Case Study Ref: Fast React_Evolve_Case Study_Dewhirst
Dewhirst achievesimproved customerservice.Marks and Spencer supplier Dewhirst have achievedimproved customer service, speed of response and lowerstock holding, through the implementation of the Fast Reactplanning system.
The SolutionDewhirst has implemented Fast React Evolve to provide fully integratedsupply chain planning, critical path management, ow reporting and rawmaterials visibility in a single coordinated system linked to and workingwith the existing JD Edwards business system.
This combination allows the impact of changes in any one area, suchas sample approvals, ow requirements, raw materials availability andcurrent production performance to be immediately re ected in otherareas, providing clear noti cation of priority changes and a clear warningof potential problems.
Glenn Walker, Finance Director at Dewhirst explains, Fast React Evolvehas enabled the closer coordination of functions within the business andthis has facilitated a better materials planning process.
This has directly resulted in the stockholding on materials beingreduced by 40-50% (25-30 days stockholding down to an average of 15days), at the same time as improving the raw material availability to theproduction oor.
Fast React Evolve was surprisingly easy to install, and we have beenvery impressed with the robustness and functionality provided by thesoftware. Given the Fast React pedigree we expected a good planningsystem, but the exibility and control provided by the Evolves CriticalPath system was an unexpected bonus.
The Conclusion
Andrew Brown, Managing Director, Fast React Systems comments:We understand the garment industry at a ground level and haveconsequently built very exible planning solutions, which meet the needsof a wide variety of garment businesses.
Fast React has provided Dewhirst with a solution that presents theirproduction planning, critical path and material delivery ows in a visualand easy to use format, which is essential when aiming to offer true
exibility and level of customer service necessary to stay competitive intodays business environment.
Key facts at a glance
Customer:Dewhirst MenswearTailoring
Location:UK
Challenge:To improve ontime delivery andcustomer service
ROI: Increased sales andreduced operating costsincluding inventoryreductions by 40-50%
Fast React Systems Ltd EuropeTel: +44 (0)1332 668942Email: [email protected] Web: www.fastreact.com
Fast React Systems Ltd AsiaTel: +66 (0)2 664 3326Email: [email protected] Web: www.fastreact.com
7/31/2019 Evolve Case Study Dewhirst
2/2
Fast React Evolve was surprisingly easy to install and we have been very impressed with the robustness and functionality provided by the software. Glenn Walker, Finance Director
Case Study Ref: Fast React_Evolve_Case Study_Dewhirst
All Saints UK
Dewhirst achievesimproved customerservice.
What our customers say
Prior to installing FastReact, thesystems in place were cumbersomeand disjointed giving us poor visibilityand reporting functions. FastReacthas greatly improved visibility,centralised the information owacross departments within thebusiness and improved responsetimes. The integrated, proactiveCritical Path management ensuresall development and pre-productionactivities are achieved in line with theplan. Once we were up andrunning with FastReact the systemimmediately started to delivertangible bene ts to the business.
Matt Arrowsmith
Chief Operating Of cer Asia
Calzedonia Italy
We have chosen FastReact to enableus to maximise production ef ciencyat our factories, whilst at the sametime providing us with the capabilitiesfor quick response and lead timereduction. These are key requirementsfor the continued success ofCalzedonia to enable us to satisfy oureverchanging customer demands.
Riccardo RomaniDirector of Production
Shadowline UK & China
Implementing FastReact has allowedus MUCH greater visibility of ouroverseas manufacturing, workingcollaboratively with our UK operation.Improved control through FR alloweda rapid reduction in excess costs,including a signi cant reduction inair freight, yet also allowed increased
exibility. We could not have achievedour recent strong business growthand still maintained controlwithout FastReact.
Michael CondonOperations Director
Fast React Systems Ltd EuropeTel: +44 (0)1332 668942Email: [email protected] Web: www.fastreact.com
Fast React Systems Ltd AsiaTel: +66 (0)2 664 3326Email: [email protected] Web: www.fastreact.com