FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS QUARTZ & CAT’S EYE MINE WITH Proposed Production Capacity of Epidote, Semi-Precious Quartz & Cat’s Eye @ 1.10 TPA Method of Mining - Semi-mechanized open cast Lease Area – 4.0515 Ha., M.L.No. - 1/1997(R) Project Cost – 30 Lakh, Mineral – Epidote, Semi-Precious Quartz & Cat’s Eye Mining project - Category “B2” Near Village – Manoharpur Bishangarh, Tehsil – Shahpura, District – Jaipur, State – Rajasthan Objective of the Project For EC Submission of Application for Environmental Clearance as per MOEF Gazette Notification 15.01.2016 ENVIRONMENT CONSULTANT EKO PRO ENGINEERS PVT. LTD. (Accredited by QCI/NABET, List ‘B’ S.No.-06, Rev. 05/Dec. 16, 2016) 32/41, South Side of GT Road, UPSIDC Industrial Area, Ghaziabad (U.P) – 201009 Ph. No. 0120-2867931, 09810243870 Email: [email protected] PROJECT PROPONENT SHRI ABDUL SALAM S/o Shri Abdul Sattar R/o – House No. - 308, Old Jalupura, Jaipur (Rajasthan)-302001 Ph. No. - 9314641763 E-Mail: [email protected]

FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

Embed Size (px)

Citation preview

Page 1: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

FORM-IM &

PRE-FEASIBILITY REPORT FOR

PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS QUARTZ & CAT’S EYE MINE

WITH

Proposed Production Capacity of

Epidote, Semi-Precious Quartz & Cat’s Eye @ 1.10 TPA

Method of Mining - Semi-mechanized open cast

Lease Area – 4.0515 Ha., M.L.No. - 1/1997(R)

Project Cost – 30 Lakh,

Mineral – Epidote, Semi-Precious Quartz & Cat’s Eye

Mining project - Category “B2”

Near Village – Manoharpur Bishangarh,

Tehsil – Shahpura,

District – Jaipur,

State – Rajasthan

Objective of the Project – For EC

Submission of Application for Environmental Clearance as per MOEF Gazette Notification 15.01.2016

ENVIRONMENT CONSULTANTEKO PRO ENGINEERS PVT. LTD.

(Accredited by QCI/NABET, List ‘B’ S.No.-06, Rev. 05/Dec. 16, 2016)

32/41, South Side of GT Road,UPSIDC Industrial Area,

Ghaziabad (U.P) – 201009Ph. No. 0120-2867931, 09810243870

Email: [email protected]

PROJECT PROPONENT

SHRI ABDUL SALAM S/o Shri Abdul Sattar R/o – House No. - 308, Old Jalupura, Jaipur (Rajasthan)-302001 Ph. No. - 9314641763 E-Mail: [email protected]

Page 2: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

Form-1M Basic Information

Submission of Application for Environmental Clearance of ‘B2’ Category

Mining Project as per MOEF Office Gazette Notification 15.01.2016

Mineral – Epidote, Semi-Precious Quartz & Cat’s Eye

Method of Mining - Semi-mechanized open cast

Mining project - Category “B2”

Proposed Production – Epidote, Semi-Precious

Quartz & Cat’s Eye @ 1.10 TPA

Lease Area – 4.0515 Ha. (M.L.No. 1/1997 (R))

Project Cost - 30 Lakh

Near Village – Manoharpur Bishangarh,

Tehsil – Shahpura,

District – Jaipur,

State - Rajasthan

PROJECT PROPONENT

SSHHRRII AABBDDUULL SSAALLAAMM S/o Shri Abdul Sattar,

R/o – House No. - 308, Old Jalupura, Jaipur (Rajasthan)-302001

Ph. No. - 9314641763 E-Mail: [email protected]

Page 3: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

1

FORM 1 M

APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

(I) Basic Information

(i) Name of the Mining Lease site : Epidote, Semi-Precious Quartz & Cat’s Eye Mining Project of Shri Abdul Salam S/o Shri Abdul Sattar (M.L.No. 1/97(R), Lease Area – 4.0515Ha.), Located near village- Manoharpur Bishangarh, Tehsil – Shahpura, District – Jaipur (Rajasthan).

(ii) Size of The Mining Lease (Hectare): 4.0515 Ha.

(iii) Capacity of Mining Lease (TPA) : 1.10 TPA

(iv) Period of Mining Lease : 30 Years

(v) Expected cost of the project : 30 Lac

(vi) Contact Information : Shri Abdul Salam S/o- Shri Abdul Sattar R/o House No.-308, Old Jalupura, Jaipur (Rajasthan) Pincode-302001, Ph.No. 09314641763 E-Mail: [email protected]

(II) Environment Sensitivity

S.No. Areas Distance in Kilometer/Details

1. Distance of Project site from nearest rail or bridge over the concerned River, Rivulet, Nallah etc.

Not Any

2. Distance from Infrastructure facilities Railway Line National Highway State Highway Major District Road Any Other Road Electric transmission line pole or tower Canal or check dam or reservoirs or ponds In-take for drinking water pump house Intake for Irrigation canal pumps

Nearest railway station is Chomu Railway Station about 27.00 km in SW direction from the mine site.

National Highway No. 8 about 2.35 km in North East direction from the mine site.

State Highway No. 37 about 8.56 km in South West direction from the mine site.

3 Area protected under international conventions, National or Local legislation for their ecological, landscape, culture or other related value

Not Applicable

4. Area which are important or sensitive for ecological reasons – Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests

Madhabini Nadi about 0.15 Km North direction of mine site. Mamtori ka Bandh about 1.88 Km South West direction of mine site.

5. Area used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting over wintering, migration

Kairli PF about 0.75km NE direction of mine site. Bidara PF about 3.90km NE direction of mine site.

Page 4: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

2

Manoharpur Bishangarh PF about 1.02km SE direction of mine site. Surana RF about 5.90km East direction of mine site.

6. Inland, costal, Marine or underground water

Not Applicable

7. State, National boundaries Not Applicable

8. Routes or facilities used by the public for access to recreation or other tourist, pilgrim area

Not Applicable

9. Defence installations Not Applicable

10. Densely population or built-up, distance from nearest human habitation

Manoharpur which is located about 2.13km in SE direction of mine site. Bishangarh which is located about 2.89 km in NW direction of mine site.

11. Area occupied by sensitive man-made land uses (hospital, Schools, place of worship, community facilities)

Manoharpur which is located about 2.13km in SE direction of mine site. Bishangarh which is located about 2.89 km in NW direction of mine site.

12. Area containing important, high quality or scarce resources (ground water resources, surface resources, forestry agriculture, fisheries, tourism, Minerals)

Madhabini Nadi about 0.15 Km North direction of mine site. Mamtori ka Bandh about 1.88 Km South West direction of mine site.

13. Area already subjected to pollution or environment damage. (those where existing legal environment standard are exceeded)

None

14. Area susceptible to nature hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslide, erosion, flooding or extreme or adverse climate conditions)

The area is not prone to flood and earthquake. No such incident is reported in this area so far. From view point of seismicity, proposed project comes in Zone-II (Low Damage Risk Zone) of Seismic Zoning Map of India.

15. Is proposed mining site located over or near fissure/fracture for ground water recharge

Not Any

16. Whether the proposal involves approval or clearance under the following Regulations or Acts, namely:-

(a) The Forest (Conservation) Act, 1980;

(b) The Wildlife (Protection) Act, 1972;

(c) The Coastal Regulation Zone Notification, 2011. If yes, details of the same and their status to be given.

None

17. Forest land involved (Hectare) None

18. Whether there is any litigation pending against the project and/or land in which the project is propose to be set up?

(a) Name of the Court

None

Page 5: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

3

(b) Case No. (c) Orders or directions of the

court, if any, and its relevance with the proposed project

(Signature of Project Proponent)

Name :- Shri Abdul Salam, S/o Shri Abdul Sattar

Address:- R/o- House No.-308, Old Jalupura, Jaipur (Rajasthan) Pincode-302001,

Page 6: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

(I) Basic Information:

S.No. Ilenr DetailsI Namc of Project Epidote, S€mi-Precious Quartz & Cats Eye Mining

Project (M.L. No.-1l97(R), tuea - 4.0515 Ha.) locatedn/v-Manoharpur Bishangarh, Tehsil-Shahpura,District-Jaipur, Raiasthan of Shri Abdul Salam.

2. S.No. in theschedule Schedule 1(a) Category 82Consideration of proposal for grant of environmentalclearance under EIA Notificatiorl 2006. The proiectcomes in ore category of 'BZ as per MOEF CircularNo.l-13012 / 12/ 2O13-l A-II(II Dated 24.12.m13.

3. ProposedCapacity/area/length/ tonnageto be handled/commandarea/lease area/number of wellsto be drilled.

Epidote, Semi-Precious Quartz & Cats Eye @

1.1mPAM.L. Area=4.0515 Ha.

4 New/Iixpansion/ Mod.mization Existing

5 Existing Capacity/Area Etc NiIArea - 4.0515 Ha

Category of Proj.ct i.e. 'A' or'B' Consideration of proposal for grant of environmentalclearance under EIA Notificatior! 2006. The projectcomes in the .ategory of'82 as per MOEF OfficeMemorandum No. f1n12/12/201tlA-II0) Dated24.12.2013.

7 Does it attract the generalcondition? ff yes, please specify.

No, it does nol atb.(t the gcneral condition.

Does it attract the specifi€condition? If yes, please specifu.

No, il do€s not attracl the specific condition.

Location The lease area is lo<ated n/v- ManoharpurBishanSarh, Tehsil- Shahpura, District-Jaipur,Raiasthan. The area falls in Sulvey of IndiaToposheet No. 45M/15. Demarcation report isAnnexed as Annexute No.1.

Plot/Survey/Khasra No.132133,1U

1.13

135,139

t4t,144, t46

0.3510Ha.

0.,,511..

o.PO llr.2-4505 Ha.

C.M. Ma.gtEtG M. Nadi

4.0515IJ.

M,L,NO. 1/e7(R)

Villagc Manoharpur BishanSarh

Shahpura

District lai[,ur

9

Rajasthan

Raitway station/Airportth distance in Kh

Railway Station -27.30 km in SWdirection of mine site.Loharwada

*i <@aParrr

saa[,

APPENDIX- IFORM.1

8.

]'etuil

Page 7: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

,aipur Airport -54.65 km in SSW direction of minesite.

11 Nearest Town,Headquartersdistance in Km.

City, Districtalong with

Nearest town/city is Manoharpura about 2.5() km SEof mine site. Djstrict headquarter is at ,aipur about-45.60 km in SW direction of mine site.

12_ VillaSe Panchayatr, ZilaParishad, Municipal Corporation,l-ocal body (completc postaladdress€s with telephone nos. tobe siven)

Zila Parishad - Jaipur SW direction of mine site.Municipal Corporation ' Jaipur

r3. Name of the Applicant

t1 Registered Address R/o - House No.-308, OId Ialupum.laipur, Raiasthan

Addrcss for Correspondence:

Namc Shri Abdul Salan S/o Ab.lul Satlar

Desitnation(Owner/Partner/CEO)

Oivner

Pir Code 302001

E-'nail [email protected]

Telephone No. 9314611763

t5

Fax No

16 Details of Alternative SitesExamined, iI any. Location ofthese sites should be shor /n on atoposheel

This is a site specific proiect, which cannot be shifdelsewhere due to availability of mineral- Hence noaltemative site can be choscn. Location map of leasearea is given on toposheet.

17 Interlinked Proje(ts None

18 Wlether separate application ofinterlinked proiect has teensubmitted?

19 If yes, date of submission Notapplicable

20 If no, reason

Not applicable21 Whethe, the proposal involvesapprovayclearance under: If yes,details of the same and theirstatus to be given.(a) The forest (Cons€wation)

Act,1980?(b) The Wildlife (Protection)

AcL 1972?

(c) The C.R.z Notification,lqr?

No22 Whether there is anyGovernment order/ Policyrelevant/ relating to this site?

None23 Forest llnd involved (Hectares)

ffiryNone24_ Whether there is any Iitigation

pendinS against the proiectand/or land in which the proiectis proposed to be set uP?(a) Name of the court

c*ozta!,D+ *dul Salarn

,vo, I/97 (RJ

Shii Atrdul Salanr

R/o - House No.-308, Old .lalupula Jaipur, Raiasthan

Page 8: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

(b) Case No.(c) Orderc/ Diiections of the

cou4 if any and itsrelevance with the proposedproiect

(II) ACTIVITY

1. Construction, operation or decommissiordnt of the Proiect involvingactions, which will cause physical changes in the locality (topogaphy,land use, changes in water bodies, etc.)

S.NoInformatiov Checklisl

confirmation No

Details thereof (with approimate quantitiesfates, wherever possible) with source of

information data1.1 Permanent or temporary

change in land use, Iandcover or topogaphyincludinS increase inintensity of land us€ (withrespect to local land useplan)

The lease area consists of almost mild hilly andundulated. The total minin8 leas€ area is 4.0515 hawhich is Govt land.At the end of life of mine, total ercavated area willbe 0.66ha will be converted into water res€rvoir andAround 1.18ha area will be afforestcd during life ofmine. The waste generated during mining will beused for backfilling. The top soil will be stackedseparately and ultimabely used for plantationpurposes during next 6ve years & no top soil willremain at the end of life of mine-

1.2 Clearance of existing land,vegetation and buildings?

No It is an existing rhininS Iease and the area is devoidof vegetation except few thorny bushes and shrubs.No building exists in the mine area.

1.3 Creation of new land No The mining activity will be done in the allotted area.No other land will be disturbed.

1.4 Prc*.constructioninvestiSations e.g.houses, soil testing?

N() NotApplicable

1.5 Facilities su.h as office, r€:st shelter, store room, firstaid facitities will be made available at mine site.

1_6 Demolition works? No Not Applicable

1.7 No NotApplicable

1.8 Above ground buildings,structures or earthworkincluding linearstructures, cut and fill or

No

1.9 Underground wotkincluding mining orturmeling?

No No underground workings are proposed. There willbe only opencast r,rorkings.

1.10 Reclamation works? pit will be used as water reservoir at endExcavated

1.11 No Notapplicable

rcs? No Not Applicable

6tiA7l.A9aD

f€rxE3 /H%:r:?B'rr,

Construction works?

Te porary sites us€d forconstruction works orhousing of consbuction

Not applicable

Noof life oI mine.

^'l'#

Page 9: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

'1.13 Produ€tion andmanufacturinE pro(ess€s?

Proposcd production of Epidote, Semi-PreciousQuartz & Cats Eyc @ 1.10IPA.

1.14 Facilities for storage ofgoods or materials?

Mineral exhacted wil be loaded directly into kucks& Dumpers manually. Temporary storage ofmaterial within mine lease will be done. No otherland will be disturbed due to storaSe of material or

1.15 Facilities for treatment ordisposal of solid waste orliquid effluents?

Approximately 84240 tonnes waste will begeneraH during at tIrc end of five yeaE, which willbe backfiled at the end o( lile of mine & stabilizedby plantation.

1.I6 Facilitics forhousing of

long termoperational

No Not Applicable, temporary site serices will beprovided for mine workerc.

1.'17 N€w road, rail or sea

haJfic during conshuctionNo NotApplicable

'1.18 New road, rail, airwaterbome or othertnnsport infrastructurcincluding new or alteredroutes and stations, ports,airports etc?

No Not Applicable

r.19 Closure or diversion oferjsting transport routesor inlrastructure leadintto changes in trafficmovements?

No Not Applicable

1.20 New ortransmissionpipelines?

divertedlines or

No Not Applicable

No Not Applicable't.21 lmpoundment, damming,culvertin& realignment orother chang€s to thehydrology ofwatercou$es or aquifers?

No Not Appli.ableSheam crossings?

No There is no wi0rdrawal of water proposed frommine lease arca. Total water requirement will be

8.0KLD which will te sourced from well & tubewels from nearby vilages

'\ 23 Abstraction or transfers ofwater form ground or

'Ihere are no wate, bodies and nahrml drainaSepassing through the lease area. Mining will be

carried on Govt. land. No chanSes in su ace waterbodics or natural d in the area will be done

1.24 Changes in watei Hiesor the land surfaceaffecting drainage or run-ofi

No construction ac6vity is envisa8ed. Epidote, Semi-

Precious Quartz & Cats Eye will be hansPorted inTrucks by road to consumels. Workers will come

7.25 Transport of personnel ormaterials Ior consEuction,operation otdecommissioning?

At the end of life of mirdng oPeration of the lease

ara would be used as water reservoir. Theproposed plantation scheme would notthe restoration of the land use but also

ecosystem of the area. The

only help inthl:

and enclosed

't.26 Long-term dismanding ordecommissioningrestoration works?

GHAEAB^'f-ifit"i?;?a

No

Page 10: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

Mining lnnd Use)

1_27 Ongoing activity duringde-commissioning whichcould have an impact on

Plantation wiI be caried out at earmarked site atmine. Preference will be given to loc.l plant speciesof plants in concern witi local for€st officials.Afforestation activities in the area to mitigateambient air, noise pollution and create aestheticbeauty of the area. For this, phase wis€ plantationwill be carried out at mine site and outside the leas€area such as schools, panchayat land and govt. wasteland as per availability etc.

1_24 Influx of people to an areain either temporarily orpermanently?

No Local peoples will be deployed to carry out mineralexcavation so no influ;r of people will be seen.

1.29 Introductionsp€cies?

of alien No Not Any

1.30 l.oss of native species orgenetic diversity?

No Not Any

1.31 Anv oth.r a.hons? No Not Applcable

2.

3.

Use of Natural resources for constmction or operation of the Proiect(such as land water, materials or energy, especially any resourceswhich are non-renewable or in short supply):

Use, storage, transport, handling or production of aubstances ormaterials, which could be harrnttul to human health or theenvironment or raise concerns about actual or perceived risks tohuman health-

S.No.Inf ormationy'Che.klist

No

Details thereof (with approximatequantities /rates, wherever possible) with

source of information data2.1 l-and especially undeveloped

or ag cultural land (ha)No Total leased out area is 4.0515 Ha. com6

under Govt. Land.2.2 Water (expected sourcc &

competing users) unit KLDWater requirement will be 8-0KLD. Waterwould be sourced from the well & tube welsfrom the nearby areas.

2.3 Mincrals (MT) Proposed production of Epidote, Semi-Precious

Quanz& Cars Eye @ l.l0 TPA.2.1 Construction mate al - stone,

agSregates, sand / soil(expecd source - MT)

No Not Appli.able

2.s Forests and timber (source -trrr)

No Not Applicable

2.6 Energy including electricityand fuels (source, competingusers) Unih tuel (MI), energy(,rlv)

Presendy there is no elechic power at mineDiesel will be used on an average 300 LPD.Soulce: Nearcst Pump/Depot

2.7 Any other natural resourcG(Use approp ate standarduni!l)

NotApplicable

No

Details thereof (with apprcximatequantitiev rates, wherever possible) with

source of information dafa

GrAZliS^D

5 /U .froourt'ru*

No

Page 11: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

3.1 Use of substanc€s or matorials,which are hazardous (as p€rMSIHC rul6) to human healthor the environment (flora,fauna, and water supplies)

No Not Applicable

Change in occurrence ofdisease or affect disease vectors(e.9. ins€ct or water bomediseases)

No Not Applicable

3.3 Affect the welJare of pcople e.g.by changinS living conditions?

Epidote, Semi-Precious Quartz & Catsmining will provid€ employmentopportuniti€s in nearby areas. l,ocal peoplewill be benefitd by this proiect. The proielctwill improve their socio €conomic conditionsby way of eamin8 due to mining and theirallied activities.

3.4 Vulnerable groups of p€oplewho could bc affe.t€d by thcproje.t e.g. hospital patients,children, the elderly etc.,

No Not Applicable

3.s No Not Applicable

S.No.Inf ormatiory'Che.klist

confirmation No

Details lher€of (with approrimatequantitie{ rates, wherever possible) with

source ol information data4.1 Soil, overbuden or mine wastes Approximately &1240 tonnes of waste will be

genented during at the end of five yearc,which will be backfilled at the end of life ofmine & stabilized by plantation.

4.2 Municipal waste (domestic andor commercial wastes)

No Not Applicable

4.3 Hazardous wastes (as perHazardous Waste ManagementRules)

No Not Applicable

4.4 Other indushial process waste6 No Not Applicabl€

4.5 Surplus product No No surplus product will b€ generated

4.6 Sewage sludge or other sludgefrom effluent heatment

No Not Applicable

4.7 ConstrucEon or demolition No Not Applicable

4.8 Redundantequipment

machinery No There is no redundant machinery

4.9 Contaminad soils or othermaterials

No Not applicable

4.10 Agricultural wastes No

4.11 Othcr solid wastes No Not Applicable

4.

5. Relcase of pollutants or any hazardous, toxic ot noxiousto air (Kglhr)

#x:n:a

Production of solid wastes during construction ot operation ordecommissioning (MT/month)

Not Applicable

Page 12: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

Informationy' Checklist.onfirmation No

Details thereof (with apprcximatequantitiev rates, wherever possible) with

sour.e of information data5.1 Emissions from combustion of

fossil tuels ftom stationary ormobile sources

Emission of gas€s and dust tales place dueto movement of vehicles and miningmachineries.

5.2 Emissions from production Particulate Mafter will be generated duringmining and will be kept below theprescriH limits.Proper mitigation measures will be adoptedIike prcp€r haul road maintenance andperiodic watd spraying on roads for dustsuppr€6sion and regular maintenance ofmachineries to .onbol these emissionswithin prescriH limits.

5.3 Emissionr fromhandling includingtransport

materialsstorage or

Fugitive emission will be due to materialhandling and rnoving of mining machineiesand equipments. Regular Water sprinklingarrangement will be done to nritigating theproblem of fugitive emission.

5.4 Emissions from conskuctionactivities including plant andequipment

No Not Applicable

5.5 Dust or odor from handling ofmaterials including constructionmaterials, s€wage and waste.

Not Applicable

5.6 Emissions from incineration of No Not Applicable

5.7 Emissions ftom burning ofwaste in open air (e.9. slashmaterials, conshuction debris)

No Not Applicable

5.8 Emissions from any other Not Any

5. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No. InformatioVchecklistconfirmation No

D€tails thereof (with approimateq uantities/ rates, wherever possible) with

source of information data6_1 From op€mtion of equipment e.g.

engines, ventilation plant,crusheIs

Noise will be generated due to movement ofmining machineries & transport vehicles.

6.2 From industrial or similar No Not Applicable

6.3 From construction or demolition Not Applicable6_4 From blasting or piling No Not Applicablc6.5 From construction or operatior.ral

trafficis no construction propos€d at mine.

of mineral will be carried out.ThereOnl

6.6 From lighting or cooling systern; No Proposed mining is open cast thus emisEionof liSht and heat will be negtigible. A[ themining operation will be done in day onty.

is ired.No6.7 No None

7 /14krursaramM.L, No. 1/97 (R)

S.No.

No

No

l1g1qr other sources

Page 13: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

7. Risks of contamination of land o! water ftom releases of pollutants intothe ground or into sewers, surface waters, groundwater, coastal waters orthe sea:

8. Risk of accidents during construction or operation of the Proiect,which could affect human health or the environment

S.No.InformatioVChecklist

confimation No

Details thereof (with approximatequantitiey rates, wherever possible) with

source of information data7.1 From handlin& storage, use or

spilage of hazardous materialsNo Not Applicable

7.2 From discharge of sewage oro0rer effluents to water or theland (expected mode and placeof discharge)

No Not Applicablc

By deposition of polutantsemitted to ail into the land or

Adequate measures such as water sp n-klingwil be providcd on haul roads forsuppression of dust which wil be generateddue to vehicular movement.

7.4 From anv other sour.es No Not Any

7.5 Is there a risk of lonS termbuild up of pollutants in theenvironment from thes€

No No dump proposal at mine site.

S.No.InformatioV Checklist

.onftumation No

Details thereof (with approxrmatequantiti€{ rates, wherever possible) with

source of information data8.1 Fron explosions, spillages,

fnes etc from storaSe,haildling, u5€ or production ofhazardous substances

Conholled blasting will be done byauthorized licensed contractor. No storageof explosive propos€d at the mine site.

8.2 From any other caus€s No Not Any

Could Orc proiect be affectedby natural disasters causingenvironmental ctamage (e.g.

Floods, eartftquakes,landslides, cloudbuGt ek)?

No The area is not prone to flood andearthquake. No such in€ident is repord in

this area so far. From view point ofseisDricity, proposed project comes in Zone-I](least active) of Seismic Zoning Map of India

Factors which should be considered (such as consequentialdevelopment) which could lead to environmental effe.ts or thepotential for cumulative impacts with other existing or Plannedactivities in the locality

*

No

DetailE thereof (with aPProximatequantitie{rates, wherever Possible) with

sou.e of information dataS.No.

Informatiorry' Checklistconfirmation

n"uds a"a tIansport facility will be

improved due to ftequent available of minevehicles. Irss€e will organize replarmedical ch€€kup camps and recreationalactivities. Employment to tocal People willbe given. Overall living standard socio-

9_l t€ad to development ofsupportin& Iacilities, ancillarydevelopment or developm€ntstimulad by the Proretctwhich could have impact onthe envLonment e.g.:! Supporting inftasbucture

GItAzlA&qDq [?dY1:19r

q

7.3

Page 14: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

(roads, por,,er supply,waste or waste watettreattnenl etc.)

> Housing development> Extractiveindustries> Supply industries) Other

impaci due to propos€d proiect of masoruystone mining in the area.

9.2 Lead to after-use of the site,which could have an impact onthe environment

It is an existing mining proiect on Govt. land.No other land wiU be disturbed due tomining activities or any other way. Themining activities will have positive impact onenvLonment by way of afforestation.Ercavaled pil will be used as water reservoirwhich will recharge the ground water tableand provide water for livestock population inthe area.

9.3 Set a precedent for laterdevelopmenb

Mining of mineral Epidote, Semi-Prccious

Quartz & Cats Eye @ r.'ImPA. Proposedplantation will help to increases aestheticbeauty of tlle area.

9.4 Have cufiulative effects due toproximity to other existing orplarmed prorects with similareffects.

There are few mining projects in its (los€proximity. Prop€r mitiSation measures willbe talen for the mine workers. Mining isproposed on GovL land. However, habitationis far away from mine site.

(III) Environmental Sensitivity:

S.No. Identity

Aerial distance (within l5km.) Proposed proiect

location boundaryt Areas prol€cd under intemational

conventions, national or locallegislation for thefu ecologlcal,landscape, culhrral or other reladvalue.

No Nonc

2_ Areas which are important orsensitive for e<ological reasons -Wedands, watercours€s or otherwater bodies, coasfal zone,biospheres, mountains, forests

Madhat ini Nadi

FManoharpurBishagarh PF

>Kairli PF>Devipura

Chatarpura PF>Bidara PF>Kumbha Bas

RT

(2.10km in north),(a.50km in Nw),

(a.30km in north),(7.80km in NE)

(1.oknt in sw),Areas used by protecd, importantor sensitive species of flora orfauna for breeding, nesting,foragin& restin& over winterin&migmtion

None1. lnland, coastal,undersround waters

No

None5. State, National boundaries No

used by the No None

"t9}a. '. .-i.a

i:f.

9 /U t**iar[,

Locad 0.15km in northdirection of mine site.

3.

Page 15: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

othcr tourist, pilgrin areas

7 Dofcnce irl5tall.tions No None

ll. Denscly populated or built-up area VilageManoharpura

"2.50km in SE direction ofmine site.

Areas occupied by sensitive man-made land uses (hospitals, schools,places of worship, communityfac ities)

All the facilities such ashospitals, s€hools, place ofworhip & communityIacilitics etc. available atTehsil-Shahpura which isabout 8.30km in NE dtuectionof mine site.

I0. Areas containing important, highquality or scar.e resour.es (groundwater resources, su ace resources,forestry, agriculture, fisheries,tou sm, minerals)

No None

l1 Areas aheady subiected to pollutionor environmental damage. (thos€where existing le8al environmentalstandards areexceeded)

No None

12_ Areas susceptble to natural hazardwhich could cause the proiect toPresent environmental problems(earthquakes, subsidencqIandslides, erosion, flooding orextreme or adverse climaticconditions)

The area is not prone to floodand earthquake. No suchincident is repo ed in thisaiea so far. From vie(, pointof seismicity, proposedproi.'ct comes in ZonGII (leastactive) of Seismic Zonin8Map of lildia.

(T9 PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

This is a proposed mining project (M.L.No. 1/97) of mineral Epidote,

Semi-Precious Quartz & Cats of Sh. Abdul Salam located n/v -Manoharpura Bishangarh, Tehsil- Shahpura, Dishict-Jaipur, Rarasthan

for an Area - 4.0515 Ha. Proposed production of Epidote, Semi-

Precious Quartz & Cats Eye @ 1.10 TPA. Environmental monitoring

will be conducted once in six month for various environmental

parameters such as air, water, noise, soil within 10km radius study alea

after getting EC. Project is seeking Environmental Clearance as per

MOEF Office Memorandum J-13072/ 72/ 2013-lA-ll(l) Dated 24.1,2.2013

under '82' category of projects. Post EC compliance will be regularly

carried and report will submit to concemed authorities i.e.

SrcB/MOEF. All the mitigation measures of

proper taken care at mine site and surroundings.

6Ma&.o,-2 Abdul Salam)F.r. 'ro.1/s7 (1b

be

No

Page 16: FORM-IM PRE-FEASIBILITY REPORT - …environmentclearance.nic.in/writereaddata/FormB/EC/FORM_1/2005201… · FORM-IM & PRE-FEASIBILITY REPORT FOR PROPOSED PROJECT OF EPIDOTE, SEMI-PRECIOUS

"1 hereby give undertaking that the data and information given in the

application and enclosures are tlue to the best of my knowledge and

belief and I am aware that if any part of the data artd infoimation

submitted is found to be false or misleading at any stage, the proiect

will be rejected and clearance give, if any to the proiect will be revoked

at our risk and cost.

Date a6htllSmace: Pc.$..rt

Signature of the Applicant

/4 s:4-'Abdul salam

(Authorized Signatory)

Abdul SalamM.L. No. 1/97 (R)

]...,