    Feasibility

    StudyTechnical Aspect

    (Chapter 4)

  • 8/13/2019 Feasibility Study Techy Aspect

    2/18

    1. Introduction 2 to 3 paragraphs

    o! did you co"e up !ith a topic or a product#

  • 8/13/2019 Feasibility Study Techy Aspect

    3/18

    2. $etailed In%or"ation o% the

    &roduct Speci%icationParagraph form pero pwede rin yung

    graphical form in case youll be

    presenting using pictures

    Length, width, size, color, height,

    benefits, functionality, etc. (be

    specific)Use your creativity

  • 8/13/2019 Feasibility Study Techy Aspect

    4/18

    3. $irect 'a! aterials and Indirect

    irect materials! visible to the finished

    product

    "ndirect materials! cant be seen (e#. $lue

    tapos tatanggalin pala%, plastic containerpero wala sa finished product pero part

    lang ng production process)

  • 8/13/2019 Feasibility Study Techy Aspect

    5/18

    4. Total Cost o% the &roduct

  • 8/13/2019 Feasibility Study Techy Aspect

    6/18

    . anu%acturing &rocessParagraph form pero numerical list

    &numerated (insert 'onting english

    before the list)

    a#imum of pages&very move of the laborer or every

    change of the product (determination

    for manufacturing process)

  • 8/13/2019 Feasibility Study Techy Aspect

    7/18

    *. Flo! Chartanufacturing process turned into graphical * chart form

    +blong na na'ahiga (start* ending)

    ectangle (process)

    iamond (decision)

    -aiting time din/awal lumi'o, from top to bottom ! 0U-1$ 1$2"P" 31

    P1P&L

    4+ &5PL1412"+4 6m*

    4o color, plain blac' and borders, white yung inside part.

    Pwedeng igilid yung shape pag may sabay na process

  • 8/13/2019 Feasibility Study Techy Aspect

    8/18

    +. aterials and ,nergy -alance7ay mga nawawala, nag8eevaporate,

    may natatapon9

    etermine the weight, length, size,

    volume from the start pa lang dapat

    "t loo's li'e a process flow (puro bo#8

    shaped) horizontal flow, bsta pwede

    lumi'o3entences are optional :)

  • 8/13/2019 Feasibility Study Techy Aspect

    9/18

    . &lant Si/eescriptive ; area (s< meters)

    =8 paragraphs

    bear in mind the size of your machines for proper spacing

    within the plant, par'ing lot din and delivery

    /ldg perspective (> drawings 2.2) ? @+42 A"&- (name, doors )

    ? floor plan (B, offices, warehouse, e#it (fire), stairs,

    machines ; significant parts) 2+P A"&-

    ? floor plan (electrical, mga outlet, switches, lightsetc)

    2+P A"&-

    ? floor plan (outside view ; par'ing) 2+P A"&-

    ? furniture inside offices

  • 8/13/2019 Feasibility Study Techy Aspect

    10/18

    0. &lant ocation

    "nclude 3pecific address2a'e a picture of the vacant lot

    (includes road, electrical posts ; PL2

    lines for communication, drainage)

  • 8/13/2019 Feasibility Study Techy Aspect

    11/18

    1. &roduction Schedule

    2abular form (crossword8li'e)

    Bontents!

    ? time to start the operation (be

    specific with the processes)

    ? must have +U2PU2 @+ 20& 1C

    6m*

  • 8/13/2019 Feasibility Study Techy Aspect

    12/18

    11. achinery and ,uip"ent

    machine, description (function),pieces, price (tabular form)

    ore or less D pages

    2his part is for the production

    process +4LC

  • 8/13/2019 Feasibility Study Techy Aspect

    13/18

    12. Auiliary ,uip"ent

    &

  • 8/13/2019 Feasibility Study Techy Aspect

    14/18

    13. $epreciation Scheduleachineries and e

  • 8/13/2019 Feasibility Study Techy Aspect

    15/18

    14. Indirect 'a! aterials

    (&ac5aging)

  • 8/13/2019 Feasibility Study Techy Aspect

    16/18

    1. Indirect abor

    irect! wor' labored inside theplant*factory that has connection

    with the process

    "ndirect! wor' labored but not a part

    of the production but in the

    manufacturing place (Eanitor,

    supervisor, security guard)

  • 8/13/2019 Feasibility Study Techy Aspect

    17/18

    1*. 6aste anage"ent

    0ow do you manage your wasteI

    (paragraph form)

  • 8/13/2019 Feasibility Study Techy Aspect

    18/18

    1+. 7tilities

    21/UL1 @+ 6m*

    ? "dentify the sources and annual

    estimated use*consumption

    electricity

    -ater

    2elecommunication

    internet