Foothill College Site ImprovementsFoothill – De Anza Community College District

Board of Trustees Presentation

May 7, 2012

1 of 17

Page 2: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

- Campus Outreach Efforts

- Project Timeline & Construction Phasing

- #162 Parking & Circulation- Phase 1 Summer 2012- Phase 2 Summer 2013

- #144 Central Campus Site Improvements

- Summer & Fall 2012

- Mitigation of Construction Impactswith emphasis maintaining enrollment

2 of 17

PRESENTATION OVERVIEW

Page 3: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

PROJECT TEAM & OUTREACH EFFORTS

Steering CommitteeFrank Nunez (FHDA)

Art Heinrich (FHDA)

Shirley Treanor (Foothill)

Brenda Visas (Foothill)

Annette Stenger (Foothill)

Chief Ron Levine (Police)

Todd Leicht (Gilbane / Maas)

Campus OutreachSustainability Committee

Building & Grounds

Academic Senate

Administration Council

Classified Senate

Planning & Resource Committee (PaRC)

President’s Cabinet

Associated Student Body (soon)

Central Services (soon)

Project Design TeamWRNS Studio (Wright Sherman)

Meyer Silberberg Land Architects

SANDIS, Civil Engineers

Fehr & Peers, Traffic Engineers

Silverman & Light

Crosby Group , Structural Engineers

Technical OutreachTraffic Studies

VTA

District Police

3 of 17

Page 4: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

GUIDING PRINCIPLES• Maintain student enrollment • Limit impact on educational offerings• Student safety• Maintain accessibility and circulation• Convenience• Sustainability• Apply engineering best practices

GOALS• Safety Improvements: Vehicle, pedestrian, bicycle • Enhance and improve accessibility• Limit impact on parking • Aesthetics – maintain beauty of campus• Lighting improvements and signage• Reduce traffic congestion & improve efficiency• Protect, renew, and enhance the integrity of the

campus• Improve storm-water management

CONSTRUCTION PROCESS

4 of 17

Page 5: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

SUMMER 2012:

• Extensive Construction Throughout Central and Outer Campus

• PSEC Bus Stop Closed

FALL 2012:

• Irrigation and Planting will continue

• Northern Threshold and Stairs under Construction

• New Pathways will be Accessible, Safe, Barrier Free

• Improved Pathway Lighting

• Fountains Restored

EXPECTATIONS FOR SUMMER & FALL 2012

5 of 17

Page 6: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

De Anza Combined Site Improvements Phase IFoothill Utilities Infrastructure Project Phase I

• Minimize impact on enrollments

• Minimize impact on parking

• Clearly defined paths for travel (signage)

• Utilize proven Campus Notification Protocols- Steering Committee- Foothill Fusion Newsletter- Measure C Construction Web Page

- Collaborative Scheduling with Contractor and College

6 of 17

LESSONS LEARNED & BEST PRACTICES

Page 7: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

• Coordinate Construction with Academic Calendar

• Maintain Accessible Routes

• Emergency Vehicle Access

• Comprehensive Signage Plan

MITIGATION OF CONSTRUCTION IMPACTS

7 of 17

Page 8: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

Parking & Circulation Projects 8 of 17

Project #162 – Parking & Circulation

IMPROVEMENTS:• New lighting• Accessibility routes• Bus Stop & Crossings• Landscaping• Storm water Management

Phase 12012

Lot 4b

Page 9: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

Parking & Circulation Projects 9 of 17

IMPROVEMENTS:• New lighting• Accessibility routes• Bus Stop & Crossings• Landscaping• Stormwater Management

Phase 2Summer 2013

Phase 1Summer 2012

Project #162 – Parking & Circulation

Lot 4b

Page 10: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

Parking Lot 2/3 Plan

IMPROVEMENTS:• Widen PE Access Road• Upgrade stairs to meet Code • Lighting upgrades• Landscape buffer• Pedestrian & Vehicle Circulation• Stormwater Management

10 of 17

Project #162 – Parking & Circulation

Page 11: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

Parking Lot 2/3 Plan

IMPROVEMENTS:• Widen PE Access Road• Upgrade stairs to meet Code • Lighting upgrades• Landscape buffer• Pedestrian & Vehicle Circulation• Stormwater Management

11 of 17

Enhanced pedestrian crossing safety measures

Emergency Access Only

PE Access Road closed for summer

Pathway closed for summer

Project #162 – Parking & Circulation

Access to PE

Page 12: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

PSEC Threshold Plan

IMPROVEMENTS:• Enhanced pedestrian plaza• Larger, safer bus stop• Safe waiting area @ bus stop• Improved sight lines for safety• New Traffic signal

5700

5800

4300

PSEC

12 of 17

5600

Bus stop closed for summer

Project #162 – Parking & Circulation

Page 13: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

Project #144 – Central Campus Site Improvements

13 of 17Central Campus Master Plan

IMPROVEMENTS:• Renovate Courtyards• Improve Pathways• Pathway Lighting upgrades• Accessibility• Landscape Renewal• Tree Replacement

Page 14: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

Project #144 – Central Campus Construction Timeline

14 of 17

PROJECT #144 CENTRAL CAMPUSCONSTRUCTION TIMELINE 2012Area 1 JULY – SEPTArea 2 AUG – SEPTArea 3 JULY – SEPTArea 4 OCT – DEC

Page 15: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

Project #144 – Central Campus Construction Mitigation & Accessibility

15 of 17

2012 CONSTRUCTION

Area 1 JULY – SEPTArea 2 AUG – SEPTArea 3 JULY – SEPTArea 4 OCT – DEC

Page 16: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

Project #144 - Central Campus Tree Replacement

16 of 17

Page 17: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

Project #144 - Central Campus Tree Replacement

16 of 17

Chinese Elm White Ash “Autumn Purple”Ginko biloba “Princeton Sentry”London Plane “Columbia” (existing)

Page 18: Foothill College Site Improvementsfhdafiles.fhda.edu/downloads/aboutfhda/FHSite... · 7.05.2012  · -Campus Outreach Efforts -Project Timeline & Construction Phasing-#162 Parking

Foothill College Site ImprovementsFoothill – De Anza Community College District

Board of Trustees Presentation

May 7, 2012