188
EPCM Services for converting existing Catalytic Reforming Unit to Isomerization Unit for BPCL Mumbai Refinery Orifice Plates and Flange s (Document No : A620-000-YF-MR-1320) Page 1 of 188

EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

  • Upload
    lamlien

  • View
    307

  • Download
    2

Embed Size (px)

Citation preview

Page 1: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

EPCM Services for converting existing Catalytic Reforming Unit to

Isomerization Unit for BPCL Mumbai Refinery

Orifice Plates and Flange s

(Document No : A620-000-YF-MR-1320)

Page 1 of 188

Page 2: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Click on the Document Title to go to that section of the document

Table of ContentsDocument Number Rev. Document Title Page

NumberA620-000-YF-MR-1320

A Orifice Plates and Flange s 3

A620-000-16-51-VDR-1320

A VENDOR DATA REQUIREMENTS 9

A620-000-16-51-SI-1320

A SPECIAL INSTRUCTIONS TO VENDOR 11

A620-000-TM-TQS-1320

A TECHNICAL QUESTIONAIRE 14

A620-000-16-51-MD-1320

A DATASHEET INDEX WITH TAGS 15

A620-000-16-51-ID-1320

A DATASHEET INDEX AND DATASHEETS 17

6-52-0004 3 Std. Spec. for orifice plates and flanges 1076-52-0006 3 Std. specification for restriction orifice plate 1147-52-0041 3 Orifice plates and flanges dimensional details. 1206-81-2006 3 ITP for restriction orifice plates 1346-78-0003 1 Specification for documentation requirement from suppliers 1396-78-0001 1 Specification for quality management system requirements from

bidders148

6-81-2004 3 ITP for orifice plates and flanges 155A620-000-16-51-MD-0016

A MISCELLANEOUS 161

6-79-0013 1 Material requirements for carbon steel components used in sourservice for petroleum refinery environments

183

Page 2 of 188

Page 3: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS INDIA LIMITED

NEW DELHI

Project :

Client :

CONV OF EXISTCRU-ISOM-N

BPCL

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

641-

515

Rev

.1 A

4-21

0x29

7

Sheet 1 Of 6

DOCUMENT NUMBER(Always quote the Document Number given below as reference)

MATERIAL REQUISITION (TOP SHEET)

Notes:1. This page is a record of all Revisions of this Requisition2. The nature of the Revision is briefly stated in the "Details" column below, the Requisition in its entirety shall be considered for contractual pupose.

3.Vendor shall note the MR category and shall submit his offer in line with the requirements included in attached 'Instructions to Bidders'

5109/06/2015

DATE

16

ORIGINATOR

DIVN. DEPT.REVJOB NO

AUNIT/ MAIN

COSTDOC.

CODE SR.NO.

A620 000 YF MR 1320

RRS SM SM Issued for BidsA 09/06/2015

REV APPDCHKBYDATE D E T A I L S

Orifice Plates and Flanges15GA BPCL-Mahul

ITEM DESCRIPTION:

GROUP ITEM CODE DESTINATION :

DELIVERY PERIOD :IITEM CATEGORY

This is a system generated approved document and does not require signature.

Page 3 of 188

Page 4: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS INDIA LIMITED

NEW DELHI

Project :

Client :

REQUISITION No. REVCONV OF EXISTCRU-ISOM-N

BPCL A620-000-YF-MR-1320 A

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

641-

515

Rev

.1 A

4-21

0x29

7

Sheet 2 Of 6

DESCRIPTION QUANTITYS.NO TAG NO ./ ITEM CODE

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 2 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 2 - 600# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 2 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 2 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 2 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 8 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 8 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 8 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

062-NHFE-0104

062-NHFE-0105

062-NHFE-0106

062-NHFE-0108

062-NHFE-0109

062-NHFE-0110

062-NHFE-0301

062-NHFE-0302

062-NHFE-0303

062-NHFE-0401

062-NHFE-0402

062-NHFE-0501

062-NHFE-0502

062-NHFE-0503

062-NHFE-0504

062-NHFE-0505

062-NHFE-0506

062-NHFE-0507

062-NHFE-0603

062-NHFE-0604

062-NHFE-606

062-NHFE-607

062-NHFE-0701

065-NCFE-1001

065-NCFE-0152

065-NCFE-0153

065-NCFE-0154

065-NCFE-1602

065-FE-1601

065-NCFE-1604

065-NCFE-1701

065-NCFE-1703

065-NCFE-1704

065-NCFE-1820

065-NCFE-1901

065-NCFE-1902

1.0001

1.0002

1.0003

1.0004

1.0005

1.0006

1.0007

1.0008

1.0009

1.0010

1.0011

1.0012

1.0013

1.0014

1.0015

1.0016

1.0017

1.0018

1.0019

1.0020

1.0021

1.0022

1.0023

1.0024

1.0025

1.0026

1.0027

1.0028

1.0029

1.0030

1.0031

1.0032

1.0033

1.0034

1.0035

1.0036

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Design ,engineering,manufacture,procurement of materials andbought out components, assembly at shop,inspection,testing atmanufacturer's works, packing, delivery, documentation as per theenclosed EIL standard specifications, instructions to vendors, jobspecification, data sheets etc

1

Page 4 of 188

Page 5: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS INDIA LIMITED

NEW DELHI

Project :

Client :

REQUISITION No. REVCONV OF EXISTCRU-ISOM-N

BPCL A620-000-YF-MR-1320 A

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

641-

515

Rev

.1 A

4-21

0x29

7

Sheet 3 Of 6

DESCRIPTION QUANTITYS.NO TAG NO ./ ITEM CODE

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 8" - 300# ,Plate- 316SS

Orifice Plates and Flanges :-Conc. Square Edged , 8" - 300# ,Plate- 316SS

Orifice Plates and Flanges :-Conc. Square Edged , 12 - 300# ,Plate- 316SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-RESTRICTION ORIFICE , 4 - 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-RESTRICTION ORIFICE , 3 - 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 2 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-RESTRICTION ORIFICE , 2 - 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 8 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

065-NCFE-2901

065-NCFE-2902

065-NCFE-2903

065-NCFE-2904

065-NCFE-1301

065-NCFE-3111

065-NCFE-3105

065-NCFE-0318

065-NCFE-0319

065-NCFE-3204

065-NCFE-3226

065-NCFE-3241

065-NCRO-3250

065-NCFE-3237

065-NCRO-3251

065-NCFE-3302

065-NCFE-3234

065-NCFE-3235

065-NCFE-3401

065-NCFE-3440

065-NCRO-3460

065-NCFE-3601

065-NCFE-3609

065-NCFE-1401

065-NCFE-1402

065-NCFE-1422

065-NCFE-0453

065-NCFE-0454

065-NCFE-0455

065-NCFE-0456

065-NCFE-0457

065-NCFE-0458

065-NCFE-0459

065-NCFE-0460

065-NCFE-0461

065-FE-0462

065-NCFE-1502

065-NCFE-0510

1.0037

1.0038

1.0039

1.0040

1.0041

1.0042

1.0043

1.0044

1.0045

1.0046

1.0047

1.0048

1.0049

1.0050

1.0051

1.0052

1.0053

1.0054

1.0055

1.0056

1.0057

1.0058

1.0059

1.0060

1.0061

1.0062

1.0063

1.0064

1.0065

1.0066

1.0067

1.0068

1.0069

1.0070

1.0071

1.0072

1.0073

1.0074

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Page 5 of 188

Page 6: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS INDIA LIMITED

NEW DELHI

Project :

Client :

REQUISITION No. REVCONV OF EXISTCRU-ISOM-N

BPCL A620-000-YF-MR-1320 A

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

641-

515

Rev

.1 A

4-21

0x29

7

Sheet 4 Of 6

DESCRIPTION QUANTITYS.NO TAG NO ./ ITEM CODE

Vendors shall quote prices against these items in their price scheduleVendor to note that the numbers given in square '[]' and curly '{}' brackets are not for their use andmeant for store purpose only.Items shall be tagged as per equipment Tag No. only.

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 2 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 3 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 600# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 600# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 6 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

Orifice Plates and Flanges :-Conc. Square Edged , 4 - 300# ,Plate- 316 SS

065-NCFE-0511

065-NCFE-0512A

065-NCFE-0513

065-NCFE-0601

065-NCFE-0702

065-NCFE-0714A

065-NCFE-0715

065-NCFE-0718

065-NCFE-0801

065-NCFE-0811

065-NCFE-0913

065-NCFE-0914

065-NCFE-0915

1.0075

1.0076

1.0077

1.0078

1.0079

1.0080

1.0081

1.0082

1.0083

1.0084

1.0085

1.0086

1.0087

1

1

1

1

1

1

1

1

1

1

1

1

1

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Nos

Page 6 of 188

Page 7: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS INDIA LIMITED

NEW DELHI

Project :

Client :

REQUISITION No. REVCONV OF EXISTCRU-ISOM-N

BPCL A620-000-YF-MR-1320 A

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

641-

515

Rev

.1 A

4-21

0x29

7

Sheet 5 Of 6

1

2

3

4

5

6

7

8

9

10

11

12

13

S. No.

Vendor Data Requirement

Special Instruction to Vendor

Technical Questionarrie

Data Sheet Index

Standard spec for Orifice Plates andFlanges

Standard spec for Restriction OrificePlates

Orifice Plates and Flanges DimentionalDetails

ITP for restriction orifice plates

Spec. for documentation requirementsfrom supplier

Spec. for quality management sys.req.from bidders

ITP for orifice plates & flanges

JOB SPECIFICATION FOR NONDESTRUCTIVE EXAMINATIONREQUIREMENTS OF PIPING

Material requirements for carbon steelcomponents used in sour service for petro

DOCUMENT TITLE

A620-000-YF-VD-1320

A620-000-YF-SI-1320

A620-000-YF-TM-1320

A620-000-YF-ID-1320

6-52-0004

6-52-0006

7-52-0041

6-81-2006

6-78-0003

6-78-0001

6-81-2004

A620-6-44-0016

6-79-0013

DOCUMENT NO.

0

0

A

0

3

3

3

2

0

0

2

0

1

REV

09/06/2015

09/06/2015

09/06/2015

09/06/2015

29/11/2010

29/11/2010

30/05/2011

15/07/2011

04/06/2009

04/06/2009

15/07/2011

20/05/2015

07/10/2011

DATE

In case of any subsequent revision of MR or PR,only revised sheets of the attachments listed above shall be issuedalongwith the revision.

LIST OF ATTACHMENTS

GENERAL NOTES:

SHEETS

2

4

1

90

7

6

14

5

12

9

5

22

6

Page 7 of 188

Page 8: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Eng

inee

rs In

dia

Lim

ited

Clie

nt/ P

roje

ct:B

PC

L/ C

ON

V O

FE

XIS

TCR

U-IS

OM

-NH

DS

-NH

T

S.N

o.D

rg/ D

oc. N

omen

clat

ure

as p

er E

IL V

endo

r Dat

aR

equi

rem

ent

Title

Rev

. 0R

ev. 1

Rev

. 2

Ven

dor D

rg/ D

oc N

o.Fo

rmE

lect

roni

c(E

)/ P

rint (

P)

Cat

egor

yR

evie

w(R

)/R

ecor

ds(I)

Sch

edul

eD

ate

of 1

stS

ubm

issi

on(R

ev. 0

)

Ant

icip

ated

(Ant

) Dat

e of

sub

mis

sion

by

vend

orA

ctua

l (A

ct) D

ate

of s

ubm

issi

on b

y ve

ndor

Dat

e of

Ret

urn

(Rew

) by

EIL

Rev

iew

Sta

tus

(Cod

e)R

ev. 3

Cod

eR

ewAct

Ant

Cod

eR

ewAct

Ant

Cod

eR

ewAct

Ant

Cod

eR

ewAct

Ant

Cod

eR

ewAct

Ant

Rem

arks

Ven

dor

Dra

win

g/ D

ocum

ent S

ubm

issi

on S

ched

ule

Item

Des

crip

tion:

Ori

fice

Pla

tes

and

Flan

ges

Ven

dor's

Nam

e

:C

onta

ct P

erso

n (N

ame/

Tel

/ Fax

/ em

ail)

:S

tatu

s D

ate:

Con

tact

Per

son(

EIL

):E

IL O

rigi

natin

g D

epar

tmen

t :I

nstr

umen

tatio

n

PR

No.

:

Dat

e of

LO

I:

PO

No.

:

Dat

e of

PO

:

Rev

iew

Sta

tus

Cod

e:

1. N

o C

omm

ents

2. P

roce

ed w

ith m

anuf

actu

re/ f

abric

atio

n as

per

com

men

ted

docu

men

t.R

evis

ed d

ocum

ent r

equi

red.

3. D

ocum

ent d

oes

not c

onfo

rm to

bas

ic re

quire

men

ts a

s m

arke

d.R

esub

mit

for R

evie

w. R

: Ret

aine

d fo

r Ref

eren

ce

V: V

oid

Form

No.

EIL

-164

1-19

23 R

ev.1

Page 8 of 188

Page 9: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

VENDOR DATA REQUIRMENT

ENGINEERS INDIA LIMITED

NEW DELHIUNIT :CLIENT

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

PLANT :

000

A620-000-YF-MR-1320SMSMRRS09/06/2015

A620-000-YF-VD-1320 0

CONV OF EXISTCRU-ISOM-N

BPCL

SPECIFICATION REV

REQ. NO. :

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

illno

t be

repr

oduc

ed, c

opie

d, e

xhib

ited

or u

sed,

exc

ept i

n lim

ited

way

per

mitt

ed b

y a

writ

ten

cons

ent g

iven

by

the

lend

er to

the

borr

ower

for t

he in

dend

ed u

se.

EIL

-165

1-72

6 R

ev.0

A4-

210x

297

0

Page 1 Of 2

Dimensional details with mounting details and model number Connections by purchase(Piping,Electrical Etc.) Wiring diagrams Parts list Recommended spare parts list(for two years operation ) Installation, Operation and maintenance manual Nomograph and sizing calculations Test certificates Certificate from statutory body Assembly details Catalogues in english Testing and Inspection proceduresSoft Copy of Final Document CD

Prints

WithProposal(Prints)

Date Needed

AFTER PURCHASE ORDERDescription

11

11

111

2W6W

2W

1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13.

FinalDocumentation

/ As Built

6W/S6W/S

6W/S

6W/S6W/S6W/S6W/S6W/S6W/S6W/S6W/S

Page 9 of 188

Page 10: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

VENDOR DATA REQUIRMENT

ENGINEERS INDIA LIMITED

NEW DELHIUNIT :CLIENT

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

PLANT :

000

A620-000-YF-MR-1320SMSMRRS09/06/2015

A620-000-YF-VD-1320 0

CONV OF EXISTCRU-ISOM-N

BPCL

SPECIFICATION REV

REQ. NO. :

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

illno

t be

repr

oduc

ed, c

opie

d, e

xhib

ited

or u

sed,

exc

ept i

n lim

ited

way

per

mitt

ed b

y a

writ

ten

cons

ent g

iven

by

the

lend

er to

the

borr

ower

for t

he in

dend

ed u

se.

EIL

-165

1-72

6 R

ev.0

A4-

210x

297

0

Page 2 Of 2

NOTES :

1. Fold all drawings to 216mm X 279mm and roll transparencies.

2. Vendor to provide all printed matter to ENGINEERS INDIA LIMITED (EIL). ATTENTION -

LEGEND:

Categories preceeded with * will be approved for fabrication by Engineers India Limited. The remaining drawings are needed for information only.

A/C = As compiled A/R = As required W/S = With shipment W = Weeks

IMPORTANT

While submittimg drawings and documents for review as indicated in vendor data requirement, vendor must ensure the following :

1. A blank space measuring 75 mm W x 38 mm H shall be provided on all vendor drawings (on the front side) for marking review codes etc. by ENGINEERS INDIA LIMITED.

2. The review of the drawings shall be done as applicable, under the following review codes : a) Review Code 1 : No Comments. b) Review Code 2 : Proceed with manufacture / fabrication as per commented drawing. Revised drawing required. c) Review Code 3 : Document does not conform to the basic requirements as marked. Resubmit for review.

3. Review of the vendor drawings by EIL would be only to check compatibility with basic design and concepts and would in no way absolve the manufacturer / fabricator of his responsibility to meet the applicable codes, specifications and statutory rules and regulations.

4. For drawings / documents indicated as FOR INFORMATION in the vendor data requirement, vendor must clearly mark FOR INFORMATION ONLY on the submitted drawings / documents.

Page 10 of 188

Page 11: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS INDIA LIMITED

NEW DELHIUNIT :CLIENT

SPECIAL INSTRUCTION TO VENDORS

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

PLANT :

000

A620-000-YF-MR-13200 SMSMRRS09/06/2015

A620-000-YF-SI-1320 0

CONV OF EXISTCRU-ISOM-N

BPCL

SPECIFICATION REV

REQ. NO. :

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

illno

t be

repr

oduc

ed, c

opie

d, e

xhib

ited

or u

sed,

exc

ept i

n lim

ited

way

per

mitt

ed b

y a

writ

ten

cons

ent g

iven

by

the

lend

er to

the

borr

ower

for t

he in

dend

ed u

se.

EIL

-165

1-72

6 R

ev.0

A4-

210x

297 Page 1 Of 3

Part A:I. BIDDING INSTRUCTIONSA1. Bidders must follow the following guidelines while submitting their offer. Offers not complying to these guidelines shall berejected summarily without any intimation to the Bidder. a. Furnish quotations only for those items that bidder can supply strictly as per MR specifications and for which they areapproved by EIL.b. No technical details of any nature shall be included in the offer. If the offer contains any technical deviations orclarifications or stipulates any technical specifications (even if in line with the MR requirements), the offer shall be summarilyrejected. However, for items where they have entered into MOU with EIL, they may provide a statement that the deviationsare as per MOU with EIL.c. No correspondence whatsoever shall be entered into or entertained after the bid submission.d. The submission of prices by the vendor shall be construed to mean that they have confirmed compliance with all technicalspecifications of the corresponding item(s).e. In case of any contradiction between this bidding instructions and any other documents attached with the MR, this biddinginstruction shall govern.f. Bidder shall submit the price details against each Item No. & Tag No. / Item Code specified in this MR, in the separateprice schedule sheet with unit rate. Accessories if any for a tag shall be indicated in the item summary and the price of theaccessories shall be included in the base price of the tag itself. No information / description, technical or non-technical, otherthan what is required shall be filled or submitted. Unit rates of accessories if any, also to be provided separately. If any change at a later date is required in the range/ selection of accessories due to wrong selection, the sameshall be borne by the vendor.A2. Bidder is responsible to meet all technical requirements in Material Requisition including Instrument data sheet. If at anystage, till the completion of order, the offered instruments and its accessories are found unsuitable to meet the specification,Vendor shall replace the same with suitable items, without any time/Cost implication.A3. The Bidder shall submit the required drawings/ documents as per the Vendor Data Requirements (VDR) enclosed withthe MR.A4. After placement of order, bidder shall furnish filled in instrument data sheets, complete model no. and model decodingdetails along with instruments catalogues for inclusion in the PR within 2 weeks of issue of LOI.A5. Bidder to note that Delivery will be reckoned from the date of issue of LOI and any delay in submission of filled in datasheet and resulting delay in delivery shall be in bidders account.

PART B:

Part A:I. BIDDING INSTRUCTIONS

A1. Bidders must follow the following guidelines while submitting their offer. Offers not complying to these guidelines shall berejected summarily without any intimation to the Bidder. a. Furnish quotations only for those items that bidder can supply strictly as per MR specifications and for which they areapproved by EIL.b. No technical details of any nature shall be included in the offer. If the offer contains any technical deviations orclarifications or stipulates any technical specifications (even if in line with the MR requirements), the offer shall be summarilyrejected. However, for items where they have entered into MOU with EIL, they may provide a statement that the deviationsare as per MOU with EIL.c. No correspondence whatsoever shall be entered into or entertained after the bid submission.d. The submission of prices by the vendor shall be construed to mean that they have confirmed compliance with all technicalspecifications of the corresponding item(s).e. In case of any contradiction between this bidding instructions and any other documents attached with the MR, this biddinginstruction shall govern.f. Bidder shall submit the price details against each Item No. & Tag No. / Item Code specified in this MR, in the separateprice schedule sheet with unit rate. Accessories if any for a tag shall be indicated in the item summary and the price of theaccessories shall be included in the base price of the tag itself. No information / description, technical or non-technical, otherthan what is required shall be filled or submitted. Unit rates of accessories if any, also to be provided separately. If any change at a later date is required in the range/ selection of accessories due to wrong selection, the sameshall be borne by the vendor.A2. Bidder is responsible to meet all technical requirements in Material Requisition including Instrument data sheet. If at anystage, till the completion of order, the offered instruments and its accessories are found unsuitable to meet the specification,Vendor shall replace the same with suitable items, without any time/Cost implication.

Page 11 of 188

Page 12: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS INDIA LIMITED

NEW DELHIUNIT :CLIENT

SPECIAL INSTRUCTION TO VENDORS

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

PLANT :

000

A620-000-YF-MR-13200 SMSMRRS09/06/2015

A620-000-YF-SI-1320 0

CONV OF EXISTCRU-ISOM-N

BPCL

SPECIFICATION REV

REQ. NO. :

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

illno

t be

repr

oduc

ed, c

opie

d, e

xhib

ited

or u

sed,

exc

ept i

n lim

ited

way

per

mitt

ed b

y a

writ

ten

cons

ent g

iven

by

the

lend

er to

the

borr

ower

for t

he in

dend

ed u

se.

EIL

-165

1-72

6 R

ev.0

A4-

210x

297 Page 2 Of 3

JOB SPECIFIC REQUIREMENTSB1. The Orifice Plates and Flanges and Restriction Orifice Plates covered in this MR shall be installed in the NapthaHydrotreating Unit -NHT (Unitno. 062), Isomarization - ISOM(Unit no. 065) of Mahul Refinery of M/s BPCL-MR. Therefore bidder's experience for thesimilar application shall be most appropriate. B2. Bidder shall carefully go through the MR and submit the offer strictly in line with the requirements spelt out in the MR.Following shall be strictly complied with:a) No detail technical offer is required. Offer shall be containing the Item Number & Tag Number only. NO OTHERDESCRIPTION IS REQUIRED. Any references or details other than the item no. and tag no. shall be ignored. b) Any offer, not complying to above will be liable for rejection.B3. Each datasheet is provided with GENERAL and SPECIFICATION SERIAL NO. NOTES specific to that Tag number.Bidder shall follow the datasheet specification along with these notes given on second page of the datasheets.B4. The Standard Specifications for Orifice plates and flanges (6-52-0004) & Standard Specifications for Restriction OrificePlates (6-52-0006) as given in this M.R. must be followed by the bidder. In case of conflict, the data sheets and this SIV shalloverride in general. However, it shall be obligatory on the bidder's part to bring to the notice of the purchaser all suchconflicts, wherein the purchaser's decision shall be final.B5. Bidder to provide number of taps for each orifice flange as per the Data sheet. Bidder to note that number of taps perorifice flange may undergo changes. Bidder to ensure that there shall not be any implication because of any addition ordeletion of taps in the flanges.B6. Tappings shall be NPT(F) in general with size 0.5" for rating upto 600# & 0.75" for 900# & above, as specified in therespective datasheet. Where two taps per flange have been specified, one of the taps shall be provided with suitable plug.For the flanges where four taps per flange have been specified, two taps shall be provided with suitable plugs. Plug materialshall be the same as flange material. Tappings type i.e. SW or NPT(F) shall be finalized at PR stage. No cost implication onaccount of the same will be allowed. Price for requirements as above shall be included as part of base price againstrespective tag.B7.A) Bidder to note that the Bore diameter and type of the plate & Fluid process data has been tentatively indicated indatasheet, which may undergo changes after placement of order. No price or delivery implication will be allowed on accountof this information. B) Bidder to note that the thickness of the plate has been tentatively indicated and may undergo change to one size higherafter placement of order. No price or delivery implication will be allowed on account of this information.B8. Bidder to size the Orifice as per ISO 5167.B9. (I) IBR Requirements:a) All flanges under IBR service shall be tested and test certificates in Form III C shall be required duly countersigned by IBRauthority or its approved representative.b) Further carbon contents shall not exceed 0.25% for flanges etc. that may require welding. Moreover, for flanges thesulphur and phosphorous shall also be limited to 0.05% each. Price for IBR certification requirement as mentioned above shall be included as part of base offer against respective tag. (II) HYDROGEN service Requirements: Tags which are identified in hydrogen service, vendor shall follow the testing requirements below: a) All carbon steel flanges having wall thickness 9.53 mm and above shall be normalised. The normalised heat treatmentshall be a separate heat treatment operation and not a part of the hot forming operation. b) All alloy steel (Cr-Mo) flanges shall be normalised and tempered. The normalising and tempering shall be a separate heattreatment operation and not a part of the hot forming operation. c) For all carbon steels and alloy steels flanges with wall thickness over 19 mm, Charpy-V notch impact testing shall becarried out in accordance with paragraph UG-84 of ASME Section VIII, Div-1 per heat of material and per heat treatmentbatch. Impact test specimen shall be in accordance with ASTM A 370. Imapct energies at 0 deg. C shall average greaterthan 27 J ( 20 ft-lb) per set of 3 specimens, with a minimum of 19 J (15ft-lb) d) If welding is applicable in manufacture, impact test of Heat Affected Zone (HAZ) and weld metal shall also be carried out.Hardness for carbon steel pipes and fittings, hardness of weld and HAZ shall be limited to 200 BHN (max.).For alloy steelpipes and fittings, hardness of weld and HAZ shall be limited to 225 BHN (max.). e) For all Austentic Stainless Steel, the weld deposit shall be checked for ferrite content. A Ferrite No.(FN) not less than 3%and not more than 10% is required to avoid sigma phase embrittlement during heat treatment. FN shall be determined byFerritescope prior to post weld heat treatment. Price for requirements as above shall be included as part of base offer against respective tag. (III) HIC (Hydrogen Induced Cracking) requirements, where specified in the datasheet, shall be complied as per documentno. 6-79-0013 Rev. 1 and price of the same shall be included as part of base offer against repective tags. (IV) NACE REQUIREMENTS. For tags under NACE service, wherever specifically mentioned in the individual data sheets, the following shall be met: - Maximum hardness in weld joints shall be limited to 200 BHN.

Page 12 of 188

Page 13: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS INDIA LIMITED

NEW DELHIUNIT :CLIENT

SPECIAL INSTRUCTION TO VENDORS

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

PLANT :

000

A620-000-YF-MR-13200 SMSMRRS09/06/2015

A620-000-YF-SI-1320 0

CONV OF EXISTCRU-ISOM-N

BPCL

SPECIFICATION REV

REQ. NO. :

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

illno

t be

repr

oduc

ed, c

opie

d, e

xhib

ited

or u

sed,

exc

ept i

n lim

ited

way

per

mitt

ed b

y a

writ

ten

cons

ent g

iven

by

the

lend

er to

the

borr

ower

for t

he in

dend

ed u

se.

EIL

-165

1-72

6 R

ev.0

A4-

210x

297 Page 3 Of 3

- The plates and flanges shall comply to NACE MR 0103 requirements. - All girth weld joints if applicable shall be 100% radiographed & all types of welds shall be wet fluorescent MP tested. Price for NACE requirements (wherever applicable as mentioned in the individual data sheets) shall be included as part ofbase offer against respective tag.(V) RADIOGRAPHY REQUIREMENTS: a) Radiography shall be considered wherever specified in the indivisual datasheet and as per NDT requirements (doc. noA620-6-44-0016) attached with the MR.

b) Post weld heat treatment (PWHT) for stress relieving shall be provided for welds, if any, wherever specified in the datasheets. Radiography shall be carried out after completion of the PWHT/ Stress relieving operation. Price for radiography shall be included as part of the base offer against respoective tag.B10. All the items supplied by bidder shall be subject to inspection at manufacturing. Inspection charges for each item shallbe included in base quote for respective tag by bidder. As a minimum, the inspection and testing requirements as per ITP fororifice plates and flanges (6-81-2004), Standard specifications for orifice plates and flanges (6-52-0004), Standardspecifications for Restriction orifice (6-52-0006), ITP for Restriction orifice plates (6-81-2006) etc., shall be adhered to.B11. All orifice plate and flange assembly must include plate, flanges,studs-bolts, Nuts (One extra for each bolt/stud, refernotes on Page 13 of 7-52-0041 Rev 3) jack screws, gasket & plugs and shall be manufactured as per "Orifice Plates andFlanges Dimensional details" (7-52-0041 Rev 3), attached with the MR. B12. For the restriction orifice tags where multiple restriction type is not indicated in the datsheet, it is fully vendor'sresponsibility to select the Orifice plate or Multiple Restriction Orifice depending on Cavitations/ Sonic Velocity calculationeffects.B13. For multiple restriction orifice assembly, the number of stages / plates and thickness of the plates shall be decided bybidder to meet process conditions. However minimum two number of stages shall be provided by vendor for such tagsirresepective of sizing requirements. The sizing calculation for multiple restriction orifice assembly shall be furnished by vendor for EIL review during detailengineering. Vendor to note that while sizing, pressure drop achieved in the first stage shall not be more than 50% of the totalpressure drop. The complete system shall be supplied with flanged end connections in fully assembled condition. B14. Tapping orientation shall be as follows:For Two tappings per flange: Both tappings shall be 90 deg apart and orientation shall be on the same side.For Four tappings per flange: Two tappings shall be 180 deg apart and third & fourth tapping shall be at 45 deg to the othertwo tapping on the same side,B15. Bidder shall furnish soft copies of all the as-built drawings and data sheets in AutoCAD/ MS Excel formats for loading inOwner's Documentation Node.B16. Bidder to note that the Orifice plate shall be suitable for the mentioned design temperature and pressure. However thebidder shall size the orifice as per operating temperature and pressure.B17. Bidder to note that wherever D-D/2 tapping is specified in the orifice datasheets, vendor's scope include only the supplyof orifice plate as per datasheet and the supplied plate shall be suitable for mounting between purchaser's flange ratingspecified.B18.

B19. As mentioned in Bidding Instructions A1 the clause 'Unit rates of accessories if any, also to be provided separately' isnot applicable.B20. Bidder to ensure the submission of all drawings / documents mentioned above in soft copies through EIL eDMS portalonly during detail engineering & no documents shall be submitted through hard copies however as built document shall besubmitted in hard copy alongwith soft copy.B21. Vendor to note that the Basis of sizing for the orifice plates shall be as per the latest ISO-5167 standard irrespective ofthe std. mentioned in the datasheets.B22. SITE CONDITIONS:The site environmental conditions at BPCL-MR are as follows:Ambient temperature (Max/min.): 42 deg C /12 deg C.Relative Humidity: 100% (max) @32 deg CMaximum recorded rainfall: 125 mm for a period of 1 hour.

Page 13 of 188

Page 14: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

TECHNICAL QUESTIONNAIRE

This questionnaire shall be duly filled in and submitted along with unpriced sets of offers to avoid furtherqueries and to ensure proper evaluation of your offer in time. If this is not complied with, your offer is liable to be rejected.------------------------------------------------------------------------------------------------------------------------------------------------------------------------- ANSWER 'YES' 'NO' OR 'NOT APPLICABLE'

DESCRIPTION BIDDER'S RESPONSE-------------------------------------------------------------------------------------------------------------------------------------------------------------------------

ENGINEERS INDIA LIMITED

NEW DELHIUNIT :CLIENT

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

PLANT :

000

A620-000-YF-MR-1320A SMSMRRS09/06/2015

[ ] Deviation [ ] No Deviation Vendor Seal And Signature

A620-000-YF-TM-1320 A

CONV OF EXISTCRU-ISOM-N

BPCL

SPECIFICATION REV

REQ. NO. :

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

illno

t be

repr

oduc

ed, c

opie

d, e

xhib

ited

or u

sed,

exc

ept i

n lim

ited

way

per

mitt

ed b

y a

writ

ten

cons

ent g

iven

by

the

lend

er to

the

borr

ower

for t

he in

dend

ed u

se.

EIL

-165

1-TE

Q

-------------------------------------------------------------------------------------------------------------------------------------------------------------------------- NOTE : If the answer is 'NO' , then furnish reasons thereof.

Page 1 Of 1

1. Have you any deviations to the following: i) General Specifications (clausewise) ii) Special requirements (clausewise) iii) Instrument specifications indicated in the data sheets. iv) The scope of supply as indicated in the material requisition. If `yes' have you included the list of deviations? (If no deviations are furnished, it will be assumed that all the specifications and requirements of the subject requisition are complied with and no deviations whatever will be accepted after the placement of order.)-------------------------------------------------------------------------------------------------------------------------------------------------------------2. Have you quoted for the spare parts including consumable items required for the startup and 2 years normal operation/maintenance of the Instruments?-------------------------------------------------------------------------------------------------------------------------------------------------------------3. Have you quoted for the mounting accessories, special calibration kits and equipments (complete with technical details) required if any, for the erection, commissioning and maintenance of the instruments?-------------------------------------------------------------------------------------------------------------------------------------------------------------4. A) Have you enclosed the relevant technical catalogue/Literature in ENGLISH language including model decoding details, drawings etc. necessary for the evaluation of your offer? (NOTE: In case of line mounted instruments, viz. control valves, positive displacement meters, Pressure relief valves etc., for all the lines quoted, relevant dimensional details required for the installation must be furnished along with the offer.) B) Have you confirmed that the documents required as per vendor data Requirements will be supplied after the placement of order. C) If so, have you indicated the extra price applicable, if any?-------------------------------------------------------------------------------------------------------------------------------------------------------------5. Have you furnished sizing, noise level calculations and certified capacity curves for the instruments, wherever applicable?-------------------------------------------------------------------------------------------------------------------------------------------------------------6. Have you furnished, separately the `Shop inspection charges, if any, for inspection at your works by EIL/Third party? (The details of the tests to be carried out on the instruments during shop inspection are to be furnished)-------------------------------------------------------------------------------------------------------------------------------------------------------------7. Have you furnished the certificates from statutory bodies vis. BASEEFA, FM, CSA etc. for the Explosion proof construction / intrinsically safe design of the instruments, wherever specified?-------------------------------------------------------------------------------------------------------------------------------------------------------------8. Have you furnished the certificates from statutory authority i.e., CCOE certificate for all electrical equipments for intrinsically safe/ explosion proof design wherever specified?-------------------------------------------------------------------------------------------------------------------------------------------------------------9. Have you confirmed that IBR certification in Form III(C) or equivalent certification from statutory bodies viz. Lloyds, Bureau veritas, TUV etc. will be furnished wherever specified?-------------------------------------------------------------------------------------------------------------------------------------------------------------10. Have you indicated separately the installation and commissioning charges, in case the same are included in your scope of work?-------------------------------------------------------------------------------------------------------------------------------------------------------------11. Have you furnished the estimated power / utility consumptions and special cable requirements, if any, for the instruments quoted?-------------------------------------------------------------------------------------------------------------------------------------------------------------12. Have you furnished the customer reference list in India/Abroad.

Page 14 of 188

Page 15: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

SNO DATA SHEET NO REVISION TAG NO

1 A620-065-YF-DS-0001 0 065-NCFE-1001

2 A620-065-YF-DS-0152 0 065-NCFE-0152

3 A620-065-YF-DS-0153 0 065-NCFE-0153

4 A620-065-YF-DS-0154 0 065-NCFE-0154

5 A620-065-YF-DS-0160 0 065-NCFE-1602

6 A620-065-YF-DS-0161 0 065-NCFE-1601

7 A620-065-YF-DS-0164 0 065-NCFE-1604

8 A620-065-YF-DS-0171 0 065-NCFE-1701

9 A620-065-YF-DS-0173 0 065-NCFE-1703

10 A620-065-YF-DS-0174 0 065-NCFE-1704

11 A620-065-YF-DS-0182 0 065-NCFE-1820

12 A620-065-YF-DS-0191 0 065-NCFE-1901

13 A620-065-YF-DS-0192 0 065-NCFE-1902

14 A620-065-YF-DS-0291 0 065-NCFE-2901

15 A620-065-YF-DS-0292 0 065-NCFE-2902

16 A620-065-YF-DS-0293 0 065-NCFE-2903

17 A620-065-YF-DS-0294 0 065-NCFE-2904

18 A620-065-YF-DS-0301 0 065-NCFE-1301

19 A620-065-YF-DS-0311 0 065-NCFE-3111

20 A620-065-YF-DS-0315 0 065-NCFE-3105

21 A620-065-YF-DS-0318 0 065-NCFE-0318

22 A620-065-YF-DS-0319 0 065-NCFE-0319

23 A620-065-YF-DS-0320 0 065-NCFE-3204

24 A620-065-YF-DS-0323 0 065-NCFE-3226

25 A620-065-YF-DS-0324 0 065-NCFE-3241

26 A620-065-YF-DS-0326 0 065-NCRO-3250

27 A620-065-YF-DS-0327 0 065-NCFE-3237

28 A620-065-YF-DS-0328 0 065-NCRO-3251

29 A620-065-YF-DS-0332 0 065-NCFE-3302

30 A620-065-YF-DS-0334 0 065-NCFE-3234

31 A620-065-YF-DS-0335 0 065-NCFE-3235

32 A620-065-YF-DS-0341 0 065-NCFE-3401

33 A620-065-YF-DS-0344 0 065-NCFE-3440

34 A620-065-YF-DS-0346 0 065-NCRO-3460

35 A620-065-YF-DS-0361 0 065-NCFE-3601

36 A620-065-YF-DS-0369 0 065-NCFE-3609

37 A620-065-YF-DS-0401 0 065-NCFE-1401

38 A620-065-YF-DS-0402 0 065-NCFE-1402

39 A620-065-YF-DS-0422 0 065-NCFE-1422

40 A620-065-YF-DS-0453 0 065-NCFE-0453

41 A620-065-YF-DS-0454 0 065-NCFE-0454

42 A620-065-YF-DS-0455 0 065-NCFE-0455

43 A620-065-YF-DS-0456 0 065-NCFE-0456

44 A620-065-YF-DS-0457 0 065-NCFE-0457

45 A620-065-YF-DS-0458 0 065-NCFE-0458

46 A620-065-YF-DS-0459 0 065-NCFE-0459

47 A620-065-YF-DS-0460 0 065-NCFE-0460

48 A620-065-YF-DS-0461 0 065-NCFE-0461

DATASHEET INDEX

Page 15 of 188

Page 16: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

49 A620-065-YF-DS-0462 0 065-NCFE-0462

50 A620-065-YF-DS-0502 0 065-NCFE-1502

51 A620-065-YF-DS-0510 0 065-NCFE-0510

52 A620-065-YF-DS-0511 0 065-NCFE-0511

53 A620-065-YF-DS-0512 0 065-NCFE-0512A

54 A620-065-YF-DS-0513 0 065-NCFE-0513

55 A620-065-YF-DS-0601 0 065-NCFE-0601

56 A620-065-YF-DS-0702 0 065-NCFE-0702

57 A620-065-YF-DS-0714 0 065-NCFE-0714A

58 A620-065-YF-DS-0715 0 065-NCFE-0715

59 A620-065-YF-DS-0718 0 065-NCFE-0718

60 A620-065-YF-DS-0801 0 065-NCFE-0801

61 A620-065-YF-DS-0811 0 065-NCFE-0811

62 A620-065-YF-DS-0913 0 065-NCFE-0913

63 A620-065-YF-DS-0914 0 065-NCFE-0914

64 A620-065-YF-DS-0915 0 065-NCFE-0915

65 A620-062-YF-DS-0101 0 062-NHFE-0104

66 A620-062-YF-DS-0701 0 062-NHFE-0701

67 A620-062-YF-DS-0103 0 062-NHFE-0106

68 A620-062-YF-DS-0104 0 062-NHFE-0108

69 A620-062-YF-DS-0105 0 062-NHFE-0109

70 A620-062-YF-DS-0106 0 062-NHFE-0110

71 A620-062-YF-DS-0301 0 062-NHFE-0301

72 A620-062-YF-DS-0302 0 062-NHFE-0302

73 A620-062-YF-DS-0303 0 062-NHFE-0303

74 A620-062-YF-DS-0401 0 062-NHFE-0401

75 A620-062-YF-DS-0402 0 062-NHFE-0402

76 A620-062-YF-DS-0501 0 062-NHFE-0501

77 A620-062-YF-DS-0502 0 062-NHFE-0502

78 A620-062-YF-DS-0503 0 062-NHFE-0503

79 A620-062-YF-DS-0504 0 062-NHFE-0504

80 A620-062-YF-DS-0505 0 062-NHFE-0505

81 A620-062-YF-DS-0506 0 062-NHFE-0506

82 A620-062-YF-DS-0507 0 062-NHFE-0507

83 A620-062-YF-DS-0603 0 062-NHFE-0603

84 A620-062-YF-DS-0604 0 062-NHFE-0604

85 A620-062-YF-DS-0606 0 062-NHFE-606

86 A620-062-YF-DS-0607 0 062-NHFE-607

87 A620-062-YF-DS-0102 0 062-NHFE-0105

Page 16 of 188

Page 17: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS INDIA LIMITED

NEW DELHIUNIT CLIENT

DATA SHEET INDEX

VENDOR:

ORDER NO.:

0

REV

SM

APPVD

SM

CHKD

RRS

BY

09/06/2015

DATE

PLANT

000

A620-000-YF-MR-1320

DATEDESCRIPTION DATA SHEET NO. REVS.NO.

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

, c

opie

d, e

xhib

ited

or u

sed,

exc

ept

in li

mite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

.

EIL

-165

1-59

3 R

ev.1

A4-

210x

297

CONV OF EXISTCRU-ISOM-

BPCL

SPECIFICATION REV

A620-000-YF-ID-1320 0

REQ. NO.:Page 1 Of 3

A620-062-YF-DS-0101A620-062-YF-DS-0102A620-062-YF-DS-0103A620-062-YF-DS-0104A620-062-YF-DS-0105A620-062-YF-DS-0106A620-062-YF-DS-0301A620-062-YF-DS-0302A620-062-YF-DS-0303A620-062-YF-DS-0401A620-062-YF-DS-0402A620-062-YF-DS-0501A620-062-YF-DS-0502A620-062-YF-DS-0503A620-062-YF-DS-0504A620-062-YF-DS-0505A620-062-YF-DS-0506A620-062-YF-DS-0507A620-062-YF-DS-0603A620-062-YF-DS-0604A620-062-YF-DS-0606A620-062-YF-DS-0607A620-062-YF-DS-0701A620-065-YF-DS-0001A620-065-YF-DS-0152A620-065-YF-DS-0153A620-065-YF-DS-0154A620-065-YF-DS-0160A620-065-YF-DS-0161A620-065-YF-DS-0164A620-065-YF-DS-0171A620-065-YF-DS-0173A620-065-YF-DS-0174A620-065-YF-DS-0182A620-065-YF-DS-0191A620-065-YF-DS-0192A620-065-YF-DS-0291A620-065-YF-DS-0292A620-065-YF-DS-0293A620-065-YF-DS-0294A620-065-YF-DS-0301

09/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/2015

Orifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and Flanges

1234567891011121314151617181920212223242526272829303132333435363738394041

00000000000000000000000000000000000000000

Page 17 of 188

Page 18: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS INDIA LIMITED

NEW DELHIUNIT CLIENT

DATA SHEET INDEX

VENDOR:

ORDER NO.:

0

REV

SM

APPVD

SM

CHKD

RRS

BY

09/06/2015

DATE

PLANT

000

A620-000-YF-MR-1320

DATEDESCRIPTION DATA SHEET NO. REVS.NO.

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

, c

opie

d, e

xhib

ited

or u

sed,

exc

ept

in li

mite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

.

EIL

-165

1-59

3 R

ev.1

A4-

210x

297

CONV OF EXISTCRU-ISOM-

BPCL

SPECIFICATION REV

A620-000-YF-ID-1320 0

REQ. NO.:Page 2 Of 3

A620-065-YF-DS-0311A620-065-YF-DS-0315A620-065-YF-DS-0318A620-065-YF-DS-0319A620-065-YF-DS-0320A620-065-YF-DS-0323A620-065-YF-DS-0324A620-065-YF-DS-0326A620-065-YF-DS-0327A620-065-YF-DS-0328A620-065-YF-DS-0332A620-065-YF-DS-0334A620-065-YF-DS-0335A620-065-YF-DS-0341A620-065-YF-DS-0344A620-065-YF-DS-0346A620-065-YF-DS-0361A620-065-YF-DS-0369A620-065-YF-DS-0401A620-065-YF-DS-0402A620-065-YF-DS-0422A620-065-YF-DS-0453A620-065-YF-DS-0454A620-065-YF-DS-0455A620-065-YF-DS-0456A620-065-YF-DS-0457A620-065-YF-DS-0458A620-065-YF-DS-0459A620-065-YF-DS-0460A620-065-YF-DS-0461A620-065-YF-DS-0462A620-065-YF-DS-0502A620-065-YF-DS-0510A620-065-YF-DS-0511A620-065-YF-DS-0512A620-065-YF-DS-0513A620-065-YF-DS-0601A620-065-YF-DS-0702A620-065-YF-DS-0714A620-065-YF-DS-0715A620-065-YF-DS-0718

09/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/201509/06/2015

Orifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and Flanges

4243444546474849505152535455565758596061626364656667686970717273747576777879808182

00000000000000000000000000000000000000000

Page 18 of 188

Page 19: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS INDIA LIMITED

NEW DELHIUNIT CLIENT

DATA SHEET INDEX

VENDOR:

ORDER NO.:

0

REV

SM

APPVD

SM

CHKD

RRS

BY

09/06/2015

DATE

PLANT

000

A620-000-YF-MR-1320

DATEDESCRIPTION DATA SHEET NO. REVS.NO.

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

, c

opie

d, e

xhib

ited

or u

sed,

exc

ept

in li

mite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

.

EIL

-165

1-59

3 R

ev.1

A4-

210x

297

CONV OF EXISTCRU-ISOM-

BPCL

SPECIFICATION REV

A620-000-YF-ID-1320 0

REQ. NO.:Page 3 Of 3

A620-065-YF-DS-0801A620-065-YF-DS-0811A620-065-YF-DS-0913A620-065-YF-DS-0914A620-065-YF-DS-0915

09/06/201509/06/201509/06/201509/06/201509/06/2015

Orifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and FlangesOrifice Plates and Flanges

8384858687

00000

Page 19 of 188

Page 20: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0101 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-62-0118N-A1A2) Element Pressure drop =0.3 (Max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

6"-P-62-0118N-A1A6

FlangeHYDROCARBONLiquid90.982.741.36.440

150.668

.667

.302

2500

100Conc. Square Edged

ISO 5167316 SS

.527

81.27

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

*

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0104 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

460802

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 20 of 188

Page 21: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0102 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-62-0117N-A1A2) Element Pressure drop =0.3 (Max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

4"-P-62-0117N-A1A4

FlangeHYDROCARBONLiquid39.936.317.52.640

150.628

.603

.195

2500

50Conc. Square Edged

ISO 5167316 SS

.5482

56.08

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0105 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 21 of 188

Page 22: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0103 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-62-0117N-A1A2) Element Pressure drop =0.3 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

4"-P-62-0119N-A1A4

FlangeHYDROCARBONLiquid20.218.49.22.640

150.701

.68

.314

2500

25Conc. Square Edged

ISO 5167316 SS

.408

41.77

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

*

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0106 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

151248

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 22 of 188

Page 23: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0104 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-62-0122N-B1A2) Element Pressure drop =0.3 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

6"-P-62-0122N-B1A6

FlangeHYDROCARBONLiquid130.911959.534.940

150.65

.63

.262

2500

150Conc. Square Edged

ISO 5167316 SS

.62

95.67

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0108 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 23 of 188

Page 24: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0105 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-62-0122N-B1A2) Element Pressure drop =0.3 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

6"-P-62-0122N-B1A6

FlangeHYDROCARBONLiquid130.911959.534.640

150.65

.63

.262

2500

150Conc. Square Edged

ISO 5167316 SS

.621

95.7

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

*

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0109 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

722455

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 24 of 188

Page 25: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0106 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-2"-P-62-0131N-B5A2) Element Pressure drop =0.15 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL+I RING5) Hydrogen Service requirements as per Special Instructions to Vendor(SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

H2

2"-P-62-0131N-B5A2

FlangeHYDROCARBONVapour90751522.740

150

1.01

3.4

1.4

.01

2500

100Conc. Square Edged

ISO 5167316 SS

.25

12.34

49.3

3.18

RequiredWeld Neck

.5Two

ASTM A1052"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0110 0

kg/hkg/hkg/h

XS

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

60.33

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 25 of 188

Page 26: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0301 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-AP-62-0301N-A1A2) Element Pressure drop =0.15 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

PLANT AIR

4'-AP-62-0301N-A1A4

FlangePLANT AIRVapour6105641305.740

150

1

28

1.4

.01

2500

700Conc. Square Edged

ISO 5167316 SS

.255

26.16

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

062-NHFE-0301 0

kg/hkg/hkg/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 26 of 188

Page 27: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0302 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-SM-62-0301N-B2A-IH2) Element Pressure drop =0.15 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) IBR requirements as per Special Instructions to vendor (SIV) shll be complied.6) Radiography requirements as per Special Instructions to Vendor(SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

STEAM

6"-SM-62-0301N-B2A6

FlangeSTEAMSteam87507000195014.2340

400

.95

18

1.25

.01

2500

9000Conc. Square Edged

ISO 5167316 SS

.5823

88.75

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

062-NHFE-0302 0

kg/hkg/hkg/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

CERTIFI-CATION

54.

Model No.

Manufacturers

IBR

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 27 of 188

Page 28: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0303 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-3"-FG-62-0301N-A5A-IT2) Element Pressure drop =0.1.5 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Hydrogen Service requirements as per Special Instructions to vendor (SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

FUEL GAS

3"-FG-62-0301N-A5A3

FlangeFUEL GASVapour4603301652.545

150

1

18.6

1.28

.01

2500

500Conc. Square Edged

ISO 5167316 SS

.394

30.75

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

*

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

062-NHFE-0303 0

kg/hkg/hkg/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

208860

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 28 of 188

Page 29: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0401 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-3"-FG-62-0201N-B9A-IH2) Element Pressure drop =0.15 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Radiography requirements as per Special Instructions to Vendor (SIV) shall be complied.6) NACE requirements as per Special Instructions to Vendor(SIV) shall be complied.7) Hydrogen Service requirements as per Special Instructions to Vendor (SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

H2

3"-FG-62-0201N-B9A3

FlangeH2Vapour1356123356632.740

150

1.01

4.939

1.35

.01

2500

1600Conc. Square Edged

ISO 5167316 SS

.52

40.93

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

*

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

062-NHFE-0401 0

kg/hkg/hkg/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

615819

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 29 of 188

Page 30: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0402 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-2"-WB-62-0401N-D2A-IH2) Element Pressure drop =0.3 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Radiography requirements as per Special Instructions to Vendor (SIV) shall be complied.6) IBR requirements as per Special Instructions to Vendor(SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

BFW

2"-WB-62-0401N-D2A2

FlangeBFWLiquid21.7.935140

200.999

.96

.2

2500

2.2Conc. Square Edged

ISO 5167316 SS

.261

13.17

49.3

2.38

RequiredWeld Neck

.5Two

ASTM A1052"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

600#

*

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0402 0

m³/hm³/hm³/h

Drain

XS

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

60.33

68874

CERTIFI-CATION

54.

Model No.

Manufacturers

IBR

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 30 of 188

Page 31: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0501 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-62-0511N-B9A2) Element Pressure drop =0.3 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Radiography requirements as per Special Instructions to Vendor (SIV) shall be complied.6) NACE requirements as per Special Instructions to Vendor(SIV) shall be complied.7) Hydrogen Service requirements as per Special Instructions to Vendor (SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPHTHA

6"-P-62-0511N-B9A6

FlangeHYDROCARBONLiquid1321206022.740

150

.649

.263

2500

156Conc. Square Edged

ISO 5167316 SS

.6355

97.93

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0501 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 31 of 188

Page 32: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0502 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-2"-P-62-0508N-B9A2) Element Pressure drop =0.15 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Radiography requirements as per Special Instructions to Vendor (SIV) shall be complied.6) NACE requirements as per Special Instructions to Vendor(SIV) shall be complied.7) Hydrogen Service requirements as per Special Instructions to Vendor (SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

FUEL GAS

2"-P-62-0508N-B9A2

FlangeH2 + HCVapour1375125065522.740

150

1.01

4.9

1.35

.009

6000

1500Conc. Square Edged

ISO 5167316 SS

.668

32.96

49.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1052"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

062-NHFE-0502 0

kg/hkg/hkg/h

Vent

XS

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

60.33

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 32 of 188

Page 33: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0503 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-62-0519N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPHTHA

6"-P-62-0519N-A1A6

FlangeHYDROCARBONLiquid132120606.540

150

.656

.277

2500

150Conc. Square Edged

ISO 5167316 SS

.6284

96.85

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0503 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 33 of 188

Page 34: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0504 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-62-0515N-B1A2) Element Pressure drop =0.3 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPHTHA

6"-P-62-0515N-B1A6

FlangeHYDROCARBONLiquid143139658.396

150

.592

.176

2500

150Conc. Square Edged

ISO 5167316 SS

.6135

94.55

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

*

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0504 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

1104021

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 34 of 188

Page 35: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0505 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-2"-P-62-0516N-B9A2) Element Pressure drop =0.3 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Radiography requirements as per Special Instructions to Vendor (SIV) shall be complied.6) NACE requirements as per Special Instructions to Vendor(SIV) shall be complied.7) Hydrogen Service requirements as per Special Instructions to Vendor (SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

SOUR WATER

2"-P-62-0516N-B9A2

FlangeSOUR WATERLiquid21.6.822.740

150.998

.99

.595

2500

2.1Conc. Square Edged

ISO 5167316 SS

.263

12.99

49.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0505 0

m³/hm³/hm³/h

Drain

XS

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

60.33

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 35 of 188

Page 36: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0506 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-62-0522N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPHTHA

6"-P-62-0522N-A1A6

FlangeHYDROCARBONLiquid132120606.540

150

.656

.277

2500

150Conc. Square Edged

ISO 5167316 SS

.6287

96.9

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0506 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 36 of 188

Page 37: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0507 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-62-0523N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPHTHA

6"-P-62-0523N-A1A6

FlangeHYDROCARBONLiquid132120606.140

150

.656

.277

2500

150Conc. Square Edged

ISO 5167316 SS

.6286

96.88

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0507 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 37 of 188

Page 38: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0603 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-2"-P-62-0603N-B9A2) Element Pressure drop =0.15 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Radiography requirements as per Special Instructions to Vendor (SIV) shall be complied.6) NACE requirements as per Special Instructions to Vendor(SIV) shall be complied.7) Hydrogen Service requirements as per Special Instructions to Vendor (SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NHT OFF GAS

2"-P-62-0606N-B9A2

FlangeFUEL GASVapour9007503509.440

150

.97

25.6

1.19

.008

2500

950Conc. Square Edged

ISO 5167316 SS

.55

27.13

49.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1052"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

*

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

062-NHFE-0603 0

kg/hkg/hkg/h

Vent

XS

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

60.33

807124

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 38 of 188

Page 39: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0604 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-62-0611N-B9A2) Element Pressure drop =0.3 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Radiography requirements as per Special Instructions to Vendor (SIV) shall be complied.6) NACE requirements as per Special Instructions to Vendor(SIV) shall be complied.7) Hydrogen Service requirements as per Special Instructions to Vendor (SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NHT REFLUX

4"-P-62-0611N-B9A4

FlangeNAPHTHALiquid52.547.722.314.240

150.585

.556

.137

2500

60Conc. Square Edged

ISO 5167316 SS

.5799

59.33

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-0604 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 39 of 188

Page 40: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0606 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-8"-P-62-1516-B1A2) Element Pressure drop =0.3 (max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

STRIPPER BOTTOM

8"-P-62-1516-B1A8

FlangeNAPHTHALiquid139.4126.762.418.2156

227.67

.518

11.2

2500

150Conc. Square Edged

ISO 5167316 SS

.462

93.7

202.7

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1058"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-606 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

219.1

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 40 of 188

Page 41: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0607 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-8"-P-62-1602-B1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

STRIPPER BOTTOM

8"-P-62-1602-B1A8

FlangeNAPHTHALiquid139.4126.762.418.2156

150.67

.518

11.2

2500

150Conc. Square Edged

ISO 5167316 SS

.462

93.7

202.7

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1058"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

062-NHFE-607 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

219.1

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 41 of 188

Page 42: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-062-YF-DS-0701 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

062

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-3"-FG-62-0371N-A5A-IT2) Element Pressure drop =0.15(max) Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Hydrogen Service requirements as per Special Instructions to Vendor (SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

FUEL GAS

3"-FG-62-0701N-A5A3

FlangeFUEL GASVapour7804603552.545

150

1

18

1.28

.01

2500

598Conc. Square Edged

ISO 5167316 SS

.4184

32.59

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

062-NHFE-0701 0

kg/hkg/hkg/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 42 of 188

Page 43: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMSM

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0001 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-8"-N-65-1001N-A3A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NITROGEN VAPOUR

8"-N-65-1001N-A3A8

FlangeNITROGENVapour345034501500540

65

.998

28

1.41

.019

2500

3800Conc. Square Edged

ISO 5167316 SS

.3119

63.25

202.7

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1058"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-1001 0

kg/hkg/hkg/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

219.1

316844.96

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 43 of 188

Page 44: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMSM

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0152 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-0110N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

6"-P-65-0110N-A1A6

FlangeHYDROCARBONLiquid139.8127.162.87.486.8

150

.601

.185

2500

170Conc. Square Edged

ISO 5167316 SS

.6512

100.36

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0152 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

1042419

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 44 of 188

Page 45: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMSM

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0153 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-CM-65-0101N-B2A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) IBR requirements as per Special Instructions to Vendor(SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

4"-CM-65-0101N-B2A4

FlangeHYDROCARBONLiquid17.616814.7181.3

400

.885

.148

2500

22Conc. Square Edged

ISO 5167316 SS

.4034

41.28

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0153 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

363876

CERTIFI-CATION

54.

Model No.

Manufacturers

IBR

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 45 of 188

Page 46: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMSM

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0154 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-3"-P-65-0115N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

3"-P-65-0115N-A1A3

FlangeHYDROCARBONLiquid18.516.8712.1162

200

.606

.173

2500

22Conc. Square Edged

ISO 5167316 SS

.478

37.26

88.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0154 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

77.9

294236

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 46 of 188

Page 47: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMSM

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0160 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-1606N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Hydrogen Service requirements as per Special Instructions to Vendor (SIV) shall be complied..

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROCARBON VAPOUR

6"-P-65-1606N-B5A6

FlangeHYDROCARBONVapour290.42641302740

150

1

6.1

1.338

.302

200

350Conc. Square Edged

ISO 5167316 SS

.233

35.96

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-1602 0

kg/hkg/hkg/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

74060

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 47 of 188

Page 48: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0161 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-1606N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Hydrogen Service requirements as per Special Instructions to Vendor (SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROCARBON VAPOUR

6"-P-65-1606N-B5A6

FlangeHYDROCARBONLiquid137.9125.45826.840

150

.622

.215

2500

170Conc. Square Edged

ISO 5167316 SS

.6528

100.6

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-FE-1601 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

915690

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 48 of 188

Page 49: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0164 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-1605N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Hydrogen Service requirements as per Special Instructions to Vendor (SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROCRBON VAPOUR

6"-P-65-1605N-B5A6

FlangeHYDROCARBONVapour290.4290.4290.42740

150

1

6.1

1.338

.009

150

320Conc. Square Edged

ISO 5167316 SS

.2397

36.95

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-1604 0

kg/hkg/hkg/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

74060

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 49 of 188

Page 50: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0171 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-1701N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

6"-P-65-1708N-A1A6

FlangeHYDROCARBONLiquid106.196.544.611.340

150

.612

.211

2500

128Conc. Square Edged

ISO 5167316 SS

.5778

89.04

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-1701 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

706344

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 50 of 188

Page 51: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0173 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-1710N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

YDROCARBON

6"-P-65-1710N-A1A6

FlangeHYDROCARBONLiquid106.196.544.69.740

150

.612

.302

2500

128Conc. Square Edged

ISO 5167316 SS

.5782

89.1

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-1703 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

706345

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 51 of 188

Page 52: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0174 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-1711N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

LIGHT ISOMERATE

6"-P-65-1711N-A1A6

FlangeHYDROCARBONLiquid106.196.544.69.740

150

.612

.211

2500

128Conc. Square Edged

ISO 5167316 SS

.5782

89.1

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-1704 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

706345

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 52 of 188

Page 53: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0182 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-3"-CM-65-1801N-B2A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) IBR requirements as per Special Instructions to Vendor(SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

3"-CM-65-1801N-B2A3

FlangeHYDROCARBONLiquid7.36.73.314.3194

400

.871

.138

2500

10Conc. Square Edged

ISO 5167316 SS

.3562

27.75

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-1820 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

209199

CERTIFI-CATION

54.

Model No.

Manufacturers

IBR

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 53 of 188

Page 54: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0191 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-1910N-B1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

4"-P-65-1906N-B1A4

FlangeHYDROCARBONLiquid50.846.28.914.240

150

.535

.134

2500

62Conc. Square Edged

ISO 5167316 SS

.584

59.75

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-1901 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

701248

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 54 of 188

Page 55: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0192 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-3"-P-65-1903N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Hydrogen Service requirements as per Special Instructions to Vendor (SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

3"-P-65-1903N-B5A3

FlangeHYDROCARBONVapour224020364659.240

150

32.9

1.18

.008

2500

2800Conc. Square Edged

ISO 5167316 SS

.5309

46.7

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-1902 0

kg/hkg/hkg/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 55 of 188

Page 56: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0291 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-3105N-B1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

6"-P-65-3105N-B1A6

FlangeHYDROCARBONLiquid106.396.647.214.990

150

.594

.178

2500

130Conc. Square Edged

ISO 5167316 SS

.5767

88.88

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-2901 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

814201

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 56 of 188

Page 57: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0292 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-8"-P-65-3006N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

DWH REFLUX

6"-P-65-3006N-A1A6

FlangeHYDROCARBONLiquid149.2135.658.311.555

150

.595

.186

2500

178Conc. Square Edged

ISO 5167316 SS

.661

101.87

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-2902 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

1095482

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 57 of 188

Page 58: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0293 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-8"-P-65-2917N-B1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

DWC FEED

8"-P-65-2917N-B1A8"

FlangeHYDROCARBONLiquid40.636.916.59.4105.7

150

.596

.2

2500

50Conc. Square Edged

ISO 5167316 SS

.2814

57.35

202.7

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1058"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-2903 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

219.1

211117

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 58 of 188

Page 59: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0294 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-8"-P-65-1704N-B1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

DWC FEED

8"-P-65-1704N-B1A8"

FlangeHYDROCARBONLiquid150.4136.755.19.4105.7

150

.553

.145

2500

180Conc. Square Edged

ISO 5167316 SS

.5138

104.15

202.7

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1058"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-2904 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

219.1

1000889.8

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 59 of 188

Page 60: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0301 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-12"-P-65-1202N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) H2 service requirement as per special instruction to vendor shall be complied

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROGEN VAP.

12"-P-65-1202N-B5A12

FlangeHYDROGEN VAPVapour1530513913579032.660

150

1.01

5.6

.009

2500

18200Conc. Square Edged

ISO 5167316 SS

.444819

135.58

304.8

4.76

3.18

RequiredWeld Neck

.5THREE

ASTM A10512"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-1301 0

kg/hkg/hkg/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

323.9

1973380

CERTIFI-CATION

54.

Model No.

Manufacturers

NOTE 5

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 60 of 188

Page 61: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0311 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-3131N-B1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROCARBON

6"-P-65-3131N-B1A6

FlangeHYDROCARBONLiquid24.724.77.814.990

150

.594

.2

2500

30Conc. Square Edged

ISO 5167316 SS

.2859

44.07

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-3111 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

168378

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 61 of 188

Page 62: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0315 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-3"-P-65-3135N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

FGH POLISH FEED

3"-P-65-3135N-B1A3

FlangeHYDROCARBONLiquid12.211.15.522.690

150

.593

.176

2500

15Conc. Square Edged

ISO 5167316 SS

.3962

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-3105 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

186637

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 62 of 188

Page 63: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0318 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-0313N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

6"-P-65-0313N-A1A6

FlangeHYDROCARBONLiquid84.476.737.79.540

150

.62

.218

2500

100Conc. Square Edged

ISO 5167316 SS

.5188

79.96

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0318 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

550947

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 63 of 188

Page 64: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0319 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-0309N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

6"-P-65-0309N-A1A6

FlangeHYDROCARBONLiquid64.658.727.49.755

150

.602

.195

2500

78Conc. Square Edged

ISO 5167316 SS

.45837

70.69

154.1

2.38

2.38

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0319 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

458508.76

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 64 of 188

Page 65: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0320 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-3"-P-65-3242N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

ISOMERATE

3"-P-65-3242N-A1A3

FlangeHYDROCARBONLiquid20.218.33.69.8131.9

200

.617

.205

2500

25Conc. Square Edged

ISO 5167316 SS

.510599

39.78

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-3204 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

276045.24

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 65 of 188

Page 66: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0323 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1)LINE NO. IS 3"-P-65-3253N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

ISOMERATE

3"-P-65-3253N-A1A3

FlangeHYDROCARBONLiquid5553.9132

200

.624

.234

2500

6Conc. Square Edged

ISO 5167316 SS

.25569

19.92

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-3226 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

68328

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 66 of 188

Page 67: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0324 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-3254N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

SBP BLENDED PRD.

6"-P-65-3254N-A1A6

FlangeHYDROCARBONLiquid60.460.4228.240

150

.675

.302

2500

70Conc. Square Edged

ISO 5167316 SS

.448

69.04

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-3241 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

285298

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 67 of 188

Page 68: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0326 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-3254N-A1A2) Element Pressure drop =6.2kG/CM2

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROCARBON

4"-P-65-3254N-A1A4

FlangeHYDROCARBONLiquid10

11108

150

.578

.162

RESTRICTION ORIFICE

ISO 5167316 SS

102.3

3.18

Not Required

kg/cm²(g)

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCRO-3250 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 68 of 188

Page 69: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0327 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-3254N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROCARBON

4"-P-65-3254N-A1A4

FlangeHYDROCARBONLiquid1010104.8108

150

.578

.162

2500

13Conc. Square Edged

ISO 5167316 SS

.2825

28.91

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-3237 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

123359

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 69 of 188

Page 70: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0328 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-3253N-A1A2) Element Pressure drop =6.1kG/CM2

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROCARBON

3"-P-65-3253N-A1A3

FlangeHYDROCARBONLiquid5

10132

200

.617

.205

RESTRICTION ORIFICE

ISO 5167316 SS

77.9

3.18

Not Required

kg/cm²(g)

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCRO-3251 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 70 of 188

Page 71: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0332 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-SM-65-2913N-B2A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) IBR requirements as per Special Instructions to Vendor(SIV) shall be complied..

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

4"-SM-65-2913N-B2A4

FlangeHYDROCARBONLiquid214.519597.514.7194

400

.933

18

1

.302

250

260Conc. Square Edged

ISO 5167316 SS

.2723

27.86

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-3302 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

49441.93

CERTIFI-CATION

54.

Model No.

Manufacturers

IBR

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 71 of 188

Page 72: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0334 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-3243N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

6"-P-65-3243N-A1A6

FlangeHYDROCARBONLiquid121.4121.450.810.3130

200

.624

.234

2500

140Conc. Square Edged

ISO 5167316 SS

.602

92.78

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-3234 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

743053

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 72 of 188

Page 73: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0335 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-3207N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

ISOMERATE

6"-P-65-3207N-A1A6

FlangeHYDROCARBONLiquid121.4110.350.810.3130

200

.624

.234

2500

145Conc. Square Edged

ISO 5167316 SS

.6113

94.2

154.1

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-3235 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

743053

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 73 of 188

Page 74: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0341 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-SM-65-3402N-B2A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) IBR requirements as per Special Instructions to Vendor(SIV) shall be complied..

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

4"-SM-65-3402N-B2A4

FlangeHYDROCARBONVapour82575037514.7194

400

.933

18

1.393

.302

2500

1000Conc. Square Edged

ISO 5167316 SS

.30038

30.73

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-3401 0

kg/hkg/hkg/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

190161

CERTIFI-CATION

54.

Model No.

Manufacturers

IBR

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 74 of 188

Page 75: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0344 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-2"-P-65-3430N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

STRIPPER REFLUX

2"-P-65-3430N-A1A2

FlangeHYDROCARBONLiquid2.32.1110.340

150

.643

.249

2500

3Conc. Square Edged

ISO 5167316 SS

.28834

14.22

49.3

3.18

RequiredWeld Neck

.5Two

ASTM A1052"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-3440 0

m³/hm³/hm³/h

Vent

XS

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

60.33

42611.57

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 75 of 188

Page 76: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0346 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-2"-P-65-3460N-A1A2) Element Pressure drop =2.7KG/CM2 AT MAX. FLOW

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROCARBON

2"-P-65-3460N-A1A2

FlangeHYDROCARBONLiquid

10.340

150

.643

.249

RESTRICTION ORIFICE

ISO 5167316 SS

49.3

3.18

Not Required

kg/cm²(g)

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCRO-3460 0

m³/hm³/hm³/h

Vent

XS

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

60.33

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 76 of 188

Page 77: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0361 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-18"-P-65-2952N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROCARBON

6"-P-65-3606N-A1A6

FlangeHYDROCARBONLiquid159145678.9132.6

200

.616

.201

2500

190Conc. Square Edged

ISO 5167316 SS

.6826

105.2

154.1

3.97

3.18

RequiredWeld Neck

.5THREE

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-3601 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

1118443.887

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 77 of 188

Page 78: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0369 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-FG-65-3601N-A5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) Hydrogen Service requirements as per Special Instructions to Vendor (SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

DWC REBOILER PMP DIS

6"-FG-65-3601N-A5A6

FlangeHYDROCARBONVapour3104221611082.545

150

1

12.9

1.28

.01

2500

3400Conc. Square Edged

ISO 5167316 SS

.5302

81.71

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-3609 0

kg/hkg/hkg/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

712449

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 78 of 188

Page 79: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0401 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-8"-P-65-1403N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5)H2 service requirement as per special instruction to vendor (SIV) shall be complied

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROGEN

8"-P-65-1403N-B5A6

FlangeHYDROGENVapour24422220107531.861.7

150

1.01

5.5

1.337

.009

2500

3000Conc. Square Edged

ISO 5167316 SS

.36385

56.07

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1058"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-1401 0

kg/hkg/hkg/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

622781

CERTIFI-CATION

54.

Model No.

Manufacturers

NOTE 5

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 79 of 188

Page 80: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0402 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-1203N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5)H2 service requirement as per pecial instruction to vendor (SIV) shall be complied

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROGEN

8"-P-65-1203N-B5A8

FlangeHYDROGENVapour24422220107531.861.7

150

1.01

5.5

1.337

.302

2500

3000Conc. Square Edged

ISO 5167316 SS

.27777

56.3

202.7

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-1402 0

kg/hkg/hkg/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

219.1

473461

CERTIFI-CATION

54.

Model No.

Manufacturers

NOTE 5

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 80 of 188

Page 81: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0422 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-CM-65-1401N-A2A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) IBR requirements as per Special Instructions to Vendor(SIV) shall be complied.

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

WATER

4"-CM-65-1401N-B2A4

FlangeSTEAMLiquid5.44.92.514.6194

400

.871

.138

1000

6.5Conc. Square Edged

ISO 5167316 SS

.27599

28.23

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-1422 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

117839.86

CERTIFI-CATION

54.

Model No.

Manufacturers

IBR

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 81 of 188

Page 82: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0453 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-0413N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

3"-P-65-0413N-A1A3

FlangeHYDROCARBONLiquid15.614.25.911.640

150

.72

.454

2500

20Conc. Square Edged

ISO 5167316 SS

.4776

37.21

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0453 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 82 of 188

Page 83: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0454 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-0415N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

3"-P-65-0415N-A1A3

FlangeHYDROCARBONLiquid15.614.25.99.640

150

.72

.454

2500

20Conc. Square Edged

ISO 5167316 SS

.478

37.24

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0454 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

112330

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 83 of 188

Page 84: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0455 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-0416N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

3"-P-65-0416N-A1A3

FlangeHYDROCARBONLiquid15.614.25.99.640

150

.72

.454

2500

20Conc. Square Edged

ISO 5167316 SS

.478

37.24

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0455 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

112330

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 84 of 188

Page 85: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0456 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-0417N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

3"-P-65-0417N-A1A3

FlangeHYDROCARBONLiquid15.614.25.99.640

150

.72

.454

2500

20Conc. Square Edged

ISO 5167316 SS

.478

37.24

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0456 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

112330

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 85 of 188

Page 86: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMSM

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0457 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-0418N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

3"-P-65-0418N-A1A3

FlangeHYDROCARBONLiquid10.29.27.69.640

150

.718

.446

2500

12Conc. Square Edged

ISO 5167316 SS

.37364

29.11

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0457 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

74556.8171

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 86 of 188

Page 87: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0458 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-0408N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

4"-P-65-0408N-A1A4

FlangeHYDROCARBONLiquid18.616.96.89.340

150

.694

.372

2500

22Conc. Square Edged

ISO 5167316 SS

.3825

39.13

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0458 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

119974.5

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 87 of 188

Page 88: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0459 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-0409N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

4"-P-65-0409N-A1A4

FlangeHYDROCARBONLiquid32.329.413.49.340

150

.694

.372

2500

40Conc. Square Edged

ISO 5167316 SS

.50856

52.03

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0459 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 88 of 188

Page 89: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0460 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-0410N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

4"-P-65-0410N-A1A4

FlangeHYDROCARBONLiquid32.329.413.49.340

150

.694

.372

2500

40Conc. Square Edged

ISO 5167316 SS

.50856

52.03

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0460 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

208342.8

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 89 of 188

Page 90: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0461 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-0410N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

4"-P-65-0410N-A1A4

FlangeHYDROCARBONLiquid32.329.413.411.640

150

.694

.372

2500

40Conc. Square Edged

ISO 5167316 SS

.5074

51.91

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0461 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

208342.8

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 90 of 188

Page 91: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0462 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-0410N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

4"-P-65-0405N-A1A4

FlangeHYDROCARBONLiquid32.329.413.411.440

150

.694

.372

2500

40Conc. Square Edged

ISO 5167316 SS

.50813

51.98

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-FE-0462 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

208342.8

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 91 of 188

Page 92: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0502 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-1204N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5)H2 service requirement as per special instruction to vendor(SIV)shall be complied

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROGEN

6"-P-65-1204N-B5A6

FlangehydrogenVapour24422220107531.861.7

150

1.01

5.5

1.337

.009

2500

3000Conc. Square Edged

ISO 5167316 SS

.3638

56.07

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-1502 0

kg/hkg/hkg/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

622781

CERTIFI-CATION

54.

Model No.

Manufacturers

NOTE 5

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 92 of 188

Page 93: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0510 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-0501N-B1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

4"-P-65-0501N-B1A4

FlangeHYDROCARBONLiquid26.924.412.2840

150

.647

.263

2500

33Conc. Square Edged

ISO 5167316 SS

.4576

46.82

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0510 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

228802

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 93 of 188

Page 94: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0511 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-43"-P-65-0502N-B1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

3"-P-65-0502N-B1A3

FlangeHYDROCARBONLiquid7.16.43.2840

150

.647

.263

2500

10Conc. Square Edged

ISO 5167316 SS

.33329

25.96

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0511 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

79305

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 94 of 188

Page 95: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0512 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-3"-P-65-0507N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5)H2 SERVICE REQUIREMENT AS PER SPECIAL INSTRUCTION TO VENDOR SHALL BE COMPLIED

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

3"-P-65-0507N-B5A3

FlangeHYDROCARBONLiquid26.824.412.22340

150

.648

.262

2500

32Conc. Square Edged

ISO 5167316 SS

.57679

44.93

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0512A 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

300958

CERTIFI-CATION

54.

Model No.

Manufacturers

NOTE 5

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 95 of 188

Page 96: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0513 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-3"-P-65-0507N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5)H2 SERVICE REQUIREMENT AS PER SPECIAL INSTRUCTION TO VENDOR SHALL BE COMPLIED

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

3"-P-65-0507N-B5A3

FlangeHYDROCARBONLiquid26.824.412.222.740

150

.649

.262

2500

32Conc. Square Edged

ISO 5167316 SS

.5774

44.98

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0513 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

301422

CERTIFI-CATION

54.

Model No.

Manufacturers

NOTE 5

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 96 of 188

Page 97: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0601 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-2"-CM-65-0601N-B2A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5) IBR requirements as per Special Instructions to Vendor (SIV) shall be complied

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

WATER

2"-CM-65-0601N-B2A2

FlangeWATERLiquid1.9.414.6194

400

.871

.138

2500

12Conc. Square Edged

ISO 5167316 SS

.5918

29.18

49.3

3.18

RequiredWeld Neck

.5Two

ASTM A1052"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0601 0

m³/hm³/hm³/h

Vent

XS

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

60.33

45282

CERTIFI-CATION

54.

Model No.

Manufacturers

IBR

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 97 of 188

Page 98: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0702 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-3"-P-65-0701N-A5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5)H2 SERVICE REQUIREMENT AS PER SPECIAL INSTRUCTION TO VENDOR SHALL BE COMPLIED

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROCARBON

3"-P-65-0701N-A5A3

FlangeHYDROCARBONLiquid22.320.36.96.840

150

.6995

.324

2500

30Conc. Square Edged

ISO 5167316 SS

.5715

44.52

77.9

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1053"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0702 0

m³/hm³/hm³/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

88.9

218441

CERTIFI-CATION

54.

Model No.

Manufacturers

NOTE 5

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 98 of 188

Page 99: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0714 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-0708N-D5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5)H2 SERVICE REQUIREMENT AS PER SPECIAL INSTRUCTION TO VENDOR SHALL BE COMPLIED

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROCARBON

6"-P-65-0708N-D5A6

FlangeHYDROCARBONLiquid135.5123.257.737.948.4

150

.63

.227

2500

162Conc. Square Edged

ISO 5167316 SS

.6693

97.93

146.3

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

600#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0714A 0

m³/hm³/hm³/h

Vent

XS

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

9.9169

CERTIFI-CATION

54.

Model No.

Manufacturers

NOTE 5

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 99 of 188

Page 100: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0715 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-0708N-D5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5)H2 SERVICE REQUIREMENT AS PER SPECIAL INSTRUCTION TO VENDOR SHALL BE COMPLIED

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

6"-P-65-0708N-D5A6

FlangeHYDROCARBONLiquid135.5123.257.738.248.4

150

.63

.227

2500

162Conc. Square Edged

ISO 5167316 SS

.6693

97.93

146.3

3.18

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

600#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0715 0

m³/hm³/hm³/h

Vent

XS

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

909169

CERTIFI-CATION

54.

Model No.

Manufacturers

NOTE 5

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 100 of 188

Page 101: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0718 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-6"-P-65-0708N-D5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NAPTHA

6"-P-65-0313N-A1A6

FlangeHYDROCARBONLiquid84.476.737.79.540

150

.62

.218

2500

101Conc. Square Edged

ISO 5167316 SS

.52123

80.32

154.1

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1056"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0718 0

m³/hm³/hm³/h

Vent

XS

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

168.3

909169

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 101 of 188

Page 102: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0801 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-N-65-0802N-A3A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NITROGEN

4"-N-65-0802N-A3A4

FlangeNITROGENVapour244424448855.128

65

.998

28

1.41

.019

2500

Conc. Square Edged

ISO 5167316 SS

.5046

51.62

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-0801 0

kg/hkg/hkg/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 102 of 188

Page 103: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0811 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-0801N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5)H2 SERVICE REQUIREMENT AS PER SPECIAL INSTRUCTION TO VENDOR SHALL BE COMPLIED

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROGEN

4"-P-65-0801N-B5A4

FlangeHYDROGENVapour816.8742.5131.252240

65

1.01

2

1.41

.009

2500

980Conc. Square Edged

ISO 5167316 SS

.4309

44.09

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-0811 0

kg/hkg/hkg/h

Vent

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

313785

CERTIFI-CATION

54.

Model No.

Manufacturers

NOTE 5

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 103 of 188

Page 104: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0913 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-3504N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5)H2 SERVICE REQUIREMENT AS PER SPECIAL INSTRUCTION TO VENDOR SHALL BE COMPLIED

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

HYDROGEN

4"-P-65-3504N-B5A4

FlangeHYDROGENVapour81474013027.560.9

150

1.01

2

1.407

.01

2500

970Conc. Square Edged

ISO 5167316 SS

.4133

42.28

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

m³/h

mmmm

mm

inch

mm

mm

065-NCFE-0913 0

m³/hm³/hm³/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

281438

CERTIFI-CATION

54.

Model No.

Manufacturers

NOTE 5

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 104 of 188

Page 105: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0914 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-P-65-0814N-B5A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL5)H2 SERVICE REQUIREMENT AS PER SPECIAL INSTRUCTION TO VENDOR SHALL BE COMPLIED

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

NITROGEN VAP

4"-P-65-0814N-B5A4

FlangeN2 VAPVapour13751375625540

65

.998

28

.019

2500

1520Conc. Square Edged

ISO 5167316 SS

.38874

39.77

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-0914 0

kg/hkg/hkg/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

CERTIFI-CATION

54.

Model No.

Manufacturers

NOTE 5

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 105 of 188

Page 106: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 SMSMRRS

ENGINEERS INDIA LIMITEDNEW DELHI

UNIT :

CLIENT:

SPECIFICATION REV

A620-065-YF-DS-0915 0

Orifice Plates and Flanges

VENDOR :

ORDER NO. :

REV APPVDCHKDBYDATE

09/06/2015

PLANT :

065

CONV OF EXISTCRU-ISOM-NHDS-

BPCL

A620-000-YF-MR-1320

The

draw

ing,

des

ign

and

deta

ils g

iven

on

this

form

at a

re th

e pr

oper

ty o

f EN

GIN

EE

RS

IND

IA L

IMIT

ED

. The

y ar

e m

erel

y lo

aned

and

on

the

borr

ower

's e

xpre

ss a

gree

men

t tha

t the

y w

ill n

ot b

e re

prod

uced

,co

pied

, exh

ibite

d or

use

d, e

xcep

t in

limite

d w

ay p

erm

itted

by

a w

ritte

n co

nsen

t giv

en b

y th

e le

nder

to th

e bo

rrow

er fo

r the

inde

nded

use

. E

IL-1

651-

585

Rev

.1 A

4-21

0x29

7

REQUISITION NO : LEGEND : ¤ Hold * By Vendor ^ Data Revised

Sheet 1 Of 1

Notes:1) Line NO.-4"-AP-65-0901N-A1A2) Element Pressure drop =0.2 Kg/cm23) Gasket thickness shall be as per B-16.20-ANSI B16.54) Gasket material shall be SP.WND SS316+GRAFIL

Tag NumberServiceLine No.Line Size & Schedule

Type of taps FluidFluid StateMaximum FlowNormal Flow

Minimum Flow

Operating Inlet PressureOperating Temperature

Design TemperatureRelative Density at 15 deg. C Relative Density at Oper. temp.Steam Density

Compressibility Factor

Relative Molecular Mass

Ratio of Specific Heats Operating Viscosity

Base Pressure

Base Temperature

Differential Range

Upper Range ValueType

Plate Material

Ring Type (for RTJ flanges)

Ring Material (for RTJ flanges)Beta=d/D

Orifice Bore Diameter

Line ID OD

Vent/Drain Hole Requirement

Centre Distance, R

Plate Thickness, W

FlangesType of Flange

Tap Size No. of Taps per flange

Flange MaterialSize & RatingFacing & Finish

Gasket thickness

Gasket MaterialStud Bolt Material

Nut Material

Others

Rev.

FLUIDDATA

METER

GENERAL

PLATE

ORIFICEFLANGES

N2

4"-AP-65-0901N-A1A4

FlangeN2 VAP.Vapour847.9847.9385.4640

65

1

29

1.3

.009

2500

940Conc. Square Edged

ISO 5167316 SS

.2929

29.97

102.3

2.38

3.18

RequiredWeld Neck

.5Two

ASTM A1054"RF 125 AARH

3

NOTE 4

ASTM A193 Gr. B7

ASTM A194 Gr. 2H

kg/cm²(g)

300#

°C

kg/m³

cPkg/cm²

°C

mm H2O

kg/h

mmmm

mm

inch

mm

mm

065-NCFE-0915 0

kg/hkg/hkg/h

Drain

STD

mmRadius r Quadrant mm

Plate Holder Plate Holder Matl.

Vent/Drain Hole Dia.

Reynolds Number

Statutory

OTHERS

1.

2.

3. 4. 5. 6. 7. 8. 9.10.11.

12.13.14.

15.

16.17.

18.

19.

20.

21.22.23.

24.

25.

26.27.

28.29.

30.31.

32.33.34.35.36.37.38.39.

40.

41.42.43.44.

45.46.47.

48.

49.

50.

51.

52.53.

114.3

325732

CERTIFI-CATION

54.

Model No.

Manufacturers

55.

°CDegree of Super Heat

Basis of Sizing

°C

Page 106 of 188

Page 107: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 107 of 188

Page 108: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 108 of 188

Page 109: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 109 of 188

Page 110: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 110 of 188

Page 111: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 111 of 188

Page 112: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 112 of 188

Page 113: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 113 of 188

Page 114: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 114 of 188

Page 115: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 115 of 188

Page 116: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 116 of 188

Page 117: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 117 of 188

Page 118: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 118 of 188

Page 119: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Page 119 of 188

Page 120: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Zitncf(NWT elecole 3,72151.1)

U,

WELDED ANDSMOOTHGROUND

V (VENT)IF REQD.

V (DRAIN)IF REQD.

A

m"

SEE DETAIL - Y SEE DETAIL - X

W

INLET FACE

SMOOTHEDWHEN REQD.

SHARP EDGE MUST NOTREFLECT LIGHT WHENVIEWED WITHOUTMAGNIFICATION

GLOSSED

45° ± 2°

SECTION Z-Z

3 30-05-112 11-08-06

REVISED & REISSUEDREVISED & REISSUED MN PM VJN

Manoj

R /JMS DM

TGM

ENGINEERSORIFICE PLATES AND FLANGES STANDARD No.

INDIA LIMITED DIMENSIONAL 7-52-0041 Rev. 3(A Gov* of India Undenalong)

DETAILS Page 1 of 14

INLET

d NBASME CLASS- - - RF

DETAIL - X

0

CONCENTRIC SQUARE EDGED ORIFICE PLATE

Rev.No. Date Purpose

Prepared Checkedby by

Stds. Committee Stds. BureauConvenor Chairman

Approved byFormat No. 8-00-0001-F4 Rev.O Copyright EIL - All rights reservedPage 120 of 188

Page 121: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERSORIFICE PLATES AND FLANGES STANDARD No.

(A Govt of India Undertaking)

DETAILSINDIA LIMITED DIMENSIONAL

Oa 18561.iref eilearre trilJWCWA)

ALTERNATE VENTLOCATION G (VENT)

IF REQD.

C

WELDED ANDSMOOTH GROUND

SEE DETAIL - Y

WHEN REQD.

SHARP EDGE MUST NOTREFLECT LIGHT WHENVIEWED WITHOUTMAGNIFICATION

SEE DETAIL - X

INLET FACE

SMOOTHED45° ± 2°

T

2 11-08-06 REVISED & REISSUED MN

Rev.No. Date Purpose

Prepared Checkedby by

Stds. Committee Stds. BureauConvenor Chairman

Approved by

3 30-05-11 REVISED & REISSUED Manoj RP/JMS DMPM VJNTGM

SECTION Z-Z

(D-) E - - 0.01 D

INLET

d NBASME CLASS- - - RF

DETAIL - X

ECCENTRIC ORIFICE PLATE

7-52-0041 Rev. 3Page 2 of 14

Format No. 8-00-0001-F4 Rev.O Copyright EIL - All rights reservedPage 121 of 188

Page 122: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

C

WELDED ANDSMOOTH GROUND

G (VENT)IF REQD.

SEE DETAIL - Y SEE DETAIL - X

INLET FACE

45° ± 2°WHEN REQD.

GLOSSED

SMOOTHED

SHARP EDGE MUST NOTREFLECT LIGHT WHENVIEWED WITHOUTMAGNIFICATION

MN TGM PM VJN2 11-08-06 REVISED & REISSUED

PurposePrepared Checked

by byRev.No. Date

Format No. 8-00-0001-F4 Rev.0

Stds. Committee Stds. BureauConvenor Chairman

Approved by Copyright EIL - All rights reserved

DETAIL - X

F = 0.98D

3 30-05-11 REVISED & REISSUED Manoj W-P411R ,-

SEGMENTAL ORIFICE PLATERP/JMS DM

0 Z1 ENGINEERS ORIFICE PLATES AND FLANGESOg-ar Meg INDIA LIMITED DIMENSIONAL

IA Govt of India Undertaking)

STANDARD No.

7-52-0041 Rev. 3Page 3 of 14

I 44T7R <wane dRsgr>.■

DETAILS

SECTION Z-Z

Page 122 of 188

Page 123: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

WeJeffsigur felf5ieg

WW1 elecnre enlJneralr

ENGINEERSORIFICE PLATES AND FLANGES STANDARD No.

INDIA LIMITED DIMENSIONAL 7-52-0041 Rev. 31A Govt of India Undertaking)

DETAILS Page 4 of 14

C

2 mm

WELDED ANDSMOOTH GROUND

OPTIONAL VENT HOLE

INSIDE RADIUSOF PIPE LESS1 mm (3/64")

A

QUADRANT EDGE ORIFICE PLATENOTES :-

DIMENSIONS A,B,C ARE SAME AS FOR SQUARE EDGE ORIFICE PLATES.W SHALL NOT BE LESS THAN 2.54 mm AND SHALL NOT EXCEED 0.1D WHERE THE RADIUS 'r' OF THEUPSTREAM PROFILE EQUALS OR EXCEEDS 0.1D (WHERE IS THE CASE WHEN R? 0.571 OR m ? 0.325),W SHALL BE REDUCED FROM ? TO 0.1D BY REMOVING METAL FROM THE UP TREAM FACE.

REVISED & REISSUED Manoj P/JMS DMREVISED & REISSUED MN TGM PM VJN

PurposePrepared

byChecked

byStds. Committee

ConvenorStds. Bureau

ChairmanApproved by

Copyright EIL - All rights reserved

3 30-05-112 11-08-06

Rev.No. Date

Format No. 8-00-0001-F4 Rev.O

(NOTE-2)

SEE DETAIL - X

INLET FACE

SEE DETAIL - Y

SEE DEATIL - A

000

SMOOTHED

DETAIL - Xd NBASME CLASS- - - RF

F = 1.5d BUT NOT GREATER THAN INTERNAL PIPE DIA "D"

INLETMATL- - - -

DETAIL - Y

TAG NO.- - - -

SECTION Z-Z

EQUAL TO r

RADIUS - r(TOLERANCE

0.01 r)

DETAIL - A

Page 123 of 188

Page 124: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

WELDED ANDSMOOTH GROUND

OPTIONAL VENT HOLE

fINSIDE RADIUSOF PIPE LESS

1 mm (3/64")

2 mm

SEE DETAIL - Y

I--I(NOTE-3)

SEE DETAIL - X

0.084d ± 0.003d0.021d ± 0.003d

0.105d MAX0.1 D MAX

DETAIL - YDETAIL - Xd NBASME CLASS- - - RF

INLETMATL- - - -

TAG NO.- - - -

3 30-05-11 REVISED & REISSUED Manoj2 11-08-06 REVISED & REISSUED MN

Rev. PreparedNo. Date Purpose by

/2i13,4_

or /JMS DM

TGM PM VJNStds. Committee Stds. Bureau

Convenor Chairman Approved by

W SHALL NOT EXCEED 0.1D WHERE D IS THE INTERNAL DIAMETER OF STREAM PI LINE.

Checkedby

ei ENGINEERSORIFICE PLATES AND FLANGES

4oi

f=galia0eg INDIA LIMITED DIMENSIONAL(A Govt of India Undertaking)

STANDARD No.

7-52-0041 Rev. 3Page 5 of 14

(iire?T ?!Oao 057.392F.1)

DETAILS

SECTION Z-Z

CONICAL ENTRANCE ORIFICE PLATENOTES :-

DETAIL - A

DIMENSIONS A,B,C ARE SAME AS FOR SQUARE EDGE ORIFICE PLATES.

DIMENSION-d SHALL NOT BE LESS THAN 0.25" AND NOT GREATER THAN 0.316D.

3. DIMENSION- W SHALL BE GENERALLY SAME AS FOR SQUARE EDGE ORIFICE PLATES ANDSHALL NECESSARILY CONFORM TO FOLLOWING;

Copyright EIL - All rights reservedFormat No. 8-00-0001-F4 Rev.0Page 124 of 188

Page 125: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERSORIFICE PLATES AND FLANGES STANDARD No.

7-52-0041 Rev. 3Page 6 of 14

INDIA LIMITED DIMENSIONALIA Gov) of India Undertaking) DETAILS

ALL RATING AS PER ASME CLASS)

NB

mm (")

A ± 0.40RATING 125 TO 2500

<315°C > 315° C

RATING

W TOLER.

T+0- 0.25 W TOLER.

T+0- 0.25125

150250300

400 600 900 1500 2500

25 (1) 66.7 73.0 73.0 73.0 79.4 79.4 85.7 3.18

SEENO2TE

0.51 6.35

± 0.25

SEENOTE

40 (11/2) 85.7 95.3 95.3 95.3 98.4 98.4 117.5 3.18 +0.12

-0.25

0.76 6.3550 (2) 104.8 111.1 111.1 111.1 142.9 142.9 146.1 3.18 0.79 6.35

80 (3) 136.5 149.2 149.2 149.2 168.3 174.6 196.9 3.18 0.79 6.35100 (4) 174.6 181.0 177.8 193.7 206.4 209.6 235.0 3.18 1.59 9.52150 (6) 222.3 250.8 247.7 266.7 288.9 282.6 317.5 3.18

± 0.25

1.59 9.52

200 (8) 279.4 308.0 304.8 320.7 358.8 352.4 387.4 3.18 3.18 12.7250 (10) 339.7 362.0 358.8 400.1 435.0 435.0 476.3 6.35 3.18 12.7300 (12) 409.6 422.3 419.1 457.2 498.5 520.7 549.3 6.35 3.18 12.7350 (14) 450.8 485.8 482.6 492.1 520.7 577.9 6.35 3.18 12.7400 (16) 514.4 539.8 536.6 565.2 574.7 641.4 6.35 6.35 12.7450 (18) 549.3 596.9 593.7 612.8 638.2 704.9 6.35 6.35 12.7500 (20) 606.4 654.1 647.7 682.6 698.5 755.7 6.35 6.35 12.7550 (22) 660.4 704.9 701.7 733.4 6.35 6.35 12.7600 (24) 717.6 774.7 768.4 790.6 838.2 901.7 6.35 6.35 12.7

NB

mm (")

- 0B + 10 C ±0.4

RRATING RATING125150

250300 400 600 900 1500 2500 125

400 2510600 TO

0025 (1)

88(2) 88 88 100100

10030

(D-G)(D2 G)R -40 (1 1/2)114

80 (3)100 (4) 100 114 127150 (6) 88 100 100200 (8) 114

15840127

140 165250 (10) 114300 (12) 177350 (14) 114 114 127 152400 (16)450 (18) 100 140 177 50500 (20) 127 127 127550 (22) 144600 (24) 40 140 140 165 203

d D D-dORIFICE PLATE DIMENSIONS 8

Manoj50 8

G3 30-05-11 REVISED & REISSUED

2 11-08-06 REVISED & REISSUED MN TGM

Rev.No. Date Purpose

Preparedby

Checkedby

dFROM I TO TOLER.

<6.350 0.0076.350 9.525 0.0139.526 12.700 0.01512.701 15.875 0.02015.876 19.050 0.02319.051 22.225 0.02522.226 25.400 0.03025.401 31.750 0.03631.751 38.100 0.04338,101 44.450 0.05144.451 127.000 0.064

0.0005> 127.000 x d

G< d TOLER.

FROM TO ± 0.05< 25.400 - -25.400 88.900 2.3888.901 104.775 3.18104.776 127.000 3.97127.001 152.400 4.76152.401 171.450 5.56171.451 190.500 6.35190.501 212.725 7.14212.726 234.950 7.94234.951 254.000 8.73254.001 276.225 9.53276.226 295.275 10.32295.276 317.500 11.11317.501 336.550 11.91> 336.550 - 12.70

Stds. Committee Stds. BureauConvenor Chairman

Approved by

LEGEND:-D - INTERNAL DIAMETER OF THE PIPENB - NOMINAL BORE.d - ORIFICE BORE DIAMETER.

DIMENSIONS IN mm UNLESS OTHERWISESPECIFIED.

NOTE:-FOR BIDIRECTIONAL FLOW BEVELLING SHALL NOT BEPROVIDED.VALUES OF T SHOWN IN THIS STANDARD ARE

VALID FOR THE CORRESPONDING W AND d/D(6) BETWEEN 0.25 AND 0.70 INCL WHEN THEVALUES ARE NOT SHOWN AND FOR B < 0.25AND 6 > 0.70, T SHALL BE CALCULATED EVERYTIME AND SHALL NOT BE HIGHER THAN THESMALLER OF THE VALUES RESULTING FROMTHE FOLLOWING RATIOS :-

43/JMS DM

PM VJN

Copyright EIL - All rights reservedFormat No. 8-00-0001-F4 Rev.0Page 125 of 188

Page 126: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Rev.No. Date Purpose

Prepared Checkedby by

Stds. Committee Stds. BureauConvenor Chairman

Approved byCopyright EIL - All rights reservedFormat No. 8-00-0001-F4 Rev.0

0 el ENGINEERSORIFICE PLATES AND FLANGES STANDARD No.

ligar lapeg INDIA LIMITED DIMENSIONAL 7-52-0041 Rev. 3Wren eleakeandTIM) IA Govt of India Undertaking)

DETAILS Page 7 of 14

ENGAGEMENT OF THREADS OF PLUGSHALL BE AS PER ASME B 1.20.1

PLUG MATERIAL SHALL BESAME AS FLANGE MATERIAL.

SECTION A-A

112" NPTOR AS SPECIFIED

SEAT MACHINEDFOR NUT SUPPORT

25.4 MINUS

O

Ct-

DETAIL - Ay

SECTION B-B

B

BEVEL FOR WALL THICKNESS (S)0.19 INCH TO 0.88 INCH INCLUSIVE.

7° MAX37.5' ± 2.5°

1 co _t___. —I I-- 0.25" MIN.

0.06"± 0.03 "

BEVEL FOR WALL THICKNESS (S)GREATER THAN 0.88 INCH.

7° MAX

10±1°

37.5° ± 2.5 °

Cr)

0.06" ± 0.03 "

WELD NECK, RAISED FACE ORIFICE FLANGES ,J\ t

Manoj InK G 14/J kre"'MN TGM PM VJN

3 30-05-112 11-08-06

REVISED & REISSUED DMREVISED & REISSUED

Page 126 of 188

Page 127: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

3 30-05-11 REVISED & REISSUED Manoj

2 11-08-06

P/ S

PM

DM

VJNMN TGMREVISED & REISSUED

G

ORIFICE PLATES AND FLANGES STANDARD No.kilf-aeiel ENGINEERS

Ogaria5teg INDIA LIMITED DIMENSIONAL 7-52-0041 Rev. 3DETAILS Page 8 of 14

1-=(..7 0)LTJ -Ne CO Cal

..-1.0.-

NN

a- I.0Tr 0N-o0

oLo cf)0)

oCDN

o ce)‘-. o177)

co-To

0,/6

bco24co

O)NCO

o.4- Zo

Pt

0

V'

0CD

0CD

bcor-co

brt,co

zqN.

Z4

N-

0N-

0N-

F17ti

4.)r,

D 6a-

.-- .-o

CD6N

CD6N

CD6N

coON

TrCoN

CDCON

C.)CriC•)

C.7C6C.)

.-6C.)

..-.6C.)

,-6C,1

coN.:Tr cNiin

cr CON

coN-

coCicv

cocfiN

CDCeiN

coC.iN

TraiN

a)CNiV)

U)06ro

in6C.)

.-4

.-,.,..4

,_,...-4

Cq Co)

COD

..., inC)

inoi

N.N

IsN—

N-N

N.csi1—

a)Lci

.-C)

NcsiN

NcNiN

TrLciN

'4".coN

4CoN

CO(7)

co.

cr N-CNi

IsN

Cr)TI

Ce)Ni

CITi

el4

cnCo

.-6

NNN

NNN

v.inN

NtviN

v.6N

coC7)

C)4C.)

.cNoic)1—

COcficoa—

Cr).;1.--

N-LeiCOa—

N6V)N

IsCr)NN

CD

siF)Cf)

CD.-.--

NNcoTr

Psi ci3

CDCr)oCr)CD

a-N.:CDCD

CD0ce)N-

TrCr) coN. CO

2 ,.CO

'4"CD

Tr(a

inC)

N-c.")—

N-csi

r....csi.

N-csi

N-N

r---N

N-csiN—

N.N

N..N

N-N

N.N

IL i_ (/)0 _j 111

-IO 0 0Z CO 2 .4. Tr CO CO CO

N,_ Na-

CDa-

coa-

oN

oN

vN

4N

TrN

vN

0 (° Ce CO CO.

CD,_ CD,_ co1f—

CDa—

Co1—

(01—

cc!V—

cc?1—

coa—

CDN—

co a-

re CO6in

N

N.ti

,-CNia)

0ISNs-

NN.:1.0.-

C)6iv-

C)a;CDN

M0)

NVi

qa-

C.)

CON,-

076CDTr

'4"C.)C.)in4opinN

;7CD

Na)CD

w illN.

CD6N

CoN.:a-

CD6N

CD6N

,:t.NN

v.6N

CD6N

CIO;;

CD(7)

.-IliV>

‘-6CI)

a-607

CI,-:1'

V?71-

CDNCD

C)if)CO

0)6CO

a)COco

A—Nco

00r

NS—.1—‘--

inN:

r

N6i)cr

0)cNiTrr

.-6v.,-

COcdni,--

.--csiccor

,-uioc,-

C.)6DC..-

0 .-6Cr)

CO,_

C.)r-6C.)

..-CDin

,_6v.)

,_6Cr)

CI■Tr

coN:TrCO6in

0.g

NISin

L I)6co

U)CMco

N-ccico

C)aico

Y a)CDCO

C.)mi.-

0N:N.—

Cf76co—

06ON

a)6coN

N6C.)01

v.1...COco

0)0It)Tr

Nt

cl:a-Co.-in

r.-CONCD

cotoCOco

oC■iTrN-

CONCD

0O4.---N-

CDCo,-

.-6CD,--

coai0N

03N

toN-Z".'")

0c7.CI

U)4mrct

N.OillN

NgCo

N-N:CO

N,t--v..

n-4N.N-

NCOcf)co

TrTi7;

X 0. 0)oiCD

CoN:a-

—CDcl-,-

TrCO0N

voCDN

r.--6CND)

1--.'N.V)

toviNNI-

coNCDNt

vCr)C.7tli

crt•-.:COO

.--

,

v. I``.NN-

< CoMCf)

C.)CGcr

Cl) 0co

a)CDCC

V)4—

.4.coco'—

NaiN

.-MisN

C)coNCO

CDItotoC.,

.(t.C C)0ct

NN:CoNP

0co0Co

coCO CoI.0

co6Oco

W()Z

u_

...,203 `-'ZE

E

__,-.._.

10N

LC)

a-..-.•

0Tr

...-.CV

0in

..-.C.)

0CD

......cl-

o0,-.

..-..CD

0in.-

.....CO

0oN

sa-

0inN

a-

0ocv0inV)

a-

0oTr0inct

N

0oLf)

N

0L17I1)

N

00CD

(9z,

I-2oco

MTN' ereakernhinufail (A Coot of India Undertaking)

Rev.No. Date Purpose

Prepared Checkedby by

Stds. Committee Stds. BureauConvenor Chairman

Approved byFormat No. 8-00-0001-F4 Rev.O Copyright Eli. - All rights reservedPage 127 of 188

Page 128: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ORIFICE PLATES AND FLANGES STANDARD No.

7-52-0041 Rev. 3DETAILS Page 9 of 14

ENGINEERSINDIA LIMITED DIMENSIONAL(A Govt of India Undertaking(

ll^ieaen faReg

IATIM eteatiez(513ttosTO

P/JMS DM

PM VJN

Checkedby

Stds. Committee Stds. BureauConvenor Chairman

Approved by

TGM

I-S0 01)LT.I -Ne CO N

.-ID.-

CVCV

4-mrcoCO

001.-

11)4-N

CVV)

a)N4-

1.11CVto

0U)co

rs.0)ti

CDCVa)

o bcoNco

bC ,)ZNIco

oNt

rnNt

o

ZrZDCO

0cobC1r,CO

or-

z.Nir-- Nr-- Nr-- ii)r- inr-

aOr,-

ai --aia-

coOCV

coOCI

cocii01

-CO01

..-ODC1

CO,_

01Ni

.4-CD.-01

-CDC1

ON4-

a)N4 N

a)

.4.

a)N4

0)

v.

cr co.(.7;

COz.„-i

co6CNI

co(c)N

inCOco

-

4N—4v

N—44

N—4-4-

a—

4-CO

ONrCOa;4 -4-

...-CD

4CO

O.4.COa;

.-•• coD)

u3ai

N.N,-

N-N

N-4

.-c7,

.-N

r •C;

r•r.-•‘-CV

,-•C71

r•C741

.-•C71

rrN

r1-CV

07 N.CNi

1.--CN1

coni

V)

4CVoiN

'tU)CV

crU)CV

V.coN

'4"U)CV

TrU)N

coCON

coCOCV

coa;CV

coCOCV

CDc6CV

-cCVcNi0.-

COC1CO4,-

C.1a-

N-6co.--

co4Cv)N

U).-a-

0U)iN-01

0)Mco

11'

r--41.‘7U)

NaiII(U)

CVc(O(MO

0)

6COO

CV

CO--I 6

01

a)OCV

CVOa)co

2 Trcth

4(6

v-Co

coa)

r-oir

r--cNir

r,-cNir oir

r•cNir

r-oir

r-oir

r-oi1—

r,-,cNi

r,-oi

r•-•c.i

LI— COI- LLI-1 -.1

d 0 0Z CO 1

,4. -4- CO CO co CV,.. CV_, CD 0CV

0CV

0CV 0

CV1'N

4-CV

V'CV

o CO.--

(o.-

co.--

u).--

Nr.co

vcri

'tco

Nrco

'4:CD

v"CD

'tCO

4-CO

4-cci '4"

co4-(ri

IX COC)Lo

MCV

r- r041a)

0N:CV.-

CVN.co,-

a)U)c7.1

a)OcoCV

a)0)01

c-::07.

01

a)C•417r

coOcov

4-ricoU)

CV.4'coU)

V.

7rco

a-Na)co

U1N-a-

COON

U1N:

CO0CV

C1'U)CV

CDCOCoCV

COr

‘-'U)C1

a- -

CO

CN!4- -4-

U)zt:

U).11of

CON:4

COaU)

›- CDC•1CO

0)IC)CO

0)U>CO

a)cdCO

0cOD0a-

COC1CCV,-

1,-D)01a-

COCDU)a-

Cq,-

r

-1,.

ol1r

U)cicr)a-

a)(aa)a-

NcOaCV

COcrioCV

o a--COC1

rCOC1

a-.IX)C1

a-aiC1

LP4

q

3a?CO

a)CA(o

0(6r...

CVcON-

COcNiCO

a)COco

07U)a)

CD,_

r

0CO0,-

Y cc;o?co

CO4a—

0N-Na—

coC C)CON—

a)U)Z.N1—

..-C•41CMCV

coaiv•V)

co.Z.73Cr

a;oCO-4-

,_N-CVU)

co0COC1

.-

3CO

C)0)CVN-

a)N:N-rs.

Nc6coco

001;CV.-

CDU)U).-

s-U)CO.-

coai0CV

,-C')r-CV

CDU)u-)01

a-C)Z:7-

0CO0U)

0)COU)U)

C1C)0up

COU)Coco

0cei4-r-

a)oi.-CO

0cir--co

COcricoa)

X cp a)CAco

.-„:66

coN.:,--.-

V'Nco%-

(t)NCVN

..-

CON.CV

C)cNiA

.-O0.4-

CD..--4-

CO

U)a)-4-

a-

U)C CD

CIDC)0CO

COccoco

coN: ;.7.

< cocei01

01COcr

coOco

a)<36co

co4,-.

't.coco.-

CVcri.-N

a-C')N-CV

CS)MCV0)

CDU)U)01

'tCO04-

NN-U)-4-

0COOco

COCOU)co

coa;Oco

LLI0Z

511

...-...

.co ..-.•ZE

E

...--,—......

cocsi

.--.1D.,--.......act

...--.CV

0u")

---,C1

0CO

......'1'

o0.-

....--CD

0co,-

......CO

0oCV

aa-

0(nN

.I-

01OD

..,.7.,..a-

0co01

Ga-

tooV'

c-6..-

0cocl'

—Nj

0oID

isi.csl

0U)U)

q.

c \1

00CO

0Z17--

00

CD

cl\/\3 30-05-11 REVISED & REISSUED Manoj

2 11-08-06 REVISED & REISSUED MN

Rev.No. Date Purpose

Preparedby

Format No. 8-00-0001-F4 Rev.O

Copyright EIL - All rights reservedPage 128 of 188

Page 129: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

3a1 4/JMS DMManojREVISED & REISSUED3 30-05-11

0 el ENGINEERSORIFICE PLATES AND FLANGES STANDARD No.

Ifgai faigteg INDIA LIMITED DIMENSIONAL 7-52-0041 Rev. 3(inert eleC131e al 3MM) (A Gov( of India Undertaking)

Page 10 of 14

I—=(.9 C))il ...sc

CV..—

CO,--

CDCV COCO ..-

LC)CO,1—

0a),-

N.N-csi10

Aa—

4LO3

c.;N.

N-CVco

N-a)c o,..

o bo,Z.,W

bMCVCD

zo4 rn4

rn4 bco

bco

bC)r,CO

zNir..-

&

N.24

N-&N-

6

N.■r)N-

M CDCOCV

CDCC)CV

COcciCV

CDCOCV

COCOCO

,_

COCO

0)N4

a)csi4

a)cNi4

0)csi,cr

aN4

coN.4

CDN:4

CON.:Tr

a- O)c.ico

a)c.iCO

a)csico

a)c‘ico

tocciCO

..-...-4

(ooiv

CDaiv

CDaiv

CDoi4

COoi4

OD

1CD

toCD

to

- N.NI:

N-aci

N-cl

a)N-

0)N.:a—

CVclCV

CV4CV

CV4CV

CV4CV

CV4CV

CV4CI

ntr- :CV

V.N-CV

r-CV

07 ,-0),

.—0)

l—ai

CV01r

CVCa.)CV CV

occiCV

CDcc;CV

COCC)CV

COCOCV

CDCDCV

cc..- cc'CO) CO

.0COCD,--a—

0)4'Cr.—

0COCO.—

‘1"cciaCV

COCOtoCV

a)cc;coCO

coaCV4

to(c>0)4

oci(Dto

r"-.,-to

CNItotoCD

(DcNiCOrs.

tocsi0co

CDCDCDa)

2 4CD

4CO v:

COto0)

N-cNir

I..c%i.—

rs.c.ir

rs.cNir

r--oiv--

r•cNir

N-c.i1—

r,cNir

rs.c.i.—

rs-c.i

U- CO0 I— W—1 —J

ci 0 0Z 03 =

,t, 4 CD CD COCV.—

CVa—

coa—

0CV 0

CV0CV

0CV

0CV

0CV

0 V.CO

v.CO

4CD

v.CD

v.CO

v.CD

v.co

'4'CD

v.CO

V:CO

v.CO

v.CO

v.coTrCO

cc 03cito

CVCON.-

a—Caia)

0N:CV,L-

CVIs:to.-

0)tri

c71

CDO)CDCV

0)CO

COCO

W..

CO

CDC

CT

CD0)CD4

V.C OCOto

CV4COto

a--0)CDco

.- 4toCV

cocciCV

v.toCV

.4InCV

cc

Z:;)

cc

CO

-OCO

,-OCO

-cdCO

CO,-

to44

coato

q3

rs-(Dco

>- 0toco

coLc;0)

Occi0e—

oCOO,—

rs.ciCV,—

,-cCD4n—

coCOCDe—

toaO)N—

4(6OCV

,-

,-N

coc .iCVCV

0L OCOCV

0.3CV

toc ciO)CV

o W.

4to

4to

4to

4coain

0?z;CDa>CO

CV(cirs-

N.LciCO

a—

it0)

COIlia)

0CoOr

C4a—

a—COat.—

Y

(O.--

0'CV

a—toCD

LOci0)

0iriCOCV

toN-(7)

N-riCOCO

a)CAD

act

NrCOCOCO

CO

CDLOLO

0

CDCO

CD

toCOCD

CO

CAartr-

IsT-C)

0CVcimra—

COtiN.a—

0)tov--N

CO

71.Cs/

.—NO)CV

910-CO

a)crit.0at

r.-(c;

COCA0CD

v.-

(?)..,.--:

a)40N.

41COIs-

coU)CO

v.

0.--

X V.CVto

C7)aico

COazio„-.

0N:CV,-

COCO(C).-

0COCOCV

LC)CO0)CV

COcciCOCO

a—ai7:";

0)

atoact

0cc;0LC)

CVinCDLC)

COcNiCVco

CO0)Nrts...

< toCOCO

CO

NI-

to o.OCO

0)

OCO

coTi,—

v.cooCOD""

CVoic7,

a—rit`rCV

CY)riCVCO

co61.0CO

N.CO0cr

CVN.:u,4

0cci0to

COaioco

W0Z

—.co ••■•••

Z EE

—.,..,

toCV

—in.-..0ad'

■CV

0LC)

••••■CO

0co

..ci-

0o,

CD

oto,--

........CO

oCV°

.. s .,—..r.0toCV

N■—••••

0oCO

0

cc..,—,....,

0toCO

0..4—.r...

o4

cs.■—.......

0toNt.

6,CV.......

0oto

4-CV•••

0CD

ZI=

000,

DETAILS

52

tY

0

—J

2 11-08-06

REVISED & REISSUED

MN TGM

PM

VJN

Rev.No. Date Purpose

Prepared Checkedby by

Stds. Committee Stds. BureauConvenor Chairman

Approved by Format No. 8-00-0001-F4 Rev.0

Copyright EIL - All rights reservedPage 129 of 188

Page 130: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

Manoj P/JMS

PMMN TGMDM

VJNfl1"-"----REVISED & REISSUED

REVISED & REISSUED3 30-05-112 11-08-06

ORIFICE PLATES AND FLANGES STANDARD No.

kti-afaelei ENGINEERS

Ota faffleg INDIA LIMITED DIMENSIONAL 7-52-0041 Rev. 3(Aire-er riecoreashAicnR)

DETAILS Page 11 of 14

I-=C.0 0Ti -SC N1- CDa-

0') LC)U)NCO g

000Nco0)at

0CDI,- COCOto0e-

CD04a-

cov.)coa-

4NcnN

C)acrCO

o ‘ i6 brN

Co

broNCo

nt6

lbNI-

to40co

0Co

bCD r-- t--

a0,Fs-CO

bP,-CO

brCO

brCO

bcpr--CD

bf?1--CO

CD05N

COCON

CDCON

CV)criC.)

Cc)ChCY)

a-6el

0)N4

C)N4

C)N4

CON.:4

4Nco

4Nup

4Nup

4Nco

cr C)c.iM

C)cNiM

C)cNiV)

upc6C.)

coCOco

r co64

CD64

CDoi4

CD

3CO6co

Cc)dCD

COci0

Cr)dCO

-.... N..4

Is-4

ti4

C)N:

C)N:

N4N

N4N

N4N

N4N

'tN-N

actr--N

4tiN

v.r-..N4N.:N

ci_ .-cri,-.

,-cri

e-cri

NcsiN

Nc.iN

act6N

CDcciN

CDcdN

COcciN

Co7,

0)4cf)

C)

A04C,)

0)4Cf)

.aCr)COrr

044s-

0Mcoa-

NcdNN

rs.NIs.N

COC)A 4

0Chce)

CD4c,)U)

0MCON

U)

gCO

N6CDIs-

'11.

cici)CO

CY)

ctiN0)

e-aioa-e-

2 NrCC

4c6 v.co

inCA

N.csir

N-oir

ticNi1-

N-Nr

N-cNir

r--c‘i

N.cNi

N-csi

N.cNi

rs-c.i

LL Cl)0 F-- w_1 _ici o OZ CO X .4. az)- CO CO CO

Ne- Na-

N.-CDa- CO

-CO`-

CDr CD.- COa-

0 actcc v.co

4ai v.co v.up

4c6 v.co v.co

4co Vco v.co

46 'tup

4co

CC COOto

NMN..

e-N0

0:

N1-

NIs:0.-

0LO.ICZI

COoiCON

a)c6NCc)

C:?.COCa")

CON

7:1

0aCO4

4c7Cc)to

N4COin

a-NC)co

...- 46N

co6N

Nr6N

00.C7)

C)A

,..CDco

co'al:4

co0co

og

cr)6co

rs-CDCD

oc7Is-

46N. Ncn

>- 6coco60)

co006o.,

CoctiN,—

N6co,-

CON.N.%—

..-

0)N

Nr6coN

0)CocoN

CO4co01

0r•-a-

NrcicoM

coNCOCe)

cocNi;7-

0 044

044

iq 040

CV6CO

0)6OD

46CD

CO4ra-

N6ce)1-

N.6v.)a-

v.Nina-

0)cCC)coe-

NU)r

CD6oN

YCD...-

04N.—

,-6CO,--

NrioN

CI:TrN

0N:a-

f••••cioCc)

CO

ONOcV'

Ini.---0

0uielCO

CO.4:oN-

Is4r--N-

q,-Co

CO

6)oC)

0N64,-

CON-N-,-

0)6,--

Is-COcoN

N‘-.M

Is-c6CDCI

Coc.iCOV'

NI0

.—MN-CO

coC)4N-

coU)NCO

Nr4.-

0'1X0)

atCOCO-.--

XactCqIn

00CO

co0a-

Nr-MCa,a.-

C)rCO

CO

NN

.-N0)N

COCOCOV)

CO60Tr

COu0)cr

0N0co

COCOa>co

er.a-CO

0N0N-

< COMc,f)

C.)CCDTi-

LO6co

06co

cocl:.-

v.coco4--

Naiii

a-cr.;N-N

0riNCf)

CO60VI

act60act

NN.:LC)cr

060uo

CDcri0co

wC.1Z

u.

ico—ZE

E

,,,_---

coN

Lc?„...

0NI•

.•••■

0In

iff.„),.......

0CO

.....

.....,

0o,_

a......,

coo,_

.......

..-..)

ooN

...,....vv..

otoN

N'-.

ooCf)

qr.

%—

oupco

a

'

oo4

.COs—

uPo4

aCNI

oo0

..4..CNI

ooCO

9..-I=g

00 ►

-L°A .._

(A Govl of India Undertaking)

towz

w

IY

w

awIn

w

aw

EzU)z0(7)zw

Rev.No. Date Purpose

Prepared Checkedby by

Stds. Committee Stds. BureauConvenor Chairman

Approved by

Format No. 8-00-0001-F4 Rev.O

Copyright EIL - All rights reservedPage 130 of 188

Page 131: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

MN TGM PM VJN2 11-08-06 REVISED & REISSUEDRev.No. Date Purpose

Prepared Checkedby by

Stds. Committee Stds. BureauConvenor Chairman

Approved by

3 30-05-11 REVISED & REISSUED Manoj P/JMS DM

ENGINEERSORIFICE PLATES AND FLANGES STANDARD No.

054eg INDIA LIMITED DIMENSIONAL 7-52-0041 Rev. 3

fairer eleotrlaoJVTAI IA Govt of India Undertaking)Page 12 of 14

TOLERANCES ALLOWED ON FLANGES ACCORDING TO ASME B16.36 / B16.5

DIMENSIONS mm (Inches) TOLERANCES (Inches)

05- 609.6 mm ± 1.59

> 609.6 mm ± 3.18 "

CNB < 450

(18)+ 3.18- 0

NB > 450(18)

+ 4.76- 0

XS 609.6 mm ± 1.59 "

> 609.6 mm ± 3.18 *

A< 125NB - + 2.38

- 0.79

NB _> 150 + 3.96- 0.79

YNB _< 250

(10)± 1.59

NB > 300(12)

± 3.18

DRILLINGK ± 1.59

CENTRES BETWEEN HOLES ± 0.79

RFOR G = 1.6 mm ± 0.79

FOR G = 6.4 mm ± 0.40

ECCENTRICITY BETWEEN K AND R DIAMETERS ± 0.79

ECCENTRICITY BETWEEN K AND D DIAMETERS ± 0.79

ECCENTRICITY BETWEEN R AND D DIAMETERS ± 0.79 *

D

150NB <- (6)

± 0.12 *

200 8250NB(8 &10)

0.12+ 0.- 0.25

*

300NB(12)

+ 0.12- 0.38

*

350 8400NB(14 816)

+ 0.12- 0.50

*

450NB ?..(18)

+ 0.12- 0.76

*

* NOT COVERED BY ASME 816.5

WELD NECK RAISED FACE ORIFICE FLANGES

DETAILS

Format No. 8-00-0001-F4 Rev.0 Copyright EIL - All rights reservedPage 131 of 188

Page 132: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERSORIFICE PLATES AND FLANGES STANDARD No.

INDIA LIMITED DIMENSIONAL 7-52-0041 Rev. 3IA Gokt of India Undertaking)

DETAILS Page 13 of 14

eielf=g-zir PieG.

Isirerf riromeem3flrkl)

DIMENSIONS AS SHOWN THREAD : ASME B 1.1FORD" <1 - UNC - 2AFORD" >1 1/8 - 8 UN - 2A

CONSTRUCTION FORGED, BAR STOCK

V (1.5 x THD. PITCH)

D mm (Inches) THREAD PITCH V 2V *15.9 (5/8)

UNC

2.309 3.46 719.0 (3/4) 2.54 3.78 7.522.2 (7/8) 2.822 4.23 8.525.4 (1) 3.175 4.76 9.5

> 28.6 (1 1/8) 8 UN 3.175 4.76 9.5

APPROXIMATE VALUE OF THE TWO BEVELSALL RATING AS PER ASME CLASS

DIAMETER (NB,D) mm (INCHES) & LENGTH - (L) IN mm ( NOTE-1 )

RATING 300 600 900 1500DIM. N B D L D L D L D L

25 (1) 15.9 (5/8) 127 15.9 (5/8) 127 22.2 (7/8) 152 22.2 (7/8) 152

40 (1 1/2) 19.0 (3/4) 133 19.0 (3/4) 133 25.4 (1) 159 25.4 (1) 15950 (2) 15.9 (5/8) 127 15.9 (5/8) 127 22.2 (7/8) 152 22.2 (7/8) 15280 19.0 (3/4) 133 19.0 (3/4) 133 22.2 (7/8) 152 28.6 (11/8) 184100 19.0 (3/4) 133 22.2 (7/8) 152 28.6 (11/8) 178 31.7 (11/4) 203

150 (6) 19.0 (3/4) 133 25.4 (1) 178 28.6 (11/8) 203 34.9 (1 3/8) 266

200 (8) 22.2 (7/8) 146 28.6 (11/8) 203 34.9 (1 3/8) 229 41.3 (1 5/8) 298250 (10) 25.4 (1) 165 31.7 (1 1/4) 222 34.9 (1 3/8) 241 47.6 (1 7/8) 343300 (12) 28.6 (1 1/8) 178 31.7 (1 1/4) 229 34.9 (1 3/8) 260 50.8 (2) 381

350 (14) 28.6 (1 1/8) 191 34.9 (1 3/8) 248 38.1 (1 1/2) 282 57.1 (2 1/4) 418400 (16) 31.7 (11/4) 203 38.1 (11/2) 266 41.3 (1 5/8) 295 63.5 (2 1/2) 456

450 (18) 31.7 (1 1/4) 209 41.3 (1 6/8) 286 47.6 (1 7/8) 333 69.8 (2 3/4) 503500 (20) 31.7 (11/4) 216 41.3 (1 5/8) 298 50.8 (2) 355 76.2 (3) 548600 (24) 38.1 (1 1/2) 241 47.6 (1 7/8) 337 63.5 (2 1/2) 445 88.9 (3 1/2) 623

TOLERANCES ON I'

L-LENGTH mm < 305 310 TO 455 > 455- o - 0 - 0TOLERANCE mm + 1.6 + 3.2 + 6.4

STUD BOLT DETAILS FOR RAISED FACE FLANGESNOTES :-

1. FOR BOLT DIAMETER 1" (25mm) & ABOVE IN EACH RATING, FOLLOWING SHALL BE CONSIDERED TO TAKE CARE OF BOLT TENSIONING.(i) ONE EXTRA NUT SHALL BE CONSIDERED FOR EACH BOLT/STUD.Ili) BOLT/STUD LENGTH SHALL BE INCREASED BY ONE DIAMETER.

A I,

3 30-05-11 REVISED & REISSUED Manoj r PIRG P/JMS DM

2 11-08-06 REVISED & REISSUED MN TGM PM VJN

Rev.No. Date Purpose

Preparedby

Checkedby

Stds. CommitteeConvenor

Stds. BureauChairman

Approved byFormat No. 8-00-0001-F4 Rev.0

Copyright EIL - All rights reservedPage 132 of 188

Page 133: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

250

401 eltg.$fgar faRegLice email 2151070W

ENGINEERSORIFICE PLATES AND FLANGES STANDARD No.

INDIA LIMITED DIMENSIONAL 7-52-0041 Rev. 3(A Govt of India Undertaking)

DETAILS Page 14 of 14

DIMENSIONS :ASME B 18.2.1

THREAD : ASME B 1.1

CONSTRUCTION :FORGED, BAR STOCK

FOR D" <1 - UNC - 2A

TOLERANCES : ASME B 18.2.1 ASME B 1.1

FORD" >1 1/8 - 8 UN - 2A

D mm (Inches) FG mm H

mmR

mmMAX. MIN.9.5 (3/8) 14.3 20.2 19.0 6.4 0.8

11.1 (7/16) 15.9 22.5 21.0 7.5 0.8

12.7 (1/2) 19.1 26.9 25.3 8.3 0.8

15.9 (5/8) 23.8 33.7 31.6 10.7 1.6

19.1 (3/4) 28.6 40.4 37.9 12.7 1.6

22.2 (7/8) 33.3 47.1 44.2 15.1 1.6

25.4 (1) 38.1 53.9 50.6 16.7 2.428.6 (1 1/8) 42.9 60.6 56.9 19.1 2.431.8 (11/4) 47.6 67.4 63.2 21.4 2.4

38.1 (11/2) 57.2 80.8 75.8 25.4 2.4

ALL RATING AS PER ASME CLASSDIAMETER (NB,D): mm (INCHES) AND LENGTH - (L) IN mm

RATING 300 600 900 1500

DIM. N B D L D L D L D L

25 9.5 (3/8) 75 9.5 (3/8) 75 15.9 (5/8) 90 15.9 (5/8) 90

40 (1 1/2) 9.5 (3/8) 75 9.5 (3/8) 75 15.9 (5/8) 90 15.9 (5/8) 90

50 11.1 (7/16) 85 11.1 (7/16) 85 15.9 (5/8) 100 15.9 (5/8) 100

80 11.1 (7/16) 85 11.1 (7/16) 85 15.9 (5/8) 100 19.1 (3/4) 115

100 11.1 (7/16) 85 19.1 (3/4) 100 19.1 (3/4) 110 19.1 (3/4) 120

150 (6) 11.1 (7/16) 90 22.2 (7/8) 115 22.2 (7/8) 130 22.2 (7/8) 160

200 (8) 12.7 (1/2) 100 22.2 (7/8) 130 25.4 (1) 140 25.4 (1) 170

250 (10) 15.9 (5/8) 110 22.2 (7/8) 135 25.4 (1) 145 25.4 (1) 190

300 (12) 19.1 (3/4) 115 22.2 (7/8) 140 25.4 (1) 155 25.4 (1) 215

350 (14) 19.1 (3/4) 120 22.2 (7/8) 140 25.4 (1) 165 28.6 (1 1/8) 235

400 (16) 22.2 (7/8) 130 25.4 (1) 155 25.4 (1) 170 31.8 (1 1/4) 255

450 (18) 22.2 (7/8) 130 25.4 (1) 160 28.6 (1 1/8) 200 31.8 (1 1/4) 275

500 (20) 22.2 (7/8) 140 25.4 (1) 165 28.6 (11/8) 205 31.8 (11/4) 295

550 (22) 28.6 (1 1/8) 155 25.4 (1) 180 - - - - - -

600 (24) 31.8 (1 1/4) 160 25.4 (1) 185 28.6 (1 1/8) 240 31.8 (1 1/4) 315

SEMI-FINISHED, SQUARE HEAD, FULL THREAD, JACK SCREW

t\'` I l• japc(A4r-3 30-05-11 REVISED & REISSUED Manoj ir• G /JMS DM

2 11-08-06 REVISED & REISSUED MN TGM PM VJN

Rev. Prepared Checked Stds. Committee Stds. Bureau

No. Date Purpose by by Convenor ChairmanApproved by

Format No. 8-00-0001-F4 Rev.0 Copyright EIL - All rights reservedPage 133 of 188

Page 134: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION NO.

£ 'AaR 900Z-I8-9

0 Aad L3-1.000-00-9 oN ;eu.uod

O

rs)

O

co o

cn o co

Cl

D,

uoneweweidw! JO} penssi

penss!ad pue pes!ned

penssied pue pes!nad

0 0

G)

pamesei sp.i6u ily —113 3ii6uAdoo

CO

Q.

nD)

o o c>

o _,3

Ca c cn

• 111

> 0 a

3 (1)

G)

D

Pag

e 13

4 o

f 18

8

Page 135: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 .A01:1 Ld-L000-00-8 '0N 3eW.10d pamesai sA6p iiv —113 pA60doo

< H

CD

!:

•;'

••-t $4 s

"

CD '"

CS

CD

o.

cp 0

CFQ

cn

o

suoljuptaiqqy

oZZ

D2

r

STANDARD SPECIFICATION NO.

900Z-I8-9

r)

5,

r- ,

,--.

,,.. x

x x

x •

-ri .

-1 "

t71

(""

)(-)r

) cr,

0

cA

'"1:1

‘ ' "

'

2 o

.z

z C

r r.

.1 r-

,I, =

-...

R CL

) t"

)

.1

©

(-)

-, .

(-)

cA

o

4

$u

t-ii

.

. .

AD

t_2.

• cn

O

cl) h

4 5

.

r o-

5

o

-=

,-izJ

2

H

'',:

> F

DP' CD

_r.

x '-

r1

til

(-) ("

) ,.

n .zicn

eig...1 c

n `-

<

0 $

:' :=

t- E

' 'z5

ci..

....

‹.•

,(7

&)i)

co

,a.•

-,.

0

j .1

,-, ,—

. -,

t ,

•-,-.

cD -

-

.5

2o c,-,

-0 6

- .0

a5 r

D

4 >

,.., ,

-,

:<,,,,,. =

,-. =

— 94

o

,-, ..

- <

o ...

c) c

l. g-

at

,-i

cn

0 ,-

,-

5

o c

) p)

o

.--3

.-

-- 7

:J

=-. "

:"--

(:)"

r[,•

zr.

<1)'-

'- 0

-i r

)

..., •

'1Z

C

D C

D

'i.--).

-11-

-;

, o

..

Cr0

A)

CD

A)

l

s-C1

tr

l .-

..

.-1

CD

, -s

1-1

5"

><

'-,2

.o

CfQ

C)

A.)

....

A

) cn

C)

■-,`

5.'

•-•-9

'... 5

.1 '8

:7

CD

'-i

cn

t''''

CfQ

a + .-'

ci'•

g,.., c

r

H H

-=

-=

-=

-=

-=

z z

4 4

0:00O

-t0O

on

CD

A)

cr) 11,

'4 •

.g

<9, ;' '-

,' =

0 C

fQ

,_,.

n c

, ._,

. co

52_

, .-L

:i =-

=

er, C

fQ

C:

0 A

D

cp

< A

Q A

. at A

o -

-1 c

p

irocn

5

fpcn

co

...,

cn =

•-r

-.

~,

'-' • -

0 4

(1)

t•-•

*- _.,•-4

()

p <

• p,

,-,,,

.--:

, -

(., ,

.,

,...] :

,,,

•(.7 ..

n O

><

CL

• <-

- •

cl)

- co

O

AD

'"0

CD

<

CD

",-

. I.

• .

....

. .-

..-

, •-

.1

CD

o O

c)

cf,

,_,.,

,--

',74:

•-■

(.4

■-3 (

~1-;

' E

'.. '5

' P,, C

'' ,,,<

I) s

(1

) H

v)

cp

CIQ

n)

•-•r. C

D

,-P-

8

cn

,-,-

1-1-

' (,)

,

5

o

r2 cr

a(D

c)

-,,,

A)

CfQ

X c

D

0.,

AD

-t-

. 0

0

0

O

fZ1 -t .. "

Cf

Q

'-r1

C4

co

C)

-1

O

cp ;

- o

X l'

'' cn

r-

cp §

- p,)

d-t

(t)

n)Z

9

• n)

o•

cl.

A) '''

G1Q

C)

(•)-

A)

po

'-d

<

■-•

1 ■H

1::

i '"

C1 '"

0 '.1

:1 '-l:

1 Z

Z

,0 Q

n

.9

›:1

c.)

-i

ci) s-

1

■-3

CD

c)

0

,......,

Pag

e 13

5 o

f 18

8

Page 136: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 .A0E1 L1-1000-00-8 'oN LLIJOJ

Copyright EIL — All rights reserved

INSPECTION AND TEST REQUIREMENTS tA1

PO/PR / Standards referred therein /Job specifications / Approved documents.

This Inspection and Test Plan covers the minimum inspection and testing requirements for Restriction Orifice Plates and Multistage Orifice Assemblies.

0

co co

O

O

O

Cr

<9:j

STANDARD SPECIFICATION NO.

W

0

N

..--,

N

eZ

■—■

■• G>

z e

] o

r

In process Inspection

Incoming Material Plates, Pipes, flanges

Material Inspection

WPS/PQR/WPQ

Procedures

STAGE/ ACTIVITY

Material Identification, Chemical and Mechanical Properties

Welding procedure Qualification for welding involved in Multistage orifice Assemblies, Meter

Runs

r) :

n

,- rii v) 14

n

w

-6" c,

,:'

100%

QUANTUM OF CHECK

Material Test Certificates /

Lab Test Certificates

,-,'-c,

,-, ,,-

--c.

,c)

c4

n

0

g

SUB SUPPLIER

SCOPE OF INSPECTION

2

2, z

ro

,--

x

SUPPLIER

7zi

W (New) R (Existing)

t'21

g

-:3

:94

Pag

e 13

6 o

f 18

8

Page 137: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 'Aed Ld-1000-00-8 '0N 3ewio8 pamesai sp.6.1 Iltl — -113

.nalj 900Z-18-9

STANDARD SPECIFICATION NO. 7=

..--

. 0

IN.)

.-,

<=

.,--,

0

t'l

Documentation and IC

Cleaning for special services, Painting of

Multistage assemblies

.0

!2. =

,P. ....

=

l'el

Final Inspection

NDT , Post Weld Heat Treatment (PWHT) ( If specified)

Final Inspection

Machining of Plates

STAGE/ ACTIVITY

Special cleaning and packing for oxygen and chlorine services

Pre treatment, primer and final paint, shade, thickness

Visual Checks

Dimensional checks

Orifice Smoothness verification

Correctness of Punching

Physical Dimensional Verification

Liquid Penetrant check for all welds (Multistage).

• Hydro test of complete Multistage Restriction

Orifice • Review of Radio,:ra shic films (for butt welds)

Radiography for weld joints

Dye Penetration test.

Post Weld Heat Treatment of welds,

Dimensions, Smoothness verification

CHARACTERISTICS

■-■

C>

0

o

■--,

C>

CD

,--,

C>

C>

■-.

0

C>

QUANTUM OF CHECK

Test Records

H

cp ut

,-,

CD;

o o -t o..

tn

NDT reports / PWHT chart

Test Records

RECORD

i t

.

SUB SUPPLIER

SCOPE OF INSPECTION

Z

x

SUPPLIER

: 7:1

.

EIL/TPIA

Pag

e 13

7 o

f 18

8

Page 138: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 'Aed Ld-1000-00-8 '0N Iewiod pamaseJ sly6!.1 IIV —113 41160doo

activities shall be as per PO/PR/ Standards referred there in/ Job specifications /Approved documents

STANDARD SPECIFICATION NO.

£ 900Z-I8-9

i. —

o r

Final Document submission

Documentation and IC

STAGE/ ACTIVITY

Compilation of Inspection reports ,drawings, etc as per VDR / PR

Review of Internal Test Reports

IC issuance

CHARACTERISTICS

--:', o ,z'

- o o

QUANTUM OF CHECK

Final data folder /Completeness

certificate

Supplier's Test Records / Inspection Certificate

o g SUB SUPPLIER

SCOPE OF INSPECTION

x x

SUPPLIER

z z

til 5 ,- '.'5

Pag

e 13

8 o

f 18

8

Page 139: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

1 12.03.15 General Revision

C)(415----2QMS QMS

Standards StandardsCommittee Committee

SC

∎31 ENGINEERSligar lafgesW INDIA LIMITED

(411W1 292,51V MIJ‘10571) Govt o India Undertalongj

SPECIFICATION FORDOCUMENTATION

REQUIREMENTS FROMSUPPLIERS

STANDARD SPECIFICATION No.

6-78-0003 Rev. 1Page 1 of 8

affrirewufat 74ER

*mat t feituSPECIFICATION FOR

DOCUMENTATION REQUIREMENTSFROM SUPPLIERS

QMS QMS0 04.06.09 Issued as Standard Specification

Standards Standards SCT NDCommittee Committee

Rev.No Date Purpose Prepared Checked

by by

Standards StandardsComm ifte BureauConvener Chairman

Approved by

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reservedPage 139 of 188

Page 140: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATIONNo.

6-78-0003 Rev. 1Page 2 of 8

(t,ft. ENGINEERS1i laWGNIIY INDIA LIMITEDogire, efiTIWAnowAl (A Govt of Into Undertaking(

SPECIFICATION FORDOCUMENTATION

REQUIREMENTS FROMSUPPLIERS

Abbreviations:

DCI - Document Control Index

eDMS - Electronic Document Management System

FOA Fax of Acceptance

HOD Head of Division / Department

IC Inspection Certificate

IRN Inspection Release Note

ITP Inspection and Test Plan

LOA Letter of Acceptance

MOU Memorandum of Understanding

MR Material Requisition

PO Purchase Order

PR Purchase Requisition

PVC Polyvinyl Chloride

QMS Quality Management System

TPIA Third Party Inspection Agency

URL Universal Resource Locator

QMS Standards Committee

Convener: Mr. M.P. Jain

Members: Mr. A.K. Chaudhary (Insp.)Mr. S.K. Kaul (C&P)Mr. R.K. Trivedi (Engg.)Mr. Ravindra Kumar (Const.)Mr. Tilak Raj (Projects)Mr. Vinod Kumar (CQA)

Copyright EIL — All rights reservedFormat No. 8-00-0001-F1 Rev. 0Page 140 of 188

Page 141: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

SPECIFICATION FORDOCUMENTATION

REQUIREMENTS FROMSUPPLIERS

STANDARD SPECIFICATIONNo.

6-78-0003 Rev. 1Page 3 of 8

ei ENGINEERSOaez idiWIeg INDIA LIMITED

011E71 ewaxedaagem) (A Govt of India Undertaking)

CONTENTS

Clause Title PageNo.

1.0 SCOPE 42.0 DEFINITIONS 43.0 REFERENCE DOCUMENTS 44.0 DOCUMENTATION REQUIREMENTS 4

Attachments

Format for completeness of Final Documentation Format No. 3-78-0004

Format No. 8-00-0001-F1 Rev. 0

Copyright EIL — All rights reservedPage 141 of 188

Page 142: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERSINDIA LIMITED(A Govt of Intha Undertakongt

SPECIFICATION FORDOCUMENTATION

REQUIREMENTS FROM

STANDARD SPECIFICATIONNo.

6-78-0003 Rev. 1dol

5'gzir tlf5ltuI.VOM

SUPPLIERS Page 4 of 8

1.0 SCOPE

This specification establishes the Documentation Requirements from Suppliers.

All documents/data against the PO / PR / MR shall be developed and submitted toEIL/Owner by the suppliers for review / records, in line with this specification.

2.0 DEFINITIONS

2.1 Supplier

For the purpose of this specification, the word "SUPPLIER" means the person(s),firm, company or organization who is under the process of being contracted by EIL /Owner for delivery of some products (including service). The word is consideredsynonymous to bidder, contractor or vendor.

2.2 Owner

Owner means the owner of the project for which services / products are beingpurchased and includes their representatives, successors and assignees.

3.0 REFERENCE DOCUMENTS

6-78-0001 Specification for Quality Management System Requirementsfrom Bidders

4.0 DOCUMENTATION REQUIREMENTS

4.1 Documents/Data to be Submitted by the Supplier

4.1.1 The Supplier shall submit the documents and data against the PO/PR/MR as per thelist given in respective PO/PR/MR.

4.1.2 Review of the supplier drawings by EIL would be only to review the compatibility withbasic designs and concepts and in no way absolve the supplier of hisresponsibility/contractual obligation to comply with PR requirements, applicablecodes, specifications and statutory rules/regulations. Any error/deficiency noticedduring any stage of manufacturing/execution/installation shall be promptly correctedby the supplier without any time and cost implications, irrespective of comments onthe same were received from EIL during the drawing review stage or not.

4.1.3 Unless otherwise specified, submission of documents for Review/Records shallcommence as follows from the date of Fax of Intent / Letter of Intent/ Fax ofAcceptance (FOA)/ Letter of Acceptance (LOA):

QMS - 1 weekDrawing/Document Control Index - 2 weeksOther Documents/Drawings - As per approved Drawing/Document Control

Index/Schedule

4.1.4 Documents as specified in PO/PR/MR are minimum requirements. Supplier shallsubmit any other document/data required for completion of the job as per EIL/Ownerinstructions.

Format No. 8-00-0001-F1 Rev. 0

Copyright EIL — All rights reservedPage 142 of 188

Page 143: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

'7f 11I OfiTt cYeawlnn

ENGINEERSINDIA LIMITED(A Govt of India UndenakIngi

SPECIFICATION FORDOCUMENTATION

REQUIREMENTS FROMSUPPLIERS

STANDARD SPECIFICATIONNo.

6-78-0003 Rev. 1Page 5 of 8

4.2 Style and Formatting

4.2.1 All Documents shall be in ENGLISH language and in M.K.S System of units.

4.2.2 Before forwarding the drawings and documents, contractor shall ensure that thefollowing information are properly mentioned in each drawing:

Purchase Requisition NumberName of Equipment / PackageEquipment / Package Tag No.Name of ProjectClientDrawing / Document TitleDrawing / Document No.Drawing / Document Revision No. and Date

43 Review and Approval of Documents by Supplier

4.3.1 The Drawing/Documents shall be reviewed, checked, approved and dulysigned/stamped by supplier before submission. Revision number shall be changedduring submission of the revised supplier documents and all revisions shall behighlighted by clouds. Whenever the supplier require any sub-supplier drawings to bereviewed by EIL, the same shall be submitted by the supplier after duly reviewed,approved and stamped by the supplier. Direct submission of sub-supplier's drawingswithout contractor's approval shall not be entertained.

4.4 Document Category

4.4.1 Review Category

Following review codes shall be used for review of supplier Drawings/Documents:

Review Code 1 No comments. Proceed with manufacture/fabrication as per the document.

Review Code 2 Proceed with manufacture/fabrication as percommented document. Revised documentrequired.

Review Code 3 Document does not conform to basicrequirements as marked. Resubmit for review

R Document is retained for Records. Proceedwith manufacture/fabrication.

V Void

4.5 Methodology for Submission of Documents to EIL/Owner

4.5.1 Document Control Index (DCI)

Supplier shall create and submit Document Control Index (DCI) for review based onPO/PR/MR along with schedule date of submission of each drawing/document on EILeDMS. The DCI shall be specific with regard to drawing/document no. and the exacttitle. Proper sequencing of the drawings/documents should be ensured in scheduledate of submission.

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reserved

Page 143 of 188

Page 144: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

r1.7-14 ENGINEERS51g-a feff5leg INDIA LIMITED

1.17,124ifflsrefloJOORI1 IA GUN. of India Undertaking,

SPECIFICATION FORDOCUMENTATION

REQUIREMENTS FROMSUPPLIERS

STANDARD SPECIFICATIONNo.

6-78-0003 Rev. 1Page 6 of 8

4.5.2 Submission of Drawings/Documents

Drawings/documents and data shall be uploaded on the EIL eDMS Portal as per DCI.The detail guidelines for uploading documents on EIL eDMS Portal are available onfollowing URL

http://edocx.eil.co.in/vportal

4.5.3 Statutory Approvals

Wherever approval by any statutory body is required to be taken by Supplier, theSupplier shall submit copy of approval by the authority to EIL.

4.5.4 Details of Contact Persons of Supplier

After placement of order supplier shall assign a Project Manager for that order. Thedetails are to be filled online through the portal. The details include e-mail address,mailing address, telephone nos., fax nos. and name of Project Manager. All the systemgenerated emails pertaining to that order shall be sent to the assigned ProjectManager.

4.5.5 Schedule and Progress Reporting

Supplier shall submit monthly progress report and updated procurement, engineeringand manufacturing status (schedule vs. actual) every month, beginning within 2 weeksfrom FOA/LOA. In case of exigencies, EIL/Owner can ask for report submission asrequired on weekly/fortnightly/adhoc basis depending upon supply status and suppliershall furnish such reports promptly without any price implication. Format for progressreport shall be submitted by the Supplier during kick off meeting or within one week ofreceiving FOA/LOA, whichever is earlier.

4.5.6 Quality Assurance Plan/Inspection and Test Plan

Inspection and test plans (ITP) attached if any, to the MR/PR are to be followed.However for cases wherein ITPs have not been attached with MR/PR, Supplier shallsubmit within one week of receiving FOA/LOA, the Quality Assurance Plan formanufacturing, covering quality control of critical bought out items/materials,inspection & testing at various stages of production, quality control records and siteassembly & testing as may be applicable to the specific order and obtain approvalfrom concerned Regional procurement Office of EIL/third party inspection agency, asapplicable.

For Package equipment contracts, the supplier shall prepare a list of items/equipments and their inspection categorization plan for all items included in the scopeof supply immediately after receipt of order and obtains approval for the same fromEIL. The items shall be categorized into different categories depending upon theircriticality for the scope of inspection of TPIA and/or EIL.

4.5.7 Inspection Release Note (IRN)/ Inspection Certificate (IC)

IRN/ IC shall be issued by EIL Inspector/ third party inspection agency on the basis ofsuccessful inspection, review of certificates as per specifications & agreed quality plan(as applicable) and only after all the drawings/documents as per DCI are submittedand are accepted under review code-1 or code R. Supplier shall ensure that necessarydocuments/manufacturing and test certificates are made available to EIL/TPIA as andwhen desired.

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reserved

Page 144 of 188

Page 145: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERSOgell 0151jeg INDIA LIMITED

IA Govt of India Unclettalong)1.127, owtore o43frosso

SPECIFICATION FORDOCUMENTATION

REQUIREMENTS FROMSUPPLIERS

STANDARD SPECIFICATIONNo.

6-78-0003 Rev. 1Page 7 of 8

Note: Non fulfilling above requirement shall result into appropriate penalty or with-holding of payment as per conditions of PO/PR/MR.

4.5.8 Transportation Plan

Transportation Plan for Over Dimensional Consignments (ODC), if any, shall besubmitted within 2 weeks of receiving FOA/LOA, for approval. Consignment withparameters greater than following shall be considered as over dimensional.

Dimensions: 4 meters width x 4 meters height x 20 meters length

Weight : 32 MT

4.6 Final Documentation

4.6.1 As Built Drawings

Shop changes made by Supplier after approval of drawings under `Code 1' by EIL anddeviations granted through online system , if any, shall be marked in hard copies ofdrawings which shall then be stamped 'As-built' by the supplier. These 'As-built'drawings shall be reviewed and stamped by EIL Inspector/ TPIA also. Supplier shallprepare scanned images files of all marked — up 'As — built' drawings. SimultaneouslySupplier shall incorporate the shop changes in the native soft files of the drawingsalso.

4.6.2 As Built Final Documents

As built final documents shall be submitted as listed in PO/PR/MR.

4.6.3 Packing/Presentation of Final Documents

Final Documents shall be legible photocopies in A4, A3 size only. Drawings will beinserted in plastic pockets (both sides transparent, sheet thickness minimum 0.1 mm)with an extra strip of 12 mm wide for punching so that drawings are well placed.

Final Documentation shall be bound in Hard board Plastic folder(s) of size 265 mm x315 mm (10 1 /2 inch x 12 1 /2 inch) and shall not be more that 75 mm thick. It may be ofseveral volumes and each volume shall have a volume number, index of volumes andindex of contents of that particular volume. Where number of volumes are more,90mm thickness can be used. Each volume shall have top PVC sheet of minimum0.15 mm thick duly fixed and pressed on folder cover and will have 2 lever clip. Incase of imported items documents, 4 lever clip shall also be accepted. All four cornersof folders shall be properly metal clamped. Indexing of contents with page numberingmust be incorporated by supplier. Spiral/Spico bound documents shall not beacceptable. As mentioned above, books should be in hard board plastic folders withsheets punched and having 2/4 lever clips arrangement.

Each volume shall contain on cover a Title Block indicating package Equipment TagNo. & Name, PO/Purchase Requisition No., Name of Project and Name of Customer.Each volume will have hard front cover and a reinforced spine to fit thickness of book.These spines will also have the title printed on them. Title shall include also volumenumber (say 11 of 15) etc.

4.6.4 Submission of Soft Copies

Supplier shall submit to EIL, the scanned images files as well as the native files ofdrawings/documents, along with proper index.

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL—AIL rights reserved

Page 145 of 188

Page 146: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

SPECIFICATION FORDOCUMENTATION

REQUIREMENTS FROMSUPPLIERS

STANDARD SPECIFICATIONNo.

6-78-0003 Rev. 1Page 8 of 8

C,'(L:ED'D ENGINEERSINDIA UMITEDIA Govt of India Undertaking)

ligar idf5lesI MT riernfO7IJOCFAI

In addition to hard copies, Supplier shall submit electronic file (CD-ROM) covering softcopies of all the final drawings and documents, all text documents prepared oncomputer, scanned images of all important documents (not available as soft files), allrelevant catalogues, manuals available as soft files (editable copies of drawings/textdocuments, while for catalogues/manuals/proprietary information and data, PDF filescan be furnished).

All the above documents shall also be uploaded on the EIL eDMS portal.

4.6.5 Completeness of Final Documentation

Supplier shall get the completeness of final documentation verified by EIUTPIA andattach the Format for Completeness of Final Documentation (Format No. 3-78-0004)duly signed by EIL Inspector or TPIA as applicable to the document folder.

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reserved

Page 146 of 188

Page 147: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

$afg7:11 tel5legMen eRali• 4,30.0

ENGINEERS COMPLETENESS OF FINAL

INDIA LIMITED DOCUMENTATION(A Gort of hula Undertakog)

fEr)

COMPLETENESS OF FINAL DOCUMENTATION

Name of Supplier/Contractor

Customer

Project

EIL's Job No.

Purchase Order No./Contract No.

Purchase Requisition No./Tender No. Rev. No. :

Name of the Work/Equipment

Tag. No.

Supplier's/ Contractor'sWorks Order No.

Certified that the Engineering Documents/ Manufacturing & Test Certificates submitted by thesupplier are complete in accordance with the Vendor Data Requirements of PurchaseRequisition.

Signature

Date

Name

Designation

Department

Signature

Date

Name

Designation

Department

Supplier/Contractor EIL/TPIA

arTilittl/APPROVED

gTffTeR/ Sig eilegiltktvi .

4/ Name: ......... .. . ......................

f4-41--/ Date: ..... ••••••• .... ........................

Copyright EIL — All rights reservedFormat No. 3-78-0004, Rev. 1/ 12.03.2015Page 147 of 188

Page 148: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

QMSStandardsCommittee

1 12.03.15 General Revision

QMS

QMS0 04.06.09 Issued as Standard Specification

Standards

Standards SCT

NDCommittee

Committee

Rev.No Date Purpose Prepared by Checked

by

StandardsCommitteeConvener

StandardsBureau

Chairman

QMSStandardsCommittee

MPJ

SC

ENGINEERSlakgINDIA LIMITED

(A Gavt at India Undertaking)

SPECIFICATION FOR QUALITYMANAGEMENT SYSTEMREQUIREMENTS FROM

BIDDERS

STANDARD SPECIFICATION No.

6-78-0001 Rev. 1Page 1 of 7

mren ewaire mjvam)

64)(11 Chrlf qu i ciall -51-04ffu tea aliikrrat t ?drift'

SPECIFICATION FOR QUALITYMANAGEMENT SYSTEM

REQUIREMENTS FROM BIDDERS

Approved by

Format No. 8-00-0001-F1 Rev. 0

Copyright EIL — All rights reservedPage 148 of 188

Page 149: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS SPECIFICATION FOR QUALITY STANDARD SPECIFICATION No.

INDIA LIMITED SYSTEM 6-78-0001 Rev. 1lft2 (AG'"ind'Undelt6ung) REQUIREMENTS FROM BIDDERS Page 2 of 7

Abbreviations:

CV Curriculum Vitae

ISO International Organization for Standardization

MR Material Requisition

PO Purchase Order

PR Purchase Requisition

QA Quality Assurance

QMS Quality Management System

QMS Standards Committee

Convener: Mr. M.P. Jain

Members: Mr. A.K. Chaudhary (Insp.)Mr. S.K. Kaul (C&P)Mr. R.K. Trivedi (Engg.)Mr. Ravindra Kumar (Const.)Mr. Tilak Raj (Projects)Mr. Vinod Kumar (CQA)

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reserved

Page 149 of 188

Page 150: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS SPECIFICATION FOR QUALITY STANDARD SPECIFICATION No.

INDIA LIMITED SYSTEM 6-78-0001 Rev.'A

Govt At ' nth' Und"k"V) REQUIREMENTS FROM BIDDERS Page 3 of 7Igar llks

Oiren

CONTENTS

Clause Title Page

No.

1.0 SCOPE 4

2.0 DEFINITIONS 4

3.0 REFERENCE DOCUMENTS 4

4.0 QUALITY MANAGEMENT SYSTEM — GENERAL 4

5.0 QUALITY SYSTEM REQUIREMENTS 4

6.0 AUDITS 7

7.0 DOCUMENTATION REQUIREMENTS 7

Copyright EIL — All rights reservedFormat No. 8-00-0001-F1 Rev. 0Page 150 of 188

Page 151: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

el ENGINEERS SPECIFICATION FOR QUALITY STANDARD SPECIFICATION No.

$1g-zg faReg INDIA LIMITED MANAGEMENT SYSTEM 6-78-0001 Rev. 1

own 120.2 .I J40.9) IA GOVt of India Undertaking) REQUIREMENTS FROM BIDDERS Page 4 of 7

1.0 SCOPE

This specification establishes the Quality Management System requirements to bemet by BIDDER for following purpose:

• QMS requirements to be met by suppliers/contractors after award of work/during contract execution.

2.0 DEFINITIONS

2.1 Bidder

For the purpose of this specification, the word "BIDDER" means the person(s), firm,company or organization who is under the process of being contracted by EIL /Owner for delivery of some products (including service). The word is consideredsynonymous to supplier, contractor or vendor.

2.2 Project Quality Plan

Document tailored from Standard Quality Management System Manual of BIDDER,specifying how the quality requirements of the project will be met.

2.3 Owner

Owner means the owner of the project for which services / products are beingpurchased and includes their representatives, successors and assignees.

3.0 REFERENCE DOCUMENTS

6-78-0002

Specification for Documentation Requirements fromContractors

6-78-0003

Specification for Documentation Requirements from Suppliers

4.0 QUALITY MANAGEMENT SYSTEM — GENERAL

Unless otherwise agreed with EIL / Owner, the BIDDER proposed quality systemshall fully satisfy all relevant requirements of ISO 9001 "Quality ManagementSystems — Requirements." Evidence of compliance shall be current certificate ofquality system registration to ISO 9001 or a recent compliance audit recommendingregistration from a certification agency. The quality system shall provide theplanned and systematic control of all quality related activities for execution ofcontract. Implementation of the system shall be in accordance with BIDDER'SQuality Manual and PROJECT specific Quality Plan.

5.0 QUALITY SYSTEM REQUIREMENTS

5.1 BIDDER shall prepare and submit for review / record, Project Quality Plan / QualityAssurance Plan for contracted scope / job. The BIDDER'S Quality Plan shalladdress all of the applicable elements of ISO 9001, identify responsible partieswithin BIDDER'S organization, for the implementation / control of each area,reference the applicable procedures used to control / assure each area, and verifythe documents produced for each area. The Project Quality Plan shall necessarilydefine control or make reference to the relevant procedures, for design andengineering, purchase, documentation, record control, bid evaluation, inspection,production/manufacturing, preservation, packaging and storage, quality control at

Format No. 8-00-0001-F1 Rev. 0

Copyright EIL — All rights reservedPage 151 of 188

Page 152: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS SPECIFICATION FOR QUALITY STANDARD SPECIFICATION No.

INDIA LIMITED MANAGEMENT SYSTEM 6-78-0001 Rev. 1(A Gavt of India undertaking' REQUIREMENTS FROM BIDDERS Page 5 of 7

construction site, pre-commissioning, commissioning and handing over (asapplicable) in line with contract requirement and scope of work.

5.2 BIDDER shall identify all specified or implied statutory and regulatory requirementsand communicate the same to all concerned in his organization and his subcontractor's organization for compliance.

5.3 BIDDER shall deploy competent and trained personnel for various activities forfulfillment of PO / contract. BIDDER shall arrange adequate infrastructure and workenvironment to ensure that the specification and quality of the deliverable aremaintained.

5.4 BIDDER shall do the quality planning for all activities involved in delivery of order.The quality planning shall cover as minimum the following:

ResourcesProduct / deliverable characteristics to be controlled.Process characteristics to ensure the identified product characteristics are

realizedIdentification of any measurement requirements, acceptance criteriaRecords to be generatedNeed for any documented procedure

The quality planning shall result into the quality assurance plan, inspection and testplans (ITPs) and job procedures for the project activities in the scope of bidder.These documents shall be submitted to EIL/Owner for review/approval, beforecommencement of work.

5.5 Requirements for sub-contracting / purchasing of services specified in contract /tender shall be adhered to. In general all outsourced items will be from approvedvendors of EIL. Wherever requirements are not specified, or approved sub vendorsdo not exist, the sub-contractor shall establish and maintain a system for purchasing/ sub-contracting to ensure that purchased product / service conforms to specifiedrequirements. Criteria for selection of sub-contractor, evaluation, re-evaluation,maintenance of purchasing data and verification of purchased product (sub-contractor services), constitute important components of this requirement.

5.6 BIDDER shall plan and carry production and service provision under controlledconditions. Controlled conditions shall include, as applicable

the availability of information that describes the characteristics of the productthe availability of work instructionsthe use of suitable equipmentthe availability and use of monitoring and measuring devicesthe implementation of monitoring and measurementthe implementation of release, delivery and post-delivery activities

5.7 BIDDER shall validate any processes for production and service provision whereresulting output cannot be verified by subsequent monitoring and measurement.This includes any process where deficiencies become apparent only after theproduct is in use or service has been delivered.

5.8 BIDDER shall establish a system for identification and traceability of product /deliverable throughout product realization. Product status with respect to inspectionand testing requirements shall be identified.

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reserved

Page 152 of 188

Page 153: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ei ENGINEERS SPECIFICATION FOR QUALITY STANDARD SPECIFICATION No.

lge.ji id5fez INDIA LIMITED MANAGEMENT SYSTEM 6-78-0001 Rev. 1IA Govt of India undettaking) REQUIREMENTS FROM BIDDERS Page 6 of 7

Oren erRRIZ .71.1.113,70

5.9 BIDDER shall identify, verify, protect and safeguard EIL / Owner property (material /document) provided for use or incorporation into the product. If any Owner / EILproperty is lost, damaged or otherwise found to be unsuitable for use, this shall bereported to the EIL / Owner.

5.10 BIDDER shall ensure the conformity of product / deliverable during internalprocessing and delivery to the intended destination. Requirements mentioned in thetender shall be adhered to.

5.11 BIDDER shall establish system to ensure that inspection and testing activities arecarried out in line with requirements. Where necessary, measuring equipmentsshall be calibrated at specified frequency, against national or internationalmeasurement standards; where no such standard exists, the basis used forcalibration shall be recorded. The measuring equipments shall be protected fromdamage during handling, maintenance and storage.

5.12 BIDDER shall ensure effective monitoring, using suitable methods, of the processesinvolved in production and other related processes for delivery of the scope ofcontract.

5.13 BIDDER shall monitor and measure the characteristics of the product/deliverable toverify that product requirement has been met. The inspection (stage as well asfinal) by BIDDER and EIL / Owner personnel shall be carried out strictly as per theITPs forming part of the contract. Product release or service delivery shall notproceed until the planned arrangements have been satisfactorily completed, unlessotherwise approved by relevant authority and where applicable by Owner / EIL.

5.14 BIDDER shall establish and maintain a documented procedure to ensure that theproduct which does not conform to requirements is identified and controlled toprevent its unintended use or delivery

5.15 All non-conformities (NCs) / deficiencies found by the BIDDER'S inspection /surveillance staff shall be duly recorded, including their disposal action shall berecorded and resolved suitably. Effective corrective and preventive action shall beimplemented by the BIDDER so that similar NCs including deficiencies do not recur.

5.16 All deficiencies noticed and reported by EIL / Owner shall be analyzed by theBIDDER and appropriate corrective and preventive actions shall be implemented.BIDDER shall intimate EIL / Owner of all such corrective and preventive actionimplemented by him.

5.17 BIDDER should follow the standards, specifications and approved drawings.Concessions/Deviations shall be allowed only in case of unavoidable circumstances.In such situations Concession/deviation request must be made by the BIDDERthrough online system of EIL eDMS. URL of EIL eDMS ishttp://edocx.eil . co . in/vportal.

5.18 BIDDER shall have documented procedure for control of documents.

5.19 All project records shall be carefully kept, maintained and protected for any damageor loss until the project completion, then handed over to EIL / Owner as per contractrequirement (Refer Specification Nos. 6-78-0002 - Specification for DocumentationRequirements from Contractors and 6-78-0003 - Specification for DocumentationRequirements from Suppliers), or disposed as per relevant project procedure.

Copyright EIL—All rights reservedFormat No. 8-00-0001-F1 Rev. 0Page 153 of 188

Page 154: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

ENGINEERS SPECIFICATION FOR QUALITY STANDARD SPECIFICATION No.

INDIA LIMITED MANAGEMENT SYSTEM 6-78-0001 Rev. 1(A Goof of India UndertakIngi REQUIREMENTS FROM BIDDERS Page 7 of 7

eiJrIft kif51ft.wirer riraxem3Tmil

6.0 AUDITS

BIDDER shall plan and carry out the QMS audit for the job. Quality audit programmeshall cover design, procurement, construction management and commissioning asapplicable including activities carried out by sub-vendors and sub-contractors. Thisshall be additional to the certification body surveillance audits carried out underBIDDER'S own ISO 9001 certification scheme.

The audit programmes and audit reports shall be available with bidder for scrutinyby EIL / Owner. EIL or Owner's representative reserves the right to attend, as awitness, any audit conducted during the execution of the WORKS.

In addition to above EIL, Owner and third party appointed by EIL/Owner may alsoperform Quality and Technical compliance audits. BIDDER shall provide assistanceand access to their systems and sub-contractor / vendor systems as required for thispurpose. Any deficiencies noted shall be immediately rectified by BIDDER.

7.0 DOCUMENTATION REQUIREMENTS

BIDDER shall submit following QMS documents immediately after award of work(Within one week) for record / review by EIL / Owner.

Organization chart (for complete organization structure and for the project)Project Quality Plan/Quality Assurance PlanJob specific Inspection Test Plans, if not attached with PRJob ProceduresInspection/Test Formats

In addition to above QMS documents, following documentation shall be maintainedby the BIDDER for submission to EIL / Owner on demand at any point of time duringexecution of the project.

Quality ManualCertificate of approval for compliance to ISO: 9001 standardProcedure for Control of Non-conforming ProductProcedure for Control of DocumentsSample audit report of the QMS internal and external audits conducted duringlast one yearCustomer satisfaction reports from at least 2 customers, during the last oneyearProject QMS audit reportTechnical audit reports for the projectCorrective action report on the audits

Documents as specified above are minimum requirements. BIDDER shall submitany other document/data required for completion of the job as per EIL/Ownerinstructions.

Copyright EIL—All rights reservedFormat No. 8-00-0001-F1 Rev. 0Page 154 of 188

Page 155: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

MVId

0 *Ao1=1 Ld-L000-00-8 '0N 1.eiwod Z

0 C

1

CD

O

t.)

0

O

co

>

=rm

rn

0

uop.ewawaidw! J0j. panssi

C")

c o

panss!-au pue pas!AaEi

G)

0) panss!-ad pue pas!nau

Copyright EIL —All rights reserved

Aq peAwddv

c.) o

co

o

eamtuwoo

spiepuels

£ *AaR 1,00Z-I8-9

STANDARD SPECFICATION NO.

Pag

e 15

5 o

f 18

8

Page 156: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 *Aad L3-1000-00-9 'oN 81.11J03 pamesal IIV —113 46i.h(cloo

:suopuptaiqqv

NVId 1S31

STANDARD SPECIFICATION NO.

.naH bOOZ-I8-9

aaj:

V,

'-r1 '-

r1 t

il

■in

nnneci

e:J>

,-,

rn tr

l c)

c.) .t

-1 ~

_, r.

()

Hn

nn

'-

, n -

i 4

x ,1

A H

:I

rli 9! r

. "

7

› c4

,-

,..,

. rl

o

c.)

rri

-, rri

n

.-ri

n >

4

o

rri

co .

CDr

, ■-t

S=

0 ._̀'

,). . C/D s-

92. 5

, 0

"

r'

...

"1

~1

-1 erl

ril

(-.

.-)n

eo

>co

>

,- -.7.

$?), .

a-. ,a

-, ,-•

CD

..1

A)

(1)

CD

'''

■-t

- ■-t

Z

c

■-s

,..2

>Z3

er)

CD

''Zi

,-t

't:f

Cl. ,

■ -t

- .-

' • c

) cc,

cn '-

. ',:-1

7, (' 7

'D * .<

?) 5 ,-. ci

,,• _. 6')

~

t C

D C

D C

D .-

t 0 C

L .

-4-

~s .

-.

61) rri

=

-,

ae 4

E, '

-(5*

z 7,_

_,.,

,, 5,•

,.,

~,)

o

»cs r

p

■-r-

.-1

■--4

4 4

,..

, ,_,7,

(...)

,..,•-. cl

., =

-•

c-, ;,, .

CD

CD

, •

;y)

•-t

1:))

0 '-

' nC

) H

co

CD

~

• c

c, '-

''.

(1)

Crci

.--1

7ci

■-3 FI

'', r.-$

c) -

co

rz).

.,

ox

, v

) -,

.-+

) e9

-1.) ,

C4

(i

)C

A

soo

(1) o

-,

o

o

'".

.4 (-

-) 5

- CA

4

CD

ril

t.-

. ■ -

r- '''

,,

_,,

ci)

.6

' ,..

c: r:

;1,

so.)

soo

M

-,

- 0:

'8-

•=s

soo

nom

' crq

-.

,,,

-,.. r

- C

fQ

, . ,

..c".

9-

.1, R

— --•

o $.

9 c

o so

o F.,_ c

r'

tri

n

CD

°

'"1"1

l''

(1)

'-i

"

,c-)••

C

T

AD

0

AD

CD

C)

''.

0

,•+

CD>

i (;

. CD

.

CD

120

c7

v)

-.

a. ..

so.)

tri

s:)..

-a

. .

.

C7

co

2 'ff

..s.

-„,:,

'.';',-

-0

I.

cr

:7

o

. CD

n

.--

,. ,..

.....,

›c

<: c

1 H

,-3

:J,CD

"z) '

-'=J '1

'- c

l '",

'-0 Z

Z Z

4

4 4

r.

,.0 ,..

, r.

,H ,-

, n H

(.)

g

,ox

C)

R

,,

...cs

,c) e

p

tri

o

-:

>

■-3

'-0

■-1

>>

C..?

<

'—] '-

-3 7

“....)

'''' 6

z, .7

(.,

1:/ ='.°

Z Z

rDZ

4

Ê

4 4

'-'. 9

'''‘:-

5i.

o

(1)

(1)

CD

CD

SW

C

l.,

CD

w

6,

,-.

• ("

) ("

) ' (-) -• -

o

CM

.

t-

,'S

,-9

0" 5

2t " '6' .0

(;

tm '«

- <

'..

$o

) sn- '(-1

7 so

o o

,:1• "

. soo n

.

;,,,

1,

,,-, ...., 5

• C

D V

) v)

Sw

C

D v

) A

D A

) .._‹-.

C

D '-'

v)

._-_,.• (

,) G

tz?

0

PH

4 ?

-')

') '<

4

`" 'i

'D

,-

'an

o

6-9 r De' ( , . i:,

ot - - .

19

c$(4 '-

4 C2

- ' -

". 21

. L'. :

i; (Da l '-#

.<- 9 -- ;'-

ö. 64

(-)

vo

'r--,'

CD o

cn o

2 4

) o

7ci

a

( )

•-r-

....

. '''

''' '-'

• '...:

V)

-'ocf

Gls

9 c

)

.-4

- n

v

) cp

■-+

''C

■-

r 5

cA

so

o '''

.,')- s

oo

,-,-''

‘ <

r0 ne

D ,5 <

.. 5-9

>

.5

H.

crQ

co

-

0

■-• r)

,-

,-

r,

(-9

o

'-

-s5.

o 0

....

og`

(5

co..

crQ

'-t

C/

7

Pag

e 15

6 o

f 18

8

Page 157: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 .Aad Ld-I,000-00-9 '0N 81.1,..LIO3 pemasai sp46P IIV —113 4116pAdoo

3.0 INSPECTION AND TEST REQUIREMENTS:

PO/PR / Standards referred there in /Job specifications / Approved documents

This Inspection and Test Plan covers the minimum testing requirements of Orifice plates & Flanges, Meter Run assemblies, Flow Straightner

:adODS O'I

£ 'Aall I700Z-IR-9

STANDARD SPECIFICATION NO.

NIVId 1S31

tv

iv

tv

'.—.

r.>

,:::,

:--

■—■

C:›

0

■-ri

't5)—

00

cp cn

Incoming Material l ike Flanges, Orifice Plate material, Studs / Nuts,

Gaskets, Pipes (for Meter Run assemblies) etc.

Material Inspection

WPS/PQR/WPQ

Procedures

STAGE/ ACTIVITY

Chemical , Mechanical Properties, Heat Treatment

Chemical , Mechanical Properties, Heat Treatment.

Welding procedure Qualification for welding

involved in Multistage orifice Assemblies, Meter Runs

r)

r)

ril c.)

'4 r5

v)

O

0

--

C>

--

0

C>

QUANTUM OF CHECK

Material Test Certificates /

Lab test Certificates

Material Test Certificates /

Lab test Certificates

e

vi g

x

x

. i

SUB SUPPLIER

SCOPE OF INSPECTION

H (Note 1)

x

x

SUPPLIER

W (New) R (Existing)

EIL/TPIA

Pag

e 15

7 o

f 18

8

Page 158: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 °A Ld-1,000-00-9 '0N leuaio3 pamesei sti6P 11V —113 4L460doo

MVId

STANDARD SPECIFICATION NO.

£ *AaR 1700Z-18-9

9:h

,--.

01

GD

c..n

tAi

7=

L)

i■.)

z(/

) 0

Documentation and IC

Documentation and IC

Cleaning for special services, Painting of CS flanges, Meter runs

Painting

Calibration

7.

c) co

CD

cn

(-)

5-

cn

v) Ro

-c,

,-<

(1

) F

).

$D)

STAGE/ ACTIVITY

Review of Internal Test Reports

IC issuance

Special cleaning and packing for oxygen and chlorine services

Pre treatment, primer and final .aint, shade, thickness

Wet Calibration of Meter Run Assembly, if specified

.

- -•

..., -

,..

-- -

• ,

o .-1

c)

• (

1) C2-

• - •

C19

.2 eD

•-• •

0

C1Q

f:'"

v)

'—

. (1)

- rd

c4ni•

i)''"

'''cpc)

(1')CD

c4

,-S

=

■-t

c4 ly

6+

) CD

ci)

(1'

,..--.'

o..

:0

CD

...• »

0 :.1

. ',:i

e+ ,

-1. co

,c,-

'.".n,

0

cp C

) o

CD

ff '-'

,,) .

CD ■-•

= sà,

"

o

o..

-:

(1) ,

c~:7

"-s

eD

..t

,,n,

(-)

.- •

(4

0

•-• co cn

C4 0

cp :=1•1, ■-• •

.

" •

CD

cn

'O •

.

•-•

p)

CHARACTERISTICS

c,

CD

c,

CD

cp

CD

0

0

QUANTUM OF CHECK

Supplier's Test Records /

Inspection Certificate

Test Records

Calibration Report from

Flow Lab

x ....

.. 5

CD

,-, •

li o 5

- {..7),

o "

CD

-,...

0

1 e

I

SCOF

SUB SUPPLIER

Z

Z

SUPPLIER

'E OF INSPECTION

X

I 1 I

EIL/TPIA

Pag

e 15

8 o

f 18

8

Page 159: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

0 'Ae2:1 L3-1000-00-8 'oN IeWJOd patuasai sA5P IIV —113 400doo

NIVId 1S31 STANDARD SPECIFICATION NO.

£ *AaH bOOZ-18-9

;--

4.

O

w

--

w

O

z w

0 r

,

NDT , Post Weld Hea Treatment (PWHT) ( If specified)

Final Inspection

Machining of Flanges, Plates and Pipes

Inprocess Inspection

STAGE/ ACTIVITY

Radiography for weld joints

• Dye Penetration test. • Post Weld Heat Treatment of welds,

Dimensions, Smoothness verification

CHARACTERISTICS

c> — c, c>

QUANTUM OF CHECK

NDT reports / PWHT chart

Test Records

o

g

SUB SUPPLIER

SCOPE OF INSPECTION

x x

SUPPLIER EIL/TPIA

Pag

e 15

9 o

f 18

8

Page 160: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

°

>"(ii

z•-• <

=

CD

•-•s•

0

ct,

(1)

CI)

••ti

l (-

)

•£,

CifQ

■-r■

>/

:$

CD

'"C:2

>,

CL,

1=1

- '=

"' •

■'=.4-

CD

CD

r:D

cic

? »C

S C

> CD

■-•

• cr

cp

C/3

' CD

CD

(t)•

CD

CD

G/Q <1>

e)

(1)

>

cn

D+

cn

r.n

CD•-.1

• CJ

I arc

a cr

cn

CD

cr

CD

CD

CD"

cn C

D

• C

f (

/)

0

CD

t=1.

‘-‹

rS7

• cp

CD

-t C

D «

cl

o

CD

<

gs;

oy o-

-t

■-d C

D

(1?) o •

f. —•

cf)

F'D •

»-

t c.)

Cfg

CD

cn

."0

0

'r7

c

CD

- Samples must include min 1 No of each type),

size 24" — 300 ANSI will be accepted on

0 •Aad Ld-1,000-00-9 'oN letwod paniesei sp.i6p ily — ii3 ly6uAdoo

NIV'Id ISII £ *Aall 1700Z-18-9

STANDARD SPECIFICATION NO.

0.,

iN,

z cA

o r

i

Final Document submission

STAGE/ ACTIVITY

Compilation of Inspection reports ,drawings, etc as per

VDR / PR

CHARACTERISTICS

,',

c>

QUANTUM OF CHECK

Final data folder

/Completeness certificate

o

g

SUB SUPPLIER

SCOPE OF INSPECTION

x

SUPPLIER

x

EIL/TPIA

Pag

e 16

0 o

f 18

8

Page 161: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 1 of 22

0

20.05.15 ISSUED AS JOB SPECIFICATION

ASA

PKA

LKK

Rev. No

Date Purpose Prepared

by Checked

by Approved by

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

ikbfiax ds v/oalkRed ijh{k.k dh vko';drkvksa gsrq ekud fofunsZ'k

JOB SPECIFICATION FOR

NON DESTRUCTIVE EXAMINATION

REQUIREMENTS OF PIPING

Page 161 of 188

Page 162: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 2 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

Abbreviations:

DP/LP : Dye/Liquid Penetrant

MP : Magnetic Particle

CS : Carbon Steel

AS : Alloy Steel

SS : Stainless Steel

ASTM : American Society for Testing & Materials

ASME : American Society of Mechanical Engineers

IBR : Indian Boiler Regulations

PMS: Piping Material Specification

Page 162 of 188

Page 163: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 3 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

CONTENTS

1.0 GENERAL………………………………………..……………………………………….4

2.0 VISUAL EXAMINATION ...…………………………..………………………………..4

3.0 NON DESTRUCTIVE EXAMINATION ……………...……………………..…………..6

.

4.0 TABLE-1 (with applicable Notes to Table-1)…..………………………………..…….… 7

Page 163 of 188

Page 164: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 4 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

1.0 GENERAL

1.1 Scope

This specification covers the general requirements for non destructive examination of

shop & field fabricated piping.

1.2 Related Codes & Engineering Standards

Referred codes / standards are as follows. Latest editions of the Codes/Standards referred

to shall be followed.

a) ASME Boiler & Pressure Vessel Codes, Section V & VIII (Div.1) including

addenda.

b) ASME B31.3

c) ASME B16.5

d) ASME B16.34

e) Job Piping Material Specification, A620-6-44-0005

f) Welding Specification Charts for Piping Classes, A620-000-06-41-WSC-01,

6-77-0005

g) Standard Specification for Fabrication & Erection of Piping 6-44-0012

h) ASTM E10

i) Welding Specification for Fabrication of Piping, 6-77-0001

j) Design Guide for Radiography Requirements, 8-77-0010

k) Indian Boiler Regulations (IBR)

2.0 VISUAL EXAMINATION

2.1 Weld shall be visually inspected wherever accessible in accordance with the following

requirements:

a) Internal misalignment 1.5 mm or less

b) Cracks or lack of fusion not permitted

c) Incomplete penetration Depth shall not exceed the lesser of 0.8mm or 0.2

times thickness of thinner component joined by

butt-weld. The total length of such imperfections

shall not exceed 38 mm in any 150 mm of weld

length.

d) Surface porosity and not permitted

exposed slag inclusions

(For nom. wall thickness

4.7 mm and less)

Page 164 of 188

Page 165: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 5 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

Page 165 of 188

Page 166: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 6 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

e) Concave root surface For single sided welded joints, concavity of the

root surface shall not reduce the total thickness

(Suck up) of joint, including reinforcement, to less than the

thickness of the thinner of the components being

joined.

f) Weld ripples irregularities 2.5 mm or less.

g) Lack of uniformity in bead 2.5 mm or less.

width

h) Lack of uniformity of leg 2.5 mm or less.

length

i) Unevenness of bead 2.0 mm or less.

j) Weld undercutting 0.8 mm or 1/4 thickness of thinner components

joined by butt weld, whichever is less. (shall be

smooth finished)

k) Overlap 1.5 mm or less

l) Bead deflection 2.5 mm or less

m) External weld reinforcement and internal weld protrusion (when backing rings are

not used) shall be fused with and shall merge smoothly into the component

surfaces. The height of the lesser projection of external weld reinforcement or

internal weld protrusion from the adjacent base material surface shall not exceed

the following limits:

Wall thickness of thinner Weld reinforcement or internal weld protrusion

component joined by butt (mm) max

weld (mm)

6.4 and under 1.6

Over 6.4 -12.7 3.2

Over 12.7 -25.4 4.0

Over 25.4 4.8

n) Throat thickness of fillet welds:

Nominal thickness of the thinner component x 0.7 or more.

o) Flattening

Flattening of a bend, as measured by difference between the nominal outside

diameter and minimum or maximum diameter at any cross section shall not

exceed 5 % of the nominal outside diameter of pipe.

p) Reduction of wall thickness

Reduction of wall thickness of a bend, as measured by difference between the

nominal thickness and minimum thickness shall not exceed 10 % of the nominal

wall thickness of pipe.

Page 166 of 188

Page 167: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 7 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

2.2 Welds having any of imperfections which exceed the limitations specified in various

clauses of 2.1 shall be repaired by welding, grinding or overlaying etc. Number of times

of repair welding for the same weld, however shall conform to applicable notes to Table

1- Note 6(b)b.5.

3.0 NON DESTRUCTIVE EXAMINATION

3.1 The type and extent of weld examination shall be in accordance with Table-1. All visual

and supplementary methods of girth weld examination shall be in accordance with ASME

B31.3 & the requirements of this standard specification.

3.2 Welds between dissimilar materials shall be examined by method & to the extent required

for the material having the more stringent examination.

Page 167 of 188

Page 168: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 8 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

4. TABLE-1 (with applicable notes)

TABLE 1 : CLASS, TYPE & EXTENT OF WELD EXAMINATION

INSPECTION CLASS: I

INSPN.

CLASS

SERVICE MATERIAL

(NOTE 3)

P.NO. TEMP.

DEG.C

PRESS.

CLASS

B16.5/

B16.34

APPLICABLE

PIPING

CLASS

TYPE OF

EXAMINATION

TYPE OF WELD EXAMINED

GIRTH

BUTT

WELD

SOCKET

WELD

(NOTE 2)

ATTACH-

MENT

WELD

FAB.

BRANCH

WELD

(NOTE 1)

FAB.

WELDS

OF

MITRES /

REDUC.

1 2 3 4 5 6 7 8 9 10 11 12 13

I CATEGORY 'D'

FLUID

SERVICE

CARBON

STEEL

1 0

TO

186

150#

UPTO

10.55

KG/CM2

A3A, A3Y,

J2A, J3A,

A4Y, A5Y,

A21Y,A95A

a)

VISUAL

b)

LP (NOTE 4, 6,9,)

100%

---

100%

---

100%

---

100%

5%

100%

10%

AUSTENIC

S.S.

8 - 29

TO

186

A3K

HDPE --- - 20

TO

50

A1Z, A4Z,

A5Z.

CURPO

NICKEL

34 - 29

TO

60

REMARKS FOR ABOVE TABLE :

1. LP TEST NOT APPLICABLE TO NON-METALLIC CLASSES.

2. MITRES & FABRICATED REDUCERS ARE PERMITTED ONLY IF SPECIFIED IN PMS.

Page 168 of 188

Page 169: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 9 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

TABLE 1: CLASS, TYPE & EXTENT OF WELD EXAMINATION (CONTD.)

INSPECTION CLASS: II

INSPN.

CLASS

SERVICE MATERIAL

(NOTE 3)

P.

NO.

TEM

P.

DEG.

C

PRESS.

CLASS

B16.5/

B16.34

APPLICABLE

PIPING

CLASS

TYPE OF

EXAMINATION

TYPE OF WELD EXAMINED

GIRTH

BUTT

WELD

SOCKET

WELD

(NOTE 2)

ATTACH

-MENT

WELD

FAB.

BRANCH

WELD

(NOTE 1)

FAB.

WELDS

OF

MITRES/

REDUC.

1 2 3 4 5 6 7 8 9 10 11 12 13

II a) ALL SERVICES

COVERED UNDER

INSPECTION

CLASS-I, BUT,

EXCEEDING

CATAGORY 'D'

PR./T EMP

LIMITATIONS.

b) ALL SERVICES

OTHER THAN

THOSE COVERED

UNDER

INSPECTION

CLASS-I BUT

NON-TOXIC, NOT

SUBJECTED TO

SEVERE CYCLIC

CONDITIONS.

c) TOXIC, NON-

LETHAL &

FLAMMABLE.

d) FLAMMABLE /

NON FLAMMABLE

& TOXIC / NON-

TOXIC; NOT

SUBJECT TO

SEVERE CYCLIC

CONDITIONS

CARBON

STEEL

1

- 29

TO

427

150# TO

600#

A1A, B1A, D1A

A6A, B6A,

A7A, A8A,

D9A, A10A,

A11A, A13A,

B13A, A15A,

A20A, A32A,

B32A,

A92A,A96A.

a)

VISUAL

b)

RADIOGRAPHY

(NOTE 5,6)

c)

MP / LP (NOTE

4,6,10,11)

d)

HARDNESS

100%

5%

---

NOTE 7

100%

---

5%

NOTE 7

100%

---

---

NOTE-7

100%

---

5%

NOTE-7

100%

20%

20%

NOTE-7

LTCS

-45

TO

204

A4A, B4A, D4A

AUSTENITIC

STAINLESS

STEEL

8 -29

TO

500

A1K, B1K,D1K,

A6K, B6K,

A1M, B1M,B3M,

A1N, B1N, B6N,

REMARKS FOR ABOVE TABLE :

1. EXTENT OF HARDNESS TEST FOR A11A IS 100%..

2. MITRES & FABRICATED REDUCERS ARE PERMITTED ONLY IF SPECIFIED IN PMS.

3. NOTE- 7 FOR HARDNESS IS NOT VALID FOR P. NO. 8.

Page 169 of 188

Page 170: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 10 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

TABLE 1: CLASS, TYPE & EXTENT OF WELD EXAMINATION (CONTD.)

INSPECTION CLASS: III

REMARKS FOR ABOVE TABLE :

1. FOR IBR SERVICE A2A, B2A & D2A NOTE- 8 IS ALSO APPLICABLE.

2. MITRES & FABRICATED REDUCERS ARE PERMITTED ONLY IF SPECIFIED IN PMS.

3. FOR A33A & A33Y FIRE WATER SERVICE, NOTE-12 IS ALSO APPLICABLE.

INSPN.

CLASS

SERVICE MATERIAL

(NOTE 3)

P.

NO.

TEMP.

DEG.C

PRESS.

CLASS

B16.5/

B16.34

APPLICABLE

PIPING

CLASS

TYPE OF

EXAMINATION

TYPE OF WELD EXAMINED

GIRTH

BUTT

WELD

SOCKET

WELD

(NOTE 2)

ATTACH

-MENT

WELD

FAB.

BRANCH

WELDS

(NOTE 1)

FAB.

WELDS

OF

MITRES /

REDUC.)

1 2 3 4 5 6 7 8 9 10 11 12 13

III FIRE WATER

AND IBR

SERVICES.

CARBON

STEEL (FIRE

WATER)

1 - 29

TO

427

150#

TO

600#

A33A, A33Y,

a)

VISUAL

b)

RADIOGRAPHY

(NOTE 5,6)

c)

LP / MP (NOTE

4,6,11)

d)

HARDNESS

100%

10%

---

NOTE 7

100%

---

10%

NOTE 7

100%

---

---

NOTE 7

100%

---

10%

NOTE 7

100%

50%

---

NOTE 7

CARBON

STEEL (IBR)

A2A, B2A,

D2A.

Page 170 of 188

Page 171: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 11 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

TABLE 1: CLASS, TYPE & EXTENT OF WELD EXAMINATION (CONTD.)

INSPECTION CLASS: III (CONTD.)

INSPN.

CLASS

SERVICE MATERIAL

(NOTE 3)

P.

NO.

TEMP.

DEG.C

PRESS.

CLASS

B16.5/

B16.34

APPLICABLE

PIPING

CLASS

TYPE OF

EXAMINATION

TYPE OF WELD EXAMINED

GIRTH

BUTT

WELD

SOCKET

WELD

(NOTE 2)

ATTACH

-MENT

WELD

FAB.

BRANCH

WELDS

(NOTE 1)

FAB.

WELDS

OF

MITRES /

REDUC.)

1 2 3 4 5 6 7 8 9 10 11 12 13

III

(CONTD)

ALL GENERAL

SERVICES

EXCEPT THOSE

SUBJECT TO

SEVERE

CYCLIC

CONDITIONS.

C - 0.5 Mo

STEEL.

3

ABOVE

-29

150#

TO

600#

a)

VISUAL

b)

RADIOGRAPHY

(NOTE 5,6)

c)

LP / MP (NOTE

4,6,11)

d)

HARDNESS

100%

20%

---

NOTE 7

100%

---

20%

NOTE 7

100%

---

---

NOTE 7

100%

---

20%

NOTE 7

100%

50%

---

NOTE 7

0.5 Cr - 0.5 Mo

STEEL

1 TO 3 Cr Mo.

STEEL.

4,5A A1D, B1D, D1D

B1E

C - 0.5 Mo

STEEL (IBR).

3

1 - 3 Cr Mo

STEEL (IBR)

4,5A D2D

REMARKS FOR ABOVE TABLE :

1. FOR IBR SERVICE D2D NOTE- 8 IS ALSO APPLICABLE.

2. MITRES & FABRICATED REDUCERS ARE PERMITTED ONLY IF SPECIFIED IN PMS.

Page 171 of 188

Page 172: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 12 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

TABLE 1: CLASS, TYPE & EXTENT OF WELD EXAMINATION (CONTD.)

INSPECTION CLASS: III (CONTD.)

INSPN.

CLASS

SERVICE MATERIAL

(NOTE 3)

P.

NO.

TEMP.

DEG.C

PRESS.

CLASS

B16.5/

B16.34

APPLICABLE

PIPING

CLASS

TYPE OF

EXAMINATION

TYPE OF WELD EXAMINED

GIRTH

BUTT

WELD

SOCKET

WELD

(NOTE 2)

ATTACH

-MENT

WELD

FAB.

BRANCH

WELDS

(NOTE 1)

FAB.

WELDS

OF

MITRES /

REDUC.)

1 2 3 4 5 6 7 8 9 10 11 12 13

III

(CONTD)

ALL GENERAL

SERVICES

EXCEPT THOSE

SUBJECT TO

SEVERE

CYCLIC

CONDITIONS.

3.5 Ni STEEL

9B

- 80

TO

120

150#

TO

600#

a)

VISUAL

b)

RADIOGRAPHY

(NOTE 5,6)

c)

LP / MP (NOTE

4,6,10,11)

d)

HARDNESS

100%

10%

---

NOTE 7

100%

---

10%

NOTE 7

100%

---

---

NOTE 7

100%

---

10%

NOTE 7

100%

50%

---

NOTE 7

REMARKS FOR ABOVE TABLE:

1. NOTE- 7 FOR HARDNESS IS NOT VALID FOR P. NO. 9B.

2. MITRES & FABRICATED REDUCERS ARE PERMITTED ONLY IF SPECIFIED IN PMS.

Page 172 of 188

Page 173: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 13 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

TABLE 1: CLASS, TYPE & EXTENT OF WELD EXAMINATION (CONTD.)

INSPECTION CLASS: III (CONTD.)

INSPN.

CLASS

SERVICE MATERIAL

(NOTE 3)

P.

NO.

TEMP.

DEG.C

PRESS.

CLASS

B16.5/

B16.34

APPLICABLE

PIPING

CLASS

TYPE OF

EXAMINATION

TYPE OF WELD EXAMINED

GIRTH

BUTT

WELD

SOCKET

WELD

(NOTE 2)

ATTACH

-MENT

WELD

FAB.

BRANCH

WELDS

(NOTE 1)

FAB.

WELDS

OF

MITRES /

REDUC.)

1 2 3 4 5 6 7 8 9 10 11 12 13

III

(CONTD)

ALL GENERAL

SERVICES

EXCEPT THOSE

SUBJECT TO

SEVERE CYCLIC

CONDITIONS.

ALUMINIUM

&

ALUMINIUM

BASE ALLOY

21

TO

25

ALL

150#

a)

VISUAL

b)

RADIOGRAPHY

(NOTE 5,6)

c)

LP / MP (NOTE

4,6,10,11)

100%

20%

---

100%

---

20%

100%

---

---

100%

---

20%

100%

50%

---

COPPER &

COPPER

BASE ALLOY

31

ALUMINIUM

BRONZE

35

OTHER NON

FERROUS

ALLOYS

---

Page 173 of 188

Page 174: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 14 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

TABLE 1: CLASS, TYPE & EXTENT OF WELD EXAMINATION (CONTD.)

INSPECTION CLASS: III (CONTD.)

INSPN.

CLASS

SERVICE MATERIAL

(NOTE 3)

P.

NO.

TEMP.

DEG.C

PRESS.

CLASS

B16.5/

B16.34

APPLICABLE

PIPING

CLASS

TYPE OF

EXAMINATION

TYPE OF WELD EXAMINED

GIRTH

BUTT

WELD

SOCKET

WELD

(NOTE 2)

ATTACH

-MENT

WELD

FAB.

BRANCH

WELDS

(NOTE 1)

FAB.

WELDS

OF

MITRES /

REDUC.)

1 2 3 4 5 6 7 8 9 10 11 12 13

III

(CONTD)

SPECIAL

SERVICES

(NACE,

CAUSTIC)

CARBON

STEEL

1

ALL

150#

TO

600#

A16A, B16A,

D16A,

A19A, B19A,

D19A,A9A,B9A

a)

VISUAL

b)

RADIOGRAPHY

(NOTE 5,6)

c)

LP / MP

(NOTE

4,6,10,11,13)

d)

HARDNESS

100%

20%

---

NOTE 7

100%

---

20%

NOTE 7

100%

---

10%

NOTE 7

100%

---

20%

NOTE 7

100%

50%

---

NOTE 7

SPECIAL

SERVICES

( O, H)

CARBON

STEEL

150#

TO

300#

A5A, B5A

SPECIAL

SERVICES

(NACE,

CAUSTIC)

AUSTENITIC

STAINLESS

STEEL

8 150#

TO

600#

-

REMARKS FOR ABOVE TABLE :

1. EXTENT OF HARDNESS TEST FOR CLASSES A5A & B5A IS 10% & FOR CLASSES A16A, B16A, D16A, A19A, B19A & D19A IT

IS 100%.

2. MITRES & FABRICATED REDUCERS ARE PERMITTED ONLY IF SPECIFIED IN PMS.

Page 174 of 188

Page 175: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 15 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

TABLE 1: CLASS, TYPE & EXTENT OF WELD EXAMINATION (CONTD.)

INSPECTION CLASS: IV

INSPN.

CLASS

SERVICE MATERIAL

(NOTE 3)

P.

NO.

TEMP.

DEG.C

PRESS.

CLASS

B16.5/

B16.34

APPLICABLE

PIPING

CLASS

TYPE OF

EXAMINATION

TYPE OF WELD EXAMINED

GIRTH

BUTT

WELD

SOCKET

WELD

(NOTE 2)

ATTACH

-MENT

WELD

FAB.

BRANCH

WELDS

(NOTE 1)

FAB.

WELDS

OF

MITRES /

REDUC.)

1 2 3 4 5 6 7 8 9 10 11 12 13

IV

ALL SERVICES

OTHER THAN

SPECIAL

SERVICES (O,H)

CARBON

STEEL

1

ALL

Above

600#

BELOW

600#

E1A, F1A,

E9A, F9A,

E19A, F19A

a)

VISUAL

b)

RADIOGRAPHY

(NOTE 5,6)

c)

LP / MP

(NOTE 4,6,10,11)

d)

HARDNESS

100%

100%

---

NOTE 7

100%

---

100%

NOTE 7

100%

---

10%

NOTE 7

100%

---

100%

NOTE 7

100%

100%

---

NOTE 7

CARBON

STEEL (IBR)

E2A, F2A.

CARBON

STEEL

REMARKS FOR ABOVE TABLE :

1. FOR IBR SERVICE E2A & F2A NOTE- 8 IS ALSO APPLICABLE.

2. EXTENT OF HARDNESS TEST FOR CLASSES E19A, F19A, IS 100% .

3. MITRES & FABRICATED REDUCERS ARE PERMITTED ONLY IF SPECIFIED IN PMS.

Page 175 of 188

Page 176: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 16 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

TABLE 1: CLASS, TYPE & EXTENT OF WELD EXAMINATION (CONTD.)

INSPECTION CLASS: IV (CONTD.)

INSPN.

CLASS

SERVICE MATERIAL

(NOTE 3)

P.

NO.

TEMP.

DEG.C

PRESS.

CLASS

B16.5/

B16.34

APPLICABLE

PIPING

CLASS

TYPE OF

EXAMINATION

TYPE OF WELD EXAMINED

GIRTH

BUTT

WELD

SOCKET

WELD

(NOTE 2)

ATTACH

-MENT

WELD

FAB.

BRANCH

WELDS

(NOTE 1)

FAB.

WELDS

OF

MITRES /

REDUC.)

1 2 3 4 5 6 7 8 9 10 11 12 13

IV

(CONTD)

ALL GENERAL

SERVICES.

C - 0.5 Mo

STEEL

3

ALL

ABOVE

600#

-- a)

VISUAL

b)

RADIOGRAPHY

(NOTE 5,6)

c)

LP / MP

(NOTE 4,6,10,11)

d)

HARDNESS

100%

100%

---

NOTE 7

100%

---

100%

NOTE 7

100%

---

10%

NOTE 7

100%

---

100%

NOTE 7

100%

100%

---

NOTE 7

5 Cr - 9 Cr Mo

STEEL

5B 150# TO

600#

A4F, A4G, B3F,

B4F, B4G.

13 Cr (TYPE-

410 SS)

6 ALL --

KILLED

CARBON

STEEL

1 UPTO

- 45

ABOVE

600#

--

1 TO 3 Cr

STEEL (IBR)

4,5A ALL F2D

REMARKS FOR ABOVE TABLE :

1. FOR IBR SERVICE F2D NOTE- 8 IS ALSO APPLICABLE..

2. MITRES & FABRICATED REDUCERS ARE PERMITTED ONLY IF SPECIFIED IN PMS.

Page 176 of 188

Page 177: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 17 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

TABLE 1: CLASS, TYPE & EXTENT OF WELD EXAMINATION (CONTD.)

INSPECTION CLASS: IV (CONTD.)

INSPN.

CLASS

SERVICE MATERIAL

(NOTE 3)

P.

NO.

TEMP.

DEG.C

PRESS.

CLASS

B16.5/

B16.34

APPLICABLE

PIPING

CLASS

TYPE OF

EXAMINATION

TYPE OF WELD EXAMINED

GIRTH

BUTT

WELD

SOCKET

WELD

(NOTE 2)

ATTACH

-MENT

WELD

FAB.

BRANCH

WELDS

(NOTE 1)

FAB.

WELDS

OF

MITRES /

REDUC.)

1 2 3 4 5 6 7 8 9 10 11 12 13

IV

(CONTD)

SPECIAL

SERVICES (O, H)

CARBON

STEEL

1 ALL ABOVE

300# D5A, E5A, F5A

a)

VISUAL

b)

RADIOGRAPHY

(NOTE 5,6)

c)

LP / MP

(NOTE

4,6,10,11,13)

d)

HARDNESS

100%

100%

---

NOTE 7

100%

---

100%

NOTE 7

100%

---

10%

NOTE 7

100%

---

100%

NOTE 7

100%

100%

---

NOTE 7

SERVICES

SUBJECT TO

SEVERE CYCLIC

CONDITIONS

0.5 TO 9 CR

Mo STEEL

3,

4,

5A,

5B

ALL

ALL

--

SPECIAL

SERVICES

(NACE, O, H,

CAUSTIC)

B5D, D5D,

D5E, E5E,

B7D,A5D,E5D

SERVICES

SUBJECT TO

SEVERE CYCLIC

CONDITIONS

13 CR

STEEL

(TYPE

410SS)

6 --

SERVICES

SUBJECT TO

SEVERE CYCLIC

CONDITIONS.

3.5 NI

STEEL

9B --

SPECIAL

SERVICES

(NACE, O, H,

CAUSTIC)

--

SPECIAL

SERVICES

(NACE, O, H,

CAUSTIC)

NI ALLOYS 41,

42,

43

--

ALL SERVICES

45 --

REMARKS FOR ABOVE TABLE :

1. NOTE-7 FOR HARDNESS IS NOT VALID FOR P.NO.9B.

2. EXTENT OF HARDNESS TEST FOR CLASS D5A, E5A AND F5A IS 10%.

3. MITRES & FABRICATED REDUCERS ARE PERMITTED ONLY IF SPECIFIED IN PMS.

Page 177 of 188

Page 178: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 18 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

TABLE 1: CLASS, TYPE & EXTENT OF WELD EXAMINATION (CONTD.)

INSPECTION CLASS: IV (CONTD.)

INSPN.

CLASS

SERVICE MATERIAL

(NOTE 3)

P.

NO.

TEMP.

DEG.C

PRESS.

CLASS

B16.5/

B16.34

APPLICABLE

PIPING

CLASS

TYPE OF

EXAMINATION

TYPE OF WELD EXAMINED

GIRTH

BUTT

WELD

SOCKET

WELD

(NOTE 2)

ATTACH

-MENT

WELD

FAB.

BRANCH

WELDS

(NOTE 1)

FAB.

WELDS

OF

MITRES /

REDUC.)

1 2 3 4 5 6 7 8 9 10 11 12 13

IV

(CONTD)

SERVICES

SUBJECT TO

SEVERE

CYCLIC

CONDITIONS.

AUSTENITIC

STAINLESS

STEEL

8

ALL

ALL

--

a)

VISUAL

b)

RADIOGRAPHY

(NOTE 5,6)

c)

LP / MP (NOTE

4,6,10,11)

d)

HARDNESS

100%

100%

--

-

100%

--

100%

-

100%

--

10%

-

100%

--

100%

-

100%

100%

--

-

LOW TEMP.

SERVICE

BELOW

- 45

150#

300# &

600#

A2K, B2K,

D2K

GENERAL

SERVICES

ALL ABOVE

600#

--

HIGH TEMP.

SERVICES

> 500 ALL B4K, B5K

SPECIAL

SERVICES (O,H)

ALL ALL B5M,

B2M, D2M

REMARKS FOR ABOVE TABLE :

1. MITRES & FABRICATED REDUCERS ARE PERMITTED ONLY IF SPECIFIED IN PMS.

Page 178 of 188

Page 179: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 19 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

Applicable Notes to Table-1

1. Branch welds shall consist of the welds between the pipe & reinforcing element (if any),

nozzles & reinforcing element and the pipe & nozzle under the reinforcing element.

Reinforcing element to be interpreted as pads, saddles, weldolets, sockolets etc.

2. Seal welds of threaded joints shall be given the same examination as socket welds.

3. Unless specifically stated, all materials shall be for "Non-IBR" service.

4. Magnetic Particle & the Liquid Penetrant method of examination shall be in accordance

with Section V of the ASME Boiler and Pressure Vessel Code, Article VII and VI

respectively. The entire area of the accessible finished weld surface shall be examined.

Selected root runs, subject to a maximum of 10%, before finished weld, may also be

examined, at the discretion of the engineer-in-charge.

a) Wherever MP / LP testing is specified, either MP or LP test may be used. But

wherever only MP test is specified, LP method of examination may be used only

if MP examination is impracticable in the field as concurred by EIL site-in charge.

b) "Random 5%" of Liquid Penetrant / Magnetic Particle test shall mean testing, by

applicable test, one weld for each twenty welds or less made by the same welding

procedure. "Random 10%" shall mean testing, by applicable test, one weld for

each ten welds or less made by the same welding procedure. Similarly "Random

20%" shall mean testing, by applicable test, one weld for each five welds or less

made by the same welding procedure.

c) When Liquid Penetrant examination is specified, the surface shall be free of

peened discontinuities.

d) Inspection shall be performed in the welds excluding those for which radiography

has been done.

e) Girth weld, branch weld, attachment weld & socket weld of 3-1/2% Ni steel shall

be Liquid Penetrant tested only when welded with austenitic material where MP

test has been specified.

5. Radiography:

a) "Random 5%, 10% or 20% radiography" shall mean examining not less than one

from each 20 welds or less in case of "Random 5% radiography", 10 welds or less

in case of "Random 10% radiography", one from each five welds or less in case of

"Random 20% radiography" made by the same welding procedure. Irrespective of

percentage, no. of welds to be radiographed shall be minimum 1. However first

two welds made by each welder shall also be radiographed in case of "Random

radiography". Welds selected for examination shall not include flange welds and

shall be radiographed for their entire length. However, where it is impossible or

impracticable to examine the entire weld length of field welds for either random

or 100% radiography, and if the same impossibility is agreeable to EIL site-in-

charge, then a single 120 deg. exposure of the weld length may be given a

Magnetic Particle test or Liquid Penetrant test. However in such cases for

ferro-magnetic materials, only MP test shall be acceptable for classes higher than

600#.

b) In-process examination shall not be substituted for any required radiographic

examination.

Page 179 of 188

Page 180: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 20 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

c) Number of radiographs per one circumferential weld shall be as per ASME Sec.V

Articles 2 and 22.

6. When radiography or other non destructive inspection is specified, acceptance criteria for

repairs or defects shall be as follows:

a) In case of 100% examination, any unacceptable weld shall be repaired and

reinspected.

b) If required random examination reveals a defect requiring repair, then:

b.1 Two additional examinations of same type shall be made of the same kind

of item (if welded joint, then by the same welding procedure or operator

or both).

b.2 If the group of items examined as required by b.1 above is acceptable, the

items requiring repair shall be repaired or replaced and reexamined as

required and all items represented by this additional examination shall be

accepted.

b.3 If any of the items examined as required by b.1 above reveals a defect

requiring repair, two further comparable items shall be examined for each

defective item found by examination.

b.4 If all the items examined as required by b.3 are acceptable, the items

requiring repair shall be repaired or replaced and reexamined as required,

and all items represented by this further examination shall be accepted.

b.5 Number of times repair welding could be done for the same weld before

acceptance shall be as follows:

Material No. of times repair welding is allowed

C.S. upto 300 # 3 or less

C.S. above 300 # 2 or less

Killed steel 2 or less

Low alloy steel 2 or less

Austenitic S.S. 2 or less

3.5 Ni steel 2 or less

Al & Al base alloy 2 or less

Cu & Cu base alloy 2 or less

Others 2 or less

b.6 Welds not found acceptable for allowed number of times of repair as per

b.5 above shall be replaced and reexamined.

Page 180 of 188

Page 181: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 21 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

b.7 If any of the items examined as required by b.4 above reveals a defect

requiring repair, all items represented by these examinations shall be

either :

- repaired or replaced and reexamined as required.

- fully examined and repaired or replaced as necessary, and

reexamined as necessary.

7. Hardness Test:

a) Hardness test shall be in accordance with ASTM specification E10.

Hardness tests of the heat affected zone shall be made at a point as near as

practicable to the edge of the weld. One test per weld shall be performed.

b) Hardness test where specifically called out in Table-1 of this specification

or in PMS, shall be carried out irrespective of thickness and to the extent

(%age) as mentioned therein.

c) All welds which are given heat treatment shall be hardness tested.

Hardness test shall be performed after final heat treatment.

d) A minimum of 10% of welds, hot bends, and hot formed components in

each furnace heat treated batch and 100% of those which are locally heat

treated shall be hardness tested.

e) Hardness test requirement not covered in this specification shall be as per

ASME B31.3.

f) The hardness limit applies to the weld and heat affected zone. Following

hardness values shall be maintained:

Base Metal Group Maximum

Hardness

(BHN/RC)

CS 238BHN/RC22

CS (NACE) , Caustic, 200BHN

Amine, H2

Cr Upto 2% 225BHN

Cr 2.25%-10% 241BHN

18/8 SS (NACE) RC22

g) In case hardness values are mentioned in both Welding Specification

Charts for Piping Classes, (6-77-0005) & table given in Note-7(f), the

lower of the two values shall be applicable.

8. For IBR service lines, following IBR requirements shall apply in addition to the notes 4, 5, 6,

7, 12 and Table 1. In case of conflict between above notes and these requirements, the more

stringent ones shall apply. IBR piping shall be erected of IBR inspector approved material and

Page 181 of 188

Page 182: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

STANDARD SPECIFICATION FOR NON DESTRUCTIVE

EXAMINATION REQUIREMENTS OF PIPING

STANDARD SPECIFICATION No.

A620-6-44-0016 Rev. 0

Page 22 of 22

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL – All rights reserved

construction procedure. Erected piping shall be hydrotested, inspected and approved by IBR

inspector.

a) Piping over 102 mm (4") bore:

10% of welds made by each welder on a pipeline with a minimum of two welds per

welder, selected at random, shall be subjected to radiography.

b) Piping 102 mm (4") bore and under, but not less than 38 mm (1-1/2") bore:

Two percent of welds made by each welder on a pipeline with a minimum of one weld

per welder, selected at random, shall be subjected to radiography or may be cut for

visual examination and tests.

c) Piping less than 38 mm (1.5") bore:

Special tests are not normally required but 2% of welds by each welder on a pipe line

may be cut out from the pipeline for the visual examination and bend tests.

d) Retests:

If any test specimen is unsatisfactory, two further weld specimens for retests shall be

selected from the production welds and subjected to tests. In the event of failure of

any retest specimens, the production welds carried out by this welder subsequent to

the previous test shall be given special consideration.

9. For fabricated fittings LP test shall be done on the final pass of welding only, in addition to

visual examination.

10. For mitres and fabricated reducers, LP / MP test shall be done on root pass in addition to

radiography applicable to circumferential joint of respective piping class.

11. For branch connections, LP/MP test shall be done on root pass and final pass.

12. 10% of the butt weld joints shall be radiographed, however, 50% of these butt weld joints

shall be field weld joints.

13. All joints including butt weld joints for A16A, B16A and D16A classes shall be wet

fluorescent magnetic particle tested. Percentage of wet fluorescent magnetic particle testing of

butt weld joints shall be 100% and this testing shall be in addition to radiography.

14. For lined specs, testing (MP/LP/Radiography etc.) shall be performed before lining.

Page 182 of 188

Page 183: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

01We?Sg7k1t5tr,

ENGINEERSINDIA LIMITEDA Got of India undertaking)

MATERIAL REQUIREMENTS FORCARBON STEEL COMPONENTS

USED IN SOUR SERVICE INPETROLEUM

REFINERY ENVIRONMENT

STANDARD SPECIFICATION No.6-79-0013 Rev. 1

Page 1 of 6

tirecrrt Rtoi it1 cimicitu i TrTK tirchiTRYITru trk A-r4 chick tack,' aNzgl

timul aTerw

MATERIAL REQUIREMENTS FORCARBON STEEL COMPONENTS USED

IN SOUR SERVICE INPETROLEUM REFINERY

ENVIRONMENTS

1 07.10.11 SPECIFICATION AR SG PPL DM0 07.10.04 ISSUED AS STANDARD SPECIFICATION GM VRK KKM SKG

Standards StandardsRev. Prepared Checked Committee BureauNo Date Purpose by by Convenor Chairman

Approved by

REVISED & REISSUED AS STANDARD

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reservedPage 183 of 188

Page 184: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

In$jg",C1T 'Meg.

ENGINEERSINDIA LIMITEDIA Govl of India undertaking)

MATERIAL REQUIREMENTS FORCARBON STEEL COMPONENTS

USED IN SOUR SERVICE INPETROLEUM

REFINERY ENVIRONMENT

STANDARD SPECIFICATION No.6-79-0013 Rev. 1

Page 2 of 6

Abbreviations:

ANSI : American National Standards Institute

API : American Petroleum Institute

ASME : American Society of Mechanical Engineers

ASTM : American Society for Testing and Materials

ISO : International Organization for Standardization

NACE : National Association of Corrosion Engineers

SMMS Standards Committee:

Convener: Mr. PP Lahiri

Members: Mr. A AminMr. GS HegdeMr. R ChaudhuryMr. S GhosalMr. P SahaMr. R Nanda (Piping)Mr. AK Gupta (HMTD)Mr. S Mukherjee (Construction)Mr. R Muthulingam (Inspection)Mr. Raj Kishore (Pipeline)Mr. AR Purushottam (POSD)Mr. MP Jain (Projects)

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reserved

Page 184 of 188

Page 185: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

1511*Zret:te ENGINEERSsig7 wegwINDIA LIMITEDIA earl of India Undenakurp)

MATERIAL REQUIREMENTS FORCARBON STEEL COMPONENTS

USED IN SOUR SERVICE INPETROLEUM

REFINERY ENVIRONMENT

STANDARD SPECIFICATION No.6-79-0013 Rev. 1

Page 3 of 6

CONTENTS

1.0 SCOPE 4

2.0 REFERENCED CODES/STANDARDS 4

3.0 GENERAL REQUIREMENTS 4

4.0 MATERIAL SPECIFICATION 5

5.0 PRODUCT SPECIFIC REQUIREMNTS 5

6.0 POST WELD HEAT TREATMENT (PWHT) AND HARDNESS REQUIREMENT 6

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL — All rights reserved

Page 185 of 188

Page 186: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

[email protected] INDIA LIMITED

IA Gan ol Intha undedakingl

MATERIAL REQUIREMENTS FORCARBON STEEL COMPONENTS

USED IN SOUR SERVICE INPETROLEUM

REFINERY ENVIRONMENT

STANDARD SPECIFICATION No.

6-79-0013 Rev. 1Page 4 of 6

1.0 SCOPE

1.1 In general, for refinery services, NACE Standard MR 0103 shall be applicable. For services

where HIC (Hydrogen Induced Cracking) resistant carbon steel is specifically mentioned inthe Process Documents, this specification shall be followed.

1.2 This specification lays down the requirements related to the chemical composition,manufacture, fabrication and testing requirements for carbon steel components intended to beused in sour service in petroleum refinery environments. These requirements are specified inorder to make the carbon steel component resistant to the various forms of material damage ina sour environment, such as Sulfide Stress Cracking (SSC), Hydrogen Induced Cracking(HIC), Stress Oriented Hydrogen Induced Cracking (SOHIC), Blistering etc. Theserequirements can be used for resisting Alkaline Stress Corrosion Cracking (ASCC) also. Thisspecification is applicable for corrosive petroleum refining facilities.

1.3 The service medium is defined as "Sour" when the service environment conforms to one ofthe following conditions, as defined in NACE Standard MR0103.

Service environments containing free water (in liquid phase) and:

>50 ppmw dissolved H 2 S in the free water.

Free water pH < 4 and some dissolved H 2S present.

Free water pH >7.6 and 20 ppmw dissolved hydrogen cyanide (HCN) in the water andsome dissolved H 2 S present.

>0.003 MPa absolute (0.05 psia) partial pressure H2S in the gas in processes with a gasphase.

2.0 REFERENCED CODES/STANDARDS

NACE MR 0103 ASTM A 694 ASTM A 770NACE RP 0472 ASTM A 216 ASTM A 370NACE Publication 8X194 & 8X294 ASTM A 106 ASTM A 578NACE TM 0284 API 5 L ASME SEC II PART CASTM A 20 API 6 A ASME SEC VIII-DIV.IASTM A 516 ASTM E 18 ASME SEC IXASTM A 105 ASTM E 45 ANSI B 16.34ASTM A 234 ASTM E 92 ANSI B 31.3

All ASTM Standard designations shall be applicable for corresponding ASME designationswhich would be read as ASME SA XXX instead of ASTM A XXX.

3.0 GENERAL REQUIREMENTS

3.1 The steel for sour service shall be manufactured by either basic oxygen or electric arc furnaceroute and shall be fully killed and fine grained.

3.2 Carbon steel shall not contain intentional additions of elements such as lead, selenium orsulphur to improve machinability.

3.3 Carbon steel shall be used in one of the following heat treatment conditions.

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL —All rights reserved

Page 186 of 188

Page 187: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

I5ilfaZre?at ENGINEERSs'gar Ea rew INDIA LIMITED

MATERIAL REQUIREMENTS FORCARBON STEEL COMPONENTS

USED IN SOUR SERVICE INPETROLEUM

REFINERY ENVIRONMENT

STANDARD SPECIFICATION No.

6-79-0013 Rev. 1

Page 5 of 6

Hot-rolled;Annealed;Normalised;Normalised and tempered;Normalised, austenitised, quenched and tempered;Austenitised, quenched and tempered.

3.4 All material after cold forming shall be thermally stress relieved to meet a hardnessrequirement of 200 BHN maximum.

3.5 All products shall be free of low temperature transformation microstructures such as bainitebands or islets of martensite.

4.0 MATERIAL SPECIFICATION

All items are required to conform to the chemical composition of the respective specificationas listed below.

Plate: SA-516 Gr.60

Pipe: SA-106 Gr. B or SA-333 Gr.1 or 6

Forgings: SA-105 or SA-350 Gr.LF1 or LF2 or SA-266 Class 1

Fittings: SA-234 Gr. WCB or SA-420 Gr.WPL6

Castings: SA-216 Gr. WCA, WCB or WCC or SA-352 Gr. LCA, LCB or LCC

Tubing: SA-179 or SA-214

5.0 PRODUCT SPECIFIC REQUIREMNTS

5.1 Plates and rolled products

All rolled products such as plates and sheets and fittings / pipes made of rolled products shallmeet the following specific requirements.

5.1.1 The steel shall be made through a clean steel making route and shall have minimum ofinclusions.

5.1.2 The sulphur level shall be restricted to 0.003 wt%.

5.1.3 The steel shall be calcium treated for inclusion morphology control and the Ca/S ratio shallbe in the range of 2 to 3. When sulphur content is less than 0.0015%, then Ca/S ratio is notapplicable and calcium can be present up to 50 ppm.

5.1.4 For plates including and above 25mm thick, through-thickness tensile testing shall be carriedout in accordance with ASTM A770, with minimum reduction in area being 35% asdetermined in accordance with ASTM A370, on one plate per heat.

5.1.5 No repair welding shall be permitted on plated.

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL —All rights reserved

Page 187 of 188

Page 188: EPCM Services for converting existing Catalytic Reforming ...tenders.eil.co.in/newtenders/userdata/Doc_Repository/A620/RFQ/A620... · EPCM Services for converting existing Catalytic

tillaZleTeell ENGINEERSsigzir tatReglite INDIA LIMITED

IA Gent 01 Intha undeftakingi

MATERIAL REQUIREMENTS FORCARBON STEEL COMPONENTS

USED IN SOUR SERVICE INPETROLEUM

REFINERY ENVIRONMENT

STANDARD SPECIFICATION No.6-79-0013 Rev. 1

Page 6 of 6

5.1.6 When the fabrication of the components from the previously HIC tested plates involves noheavy wall thickness reduction or material flow, such as bending, spinning or welding, nofresh HIC test would be required on the final product. However, for fabrication of productswhere heavy reduction of thickness and heavy flow of material is encountered while formingsuch as like forging, extrusion or drawing, metallographic examination of the final productshall be required to be carried out to ensure absence of elongated inclusions.

5.1.7 The plates shall be procured only from pre-qualified manufacturers.

5.2 Pre-qualification criteria for vendors with prior experience track record

Vendors/manufacturers who have proven track record of supplying materials for sour serviceapplications in petroleum refineries to any of the reputed operating companies/EngineeringConsultants or Process Licensors such as UOP/ IFP/ EXXON/ BP/ CHEVRON/ IOCL/ HPCL/BPCL/ EIL will be considered as 'pre-qualified vendors/manufacturers', on production of therelevant Purchase Orders and test certificates, certified by a witnessing third party inspectionagency such as DNV/Lloyds/BV/ABSTECH/TUV/SGS/CEIL for the conformance of thematerials to the respective materials specification of the mentioned operators / engineeringconsultants. For pre-qualified vendors, Clause No.5.4 is not applicable.

5.3 Pre-qualification criteria for New Vendors with out track record

A vendor who has no track record of supplying sour service materials to any of the reputedengineering consultants/operators, as mentioned in Clause 5.2 above, shall be considered as anew vendor and shall be required to carry out HIC test as detailed out in Clause 5.4 for pre-qualification by any one of the reputed third party inspection agencies like Lloyds, BV, CEIL,DNV or TUV etc..

5.4 Hydrogen Induced Cracking (HIC) Test

The requirements for HIC test shall be as follows.

This test is required for vendor pre-qualification only.

This test shall be performed on a set of three specimens representing each productionbatch/heat of rolled products in accordance with NACE TM 0284 with the followingacceptance criteria:

Crack Length Ratio (CLR) 10.0%Crack Sensitivity Ratio (CSR) 1%

(iii) In case of failure of any one of the specimens, three more specimens from the sameproduct shall be retested and all the specimens shall meet the acceptance criteria. In caseof failure of any retest sample, the material shall be considered unacceptable.

6.0 POST WELD HEAT TREATMENT (PWHT) AND HARDNESS REQUIREMENT

All the weld joints, irrespective of thickness, shall be given a post weld heat treatment. Thetemperature range for PWHT shall be 595-650°C. Other aspects such as rate of heating,holding time etc. for PWHT shall be as per ASME Sec.VIII, Div.I /ANSI B31.3 requirements.The hardness of the weldment after PWHT shall be 200 BHN maximum.

Format No. 8-00-0001-F1 Rev. 0 Copyright EIL—All rights reserved

Page 188 of 188