92
FACILITY LAYOUT

FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Embed Size (px)

Citation preview

Page 1: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

FACILITY LAYOUT

Page 2: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Facility Layout Defined

Facility layout can be defined as the process by which the placement of departments, workgroups within departments, workstations, machines, and stock-holding points within a facility are determined

This process requires the following inputs:– Specification of objectives of the system in terms of output and

flexibility

– Estimation of product or service demand on the system

– Processing requirements in terms of number of operations and amount of flow between departments and work centers

– Space requirements for the elements in the layout

– Space availability within the facility itself

Page 3: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Facility layout includes

• planning for the location of all machines, utilities, employee workstations, customer service areas, material storage areas, aisles, restrooms, lunchrooms, drinking fountains, internal walls, offices and computer rooms

• planning for the flow patterns of materials and people around, into, and within buildings

Page 4: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

• Requires substantial investments of money and effort

• Involves long-term commitments

• Has significant impact on cost and efficiency of short-term operations

Importance of Layout Decisions

Page 5: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

The Need for Layout Designs(Cont’d)

Changes inenvironmentalor other legalrequirements

Changes in volume ofoutput or mix of

products

Changes in methodsand equipment

Morale problems

Page 6: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

The Need for Layout Decisions

Inefficient operations

For Example:

High CostBottlenecks

Changes in the designof products or services

The introduction of newproducts or services

Accidents

Safety hazards

Page 7: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Basic Layout Types

• Product Layouts

• Process Layouts

• Fixed-Position Layouts

• Cellular Manufacturing Layouts

Page 8: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Figure 14.3

Three Facilities Layouts

Page 9: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Four basic types of manufacturing layouts

• process layout for producing a variety of custom ‑‑products in relatively small batches

• product layout for producing a few standardized ‑‑products in relatively large quantities

• cellular manufacturing layout machines are grouped ‑‑into cells, and the cells function somewhat like a product layout island within a larger process layout

• fixed position layout for working on a product that is ‑ ‑‑very bulky, large, heavy, or fragile with workers, materials, and machines transported to and from the product

Page 10: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Product-Process Matrix

Flexibility-Quality Dependability-Cost

ContinuousFlow

AssemblyLine

Batch

JobShop

LowVolumeOne of a

Kind

MultipleProducts,

LowVolume

FewMajor

Products,HigherVolume

HighVolume,

HighStandard-

ization

CommercialPrinter

HeavyEquipment,S

AutomobileAssembly

SugarRefinery

Flexibility-Quality

DependabilityCost

Page 11: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

ProductVariety

High Moderate Low Very Low

Equipmentflexibility

High Moderate Low Very Low

LowVolume

ModerateVolume

HighVolume

Very highVolume

JobShopJob shop

Batch

Repetitiveassembly

ContinuousFlow

Variety, Flexibility, & Volume

Page 12: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Process Layout

Gearcutting

Mill Drill

Lathes

Grind

Heattreat

Assembly

111

333

222

444

222111444

111 33311112222

222

3333

111

444111

333333333

44444

3333

3322

222

Page 13: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Process Layout

Process Layout - work travels to dedicated process centers

Milling

Assembly& Test Grinding

Drilling Plating

Page 14: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Process Layouts• Process layout unique characteristics include;

– General purpose & flexible resources

– Facilities are more labor intensive

– Lower capital intensity & automation

– Higher labor intensity

Page 15: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Process Layouts - continued• Processing rates are slower

• Material handling costs are higher

• Scheduling resources & work flow is more complex

• Space requirements are higher

Page 16: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Traditional Process Layout

Page 17: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Changing a Facilities Layout

Figure 14.4

Page 18: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

A Flow Line for Production or Service

Flow Shop or Assembly Line Work Flow

Raw materialsor customer

Finished item

Station 2

Station 3

Station 4

Material and/or labor

Station 1

Material and/or labor

Material and/or labor

Material and/or labor

Page 19: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Product Layouts

• Product layout unique characteristics are– Produce small number of products efficiently– Resources are specialized – High capital intensity – Low flexibility relative to the market

Page 20: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Product Layouts - continued

– Processing rates are faster

– Material handling costs are lower

– Lower space requirements

Page 21: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Hybrid Layouts

• Combine elements of both product & process layouts– Maintain some of the efficiencies of product layouts– Maintain some of the flexibility of process layouts

• Examples: – Group technology & manufacturing cells– Grocery stores

Page 22: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Fixed-Position Layout

• Used when product is large• Product is difficult or impossible to move, i.e.

very large or fixed• All resources must be brought to the site• Scheduling of crews and resources is a

challenge

Page 23: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

A U-Shaped Production Line

1 2 3 4

5

6

78910

In

Out

Workers

Page 24: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

BENEFITS OF U-SHAPED LAYOUTS

• One worker can do more work• Workers can interact with each other while

working• Less production space required

Page 25: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Fundamentals of Operations Management 4e

© The McGraw-Hill Companies, Inc., 2003

8–25

Flexible Line Layouts

Exhibit 8.13Source: Robert W. Hall, Attaining Manufacturing Excellence (Homewood, IL: Dow Jones-Irwin, 1987), p. 125.

Page 26: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Designing Process Layouts

• Step 1: Gather information:– Space needed, space available, importance of proximity

between various units• Step 2: Develop alternative block plans:

– Using trial-and-error or decision support tools• Step 3: Develop a detailed layout

– Consider exact sizes and shapes of departments and work centers including aisles and stairways

– Tools like drawings, 3-D models, and CAD software are available to facilitate this process

Page 27: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Process Layout Steps

• Step 1: Gather information like space needed, from-to matrix, and REL Chart for Recovery First Sports Medicine Clinic (total space 3750 sq. ft.)

ARadiology

400 sq. ft.

BLaboratory

300 sq. ft.

CLobby & Waiting

300 sq. ft.

DExamining

Rooms800 sq. ft.

ESurgery & Recovery900 sq. ft.

FPhysical Therapy

1050 sq. ft.

Page 28: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Step 1: Gather Information (continued)

Page 29: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Step 2: Develop a New Block Layout

• Use trial and error with from-to and REL Charts as a guide• Use computer software like ALDEP or CRAFT

Page 30: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Special Cases of Process Layouts

• There are a number of unique process layouts which include

– Warehouse layouts

– Office Layouts

Page 31: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Warehouse Layouts

• Warehouse Layout Considerations:– Primary decision is where to locate each department

relative to the dock– Departments can be organized to minimize “ld” totals– Departments of unequal size require modification of the

typical ld calculations to include a calculation of the “ratio of trips to area needed”

– The usage of “Crossdocking” modifies the traditional warehouse layouts; more docks, less storage space, and less order picking

Page 32: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Office Layouts

• Office Layout Considerations:– Almost half of US workforce works in an office environment– Human interaction and communication are the primary

factors in designing office layouts– Layouts need to account for physical environment and

psychological needs of the organization– One key layout trade-off is between proximity and privacy– Open concept offices promote understanding & trust– Flexible layouts incorporating “office landscaping” help to

solve the privacy issue in open office environments

Page 33: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Designing Product Layouts

• Product layouts are different than process layouts• Product layouts provide for sequential product

movement that enhances efficiency• Designing product layouts requires consideration of

– Sequence of tasks to be performed by each workstation– Logical order– Speed considerations – line balancing

Page 34: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Designing Product Layouts - continued

• Step 1: Identify tasks & immediate predecessors• Step 2: Determine the desired output rate• Step 3: Calculate the cycle time• Step 4: Compute the theoretical minimum number of workstations• Step 5: Assign tasks to workstations (balance the line)• Step 6: Compute efficiency, idle time & balance delay

Page 35: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Step 1: Identify Tasks & Immediate Predecessors

Example 10.4 Vicki's Pizzeria and the Precedence DiagramImmediate Task Time

Work Element Task Description Predecessor (secondsA Roll dough None 50B Place on cardboard backing A 5C Sprinkle cheese B 25D Spread Sauce C 15E Add pepperoni D 12F Add sausage D 10G Add mushrooms D 15H Shrinkwrap pizza E,F,G 18I Pack in box H 15

Total task time 165

Page 36: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Layout Calculations

• Step 2: Determine output rate– Vicki needs to produce 60 pizzas per hour

• Step 3: Determine cycle time– The amount of time each workstation is allowed to

complete its tasks

– Limited by the bottleneck task (the longest task in a process):

sec./unit 60

units/hr 60

sec/min 60x min/hr 60

units/hroutput desired

sec./day time available)(sec./unit time Cycle

hourper pizzasor units/hr, 72sec./unit 50

sec./hr. 3600

time task bottleneck

time availableoutput Maximum

Page 37: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Layout Calculations (continued)

• Step 4: Compute the theoretical minimum number of stations– TM = number of stations needed to achieve 100%

efficiency (every second is used)

– Always round up (no partial workstations)– Serves as a lower bound for our analysis

stations 3or 2.75,

nsec/statio 60

seconds 165

time cycle

times taskTM

Page 38: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Layout Calculations (continued)

• Step 5: Assign tasks to workstations– Start at the first station & choose the longest eligible task following precedence

relationships– Continue adding the longest eligible task that fits without going over the desired

cycle time – When no additional tasks can be added within the desired cycle time, begin

assigning tasks to the next workstation until finishedWorkstation Eligible task Task Selected Task time Idle time

A A 50 10

B B 5 5

C C 25 35

D D 15 20

E, F, G G 15 5

E, F E 12 48

F F 10 38

H H 18 20

I I 15 5

1

2

3

Page 39: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Last Layout Calculation

• Step 6: Compute efficiency and balance delay– Efficiency (%) is the ratio of total productive time divided

by total time

– Balance delay (%) is the amount by which the line falls short of 100%

91.7%100sec. 60x stations 3

sec. 165

NC

t (%) Efficiency

8.3%91.7%100%delay Balance

Page 40: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

© Wiley 2007

Other Product Layout Considerations

• Shape of the line (S, U, O, L):– Share resources, enhance communication & visibility,

impact location of loading & unloading

• Paced versus un-paced lines– Paced lines use an automatically enforced cycle time

• Number of products produced– Single– Mixed-model lines

Page 41: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Line balancing and sequencing

• the analysis of production lines that nearly equally divides the work to be done among workstations so that the number of workstations required is minimized

• the goal is to determine how many workstations to have and which tasks to assign to each workstation so that the minimum number of workers and the minimum amount of machines are used to provide the required capacity

Page 42: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Seven steps in the line balancing procedure

• determine which tasks must be performed to complete one unit of a particular product

• determine the order or sequence in which tasks must be performed

• draw a precedence diagram• estimate task times• calculate the cycle time• calculate the minimum number of workstations• use one of the heuristics to assign tasks to workstations

so that the production line is balanced

Page 43: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Station 1Minutes per

Unit 6

Station 2

7

Station 3

3

Assembly Lines Balancing Concepts

Question: Suppose you load work into the three work stations below such that each will take the corresponding number of minutes as shown. What is the cycle time of this line?

Question: Suppose you load work into the three work stations below such that each will take the corresponding number of minutes as shown. What is the cycle time of this line?

Answer: The cycle time of the line is always determined by the work station taking the longest time. In this problem, the cycle time of the line is 7 minutes. There is also going to be idle time at the other two work stations.

Answer: The cycle time of the line is always determined by the work station taking the longest time. In this problem, the cycle time of the line is 7 minutes. There is also going to be idle time at the other two work stations.

Page 44: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Example of Line Balancing• You’ve just been assigned the job a setting up an

electric fan assembly line with the following tasks:

Task Time (Mins) Description PredecessorsA 2 Assemble frame NoneB 1 Mount switch AC 3.25 Assemble motor housing NoneD 1.2 Mount motor housing in frame A, CE 0.5 Attach blade DF 1 Assemble and attach safety grill EG 1 Attach cord BH 1.4 Test F, G

Page 45: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Example of Line Balancing: Structuring the Precedence Diagram

Task Predecessors

A None

A

B A

B

C None

C

D A, C

D

Task Predecessors

E D

E

F E

F

G B

G

H E, G

H

Page 46: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Example of Line Balancing: Precedence Diagram

A

C

B

D E F

GH

2

3.25

1

1.2 .5

11.4

1

Question: Which process step defines the maximum rate of production?

Question: Which process step defines the maximum rate of production?

Answer: Task C is the cycle time of the line and therefore, the maximum rate of production.

Answer: Task C is the cycle time of the line and therefore, the maximum rate of production.

Page 47: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Example of Line Balancing: The Bottleneck

Task Time (Mins) Description PredecessorsA 2 Assemble frame NoneB 1 Mount switch AC 3.25 Assemble motor housing NoneD 1.2 Mount motor housing in frame A, CE 0.5 Attach blade DF 1 Assemble and attach safety grill EG 1 Attach cord BH 1.4 Test E, G

Max Production = Production time per day

Bottleneck time=

420 mins

3.25 mins / unit= 129 units

Page 48: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Example of Line Balancing: Determine Cycle Time

Required Cycle Time, C = Production time per period

Required output per period

C = 420 mins / day

100 units / day= 4.2 mins / unit

Question: Suppose we want to assemble 100 fans per day. What would our cycle time have to be?

Question: Suppose we want to assemble 100 fans per day. What would our cycle time have to be?

Answer: Answer:

Page 49: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Example of Line Balancing: Determine Theoretical Minimum Number of

Workstations

Question: What is the theoretical minimum number of workstations for this problem?

Question: What is the theoretical minimum number of workstations for this problem?

Answer: Answer: Theoretical Min. Number of Workstations, N

N = Sum of task times (T)

Cycle time (C)

t

t

N = 11.35 mins / unit

4.2 mins / unit= 2.702, or 3t

Page 50: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Example of Line Balancing: Determine the Efficiency of the Assembly Line

Efficiency =Sum of task times (T)

Actual number of workstations (Na) x Cycle time (C)

Efficiency =11.35 mins / unit

(3)(4.2mins / unit)=.901

Page 51: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Some issues involved with line balancing

• workers must be in control and not under the control of machines

• the relationship between cycle time and the number of workstations

• varying cycle time can have important results• rebalancing a production line is a common

occurrence

Page 52: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Group Technology:Benefits

1. Better human relations

2. Improved operator expertise

3. Less in-process inventory and material handling

4. Faster production setup

Page 53: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Fixed Position Layout

Question: What are our primary considerations for a fixed position layout?

Question: What are our primary considerations for a fixed position layout?

Answer: Arranging materials and equipment concentrically around the production point in their order of use.

Answer: Arranging materials and equipment concentrically around the production point in their order of use.

Page 54: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Nature of manufacturing cells

• most applications are in metalworking production• cells are usually formed by taking production of parts from

an existing job shop• the percentage of parts produced in cells is a relatively

small percentage of the total production• both small and large firms use manufacturing cells• moderate batch sizes of parts are produced in cells• the number of cells is relatively small• the number of production machines per cell is relatively

small• there are relatively few workers within cells

Page 55: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Potential benefits from using a cellular manufacturing layout

• machine changeovers are simplified• training periods for workers are shortened• materials handling costs are reduced‑• parts can be made faster and shipped more

quickly• less in process inventory is required‑• production is easier to automate

Page 56: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Appropriateness of the incremental utilization and the longest task time heuristics‑

• incremental utilization when one or more ‑‑task times is equal to or greater than the cycle time

• longest task time when each and every task ‑ ‑ ‑‑time is less than or equal to the cycle time, and when the primary focus of the analysis of production lines is minimizing the number of workstations and the amount of tools and equipment required

Page 57: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

SERVICE FACILITY LAYOUT

• Service facilities bring together the customer and the organization’s services.

• Two types of service facilities layout-– Designed around customer- ex- banks– Designed around technology. Ex- hospitals– Designed keeping in mind the balance between

these extremes. Ex- restaurant

Page 58: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Common features of service facility layouts

• provide for easy entrance to the properties from freeways and thoroughfares

• large, amply lighted parking areas with wide walkways leading to buildings

• well marked, high-capacity entryways and exits• powered doors and escalators• lobbies or other receiving/holding areas for

customers• services counters, employee workstations,

merchandise displays, and many aisle ways

Page 59: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Two extremes in service facility layouts

• front-room operations – where entire layout must be designed around customers (customer-as-participant or customer-as-product)

• back-room operations – where the layout must be designed only for physical materials processing and production efficiency (quasi-manufacturing)

Page 60: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Some quantifiable objectives in service facility layout

• minimize the total travel distance among departments

• minimize the total cost of material handling among departments

• minimize the sum of pairs of closeness ratings

Page 61: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

PROBLEMS

Page 62: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

TASK TASK TIME(SECONDS)

PRECEDING TASK

A 28 --

B 13 --

C 35 B

D 11 A

E 20 C

F 6 D,E

G 23 F

H 25 F

I 37 G

J 11 G,H

K 27 I,J

Total 236

Problem1: The manufacturing engineers at Sunny Manufacturing were working on a new remote controlled toy Monster Truck. They hired a production consultant to help them determine the best type of production process to meet the forecasted demand for this new product. The consultant recommended that they use the assembly line. He told the manufacturing engineers that the line must be able to produce 600 Monster Trucks per day to meet the demand forecast. The workers in the plant work eight hours per day. The task information for the new monster truck given below;

Page 63: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

A)What is the required cycle time to meet the forecasted demand of 600 trucks per day based on an eight hour work day?B)What is the theoretical minimum number of workstations given the answer in part b?C)Use longest task time with alphabetical order as the tie breaker and balance the line in the minimum number of workstations to produce 600 trucks per day.D)Use shortest task time with largest number of following task as the tie breaker and balance the line in the minimum number of stations to produce 600 trucks per day.

Solution: (A) The required cycle time will be equal to = Production time per day / Output per day = 60 * 480 / 600 = 48 seconds(B) The minimum number of theoretical workstations are = Total time / Cycle time = 236 / 48 = 4.92 = 5 (rounded up)

Questions

Page 64: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

(C) Using longest task time the tasks can be arranged as follows;

FEASIBLE TASKS TASK TASK TIMEREMAINING

UNASSIGNED TIME

Station 1 A,B A 28 20

B,D B 13 7

Station 2 C,D C 35 13

D D 11 2

Station 3 E E 20 28

F F 6 22

Station 4 G,H G 25 23

G H 23 0

Station 5 I,J I 37 11

J J 11 0

Station 6 K K 27 21

Page 65: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

TASK NUMBER OF FOLLOWING TASK

A 7

B 8

C 7

D 6

E 6

F 5

G 3

H 2

I 1

J 1

K 0

D)By shortest task time

Page 66: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

FEASIBLE TASKS TASK TASK TIMEREMAINING

UNASSIGNED TIME

Station 1 A,B B 13 35

A,C A 28 7

Station 2 C,D D 11 37

C C 35 2

Station 3 E E 20 28

F F 6 22

Station 4 G,H G 23 25

H,I H 25 0

Station 5 I,J J 11 37

I I 37 0

Station 6 K K 27 21

Page 67: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

TASK IMMEDIATE PREDECESSOR TIME(min)

A - 3B A 4C - 7D C 4E D 7F E 10G E 7H - 2I B,F 9J H 9K I 7L G 8M J 4N M, K 10O L 6P K 2Q O 8R P 5S Q, N 3T R 7U S 4V T, U 3W V 9X W 1

Q) The precedence relationship & the task times for an assembly line are given below: Balance the line for a production rate of 4 units per hour.

Page 68: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Solution

S1 S2 S3 S4 S5 S6

S7S8S9S10S11

HC

A B J MD

E F I G L

O KNPQRS

TUV

WX

Production Rate-4 units/hoursCycle Time-15 minutes

Production Rare-3 units/hourCycle Time-20 minutes

Page 69: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

WORK ELEMENTS TIME(min)

IMMEDIATE PREDECESSOR(S)

A 3 -B 5 AC 2 BD 7 BE 7 C,DF 6 EG 2 D,EH 3 F

Problem3 The manager of Sugar Hams wants to organize the tasks involved in the preparation & delivery of hams. The manager plans to produce 60 hams per 10 hour workday. The following table represents work-element times & precedence relationships.

I 8 G

J 6 H

K 3 I, J

L 8 K

•Construct a precedence diagram for this process.

Page 70: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

A B

C

D

E

G

F

H

I

J

KL

precedence Diagram

Page 71: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Problem 4:

Real Fruit Snack Stripes are made from a mixture of dried fruit, food coloring, preservatives and glucose. The mixture is pressed out into a thin sheet, imprinted with various shapes, rolled, and packaged. The precedence and time requirements for each step in the assembly process are given below. To meet demand, Real Fruit need to produce 6000 fruit strips every 40-hour week. Design an assembly line with the fewest number of workstations that will achieve the production quota without violating precedence constraints.

WORK ELEMENT PRECEDENCE TIME(MIN)

A Press out sheet of fruit 0.1 -

B Cut into strips A 0.2

C Outline fun shapes A 0.4

D Roll up and package B,C 0.3

Page 72: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

SolutionFirst, we draw a precedence diagram. Element A has no elements preceding it, so node A can be placed anywhere. Element A precedes element B, so the line segment that begins at node A must end at node B.Element A precedes element C. Again a line segment from node A must end at node C.Element B and C precede element D, so the line segments extending from nodes B and C must end at node D. The precedence diagram is completed by adding the time requirements beside each node

B

C

A D

Next, we calculate the desired cycle time and the theoretical minimum number of workstations:

Page 73: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Cd = 40 hrs * 60 minutes/ hour = 2400 = 0.4 minute

6000 units 6000

N= 0.1 + 0.2+ 0.3+ 0.4 = 2.5 workstations ------------------------- 0.4  

Since we cannot have half a workstation(or any portion of a workstation) we round up to 3 workstations.We must group elements into workstations so that the sum of the element time at each workstation is less than or equal to the desired cycle time of 0.4 minute.Examining the precedence diagram, let us begin with A since it is the only element that does not have a precedence. We assign A to workstation 1. B and C are now available for assignment. Cycle time is exceeded with A and C in the same workstation, so we assign B to workstation 1 and place C in a second workstation. No other element can be added to workstation 2, due to cycle time constraints. That leaves D for assignment to a third workstation. Elements grouped into workstations are circled on the precedence diagram.

Page 74: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

WORKSTATION ELEMENT REMAINING REMAINING TIME ELEMENTS

1 A 0.3 B,CB 0.1 C,D

2 C 0.0 D3 D 0.1 NONE

Our assembly line consists of three workstations, arranged as follows:-

A,B C D Since the theoretical minimum of workstations was three, we know we have balanced the line as

efficiently as possible.The assembly line has an efficiency ofE= 0.1 + 0.2+ 0.3+ 0.4 =.833= 83.3% 3 ( 0.4 ) 

3 ( 0.4 )

Page 75: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Problem 5: The Food Bin grocery store operates 24 hours per day, seven days per week. Fred Bulger, the store manager, has been analyzing the efficiency and productivity of store operations recently. Bulger decided to observe the need for check out clerks on the first shift for a one month period. At the end of the month he calculated the average number of check out registers that should be open during the first shift each day. His results showed peak needs on Saturdays and Sundays.

Day M T W Th F S Su

Number of Employee

3 4 5 5 6 7 8

Bulger now has to come up with a work force schedule that guarantees each checkout clerk two executive days off but still covers all requirements.(a) Develop a work force schedule that covers all requirements while giving two consecutive days off to each clerk. How many clerks are needed? Assume that the clerks have no preference regarding which days they have off.(b) Plans can be made to use the clerks for other duties if slack time or idle time resulting from this schedule can be determined. How much idle time will result from this schedule on what days?

Page 76: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

M T W Th F S SuRequirementsClerk 1RequirementsClerk 2RequirementsClerk 3RequirementsClerk 4RequirementsClerk 5RequirementsClerk 6RequirementsClerk 7RequirementsClerk 8Requirements

3 Off3Off3*2*1*0Off0*0*0

4Off4Off4*3*2Off2Off2**1**0

5*4*3*2*1Off1*0Off0*0

5*4*3Off3Off3*2*1Off1**0

4*3*2Off2Off2*1*0*0Off0

7*6*5*4*3*2*1*0Off0

8**7**6**5**4**3**2**1**0

Solution: (a)

The minimum number of clerks is eight.

Page 77: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

(b) Based on the results in part (a), the number of clerks on duty minus the requirements is the number of idle clerks available for other duties:

M T W Th F S Su

Number on dutyRequirementsIdle Clerks

532

440

651

550

541

770

880

The slack in this schedule would indicate to Bulger the number of employees he might ask to work part time (fewer than five days per week). For example clerk 7 might work Tuesday, Saturday, and Sunday and clerk 8 might work Tuesday Thursday and Sunday. That would eliminate slack from the schedule.

Page 78: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

MINI CASES

Page 79: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

CATERPILLAR Inc.

Page 80: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Cellular layouts achieve improved performance.

• Modernizing a plant is a high risk/high reward task, as caterpillar, Inc. is learning.

• Caterpillar has earmarked $1.8 billion for modernizing its plants by 1993. with more than $10 billion in annual sales, Caterpillar expects to reduce manufacturing costs by 20 percent , or about $1.5 billion, each year until the revision is complete.

• Included in the company’s plans are world wide information network , flexible manufacturing , and a cellular layout in which workers will increase the range of tasks they perform.

Page 81: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

• For another U.S. company , cellular layout in conjunction with just-in-time(JIT) production transformed its classic job shop into a world-class manufacturing system.

• Machines have been grouped by process , but material movement was excessively slow , work-in progress inventories were too large , and quality was unacceptably low.

• Costs were increasing and market share decreasing. In response , management first moved machines on one assembly line into an L-shaped cell, then they negotiated with union workers to accept group rather than individual incentives . productivity increased. Lead time for the product was reduced from seven days to one day.

Page 82: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

• Flexibility increased because every operator in the cell could perform all jobs.

• In every respect, the cellular layout was a success-for the employees and for management.

• Cellular layouts often mean reduced annual inventory costs and improved productivity. Claims about improvements in quality are often made, but less often documented. Better documented is improved employee morale, an important result.

Page 83: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Process and Conceptual Facility Design for manufacturing Wind Energy Gearboxes

Page 84: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

• quite a challenge to achieve the desired production levels. OCI performed the consulting services in capacity as a Sub Contractor to an Architectural Firm. OCI evaluated the existing gearbox manufacturing process and provided recommendations to improve purchasing, inventory levels, ergonomics, and material handling for short term implementation.

• The goal was to provide a conceptual facility design to accommodate an exponential increase in the gearboxes during the next five (5) years. OCI analyzed different gearbox models to be manufactured and recommended the optimal number of workstations and assembly lines following a ‘Lean Flexible Production Model’ approach. Due to the weight of the finished gearboxes, that fell in the range of 35,000 lb – 100,000 lb, safe and efficient material handling was

Page 85: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

• However, OCI recommended a solution which is one of the best in industry, meet all OSHA regulations, and accommodate the required TAKT time. The recommended solution allowed the client to produce 8x the current production levels with 2x the labor cost.

• OVERALL EST. PROJECT: • $13,000,000.00• FACILITY SIZE: • 300,000 sq. ft.

Page 86: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

THE RESULTS:

• Completed the design of the new facility. Areas designed included Warehouse, Receiving, Prep for Sub-Assembly, Sub-Assembly, Assembly, Prep-to-Paint, Paint, Test & Ship

• Maintained all project schedules to meet the deadlines with no delays.

• Continuous flow of the gearboxes was achieved between different workstations

Page 87: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

• Line balancing was performed to eliminate any idle time during the production of the gearboxes

• Voice directed WMS was recommended to improve accuracy and efficiency in the warehouse and manufacturing stations

• Lean Visual Workplace was recommended to enhance productivity

Page 88: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

Materials Handling Review and Recommendations

• Client is a food processing company whose primary products are packaged condiments, dressings and oils.

• OCI reviewed and prepared Baseline Measures reports for client to establish current operating standards while making short term recommendations to obtain a quick return. OCI prepared two conceptual layouts of the client’s manufacturing and distribution facility to optimize the material handling and flow through the facility.

Page 89: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

• Client was experiencing tremendous growth and needed to know if the existing facility could handle the forecasted growth through the next three years. Although considerations were given to moving production and/or distribution into a new facility, the client desired to stay in the existing building.

• OCI provided the client with a high and low cost concept to completely re-design the interior layout of the existing facility, including automated material storage and handling equipment, automated packaging equipment, RFDC and related hardware and software for a WMS, thereby upgrading and optimizing the flow of material through the facilities, and increasing storage capacity.

Page 90: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

• OVERALL EST. PROJECT: • $7,000,000.00• FACILITY SIZE: • 150,000 sq. ft.

Page 91: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

THE RESULTS:

• Completed and presented bi-weekly reports on existing operations and recommended "quick fixes" to obtain "biggest bang for the buck" returns.

• Completed and presented conceptual re-designs of the materials handling capabilities in their manufacturing and distribution facility to accommodate a forecasted growth through three years.

Page 92: FACILITY LAYOUT. Facility Layout Defined Facility layout can be defined as the process by which the placement of departments, workgroups within departments,

• Presented concepts, high cost and low cost, so that client could stay in their existing facility by streamlining materials flow through automating materials handling in receiving, manufacturing, storage, and distribution.