Upload
coty
View
52
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Final Project: Bridge Building. Lior Shimonovich and Adam Drozdowski. Possible Designs. Suspension. Flatbed. Why we chose flat…. Stability Easier to build Lighter Time Material contraints. The building process. -Glue sticks together. The building process (cont’d). - PowerPoint PPT Presentation
Citation preview
Final Project:Final Project:Bridge BuildingBridge Building
Lior ShimonovichLior Shimonovichandand
Adam DrozdowskiAdam Drozdowski
Possible DesignsPossible Designs
Suspension
Flatbed
Why we chose flat….Why we chose flat….- StabilityStability- Easier to buildEasier to build- LighterLighter- TimeTime- Material contraintsMaterial contraints
The building processThe building process
-Glue sticks together
The building process (cont’d)The building process (cont’d)
-stick units together by glue
main structure
The building process (cont’d)The building process (cont’d)
The building process (cont’d)The building process (cont’d)
-The polymers were super-glued onto the bridges main structure
-Everything is clamped down
The building process (cont’d)The building process (cont’d)
The building process (cont’d)The building process (cont’d)
The building process (cont’d)The building process (cont’d)
-Road surface
The building process (cont’d)The building process (cont’d)
-More reinforcement
In ConclusionIn Conclusion
Our bridge can hold…