Jundu Spoil Ground.

2. Pay attention to serious water and soil loss at Wubao Station

This investigation found water drained from Wubao Station by China and Communications Construction Company Ltd. and subgrade culverts was directly brushing station sideslope or spoil grounds instead of being led into reliable local drainage channels, which had led to serious water and soil loss around the station yard and harmed safety of station yard; some drainage ditches at subgrade sideslope had sunk and disconnected, with obvious gully in sideslope; what’s more, water and soil loss in 5# spoil ground would harm safety of village roads and residences on hillside. Taiyuan-Zhongwei (Yinchuan) Railway Company was recommended to request relevant units to take measures as soon as possible for complete settlement.

Photo 3-68: 5# spoil ground at Wubao Station by China Communications Construction Company Ltd.

Photo 3-69: Water drained from Wubao Station by China Communications Construction Company Ltd. and subgrade culverts brushing station yard sideslope

3. About restoration, acceptance and handover of borrow pits and spoil grounds

In terms of restored borrow pits and spoil grounds, construction unit should keep video data and handle handover procedures with local land and resource department in time, with those with respect to temporary land acquisition in riverway requiring formal signatures and seals by water conservancy department so as to prevent second occupation of spoil ground, which would impact acceptance of environment and water protection.

Local villagers were still using spoil grounds which could not reach restoration requirements, so construction unit should reach a spoil ground restoration agreement with local units using spoil

Beijing OASIS Environmental Protection Technology Co., Ltd. 37

Page 51: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

grounds, which specified requirements and responsibilities for restoration and sealed and approved by county-level land and resource department.

Spoil ground at 2# Inclined Shaft at the entrance of Lvliangshan Tunnel by China Railway 12th

Bureau Group Co., Ltd. and spoil ground at the exit of No.1 Tunnel in Miaojiaping by China Railway 16th Bureau Group Co., Ltd. could not meet acceptance requirements, so construction unit needed to make timely arrangement so as to early complete restoration of spoil grounds.

4. About monitoring of environmental protection controlling facilities

After completion of acoustic barrier engineering, Taiyuan-Zhongwei (Yinchuan) Railway Company needed to make timely arrangement for monitoring of effects of using environmental protection controlling facilities, including boilers, water treatment facilities and acoustic barrier, so as to provide evidence for inspection and acceptance of environmental protection.

4. Monitoring over Completion Acceptance of Environmental Protection

The project was fully opened for trial operation on January 11, 2011 and it entered into the stage for completion acceptance of environmental protection then.

According to the Environmental Protection Law of the People’s Republic of China and the Administrative Measures over Construction Project’s Completion Acceptance of Environmental Protection, the project has implemented the system of environmental impact, as well as the “three simultaneity” system for the environmental protection facilities and the principal part of the project to be designed, constructed and put into operation simultaneously.

4.1 Investigation over tunnelling worksTaiyuan-Zhongwei (Yinchuan) Railway has totally constructed 109 tunnels, which, with an overall length of 180126 linear meters, accounts for 19.15% of the line length. Taiyuan-Zhongwei (Yinchuan) Railway has newly constructed 25 tunnels with a length more than 1000 meters, 13 of which have a length more than 3000 meters: to be specific, the tunnel holding a length more than 10Km includes Lvliang Mountain Tunnel (single track both for the left and right), Lishi Tunnel, Wubu Tunel, Suide Tunnel, Hengshan Tunnel, Xingwangmao Tunnel and so on 7 tunnels in toal; futhermore, the left track and right track of the longest Lvliang Mountain Tunnel respectively have a length of 20785 linear meters and 20772 linear meters.

4.1.1 Overview

The tunnel construction for Taiyuan-Zhongwei (Yinchuan) Railway has been fully completed and the construction camps have also been fully restored.

Photo 4-1: Entrance of Lvliang Mountain Tunnel by China Railway 12th Bureau Group Co., Ltd.

Photo 4-2: Exit of Lvliang Mountain Tunnel by China Railway 3rd Bureau Group Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 38

Page 52: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 4-3: Exit of Xingwangmao Tunnel by China Railway Tunnel Bureau

Photo 4-4: Suide Tunnel by China Railway 19th and 21st Bureaus Group Co., Ltd.

Photo 4-5: The construction camp at the exit of Lvliang Mountain Tunnel by China Railway 3rd Bureau Group

Co., Ltd. has been restored

Photo 4-6: The construction site outside the exit of Niumaojing Tunnel by China Railway 12th Bureau

Group Co., Ltd. has been restored

Photo 4-7: The second ploughing has been realized for the construction camp at the entrance of Suide Tunnel by China Railway 19th Bureau Group Co., Ltd.

4.1.2 Impact of tunnel water inflow on the surroundings

1. Lvliang Mountain Tunnel

(1) Overview

Beijing OASIS Environmental Protection Technology Co., Ltd. 39

Page 53: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Located in the west of Shanxi Province, Lvliang Mountain Tunnel runs through the denudation area in the middle sourthern section of Lvliang Mountain; the entrance of the Tunnel is located in the loess gully of the convergence zone between Jinzhong Basin and Lvliang Mountain; the overall terrain within the Tunnel area is high in the middle while low at both sides, as well as high in the north while low in the south, the sea-level elevation of which is between 1080~1750m.

Lvliang Mountain Tunnel will be divided into two bid sections for construction: to be specific, China Railway 12th Bureau Group Co., Ltd. will undertake the construction for the entrance section, that is, the ZK-Ⅲ bid, of Lvliang Mountain Tunnel while China Railway 3rd Bureau Group Co., Ltd. will undertake the exit section, that is, ZK-Ⅳ bid of Lvliang Mountain Tunnel.

Lvliang Mountain Tunnel runs through the middle section of Lvliang Mountain; during the tunnel construction, the water inflow is huge so that a discharge point centering on the tunnel has been formed.

In 2007, the effluent at the entrance of Lvliang Mountain Tunnel was as huge as about hundreds of tons per hour while that for the exit was about dozens of tons per hour.

In 2008, the water inflow of 2# inclined shaft at the entrance of Lvliang Mountain Tunnel was about 200t/h (maximally about 1450t/h), which affected Xiangyang Village and so on seven villages of Daohe Town, Fenyang City with more than 2000 households and about 10000 people involved; the water inflow of 3# and 4# inclined shafts at the exit section of Lvliang Mountain Tunnel was about 200-300t/h while that of 5# inclined shaft was about 400-500t/h, which affected the drinking for eight villages around Wucheng Station with 2800 households and about 9000 people involved.

In 2009, the water inflow at the entrance of Lvliang Mountain Tunnel undertaken by China Railway 12th Bureau Group Co., Ltd. was maintained at 100t/h: specifically, the water inflow was less at the 2# inclined shaft but was more at the entrance; moreover, as for the exit section of Lvliang Mountain Tunnel, the total water outflow was about 180t/h.

In 2009, three water plugging teams were still conducting the construction so that the water inflow was decreased to some extent. In 2009, China Railway 12th Bureau Group Co., Ltd. continued to provide water for more than 1000 people and animals in the surrounding Xiangyang Village, Potou Village, etc through clear water tank and pump station.

As for the exit section of Lvliang Mountain Tunnel constructed by China Railway 3rd Bureau Group Co., Ltd., the total water outflow was about 180t/h: in addition to the water plugging construction, it also took water from the self-served water wells and delivered water to the villagers through special vehicle.

After 2010, the water outflow of Lvliang Mountain Tunnel was drained from the entrance of Lvliang Mountain Tunnel, the flow rate per hour of which was about 800-1000 cubic meters.

Beijing OASIS Environmental Protection Technology Co., Ltd. 40

Page 54: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 4-8: The clear water tank to provide water to the villagers at the entrance of Lvliang Mountain Tunnel by

China Railway 12th Bureau Group Co., Ltd.

Photo 4-9: The master outlet at the entrance Lvliang Mountain Tunnel by China Railway 12th Bureau Group

Co., Ltd.

(2) Countermeasures

Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. has always attached great importance to the water inflow issue of Lvliang Mountain Tunnel. In January 2007, Taiyuan-Zhongwei (Yinchuan) Company invited Taiyuan University of Technology to conduct the engineering hydrogeological environment impact assessment over Lvliang Mountain Tunnel. During May 20-21, 2008, the argumentation meeting over the hydrological environmental protection measures taken for Lvliang Mountain Tunnel of Taiyuan-Zhongwei (Yinchuan) Railway was held in Taiyuan; to be specific, with the presence of six experts from three units, the meeting developed the expert opinions.

Aiming at the water outflow of Lvliang Mountain Tunnel, Taiyuan-Zhongwei (Yinchuan) Company and the construction units had taken the following countermeasures:

Since September 2006, China Railway 12th Bureau Group Co., Ltd. had built 17 kilometers’ pipeline, pumping station, pool, etc for the water delivery of the local, conducted direct water delivery for some villages, and made tens of millions of Yuan’s advance payment;

Since July and August in 2007, China Railway 3rd Bureau Group Co., Ltd. made advance payment to deliver water to the villagers everyday so as to solve the problem of drinking water;

Since December 2007, it invited professional water plugging team to conduct the water plugging so that the tunnel water inflow was quickly stabilized at about 200T/h-400T/h;

On September 26, 2008, China Railway 12th Bureau Group Co., Ltd. invited Taiyuan Monitoring Station to conduct monitoring over the water quality and the monitoring items included: PH, turbidity, odor & taste, total coliform group, heavy metal and so on 30 items. The sampling place: the pool of the Headquarters. The result was: the monitoring items could meet the requirements of Hygienic Standard For Drinking Water (Hygienic Standard For Drinking Water).

Taiyuan-Zhongwei (Yinchuan) Company had organized two expert argumentation meetings, as well as had entrusted the design unit and Shanxi Hydraulic Design Institute to jointly study a permanent solution for water supply.

The water inflow generated due to the tunnel construction brought about a certain impact to the life of the people around and had ever resulted into quite a few contradictions. However, China Railway 12th and 3rd Bureaus Group Co., Ltd. took an active attitude to communciate with the local and made advance payment to take various measures to solve the water difficult for the villagers; meanwhile, Taiyuan-Zhongwei (Yinchuan) Headquarters also carried out active coordination with the relevant departments to facilitate the study and implementation of the permanent solution. Under the various efforts, the social order in this region was stable. Therefore, the Public Security Bureau of Fenyang City presented China Railway 12th Bureau Group Co., Ltd. with an award inscribed with “chivalrous deed to eulogize the flourishing age and cooperative manner to ensure safety”.

Beijing OASIS Environmental Protection Technology Co., Ltd. 41

Page 55: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 4-10: Award presented by the Public Security Bureau of Fenyang City to the Construction Headquarters of China Railway 12th Bureau Group Co., Ltd. for Lvliang Mountain Tunnel

(3) Final solution

In 2010, Ministry of Railways signed an agreement with Shanxi Province, upon which Ministry of Railways and Shanxi Province would respectively provide 50 million Yuan and 20 million Yuan to comprehensively treat the impacts brought about by the water outflow of Lvliang Mountain Tunnel to the local hydrogeology and the villagers’ life. The concrete implementation scheme would be uniformly arranged by Shanxi Province.

In 2011, the relevant investigation revealed that China Railway 12th Bureau Group Co., Ltd. was carrying out the water interception works at the 3# inclined shaft within 8km of the exit of Lvliang Mountain Tunnel: to be specific, it was to gather the water inflow at the upper part of the tunnel to the water storage tank and then pump the water along the 2 kilometers’ pipeline into the 1000 cubic meters’ water collection tank outside the 3# inclined shaft and then the water would be discharged out into the river and then the water would return to Wucheng Reservoir to eventually reduce the impact brought about by the tunnel water inflow to Wucheng region. After the completion of the works, it was expected that 300-400 cubic meters could flow back per hour.

To solve the water shortage problem for the people, the local government had decided and managed to dig a well and establish a water storage tank in the Old Xiangyangquang Courtyard, which could solve the water supply for 400 households in Xiangyang Village and Potou Village. Meanwhile, the local government would continue to dig wells to successively solve the domestic drinking water problem for the surrounding villages suffering water shortage.

In addition, the local water department had newly built an Anjiazhuang reservoir dam at the 3 kilometers of the entrance of Lvliang Mountain Tunnel to intercept the water inflow at the tunnel entrance and use the water to regulate the local water supply.

Till August 2013, the local comprehensive improvement works were still on.

Beijing OASIS Environmental Protection Technology Co., Ltd. 42

Page 56: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 4-11: The well and water storage tank newly constructed in the Old Xiangyangquan Courtyard

Photo 4-12: Anjiazhuang reservoir dam

Photo 4-13: The 0# inclined shaft opening of Lvliang Mountain Tunnel had become the water source for the water supply project of Yanjiazhuang

2. Other tunnel water inflow situations

(1) Water inflow situation of Xingwangmao Tunnel constructed by China Railway Tunnel Bureau

In 2008, the water inflow of Xingwangmao Tunnel’s 2# inclined shaft increased for a time, which then maintained at about 30 tons/hour. The water inflow flowed downwards along the drainage ditch of the slope till the water interception dam hundreds of meters away from the lower reaches of the spoil ground’s retaining wall. The water had ever broken through the drainage ditch and flooded the surrounding farmland. Till April 2009, the water in the farmland had receded and the second ploughing had been realized for part of the farmland.

Beijing OASIS Environmental Protection Technology Co., Ltd. 43

Page 57: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 4-14: The farmland flooded on May 28, 2008 Photo 4-15: The second ploughing had been realized for part of the farmland till April 22, 2009

China Railway Tunnel Bureau had always attached great importance to the impact brough about by the water inflow of Xingwangmao Tunnel’s 2# inclined shaft. In June 2008, China Railway Tunnel Bureau conducted measurement over the farmland flooded by the water inflow together with the Town Land Resources Bureau, Township Government and Village Head to preliminarily determine that the water inflow flooded 330 mu farmland and 2883 trees of Kongjiayan Village. Meanwhile, the Project Department also carried out mointoring over the domestic drinking water level for the surrounding 37 affected village households.

In addition to the construction of water storage tanks for the villagers to provide the water supply on a regular basis to meet the temporary needs, after the project completion, the Project Department also carried out the compensation according to the compensation scheme.

(2) The water inflow generated during the construction for 1# & 2# inclined shafts of Hengshan Tunnel, Weijialou 3# Tunnel and Miaojiaping Tunnel had aslo exerted impacts in varying degree on the surrounding villagers. Through temporary water supply and construction of water wells, the construction unit had satisfactorily settled the impats exerted by the water inflow generated during the tunnel construction.

4.1.3 Impact of vibration on the surrounding

The vibration generated during the construction for Xingwangmao Tunnel undertaken by China Railway Tunnel Bureau, Hengshan Tunnel undertaken by China Railway 1st Bureau Group Co., Ltd., Baijia Mountain Tunnel undertaken by China Railway 21st Bureau Group Co., Ltd., Wubu Tunel undertaken by China Railway 16th Bureau Group Co., Ltd. and other tunnels had also ever brought about a certain impact on the surrounding villagers’ housing. Under the joint efforts of the construction unit and the local government, temporary resettlement and compensation were carried out appropriately so that no negative impact was caused.

For example, to solve the impact exerted by the vibration due to the construction for Xingwangmao Tunnel undertaken by China Railway Tunnel Bureau on the surrounding villagers’ housing, on October 12-13, 2008, Taiyuan-Zhongwei (Yinchuan) Railway Suide Headquarters conducted a filed investigation over the impact exerted by the construction vibration on the cave dwelling jointly with Design Institute, Construction Unit, County Land Resources Bureau, County Government and Villagers' Representatives: the field investigation revealed that 37 households in total were involved and the impact on 6 of them were relatively more serious. As for the 6 households suffering more serious cave dwelling crack, temporary resettlement and compensation were carried out in place.

4.1.4 Impact of petroleum on the surrounding environment

During the tunnel construction, if the waster oil gas of the air compressor’s air storage tank was discharged improperly, it might probably pollute the surrounding soil and groundwater; during the construction of Taiyuan-Zhongwei (Yinchuan) Railway, the similar problem had also ever taken place. Through the constant supervision and inspection by Taiyuan-Zhongwei (Yinchuan) Company and the Environmental Protection Supervision Unit of the construction bid section, the impact exerted by the waste oil gas of the air compressor’s air storage tank on the surrounding environment was solved successively.

Beijing OASIS Environmental Protection Technology Co., Ltd. 44

Page 58: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 4-16: The air compressor’s waste oil of Suide Tunnel 2# inclined shaft by China Railway 19th Bureau Group Co., Ltd. had been collected and utilized by the

local

Photo 4-17: The site for clean air compressor’s air storage tank of Liulin Tunnel 2# inclined shaft by

China Communications Construction Co., Ltd.

Photo 4-18: The tidy air compressor room for the 2# inclined shaft of Lvliang Mountain Tunnel by China

Railway 12th Bureau Group Co., Ltd.

Photo 4-19: The waste oil of the air compressor’s air storage tank for 1# inclined shaft of Wubu Tunel by

China Railway 16th Bureau Group Co., Ltd. had been centrally collected

4.2 Investigation over bridge works4.2.1 Overview

There are 340 bridges in total with an overall length of 184572.65 linear meters along the whole line of Taiyuan-Zhongwei (Yinchuan) Railway, accouting for 19.62% of the line’s overall length. Specifically, there are 80 super-major bridges with an overall length of 126873 meters, 148 major bridges and 119 middle & small bridges.

The longest bridge: Super-major bridge across Shijiazhuang-Taiyuan Railway constructed by China Railway 25th Bureau Group Co., Ltd. with a length of 7124.23 meters;

Beijing OASIS Environmental Protection Technology Co., Ltd. 45

Page 59: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

The highest bridge: Qinghegou Super-major Bridge constructed by China Communications Construction Co., Ltd. with a height of 127 meters.

Taiyuan-Zhongwei (Yinchuan) Railway strides across the Yellow River, for three times, which are respectively shown as follows:

Zhongning Yellow River Super-major Bridge constructed by China Railway 17th Bureau Group Co., Ltd. with a length of 4424.58 meters;

Yongning Yellow River Super-major Bridge constructed by China Railway 4th Bureau Group Co., Ltd. with a length of 3946.65 meters;

Wubu Yellow River Super-major Bridge constructed by China Communications Construction Co., Ltd. with a length of 862.9 meters

4.2.2 Situation & analysis

The bridge construction for Taiyuan-Zhongwei (Yinchuan) Railway has been completed and the construction site has been fully restored

Photo 4-20: Construction site for approach bridge and main bridge of Zhongning Yellow River Super-major Bridge by China Railway 17th Bureau Group Co., Ltd.

Photo 4-21: The completed Zhongning Yellow River Super-major Bridge by China Railway 17th Bureau Group Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 46

Page 60: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 4-22: Construction site for east approach bridge and main bridge of Yongning Yellow River Super-major Bridge by China Railway 4th Bureau Group Co., Ltd.

Photo 4-23: The completed Yongning Yellow River Super-major Bridge by China Railway 4th Bureau Group Co., Ltd.

Photo 4-24: Construction site for main bridge of Wubu Yellow River Super-major Bridge by China

Communications Construction Co., Ltd.

Photo 4-25: The completed Wubu Yellow River Super-major Bridge by China Communications Construction

Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 47

Page 61: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 4-26: The construction site for Yiwang Super-major Bridge by China Communications Construction Co., Ltd. has been fully restored

Photo 4-27: The completed Beichuan River Super-major Bridge by China Communications Construction

Co., Ltd.

Photo 4-28: The completed Liulin Sanchuan River Super-major Bridge by China Communications

Construction Co., Ltd.

Photo 4-29: Super-major bridge across Qingdao-Yinchuan Expressway by China Railway 16th Bureau

Photo 4-30: Yihe Super-major Bridge by China Communications Construction Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 48

Page 62: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Group Co., Ltd.

4.2.3 Main soil and water conservation measures taken during the construction period

1. Neat construction site with explicit boundary

Photo 4-31: The construction site for super-major bridge across Hekoumiao Reservoir by China Railway

Erju Co., Ltd.

Photo 4-32: The construction site for Zizhou County Dali River Super-major Bridge by China Railway 17th

Bureau Group Co., Ltd.

Photo 4-33: The construction site for freight-dedicated Zuolian Super-major Bridge by China Railway 25th

Bureau Group Co., Ltd.

Photo 4-34: The construction site for Beichuan River Super-major Bridge by China Communications

Construction Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 49

Page 63: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

2. There was warnning, protection and fence available for the mud pit an the mud had been disposed of properly

Photo 4-35: The mud pit of Beichuan River Super-major Bridge by China Communications Construction Co., Ltd.

3. Slope protection across the watercourse to prevent water and soil loss

Photo 4-36: Watercourse and slope protection for Super-major Bridge across Hekoumiao Reservoir by China Railway Erju Co., Ltd.

Photo 4-37: Watercourse protection for Er’shilipu Super-major Bridge by China Railway 16th Bureau

Group Co., Ltd.

Photo 4-38: Simple bank protection for Luhe River bank protection by China Railway Erju Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 50

Page 64: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

4. Spray water for dust settling and precipitate sewage for discharging

Photo 4-39: Water spray for dust setting over super-major bridge across Shizhong by China Railway 21st Bureau Group Co., Ltd.

5. Fully restored construction site

Photo 4-40: The canal at the construction site for Wangwu Xiaohe River Super-major Bridge by China Communications Construction Co., Ltd. has been restored

4.3 Investigation over slope protection for stations and subgrades4.3.1 Overview

Taiyuan-Zhongwei (Yinchuan) Railway has set up 50 stations (including 6 reserved stations), including 43 stations for the main line of Taiyuan-Zhongwei (Yinchuan) and 7 stations for Yinchuan link. To be specific, Taiyuan South and Zhongwei are the passenger stations; Yingshuiqiao is the marshalling station; other stations are intermediate stations, overtaking stations and crossing stations.

Beijing OASIS Environmental Protection Technology Co., Ltd. 51

Page 65: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 4-41: Lvliang Station Photo 4-42: Yanchi Station

Photo 4-43: Wenshui Station Photo 4-44: Wubu Station

Photo 4-45: Subgrade slope protection for entrance of Longfangli Tunnel by China Communications Construction Co., Ltd.

Photo 4-46: Amorpha fruticosa in front of the subgrade of Xizhigou Tunnel by China Communications Construction Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 52

Page 66: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 4-47: Subgrade and slope vegetation near DK385+600 by China Railway Erju Co., Ltd.

Photo 4-48: Subgrade slope protection for DK508+800 by China Construction

Photo 4-49: Subgrade slope protection by China Railway Erju Co., Ltd.

Photo 4-50: Subgrade slope and culvert protection by China State Construction Engineering Corporation

Photo 4-51: Subgrade slope vegetation protection by China Railway 16th Bureau Group Co., Ltd.

Photo 4-52: Subgrade slope vegetation near Qingxu Station

Beijing OASIS Environmental Protection Technology Co., Ltd. 53

Page 67: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 4-53: Subgrade slope vegetation of Wubu Station

4.3.2 Solutions for the remaining issues

In 2011, the Environmental Control Survey revealed what shall be focused on for the stations and subgrade slope protection was that due to the erosion of slope by the drainage of Wubu Station constructed by China Communications Construction Co., Ltd., the soil and water loss was very obvious.

Photo 4-54: The station slope was eroded by the drainage pipe of Wubu Station by China Communications Construction Co., Ltd.

Photo 4-55: The slope drainage ditch of Wubu Station constructed by China Communications Construction

Co., Ltd. had been fractured

In 2013, the investigation revealed that the slope trimming for Wubu Station had been completed and the water intersection & drainage works had also been completed.

Beijing OASIS Environmental Protection Technology Co., Ltd. 54

Page 68: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 4-56: The slope trimming for Wubu Station had been completed

5. Implementation of the Ecological Environment Measures

5.1 Occupation of landThe permanet land occupation area for subgrade, station yard, tunnel, etc of Taiyuan-Zhongwei (Yinchuan) Railway is 4160.5hm2 while the temporary temporary for construction camp, construction road, spoil ground & borrow pit, etc is 2839.66 hm2.

5.2 Investigation over borrow pits5.2.1 Overview of the borrow pit

There are 307 borrow pits in total along the whole line of Taiyuan-Zhongwei (Yinchuan) Railway; to facilitate the inspection and acceptance by the local, according to the administrative divisions of the villagers, Taiyuan-Zhongwei (Yinchuan) Company has integrated the borrow pits into 170, which occupy a land area of 1313.32 hm2 and the borrowed soil volume of which is 5208.93 104m3. Meanwhile, the borrow pits are concentrated in Jingbian and Dingbian, as well as along the railway in the west of Dingbian.

There are four large-scale borrow pits with a single borrowed soil volume above 1 104m3, including Jinzhong City Yuci District Xiyan Village Borrow Pit 184.7 104m3 (DK16+150), Lvliang City Jiaocheng County Sanjiao Village Borrow Pit 110 104m3, Lvliang City Wenshui County Maxi Township Xiaonanyu Village Borrow Pit 190 104m3 and Yinchuan City Huangyangtan Borrow Pit 186.5 104m3 (on the right of LDK689+000).

Photo 5-1: Huangyangtan 2# Borrow Pit by China Railway 12th Bureau Group Co., Ltd.

Photo 5-2: Xiyan Village Borrow Pit by China Railway 15th Bureau Group Co., Ltd.

By comparing the acutally borrowed soil volume of Taiyuan-Zhongwei (Yinchuan) Railway with the soil and water conservation scheme, it can be found that the acutally borrowed soil volume is 250 104m3 less than the 5459 104m3 of the soil and water conservation scheme while the land occupation area of the actual borrow pits is 25.29 hm2 more than that of the soil and water conservation scheme so that the total borrowed soil volume is close. However, there is a large difference for the land occupation number of the borrow pits, which shall be put down to the fact that most of the 59 borrow pits in the soil and water conservation scheme are designed as the centralized soil taking while the actual soil taking is carried out in a decentralized way; moreover, in the soil and water conservation scheme, there are still some borrow pits with the location having not been determined yet.

In addition, as for the borrow pits along the railway within Shaanxi Province, the groundwater level for some of them is high while the underground rock for some of them is hard so that the average soil taking depth of the borrow pits cannot meet the design requirements, which is the main reason

Beijing OASIS Environmental Protection Technology Co., Ltd. 55

Page 69: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

for the decentralized soil taking.

5.2.2 Restoration of the borrow pits

The restoration for the 170 borrow pits is sound and the handover formalities have been fully handled. Specifially, 8 borrow pits in total have been comprehensivly utilized and the comprehensive utilizations include power plant, resettlement place while the protective measures have been taken for the unused borrow pits. Furthermore, the actually completed land consolidation, earthing and reclamation are up to 683.40hm2, 354.04 hm2 and 233.6 hm2 respectively.

Photo 5-3: DK146+650 Borrow Pit by China Communications Construction Co., Ltd. has been

planted with Chinese pine

Photo 5-4: Xizhigou Borrow Pit by China Communications Construction Co., Ltd. has been

planted with corn

Photo 5-5: Zhangjiajian Borrow Pit by China Railway 17th Bureau Group Co., Ltd. has been restored

Photo 5-6: DK391+000 Borrow Pit by China Railway Erju Co., Ltd. has been planted with trees

Beijing OASIS Environmental Protection Technology Co., Ltd. 56

Page 70: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-7: The second ploughing has been realized for DK422+200 Yidangwan Borrow Pit by China

Construction

Photo 5-8: DK634+058 Tongtiangou Borrow Pit by China Construction has been restored

Photo 5-9: Yuding Township Lucaowan Borrow Pit by China Railway 21st Bureau Group Co., Ltd. has been

restored

Photo 5-10: The vegetation of DK646+402 Borrow Pit by China Construction has been restored

Photo 5-11: DK548+400 Borrow Pit by China Railway 12th Bureau Group Co., Ltd. has been afforested

Photo 5-12: DK505+400 Borrow Pit by China Construction has become a pool

Beijing OASIS Environmental Protection Technology Co., Ltd. 57

Page 71: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-13: DK421+400 Borrow Pit by China Construction has become farmland

Photo 5-14: DK391+100 Borrow Pit by China Railway Erju Co., Ltd. has become farmland

Photo 5-15: DK420+200 Borrow Pit by China Construction has been flattened

5.3 Investigation over spoil grounds5.3.1 Overview the spoil grounds

Covering a total area of 815.23 hm2 and with a total discarded soil (slag) volume of 5146.34 104m3, there are 289 spoil grounds in total along the whole line of Taiyuan-Zhongwei (Yinchuan) Railway. Specially, 52 spoil grounds in total have been comprehensively utilized and the comprehensive utilizations include brick factory, gravel field, livestock farm, etc; with a utilization rate of 24.3%, the volume of the utilized dicarded slag is 1248.59 104m3. Moreover, the protective measures have been taken for the unused spoil grounds.

According to the volume of the actually discarded soil (slag), there are 14 spoil grounds with a single volume of actually discarded soil (slag) up to 50 (including)-100 104m3, 71 spoil grounds with a single volume of actually discarded soil (slag) up to 20 (including)-50 104m3 and 184 spoil grounds with a single volume of actually discarded soil (slag) up to 2 (including)-20 104m3. In addition, there are 20 spoil grounds with a single volume of actually discarded soil (slag) less than 2 104m3.

Most of the regions Taiyuan-Zhongwei (Yinchuan) Railway passes through are the loess gullies; therefore, according to the requirements of environmental protection and water conservation, the location of the spoil grounds shall be combined with the local land planning: specifically, the spoil grounds shall occupy the uncultivated land and marginal land as much as possible, as well as shall give priority to take advantage of the natural gully top or side; moreover, the discarded soil shall be utilized for land reclamation and the corresponding engineering measures shall be taken to prevent soil & water loss.

5.3.2 Restoration of the spoil grounds

The restoration of the spoil grounds are mainly divided into two types: the first one is that after the construction unit has completed the restoration in accordance with the requirements of the land acquisition agreement, the local competent department shall conduct the inspection and accetpance; the second one is that as for the spoil grounds required to be used by the local, the construction unit

Beijing OASIS Environmental Protection Technology Co., Ltd. 58

Page 72: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

shall sign an agreement with local user unit, which shall be examined and approved by the local competent department for land resources, and then the restoration of the spoil grounds shall be undertaken by the relevant local units.

Photo 5-16: The Land Reclamation Agreement of China Railway 17th Bureau Group Co., Ltd.

Photo 5-17: The power of attorney for land restoration of China Railway 19th Bureau Group Co., Ltd.

Most of the spoil grounds along the whole line of Taiyuan-Zhongwei (Yinchuan) Railway have been restored and handed over.

Beijing OASIS Environmental Protection Technology Co., Ltd. 59

Page 73: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-18: The 1# Spoil Ground of Chujiagou Station by China Communications Construction Co., Ltd. has

been restored

Photo 5-19: The second ploughing for the 5# Inclined Shaft Spoil Ground of Lvliang Mountain Tunnel by China Railway 3rd Bureau Group Co., Ltd. has been

realized

Photo 5-20: The Spoil Ground at the exit of Lishi Tunnel by China Coal has been restored

Photo 5-21: The Spoil Ground of Wucheng 1# Tunnel by China Communications Construction Co., Ltd. has

been restored

Beijing OASIS Environmental Protection Technology Co., Ltd. 60

Page 74: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-22: The 1# Spoil Ground of Shanglouqiao Tunnel by China Communications Construction Co.,

Ltd. has been restored

Photo 5-23: The gully of Spoil Ground for Qiaojiata Tunnel by China Communications Construction Co.,

Ltd. has been filled and flattened

Photo 5-24: The Spoil Ground at the entrance of Shangbaishuang 2# Tunnel by China Communications

Construction Co., Ltd. has been utilized as the coal storage yard

Photo 5-25: The Yihe Spoil Ground by China Communications Construction Co., Ltd. has been

restored

Photo 5-26: The 5# Spoil Ground located beside the road of Huotangzhai Tunnel by China Communications

Construction Co., Ltd. has been restored

Photo 5-27: The gully of 1# Inclined Shaft Spoil Ground for Baijia Mountain Tunnel by China Railway 16th Bureau Group Co., Ltd. has been filled for land

reclamation and second ploughing

Beijing OASIS Environmental Protection Technology Co., Ltd. 61

Page 75: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-28: The Spoil Ground at the entrance of Wubu Tunel by China Railway 16th Bureau Group Co., Ltd.

has been restored

Photo 5-29: Lijiabian Spoil Ground by China Railway 17th Bureau Group Co., Ltd. has been restored

Photo 5-30: The earthing for Dujiagou Spoil Ground by China Railway 17th Bureau Group Co., Ltd. has been

completed

Photo 5-31: Suqu Spoil Ground by China Railway 17th Bureau Group Co., Ltd. has been restored

Photo 5-32: The Spoil Grounds respectively at the entrance and exit of Weijialou 3# and 2# Tunnels by

China Railway 1st Bureau Group Co., Ltd. have been restored

Photo 5-33: The Spoil Ground at the entrance of Hengshan Tunnel by China Railway 1st Bureau Group

Co., Ltd. has been restored

Photo 5-34: The 2# Inclined Shaft Spoil Ground of Hengshan Tunnel by China Railway 1st Bureau Group

Photo 5-35: The Spoil Grounds respectively at the entrance of Xingwangmao Tunnel and the exit of

Beijing OASIS Environmental Protection Technology Co., Ltd. 62

Page 76: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Co., Ltd. has been restored Gangcheng Tunnel both by China Railway Tunnel Bureau have been restored with the slopes planted with

willows

Photo 5-36: The 1# Inclined Shaft Spoil Ground of Xingwangmao Tunnel by China Railway Tunnel

Bureau has been restored

Photo 5-37: The DK579+000 Subgrade Spoil Ground by China Construction has been restored

Photo 5-38: The DK591+600 Gaoshawo Spoil Ground by China Railway 12th Bureau Group Co., Ltd. has

been restored

Photo 5-39: The Spoil Ground at the entrance of Niumaojing Tunnel by China Railway 12th Bureau

Group Co., Ltd. has been restored

Photo 5-40: Zhangjiajian Spoil Ground by China Railway 17th Bureau Group Co., Ltd. has been restored

Photo 5-41: The Spoil Ground at the entrance of Lvliang Mountain Tunnel by China Railway 12th

Bureau Group Co., Ltd. has been restored

Beijing OASIS Environmental Protection Technology Co., Ltd. 63

Page 77: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-42: The 5# Spoil Ground of Wubu Station by China Communications Construction Co., Ltd. has been

avaliable for second ploughing

Photo 5-43: The earthing for 5# Spoil Ground of Lvliang Mountain Tunnel by China Railway 3rd

Bureau Group Co., Ltd. has been completed so that it has been avaliable for second ploughing

Photo 5-44: The DK584+750 Spoil Ground by China Railway 12th Bureau Group Co., Ltd. has been planted

with vegetation

Photo 5-45: The Spoil Ground at the entrance of Hengshan Tunnel by China Railway 1st Bureau Group

Co., Ltd. has been restored

Photo 5-46: The Spoil Ground of Xizhigou Tunnel by China Communications Construction Co., Ltd. has been

restored

Photo 5-47: Huangzhang 3# Spoil Ground by China Communications Construction Co., Ltd. has been

restored

Beijing OASIS Environmental Protection Technology Co., Ltd. 64

Page 78: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-48: The graded slope cutting, as well as the construction of retaining wall and ditch have been conducted for the Spoil Ground of Huangzhang 1#

Tunnel by China Communications Construction Co., Ltd.

Photo 5-49: The 2# Inclined Shaft Spoil Ground at the entrance of Xingwangmao Tunnel by China Railway Tunnel Bureau has been flattened to reclaim land for

the local

Photo 5-50: The artemisia desertorum and sorghum hybrid sudangrass experimentally planted by China Railway 12th Bureau Group Co., Ltd. in the slope of the spoil ground

5.3.3 Investigation over the key spoil grounds

1. Overview of Jundu Village Spoil Ground

Jundu Village Spoil Ground of Lulin Tunnel 2# Inclined Shaft constructed by China Communications Construction Co., Ltd. was originally arranged for temporary storage so that it was not a real spoil ground. The total volume of the discarded slag was nearly 30 104m3, 20 104m3

of which was transported out in succession; till May 2010, there was still nearly 10 104m3 left in Jundu Village Spoil Ground. The slope toe of the spoil ground was about 200m away from Jundu Village and the top height of the stacked slag was about 65m.

Jundu Village Spoil Ground was located in the corrie behind Jundu Village in the west of Wubu Yellow River Highway Bridge: the valleys around were steep so that in case of the collapse of the spoil ground, the consequence would be rather severe.

In January 2010, upon the application by the construction unit, as well as through the joint argumentation by the design, construction & supervision units and Taiyuan-Zhongwei (Yinchuan) Company, it was decided that the remaining slag would not be transported out any more and the Spoil Ground would be transformed into a permanent one. In April 2010, the scheme was approved by the local government.

Beijing OASIS Environmental Protection Technology Co., Ltd. 65

Page 79: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

In 2011, according to the design drawing of Third Railway Survey and Design Institute Group Co., Ltd., the retaining wall for Jundu Village Spoil Ground had been completed while the water interception & drainage works had not been implemented yet.

Photo 5-51: The spoil ground on the hillside behind Jundu Village

Photo 5-52: Jundu Village Spoil Ground of Lulin 2# Inclined Shaft by China Communications Construction

Co., Ltd.

Photo 5-53: The retaining wall for Jundu Village Spoil Ground by China Communications Construction Co., Ltd. had been completed

In August 2012, Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. signed the Management Contract over the Spoil Ground at the Mouth of Liulin Tunnel 2# Inclined Shaft for the Newly-constructed Railyway from Taiyuan to Zhongwei (Yinchuan) with Liulin County People's Government of Shaanxi Province (Taiyuan-Zhongwei (Yinchuan) Railway Coordination Leading Group) (TZYTGHZ [2012] No.38). The Contract stipulated that Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. shall contribute 2.5 million Yuan as the treatment cost for the spoil ground, which would be used in fixed allocations by Liulin County People's Government of Shaanxi Province (Taiyuan-Zhongwei (Yinchuan) Railway Coordination Leading Group): under the premise that the safety demand shall be satisfied, the Coordination Leading Group shall eleminate the safe hidden troubles of the spoil ground, and shall live up to the standards for water conservation, as well as shall be responsible for the treatement results.

Till August 2013, Jundu Village Spoil Ground at the Mouth of Liulin Tunnel 2# Inclined Shaft was still under treatment.

Beijing OASIS Environmental Protection Technology Co., Ltd. 66

Page 80: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-54: Jundu Village Spoil Ground was still under treatment2. The spoil ground set up beside Sanchuan River for Huotangzhai 2# Tunnel constructed by

China Communications Construction Co., Ltd. had been completely transferred

Photo 5-55: The spoil ground set up beside Sanchuan River for Huotangzhai 2# Tunnel by China Communications Construction Co., Ltd. had been completely transferred

3. Spoil Ground of Wucheng Reservoir constructed by China Communications Construction Co., Ltd.

In 2010, over the issue that the Spoil Ground of Wucheng Tunnel constructed by China Communications Construction Co., Ltd. affected the spillway of the reservoir, through the negotiation between China Communications Construction Co., Ltd. and the people in charge of the reservoir, the following decision was made: the slag in the spillway would be removed. Now all the slag in the spillway of the reservoir had been completely removed.

Beijing OASIS Environmental Protection Technology Co., Ltd. 67

Page 81: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-56: The slag in the spillway of the Wucheng Reservoir had been completely removed (year of 2010)

4. Sanchuan River Spoil Ground of China Communications Construction Co., Ltd.

Through the contact with the local water conservancy department for many times conducted by China Communications Construction Co., Ltd., upon the fact the Spoil Ground had been flattened into ground, the conclusion and decision were respectively made that it had been available for second ploughing and it would not be removed any more. In July 2009, Lijiawan Township Government of Liulin County agreed to the acceptance for the Spoil Ground.

Photo 5-57: Sanchuan River Spoil Ground and the instructions of the Township Government

5. Spoil Ground of Wubu Station

The 5# Spoil Ground of Wubu Station constructed by China Communications Construction Co., Ltd. was adjacent to the subgrade while there were houses and village roads beside the moutain slope. Instead of being extended to the local drainage canals, the subgrade drainage culvert and the subgrade drainage ditch directly eroded the 5# Spoil Ground: during the investigation conducted in 2011, it had been found that there had been the obvious gully formed in the Spoil Ground so that the soil and water loss was very serious, which would threaten the safety of the village roads.

Beijing OASIS Environmental Protection Technology Co., Ltd. 68

Page 82: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-58: Serious soil and water loss of 5# Spoil Ground of Wubu Station by China Communications Construction Co., Ltd. (year of 2011)

During the investigation conducted in 2013, it was found that the subgrade drainage was connected to the gully under the slope through the pipe culvert with three wells set up in the middle. The investigation also revealed that a drainage culvert had been broken, which would probably lead to the blockage of the wells. Moreover, this drainage scheme still held the hidden troubles for water and soil loss.

Photo 5-59: The drainage culvert of the 5# Spoil Ground of Wubu Station had been broken

6. Spoil Ground of Wubu Tunel 1# Inclined Shaft

With a large volume of discarded slag, this Spoil Ground was located on the high steep slope of a gully; according to the preliminary design of Third Railway Survey and Design Institute Group Co., Ltd., the necessary reinforcement or repair had been carried out.

Photo 5-60: The retaining wall constructed beside the gully for Spoil Ground of Wubu Tunel 1# Inclined Shaft by China Railway 16th Bureau Group Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 69

Page 83: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

7. The spoil grounds still under use for crushed stone in 2011

During the investigation conducted in 2011, the Spoil Ground of Lvliang Mountain Tunnel 3# Inclined Shaft constructed by China Railway 3rd Bureau Group Co., Ltd., the 1# Spoil Ground at the exit of Wangjiahui Tunnel constructed by China Communications Construction Co., Ltd., the Spoil Ground of Wubu Tunel 4# Inclined Shaft constructed by China Railway 16th Bureau Group Co., Ltd., the Yuding Township Wangyuansi Spoil Ground constructed by China Railway 21st Bureau Group Co., Ltd., the Spoil Ground of Suide Tunnel 4# Inclined Shaft constructed by China Railway 19th Bureau Group Co., Ltd. and other spoil grounds had been under the use for crushed stone; however, during the investigation conducted in August 2013, it had been found that these spoil grounds had been fully restored.

Photo 5-61: The Spoil Ground of Suide Tunnel 4# Inclined Shaft had been utilized by the local brick factory

8. The spoil grounds with the restoration works having not been completed yet in 2011

Till August 2013, the restoration works for the three unrestored spoil grounds, including the Spoil Ground of Lvliang Mountain Tunnel 0# Inclined Shaft constructed by China Railway 12th Bureau Group Co., Ltd., the Spoil Grund of Lvliang Mountain Tunnel 2# Inclined Shaft constructed by China Railway 12th Bureau Group Co., Ltd. and the Spoil Ground at the exit of Miaojiapiing 1# Tunnel constructed by China Railway 16th Bureau Group Co., Ltd., had been completed.

Photo 5-62: The Spoil Ground of Lvliang Mountain Tunnel 0# Inclined Shaft had been used as a local walnut seedling base

5.4 Situation of the ecological sensitive area5.4.1 Ningxia Haba Lake National Nature Reserve and Baijitan National Nature Reserve

Beijing OASIS Environmental Protection Technology Co., Ltd. 70

Page 84: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

1. Relationship between Taiyuan-Zhongwei (Yinchuan) Railway and Haba Lake National Nature Reserve

Situation of the preliminary design:

Line mileage: LDK533+050~LDK536+300 (Pilot Area); LDK536+300~LDK538+800 (Buffer Area); 2500m; LDK538+800~LDK552+700 (Pilot Area), with an overall length of 13150m.

Main Content of the Project

—— Si’er’tan Super-major Bridge, LDK541+840.655~LDK546+026.445, 4200m, Haba Lake National Nature Reserve Pilot Area;

Photo 5-63: The completion site of Si’er’tan Super-major Bridge constructed by China Railway 12th Bureau Group Co., Ltd.

—— Yanchi Station, LDK547+750~LDK549+500, Haba Lake National Nature Reserve Buffer Area;

Photo 5-64: Yanchi Station by China Railway 12th Bureau Group Co., Ltd.—— Hongshangou Medium Bridge, LDK551+452.54~LDK551+564.82, Haba Lake National Nature Reserve Pilot Area.

Beijing OASIS Environmental Protection Technology Co., Ltd. 71

Page 85: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-65: The subgrade and surrounding vegetation of LDK549+600 by China Railway 12th Bureau Group Co., Ltd.

2. Relationship between Taiyuan-Zhongwei (Yinchuan) Railway and Baijitan Nature Reserve

Photo 5-66: Ningxia Baijitan Nature Reserve

Situation of the preliminary design:

Line mileage: LDK647+600~LDK661+300 (Pilot Area), with an over length of 13700m.

Actual construction sites of Taiyuan-Zhongwei (Yinchuan) Railway within the Nature Reserve:

—— Haojiagou Major Bridge, LDK647+574.23~LDK647+786.17—— Dongwan Major Bridge, LDK650+605.1~LDK650+882.4—— Lijiaquan Major Bridge, LDK652+210.1~LDK652+392.7—— Zhuanjugou Major Bridge, LDK653+057.11~LDK653+302.89—— Xiongjiagou Major Bridge, LDK655+761.8~LDK656+102.96 —— Jiaonigou Major Bridge, LDK658+629.75~LDK660+481.55 —— Zhujiagou Major Bridge, LDK661+240.53~LDK661+387.33—— Dongwan Medium Bridge, LDK649+139.9~LDK649+253—— Dongta 1# Tunnel, LDK653+520~LDK653+840 —— Dongta 2# Tunnel, LDK654+030~LDK654+110 —— Dongta 3# Tunnel, LDK656+945~LDK657+270 —— Baijitan Tunnel, LDK657+636~LDK657+680 —— Dongta 4# Tunnel, LDK657+740~LDK658+065

Beijing OASIS Environmental Protection Technology Co., Ltd. 72

Page 86: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

—— Dongta 5# Tunnel, LDK658+320~LDK658+412 —— Lingwu Station, LDK660+500~LDK662+250

Photo 5-67: Lingwu Station Building and square in front of the Station (year of 2011)

3. Situation and analysis of soil and water conservation

The Pilot Area of Haba Lake Nature Reserve, which the Taiyuan-Zhongwei (Yinchuan) Railway passes through, belongs to the desert vegetation belt, where the vegetation coverage is low. Due to the serious ground cutting in the place of Baijitan Nature Reserve, which the Taiyuan-Zhongwei (Yinchuan) Railway passes through, there are many gullies generated by water and soil loss and the ecological system is very fragile in the Nature Reserve.

Both of the two nature reserves are located within the bid section of China Railway 12th Bureau Group Co., Ltd. In accordance with the design requirements, during the railway construction, China Railway 12th Bureau Group Co., Ltd. had used the excavated earthwork as the backfil soil within the scope of the bid section as much as possible, as well as had conducted the centralized soil borrowing/discarding away from the reserve; at the same time, the construction unit had carried out the strict boudary construction, strengthened greening & vegetation restoration and controlled the solid waste emission so as to maximally reduced or mitigated the damage imposed oon the Reserve, as well as its surrounding earth’s surface and vegetation during the construction process. In fact, the railway construction eventually did not damage the integrity and biodiversity of the Reserve, as well as did not cause the change of the Nature Reserve’s ecological function.

5.4.2 Shanxi Xuegongling Province-level Nature Reserve

1. Relation between Taiyuan-Zhongwei (Yinchuan) Railway and the Reserve

Situation of the preliminary design:

CK129+230~CK131+030 is the exit end of Lvliang Mountain Tunnel, the longest tunnel along the line; within the Reserve, the length of the Tunnel is 1800m; the average burial depth and the maximum burial depth within the Reserve are 75m and 120m respectively; meanwhile, the minimum burial depth at the exit is 5m.

CK131+030~CK131+280 is the bridge end of Yuanzewan Dadongchuan Super-major Bridge set to come across the old 307 National Highway and Dadongchuan River, which is the 32m beam; the old 307 National Highway is the boundary of the Reserve and the bridge length within the Reserve is 250m.

The actual line mileage of Lvliang Mountain Tunnel:

As for the entrance section of Lvliang Mountain Tunnel undertaken by China Railway 12th Bureau Group Co., Ltd., the railway mileage is DK119+157 ~ DK129+255 with an overall length of 20.222Km; As for the exit section of Lvliang Mountain Tunnel undertaken by China Railway 3rd

Bureau Group Co., Ltd., the railway mileage is DK129+255~DK139+895 with an overall length of 21.335Km.

Beijing OASIS Environmental Protection Technology Co., Ltd. 73

Page 87: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

2. Situation and analysis of environmental and water protection

Lvliang Mountain Tunnel has passed through Xuegongling Nature Reserve from the underground so that the railway construction has exerted little impact on the surface’s natural ecology. However, the water inflow of Lvliang Mountain Tunne has changed the distribution of groundwater in Wucheng Region so that the potential impact on Xuegongling Nature Reserve shall be furhter observed.

5.4.3 Suide County Dingjiagou—Shilipu drinking water source

1. Relationship between Taiyuan-Zhongwei (Yinchuan) Railway and the drinking water source

Situation of the preliminary design:

The length of line passing through the water source protection zone is 3260m and the line mileage is CK264+050-CK267+310: to be specific, with a length of 820m, CK265+400-CK266+130 and CK266+260-CK266+350 pass through the first-grade protection zone; with a length of 2080m, CK264+050-CK265+400, CK266+130-CK266+260 and CK266+350-CK266+950 pass through the second-grade protection zone; with a length of 360m, the rest section is the prospective protection zone.

In this bid section, Suide Tunnel has been reconstructed, which is located within the second-grade protection zone; two super-major bridges have been newly constructed, which are located within the first and second-grade protection zones; one tunnel has been newly constructed, which is located with the prospective protection zone.

Actual construction sites of the projectEr’shilipu Wuding River Super-major Bridge, DK263+221.03~DK264+372.03Dingjiagou Wuding River Super Major Bridge, DK264+879.09~DK266+301.03

Baijiashan Tunnel, DK266+409~DK271+717 Suide Station, central mileage DK262+550

2. Situation & analysis

Photo 5-68: Billboards of Environmental Protection at Construction Site at Er’shilipu Super-major Bridge by

China Railway 16th Bureau Group Co., Ltd.

Photo 5-69: Dingjiagou Super-major Bridge by China Railway 16th Bureau Group Co., Ltd.

The railway construction and operation will not exert impact on the drinking water source.

5.4.4 Liulin spring field

Within the territory of Lvliang City, the line mileage CK117+000~CK196+000 with a length about

Beijing OASIS Environmental Protection Technology Co., Ltd. 74

Page 88: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

79Km of the project passes through Liulin spring field (as shown in the diagram of relationship between Taiyuan-Zhongwei (Yinchuan) Railway and Liulin spring field): to be specific, along the north bank of Sanchuan River and Xiaoxi-Liulin Railway, the section from Lvliang to Liulin is parallel to Fenyang-Lishi Expressway, which is still under construction; due to the restriction of the coal mining goaf, the line mileage CK195+200~CK196+000 with a length of 800m of the project has entered into the key protection zone for the spring field in the form of bridge at the end of the lower reaches of Sanchuan River.

Within the scope of the spring field: three stations have been newly constructed; 55 bridges have been built with a length of 13966 linear meters accounting for 17.6% of the overall length of the line; 54 tunnels have been constructed with a length of 40480m accounting 51.2% of the overall length of the line; there are 208 individual subgrade construction sites with a length of 22652 linear meters accounting for 28.7% of the overall length.

1. The construction sites of Taiyuan-Zhongwei (Yinchuan) Railway in Liulin spring field

Tunnels with a single length above 1000m:Huangzhang 2# Tunnel: DK116+730~DK117+989.23Lvliang Mountain Tunnel (left line): DK119+145~DK139+930、 (right line): DK119+143~DK139+915Yiju 2# Tunnel: DK156+855~DK158+245Shanglouqiao Tunnel: DK158+287~DK159+895Lishi Tunnel: DK163+364~DK173+600Wangjiahui Tunnel: DK187+939~DK190+219Xiabaishuang 3# Tunnel: DK192+550~DK193+919Wangjiazhuang Tunnel: DK193+970~DK195+712

The main bridges:Shanglinshe Major Bridge (left line): central mileage DK118+980.16 with a length of

175.94m (right line): central mileage DK119+027.38 with a length of

172.74mFenghaoliang Dadongchuan Super-major Bridge: (left line): central mileage DK140+461.22 with a length of 730.13 (right line): central mileage DK140+438.14 with a length of 750.81Longfangli Super-major Bridge: central mileage DK147+972.72 with a length of 630.44Xiawangying Super-major Bridge: central mileage DK152+937.42 with a length of 695.84879.44Beichuan River Super-major Bridge: central mileage DK175+183.45 with a length of 1892.92Zhaojiazhuang Super-major Bridge: central mileage DK176+714.94 with a length of 1650.88Xiyadi Super-major Bridge: central mileage DK179+482.75 with a length of 1289.31Hejiata Sanchuan River Super-major Bridge: central mileage DK185+856.97 with a length of 689.08

Stations:Wucheng Station, Liulin North Station and Lvliang Station

2. Environmental protection measures and analysis

All construction units of Taiyuan-Zhongwei (Yinchuan) Railway have fundamentally followed the principle of “retaining first discarding second” for the spoil ground, attached attention to the filtration of the construction drainage, as well as completed the subgrade protection and line greening in accordance with the design; therefore, during the whole construction period, no any impact has been exerted on the function of Liulin spring field.

5.4.5 Ruins Ming Great Wall

Beijing OASIS Environmental Protection Technology Co., Ltd. 75

Page 89: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Situation of the preliminary design:

The mileage CK382+100 of the project comes across the ruins Ming Great Wall in Yanger Village, Jingbian County, the subgrade height of which is 5-6m. The Great Wall in this section has been taken as the by the local residents, which has been severely damaged and whose residual trench height is 1~3m; moreover, some place near the line location has been razed to the ground. Due to the technical requirements of the project, the ruins of Ming Great Wall shall be excavated with a depth of 20-30m.

The mileage CK511+050 of the project comes across the ruins Ming Great Wall once again near Hequan Town, Dingbian County; The Great Wall in this section has been severely damaged and only some abutments are sporadically scattered every 500-1000m; the place of the line location has been razed to the ground; meanwhile, there has been no building wall anymore.

Actual situation of the project

In accordance with the requirements of the local cultural relics department, the line constructed by China Railway Erju Co., Ltd. near the ruins of Ming Great Wall in Yanger Village, Jingbian County shall come across the Great Wall through the transformation of the subgrade into the bridge; the road-to-bridge design drawing was completed in September 2009; meanwhile, the road-to-bridge construction has been completed so that the ruins of Ming Great Wall have been kept intact.

The ruins of Ming Great Wall beside the line constructed by China Construction Company in Hequan Town, Dingbian County have been kept intact and the subgrade works have been fully completed.

Photo 5-70: The road-to-bridge of Ming Great Wall for the mileage DK381+878 by China Railway Erju Co.,

Ltd.

Photo 5-71: The line mileage DK510+600 by China Construction and the runis of Ming Great Wall

5.5 Investigation over the temporary works

Taiyuan-Zhongwei (Yinchuan) Railway has set up seven beam fabrication plants, which respectively are: Yuci Beam Fabrication Plant, Qingxu Beam Fabrication Plant, Yulin Beam Fabrication Plant, Wubu Beam Fabrication Plant, Suide Beam Fabrication Plant, Huangyangwan Beam Fabrication Plant and Pingjibao Beam Fabrication Plant.

Beijing OASIS Environmental Protection Technology Co., Ltd. 76

Page 90: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-72: The construction camp mixing station of China Railway 19th Bureau Group Co., Ltd. has been

restored so that it has been availabe for second ploughing

Photo 5-73: The mixing station site of China Railway 16th Bureau Group Co., Ltd. has been processed

Photo 5-74: Hardening and protection for the service road of China Railway 17th Bureau Group Co., Ltd.

5.6 People-benefiting projectDuring the construction process, each bid section, to different extent, has completed some people-benefiting projects for the villagers, such as road construction, land reclaimation, improvement of water conservancy facilities, application of local migrant workers or raw materials, etc.

—— Land reclaimation

The construction units have paid attention to make full use of the discarded soil (slag) to fill the gaps, construct dam for the silt places, or flatten the land for second ploughing or develop the land for utilization so that Taiyuan-Zhongwei (Yinchuan) Railway has created a great number of exploitable land and precious farmland for the villagers and local governments along the line.

The 30 mu’s spoil ground for DK383+400 constructed by China Railway Erju Co., Ltd. has been included into the planning for the entrepreneurial park of the small and medium-sized enterprises in Jingbian County, which will be constructed into a road. The Gaojiagou Spoil Ground for DK365+750 constructed by China Railway Erju Co., Ltd. has reclaimed 90 mu’s land while DK393+200 Spoil Ground has reclaimed 120 mu’s land for the local industrial park, etc.

As for the spoil ground at the entrance of Jiushan Tunnel constructed by China Railway 17th Bureau Group Co., Ltd., it has taken advantage of the 3 104m3 discarded slag to fill the depression, construct the wall and help the local to build a primary school.

Beijing OASIS Environmental Protection Technology Co., Ltd. 77

Page 91: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-75: The spoil ground of Qizegou Tunnel by China Communications Construction Co., Ltd. has

reclaimed 53 mu’s land

Photo 5-76: The second ploughing for the 2# spoil ground of Chujiagou Station by China Communications

Construction Co., Ltd. has been realized

Photo 5-77: The second ploughing for the spoil ground of Dujiawan Tunnel by China Communications

Construction Co., Ltd. has been realized

Photo 5-78: The spoil ground at the exit of Mucun 1# Tunnel by China Communications Construction Co.,

Ltd. has reclaimed 63 mu’s land

Photo 5-79: The spoil ground at the entrance of Wubu Tunel by China Railway 16th Bureau Group Co., Ltd. has been utilized

Beijing OASIS Environmental Protection Technology Co., Ltd. 78

Page 92: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-80: Dingjiagou spoil ground of China Railway 16th Bureau Group Co., Ltd. has flattened and

reclaimed 102 mu’s land

Photo 5-81: Gaojiagou spoil ground of China Railway Erju Co., Ltd. has reclaimed 90 mu’s land

Photo 5-82: The second ploughing for Yidangwan Village Spoil Ground DK422+200 by China

Construction has been finished

Photo 5-83: About 65 mu’s land of Paomaquan Village 2# Spoil Ground by China Railway 12th Bureau Group Co., Ltd. has been developed into an automobile market

Photo 5-84: The second ploughing has been realized for 27 mu’s land of LDK684+000 spoil ground by China

Railway 12th Bureau Group Co., Ltd.

Photo 5-85: The spoil ground of Zhongningdong Station by China Railway 21st Bureau Group Co., Ltd.

has been developed into an automobile market

Beijing OASIS Environmental Protection Technology Co., Ltd. 79

Page 93: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-86: The primary school built by the local government upon the spoil ground of China Railway

17th Bureau Group Co., Ltd.

Photo 5-87: The DK383+400 spoil ground of China Railway Erju Co., Ltd. has been built into a road by

the development zone

—— Construction of road and bridge

During the construction for Taiyuan-Zhongwei (Yinchuan) Railway, in a short span just more than a year, China Railway 17th Bureau Group Co., Ltd. invested 1.8 million Yuan to construct many poverty alleviation projects for the villagers of Zhangjiazhai, mainly including: strengthening 70 meters’ cement steel bridge deck and 70 meters’ bridge railing for Zhangjiazhai Bridge; constructing a 260 meters’ flood retaining wall and a 100 meters’ drainage ditch; hardening a 2000 meter’s gravel road; and enhancing a 100 meters’ canal retaining for the clear ditch. For this reason, on May 26, 2008, the villagers of Zhangjiazhai erected a piece of “Monument of Merits and Virtues” at the head of Zhangjiazhai Bridge for commemoration.

 

Photo 5-88: The Monument of Merits and Virtues presented by the villagers of Zhangjiazhai to China Railway 17th Bureau Group Co., Ltd.

Photo 5-89: The retaining wall by China Railway 17th Bureau Group Co., Ltd. for the local village road

Photo 5-90: The hardened road in front of Yuci Beam Fabrication Plant of China Railway 22nd Bureau Group

Co., Ltd.

Beijing OASIS Environmental Protection Technology Co., Ltd. 80

Page 94: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-91: The Letter of Thanks presented by Baishuqu Village Committee, Shuangcheng Township, Hengshan County to China Railway 1st Bureau Group

Co., Ltd.

Photo 5-92: The silk banner presented by Dujiagou Village Committee, Miaoping Town, Zizhou County to

China Railway 16th Bureau Group Co., Ltd.

—— Construction of water-conservancy projects

Photo 5-93: The 6th Economic Department of China Communications Construction Co., Ltd. donated

280000 Yuan to construct a 250 meters’ floodwall for Sanchuan River

Photo 5-94: The DK611+500 spoil ground of China Construction has become a pond

Beijing OASIS Environmental Protection Technology Co., Ltd. 81

Page 95: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 5-95: The couplet on the well reads : “the well has been constructed in a flourishing age and do not forget the well-digger, China Railway 16th Bureau Group Co., Ltd., when to drink water from this well”

The top scroll: “Flow of Clear Spring”

—— Comprehensive utilization of the discarded slag

A large number of the discarded slag of the tunnels has been comprehensively utilized by the local: to be specific, 52 spoil grounds in total have been utlized and the main utilization directions include brick factory, gravel field, livestock farm, etc; meanwhile, the total volume of the comprehensively utilized discarded slag is about 1248.59 104m3.

6. Situation of Environmental Pollution Prevention

6.1 Implementation situation of water environment prevention measuresAccording to the examination and approval opinions for the preliminary design, 47 sewage treatment stations in total (including the newly-constructed stations and the existing ones) shall be designed for the sewage treatment of the main stations along Taiyuan-Zhongwei (Yinchuan) Railway: to be specific, the sewage treatment measures will be divided into four types, including septic tank, oil separation sedimentation tank, anaerobic filter tank + artificial undercurrent wetland, and contact oxidation process. Jingbian Station, Hongsibao Station and Taiyangshan Station have adopted the contact oxidation process; Dingbian Station has adopted the primary enhanced treatment process; the rest stations have all adopted the low power sewage treatment measure or treatment mode of anaerobic filter tank + sewage storage pond.

After the sewage has been treated with the corresponding standards met, according to the specific conditions of the local, the treated sewage shall be used for the station greening, agricultural irrigation or discharged into the municipal pipe network, the near ditches, etc.

At present, the installation for the sewage treatment facilities has been completed and they have been put into the trial operation. For the next step, it is necessary to arrange the monitoring over the treatment effect of the sewage treatment facilities as soon as possible.

Beijing OASIS Environmental Protection Technology Co., Ltd. 82

Page 96: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 6-1: The sewage treatment facilities at Lvliang Station

Photo 6-2: The water storage pond in the sewage treatment plant of Fenyang Station

The sewage treatment facilities at Jingbian Station have been put into operation.

Photo 6-3: The sewage treatment plant at Jingbian Station

6.2 Implementation situation of atmospheric environment prevention measuresThe 41 boilers required by 32 stations of Taiyuan-Zhongwei (Yinchuan) Railway have adopted the 0.21-1.4MW double-deck grate hot-water boiler, which can meet the environmental protection requirements; the boiler rooms have all been built and the installation for the boilers has been completed; for the next step, it is necessary to test the emission data of the boiler flue gas.

Beijing OASIS Environmental Protection Technology Co., Ltd. 83

Page 97: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Photo 6-4: The 1t atmospheric pressure coal-fired hot water boiler at Fenyang Station

6.3 Implementation situation of acoustic environment prevention measuresIn April 2011, Taiyuan-Zhongwei (Yinchuan) Railway Company signed the entrustment contract over the acoustic barrier project in the section of Shaanxi with Yanliang Track Maintenance Division of Xi’an Railway Bureau; in June 2011, Taiyuan-Zhongwei (Yinchuan) Railway Company signed the entrustment contract over the acoustic barrier project in the section of Ningxia with Lanzhou Railway Bureau; Taiyuan Track Maintenance Division of Taiyuan Railway Bureau will be entrusted to undertake the acoustic barrier project in the section of Taiyuan, but temporarily the contract has not been formally signed yet.

Upon the information provided by Taiyuan-Zhongwei (Yinchuan) Railway Company, it can be known that, as for the acoustic barrier project of Taiyuan-Zhongwei (Yinchuan) Railway, there are 78 in total put forward by the Environmental Impact Assessment Report; however, due to the rerouting, road-to-bridge and increased demolition scale for Taiyuan-Zhongwei (Yinchuan) Railway, in December 2010, the design unit Third Railway Survey and Design Institute Group Co., Ltd. finally confirmed 31 acoustic barrier projects.

Till August 2013, except the suspended construction of the outsourced southwest ring for Xiaobeige Village, still 8 acoustic barrier projects, including Houfang Village, Mingli Village, etc, had not been completed; it had been expected that all the acoustic barrier projects would be completed by the end of 2013.

Photo 6-5: The acoustic barrier above Beichuan River Super-major Bridge beside Shuangwudu Village has

been built

Photo 6-6: The acoustic barrier at the exit of Shijiawan Tunnel adjacent to Shijiawan primary and secondary

schools

6.4 Impact of construction vibration on environmentAs for Xingwangmao Tunnel constructed by China Railway Tunnel Bureau, on October 12-13, 2008, the County Land and Resources Bureau (Railway Office), the township government, the village cadres, the villagers, the

Beijing OASIS Environmental Protection Technology Co., Ltd. 84

Page 98: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

design institute (Wang Yimin), the Owner (Zhang Liang of Suide Headquarters), and the construction unit jointly carried out a field investigation over the impact of the construction vibration on the cave dwelling, upon which it could be known that 37 cave dwellings in total had been affected and the impact on 6 of them was relatively more serious with large block falling phenonmenon so that they also conducted the measurement over the crack. Moreover, they had aslo signed to confirm the present situation. As for the 6 cave dwellings seriously affected the temporary resettlement had been carried out while the compensation scheme had been undetermined yet.

In addition, the 30 households, which shall be resettled due to the vibration outside the red line of Hengshan Tunnel constructed by China Railway 1st Bureau Group Co., Ltd. and the 40 households, which were affected by the vibration for construction of Baijia Mountain Tunnel undertaken by China Railway 21st Bureau Group Co., Ltd., had been properly settled.

7. Implementation Situation of Vegetation Measures for Soil and Water Conservation of Taiyuan-Zhongwei (Yinchuan) Railway

The vegetation measures for soil and water conservation of Taiyuan-Zhongwei (Yinchuan) Railway have been included in the construction for the main works; the vegetation measures along the line have been carried out by the construction unit for the main works of the bid section; meanwhile, Xi’an Yellow River Project Supervision Company has been entrusted to be responsible to conduct the construction supervision over the corresponding vegetation measures. The vegetation measures for soil and water conservation of Taiyuan-Zhongwei (Yinchuan) Railway mainly include the subgrade slope for the main project area, the planting of trees & shrubs on both sides of the subgrade, the station greening, as well as the greening for the temporary project area, borrow pit and spoil ground; meanwhile, the total area with the vegetation measures for soil and water conservation completed is 2459.54hm2. To be specific, 562300 trees, 48.1762 million shrubs and 31900 vines have been planted; 3.16 m2

lawn turfed; 119 flower beds have been constructed; 854.34hm2 grass seed has been strewn.

8.Passenger & Cargo Transporation and Income of Taiyuan-Zhongwei

(Yinchuan) Railway

In 2011, the number of the transported passengers was 2058134, the passenger person-kilometers was 4893965 per thousand people per kilometer, the transported cargo was 2457959 tons (including: 567490 tons for Lanzhou Bureau and 1890469 tons for Taiyuan Bureau), and the rotation volume of freight transport was 16576585 per thousand tons per kilometer. The transportation revenue liquidated by the Company in 2011 was 3.9648 billion Yuan.

In 2012, the number of the transported passengers was 2417478, the passenger person-kilometers was 5088779 per thousand people per kilometer, the transported cargo was 2616487 tons (including: 1214106 tons for Lanzhou Bureau and 1402381 tons for Taiyuan Bureau), the arrival of cargo was 96041 tons (including: 83062 tons for Lanzhou Bureau and 12979 tons for Taiyuan Bureau) and the rotation volume of freight transport was 21856461 per thousand tons per kilometer. With an increase of 14.56% compared with 2011, the total operating income of the Company in 2012 was 4.59638 billion Yuan.

As for the first quarter of 2013, the number of the transported passengers was 554560, the passenger person-kilometers was 1232167 per thousand people per kilometer, the transported cargo was 1110112 tons (including: 675413 tons for Lanzhou Bureau and 434699 tons for Taiyuan Bureau), the arrival of cargo was 8880 tons (including: 7360 tons for Lanzhou Bureau and 1520 tons for Taiyuan Bureau) and the rotation volume of freight transport was 5345273 per thousand tons per kilometer.

Beijing OASIS Environmental Protection Technology Co., Ltd. 85

Page 99: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

9. Situation of Investment in Environmental Protection

The total investment of the preliminary design for Taiyuan-Zhongwei (Yinchuan) Railway was 32.101 billion Yuan; till 2013, the actual total investment was 44 billion Yuan; to be specific, it included 1.427 billion Yuan’s actual investment for the soil and water conservation works.

10. Conclusion and Suggestion

Taiyuan-Zhongwei (Yinchuan) Railway Co., Ltd. has attached great importance to the soil and water conservation works during the railway construction period; in addition to the enhancement over the propaganda and management over the construction unit’s soil and water conservation works, they have also taken full advantage of the strength from the external supervision, monitoring and control units to jointly carry out the soil and water conservation works during the railway construction period so as to properly implement the laws & regulation related to the soil and water conservation, as well as the relevant requirements of the reply in the Environmental Impact Assessment Report during the railway construction period, which eventually has achived remarkable effects.

It is suggested that Taiyuan-Zhongwei (Yinchuan) Company shall speed up the construction progress for the acoustic barrier project, lose no time to start the sorting & summarization over the completion data, and apply for the national special acceptance for soil and water conservation. At the same time, Taiyuan-Zhongwei (Yinchuan) Company shall strengthen the operation management over the pollution abatement facilities so as to ensure the long-term using effect of the pollution abatement facilities.

Beijing OASIS Environmental Protection Technology Co., Ltd. 86

Page 100: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Attachment:

Appendix 1. Details of the borrow pits of Taiyuan-Zhongwei (Yinchuan) Railway

Table of Monitored Borrow Pits along the Whole Line

S.N. Administrative Region

Stake Mark Disturbance Area (hm2)

Accumulatively Borrowed Volume

(104m3)1 Jinzhong

CityDongzhuang Village, Shitie Town, Yuci

District6.67 90.00

2 Yuci District DK16+150 6.47 184.70

Subtotal 13.14 274.70

3 Taiyuan City

Near DK45+000 in Nanyun Village, Jinyuan District, Taiyuan City

5.93 10.00

4 DK56+350, 6.9km at right side of Xinmin Village, Dongyu Town, Qingxu County

7.07 90.00

Subtotal 13.00 100.00

5 Lvliang City

Sanjiao Village, Jiaocheng County (local borrow pit)

4.68 110.00

6 Kaipeng Borrow Pit of Wenshui County 1.03 35.30

7 DK86+800, 4.1 km at right side of Xiaonanyu Village, Maxi Township, Wenshui County

20.60 190.00

8 Xiaoxiangzhai Borrow Pit of Fenyang City 8.00 58.00

9 DK145+900 Borrow Pit 4.27 22.10

DK145+700 Borrow Pit 2.53 41.80

DK146+650 Borrow Pit 2.20 25.80

Subtotal 43.31 483.00

10 Yulin City Xizhigou Borrow Pit 2.13 21.20

11 Shijiawan Village Borrow Pit 0.46 10.12

12 Xujiaping Village Borrow Pit 0.46 9.84

13 Yanjiacha Subgrade Borrow Pit 0.48 2.21

14 DK298+900, 400m at right side 2.00 12.00

15 DK310+900, 500m at right side 1.91 16.00

16 Xiaoya Village Borrow Pit 3.00 10.00

17 At right side of DK366+350 1.80 8.00

At right side of DK369+400 1.47 6.00

18 At right side of DK378+500 1.87 8.00

At right side of DK378+750 1.93 8.00

At left side of DK379+250 2.00 8.00

At left side of DK380+000 0.80 4.00

19 At left side of DK383+100 5.33 22.00

DK384+015 1.26 17.00

20 At left side of DK379+600 3.60 15.00

21 DK386+500 (monitoring point) 2.52 20.00

22 DK391+000 2.60 21.00

DK391+100 2.97 25.00

23 DK400+300 2.71 30.00

Beijing OASIS Environmental Protection Technology Co., Ltd. 87

Page 101: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

24 DK393+000 8.00 50.00

25 DK394+600 2.72 30.00

26 DK401+000 1.80 20.00

27 DK404+500 2.93 30.00

28 DK405+800 2.77 30.00

29 DK406+900 9.33 39.30

DK407+230 10.00 43.00

DK407+750 6.67 26.70

DK408+150 8.67 34.70

30 GDK409+800 6.00 24.60

GDK411+600 4.00 16.00

GDK412+100 2.67 11.00

31 GDK413+950 3.33 13.40

GDK414+750 2.67 11.70

GDK416+000 2.67 11.00

GDK416+720 2.67 11.50

32 GDK417+560 4.00 15.20

GDK418+520 2.67 10.40

33 GDK420+057 3.33 13.40

GDK421+400 4.00 15.20

GDK422+200 3.33 14.00

GDK423+000 4.00 16.00

In the south of modified DK422+640 line 4.94 16.70

34 In the south of DK425+250 line 3.28 24.55

35 In the north of DK429+400 line 13.29 46.00

36 In the south of DK429+450 line 11.64 35.70

In the north of modified DK434+000 line 1.21 1.50

37 In the south of modified DK434+200 line 1.29 5.20

38 In the north of modified DK436+115 line 8.65 25.60

In the north of modified DK439+630 line 1.56 5.80

39 In the south of modified DK440+835 line 7.39 39.00

40 In the north of modified DK441+220 line 1.22 4.40

In the south of modified DK442+670 line 1.85 2.30

In the north of DK445+300 line 1.73 12.30

In the north of DK446+260 line 2.28 6.50

In the north of DK447+240 line 5.55 21.20

41 In the south of DK447+100 line 4.48 17.40

In the south of DK447+280 line 4.00 9.30

In the south of DK447+280 line 3.12 7.70

In the south of DK447+500 line 6.34 15.40

In the south of DK451+250 line 7.12 23.50

In the north of DK452+450 line 6.65 12.00

In the south of DK452+600 line 15.29 24.50

42 In the south of DK451+300 line 1.91 1.00

2200 at left side of DK452+900 (newly added) 1.30 15.00

Beijing OASIS Environmental Protection Technology Co., Ltd. 88

Page 102: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

43 In the south of DK453+100 line 1.19 1.73

In the south of DK453+500 line 8.38 13.80

In the south of DK455+150 line 2.44 4.50

In the north of DK455+400 line 4.21 4.50

In the south of DK455+500 line 12.41 20.45

In the north of DK455+400 line 5.47 10.81

44 DK457+100 7.61 21.67

45 DK457+350 1.30 3.13

DK457+500 1.02 3.05

DK460+200 0.67 1.77

46 DK459+200 3.92 20.16

47 DK461+150 2.42 5.28

DK461+300 2.49 6.22

DK461+700 4.29 10.99

DK461+800 0.75 1.86

DK462+600 2.42 6.20

DK463+100 2.14 5.36

48 DK463+850 2.71 6.78

DK464+363 1.10 2.74

DK465+750 1.99 5.73

DK465+800 2.29 4.96

DK466+200 3.83 5.81

49 DK464+600 0.74 1.96

DK466+400 2.10 5.25

50 500 at right side of DK468+200 5.35 16.00

51 150 at left side of DK469+050 7.00 19.70

450 at right side of DK469+900 1.31 4.80

600 at right side of DK472+600 0.53 2.40

52 600 at right side of DK476+300 1.33 6.00

800 at right side of DK477+500 3.13 8.87

53 DK477+200 3.40 12.71

DK478+300 2.70 1.54

54 DK479+300 2.99 11.32

DK479+800 1.42 4.29

55 DK480+000 1.19 3.85

DK480+300 2.28 5.01

DK480+400 1.72 4.12

DK481+000 1.90 6.97

DK481+800 2.99 10.71

DK482+800 1.90 5.88

56 DK484+550 3.49 8.72

DK484+550 2.73 10.86

57 DK486+000 2.47 10.26

DK488+100 0.66 2.24

DK488+400 3.72 13.72

Beijing OASIS Environmental Protection Technology Co., Ltd. 89

Page 103: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

DK489+700 2.00 8.16

DK490+900 3.25 10.23

DK491+200 1.33 3.48

58 DK488+500 3.00 1.22

DK492+500 3.19 6.56

DK493+100 3.30 12.81

59 DK493+200 0.86 3.78

60 DK494+800 1.33 3.40

DK497+000 left line 2.00 4.00

DK498+750 left line 0.67 2.00

61 DK505+400 left line 18.00 46.00

62 DK506+050 right line 2.00 5.00

DK505+650 right line 0.67 2.50

DK507+100 left line 5.00 8.00

DK507+900 right line 2.00 5.60

DK508+000 right line 2.53 6.70

DK510+900 left line 6.07 27.00

DK511+250 left line 8.00 20.00

DK512+400 left line 5.80 23.00

63 At right side of DK514+680 2.78 10.40

At left side of DK514+680 1.26 4.40

At left side of DK516+020 1.45 4.50

At left side of DK516+380 1.91 6.40

64 At left side of DK516+700 1.52 4.50

At right side of DK518+140 2.39 10.40

At right side of DK519+540 0.88 4.70

65 At right side of DK521+500 2.92 18.50

At right side of DK522+500 0.36 1.60

66 At left side of DK523+300 2.90 9.20

At right side of DK523+600 0.74 2.30

67 At right side of DK526+300 9.89 29.60

68 At left side of DK534+200 9.87 34.10

69 At left side of DK537+000 8.80 42.60

70 At left side of DK542+140 6.78 32.40

71 80m at left side of modified LDK514+700 0.86 3.00

40m at right side of modified LDK515+600 2.50 9.00

40m at left side of modified LDK515+700 2.49 9.00

40m at right side of modified LDK515+700 0.91 3.00

72 40m at right side of modified LDK515+700 0.27 3.00

150m at left side of modified LDK516+600 0.26 2.00

200m at left side of modified LDK516+700 0.22 3.00

73 At right side of DK527+950 4.29 12.20

At left side of DK531+010 10.92 38.30

74 At left side of DK535+400 6.70 28.90

75 At left side of DK540+560 5.44 21.00

Beijing OASIS Environmental Protection Technology Co., Ltd. 90

Page 104: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

76 40m at right side of modified LDK521+500 4.90 15.00

20m at right side of modified LDK522+500 1.94 6.00

200m at right side of modified LDK522+800 2.59 8.00

60m at left side of modified LDK523+700 2.53 13.00

60m at right side of modified LDK524+000 0.81 4.00

80m at left side of modified LDK524+300 0.56 3.00

77 200m at right side of modified LDK524+500 1.17 6.00

78 300m at right side of modified LDK525+350 3.45 18.00

100m at right side of modified LDK525+800 1.51 6.00

100m at right side of modified LDK526+200 1.26 5.00

600m at left side of modified LDK526+500 1.79 7.00

150m at right side of modified LDK526+600 1.31 6.00

300m at left side of LDK527+400 3.25 9.00

100m at left side of LDK527+500 0.20 1.00

79 20m at left side of LDK527+990 0.13 0.50

20m at right side of LDK527+990 0.03 0.10

400m at right side of LDK528+400 5.59 15.00

100m at right side of LDK528+400 5.55 15.00

150m at left side of LDK529+080 1.04 3.00

40m at left side of LDK530+800 1.60 5.00

600m at right side of LDK532+300 3.14 14.00

150m at right side of LDK533+400 8.00 36.00

Subtotal 600.38 2220.74

80 Wuzhong City

DK558+300 8.00 24.00

DK559+100 5.33 13.00

DK559+400 5.33 13.00

81 DK560+000 0.65 1.90

DK560+800 5.64 16.60

DK561+300 7.02 28.00

DK562+240 1.10 3.00

DK562+800 0.51 1.50

DK563+600 8.67 34.00

82 DK564+800 0.90 2.50

DK565+600 2.53 7.50

DK566+500 1.76 5.30

DK567+400 0.29 0.70

DK567+800 0.95 2.80

83 DK569+000 1.00 4.00

DK569+700 0.73 2.90

84 DK575+300 1.57 7.10

85 DK578+000 2.27 15.50

86 DK580+600 0.61 2.40

87 DK581+800 0.34 1.00

88 DK584+400 0.77 4.20

89 DK588+050 1.47 6.50

Beijing OASIS Environmental Protection Technology Co., Ltd. 91

Page 105: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

90 DK594+200 Borrow Pit (original) 9.99 13.00

91 DK596+200 Borrow Pit (original) 6.00 15.00

92 DK598+400 Spoil Ground (original) 5.00 12.00

93 DK599+050 Borrow Pit (original) 6.00 9.00

94 DK600+800 Borrow Pit (original) 6.00 7.00

95 DK602+700 Borrow Pit (original) 9.99 19.00

96 DK603+600 Borrow Pit (original) 6.00 12.00

97 DK603+850 Borrow Pit (original) 6.00 14.00

98 DK604+500 Borrow Pit (original) 8.00 12.00

99 DK608+450 Borrow Pit (original) 8.00 15.00

100 DK608+450 Borrow Pit (original) 8.00 10.00

101 DK610+500 Borrow Pit (original) 9.99 7.00

102 DK611+500 Borrow Pit (original) 7.00 11.00

103 DK616+500 Borrow Pit (original) 9.00 18.00

104 DK630+000 Borrow Pit (original) 6.00 15.00

105 300m at left side of DK610+500 (newly added) 1.10 5.00

106 200m at left side DK611+500 (newly added) 1.10 5.00

107 100m at right side of DK612+300 (newly added)

6.60 33.00

108 200m at right side of DK615+000 (newly added)

1.30 6.60

109 50m at left side DK621+980 (newly added) 2.30 11.30

110 500m at left side DK622+500 (newly added) 4.00 20.10

111 100m at left side DK625+500 (newly added) 1.60 7.90

112 100m at left side DK627+500 (newly added) 1.50 7.50

113 150m at right side of LDK533+600 8.41 10.00

80m at left side of LDK535+100 2.37 3.00

80m at right side of LDK535+350 0.26 0.30

30m at left side of LDK535+600 0.39 0.50

114 At left side of LDK548+400 18.00 85.00

115 At left side of LDK549+600 10.00 40.00

116 At left side of LDK554+900 10.60 60.00

117 At right side of LDK557+600 7.00 20.00

118 At left side of LDK562+000 15.00 60.00

119 At left side of LDK574+400 2.00 30.50

At left side of LDK577+840 0.93 44.40

120 At right side of LDK579+500 5.00 25.00

121 At right side of LDK581+200 5.07 15.00

123 At left side of LDK584+750 4.67 15.00

124 At right side of LDK583+300 5.00 15.00

125 At left side of LDK589+200 5.67 20.00

At left side of LDK589+580 3.67 12.00

126 At left side of LDK592+500 5.67 22.00

127 At left side of LDK596+650 7.67 11.00

128 At left side of LDK599+700 5.00 30.00

129 At left side of LDK602+800 4.80 40.00

At right side of LDK604+500 7.00 50.00

Beijing OASIS Environmental Protection Technology Co., Ltd. 92

Page 106: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

130 At right side of LDK609+700 4.33 12.00

131 At right side of LDK610+800 7.33 15.00

At left side of LDK612+880 3.33 8.00

At right side of LDK613+700 6.23 12.00

At right side of LDK614+700 2.87 11.00

132 At right side of LDK615+600 4.67 16.00

Total 350.85 1165.50

133 Zhongwei City

200m at left side of DK629+214.07 1.33 1.50

134 150m at left side of DK630+030 (newly added) 1.00 10.00

135 200m at right side of DK634+058 1.33 1.20

136 150m at left side of DK637+794 1.80 1.30

137 150m at left side of DK639+450 (newly added) 0.70 15.00

138 150m at left side of DK643+900 1.33 1.50

139 200m at left side of DK644+900 0.67 1.50

140 150m at left side of DK646+402 0.67 1.50

141 700m at left side of DK649+670 0.67 1.50

142 At right of DK664+32 1.60 6.40

143 At right side of DK671+800 2.87 11.50

144 At left side of DK672+920 1.67 5.90

145 5000m at right side of DK676+150 (newly added)

0.50 1.00

146 800m at right of DK679+300 (newly added) 0.20 0.70

147 At left side of DK682+700 3.73 15.00

148 At right side of DK684+360 6.13 25.00

149 At left side of DK686+040 2.93 8.80

150 At right side of DK686+040 4.00 16.00

151 At right side of DK688+450 2.67 10.60

152 At right side of DK690+210 1.33 4.80

153 At left side of DK691+500 2.00 8.00

154 At left side of DK692+280 0.67 3.30

155 In the south side of DK666+220 3.53 23.50

156 In the south side of DK666+900 0.67 4.69

157 In the north side of DK667+400 2.80 20.00

158 In the south side of DK667+800 0.47 5.90

159 In the north side of DK668+500 0.10 1.50

160 In the north side of DK671+180 0.37 4.60

161 280m at left side of DK694+100 10.67 65.00

162 Jinsha Village Borrow Pit of Yuding Township 5.60 12.00

163 Yongxing Village Lucaowan Borrow Pit 2.50 10.00

164 BLK724+600 Borrow Pit 1.20 9.50

Subtotal 67.71 308.69

165 Yinchuan City

At right side of LDK616+600 8.33 28.00

At right side of LDK620+780 12.67 65.80

166 At right side of LDK629+300 3.27 16.90

167 At left side of LDK636+580 5.73 29.80

1900m at right side of LDK638+200 3.60 18.70

Beijing OASIS Environmental Protection Technology Co., Ltd. 93

Page 107: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

100m at left side of LDK639+200 2.07 10.70

168 At left side of LDK642+100 10.00 52.00

At right side of LDK645+200 3.73 19.40

169 At right side of modified LDK661+300 12.40 40.00

At left side of modified LDK663+500 2.93 15.00

At left side of modified LDK664+940 24.07 60.00

At right side of modified LDK665+050 12.60 20.00

170 At right side of LDK677+120 43.40 93.50

At right side of LDK689+000 80.13 186.50

Subtotal 224.93 656.30

Total 1313.32 5208.93

Appendix 2. Details of the spoil grounds of Taiyuan-Zhongwei (Yinchuan) Railway

Table of Monitored Spoil Grounds along the Whole Line

Prov

ince S.N. Name of Spoil

GroundRelative Railway Mileage

Distance (Left &

Right) (m)

County, Township,

Village

Volume of discarded

soil (104m3)

Land Occupation Area

(mu)

Land Occupation Area (hm2)

Shan

xi P

rovi

nce 1 Mujiazhai Spoil

GroundDK89+650 34 on the

rightMujiazhai

Village, Wenshui County

11.5 17.1 1.14

2 Madong Village Spoil Ground

DK90+100 100 on the left

Madong Village,

Wenshui County

2.9 4 0.27

3 Maxi Village 1# Spoil Ground

DK91+400 240 on the left

Maxi Village, Wenshui County

10.8 20.3 1.35

4 Maxi Village 2# Spoil Ground

DK91+450 360 on the left

Maxi Village, Wenshui County

7.8 11.8 0.79

5 Wujiayuan 1# Spoil Ground

DK93+070 407 on the right

Wujiayuan Village,

Xinghuacun Town, Fenyang

City

14 10.1 0.67

6 Wujiayuan 2# Spoil Ground

DK94+500 299 on the right

Wujiayuan Village,

Xinghuacun Town, Fenyang

City

28 16.9 1.13

7 Xinghua 1# Spoil Ground

DK95+578 653 on the right

Anshang Village,

Xinghuacun Town, Fenyang

City

21 19.4 1.29

8 Anshang 1# Spoil Ground

DK96+650 575 on the right

Anshang Village,

Xinghuacun Town, Fenyang

City

18 21.8 1.45

9 Xinghua 2# Spoil Ground

DK97+300 405 on the right

Anshang Village,

Xinghuacun Town, Fenyang

City

27 14.1 0.94

Beijing OASIS Environmental Protection Technology Co., Ltd. 94

Page 108: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

10 Xiaoxiangzhai 1# Spoil Ground

DK98+000 447 on the right

Xiaoxiangzhai Village,

Xinghuacun Town, Fenyang

City

10 11.2 0.75

11 Xiaoxiangzhai 2# Spoil Ground

DK98+810 644 on the right

Xiaoxiangzhai Village,

Xinghuacun Town, Fenyang

City

18 17.1 1.14

12 Spoil Ground at the entrance of

Xiaoxiangzhai 1# Tunnel

DK99+900 150 on the right

Xiaoxiangzhai Village,

Xinghuacun Town, Fenyang

City

3.4 10 0.67

13 Spoil Ground between

Xiaoxiangzhai 1# and 2# Tunnels

DK100+600 50 on the left Zhangshang Village,

Xinghuacun Town, Fenyang

City

30.2 33.2 2.21

14 Exit of Xiaoxiangzhai 2#

Tunnels

DK100+900 32 on the right

Zhangshang Village,

Xinghuacun Town, Fenyang

City

0.86 2.6 0.17

15 Spoil Ground of Meiyaogou 1# Major Bridge

DK101+100 20 on the left Zhangshang Village,

Xinghuacun Town, Fenyang

City

3.3 15.3 1.02

16 1# Spoil Ground for cutting of Chaoyangpo

Section

DK101+700 12 on the left Zhangshang Village,

Xinghuacun Town, Fenyang

City

4.2 5.8 0.39

17 2# Spoil Ground for cutting of Chaoyangpo

Section

DK101+800 30 on the left Zhangshang Village,

Xinghuacun Town, Fenyang

City

11.2 10.5 0.70

18 Spoil Ground at the entrance of Chaoyangpo 1#

Tunnel

DK102+400 23 on the left Chaoyangpo Village,

Jiajiazhuang Town, Fenyang

City

12.1 18.1 1.21

19 Spoil Ground Spoil Ground

between Chaoyangpo 1# and 2# Tunnels

DK102+750 77 on the left Chaoyangpo Village,

Jiajiazhuang Town, Fenyang

City

26 25.5 1.70

20 Exit of Chaoyangpo 2#

Tunnel

DK103+750 108 on the left

Chaoyangpo Village,

Jiajiazhuang Town, Fenyang

City

3.7 4.8 0.32

21 1# Spoil Ground of Songshunao

Subgrade

DK103+900 20 on the left Xiachijia Village,

Yudaohe Town, Fenyang

City

21.3 19.7 1.31

22 2# Spoil Ground of Songshunao

Subgrade

DK104+300 30 on the left Xiachijia Village,

Yudaohe Town, Fenyang

City

7.1 14.1 0.94

23 Spoil Ground of Songshunao 2# Major Bridge

DK104+500 24 on the left Xiachijia Village,

Yudaohe Town, Fenyang

City

0.3 1 0.07

Beijing OASIS Environmental Protection Technology Co., Ltd. 95

Page 109: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

24 Spoil Ground of Xiachijia 1#

Medium Bridge

DK104+900 20 respectively on the left and right

Xiachijia Village,

Yudaohe Town, Fenyang

City

2.2 8.9 0.59

25 Spoil Ground of Xiachijia 1#

Major Bridge

DK106+000 24 on the right

Xiachijia Village,

Yudaohe Town, Fenyang

City

1.7 7.22 0.48

26 Spoil Ground of Xiachijia 2#

Major Bridge

DK106+550 50 on the left Xiachijia Village,

Yudaohe Town, Fenyang

City

1.1 4.5 0.30

27 Spoil Ground of Hongquangou Major Bridge

DK107+700 27 on the left Wangshengzhuang, Yudaohe

Town, Fenyang City

0.3 0.9 0.06

28 1# Spoil Ground of Zhaozhuang Major Bridge

DK108+400 410 on the right

Wangsheng Zhaozhuang

Village, Yudaohe

Town, Fenyang City

0.6 5.5 0.37

29 2# Spoil Ground of Zhaozhuang Major Bridge

DK108+450 28 on the left Wangsheng Zhaozhuang

Village, Yudaohe

Town, Fenyang City

1 15.1 1.01

30 Zhaozhuang 2# Spoil Ground

DK109+700 608 on the right

Hougao Village,

Yudaohe Town, Fenyang

City

17.9 26 1.73

31 Spoil Ground of Xiangziyuan 1# Major Bridge

DK109+700 57 on the left Xiangziyuan Village,

Yudaohe Town, Fenyang

City

4.5 9 0.60

32 Spoil Ground of Xiangziyuan

Subgrade

DK110+300 236 on the right

Xiangziyuan Village,

Yudaohe Town, Fenyang

City

2.6 5 0.33

33 Spoil Ground of Xiangziyuan 2# Major Bridge

DK110+150 52 on the left Xiangziyuan Village,

Yudaohe Town, Fenyang

City

2 6.6 0.44

34 Spoil Ground of Yujiayuan 1# Major Bridge

DK111+150 25 on the left Xiangziyuan Village,

Yudaohe Town, Fenyang

City

4.2 14.5 0.97

35 Hejiayuan Spoil Ground

DK111+400 832 on the left

Yujiayuan Village,

Yudaohe Town, Fenyang

City

5.7 17.7 1.18

36 Spoil Ground of Yujiayuan 2# Major Bridge

DK111+459 30 on the left Yujiayuan Village,

Yudaohe Town, Fenyang

City

3.5 8.2 0.55

37 1# Spoil Ground of Chujiagou

Station

DK111+800 124 on the left

Yujiayuan Village & Chujiagou

Village,,

14.3 22.1 1.47

Beijing OASIS Environmental Protection Technology Co., Ltd. 96

Page 110: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Yudaohe Town, Fenyang

City38 2# Spoil Ground

of Chujiagou Station

DK111+900 837 on the left

Yujiayuan Village & Chujiagou

Village, Yudaohe

Town, Fenyang City

134.3 41.35 2.76

39 3# Spoil Ground of Chujiagou

Station

DK112+600 50 on the left Potou Village, Yudaohe

Town, Fenyang City

  7.65 0.51

40 Spoil Ground of Xiangyang River

Super-major Bridge

DK112+900 36 on the left Potou Village, Yudaohe

Town, Fenyang City

2.5 7.5 0.50

41 Spoil Ground at the entrance of Huangzhang 1#

Tunnel

DK113+500 20 on the left Potou Village, Yudaohe

Town, Fenyang City

21 41 2.73

42 Spoil Ground at the exit of

Huangzhang 1# Tunnel

DK115+400 10 on the left Huangzhang Village,

Lijiazhuang Town, Fenyang

City

11.7 30 2.00

43 Xiegou Spoil Ground

DK116+300 21 on the left Huangzhang Village,

Lijiazhuang Town, Fenyang

City

5.5 17.8 1.19

44 Spoil Ground at the entrance of Huangzhang 2#

Tunnel

DK116+600 32 on the right

Huangzhang Village,

Lijiazhuang Town, Fenyang

City

6.7 11.5 0.77

45 Spoil Ground at the exit of

Huangzhang 2# Tunnel

DK118+000 108 on the left

Qianzhuang Village,

Lijiazhuang Town, Fenyang

City

29.4 66 4.40

46 Spoil Ground at the exit of

Huangzhang 3# Tunnel

DK118+700 23 on the left Shanglinshe Village,

Lijiazhuang Town, Fenyang

City

13.1 22 1.47

47 Spoil Ground at the entrance of

Lvliang Mountain Tunnel

YDK119+150 10m on the right

Shanglinshe Village,

Lijiazhuang Township,

Fenyang City

46.4 95.2 6.35

48 0# Inclined Shaft Spoil Ground of

Lvliang Mountain Tunnel

DK120+200 182m on the left

Yangjiazhuang Village,

Lijiazhuang Township,

Fenyang City

26.2 103.7 6.91

49 1# Inclined Shaft Spoil Ground of

Lvliang Mountain Tunnel

DK122+000 1180m on the left

Haojiazhuang Village,

Lijiazhuang Township,

Fenyang City

42.9 90.57 6.04

50 2# Inclined Shaft Spoil Ground of

Lvliang Mountain Tunnel

YDK124+200 1561m on the right

Xiangyang Village,

Yudaohe Town, Fenyang

City

36.8 95.2 6.35

51 3# & 4# Inclined Shaft Spoil Ground of

Lvliang

DK133+900 1711 on the right

Jiuliwang Village,

Wucheng Town, Lishi

98.2 136.1 9.07

Beijing OASIS Environmental Protection Technology Co., Ltd. 97

Page 111: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Mountain Tunnel District

52 5# Inclined Shaft Spoil Ground of

Lvliang Mountain Tunnel

DK135+200 1366 on the right

Shuijinggou Village,

Wucheng Town, Lishi

District

53.9 77 5.13

53 Spoil Ground at the exit of Lvliang

Mountain Tunnel

DK139+500 358 on the left

Wucheng Town, Lishi

District

43.4 92 6.13

54 Spoil Ground at the entrance of

Wucheng 1# Tunnel

DK141+200 23 on the left Majiata Village,

Wucheng Town, Lishi

District, Lvliang City

6 17 1.13

55 Spoil Ground of Wucheng Tunnel

DK142+600 44 on the left Wucheng Reservoir, Wucheng

Town, Lishi District,

Lvliang City

13.5 48 3.20

56 Spoil Ground of Wucheng 2#

Tunnel

DK142+800 105 on the right

Lijiagou Village,

Wucheng Town, Lishi

District, Lvliang City

3.5 13 0.87

57 Spoil Ground of Shangsihao 1# &

2# Tunnels

DK144+800 24 on the right

Shangsihao Village,

Wucheng Town, Lishi

District, Lvliang City

16.1 33 2.20

58 Spoil Ground of Xiasihao 1# & 2#

Tunnels

DK147+200 70 on the left Xiasihao Village,

Wucheng Town, Lishi

District, Lvliang City

7.9 28 1.87

59 1# Spoil Ground of Longfangli 1#

& 2# Tunnels

DK148+550 47 on the left Longfangli Village,

Wucheng Town, Lishi

District, Lvliang City

4 6 0.40

60 2# Spoil Ground of Longfangli 1#

& 2# Tunnels

DK148+600 6 on the left Longfangli Village,

Wucheng Town, Lishi

District, Lvliang City

8.8 14 0.93

61 Spoil Ground of Beihaigou Major

Bridge

DK149+200 10 on the right

Youfangping Village,

Wucheng Town, Lishi

District, Lvliang City

8 7 0.47

62 1# Spoil Ground of Youfangping

Tunnel

DK149+950 21 on the left Youfangping Village,

Wucheng Town, Lishi

District, Lvliang City

12 14 0.93

63 2# Spoil Ground of Youfangping

Tunnel

DK150+300 68 on the left Youfangping Village,

Wucheng Town, Lishi

District, Lvliang City

8 18 1.20

Beijing OASIS Environmental Protection Technology Co., Ltd. 98

Page 112: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

64 3# Spoil Ground of Youfangping

Tunnel

DK150+600 112 on the left Youfangping Village,

Wucheng Town, Lishi

District, Lvliang City

7 10 0.67

65 DIK151+225 Spoil Ground

DIK151+225 33 on the right

Shangwangying Village, Wucheng

Town, Lishi District,

Lvliang City

14 13 0.87

66 Spoil Ground of Shangwangying

1# Medium Bridge

DIK151+400 153 on the right

Shangwangying Village, Wucheng

Town, Lishi District,

Lvliang City

5 3 0.20

67 DIK151+725Spoil Ground

DIK151+725 25 on the right

Shangwangying Village, Wucheng

Town, Lishi District,

Lvliang City

7 11 0.73

68 Spoil Ground of Xiawangying 1#

Tunnel

DIK152+100 22 on the right

Shangwangying Village, Wucheng

Town, Lishi District,

Lvliang City

7 13 0.87

69 Spoil Ground of Xiawangying Super-major

Bridge

DIK152+650 25 on the left Xiawangying Village,

Wucheng Town, Lishi

District, Lvliang City

4 4 0.27

70 DIK153+412Spoil Ground

DIK153+412 83 on the right

Xiawangying Village,

Wucheng Town, Lishi

District, Lvliang City

4.5 13 0.87

71 Spoil Ground of Haojiaya 2#

Major Bridge

DIK154+200 175 on the right

Xiawangying Village,

Wucheng Town, Lishi

District, Lvliang City

7.5 5 0.33

72 Spoil Ground of Tuerping Major

Bridge

DIK155+800 69 on the right

Tuping Village, Wucheng

Town, Lishi District,

Lvliang City

12 10 0.67

73 Spoil Ground of Yangbei Medium

Bridge

DIK155+600 11 on the right

Tuping Village, Wucheng

Town, Lishi District,

Lvliang City

6 12 0.80

74 Spoil Ground of Yangbeizhegou

1# Tunnel

DIK155+950 20 on the left Beizhegou Village,

Wucheng Town, Lishi

District, Lvliang City

11 13 0.87

75 Spoil Ground Yangbeizhegou

2# Tunnel

DIK156+200 59 on the left Beizhegou Village,

Wucheng Town, Lishi

District, Lvliang City

6 9 0.60

Beijing OASIS Environmental Protection Technology Co., Ltd. 99

Page 113: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

76 Spoil Ground of Beizhegou 2# Major Bridge

DIK156+400 24 on the right

Beizhegou Village,

Wucheng Town, Lishi

District, Lvliang City

8 8 0.53

77 1# Spoil Ground of Yiju 2# Tunnel

DIK156+800 58 on the right

Shanglouqiao Village,

Tianjiahui Street, Lishi

District, Lvliang City

13.5 26 1.73

78 2# Spoil Ground of Yiju 2# Tunnel

DIK158+000 180 on the right

Shanglouqiao Village,

Tianjiahui Street, Lishi

District, Lvliang City

8.8 12 0.80

79 1# Spoil Ground of Shanglouqiao

Tunnel

DIK158+600 673 on the left

Shanglouqiao Village,

Tianjiahui Street, Lishi

District, Lvliang City

14.9 21 1.40

80 2# Spoil Ground of Shanglouqiao

Tunnel

DIK159+500 85 on the left Chejiawan Village,

Tianjiahui Street, Lishi

District, Lvliang City

17.7 54 3.60

81 Spoil Ground of Xialouqiao 1#

Tunnel

DIK160+800 23 on the left Chejiawan Village,

Tianjiahui Street, Lishi

District, Lvliang City

3.1 9 0.60

82 Spoil Ground of Xialouqiao 2#

Tunnel

DIK161+500 100 on the right

Xialouqiao Village,

Tianjiahui Street, Lishi

District, Lvliang City

8.7 25 1.67

83 Spoil Ground of Xialouqiao 3#

Tunnel

DIK162+550 35 on the left Xialouqiao Village,

Tianjiahui Street, Lishi

District, Lvliang City

27 47 3.13

84 Entrance of Lishi Tunnel

DK163+364 100m on the left

Houmajia Village,

Tianjiahui Street Office, Lishi District

36 88 5.87

85 Lishi Tunnel 1# Inclined Shaft

DK168+500 200m on the left

Baicaoyan Village,

Chengbei Town, Lishi

District

48 80 5.33

86 Lishi Tunnel 2# Inclined Shaft

(I)

DK171+900 Above the tunnel

Gaolimao Village,

Xishuba Street Office, Lishi

District

12 57 3.80

87 Lishi Tunnel 2# Inclined Shaft

(II)

DK171+300 900m on the right

Gaolimao Village,

Xishuba Street Office, Lishi

District

18 44 2.93

88 Exit of Lishi Tunnel

(I)

DK173+700 150m on the right

Shuangwudu Village,

Xishuba Street

15.6 46 3.07

Beijing OASIS Environmental Protection Technology Co., Ltd. 100

Page 114: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Office, Lishi District

89 Exit of Lishi Tunnel

(II)

Modified DK174+500

145m on the right

Shuangwudu Village,

Xishuba Street Office, Lishi

District

17.23 61 4.07

90 Spoil Ground of Zhaojiazhuang

Tunnel

DIK178+350 15 on the right

Xiashuixi Village,

Fengshan Street Office, Lishi District, Lvliang City

17.2 20 1.33

91 Qizegou Spoil Ground

DIK181+900 41 on the right

Qizegou Village,

Jiaokou Street Office, Lishi

District

18 53 3.53

92 Qiaojiata Spoil Ground

Modified DK183+400

24 on the right

Qiaojiata Village,

Jiaokou Street Office, Lishi

District

16.53 62 4.13

93 Wangjiata 1# Spoil Ground

Modified DK183+750

31 on the right

Wangjiata Village,

Jiaokou Street Office, Lishi

District

2.6 14 0.93

94 Wangjiata 2# Spoil Ground

Modified DK184+450

33 on the left Wangjiata Village,

Jiaokou Street Office, Lishi

District

7.6 6 0.40

95 Wangjiata 3# Spoil Ground

Modified DK184+400

43 on the right

Wangjiata Village,

Jiaokou Street Office, Lishi

District

8 24 1.60

96 Wangjiata 4# Spoil Ground

Modified DK184+450

94 on the right

Wangjiata Village,

Jiaokou Street Office, Lishi

District

5.2 8 0.53

97 Wangjiata 5# Spoil Ground

Modified DK184+850

10 on the left Wangjiata Village,

Jiaokou Street Office, Lishi

District

5 33 2.20

98 Liangjiahui 3# Spoil Ground

Modified DK186+200

99 on the right

Liangjiahui Village,

Lijiawan Township,

Liulin County

7 19 1.27

99 Xialiujiashan 3# Spoil Ground

Modified DK187+400

656 on the left

Xialiujiashan Village,

Lijiawan Township,

Liulin County

2.5 10 0.67

100 Xialiujiashan 2# Spoil Ground

Modified DK187+550

22 on the right

Xialiujiashan Village,

Lijiawan Township,

Liulin County

5.8 33 2.20

101 Xialiujiashan 3# Spoil Ground

Modified DK187+700

13 on the right

Xialiujiashan Village,

Lijiawan Township,

Liulin County

0.6 3 0.20

102 Xialiujiashan 4# Spoil Ground

Modified DK188+350

18 on the left Xialiujiashan Village,

Lijiawan

16.8 29 1.93

Beijing OASIS Environmental Protection Technology Co., Ltd. 101

Page 115: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Township, Liulin County

103 Xialiujiashan 5# Spoil Ground

Modified DK187+700

60 on the left Xialiujiashan Village,

Lijiawan Township,

Liulin County

17 28.6 1.91

104 Wangjiahui 1# Spoil Ground

Modified DK190+200

35m on the right

Wangjiahui Village &

Shangbaishuang Village, Lijiawan

Township, Liulin County

32 39 2.60

105 Wangjiahui 2# Spoil Ground

Modified DK190+300

126m on the left

Wangjiahui Village &

Shangbaishuang Village, Lijiawan

Township, Liulin County

7.2 17 1.13

106 Shangbaishuang 1# Spoil Ground

(Tunnel)

Modified DK191+450

38m Shangbaishuang Village &

Xiabaishuang Village,

Lijiawan Township,

Liulin County

10 37.3 2.49

107 Xiabaishuang 1# Spoil Ground

Modified DK192+500

59m on the left

Xiabaishuang Village,

Lijiawan Township,

Liulin County

4.9 7 0.47

108 Xiabaishuang 2# Spoil Ground

Modified DK192+600

67m on the right

Xiabaishuang Village,

Lijiawan Township,

Liulin County

5.7 26 1.73

109 Xiabaishuang 3# Spoil Ground

Modified DK192+200

21m on the right

Xiabaishuang Village,

Lijiawan Township,

Liulin County

7.8 11 0.73

110 Wangjiazhuang 1# Spoil Ground

Modified DIIK194+200

340m on the left

Wangjiazhuang Village,

Liulin Town, Liulin County

6 3.5 0.23

111 Wangjiazhuang 2# Spoil Ground

Modified DK193+850

131m on the right

Wangjiazhuang Village & Caijiagou

Village, Liulin Town, Liulin

County

28 87 5.80

112 Huotangzhai 1# Spoil Ground

Modified DIIK195+600

234m on the left

WangjiazhuanVillage, Liulin Town, Liulin

County

8.8 14.5 0.97

113 Huotangzhai 2# Spoil Ground

Modified DIIK195+800

90m on the left

Yagou Village, Liulin Town,

Liulin County

4.2 10 0.67

114 Huotangzhai 3# Spoil Ground

Modified DIIK196+500

Above tunnel Yagou Village, Liulin Town,

Liulin County

43.4 33.5 2.23

115 Huotangzhai 4# Spoil Ground

Modified DIIK195+800

Under bridge Yagou Village, Liulin Town,

Liulin County

2.5 4 0.27

116 Huotangzhai 5# Spoil Ground

Modified DIIK196+200

27m on the left

Yagou Village, Liulin Town,

Liulin County

3.5 10 0.67

Beijing OASIS Environmental Protection Technology Co., Ltd. 102

Page 116: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

117 Zhaidong 1# Spoil Ground

Modified DIIK196+900

Above tunnel Yagou Village, Liulin Town,

Liulin County

4.3 22.5 1.50

118 Zhaidong 2# Spoil Ground

Modified DIIK196+900

184m on the right

Yagou Village, Liulin Town,

Liulin County

17 23.5 1.57

119 Spoil Ground of Zhaidong Subgrade

Modified DIIK197+400

48m on the right

Zhaidong Village, Liulin Town, Liulin

County

23.4 17 1.13

120 Spoil Ground of Longmenhui

Sanchuan River Super-major

Bridge

Modified DIIK198+300

318m on the right

Zhaidong Village, Liulin Town, Liulin

County

4.1 5 0.33

121 1# Spoil Ground of Liulin South

Station

Modified DIIK198+400

365m on the left

Longmenhui Village, Liulin Town, Liulin

County

11.9 31 2.07

122 2# Spoil Ground of Liulin South

Station

Modified DIIK198+850

50m on the left

Longmenhui Village, Liulin Town, Liulin

County

21 66.8 4.45

123 3# Spoil Ground of Liulin South

Station

Modified DIIK199+500

990m on the left

Longmenhui Village, Liulin Town, Liulin

County

10 46.6 3.11

124 Spoil Ground of Qinglong Tunnel

Modified DIIK200+400

981m on the left

Qinglong Village, Liulin Town, Liulin

County

20 57 3.80

125 Spoil Ground of Liulin Sanchuan

River Super-major Bridge

Modified DIIK205+100

81m on the right

Dujiawan Village, Mucun

Town, Liulin County

3.6 9.5 0.63

126 Dujiawan Spoil Ground

Modified DIIK205+600

241m on the right

Dujiawan Village, Mucun

Town, Liulin County

17 93 6.20

127 Spoil Ground at the exit of Mucun

1# Tunnel

Modified DK206+550、M

odified DK206+600

72 on the right, 111 on

the left

Mucun I Village

Committee, Mucun Town, Liulin County

16.6 63 4.20

128 Spoil Ground of Mucun II Village

Committee Subgrade

Modified DK207+200

67 on the right

Mucun II Village

Committee, Mucun Town, Liulin County

20 58.5 3.90

129 Spoil Ground at the entrance of Liulin Tunnel

DK207+600 38 on the left Mucun III Village Committee, Mucun Town, Liulin County

31.3 106 7.07

130 Spoil Ground of Liulin Tunnel 1#

Inclined Shaft

DK211+500 324 on the left

Gaohong Village,

Xuecun Town, Liulin County

27 101.5 6.77

131 Spoil Ground of Liulin Tunnel 2#

Inclined Shaft

DK216+116 1171 on the left

Jundu Village, Xuecun Town, Liulin Count

31 130.5 8.70

Shaa

nxi

Prov

ince

132 Wubu 3# Spoil Ground

DK218+648 221 on the right

Songjiachuan Village,

Songjiachuan Town, Wubu

County

18 39.8 2.65

133 Wubu 4# Spoil Ground

DK220+220 56 on the left Nanwangjia Village &

Qianmiaoshan Village,

Songjiachuan

19 54.8 3.65

Beijing OASIS Environmental Protection Technology Co., Ltd. 103

Page 117: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Town, Wubu County

134 Spoil Ground at the exit of

Baishuping Tunnel

DK221+780 39 on the left HoumiaoshanVillage,

Songjiachuan Town, Wubu

County

10 35 2.33

135 Wubu 1# Spoil Ground

DK217+000 About 300m on the right

Songjiachuan Village,

Songjiachuan Town, Wubu

County

14.6 23.9 1.59

136 Spoil Ground of Baijiagou Tunnel

DK217+742 200m on the left

Songjiachuan Village,

Songjiachuan Town, Wubu

County

10 14 0.93

137 Houmiaoshan Spoil Ground

DK222+200 50m on the right

HoumiaoshanVillage,

Songjiachuan Town, Wubu

County

2 8 0.53

138 1# Spoil Ground of Xingzita

Tunnel

DK222+360 200m on the left

Renjiashan Village,

Songjiachuan Town, Wubu

County

14 18 1.20

139 Qinghegou 1# Spoil Ground

DK222+900 76m on the left

Renjiashan Village,

Songjiachuan Town, Wubu

County

10 17 1.13

140 Qinghegou 2# Spoil Ground

DK223+400 28m on the right

Zhangjiayan Village,

Songjiachuan Town, Wubu

County

8 21 1.40

141 Wubu Station 1# Spoil Ground

DK223+900 20m on the left

Zhangjiayan Village,

Songjiachuan Town, Wubu

County

70 69.7 4.65

142 Wubu Station 2# Spoil Ground

DK224+800 60m on the left

Zhangjiayan Village,

Songjiachuan Town, Wubu

County

40 58 3.87

143 Wubu Station 3# Spoil Ground

DK225+317 20m on the left

Zhangjiayan Village,

Songjiachuan Town, Wubu

County

45 50 3.33

144 Wubu Station 4# Spoil Ground

DK225+550 16m on the left

Zhangjiayan Village,

Songjiachuan Town, Wubu

County

28 22.8 1.52

145 Wubu Station 5# Spoil Ground

DK224+480 76m on the right

Zhangjiayan Village,

Songjiachuan Town, Wubu

County

5 15.5 1.03

146 Spoil Ground of Qianwangjiashan 1# Major Bridge

DK225+800 50m on the left

Qianwangjiashan Village,

Songjiachuan Town, Wubu

County

18 25 1.67

147 Qianwangjiashan Spoil Ground

DK226+450 100m on the right

Qianwangjiashan Village,

Songjiachuan

16 31 2.07

Beijing OASIS Environmental Protection Technology Co., Ltd. 104

Page 118: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Town, Wubu County

148 Entrance of Wubu Tunnel

DK227+000 255 on the left

Qianwangjiashan, Songchuan Town, Wubu

County

25 96.2 6.41

149 1# Spoil Ground of Wubu Tunnel 1# Inclined Shaft

DK229+900 900 on the right

Tianjiaxia Village, Yihe Town, Suide

County

33 54 3.60

150 2# Spoil Ground of Wubu Tunnel 1# Inclined Shaft

DK229+900 900 on the right

Tianjiaxia Village, Yihe Town, Suide

County151 Wubu Tunnel 2#

Inclined ShaftDK231+800 255 on the

rightLujiawa

Village, Yihe Town, Suide

County

44.3 82 5.47

152 Wubu Tunnel 3# Inclined Shaft

DK236+600 425 on the left

Xinguandao, Yihe Town,

Suide County

28.4 33 2.20

153 Wubu Tunnel 4# Inclined Shaft

DK237+700 100 on the right

Qiaoshang Village, Yihe Town, Suide

County

31.7 66 4.40

154 Exit of Wubu Tunnel

DK239+700 22 on the left

Huobaiwan Village, Yihe Town, Suide

County

25 73 4.87

155 Subgrade Spoil Ground at the

entrance of Wubu Tunnel

DK227+000 126 on the left

Qianwangjiashan, Songchuan Town, Wubu

County

15 42 2.80

156 Lougou 1# Spoil Ground

DK239+579 144 on the right

Lougou Village, Yihe Town, Suide

County

29 59.19 3.95

157 Yihe Station 1# Spoil Ground

DIK240+550 46 on the right

Hejiajian, Yihe Town, Suide

County

14 35 2.33

158 Yihe Station 2# Spoil Ground

DIK240+815 69 on the right

Hejiajian, Yihe Town, Suide

County

15 71.1 4.74

159 Yihe Town 1# Spoil Ground

Modified DK242+650

45 on the right

Yangjiaqu Village, Yihe Town, Suide

County

26.3 12.84 0.86

160 Xizhigou Spoil Ground

Modified DK243+500

427 on the right

Xizhigou Village, Yihe Town, Suide

County

3.9 5.34 0.36

161 2# Spoil Ground of Danangou

Tunnel

Modified DK245+100

35m on the right

Xuejiasi Village,

Mantangchuan Township,

Suide County

12 42.15 2.81

162 Spoil Ground of Xuejiasi Tunnel

Modified DK246+700

124m on the left

Zhaojiapu Village,

Mantangchuan Township,

Suide County

16.2 45.9 3.06

163 Spoil Ground of Xizhigou 2#

Tunnel

Modified DK244+200

50m Leijiagelao Village,

Mantangchuan Township,

Suide County

12.1 38.96 2.60

164 Spoil Ground of Danangou

Tunnel

Modified DK244+900

23m on the left

Xuejiash Village,

Mantangchuan Township,

Suide County

9.1 45 3.00

Beijing OASIS Environmental Protection Technology Co., Ltd. 105

Page 119: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

165 Spoil Ground at the entrance of Suide Tunnel

DK247+100 242 on the right

Zhaojiabao Village,

Mantangchuan Township,

Suide County

67.7 65 4.33

166 DK247+700 15 on the left Zhaojiabao Village,

Mantangchuan Township,

Suide County

5 23.1 1.54

167 Spoil Ground of Suide Tunnel 1# Inclined Shaft

DK249+000 400 on the right

Dabaijiagou, Mantangchuan

Township, Suide County

81.5 82.5 5.50

168 Spoil Ground of Suide Tunnel 2# Inclined Shaft

DK253+500 700 on the right

Gaojiaya, Mantangchuan

Township, Suide County

48.3 113 7.53

169 Suide Tunnel 3# Inclined Shaft

DK255+800 20m on the left

Wanghepu Village, Xindian

Township, Suide County

30.9 18.62 1.24

170 Suide Tunnel 4# Inclined Shaft

DK259+100 100m on the left

Liujiawan Village, Xindian

Township, Suide County

33 29 1.93

171 Exit of Suide Tunnel

DK259+380 60m on the left

Liujiawan Village, Xindian

Township, Suide County

5.5 55 3.67

172 Suide Station Spoil Ground

    Dingjiagou Village, Suide

County

20 97.5 6.50

173 Spoil Ground at the entrance of

Baijiashan Tunnel

DK267+000 260 on the right

Yujiagou Village,

Zhangjiabian Township,

Suide County

19 61 4.07

174 Spoil Ground of Baijiashan Tunnel 1#

Inclined Shaft

DK267+200 600 on the right

Majiagou Village,

Zhangjiabian Township,

Suide County

23 22 1.47

175 Spoil Ground of Baijiashan Tunnel 2#

Inclined Shaft

DK269+900 150 on the left

Jinjiagou Village, Suide

County

23 18 1.20

176 Spoil Ground at the exit of Baijiashan

Tunnel

DK271+800 300 on the right

Zhangjiabian Village,

Shijiawan Town, Suide

County

25 121 8.07

177 Spoil Ground at the entrance of Miaojiaping 1#

Tunnel

Modified DK279+800

150 on the right

Dongjiawan Village, Zizhou

County

15 33 2.20

178 Spoil Ground at the exit of

Miaojiaping 1# Tunnel

Modified DK281+360

80 on the right

Miaojiaping Town, Zizhou

County

10.6 28.7 1.91

179 Spoil Ground at the entrance of Miaojiaping 2#

Tunnel

Modified DK282+300

3200 on the left

Miaojiaping Town, Zizhou

County

15.3 70.8 4.72

Beijing OASIS Environmental Protection Technology Co., Ltd. 106

Page 120: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

180 1#Spoil Ground of Miaojiaping

2# Tunnel

DK284+230 150 on the left

Dujiagou Village,

Miaojiaping Town, Zizhou

County

10 28 1.87

181 2# Spoil Ground of Miaojiaping

2# Tunnel

DK284+000 1100 on the left

Dujiagou Village,

Miaojiaping Town, Zizhou

County

4 35.5 2.37

182 Dujiagou (at the entrance of Duijiushan

Tunnel) Spoil Ground

DK284+200 620m on the left

Dujiagou Village,

Miaojiaping Town, Zizhou

County

9.5 40.569 2.70

183 Suqu Spoil Ground

DK285+520 160m on the left

Suqu Village, Shuanghuyu Town, Zizhou

County

16 79.047 5.27

184 Zhangjiazhai Spoil Ground

DK287+640 550m on the right

Qingshuigou Village,

Shuanghuyu Town, Zizhou

County

40 98.598 6.57

185 Lijiabian Spoil Ground

DK290+000 520m on the right

Lijiabian Village

Committee, Matigou Town, Zizhou County

22 72.536 4.84

186 Duanjiawan Spoil Ground

DK305+000 300m on the right

Duanjiawan Village

Committee, Matigou Town, Zizhou County

19 61.865 4.12

187 Qiaogou Spoil Ground

DK312+100 200m on the right

Qiaogou Village

Committee, Zhoujiajian

Town, Zizhou County

12 50.96 3.40

188 Zhangjiabian Spoil Ground

DK312+850 185m on the right

Zhangjiabian Committee, Zhoujiajian

Town, Zizhou County

22 33.287 2.22

189 Weijialou 1# Exit,

Weijialou 2# Entrance

DK330+908 79m on the right

Weijialou Village,

Weijialou Township, Hengshan

County

23.7 70 4.67

190 Weijialou 2# Exit,

Weijialou 3# Entrance

DK331+850 112m on the right

Weijialou Village,

Weijialou Township, Hengshan

County

14.6 80 5.33

191 Weijialou 3# Exit DK332+709 150m on the right

Wayaoqu Village,

Weijialou Township, Hengshan

County

14.6 52 3.47

192 Spoil Ground at the entrance of

Hengshan Tunnel

DK333+850 141m on the right

Wayaoqu Village,

Weijialou Township, Hengshan

County

39.4 126 8.40

193 Spoil Ground of Hengshan Tunnel

DK335+400 485m on the left

Yangjialou Village,

44.7 118 7.87

Beijing OASIS Environmental Protection Technology Co., Ltd. 107

Page 121: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

1# Inclined Shaft Weijialou Township, Hengshan

County194 Spoil Ground of

Hengshan Tunnel 2# Inclined Shaft

DK336+100 369m on the right

Yangjialou Village,

Weijialou Township, Hengshan

County

57.3 135 9.00

195 Spoil Ground Hengshan Tunnel 3# Inclined Shaft

DK342+550 249m on the right

Baishuqu Village,

Shuangcheng Township, Hengshan County;Madigou Village, Shiwan

Township

74.4 194 12.93

196 Spoil Ground at the exit of

Hengshan Tunnel

DK344+650 144m on the left

Gangcheng Village,

Shuangcheng Township, Hengshan

County

22.9 145 9.67

197 Dalumao Tunnel DK344+937 64m on the left

Gangcheng Village,

Shuangcheng Township, Hengshan

County

13.9 55 3.67

198 Ganghceng 1# Spoil Ground

DK345+407 27 on the left Gangcheng Village,

Shuangcheng Township, Hengshan

County

28 76.4 5.09

199 Ganghceng 2# Spoil Ground

DK345+445 151 on the left

Gangcheng Village,

Shuangcheng Township, Hengshan

County

34 66 4.40

200 Spoil Ground at the entrance of Xingwangmao

Tunnel

DK350+267 138m on the right

Wangliang Village,

Shuangcheng Township, Hengshan

County

61.5 142.3 9.49

201 Spoil Ground of Xingwangmao

Tunnel 1# Inclined Shaft

Modified DK351+800

700m on the right

Wangliang Village,

Shuangcheng Township, Hengshan

County

42.2 166 11.07

202 Spoil Ground of Xingwangmao

Tunnel 2# Inclined Shaft

Modified DK354+020

1050m on the right

Kongjiayan Village,

Shuangcheng Township, Hengshan

County

70.9 214 14.27

203 Spoil Ground of Xingwangmao

Tunnel 3# Inclined Shaft

DK356+240.2 211 on the left Xiaojiapan Village,

Gaojiagou Township, Jingbian County

43.6 179 11.93

204 Spoil Ground at the exit of

Xingwangmao

DK361+295 153 on the left

Baoqu Village, Gaojiagou Township,

52.7 99 6.60

Beijing OASIS Environmental Protection Technology Co., Ltd. 108

Page 122: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Tunnel Jingbian County

205 Baoqu Spoil Ground

DK365+750 (inconsistent

name but same mileage)

50 on the left Gaofeng Village,

Gaojiagou Township, Jingbian County

41 85 5.67

206 Jiajiawan Spoil Ground

DK373+250 (inconsistent

name but same mileage)

50 on the left Zhaozhuang Village,

Gaojiagou Township, Jingbian County

11 57 3.80

207 1 # Spoil Ground (across

Hekoumiao)

DK374+850 Under bridge Jiaonidun Village,

Gaojiagou Township, Jingbian County

45 42 2.80

208 2# Spoil Ground (across

Hekoumiao)

DK375+951.95 16m on the right

Jiaonidun Village,

Gaojiagou Township, Jingbian County

17 20 1.33

209 3# Spoil Ground (across

Hekoumiao)

DK376+879.06 16m on the right

Daqiaopan Village,

Gaoyang Qiaopan Town,

Jingbian County

17 20 1.33

210 DK384+500Spoil Ground

DK384+500 600m on the left

Xinxiang Government, Yangqiaopan

Town, Jingbian County

1.7 32 2.13

211 DK400+200Spoil Ground

DK400+200 1500m on the right

Zhanghuochang Village,

Zhangjiapan Town,

Jingbian County

1.5 22 1.47

212 Jingbian DK407+800 200 on the right

Zhangjiapan Town,

Jingbian County

15 50 3.33

213 Zhangliang Village

LDK519+500 500 on the right

Zhangliang Village,

Yanchangbao Township, Dingbian County, Shaanxi Province

13 51 3.40

214 Lannichi Village LDK528+500 200 on the right

Lannichi Village,

Yanchangbao Township, Dingbian County, Shaanxi

Province

8 56.5 3.77

215 Gaoquan Village LDK532+300 200 on the right

Gaoquan Village,

Yanchangbao Township, Dingbian County,

5 40.8 2.72

Beijing OASIS Environmental Protection Technology Co., Ltd. 109

Page 123: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Shaanxi Province

Nin

gxia 216 Same mileage DK549+100 150m on the

leftErdaogou

Village, Dashuikeng

Town, Yanchi Town

11 16.8 1.12

217   DK549+760 260m on the left

Erdaogou Village,

Dashuikeng Town, Yanchi

Town

30 44.4 2.96

218   DK551+850 157m on the left

Erdaogou Village,

Dashuikeng Town, Yanchi

Town

20 100.34 6.69

219   DK555+220 300m on the right

Hongjingzi Village,

Dashuikeng Town, Yanchi Town, Ningxia

28 100 6.67

220   DK570+880 400m on the right

Songbaozi Village,

Dashuikeng Town, Yanchi

Town

2 6.5 0.43

221   DK572+800 600m on the right

Xiejialiang Village,

Dashuikeng Town, Yanchi

Town

41 80 5.33

222   DK573+800 600m on the left

Yuhuangmiao Village,

Dashuikeng Town, Yanchi

Town

19 16.5 1.10

223   DK579+000 600m on the left

Zhuxinzhuang Village,

Dashuikeng Town, Yanchi

Town

12.6 20.6 1.37

224   DK580+000 400m on the left

Zhuxinzhuang Village,

Dashuikeng Town, Yanchi

Town

16 11.6 0.77

225   DK584+500 350m on the left

Yujialiang Village,

Fengjigou Township,

Yanchi County

26 60 4.00

226   DK585+600 400m on the left

Yujialiang Village,

Fengjigou Township,

Yanchi County

26 48 3.20

227   DK586+600 350m on the right

Wangjia Geda Viilage,

Fengjigou Township,

Yanchi County

13 25.8 1.72

228   DK590+300 350m on the right

Wangshuitang Village,

Fengjigou Township,

Yanchi County

8 13.5 0.90

229   DK592+200 300m on the right

Wangshuitang Village,

Fengjigou

10.4 20.2 1.35

Beijing OASIS Environmental Protection Technology Co., Ltd. 110

Page 124: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

Township, Yanchi County

230   DK593+550 150m on the left

Chenshuitang Village,

Fengjigou Township,

Yanchi County

1.3 6.3 0.42

231   DK598+000 100m on the left

Laoyanchi Village,

Taiyangshan Development

Zone, Wuzhong City

5.5 27 1.80

232   DK618+200 80m on the left

Bazhuang Village,

Taiyangshan Development

Zone, Wuzhong City

6 15 1.00

233   DK619+160 40m on the right

Bazhuang Village,

Taiyangshan Development

Zone, Wuzhong City

17.6 58.8 3.92

234   DK620+900 50m on the left

Bazhuang Village,

Taiyangshan Development

Zone, Wuzhong City

12.4 41.3 2.75

235   DK621+560 100m on the left

Bazhuang Village,

Taiyangshan Development

Zone, Wuzhong City

36.4 65.3 4.35

236   DK622+800 50m on the left

Bazhuang Village,

Taiyangshan Development

Zone, Wuzhong City

4.8 29.4 1.96

237   DK643+783 258m on the right

Village V, Taiyangshan

Town, Hongsibao

Development Zone

9.1 20 1.33

238   DK649+523 185m on the right

Village III, Taiyangshan

Town, Hongsibao

Development Zone

1.2 4.2 0.28

239   DK664+400 150m on the right

Hongsibao Development

Zone

10.7 19 1.27

240   DK665+040 40m on the right

Hongsibao Development

Zone

1 6 0.40

241   DK670+650 85m on the left

Hongsibao Development

Zone

8.1 40 2.67

242   DK672+900 100m on the right

Hongsibao Development

Zone

13.8 23 1.53

243   DK673+580 100m on the right

Hongsibao Development

Zone

7.7 29 1.93

Beijing OASIS Environmental Protection Technology Co., Ltd. 111

Page 125: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

244   DK674+960 90m on the right

Hongsibao Development

Zone

8.7 13 0.87

245   DK676+200 150m on the right

Hongsibao Development

Zone

10.7 17 1.13

246   DK677+140 160m on the right

Hongsibao Development

Zone

3.4 50 3.33

247   DK678+100 170m on the left

Mingsha Town,

Zhongning County

23.2 70 4.67

248   DK678+302 212m on the right

Mingsha Town,

Zhongning County

4.4 20 1.33

249   DK679+700 103m on the right

Mingsha Town,

Zhongning County

2 8 0.53

250 Yuding Township Spoil Ground

DK710+000 150m on the right

Huangyangwan Village,

Zhongning County

4.26 64 4.27

251 Huangyangwan Spoil Ground

BLK663+500 200m on the right

Huangyangwan Village,

Zhongning County

17.36 21.6 1.44

252 Zhongningdong Spoil Ground

      70 150 10.00

253 Si’er’tan Village LDK533+600 150 on the right

Si’er’tan Village,

Huamasi Township,

Yanchi County,

Wuzhong City, Ningxia

2 15 1.00

254 Wujiquan Modified LDK548+000

250 on the left

Wujiquan Village,

Huamasi Township,

Yanchi County,

Wuzhong City, Ningxia

15 269 17.93

255 Sidunzi Modified LDK557+600

450 on the right

Sidunzi Village,

Huamasi Township,

Yanchi County,

Wuzhong City, Ningxia

5 157.8 10.52

256 Tianjizhang Modified LDK563+000

50 on the left Tianjizhang Village,

Huamasi Township,

Yanchi County,

Wuzhong City, Ningxia

5 225 15.00

257 Entrance of Niumaojing

Tunnel (Jibao Wangle

Township)

Modified LDK565+300

50 on the right

Huamasi Township,

Yanchi County,

Wuzhong City, Ningxia

26 86 5.73

Beijing OASIS Environmental Protection Technology Co., Ltd. 112

Page 126: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

258 Exit of Niumaojing

Tunnel

Modified LDK571+000

50 on the right

Wangle Township,

Yanchi County Wuzhong City,

Ningxia

27 95 6.33

259 Jijiaquan Modified LDK588+500

500 on the right

Jijiaquan Village,

Wuzhong City, Ningxia

20 75 5.00

260 Gaoshawo 1# Modified LDK593+950

450 on the right

Gaoshawo Village,

Wuzhong City, Ningxia

10.5 34 2.27

261 Gaoshawo 2# Modified LDK594+250

50 on the left Gaoshawo Village,

Wuzhong City, Ningxia

12.7 45 3.00

262 Gaoshawo 3# Modified LDK594+700

150 on the left

Gaoshawo Village,

Wuzhong City, Ningxia

16 50 3.33

263 Lijiquan Modified LDK599+600

100 on the left

Lijiquan Village,

Wuzhong City, Ningxia

32 75 5.00

264 Zhangzhaizi Modified LDK606+950

100 on the right

Zhangzhaizi Village,

Wuzhong City, Ningxia

35 85.5 5.70

265 Huiminxiang 1# Modified LDK624+500

100 on the right

Huiminxiang Village,

Ningdong Town, Lingwu City, Ningxia

11.8 23.5 1.57

266 Huiminxiang 2# Modified LDK626+400

100 on the left

Huiminxiang Village,

Ningdong Town, Lingwu City, Ningxia

44 96.5 6.43

267 Huiminxiang 3# Modified LDK627+750

150 on the right

Huiminxiang Village,

Ningdong Town, Lingwu City, Ningxia

46.5 105.3 7.02

268 Huiminxiang 4# Modified LDK629+700

50 on the left Huiminxiang Village,

Ningdong Town, Lingwu City, Ningxia

38.2 75.5 5.03

269 Mapaoquan Village 1#

Modified LDK631+000

150 on the right

Mapaoquan Village,

Ningdong Town, Lingwu City, Ningxia

52.6 48.3 3.22

270 Mapaoquan Village 2#

Modified LDK639+500

350 on the right

Mapaoquan Village,

Ningdong Town, Lingwu City, Ningxia

22.1 64.9 4.33

271 1# Tianshuihe Village, Lingwu

City

Modified LDK646+700

50 on the left Tianshuihe Village,

Lingwu City, Ningxia

2.9 9.4 0.63

272 2# Tianshuihe Village, Lingwu

City

Modified LDK648+510

50 on the left Tianshuihe Village,

Lingwu City, Ningxia

11 24.5 1.63

273 3# Tianshuihe Village, Lingwu

City

Modified LDK649+050

50 on the right

Tianshuihe Village,

Lingwu City, Ningxia

10 17.3 1.15

Beijing OASIS Environmental Protection Technology Co., Ltd. 113

Page 127: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

274 4# Tianshuihe Village, Lingwu

City

Modified LDK649+600

50 on the left Tianshuihe Village,

Lingwu City, Ningxia

12 55.1 3.67

275 5# Tianshuihe Village, Lingwu

City

Modified LDK650+000

120 on the left

Tianshuihe Village,

Lingwu City, Ningxia

18 21.8 1.45

276 6# Tianshuihe Village, Lingwu

City

Modified LDK650+400

100 on the right

Tianshuihe Village,

Lingwu City, Ningxia

13 15.7 1.05

277 7# Tianshuihe Village, Lingwu

City

Modified LDK651+000

100 on the left

Tianshuihe Village,

Lingwu City, Ningxia

6 28.2 1.88

278 1# (I) Dongta Town, Lingwu

City

Modified LDK652+650

100 on the left

Dongta Town, Lingwu City,

Ningxia

4 17.8 1.19

279 1# (II) Dongta Town, Lingwu

City

Modified LDK652+740

50 on the left Dongta Town, Lingwu City,

Ningxia

2 5.9 0.39

280 1# (III) Dongta Town, Lingwu

City

Modified LDK652+940

150 on the left

Dongta Town, Lingwu City,

Ningxia

2.6 6.9 0.46

281 2# Dongta Town, Lingwu City

Modified LDK653+950

50 on the left Dongta Town, Lingwu City,

Ningxia

4 19.2 1.28

282 3# Dongta Town, Lingwu City

Modified LDK654+540

50 on the left Dongta Town, Lingwu City,

Ningxia

5 4.7 0.31

283 4# (Small) Dongta Town, Lingwu City

Modified LDK656+400

100 Dongta Town, Lingwu City,

Ningxia

1.5 5.8 0.39

284 4# (Large) Dongta Town, Lingwu City

Modified LDK656+700

50 on the left Dongta Town, Lingwu City,

Ningxia

9.5 37.5 2.50

285 5# Dongta Town, Lingwu City

Modified LDK657+600

400 on the left

Dongta Town, Lingwu City,

Ningxia

9 45 3.00

286 6# Dongta Town, Lingwu City

Modified LDK658+200

50 on the right

Dongta Town, Lingwu City,

Ningxia

2.1 5.9 0.39

287 Intersection of Yongning

Expressway

Modified LDK676+850

4500 on the left

Yongning County,

Yinchuan City, Ningxia

29.6 29.6 1.97

288 Nanquanqu Village, Shengli

Township

Modified LDK684+000

5000 on the left

Nanquanqu Village, Shengli

Township, Yinchuan City,

Ningxia

27 27 1.80

289 Xingyuan Village,

Liangtian Township

Modified LDK693+200

3500 on the left

Xingyuan Village,

Liangtian Township,

Yinchuan City, Ningxia

49 49 3.27

  Total         5146.34 12228.492 815.23

Appendix 3. Details of the acoustic barrier projects of Taiyuan-Zhongwei (Yinchuan) Railway

Table of Position and Number of Acoustic Barriers

Beijing OASIS Environmental Protection Technology Co., Ltd. 114

Page 128: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

S.N. Name of Sensitive Spot

Line Mileage and Position Acoustic Barrier (m×m)

Note

1 Houfang Village At left side of modified DK207+200~modified DK207+900

700×3 Uncompleted

2 Mingli Village At left side of modified DK210+450~modified DK210+800

354×2.5 Uncompleted

3 Nanliubao Village At right side of HL right DK16+350~HL right DK16+600

254×2.5 Uncompleted

4 Xiaobeige Village At left side of DK28+350~DK28+750 400×2.5 Suspended (outsourced southwest ring)

5 Wangwu Village At right side of DK41+850~DK42+250 400×2.5 Uncompleted

6 Xiguxiang Middle School

At left side of DK44+470~DK44+700 230×2.5 Completed

7 Jiangjiazhai At left side of DK47+400~DK47+850 454×2.5 Uncompleted

8 Qiaotou Village At left side of DK83+600~DK84+500 900×2.5 Completed

9 Dongxiachi At left side of DK85+560~DK86+100 540×2.5 Completed

10 Xiachijiazhuang At right side of DK105+200~DK105+600 400×3.0 Completed

11 Shuangwudu At left side of modified DK174+240~modified DK174+500

264×2.5 Completed

12 Shang’an Village At right side of modified DK175+610~modified DK176+000

394×2.0 Completed

At left side of modified DK175+700~modified DK176+400

706×2.0(2.5)

At right side of modified DK176+300~modified DK176+750

450×2.5

13 Zhaojiazhuang At right side of modified DK178+550~DIK176+050 432×2.5 Completed

At left side of modified DK178+550~DIK176+000 382×2.5

14 Qianzhaojiazhuang

At right side of DIK176+400~DIK177+050 656×2.0 Completed

At left side of DIK176+200~DIK176+600 404×2.0

15 Houzhaojiazhuang

At left side of DIK177+250~DIK177+538 292×2.0 Completed

16 Shangshuixi Village,

Xiashuixi Village

At right side of DIK178+700~DIK179+400 708×2.5 Completed

At left side of DIK178+700~DIK179+050 356×2.5

17 Liulin County At right side of modified DIIK201+900~modified DIIK203+050

1162×2.5 Completed

18 Wubu County At left & right side of DK216+600~DK216+860 520×2.0 Uncompleted

Beijing OASIS Environmental Protection Technology Co., Ltd. 115

Page 129: Environmental Monitoring Report - adb.org · This environmental monitoring report is a document of the ... Spoil ground of Lijiabian Tunnel by China Railway 17 Bureau Group Co

General Environmental Monitoring Report of Taiyuan-Zhongwei (Yinchuan) Railway

19 Shiwan School At left & right side of DK271+720~DK271+900 360×2.5 Completed

20 Majiagoucha and Primary

School

At left side of DK321+850~DK322+310 460×2.5 Completed

21 Sibaishu Village At right side of DK402+600~DK402+900 300×2.5 Completed

22 Hequan At right side of DK508+800~DK510+200 1400×2.5 Completed

At left side of DK508+850~DK510+200 1350×2.5

23 Panying Village At right side of DK702+100~DK702+400 300×2.5 Completed

At left side of DK702+150~DK702+450 300×2.5

24 Lijiatan (1) At left side of DK702+750~DK703+100 350×2.5 Completed

At right side of DK702+850~DK703+100 250×2.5

25 Lijiatan (2) At right side of DK703+865~DK704+135 274×2.5 The road embankment has been completed while the bridge has not been completed

At left side of DK703+924~DK704+050 128×2.5

26 Kongjiatan Village

At right side of DK704+740~DK705+000 264×2.5 Uncompleted

At left side of DK704+740~DK705+050 314×2.5

27 Fanjiazhuang At right side of DK708+250~DK708+900 656×2.0 Uncompleted

At left side of DK708+650~DK708+950 304×2.0

28 Huangyang Village

At right side of DK710+550~DK711+630 1080×2.5 Completed

29 Shengjin Guan At left side of BLK666+150-BLK667+150 1000×2.5 Completed

30 Hujiazhuang At left side of BLK668+100-BLK669+200 1100×2.5 Completed

31 Wangquan Vilalge

At right side of LDK677+850~LDK678+400 554×2.5 The road embankment has been completed while the bridge has not been completed

At left side of LDK678+650~LDK679+100 456×2.0

Total 22557m

Beijing OASIS Environmental Protection Technology Co., Ltd. 116