! ADDENDUM 3 March 29, 2017 TAM+CZ Project No. 1002 DSAFileNo. 10-23 DSAAPPL. #02-113972 VALENTINE-WELDON ELEMENTARY SCHOOL (TILLEY ELEM. SCHOOL) 2251 N. VALENTINE AVE. FRESNO, CA CENTRAL UNIFIED SCHOOL DISTRICT ADDENDUM NO. 3 The following changes, omissions, additions, and alterations in, on, and to, the Contract Documents will apply to proposals made for the execution of the various parts of the work affected thereby. Careful note of this Addendum shall be taken by all parties of interest so that the proper allowance may be made in all computations, estimates, and contracts, and all trades affected shall be fully advised in the performance of the work which will be required by them. In cases of conflict between Drawings, Specifications, and this Addendum, this Addendum shall govern. Attention is directed to the Addendum receipt blank in the Form of Proposal. ITEM 3-1. SPECIFICATION: TABLE OF CONTENTS A. Section 02 21 00 Site Data: Exhibit: Change "Excepts" to "Excerpts". B. Replace Specification "Table of Contents" (attached). C. Substitute Revised Specifications Sections, "Issued 3/16/17, As Addendum No.3" (attached), for the originally issued Sections 01 11 00 and 01 32 00 revised to 01 11 01 and 01 32 12. D. The new Specification Sections 01 11 01 and 01 32 12 refers to PARTS A, B, C, D, & E. The Schematic Site Plan on Addendum drawing ADD3-1A (attached) shows graphic indication of PARTS A, B, C, D, & E, which together. PART A, C & D are the subject of this Bid. ITEM 3-2. DRAWINGS: SHEET 0.1 ABBREVIATION LIST, (IF SO NOTED) A. (N) = NEW BY THIS CONTRACT B. (E) = EXISTING TO REMAIN ITEM 3-3. DRAWINGS: SHEET AO.O GATES A. Gate Schedule: 1. At Gates G-2, G-3, G-5, G-6, G-13, G-15, G-16 provide center 4" X 4" post for latching. 2. Provide Fire Access Key Box at the following openings to campus: G-1, G-2, G-5 & G-16. Refer to details 3/A0.9.1 & 4/A0.9.2. 3. Gate numbers G-9 and G-12, change the Detail to 9/A0.9.2. 4. Gate G-9 shall be centered equally in the 9'-0" space between the CMU wall and the concrete planter seating bench adjacent to Building B. 5. Gates G-10 and G-11: change size to 3'-0" x 7'-0" pair in lieu of what is shown. ADDENDUM NO. 3 TAM+CZ PROJECT NO. 1002 PAGE 1 OF 3 File index no. tam+c A R C H I T E C T U R E • P L A N N I N G • I N T E R I O R S Tei. C559) 435-4750 Fax C559] 435-4774

File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

Embed Size (px)

Citation preview

Page 1: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

! ADDENDUM 3

March 29, 2017 TAM+CZ Project No. 1002 DSAFileNo. 10-23

DSAAPPL. #02-113972

VALENTINE-WELDON ELEMENTARY SCHOOL (TILLEY ELEM. SCHOOL) 2251 N. VALENTINE AVE. FRESNO, CA CENTRAL UNIFIED SCHOOL DISTRICT

ADDENDUM NO. 3

The following changes, omissions, additions, and alterations in, on, and to, the Contract Documents will apply to proposals made for the execution of the various parts of the work affected thereby. Careful note of this Addendum shall be taken by all parties of interest so that the proper allowance may be made in all computations, estimates, and contracts, and all trades affected shall be fully advised in the performance of the work which will be required by them. In cases of conflict between Drawings, Specifications, and this Addendum, this Addendum shall govern. Attention is directed to the Addendum receipt blank in the Form of Proposal.

ITEM 3-1. SPECIFICATION: TABLE OF CONTENTS A. Section 02 21 00 Site Data: Exhibit: Change "Excepts" to "Excerpts". B. Replace Specification "Table of Contents" (attached). C. Substitute Revised Specifications Sections, "Issued 3/16/17, As Addendum No.3" (attached),

for the originally issued Sections 01 11 00 and 01 32 00 revised to 01 11 01 and 01 32 12. D. The new Specification Sections 01 11 01 and 01 32 12 refers to PARTS A, B, C, D, & E. The

Schematic Site Plan on Addendum drawing ADD3-1A (attached) shows graphic indication of PARTS A, B, C, D, & E, which together. PART A, C & D are the subject of this Bid.

ITEM 3-2. DRAWINGS: SHEET 0.1 ABBREVIATION LIST, (IF SO NOTED)

A. (N) = NEW BY THIS CONTRACT B. (E) = EXISTING TO REMAIN

ITEM 3-3. DRAWINGS: SHEET AO.O GATES

A. Gate Schedule: 1. At Gates G-2, G-3, G-5, G-6, G-13, G-15, G-16 provide center 4" X 4" post for latching. 2. Provide Fire Access Key Box at the following openings to campus: G-1, G-2, G-5 & G-16.

Refer to details 3/A0.9.1 & 4/A0.9.2. 3. Gate numbers G-9 and G-12, change the Detail to 9/A0.9.2. 4. Gate G-9 shall be centered equally in the 9'-0" space between the CMU wall and the

concrete planter seating bench adjacent to Building B. 5. Gates G-10 and G-11: change size to 3'-0" x 7'-0" pair in lieu of what is shown.

ADDENDUM NO. 3 TAM+CZ PROJECT NO. 1002 PAGE 1 OF 3

File index no.

tam+c A R C H I T E C T U R E • P L A N N I N G • I N T E R I O R S

T e i . C 5 5 9 ) 4 3 5 - 4 7 5 0 F a x C 5 5 9 ] 4 3 5 - 4 7 7 4

Page 2: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

6. Gates G-10 & G-11: Painting of leaves shall be P-52. 7. Finish Hardware by Spec. Sec. 08 71 02 provided as similar to Group IE, including closer,

removable center mullion & panic device (with outside handle and inside panic bar, with keylock).

8. G-10 & G-11: Provide Lock guard TRIMCO 1082. 9. Clarification Elevation: Gates G-10 & G-11 and surrounding picket fence system. Refer to

Addendum drawing ADD3-4 (attached). 10. Gates G-10 and G-11: Change hold-open post to detail 12/A0.9.2. 11. Gate G-17 delete from project.

ITEM 3-4. DRAWINGS: Sheet A0.2 NOTED SITE PLAN

A. Replace Sheet A0.2 (Revised, dated 3/24/17) issued by this addendum (attached). Originally issued Sheet A0.2 dated 12/01/2016 is hereby rescinded.

ITEM 3-5. DRAWING: SHEET AO.9.3: Detail 16

A. Revise 7'-4" dimension to read 6'-8" to achieve a 6'-0" high CMU fence from finish grade.

ITEM 3-6. CEMENT BOARD ON STUD WALL

A. Where cement board is part of a "finish" system over another material, delete cement board: Provide lath and plaster system with integral color finish in lieu of cement board; install all typical plaster screeds as required, (examples of locations on plans: Exterior Elevations, Drawings A-9.10.3 & A-9.10.6, but not limited to these locations).

ITEM 3-7. SPECIFICATIONS: SECTION 10 05 00 MISC. SPECIALTIES

A. Add Paragraph N. to Section 10 05 00, Fiber-Cement Products (attached).

ITEM 3-8. DRAWINGS: SHEET A-9.10.2

A. Detail 5, Material & Finish:

(1) Mechanical Screen Face Material: per paragraph N., Section 10 05 00, Misc. Spec. Finish: System P-66, Exterior Finish. (2) Angle bracket assembly per Section 05 50 00, galvanize after fabrication.

ITEM 3-9. DRAWINGS: SHEET AO.2.1 SITE PLAN

A. Refer to the ramp adjacent to Building B, next to the Play Equip. The landing at the top of the ramp shall be 5'-0" long in the direction of the ramp travel.

ITEM 3-10. DRAWING: SHEETS C1, C2, C3A0.1 A0.2, AO.2.1

A. Subject: The existing chain link fence & mowstrip south of the EXISTING PAVED PLAY AREAD AND FIRE LANE, starting at the North East Corner of the Existing service yard and ending at the East Property Line of the School. Refer to re-issued Sheet A0.2 by this addendum for additional clarification.

ADDENDUM NO. 3 TAM+CZ PROJECT NO. 1002 PAGE 2 OF 3

Page 3: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

B. On Sheet A0.1: The fence is currently noted with Keynote 1 and 10. Delete Keynote 10 and replace with keynote 9. The existing fence, footings and mowstrip are to be removed.

C. Provide new concrete mowstrip to replace the existing mowstrip, fence and footing being removed.

D. New concrete mowstrip flush to adjacent existing/new surfaces. 15" wide X 6" deep concrete with 2-#4 horizontal bars continuous. Refer to Detail 14/A0.9.3 sim. for additional requirements.

ITEM 3-11. DRAWINGS: SHEET A0.1

A. Revised scope for Base Bid as shown on Addendum drawing ADD3-11A (attached).

ITEM 3-12. DRAWINGS: SHEET AO.9.2

A. Gates G-10 & G-11: Refer to Drawing Sheet AO.9.2 Detail 12, Hold-open post shown at 5" to the jamb post shall be changed to read 30".

ITEM 3-13. DRAWINGS: CIVIL SHEETS

A. Refer to document prepared by Civil Engineer, dated 3/29/17 (attached). Attachment also includes Exhibit A, B, C, D & E.

ITEM 3-14. CHANGE OF SCOPE: REVISED BASE BID PER RE-ISSUED SHEET A0.2

A. Electrical, Mechanical/Plumbing, Civil, Landscaping and Fire Protection Information to be issued in Future Addendum.

ADDENDUM NO. 3 TAIVI+CZ PROJECT NO. 1002 PAGE 3 OF 3

Page 4: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

1002 NEW ELEMENTARY SCHOOL VALENTINE-WELDON ELEMENTARY SCHOOL

TABLE OF CONTENTS

SECTION PAGES

Cover Page Table of Contents

DIVISION 1 -GENERAL REQUIREMENTS

0110 00 Special Requirements 01 1101 Special Information and Requirements

Exhibit A: Definition of A/E Role in this Project 01 12 00 Existing-Site: Requirements 01 25 05 A/E Role in Substitutions 01 26 05 Forms For Construction Phase 01 26 13 Request for Interpretation (RFI) 01 31 00 Coordination and Meetings 01 32 12' Construction Scheduling 01 33 00 Submittals 01 45 20 Tests and Inspections

Exhibit: final copy of SS-103 01 50 22 Temporary Facilities 01 57 23 Temporary Storm Water Pollution Controls 01 73 29 Cutting and Patching 01 74 05 Construction Cleaning 01 77 19 Closeout Requirements 01 78 23 Operation and Maintenance Data 01 78 39 Project Record Documents 01 78 46 Extra Finish Materials

DIVISION 02 - EXISTING CONDITIONS

02 21 00

02 41 14

Site Data Exhibit: Excerpts from Soils/Investigation Report Site: Clearing and Selective Demolition

1 116 4

j^CQMCREXE

03 16 00 Expansion Anchors 03 30 01 Cast-in-Place Concrete 03 35 19 Concrete Floor Stain

4 13

DIVISION 4 - MASONRY

04 22 00 Concrete Unit Masonry

05 12 15 Structural Steel

1002 3/30/2017 9:46:55 AM

Issued Adden No.3, 3/16/2017 TABLE OF CONTENTS PAGE1

Page 5: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

SECTION. EAOES

07 21 00 07 54 19 07 41 14 07 62 00 07 72 00

07 84 00 07 92 00

Building and Acoustical Insulation PVC Single-Ply Roofing Standing Seam Metal Roofing Flashing and Sheet Metal Roof Accessories A. Roof Hatch B. Tubular Sky Lights Firestopping Standards for Joint Sealants

05 31 00 Steel Decking 4 05 31 01 Metal Decking at Awning - Prefinished 2 05 50 00 Misc. Steel Fabrications 3 05 52 00 Stainless Steel Handrails 3

06 10 10 Fire Retardant Plywood/Framing 3 06 20 00 Finish Carpentry and Millwork 3 06 21 00 Finish Work, Install "Furnish Only" 2 06 4119 Laminated Plastic Casework 5

6 6

.WINDOWS

08 11 13 Hollow Metal Doors and Frames 5 08 14 16 Wood Doors 4 08 31 00 Access Doors 2 08 33 10 Roll-up Doors 3 08 4114 Curtainwall Windows 4 08 5114 Aluminum Windows 3 08 71 02 Finish Hardware 9 08 80 00 Glass and Glazing 3

OMSIQlvLa^EilsilSHES

09 2116 Gypsum Wallboard 8 09 22 16 Metal Studs and Furring 3 09 24 10 Exterior Plaster (Acrylic Finish) 5 09 30 13 Ceramic Tile and Thin-brick 3 09 30 16 Quarry Tile 3 09 5113 Acoustical Treatment 6 09 65 00 Resilient Flooring 4 09 68 10 Sheet Carpeting 7 09 72 00 FRP Wall Paneling 2 09 90 00 Painting 8

DIVISION 10-SPECIALTIES

10 05 00 Miscellaneous Specialties 6 A. Framed Dry-Markerboards H. Trophy Case B. Tackboard Wall Covering I. Safe C. Metal Lockers J. Cubicle Curtain and Track

1002 TABLE OF CONTENTS PAGE 2 3/30/2017 9:46:55 AM

Page 6: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

SECTION PAGES

D. Wall Protection K. Pipe Bollards E. Projection Screen L. Metal Shelving F. Grille Cloth M. Sliding Pass Window G. Flagpole

10 14 01 Dimensional Graphics and Signage 4 10 14 53 Exterior Access and Traffic Signage 3 10 2114 Plastic Toilet Partitions 3 10 28 12 Toilet and Bath Accessories 2 10 44 00 Firefighting Devices 2

DIVISIQNJLl^^i3UiPJVIEJNT

113110 Residential Appliances 4 11 41 20 Walk-In Boxes 11 11 44 00 Food Service Equipment 16 11 61 40 Stage Curtains and Rigging 4

12 2116 Vertical Louver Blinds 2 12 36 61 Solid Surfacing 3

DIVISION 13-(NOT USED)

14 24 00 Hydraulic Passenger Elevators 5 14 4216 Wheelchair Lift 4

DIVISION 15-19 (NOT USED)

DIVISION 20 - MECHANICAL

20 01 00 General Mechanical Provisions 8

21 05 01 Fire Sprinkler System 4

DIVISION 22-PLUMBING

22 04 00 Plumbing 22

DIVISION 23 - HVAC

23 08 00 HVAC 15

DIVISION 24 - (NOXUSJED)

DIVISION 25 - INTEGRATED AUTOMATION

25 00 00 Temperature Control System 29

1002 TABLE OF CONTENTS PAGE 3 3/30/2017 9:46:55 AM

Page 7: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

SECTJOii PAGES

DIVISION 26 - ELECTRICAL

26 00 10 Electrical Scope & General Requirements 14 26 00 30 Electrical Acceptance Tests 5 26 46 10 Dry Type Transformers 2

27 00 00 Communications 7 27 20 00 Data, Telephone 22 27 41 16.51 Integrated Audio - Video Systems: Classroom 6 27 41 16.62 Integrated Audio - Video Systems: Auditorium, (Multi-Use Rooms) 8 27 5113 Paging Systems, Clocks 4 27 51 16 Sound Amplification System (Multi-Use Room) 6

28 00 00 Electronic Safety & Security 6 28 16 00 Intrusion Detection 17 28 16 33 Intrusion Detection Interfaces 3 28 23 23 Video Surveillance Systems Infrastructure 2 28 31 11 Fire Alarm System 3

DIVISION 31 - EARTHWORK

31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control 4

32 12 16 Asphaltic-Concrete Paving 4 32 16 13 Concrete Curbs, Gutters, and Sidewalks 4 32 17 23 Pavement Striping and Marking 2 32 31 13 Chain Link Fencing and Gates 5 32 31 20 Steel Picket Fences and Gates 4 32 80 00 Landscape Irrigation 17 32 90 00 Landscaping 16

JDMSlOJOardLmLlIlES

33 10 00 On-Site Water Systems 5 33 13 00 Disinfection of Site Water Distribution System 4 33 30 00 On-Site Sewer System 5 33 40 00 Storm Drainage Improvements 5

1002 TABLE OF CONTENTS PAGE 4 3/30/2017 9:46:55 AM

Page 8: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

SECTION 01 11 0 1 : SPECIAL INFORMATION AND REQUIREMENTS

1.01 PROJECT PERSONNEL AND DUTIES (other than Contractor)

A. The Architect

1. Architect of Record: TAM+CZ, LLP, Architecture Planning Interiors 5650 N. Fresno St., Suite 110, Fresno, CA 93710 Identified Signer of Documents: Rodney V. Andreasen, Architect and Firm Principal Designated Alternate: J. Martin Temple, Architect Firm Principal

2. Consultants: as listed on Drawings for the Project. Each Consultant is responsible for review of submittals related to and for on-the-job review of construction related to its design scope.

3. The term "Architect" refers to the above-described Architect of Record (which together with the Consultants is termed the "Design Team"), which includes the Consultants listed. The duties and authority of the Architect during construction of the Project shall be as described in Exhibit A to this Section. Refer also to General Requirements Section 01 26 00 et. seq. for the definition and description of the formal paperwork related to the construction contract. Refer also to General Requirement Section 01 25 05 for the procedure for substitutions.

4. A Bidder or the Contractor shall not contact the Consultants direct, but is required to initiate inquiries regarding the Project via the contact person at TAM+CZ, or his designated in-office assistants. All official responses will be from Architect of Record, with concurrent copies to the related Consultant and the Owner's Representatives.

B. The Owner's Personnel

1. Inspector (or Inspector of Record). This position has the duties and authority as described in the General Conditions and state law. a. In the event that the Contractor is authorized to perform extra work on a "Time and Material"

basis, the Inspector shall be authorized to verify such hours and material uses. b. Depending on the size and scope of the Project, the District may employ assistants for the

Inspector.

2. Project Manager (PM). This position and title follows the policy of the District for terminology and duties. The person is the representative from the Facilities Division who is assigned to this Project. a. The PM is the District's Representative for this Project and is the first line of contact for the

Architect in seeking District response to issues related to the Project. b. Similar to the Architect's Consultants, questions related to the Project Documents or

substitutions or product equivalency should be initiated with the Architect, who in turn will contact the PM for District input.

c. The PM is the liaison with the District as regards the Contractor on issues other than Project Document interpretation or substitutions, especially as related to general District policy or (if the Project is an addition to an existing campus), coordination issues regarding that existing campus.

3. Other District or site personnel as the PM may designate.

ISSUED 3/16/2017 As Addendum No. 3

1002 3/21/2017 SPECIAL INFORMATION & REQUIREMENTS 01 11 01 - 1

Page 9: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

1.02 SCHEDULE OF VALUES

A. The Contractor shall submit a detailed breakdown of the Contract Price (Schedule of Values) for each of the Parts A & B for the Project. Each item in the Schedule of Values shall include its proportionate share of the applicable overheard and profit.

B. The Schedule of Values shall include separate sections for Building, the on-Site Development/Site Utilities and Off-site Development. Each section shall contain line items which in general conform to the line items portrayed in the Schedule required by Division 01 and shall indicate clearly all categories of the major subcontractors and / or construction work; specification section number is also a good guide.

C. If the Project includes more than one structure, the Schedule of Values shall include Site Development as a whole and each Building.

D. The Schedule of Values shall include the following. 1. The Schedule shall include a major subdivision entitled "PART A - The School Proper". The

Schedule Shall.

a. Fire Sprinkler Costs; (up to 5' from Building, underground. b. Fire Sprinkler Costs (including 5' from the Building) c. Site Lighting (not on building) d. All other site development costs, each as a line item (landscape, irrigation, concrete flatwork,

etc.) e. All other costs, each a line item (flooring, framing, etc.).

2. The Schedule shall include a major subdivision entitled "PART B - Offsite Costs". Off-site is defined as new property line to new property line.

3. The Schedule shall DflLcontain a subdivision PART C. 4. The Schedule shall include a major subdivision entitled "clearing the portion called

"PART D -Temporary Building Area" One cost to be displayed, including:

a. District to remove temporary, factory-built buildings. b. Contractor to accomplish required demolition. c. Contractor to install new irrigation and planting, including turf, per shts. L1.0 thru L5.2 d. Contractor to install accomplish earthwork requirement.

5. The Schedule shall have a major subdivision entitled "Eliminate the Existing Ponding Basin". The Schedule shall include under Site Development:

a. Demolition of the fences and gates, (per Spec. Sec. 02 41 14, Art. 3.04) and piping and "Outlet Structure".

b. Placement of fill as completed fill (per Spec. Sec. 31 23 00). c. Surface treatment as grading, (includes PART E).

1.03 QUALITY CONTROL

A. The Contractor is required to install each category of material or system, at the least, to the average of the current workmanship standards is to be expected of institutional work in 2017 in this part of California. Many Sections of this Specification specify higher standards, or specify accepted industry standards; such specified standards shall be required for this Project.

ISSUED 3/16/2017 As Addendum No. 3 01 11 01 - 2 SPECIAL INFORMATION & REQUIREMENTS 3/21/2017 1002

Page 10: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

B. The Owner expects the General Contractor, via its Job Superintendent, to review all workmanship, and to demand of its own workers and subcontractors conformance with the specified standards of workmanship, and proper installation of all products and systems shown and / or specified, including the Consultant's designated systems. The Contractor shall comply with the Contract Documents if previous observations by the Architect / Engineer or the Inspector have not identified failure to meet the requirements.

C. During the course of construction, either the Inspector, the District's PM, or the Architect is authorized to call the Contractor's attention to inadequate workmanship, and demand that the work be improved (or replaced) to meet the requirement standards. Such requirement for improvement shall be communicated to the Architect, and should be noted in writing, with copy to the Architect.

D. During the course of Construction the Architect's consultants will visit the Project for review of each Consultant's related work, at approximate points in the construction process.

1.04 ELECTRONIC FILE AVAILABILITY

A. Read-only Files: PDF format files will be made available to the General Contractor, via a CD with all sheets recorded thereon. The Architect will not allow, nor will it allow the printing company holding the Project drawings, to print a partial set for any person or entity.

B. Autocad (editable) Files: The Architect has produced the Project in Autocad, and will make available, after the Project has been awarded and subcontractors are officially listed, and only to the General Contractor or its subcontractors, certain drawing sheet numbers in Autocad on CD.

1. Availability will be limited to site-plan-related sheets but in all design disciplines. 2. The contractors involved will be required to sign an understanding/release form. 3. There will be a charge to the General Contractor of $960 per Drawing Sheet number so

requested, to compensate the Architect for the staff time required to create the "bound" sheets.

1.05 ON-SITE UTILITIES

A. The on-site utilities will only be in/or related to the Weldon Ave. frontage; there are none in the Valentine Ave. frontage.

B. City of Fresno utilities. The pipelines required to serve the school shown in these Drawings are already in place. Provide the materials required to complete the connection is shown in the Drawings.

C. Utility-company owned facilities. Provide labor and materials required to complete the connection for the school as shown in the Drawing. To the extent that the Rule 16 requires the utility company to provide such as part of its requirements, the utility company shall provide such.

1.06 THIS PROJECT 1002

A. This Project is to complete the construction of a permanent Elementary School Campus at the Valentine-Weldon site. There is already an operating school at that site, although it is housed in temporary building facilities of a factory-built type and an outdoor playing/parking area related to Valentine Ave..

B. DSA has approved two projects, which together complete the steps that Central Unified School District some years ago realized that would form the campus that we now see.

ISSUED 3/16/2017 As Addendum No. 3 1002 3/21/2017 SPECIAL INFORMATION & REQUIREMENTS 01 11 01 - 3

Page 11: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

C. The DSA approvals:

1. Appl. #02-113619, implemented by TAM+CZ Project 1407 2. Appl. #02-113972, implemented by TAM+CZ Project 1002.

D. PARTS which make up the whole Site:

1. PARTS A&B: Standard design with new work by Architect & Agencies, each Professional with a contract issued, by District.

2. PART C: Play area and parking lot are existing. The District is responsible for moving the factory - built portables. Each piece of piping missing under asphalt shall be subject to discussion with Owner.

3. PART D: The temporary school will be relocated by the District, (to another site needing factory-built buildings). The Contractor will remove concrete paving/fences and piping, and the site turned into turfed play area. a. Install plants and irrigation, and demolition of existing facilities. b. Limits of new Grading per C3 apply to L4.3 and L4.4, as well as other sheets. c. Demolition shall comply with Art. 1.02 D. of Sec. 01 11 00, issued with Adden. No. 1

4. PART E: The Drawings require the Contractor to do what's necessary. 5. Existing Ponding Basin. The new offsite curbs which forms W. Weldon Ave. are indicated; the

new offsite curbs which form that new street essentially bisects the existing Ponding Basin (after the existing Ponding Basin has been eliminated).

1.07 OPERATION OF PROFESSIONALS: PROJECT PARTS A (and D) and B

A. PART A (and PART D as it is modified to a permanent configuration)- Permanent School with

Prime Design Firm: TAM+CZ, LLP

Project Documents: Drawings, Sheets 00 thru Sheet F-10 and Project Manual. (Including Sheets C1 thru C6)

Building Official (Agency of Jurisdiction): DSA (Division of the State Architect) issues authority to construct (in this case the approved Drawings and Specifications). The District's Inspector of Record (IR) is also a DSA inspector, although the DSA field inspector will additionally call on the Project during the construction of the Project.

Submittals: Contractor shall submit to TAM+CZ, which will be responsible for reviewing (or cause it's Consultants to review) all such submittals.

A/E Instructions to Contractor: Coordinated by TAM+CZ.

Review of Monthly Contractor Pay Request: IR and TAM+CZ.

B. Part B - QfisJte_^ej/eJopmejii

Prime Design Firm: Alan Mok, Civil Engineer (Consultant direct to District). Hired direct by District.

Project Documents: Drawings: Sheets C1 thru C18 (C1 thru C6 apply to both PART A and B).

Specifications: Project Manual references to Agency Standard Specifications.

ISSUED 3/16/2017 As Addendum No. 3 01 11 01 - 4 SPECIAL INFORMATION & REQUIREMENTS 3/21/2017 1002

Page 12: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

Agencies of Jurisdiction: City of Fresno and County of Fresno, and FMFCD. These agencies will have their inspection forces, whose directions will have priority with the Contractor. The IR will not have jurisdiction on technical or quality control issues. All Jurisdictional Agency discussions regarding the offsites will be handled direct by the Office of Alan Mok with the respective Agency. TAM+CZ and IR roles are strictly limited to the overall project schedule and on-site/off-site systems transition coordination.

Submittals: Contractor shall make submissions to TAM+CZ, which will pass the data on to the Mok Office for review. The Mok Office will apply its review stamp, not TAM+CZ (the architectural firm will act as a "traffic director"- only for this PART B).

AE Instructions to Contractor: The Mok Office deals direct with Contractor, with information copy only to TAM+CZ and IR. Likewise, the Mok office will discuss issues direct with the District (as its client).

Review of Monthly Contractor Payment Requirements: The Mok Office deals direct with District.

1002 3/21/2017 ISSUED 3/16/2017 As Addendum No. 3 SPECIAL INFORMATION & REQUIREMENTS 01 11 01 -5

Page 13: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

SECTION 01 32 12: CONSTRUCTION SCHEDULING

PART1: GENERAL

1.01 DESCRIPTION

A. This Section sets forth the requirements related to a CPM construction schedule, and the phasing and scheduling required of the Contractor in performing the work of the Project.

1.02 PREPARE CPM SCHEDULE

A. Within twenty five (25) calendar days after receiving the Notice to Proceed, Contractor shall submit a Progress Schedule for District's approval. The Schedule shall include PARTS A, B, D and E and work on the Ponding Basin, and shall indicate the beginning and completion dates of all phases of construction and the PARTS, and shall use the critical path method (commonly called CPM) or equivalent scheduling methodology for the value reporting, planning and scheduling, of all work required by the Contract Documents. The Schedule will separately identify those milestones or events that must be completed before other portions of the Project can be accomplished.

B. The scheduling is necessary for the District's adequate monitoring of the progress of the Project and shall be prepared in accordance with the construction time frame described in this section of the Specifications. The District may disapprove such a Schedule and require modification to it if, in the opinion of the Architect and District, adherence to the Schedule will cause the Project not to be completed in accordance with the Contract Contractor shall adhere to any such modifications required by the District. Contractor shall exchange scheduling information with subcontractors and suppliers, Contractor shall order submittals, work, equipment and materials with sufficient lead time to avoid interruption of the Work/Project.

C. The Contractor shall submit to District a monthly schedule with Contractor's pay application to reflect the actual sequence of the Work which shall be totally separate and apart from the original progress schedule. Failure to submit with result in rejection of pay application.

D. The Contractor shall also, if requested by the Architect and District, provide revised schedules within ten (1 0) calendar days if, at any time, the Architect and District consider the completion date to be in jeopardy. The revised Schedule shall be designed to show how the Contractor intends to accomplish the work to meet the original completion date. The form and method employed by the Contractor shall be the same as or the original progress schedule. The Contractor shall modify any portions of the Schedule that become infeasible because of activities behind schedule or for any other valid reason. Contractor shall provide documents and justification for any schedule changes. An activity that cannot be completed by its original completion date shall be deemed to be behind schedule.

E. Contractor shall submit a revised Schedule within ten (1 0) consecutive calendar days of Contractor's request for any extension of time. Failure to submit such schedule will result in Contractor waiving its right to obtain any extension of time.

F. If Contractor submits a revised Schedule showing an earlier completion date for the Project, District's acceptance of this revised schedule shall not entitle Contractor to any delay claim or damages due to any revised Schedule, or any additional compensation for early completion.

ISSUED 3/16/2017 As Addendum No. 3 1002 3/21/17441:42PM 3/13 CONSTRUCTION SCHEDULING 0132 1 2 - 1

Page 14: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

1.03 PHASING REQUIREMENTS

A. PHASE 1: PARTS A & B

1. Construction of PARTS A&B may start upon receipt of the NTP and proceed to completion within stipulated construction time, including all submittals and ordering related to the project. Stipulate the calendar days, not to exceed 548 calendar days. Contractor to be loaned the plans of Project 1407.

2. PART B - OFF-SITE WORK: PART B Shall be completed in time to move traffic east-west the width of the site. This traffic shall be able to turn the corner at Valentine Ave. and Weldon Ave.

B. PHASE 2 & 3, PART D

1. PHASE 2: The District will move-in to the new building upon completion of Phase 1, at the start of "Moving the Temporary School Off the Campus." Phase 2A - District to move the factory built buildings off the campus. Phase 2B - Contractor to Demo surface features: fences, curbs and concrete flatwork. Phase 2C - Contractor shall shown water and storm drain systems (saving those indicated)

Assign 60 Calendar Days for the Moving/Demolition).

2. Phase 3: Contractor to complete PART D, including: Phase 3B - Complete new irrigation and landscaping per "L" sheets Phase 3C - Turf area to existing the concrete curb at south.

Assign 60 Calendar Days, the time for turf to grow.

C. Contractor shall confer with the on-site school administration to determine mutually acceptable intermediate dates within the construction time framework, which will then be reflected in the Schedule required by this Section.

D. Work done at other than vacation times, will be during regular school time and is subject to utility interface requirements of Specification Section 01 12 00, Para. 3.04. Work done during holiday and vacation time will be deemed to allow contractor to interrupt utilities at its convenience.

1.04 RELATED TIME OF CONSTRUCTION

A. In light of the Construction and Phasing Requirements, the specific dates are herewith translated into the following allowed calendar days for completion of the Project: The Contractor shall enter required complete all Phases (PART A&B [including work on the existing Ponding Basin] and PART D) of the project in 548 calendar days from the Notice to Proceed. The finite number "548 calendar days" is the Time of Construction and is the number stipulated on Page 6/6 in the Instructions To Bidder

ISSUED 3/16/2017 As Addendum No. 3 0 1 3 2 1 2 - 2 CONSTRUCTION SCHEDULING 3/21/1744142 PM 3/13 1002

Page 15: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

2. Upper section of glazing is stationary, bottom section slides, with wool pile closer against stainless steel countertop. Slides functions with nylon runners over coiled compression springs, has finger guides for lifting. Equal to Nissen & Co. Series C window.

3. Mount tightly in painted hollow metal frames with OH machine screws, csk.. Custom size if required, to fit tightly in fabricated hollow metal frame.

N. FIBER-CEMENT PRODUCTS

1. Fiber-Cement Siding Panels: Made from fiber-cement board that does not contain asbestos fibers; complies with ASTM C 1186, Type A, Grade II; is classified as noncombustible when tested according to ASTM E 136; and has flame-spread index of 25 or less when tested according to ASTM E 84. a. Basis-of-Design Product: James Hardie, Inc. b. Available Manufacturers:

1) ABTco 2) CertainTeed Corp. 3) GAF Materials Corporation

2. Mechanical Screen: Hardipanel 5/16 inch thick, 4' wide sheets. a. Smooth, primed face, equal to Hardie Plus factory prime. b. Fasteners: stainless steel ribbed, bugle head, for steel studs

3. Installation: a. Apply to furring channels or shown in 5/A-9.10.2. b. Fasten panels to steel substrate with specified fasteners. Comply with manufacturer's

fastener spacing requirements. c. Vertical joint treatment:

1) Leave 1/8" space between abutting edges. d. General: comply with manufacturer's written installation instructions applicable to products

and applications indicated unless more stringent requirements apply. e. Cracks at panels (especially those related to the nailing/fastening operation) shall be cause

for replacement of the whole panel.

Add Para. N. per Adden. No. 3 10 05 00 - 6 MISCELLANEOUS SPECIALTIES 1002 3/16/2017 2:56:20 PM

Page 16: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

PARTC

LEGEND: PART A

PART B

PARTC

; ;, .; - V - V PARTD

rj^.iTSj? PART E

SCHEMATIC SITE PLAN SCALE: NONE

r

1HX I_I_I=

^ • - - J

A R C H I T E C T U R E ® P L A N N I N G • INTERIORS 5 B 5 D N . F R E S N O S T R E E T , S U I T E 1 1 0 F R E S N O , C A 9 3 7 1 D PHONE E59) 43B-47BO FAX [568] 435-4774

Valentine - Weldon Elementary Central Unified School District

Job No.

1002 v > ^

0 3 / 2 4 / 2 0 1 7 Dwg. No.

ADD3-1A

Page 17: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

BUILDING by SEE SHEET*!

REMOVABLE MULLION (SHOWN DASHED)

DOOR/GATES, SEE SHEET AO.O

AA-7.1 NOTE: REFER TO DETAILS 11/A0.9.2, 7/A0.9.2 AND 9/A0.9.2 SIM, FOR ADDITIONAL INFORMATION

A UILDING B.

+23 ' -4w

T.O. STEEL

T a CONC. COLUMN

, + 1 3 - 6 " 'T.O. FACIA

, + 1 0 - 0 ° 'B.O. FACIA

TYPICAL STEEL PICKET SYSTEM

TYPICAL STEEL PICKET SYSTEM WITH SECURITY MESH

«#~-°:

SEE SHEET AB-7.1

<U 1AENTRY STRUCTURE EXTERIOR ELEVATION SCALE: 1/4"=1'-0'

REFER TO ORIGINAL SHEET NO. AO.9.5.1

T ; V ^ -i^.lnnHKP* A R C H I T E C T U R E © P L A N N I N G • INTERIORS

S B S O N . F R E S N O S T R E E T , S U I T E 1 1 0 F R E S N O , C A 9 3 7 1 0 PHONE CBBSJ 435-4750 FAX (5S9) 435-4774

Valentine - Weldon Elementary Central Unified School District

1002 0 3 / 2 4 / 2 0 1 7 Dwg. No.

ADD3-4A

Page 18: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

=x

VALENTINE

PARTIAL EXISTING/DEMOLITION SITE PLAN

REFER TO ORIGINAL SHEET NO. A0.1 SCALE: 1"=40'-0"

L L P

v l .: J-.1)

ARCHITECTURE © P L A N N I N G © INTERIORS S 6 5 0 N . F R E S N O S T R E E T , S U I T E 1 1 Q F R E S N O , C A B 3 7 1 D

PHONE C5BS) 43B-47BO FAX C5BS) 435-4774

r Valentine - Weldon Elementary ^ Central Unified School District

Job No.

1002 Date

0 3 / 2 4 / 2 0 1 7 Dwg. No.

ADD3-11A J J

Page 19: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

^hifiy

CIVIL ADDENDUM

DRAWINGS

1. SHEET CO, TOPOGRAPHIC SURVEY: a. ADD the Topographic Survey to the project drawings as shown on the attached

Addendum Drawing Labeled Exhibit "A".

2. SHEET C3, GRADING AND DRAINAGE PLAN: a. REVISE the grades as shown on the attached Addendum Drawings labeled Exhibit "B" to

"E".

Page 20: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

/2BI//S& /»*3£> *

Page 21: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

/Z&//S&

MS=C2B5.83-

0t//ij?M/4> *e

rD286.17

if($./;• ^\\ JJ^T^io.C 25141 jJf

v 'ivy* -t^^>\l<$$-//

Page 22: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

a

/ *

/ZGV/5&

286,50 2.2X

-P286.1& MATCH L

P=Cy

286.57 g

(TYP) i-jx

Page 23: File index no. tam+c - 1.cdn.edl.io · 31 23 00 Earthwork 7 31 23 16 Trench Excavation and Backfill 4 31 23 23 Soil Materials 2 31 23 25 Aggregate Base Course 2 31 31 16 Termite Control

/»*&#'

GZ0O

y/3&

H'No.C 25141, J "A

d&MW