    ASSIGNMENT

    NICMAR/SODEOFFFICE

    1.COURSE NO : MQS 212

    2.COURSETITLE : QUANTITIES(TAKING OFF)

    3.ASSIGNMENT NO : FIFTY SIX

    4.DATEOFDISPATCH :

    5.LAST DATE OF RECEIPT OF

    ASSIGNMENT AT SODE OFFICE :

    ASSIGNMENT

    THE PLAN AND SECTIONAL ELEVATION OF A BUILDING ARE GIVEN IN FIGURE. ESTIMATE THE

    QUANTITIES OF THE FOLLOWING ITEMS OF WORK OF THE BUILDING.

    1. EARTHWORK IN EXCAVATION IN FOUNDATION.

    2. P.C.C. CONCRETE IN FOUNDATION(1:4:5)

    3. MASONRY WORK UPTO PLINTH(1:6)

    4.1ST

    CLASS BRICKWORK FOR WALLS(1:6)

    5. R.C.C. WORK IN ROOF SLABS, LINTELS, SUNSHADES ETC.(1:2:4 CONCRETE)

  • 7/28/2019 Estimation Asg

    4/24

    4

    WHAT IS AN ESTIMATE

    BEFORE TAKING UP ANY WORK FOR ITS EXECUTION, THE OWNER OR BUILDER

    SHOULD HAVE A THOROUGH KNOWLEDGE ABOUT THE VOLUME OF WORK THAT CAN

    BE COMPLETED WITHIN THE LIMITS OF HIS FUNDS OR THE PROBABLE COST THAT MAY

    BE REQUIRED TO COMPLETE THE PROPOSED WORK. IT IS THEREFORE NECESSARY TO

    PREPARE THE PROBABLE COST OR ESTIMATE FOR THE PROPOSED WORK FROM ITS

    PLAN AND SPECIFICATION. OTHERWISE IT MAY SO HAPPEN THAT THE WORK HAS TO

    BE STOPPED BEFORE ITS COMPLETION DUE TO THE SHORTAGE OF FUNDS AND OF

    MATERIALS. BESIDE THE ABOVE, AN ESTIMATE FOR ANY PUBLIC CONSTRUCTION WORK

    IS REQUIRED TO BE PREPARED AND SUBMITTED BEFOREHAND SO THAT SANCTION OF

    NECESSARY FUNDS MAY BE OBTAINED FROM THE AUTHORITY CONCERNED

    THUS AN ESTIMATE FOR ANY CONSTRUCTION WORK MAY BE DEFINED AS THE

    PROCESS OF CALCULATING THE QUANTITIES AND COST OF VARIOUS ITEMS REQUIREDIN CONNECTION WITH THE WORK. IT IS PREPARED BY CALCULATING THE QUANTITIES

    FROM THE DIMENSION ON THE DRAWINGS FOR THE VARIOUS ITEMS REQUIRED TO

    COMPLETE THE PROJECT AND MULTIPLIED BY UNIT COST OF THE ITEM CONCERNED.

    TO PREPARE AN ESTIMATE DRAWING CONSISTING OF THE PLAN THE ELEVATION AND

    THE SECTIONS THROUGH IMPORTANT POINTS ALONG WITH A DETAILED SPECIFICATION

    GIVING SPECIFIC DESCRIPTION OF ALL WORKMANSHIP, PROPERTIES AND PROPORTION OF

    MATERIALS ARE REQUIRED.

    ESTIMATE

    ESTIMATE IS A WORD OF WIDER CONNOTATION AND ITS DEFINITIONS SCOPE AND

    MEANING WILL DEPEND UPON THE CIRCUMSTANCES OF THE CASE. IT RANGES VARIES

    FROM FORECASTING VALUES WITHOUT MEASURING TO APPROXIMATE JUDGEMENT OR

    OPINION BASED ON ACTUAL DATA SUPPLIED INCLUDING MEASURED DRAWINGS AND

    SPECIFICATIONS. AT TIMES THIS WORK IS PRECEDED BY CAUTIONARY ADJECTIVES

    LIKE APPROXIMATEROUGHESTIMATE IN GENERALPROBABLE IN SPITE OF THE

    FACT THAT ESTIMATE BY ITSELF CARRIES WITH IT THE INBUILT FEATURES OF THE

    ABOVE ADJECTIVES. THE USE OF ADJECTIVES CAN BE TRACED TO THE OLD ENGLISHCASE OF CROWSHAW WHERE ESTIMATE WAS HELD AS AN OFFER.THIS CASE HAS TO

    BE DISTINGUISHED FROM THE ESTIMATE PREPARED BY ARCHITECT WHO DOES NOT

    MAKE AN OFFER TO EXECUTE THE WORK BUT FORECAST THE PROBABLE AMOUNT OF

    MONEY WHICH A CONTRACTING PARTY WILL EXECUTE THE SPECIFIED WORK PROVIDED

    THE SITE CONDITIONS TIME FACTOR OWNER S TENDENCY TO VARY AND COUNTRY

    ECONOMIC PARAMETERS REMAIN UNALTERED.THE CROWSHAW CASE ALSO SHOWS

    THE CHANGE IN DIMENSION OF THE WORD ESTIMATE DEPENDING UPON THE

    CIRCUMSTANCES OF THE CASE.

  • 7/28/2019 Estimation Asg

    5/24

    5

    IMPORTANCE OF ESTIMATING

    1. IT HELPS IN WORKING OUT THE APPROXIMATE COST OF A BUILDING OR PROJECTBEFORE THE WORK IS TAKEN IN ORDER TO ASCERTAIN THE FINANCIAL

    IMPLICATIONS INVOLVED AND TO KNOW WHETHER IT CAN BE COMPLETED

    ACCORDING TO GIVEN SPECIFICATIONS WITHIN CERTAIN FINANCIAL LIMITS OR

    REQUIRES MODIFICATIONS OR DROPPING OF THE PROPOSAL ALTOGETHER

    DEPENDING UPON THE AVAILABLE FINANCIAL RESOURCE.

    2. IT FORMS THE BASE FOR THE PROCESS OF COST-PLANNING.3. IT IS USEFUL IN FRAMING THE TENDERS FOR THE WORKS AND TO CHECK THE

    CONTRACTOR S WORKS DURING AND AFTER EXECUTION FOR THE PURPOSE OF

    INTERIM AND FINAL CERTIFICATE.

    4. REQUIREMENT OF CONTROLLED MATERIALS LIKE CEMENT AND STEEL CAN BEESTIMATED FOR MAKING APPLICATIONS TO THE CONTROLLING AUTHORITIES.

    5. CLIENTS CAN BE ADVISED ON :a) FIXATION OF STANDARD RENT.

    b) COVER NOTE FOR FIRE INSURANCE AND CLAIM FOR DAMAGES IN CASE OF FIRETO A BUILDING.

    c) REASONABLENESS OF THE AMOUNT CLAIMED IN THE ARBITRATIONPROCEEDINGS.

    VALUATIONS OF OWNER OCCUPIED PROPERTIES ON LAND AND BUILDINGS BASIS FOR

    SALE, PURCHASE, MORTGAGE, GENERAL GOVERNMENT PURPOSE.

    EARTHWORK INEXCAVATION FOR FOUNDATION TRENCHES

    EARTH IS EXCAVATED FOR FOUNDATION TRENCHES TO THE EXACT WIDTH AND

    DEPTH OF FOUNDATION TRENCHES TO THE EXACT WIDTH AND DEPTH OF FOUNDATION

    WITH VERTICAL SIDES AND THE BOTTOM LEVELLED BOTH LONGITUDINALLY AND

    TRANSVERSELY. THE QUANTITY OF EARTHWORK IS CALCULATED IN CUBIC METRE (CU

    M) UP TO TWO DECIMAL PLACES, MULTIPLYING THE ACTUAL REQUIRED LENGTH X

    BREADTH X DEPTH OF EXCAVATION. EARTHWORK FOR STEPS SHALL BE INCLUDED.

    EARTHWORK IN FILLING:-

    THIS CONSIST OF TWO PARTS:-

    A)FOUNDATION TRENCHES

    B)PLINTH FILLING.

    NORMALLY EXCAVATED EARTH FROM THE FOUNDATION TRENCHES IS USED FOR

    FILLING. THE EXACT RAMMED AND CONSOLIDATED VOLUME IS CALCULATED. BUT

    CONSIDERING THE QUALITY OF EARTH PLINTH FILLING MAY BE DONE BY SAND AND

    IN SUCH A CASE PLINTH FILLING WORK SHALL BE SEPARATED FROM FOUNDATION

    FILLING.

  • 7/28/2019 Estimation Asg

    6/24

    6

    a) FOR FOUNDATION FILLING : THE VOLUME IS CALCULATED IN CU M. CONSIDERINGTHE LOW RATE OF EARTH FILLING THE QUANTITY IS USUALLY TAKEN AS 1/5 THE

    VOLUME OF EARTHWORK IN EXCAVATION. BUT FOR HIGH RATE DUE TO CARRIED

    EARTH OR FOR ACCURACY,

    QUANTITY OF EARTHWORK=(

    VOLUME OF WORK IN

    EXCAVATION-VOLUME OF WORK IN FOUNDATION)THE VOLUME OF WORK IN

    FOUNDATION MAY BE OF BRICK SOLING, CONCRETING AND MASONRY WORK UPTO

    GROUND LEVEL.

    b) PLINTH FILLING : THE VOLUME IS CALCULATED IN CU M.THE INTERNAL LENGTHAND BREADTH OF A ROOM OR VERANDAH BETWEEN PLINTH WALLS I .E: EXCLUDING

    PLINTH OFFSET FROM THE MEASUREMENT OF ROOM OR VERANDAH ARE TAKEN

    AND MULTIPLIED BY THE DEPTH OF FILLING. THE DEPTH OF FILLING IS TAKEN

    FROM THE GROUND LEVEL UPTO THE BOTTOM OF FLOOR STRUCTURE .

    CEMENT OR LIME CONCRETE IN FOUNDATION:-

    THE VOLUME IS COMPUTED IN CU.M I.E : LENGTH X BREADTH X DEPTH OF

    CONCRETE. DIMENSION OF LENGTH AND BREADTH FOR CONCRETE REMAIN THE SAME

    AS THAT OF EARTHWORK WHEN THE SECTION OF ALL WALLS OF THE BUILDING ARE

    SAME .

    MASONRYWORKINFOUNDATION &PLINTH:-

    THE VOLUME OF DIFFERENT OFFSETS OR LAYERS AND PLINTH WALL ARE

    CALCULATED ONE BY ONE IN CU M BY MULTIPLYING THEIR INDIVIDUAL LENGTH,

    BREADTH AND THICKNESS ORHEIGHT.AS THERE IS NO OPENING IN THE WALL UPTO

    PLINTH NO DEDUCTION IS REQUIRED.

    MASONRYWORKINSUPERSTRUCTURE WALLS:-

    FOR WALLS UPTO ONE BRICK THICK(I.E UPTO 20 CM) THICK THE VOLUME IS

    CALCULATED IN CU.M . LENGTH X BREADTH OR THICKNESS X HEIGHT.THE WALL IS

    CONSIDERED FIRST SOLID HAS NO OPENINGS AND NO LINTEL. AFTER CALCULATING

    THE VOLUME OF BRICKWORK (CONSIDERING SOLING FIRST) STANDARD DEDUCTION FOR

    VOLUME OF OPENINGS VOLUME OCCUPIED BY LINTEL OR ANY OTHERS ARE MADE AS

    PER STANDARD RULES OF DEDUCTION PRESCRIBE BY IS:1200(DESCRIBE IN ARTICLE

    4-4) TO ARRIVE IN THE ESTIMATED QUANTITY OF BRICKWORK. FOR MULTI-STOREYED

    BUILDINGS BRICKWORK FOR DIFFERENT STORIES SHALL BE KEPT SEPARATED .

  • 7/28/2019 Estimation Asg

    7/24

    7

    R.C.C OR R.BWORK:-

    REINFORCED CONCRETE MAY BE USED IN COLUMNS,LINTELS,BEAMS,ROOF SLABS

    ETC.THE QUANTITY IS WORKED OUT IN CU .M I.E: LENGTH X BREADTH X DEPTH

    INCLUDING REINFORCEMENT. THE VOLUME OCCUPIED BY REINFORCEMENT IS NOT

    DEDUCTED FROM THE VOLUME OF CONCRETE. THE QUANTITY OF REINFORCEMENT IS

    FOUND SEPARATELY BY PROVIDING A SEPARATE ITEM IN THE ESTIMATE IF NOT

    OTHERWISE MENTIONED. EACH TYPE OF WORK IS CLASSIFIED SEPARATELY .THE

    METHOD OF MEASUREMENT IN CONJUNCTION IN COLUMN AND BEAMS HAS BEEN

    STATED IN THE R.C.C CHAPTER.ACCORDING TO IS RECOMMENDATION FORMWORK I.E :

    SHUTTERING SHALL BE CLASSIFIED AND MEASURED SEPARATELY .IF REINFORCEMENT

    OR SHUTTERING ARE INCLUDED AND CONSIDERED AS A CONSOLIDATED ONE ITEM.

    THIS SHOULD BE FULLY DESCRIBE AND MEASURED IN CU. M R.B WORK IN LINTEL AND

    ROOF SLAB IS MEASURED IN CU. M AS IN THE CASE OF R.C.CCHAJJA IS INCLUDED

    WITH R.C.C WORK.

    PRINCIPLES UNIT FOR VARIOUS ITEM OF WORKS:-

    a) MASS, VOLUMINOUS AND THICK WORK SHALL BE TAKEN IN CUBIC UNIT ORVOLUME (VIZ, CUBIC METRE,CU M)

    b) THIN, SHALLOW AND SURFACE WORK SHALL BE TAKEN IN SQUARE UNIT OR INAREA.THE THICKNESS SHALL BE SPECIFIED IN THE DESCRIPTION OF THE ITEM AND

    THE MEASUREMENT OF LENGTH AND BREADTH OR PROJECTION SHALL BE TAKEN

    TO CALCULATE THE AREA.( VIZ, SQUARE METRE, SQ M)c) LONG AND THIN WORK SHALL BE TAKEN IN LINEAR OR RUNNING UNITS AND

    LINEAR MEASUREMENT SHALL BE TAKEN (VIZ, RUNNING METRE, RM).

  • 7/28/2019 Estimation Asg

    8/24

    8

    LONG AND SHORT WALLOR OUT-TO-OUT &IN-TO-IN METHOD:-

    IN THIS METHOD THE LONGER WALLS IN A BUILDING (GENERALLY IN ONE

    DIRECTION) ARE CONSIDERED AS LONG WALLS AND MEASURED FROM OUT-TO-OUT

    AND THE SHORTER OR PARTITION WALLS IN A PERPENDICULAR DIRECTION OF THE

    LONG WALLS ARE CONSIDERED AS SHORT WALLS AND ARE MEASURED FROM IN-TO-IN

    FOR A PARTICULAR LAYER OF WORK. THESE LENGTH OF LONG AND SHORT WALLS

    ARE MULTIPLIED SEPARATELY BY BREADTH AND HEIGHT OF THE CORRESPONDING

    LAYER AND ARE ADDED TO GET THE QUANTITY. SUCH LENGTH OF LONG AND SHORT

    WALLS VARY IN EVERY LAYER OF FOOTING.

    TO CALCULATE THE LENGTH OF LONG AND SHORT WALLS DETERMINE FIRST

    THEIR CENTER-TO-CENTRE LENGTH INDIVIDUALLY FROM THE PLAN. THEN THE LENGTH

    OF THE LONG WALL OUT-TO-OUT MAY BE CALCULATED AFTER ADDING HALF

    BREADTH OF WALL AT EACH END TO ITS CENTRE-TO-CENTRE LENGTH. THUS THE

    LENGTH OF SHORT WALL MEASURED IN-TO-IN MAY BE FOUND OUT AFTERSUBTRACTION OF HALF BREADTH AT EACH END FROM ITS CENTRE-TO-CENTRE

    LENGTH. THE LENGTH OF THE LONG WALL GENERALLY DECREASE FROM EARTHWORK

    TO BRICKWORK IN SUPERSTRUCTURE AND IN THE CASE OF SHORT WALL, ITS LENGTH

    INCREASES.

    CENTRE LINE METHOD:

    IN THIS METHOD CALCULATE THE TOTAL CENTRE LINE LENGTH OF WALLS IN

    BUILDING AND MULTIPLY THE SAME BY BREADTH AND DEPTH OF THIS TO GET THETOTAL QUANTITY AT A TIME.FOR DIFFERENT SECTIONS OF WALLS IN A BUILDING, THE

    CENTRE LINE LENGTH FOR EACH TYPE SHALL BE WORKED OUT SEPARATELY.IN CASE

    OF PARTITION OR VERANDAH WALLS JOINING THE MAIN WALLS, THE CENTRE LINE

    LENGTH SHALL BE REDUCED BY HALF OF THE BREADTH OF THE LAYER OF MAIN

    WALL THAT JOINS WITH THE PARTITION OR VERANDAH WALL AT THE SAME LEVEL

    NUMBER OF SUCH JOINTS ARE STUDIED FIRST TO CALCULATE THE CENTRE LINE

    LENGTH.

    ENGLISH METHOD OF TAKING OUT QUANTITIES:-

    THE DIMENSION SHEET USED FOR TAKING-OFF IS A FOOLSCAP SHEET DIVIDED INTO

    MAIN SECTIONS EACH SECTION HAVING FOUR COLUMNS. COLUMNS 1 IS TERMED TIMES

    TING AND IS USED FOR SETTING THE NUMBER OF ITEM.COLUMN 2 IS KNOWN

    DIMENSION COLUMN IN THIS COLUMN MEASUREMENT ARE WRITTEN . COLUMN 3 IS

    CALLED SQUARING COLUMN QUANTITIES WORKED OUT ARE ENTERED IN THIS

    COLUMN .COLUMN 4 IS CALLED DESCRIPTION COLUMN DESCRIPTION OF THE ITEM OF

    WORKS ARE STATED IN THIS COLUMN. THIS IS A LENGTHY PROCESS OF RECORDING

    MEASUREMENTS AND NOT FOLLOWED HERE.SO FURTHER DETAILS ARE NOT DESCRIBE.

  • 7/28/2019 Estimation Asg

    9/24

    9

    DATAREQUIREDFORDETAILEDESTIMATE

    FOLLOWING DATA IS NECESSARY FOR PREPARING AN ESTIMATE:

    1. DRAWING

    2. SPECIFICATION

    3. RATES

    4. MODE OF MEASUREMENTS

    DRAWING

    THE DRAWING IS THE BASIS FROM WHICH QUANTITIES OF VARIOUS ITEM FOR A WORK ARE

    CALCULATED

    SO FULLY DIMENSIONED DRAWING MUST BE PREPARED WHICH IS SHOWING PLANS,

    DIFFERENT SECTIONS AND OTHER RELEVANT DETAILS FOR THE WORK.

    FOR PLANS, SECTIONS AND ELEVATION:1CM =0.5M TO 1CM =2M SCALE CAN BE USED.

    FOR DETAILED DRAWING:1CM =1CM TO 1CM=20CM SCALE CAN BE USED

    SPECIFICATION

    GENERALSPECIFICATION:

    IN GENERAL SPECIFICATION THE NATURE AND C LASS OF WORK AND THE NAMES OF

    MATERIAL TO BE USED ARE DESCRIBED.

    IT GIVES A GENERAL IDEA FOR THE PROJECT.

    DETAILEDSPECIFICATION:

    DETAILED SPECIFICATION GIVES DETAILED DESCRIPTION OF EVERY ITEMS TO BE EXECUTED,

    WITH THE QUALITIES, QUANTITIES, PROPORTION OF MATERIALS, WORKMANSHIP, THE

    METHOD OF PREPARATION AND EXECUTION.

    DETAILED SPECIFICATION ARE HELPFUL FOR THE EXECUTION OF THE DIFFERENT ITEMS OF

    WORK TO THE SITE SUPERVISOR AND THE OWNER TO EXECUTE THE WORK AS PER DETAILED

    SPECIFICATION.

  • 7/28/2019 Estimation Asg

    10/24

    10

    RATES

    THE RATES OF VARIOUS MATERIAL USED IN THE CONSTRUCTION AND THE WAGES OF

    DIFFERENT CATEGORIES OF LABOUR SHOULD BE AVAILABLE FOR PREPARING ESTIMATE.

    THE LOCATION OF WORK AND ITS DISTANCE FROM THE SOURCE OF MATERIALS AND THECOST OF TRANSPORT SHOULD BE KNOWN.

    THESE RATES MAY BE OBTAINED FROM PWD SCHEDULE OF RATES BOOK OR THE RATES

    MAY BE WORKED OUT BY THE ANALYSIS OF RATE METHOD.

    MODEOFMEASUREMENT

    IT IS A STANDARD METHOD OF MEASUREMENT.

    A BOOK IS PUBLISHED BY BUREAU OF INDIAN STANDARDS ,IS1200 WHICH SPECIFIES THE

    UNIQUE METHOD OF MEASUREMENT OF QUANTITIES OF ITEMS OF WORK.

    IT HELPS IN PREPARATION OF ESTIMATE TO THE FINAL COMPLETION OF WORK AND MAKING

    PAYMENTS OF WORKS.

    SCHEDULEOFRATES

    A BOOKLET CONTAINING RATES OF VARIOUS ENGINEERING ITEMS FOR THE PREPARATION OFDETAILED ESTIMATES SUCH AS BUILDINGS, ROADS, BRIDGES, CANALS ETC.CALLED AS

    SCHEDULE OF RATES.

    IT ALSO GIVES THE RATE OF MATERIALS, DAILY WAGES OF LABOUR, CARRIAGE

    EXPENDITURE.

    IT IS ALSO GIVEN WITH TABLE FOR QUANTITIES OF VARIOUS MATERIAL REQUIRED IN

    CONSTRUCTION.

    SCHEDULE OF RATES VARY WITH THE REGION.

    SCHEDULE OF RATES INCREASES EVERY YEAR BY CERTAIN PERCENTAGE OF PREVIOUS YEAR

    RATES.

  • 7/28/2019 Estimation Asg

    11/24

    11

    MATERIALSREQUIREDFORFRAMINGANESTIMATE

    i. A SET OF PLANS COMPLETE IN EVERY RESPECT AND FULLY DIMENSIONAL WITHTHE SECTION. WHILE WORKING OUT, FIGURED DIMENSIONS MUST BE FOLLOWED IN

    PREFERENCE TO SCALED ONES.

    ii. DETAILED SPECIFICATIONS ABOUT THE MATERIALS TO BE USED THEIRPROPORTIONS AND THE METHOD OF EXECUTION OF THE WORK.

    iii. A SCHEDULE OF RATES OF ALL THE ITEMS OF CONSTRUCTION WORK.

    HOWTOWORKOUTTHEDETAILEDESTIMATE

    BEFORE WORKING OUT THE DETAILED ESTIMATE, THE WHOLE PROJECT IS

    DIVIDED INTO PART WORK KNOWN AS SUB-WORKS. THE COST OF EACH OF THE SUB

    WORK IS ESTIMATED SEPARATELY AND THEN ADD TOGETHER TO GIVE THE TOTALCOST OF A PROJECT EG:A BUNGALOW WITH AN OUTHOUSE, GARAGE, COMPOUND

    WALL EACH WORKED OUT SEPARATELY AND WHEN ADDED TOGETHER WILL GIVE AN

    IDEA OF THE TOTAL COST OF THE PROJECT.

    PRELIMINARIES

    1. PLAN SHOULD BE THOROUGHLY STUDIED AND SPECIAL POINTS WHICH ARELIKELY TO BE OVERLOOKED SHOULD BE NOTED ON A SEPARATE SHEET OF

    PAPER.

    2.

    DIFFERENT SEQUENCES OF OPERATIONS OF CONSTRUCTION WORK SHOULD BEVISUALIZED AND NOTED.

    3. WORK OF FINDING OUT QUANTITIES SHOULD BE COMMENCED IN ACCORDANCEWITH THE SEQUENCE OF CONSTRUCTION WORK AND RECORDED ON QUANTITY

    SHEETS.

    4. BILL OF QUANTITY OR ABSTRACT SHEET SHOULD BE PREPARED SHOWING THEITEMS, QUANTITIES, RATES AND THE TOTAL OF ALL ITEMS WILL REPRESENT AN

    APPROXIMATE COST. TO THIS COST, USUALLY 10% TO 15% OF THE SAME

    KNOWN AS CONTINGENCIES IS ADDED TO GIVE THE TOTAL ESTIMATE OF THE

    WORK. IN THE CASE OF REPAIR PROPOSAL, CONTINGENCIES IS ADDED TO THE

    EXTENT OF 25%.

    5. SEQUENCE OF OPERATIONS OF THE CONSTRUCTION WORK FOR AN R.C.CFRAMED BUILDING OF GROUND AND ONE UPPER FLOOR:

    1) CLEARING THE SITE.2) EXCAVATION FOR FOUNDATION.3) MASS CONCRETE BELOW R.C.C FOOTINGS4) R.C.C FOOTINGS5) R.C.C COLUMNS BELOW PLINTH.6) R.C.C PLINTHS BEAMS7) RUBBLE MASONRY OR BRICK WORK FOR PLINTH.8) MURUM FILLING IN PLINTH

  • 7/28/2019 Estimation Asg

    12/24

    12

    9) DRY RUBBLE PACKING IN PLINTH .10)CEMENT CONCRETE BEDDING FOR PLINTH11)R.C.C COLUMNS FOR GROUND FLOOR12)CASTING FIRST R.C.C SLABS WITH BEAMS.13)

    R.C.C

    COLUMNS FOR FIRST FLOOR.14)CASTING LAST R.C.C SLABS WITH BEAMS.

    15)ERECTIONS OF FRAMES OF DOORS, WINDOWS, AND CONSTRUCTION OFBRICK WALLS

    16)STAIRCASE CABIN WORK17)PLASTER TO WALLS18)FLOOR PAVEMENT19)BRICK BAT COBA AND TERRACE FINISHING 20)FIXING DOOR AND WINDOW SHUTTERS21)DRAINAGE AND PLUMBING WORK.22)ELECTRIC INSTALLATION WORK23)OIL PAINT AND COLOUR WASH24)FINAL FINISHING OF THE BUILDING.

    CEMENTPLASTERING :

    1)MATERIALS:CEMENT SHALL BE FRESH PORTLAND CEMENT AND SAND SHALL BE

    MEDIUM QUALITY, CLEANED FREE FROM ORGANIC MATTER OR SALTS.ALL THE

    MATERIALS INCLUDING WATER SHALL BE OF STANDARD SPECIFICATION.

    2)PREPARATION OF MORTAR:THE MATERIALS SHALL BE AT FIRST MIXED DRY

    THOROUGHLY TILL UNIFORM IN COLOUR IN THE REQUIRED PROPORTION AND THEN

    SHALL BE MIXED WET ADDING WATER SLOWLY AND GRADUALLY FOR AT LEAST FOUR

    TIMES TO GIVE UNIFORM PASTE.

    3)PREPARATION OF SURFACE: THE SURFACE OF THE WALL SHALL BE BRUSHED,

    CLEANED, WASHED, WATERED AND WETTED WITH WATER BEFORE PLASTERING.IN CASE

    OF CEMENT PLASTER OR CEMENT CONCRETE THE FACE SHALL BE LIGHTLY

    ROUGHENED, CLEANED WASHED AND WETTED.TO ENSURE UNIFORM THICKNESS OF

    PLASTER AS SPECIFIED NARROW STRIPS OF WHITE PLASTER SHALL BE APPLIED A

    DISTANCE OF 1 CM AND GAPS BETWEEN SUCH STRIPS SHALL BE FILLED WITH MORTAR.4)LAYING :THE PLASTERING SHALL BE STARTED FROM TOP AND WORKED TOWARDS

    THE GROUND THE WHOLE SURFACE SHALL BE MADE FLUSH WITH WOODEN STRAIGHT

    EDGES AND RUBBED THOROUGHLY WITH WOODEN FLOATS TO ENSURE AN EVEN

    SURFACE.ROUNDING OF CORNERS IF DESIRED BY THE ENGINEER-IN-CHARGE SHALL

    BE CARRIED OUT IN ONE OPERATION.

    5)CURING :

    PLASTERING SURFACE SHALL BE KEPT WET BY SPRINKLING WATER AFTER 12 HOURS

    FOR AT LEAST 7 DAYS AND SHALL BE PROTECTED FROM RAIN OR SUN.

  • 7/28/2019 Estimation Asg

    13/24

    13

    PLASTERING ANDPOINTING:

    PLASTERING : PLASTERING SHALL BE MEASURED IN SQ.M STATING THICKNESS,

    MORTAR, AND ITS MIX, NATURE OF BASE AND SPECIAL TREATMENT OF BASE IF ANY .

    THE DESCRIPTION SHALL INCLUDE INTERNAL ROUNDING ANGLES., EXTERNAL

    CHAMFERS AND ROUNDING ANGLES UPTO 80MM IN GRITH. REMOVAL OF PLASTERING

    BY SCRAPING OR OTHERWISE SHALL BE MEASURED IN SQ .M PLASTERING ON ROOFS,

    CEILINGS, AND WALLS SHALL BE KEPT SEPARATE.

    PLASTERING IN ISOLATED WIDTHS OR IN WIDTH NOT FORMING A PART OF GENERAL

    PLASTER WORK AS IN THE CASE OF CORNICES, BANDS, PANELS ETC.AND ALSO IN THE

    CASE OF CHAMFERS, ROUNDED ANGLES MORE THAN 80MM IN GIRTH SHALL BE

    MENTIONED BELOW:

    1. WIDTH OR GIRTH ABOVE 30 CM IN SQ.M2. WIDTH OR GIRTH BELOW 30CM IN RUNNING METRES.

    PLASTERING AT A HEIGHT MORE THAN 10M ABOVE GROUND LEVEL SHALL BE

    KEPT SEPARATE AND SHALL BE MEASURED IN STAGES OF 5M HEIGHT EXCEPT

    INTERIOR PLASTERING IN CASE OF BUILDING MEASURED SEPARATELY FOR EACH

    STOREY. CEILING SHALL BE MEASURED BETWEEN WALLS OR PARTITIONS

    DIMENSION SHALL BE TAKEN BEFORE PLASTERING. SOFFIT OF STAIRS SHALL BE

    MEASURE AS PLASTERING ON CEILING. RIBS AND MOULDINGS ON CEILINGS SHALL

    BE MEASURED AS FOR CORNICES DEDUCTION BEING MADE FROM PLASTERING IF

    WIDTH OR GIRTH EXCEEDS 15 CM.

    POINTING : POINTING SHALL BE MEASURE IN SQ.M . PROPORTIONS OF THE

    MATERIALS TYPE OF POINTING SHALL BE DESCRIBE FULLY .DIFFERENT TYPES OF

    POINTING SHALL BE KEPT SEPARATE. POINTING OF WALL, FLOOR WALL, ROOF

    SHALL BE KEPT SEPARATE.POINTING ON HONEYCOMB WORK SHALL BE DESCRIBE

    AND MEASURED IN SQ.M ON THE BASIS OF OVERALL SUPERFICIAL AREA WITHOUT

    ANY DEDUCTION FOR OPENINGS.

  • 7/28/2019 Estimation Asg

    14/24

    14

    CONCRETEWORK

    THE ITEM OF THE CONCRETE WORK WHETHER PLAIN OR REINFORCED INCLUDES ALL

    THE MATERIALS THAT ARE REQUIRE TO PREPARE THE CONCRETE CENTERING

    MATERIALS FROM WORKS MIXING POURING IN POSITIONS VIBRATING CONSOLIDATING

    CURING HACKING (THAT IS MAKING THE SURFACE ROUGH TO RECEIVE THE PLASTER)

    AND PROVIDING KEY FOR THE FURTHER CONCRETE WORK .THE ITEM DOES NOT

    INCLUDE THE TEST FOR THE MATERIALS OR MIX AND FINISHING UNLESS SPECIFIED IN

    ADVANCE. THE PROPORTIONS OF MATERIALS METHOD OF MIXING PLACING IN

    POSITIONS VIBRATING AND AMOUNT OF STEEL SHOULD BE MADE KNOWN TO THE

    CONTRACTOR IN THE ADVANCE.

    CONCRETE WORK IS EITHER PAID AS A UNIT CONSISTING OF CONCRETE AND STEEL

    OR PLAIN CEMENT CONCRETE AND STEEL IS PAID SEPARATELY THE PRACTICE

    FOLLOWED BY THE ARCHITECTS AND ENGINEERS IS TO PAY FOR THE R.C.C WORK

    COMPRISING OF CONCRETE AND STEEL EACH PAID SEPARATELY PER CUBIC METER

    AND PER TONNE RESPECTIVELY.

    A POINT OF DIFFERENCE OCCURS ON MODES OF MEASUREMENT WHEN THE R.C.C

    ITEM OF WORK INCLUDE NECESSARY FINISHING.THE CONTRACTOR USUALLY CONTEND

    THAT FINISHED MEASUREMENT OF THE WORKS SHOULD BE TAKEN WHEREAS THE

    ARCHITECT AND ENGINEERS CONTEND THOUGH ITEM INCLUDE FINISHING YET

    CONTRACTOR IS NOT ENTITLED TO FINISHED MEASUREMENT AND THAT HE SHOULD BE

    PAID ACCORDING TO MEASUREMENT OF UNFINISHED R.C.C WORK AS GIVEN ON R.C.C

    PLANS .THIS POINT SHOULD BE MADE CLEAR IN THE TENDER AS THE CONTRACTORWILL BE ENTITLE TO FINISHED MEASUREMENT. R.C.C SHOULD BE DIVIDED INTO TWO

    PARTS ONE FOR UNFINISHED R.C.C WORK AND OTHER REPRESENTING THE RATE OF

    FINISHING AND THE BILLS PREPARED ACCORDINGLY.

    WHEN THE CONCRETE AND STEEL USE ARE PAID SEPARATELY THE FOLLOWING ARE

    INCLUDED IN THE PAYMENT FOR STEEL WORK PERM.T BASIS NAMELY;

    a) BINDING WIRESb) OVERLAPS OTHER THAN SPECIFIED ONES.

  • 7/28/2019 Estimation Asg

    15/24

    15

    DEDUCTIONFOR R.C.CORPLAINCONCRETEWORKS

    1. NO DEDUCTION TO BE MADE FOR DISSIMILAR MATERIAL UPTO 500 SQ.MM LIKEENDS OF BEAMS, PULINS,RAFTERS,TRUSSES.

    2. NO DEDUCTION TO BE MADE FOR OPENINGS UPTO 0.20 SQ.M.3. NO DEDUCTION TO BE MADE FOR THE VOLUME OCCUPIED BY THE

    REINFORCEMENT.

    4. NO DEDUCTION TO BE MADE FOR PIPES AND CONDUITS UPTO 25 SQ.CM CROSS-SECTIONAL AREAS.

    UNLESS OTHERWISE SPECIFIED ALL MEASUREMENTS OF R.C.C BEAMS AND

    COLUMNS ARE TO BE PAID IN CUBIC METRES ONLY AND NO MEASUREMENT ON

    RUNNING METRE BASIS.

    POINTING

    IT IS MEASURED IN SQ.M OF THE FALL SURFACE COVERED BY POINTING AND

    DEDUCTIONS TO BE ALLOWED ARE THE SAME AS GIVEN FOR THE PLASTERING WORK.

    CARE SHOULD BE TAKEN TO SPECIFY THE TYPE OF POINTING REQUIRED LIKE FLUSH,

    TUCK, KEYED OR STUCK.

  • 7/28/2019 Estimation Asg

    16/24

    16

    COMPUTATIONS:-

    GROUND FLOOR CENTRE TO CENTRE LENGTH OF WALL

    MAIN ROOMS

    BACK LONG WALLS OF ALL ROOMS INCLUDING STAIRCASE ROOM C TO C LENGTH =2(3.5+

    3.0)+2.3+4 X 0.3+0.3/2+0.3/2 = 16.80M

    FRONT LONG WALL OF BED AND LIVING ROOM ON ONE SIDE OF STAIRCASE ROOM C. TO C.

    LENGTH = 3.5+3.0+0.3+0.3/2+0.3/2 = 7.10M

    CROSS OR SHORT WALL C. TO C. LENGTH = 3.5+0.3/2+0.3/2 = 3.80M

    FRONT VERANDAH:

    STUDY ROOM, FRONT LONG WALL C. TO C. LENGTH = 3.70+0.3/2+0.2/2 =3.9M

    STUDY ROOM CROSS OR SHORT WALL C. TO C. LENGTH +2.0+0.3/2+0.2/2 = 2.25M

    VERANDAH WALL IN BETWEEN STUDY ROOMS C. TO C . LENGTH =8.9+0.2/2+0.2/2 = 9.1M

    BACK VERANDAH:

    KITCHEN, BACK WALL C. TO C. LENGTH = 2.5+0.2/2+0.2/2 = 2.70M

    KITCHEN, CROSS OR SHORT WALL C. TO C. LENGTH = 2.5+0.3/2+0.2/2 = 2.75M

    BATH AND W.C. TWO SETS COMBINED, BACK LONG WALL C. TO C. LENGTH =

    2X1.2+0.2+2X0.2/2 = 2.8M

    BATH AND W.C. CROSS OR SHORT WALL C. TO C. LENGTH = 1.4+1.0+0.1+0.3/2+0.2/2 =

    2.75M

    VERANDAH WALL IN BETWEEN KITCHEN AND W.C. C. TO C. LENGTH = 4.15+0.1+0.1+0.1 =

    4.45M

    FIRST FLOOR CENTRE TO CENTRE LENGTH OF WALLS:-

    MAIN ROOMS

    BACK LONG WALL OF ALL ROOMS INCLUDING STAIRCASE ROOM C. TO C. LENGTH =

    (3.7+3.1) X 2+2.3+(4X0.2)+0.2/2+0.2/2 = 16.9M

    FRONT LONG WALL OF BED AND LIVING ROOMS ON ONE SIDE OF STAIRCASE ROOM C. TO C.

    LENGTH = (3.7+3.1)+0.2+2X0.2/2 = 7.2M

    CROSS OR SHORT WALLS C. TO C. LENGTH = 3.7+2X0.2/2 = 3.9M

    FRONT VERANDAH

    STUDY ROOM FRONT LONG WALL C. TO C. LENGTH =3.7+2X0.2/2 =3.9M

  • 7/28/2019 Estimation Asg

    17/24

    17

    STUDY ROOM CROSS OR SHORT WALL C. TO C. LENGTH =2.0+2X0.2/2 = 2.2M

    VERANDAH WALL IN BETWEEN STUDY ROOMS C. TO C . LENGTH =

    3.1+2.3+3.1+(2X0.2)+2X0.2 = 9.1M

    BACK VERANDAH-

    KITCHEN- BACK WALL C. TO C. LENGTH = 2.5+2X0.2/2 = 2.7M

    KITCHEN CROSS OR SHORT WALL C. TO C. LENGTH =2.5+2X0.2/2 = 2.7M

    BATH AND W.C.TWO SETS COMBINED, BACK WALL C. TO C. LENGTH =

    1.2+1.2+0.2+2X0.2/2 = 2.8M

    BATH AND W.C.CROSS WALLS C. TO C. LENGTH =1.4+1.0+0.1+2X0.2/2 = 2.7M

    VERANDAHWALL IN BETWEEN KITCHEN AND W.C. C. TO C. LENGTH = 4.15+2X0.2/2 =4.35M

    SR

    NO

    PARTICULARS NO LENG

    TH

    M

    BREADT

    H

    M

    HEIGHT

    M

    QUAN

    TITY

    REMARKS

    1 EARTHWORK IN

    EXCAVATION IN

    FOUNDATION

    MAIN ROOMSBACK LW FULL 1 17.6 0.8 0.9 12.67 L=16.8+0.8

    FRONT LW OF BED

    AND LIVING ROOM

    2 7.9 0.8 0.9 11.38 L=7.1+0.8

    SHORT WALLS

    STUDY ROOMS 6 3.0 0.8 0.9 12.96 L=3.8-0.8

    FRONT WALL 2 4.5 0.6 0.6 3.24 L=3.9+0.6

    CROSS WALL 4 1.55 0.6 0.6 2.23 L=2.25-0.6/2-

    0.8/2

    KITCHEN

    LONG WALL 2 3.3 0.6 0.6 2.38 L=2.7+0.6

    SHORT WALL 4 2.05 0.6 0.6 2.95 L=2.75-0.6/2-

    0.8/2

    BATH AND W.C.

    LONG WALL 1 3.4 0.6 0.6 1.22 L=2.8+0.6

    SHORT WALL 3 2.05 0.6 0.6 2.21 L=2.75-0.6/2-

    0.8/2

    VERANDAH PILLARS 4 0.8 0.6 0.6 1.15

    FRONT

    DWARF WALL

    TOTAL LENGTH 1 6.9 0.4 0.4 1.1 L=9.1-2X0.6/2-

  • 7/28/2019 Estimation Asg

    18/24

    18

    2X0.8

    BACK VERANDAH

    PLINTH DWARF WALL 2 2.95 0.4 0.4 1.1 L=4.35-2X0.6/2-

    0.8

    STAIRCASE BASE 1 1.1 0.6 0.7 0.46

    STEP FRONT 1 2.5 0.7 0.25 0.44

    STEP BACK 2 1.2 0.7 0.25 0.42

    TOTAL 55.75

    CU M

    2 P.C.C. CONCRETE IN

    FOUNDATION (1:4:5)

    MAIN ROOMS

    BACK LONG WALL 1 17.6 0.8 0.3 4.22

    FRONT LONG WALL OF

    BED AND LIVING

    2 7.9 0.8 0.3 3.79

    CROSS SHORT WALL 6 3.0 0.8 0.3 4.32

    STUDY ROOMS

    FRONT LONG WALL 2 4.5 0.6 0.2 1.08

    CROSS SHORT WALL 4 1.65 0.6 0.2 0.79

    KITCHENS

    LONG WALL 2 3.3 0.6 0.2 0.79

    SHORT WALL 4 2.15 0.6 0.2 1.03 L=2.75-0.6/2-

    0.6/2

    BATH AND W.C.

    LONG WALL 1 3.4 0.6 0.2 0.41

    SHORT WALL 3 2.15 0.6 0.2 0.77 L=2.75-0.6/2-

    0.6/2

    VERANDAH PILLARS 4 0.8 0.6 0.2 0.38

    FRONT VERANDAH

    PLINTH DWARF WALL 1 7.5 0.4 0.2 0.6 L=9.1-2X0.4/2-2X0.6

  • 7/28/2019 Estimation Asg

    19/24

    19

    STAIRCASE BASE 1 1.1 0.6 0.2 0.13

    STEP FRONT 1 2.5 0.7 0.15 0.26

    STEP BACK 2 1.2 0.7 0.15 0.25

    TOTAL 19.36

    CU M

    3 MASONRY WORK UPTO

    PLINTH (1:6)

    MAIN ROOMS

    BACK WALL

    1ST FOOTING 1 17.4 0.6 0.2 2.09 L=16.8+0.6

    2ND

    FOOTING 1 17.3 0.5 0.2 1.73 L=17.4-0.1

    PLINTH WALL 1 17.2 0.4 0.7 4.82 L=17.3-0.1

    FRONT LONG WALL

    1ST

    FOOTING 2 7.7 0.6 0.2 1.85 L=7.1+0.6

    2ND

    FOOTING 2 7.6 0.5 0.2 1.52 L=7.7-0.1

    PLINTH WALL 2 7.5 0.4 0.7 4.2 L=7.6-0.1

    CROSS WALL

    1ST

    FOOTNG 6 3.2 0.6 0.2 2.3 L=3.8-0.6

    2ND

    FOOTING 6 3.3 0.5 0.2 1.98 L=3.2+0.1

    PLINTH WALL 6 3.4 0.4 0.7 5.71 L=3.3+0.1

    STUDY ROOMSFRONT WALL

    FOOTING 2 4.3 0.4 0.2 0.69 L=3.9+0.4

    PLINTH WALL 2 4.2 0.3 0.7 1.76 L=4.3-0.1

    FOOTING 4 1.8 0.4 0.2 0.58 L=2.25-0.5/2-

    0.4/2

    PLINTH WALL 4 1.9 0.3 0.7 1.6 L=1.8+0.1

    KITCHEN

  • 7/28/2019 Estimation Asg

    20/24

    20

    BACK WALL

    FOOTING 2 3.1 0.4 0.2 0.5 L=2.7+0.4

    PLINTH WALL 2 3.0 0.3 0.7 1.26 L=3.1-0.1

    CROSS WALL 4

    FOOTING 4 2.3 0.4 0.2 0.74 L=2.75-0.5/2-

    0.4/2

    PLINTH WALL 4 2.4 0.3 0.7 2.02 L=2.3+0.1

    BATH AND W.C.

    BACK WALLS

    FOOTING 1 3.2 0.4 0.2 0.26 L=2.8+0.4

    PLINTH WALLS 1 3.1 0.3 0.7 0.65 L=3.2-0.1

    CROSS WALL

    FOOTING 3 2.3 0.4 0.2 0.55 L=2.75-0.5/2-

    0.4/2

    PLINTH WALL 3 2.4 0.3 0.7 1.51 L=2.3+0.1

    VERANDAH PILLAARS

    FOOTING 4 0.6 0.4 0.2 0.19

    PLINTH WALL 4 0.5 0.3 0.7 0.42

    FRONT VERANDAH

    PLINTH WALL

    FRONT VERANDAH

    PLINTH DWARF WALL

    SUM TOTAL LENGTH 1 7.8 0.2 0.7 1.09 L=9.1-2X0.3/2-

    2X0.5

    BACK VERANDAH

    PLINTH DWARF WALL 2 3.55 0.2 0.7 0.99 L=4.35-2X0.3/2-

    1X0.5

    STAIRCASE BASE 1 1.1 0.5 0.4 0.22

    STAIR FRONT 1ST

    1 2.3 0.6 0.2 0.28

    STEP FRONT 2ND

    1 2.3 0.3 0.15 0.1

    STEP BACK1ST 2 1.0 0.6 0.2 0.24

  • 7/28/2019 Estimation Asg

    21/24

    21

    STEP BACK2ND 2 1.0 0.3 0.15 0.09

    TOTAL 41.94

    CU M

    4 1ST

    CLASS BRICKWORK

    FOR WALLS(1:6)

    BACK WALL 1 17.1 0.3 3.0 15.39 L=16.8+0.3

    FRONT LONG WALL 2 7.4 0.3 3.0 13.32 L=7.1+0.3

    CROSS WALL 6 3.5 0.3 3.0 18.9 L=3.8-0.3

    STAIRCASE ROOM

    FRONT WALL

    1 2.3 0.3 0.6 0.42

    TOTAL 48.3

    CU M

    DEDUCT

    DOOR OPENING 10 1.0 0.3 2.0 6.0

    WINDOW OPENING 8 0.9 0.3 1.2 2.59

    SHELVES OPENING 6 1.0 0.2 1.8 2.16

    LINTELS 0.834

    TOTAL

    OF

    DEDUCTI

    ON

    11.58

    NET

    TOTAL

    36.45

    CU M

    5 R.C.C. WORK IN ROOF

    SLABS, LINTELS,

    SUNSHADES ETC.(1:2:4) CONCRETE

    R.C.C. SLAB BED AND

    LIVING ROOMS

    2 7.4 3.8 0.12 6.749

    FRONT VERANDAH

    INCLUDING STUDY

    ROOMS

    1 17.1 2.35 0.1 4.019

    BACK VERANDAH

    INCLUDING KITCHEN,

    BATH AND W.C.

    ROOMS

    1 17.1 2.85 0.1 4.874

  • 7/28/2019 Estimation Asg

    22/24

    22

    LINTELS

    OVER DOORS MAIN

    ROOM

    8 1.3 0.3 0.1 0.312

    OVER WINDOWS MAIN

    ROOM

    8 1.2 0.3 0.1 0.288

    OVER SHELVES IN

    30CM WALL

    6 1.3 0.3 0.1 0.234

    OVER ENTRANCE OF

    STAIRCASE

    1 2.7 0.3 0.2 0.162

    OVER DOORS STUDY

    ROOM

    2 1.3 0.2 0.1 0.052

    OVER DOORS KITCHEN 2 1.2 0.2 0.1 0.048

    OVER DOOR BATH AND

    W.C.

    4 1.05 0.2 0.1 0.084

    OVER WINDOWS

    STUDY ROOM

    4 1.2 0.2 0.1 0.096

    OVER WINDOWS

    KITCHEN

    2 1.1 0.2 0.1 0.044

    OVER SHELVES

    KITCHEN

    2 1.3 0.2 0.1 0.052

    OVER R.C.C. JALI

    OVER DOOR OF BATH

    AND W.C.

    4 1.05 0.2 0.1 0.084

    OVER FRONT

    VERANDAH 20 CM

    THK

    1 9.2 0.2 0.2 0.368

    OVER BACK

    VERANDAH

    INCLUDING WINDOW

    1 13.6 0.2 0.15 0.408

    SUNSHADES

    OVER WINDOW IN

    MAIN ROOM AND

    STUDY ROOM

    8 1.2 0.5 0.05 0.24

    OVER WINDOW IN

    KITCHEN

    2 1.1 0.5 0.05 0.055

    OVER FRONT

    VERANDAH

    1 9.2 0.6 0.05 0.276

    OVER BACK

    VERANDAH

    INCLUDING BACK

    WINDOWS

    1 13.6 0.5 0.05 0.34

    SLABS OF SHELVES

    25CM WIDE 4CM THK

    8X

    3

    1.1 0.25 0.04 0.264

    STAIRCASE

  • 7/28/2019 Estimation Asg

    23/24

    23

    INCLINED SLABS 2 2.54 1.1 0.15 0.838

    ABOVE WALL AT BASE 1 1.1 0.5 0.15 0.083

    LANDING SLAB

    MIDDLE

    1 2.6 1.05 0.15 0.41

    LANDING SLAB 1ST

    FLOOR LEVEL1 2.6 0.75 0.15 0.293

    STEPS WITHOUT

    REINFORCEMENT

    8X

    2

    1.1 X0.5(0.2

    5X1.75)

    0.385

    TOTAL 21.05

    8

    CU M

  • 7/28/2019 Estimation Asg

    24/24

    BIBLOGRAPHY

    ESTMATING AND COSTING IN CIVIL ENGINEERING BY M . CHAKRABORTY

    ESTIMATING AND COSTING BY NICMAR PUBLICATIONS